Project Search Results

Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Back to Search Page
Project Name Description State Year Activity Activity Type City County Federal Funds ARRA Funds Local Funds Total
AMATS: ASD BIKE SHARING EDUCATION TRAILER PROGRAM Project will purchase four bicycle fleets and two transportation trailers for a bicycle sharing education program used by the Anchorage School Distrct Physical Education Department ot instruct studies in grades 5-12 on bicycle safety, rider skills, and encourage the use of bicycles as transportation. Alaska 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Anchorage Anchorage, Municipality of $136,048 $0 $34,012 $170,060
Transfer through BIA to Craig Tribal Assoc Craig Community Sidewalk Prgn Ph1. FHWA contact is Danny Capri, 360-619-7960; danny.capri@dot.gov, Tribal is Anna Guthrie 907-826-3998 tribal.admin@craigtribe.org Alaska 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Craig 0 $464,144 $0 $116,036 $580,180
Transfer USFS Tongass Nat Forest AK Region for the W. Glacier Trail Enhan;project awarded via competitive TAP. Contacts: borr@fs.fed.us /907-789-6244 & marcheta.moulton@alaska.gov 80%match 73426.50 Alaska 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Juneau 0 $293,706 $0 $73,427 $367,133
FISH CREEK TRAIL EXTENSION - ANCHORAGE Alaska 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Statewide Various Boroughs $800,000 $0 $208,000 $1,008,000
10TH AVE BIKE BOULEVARD PHASE II - ANCHORAGE Alaska 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Statewide Various Boroughs $512,800 $0 $347,263 $860,063
Transfer to WFL for PJ AK FS CNF 164(1) INHT Portage Curve Multi-modal Connector. Match by the National Forest Service. A LOAt trans. responsibility for the funds is available. Susan Law WFL 360-619-7840 Alaska 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Anchorage 0 $101,000 $0 $25,250 $126,250
Third Ave Sidewalk Alaska 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Kotzebue Northwest Arctic $760,000 $0 $100,000 $860,000
Transfer to WFL for Cross Trail PJ is AK SITKA 2013(1). Match from C&B of Sitka.Contact is Peter Field; peter.field@dot.gov or 360-619-7619. Alaska 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Sitka 0 $824,188 $0 $206,047 $1,030,235
AMATS: BICYCLE PLAN IMPLEMENTATION (MOA OWNED) - PARENT Alaska 2013 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Anchorage Anchorage, Municipality of $82,702 $0 $8,209 $90,911
CITY OF FAIRBANKS BICYCLE AND PEDESTRIAN COUNT EQUIPMENT Alaska 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Various Fairbanks North Star Borough $54,425 $0 $5,402 $59,827
Cross Trail Extend Cross Trail - High School to Baranof, Charles, Yaw & Pherson Streets in Sitka, AK. WFL PJ is AK SITKA 2013(1). Match will be provided by the City & Borough of Sitka. Alaska 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Sitka Sitka $824,188 $0 $81,812 $906,000
Transfer to WFL for AK SITKA 2017(1) Sitka Sea Walk Phase 2. Please note, the AK176 56C0 funds 100% federal no match. TAP funds match will be provided by Sitka & NPS. Susan Law 360-619-7840 Alaska 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Anchorage 0 $1,360,000 $0 $340,000 $1,700,000
AMATS: MOUNTAIN VIEW DRIVE PATHWAY RECONSTRUCTION Alaska 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Statewide Various Boroughs $117,975 $0 $29,494 $147,469
ADA Compliance Alaska 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Palmer Matanuska-Susitna $300,000 $0 $15,000 $315,000
CITY OF FAIRBANKS SIDEWALK CONDITION SURVEY Alaska 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Various Fairbanks North Star Borough $47,741 $0 $4,739 $52,480
AMATS: FISH CREEK TRAIL REHAB: TURNAGAIN BLVD TO KONA LN Project will analyze existing pathways for rehabilitation needs community-wide and promote specific projects to rehabilitate those existing pathways. The scope is primarily expected to include pavement replacement with a focus on trails that form the Anchorage Bicycle Plan Core Bicycle Network. Alaska 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Anchorage Anchorage, Municipality of $692,308 $0 $173,077 $865,385
New Street light Alaska 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Russian Mission 0 $75,000 $0 $3,800 $78,800
Transfer to WFL for AK FS CNF 164(1) INHT Portage Curve Multi-modal Connector. Project is adjacent to Seward Hwy between Mile Post 75-82, Rural interstate. Match is WFL responsibility; Susan Law 360-619-7846 Alaska 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Anchorage 0 $1,000,000 $0 $250,000 $1,250,000
SOUNDVIEW PEDESTRIAN ACCESS - HOMER Alaska 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Statewide Various Boroughs $518,825 $0 $207,530 $726,355
AMATS: MULTI-MODAL VOLUME COUNTERS Expansion of the Municipality of Anchorages ability to collect and report multi-modal volumes on roadways, paths, and trails within the Municipality of Anchorage.  This project would include additional devices and reporting capabilities (including possible polling of some field devices) with the goal of assessing areas in regards to: travel demand, route identification, traffic patterns, and seasonal use to include vehicles, bicyclists, pedestrians, and other non-motorized forms of transportation. Valuable information would be directed to support on-road and off-road planning and design activities as related to applicable: safety concerns, fulfillment of existing plan objectives and goals, facility designs, and area connectivity concerns and/or improvements.  This project does not include installation. Alaska 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Anchorage Anchorage, Municipality of $389,000 $0 $97,250 $486,250
AMATS: BICYCLE STORAGE PURCHASE Project will study and inventory existing conditions; begin a process of education and citizen engagement; institute new municipal policies and means of enforcement; provide improvements to transit facilities; fund a Safe Routes to School program coordinator; update the Anchorage Bike Plan, Anchorage Pedestrian Plan, and Anchorage Trails Plans; and start a smart lighting project. Alaska 2017 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Anchorage Anchorage, Municipality of $40,000 $0 $10,000 $50,000
AMATS: VISION ZERO PROGRAM Project will study and inventory existing conditions; begin a process of education and citizen engagement; institute new municipal policies and means of enforcement; provide improvements to transit facilities; fund a Safe Routes to School program coordinator; update the Anchorage Bike Plan, Anchorage Pedestrian Plan, and Anchorage Trails Plans; and start a smart lighting project. Alaska 2017 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Anchorage Anchorage, Municipality of $288,000 $0 $72,000 $360,000
FIXING MT. BALDY Widen and realign the multi-use paths along Egan Expressway, including the crossing of Duck Creek, and correct other deficiencies including badly deteriorated pavement. Upgrades include the replacement of two narrow bridges. Alaska 2014 201 (TAP) 201. Trails Juneau Juneau, City and Borough of $9,452 $0 $2,363 $11,815
HOWI TRAIL DAYS ACROSS THE BAY This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2015 201 (TAP) 201. Trails Statewide Various Boroughs $40,638 $0 $10,159 $50,797
TSALTESHI TRAILS EQUIPMENT This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2014 201 (TAP) 201. Trails Statewide Various Boroughs $50,000 $0 $12,500 $62,500
LOOKOUT MOUNTAIN MAINTENANCE BLDG - PH II This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2015 201 (TAP) 201. Trails Statewide Various Boroughs $30,000 $0 $7,500 $37,500
PALMER BIKE PARKE: PHASE 1 This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2014 201 (TAP) 201. Trails Statewide Various Boroughs $50,000 $0 $12,500 $62,500
TANANA LAKES TRAIL PHASE III This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2014 201 (TAP) 201. Trails Statewide Various Boroughs $50,000 $0 $12,500 $62,500
WATERHOLE & STRAIGHT IN TRAILS This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2014 201 (TAP) 201. Trails Statewide Various Boroughs $8,374 $0 $2,093 $10,467
METHODIST CAMP TRAIL This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2014 201 (TAP) 201. Trails Statewide Various Boroughs $9,895 $0 $982 $10,877
2016 RTP ADMIN ALLOWANCE This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2016 201 (TASA) 201. Trails Statewide Various Boroughs $93,978 $0 $30,209 $124,187
HATCHER PASS MULTI-USE TRAIL REPAIRS This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2017 201 (TASA) 201. Trails Statewide Various Boroughs $47,486 $0 -$24,298 $23,188
GRANITE CREEK TRAIL IMPROVEMENTS This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2016 201 (TASA) 201. Trails Statewide Various Boroughs $55,061 $0 $5,464 $60,525
NORTHERN REGION TRAIL TRAINING AND ASSESSMENT This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2016 201 (TASA) 201. Trails Statewide Various Boroughs $13,307 $0 $1,321 $14,628
BARTLETT GLACIER TRAIL CONSTRUCTION This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2017 201 (TASA) 201. Trails Statewide Various Boroughs $49,945 $0 $5,549 $55,494
CURRY RIDGE TRAIL PHASE III This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2017 201 (TASA) 201. Trails Statewide Various Boroughs $77,505 $0 $9,473 $86,978
WILLOW PARK TRAIL This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2017 201 (TASA) 201. Trails Statewide Various Boroughs $26,347 $0 $2,927 $29,275
SADDLE TRAIL REROUTE, PHASE II This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2016 201 (TASA) 201. Trails Statewide Various Boroughs $46,458 $0 $4,612 $51,070
Transfer to return required 1% of funds set aside for the Rec Trails Program (RTP) to FHWA HQ for RTP program administration. Required per 23USC213(f)(2), FAST Act PL114-94. AK has chosen to transfer full 1% of APPN. Contact is Christopher Douwes. Alaska 2017 201 (TASA) 201. Trails Statewide 0 $15,279 $0 $0 $15,279
CAINES HEAD SRA: TONSINA SECTION This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2016 201 (TASA) 201. Trails Statewide Various Boroughs $43,441 $0 $4,312 $47,753
SHOUP TRAIL REOPENING This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2017 201 (TASA) 201. Trails Statewide Various Boroughs $39,573 $0 $4,400 $43,973
RILKE SCHULE TRAIL CONNECTION TO MEADOW PARK This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2016 201 (TASA) 201. Trails Statewide Various Boroughs $33,782 $0 $8,445 $42,227
2017 DNR TRAIL GUIDE VIDEOS (CAINES HEAD REED LAKE) This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. Alaska 2017 201 (TASA) 201. Trails Statewide Various Boroughs $60,876 $0 $6,206 $67,082
EGAN DRIVE MULTI-USE PATH REPAIR/BRIDGE NO.6011 REPLACEMENT Crack sealing, surface treatment drainage, signage, guardrail, illumination and other refurbishments to prolong the life of road pavement and bridges and their safety related structures. Project includes NHS Lane Delineators, Destination & Distance Signing, Pavement Markings and Signalization, Abandoned Vehicle Program, Road Surfacing and Transfer and Road Surface Treatments. Alaska 2014 1 (TE) 1. Pedestrian and bicycle facilities Southcoast Region Various Boroughs $122,810 $0 $12,191 $135,000
KENAI SPUR RD MP 0.0 TO MP 2.8 Establish project to reconstruct Kenai Spur Rd to current standards for a 4-lane urban roadway from the Sterling Hwy intersection through Soldotna, MP 0.0 to 1.9; and a rural 4-lane divided highway from MP 1.9 to 2.8. Design through location approval was Alaska 1997 1 (TE) 1. Pedestrian and bicycle facilities Kenai Kenai Peninsula $396,642 $0 $39,371 $436,013
JUNEAU MENDENHALL RIVER PEDESTRIAN CROSSING Locate, design, and construct an eight foot wide suspension or clear span bridge over the Mendenhall River to provide a Dimond Park access point to the Mendenhall River Trail and Green Belt located across the river. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau $2,228,056 $0 $112,165 $2,340,221
MAT-SU TE: BIG LAKE PED/BIKE PATH Reduce scope to construct only the section of pathway along the Parks Highway from approximately MP 47 to the Big Lake Road intersection. Project includes pedestrian undercrossing of the Alaska Railroad and a traffic signal at the Parks Highway/Pittman R Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities Mat-Su Anchorage $2,052,251 $0 $306,865 $2,359,116
STEESE HWY TRAILHEADS & CAMPGROUNDS Construct McKayh Creek, Cripple Creek, Birch Creek Put-in, Birch Creek Take-out, Eagle & Twelve-Mile Summits. Construction of a turnout and recreation off-ramp at McKay Creek Trailhead; trails, access roads, and restroom facilites at Cripple Creek Campgr Alaska 1993 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $384,928 $0 $38,213 $423,141
SEWARD HWY: SIX MILE TRAIL Construct a pedestrian/bike pathway from Six Mile Creek to Johnson Trailhead parking area near Granite Creek. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Seward Kenai Peninsula $374,906 $0 $31,492 $406,398
AMATS: PEDESTRIAN SAFETY ENHANCEMENTS Design the following remaining two pedestrian safety enhancements. 1. A paved walkway on the east side of the Old Glenn Highway from Birchwood Road to Ski Road in Peters Creek. 2. A paved walkway from the Muldoon Road - East 10th Avenue intersection to Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $367,865 $0 $91,966 $459,831
MCCARTHY FOOTBRIDGE-TE Design and construct a footbridge across the Kennicott River at approximately MP 93 of the Edgerton Highway to connect the highway with the community of McCarthy and the Kennicott Mine area. Construction of two new vault toilets, one on each side of the Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Kennicott Valdez-Cordova $2,030,494 $0 $262,085 $2,292,579
CHENA HOT SPRINGS ROAD YUKON QUEST TRAIL PARKING AREAS Construct trailhead parking areas on Chena Hot Springs Road between Nordale Road (MP 7) and Chena Hot Springs Resort (MP 56), and on Nordale Road at the trail crossing. Project will provide access to the Yukon Quest Winter Trail. This project will inclu Alaska 2000 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $653,926 $0 $65,611 $719,537
AMATS: SHIP CREEK TRAIL, PHASE IV Construct a new paved pedestrian and bicycle trail segment at Ship Creek, beginning at the end of the pathway constructed under the Ship Creek Trail Phase III near Post Road continuing to Viking Drive where the Ship Creek Phase II project left off. The p Alaska 2006 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $2,604,697 $0 $258,551 $2,863,248
SEWARD HWY REC IMP, BIRD CREEK CAMPGROUND (SEC 117) AK067 This project will relocate and improve RV facilities in Alaska State Parks along the Seward Highway in conjuction with Seward Highway improvement projects. Highway upgrade projects are phased over several years and will impact existing Alaska State Park facilities. The highway upgrades include construction of rock quarries, separated pathways, and passing lanes in Chugach State Park, resulting in the relocation of various Park facilities. Alaska 2006 1 (TE) 1. Pedestrian and bicycle facilities Central Region Anchorage, Municipality of $543,534 $0 $38,408 $581,942
KENAI RIVER BRIDGE ACCESS ROAD PATHWAY Construct a pedestrian/bike path parallel to the Kenai River Bridge Access Road between Kalifornsky Beach Road and the Kenai Spur Rd, approximately 3.3 miles. Alaska 2000 1 (TE) 1. Pedestrian and bicycle facilities Kenai Kenai Peninsula $367,203 $0 $36,449 $403,652
FFY98/99 ANNUAL WORK PROGRAM Construction of the Starrigavan pedestrian walkway at Sitka Ferry Terminal. Alaska 1998 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $686,184 $0 $83,122 $769,306
USFS: PORTAGE VALLEY TRAIL SYSTEM CONST, PHASE II Install two segments of pedestrian trial on new alignments. Includes clearing, grading, drainage, geotextile, trail surfacing, stone retaining walls, pedestrian bridges at creek crossings, boardwalks, and interpretive and regulatory signs. Design was ac Alaska 2008 1 (TE) 1. Pedestrian and bicycle facilities 0 Aleutians East $702,063 $0 $240,814 $942,878
AMATS: MULDOON RD PEDESTRIAN & LANDSCAPING, PHASE III Provide enhanced pedestrian amenities along Muldoon Road as well as landscaping. The project also includes extending the sidewalk on the east side of Muldoon from 16th to 20th Avenues. Alaska 2011 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage, Municipality of $1,004,784 $0 $99,765 $1,104,548
BROWN ELEMENTARY BICYCLE/PED-TE CONSTRUCT A SEPARATED BIKE/PED FACILITY ALONG LAKLOEY DR FROM MP 2.3 BADGER TO TICASUK BROWN ELEM. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $322,664 $0 $56,434 $379,098
AMATS: PED SAFETY ENHANCE @ PETERS CREEK Construct a paved walkway on the east side of the Old Glenn Highway from Birchwood Road to Ski Road in Peters Creek. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $707,060 $0 $70,188 $777,248
INVENTORY OF OUTDOOR ADVERTISING PROVIDE A PEDESTRIAN/BIKE PATH ALONG S. TONGASS HWY BETWEEN THE COAST GUARD STATION AND TOTEM ROW IN SAXMAN. Alaska 1992 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $318,464 $0 $193,670 $512,134
JNU GLACIER HWY MULTI-USE SEPARATED PATH TO UAS Construct new, multi-use pathway from the west side of the entrance to Swampy Acres to UAS along the north side of Glacier Highway. The multi-use path will terminate at the UAS pedestrian bridge near Auke Lake and this project will also include paving of the Auke Lake parking lot. The replacement of the bridge and section of separated, multi-use pathway between Riverside Drive and Swampy Acres will be completed as part of the Brotherhood Bridge and Separated Multi-Use Path to UAS, Stage I (Need ID 2141, AKSAS 67987) Project. Alaska 2010 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau, City and Borough of $1,219,453 $0 $121,047 $1,340,500
JUNEAU - RIVERSIDE DRIVE PED/BIKE ACCESS IMPROVEMENTS INSTALL A BIKE/PEDESTRIAN FACILITY BETWEEN MENDENHALL LOOP RD AND RIVERSIDE DR ON EGAN DRIVE. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau $309,314 $0 $77,330 $386,644
PALMER PED/BIKE PATH COPE INDURSTRIAL WA Develop pedestrian/bicycle pathway along Cope Industrial Way. The pathway will begin by connecting into the existing sidewalk on South Chugach Way and proceed along to Springer Inner Loop Road. This project is split off from parent project 51206 Palmer- Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities Mat-Su Anchorage $302,821 $0 $42,049 $344,870
PARKS CHENA RIDGE INTERCHANGE Construction of a new interchange, including upgrading portions of Chena Pump and Chena Ridge Roads and the construction of two bridges. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $298,289 $0 $21,078 $319,367
BETHEL: CHIEF EDDIE HOFFMAN HWY REHAB & SEPARATED PATHWAY Scope Revision: Construct a 4.2 mile, separated pathway along the north side of Eddie Hoffman Highway from the airport to Watson's Corner, then north along Ridgecrest Drive to the High School. Rehabilitate the Chief Eddie Hoffman Highway from Mile 0.0 to Alaska 2000 1 (TE) 1. Pedestrian and bicycle facilities Bethel Bethel $727,760 $0 $72,240 $800,000
NORTH POLE BICYCLE/PEDESTRIAN PATH Construct a separated bicycle/pedestrian path along Hurst Road from the existing Badger Road Bike Path east toward Nelson Road in the North Pole area. Alaska 1997 1 (TE) 1. Pedestrian and bicycle facilities North Pole Fairbanks North Star $743,139 $0 $74,265 $817,404
TUDOR ROAD PEDESTRIAN FACILITIES Construct pedestrian facility improvements along Tudor Road from Bering Street to Campbell Airstrip. Project design completed under ADA TE: Highway Pedestrian Facility Improvements, 51237 , TE-OOOS(155). Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $537,133 $0 $139,635 $676,768
JNU BACKLOOP SHARED USE PATH REHABILITATION Rehabilitate/reconstruct the shared use path along Back Loop Rd. from Mendenhall Loop Rd. to the Mendenhall River Elementary School entrance (approximately 1 mile) including repaving, widening to meet current design standards, addressing ADA deficiencies (such as cross slope), and drainage improvements. Alaska 2012 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau, City and Borough of $752,073 $0 $74,653 $826,726
AMATS: CAMPBELL CREEK CONNECTION Campbell Creek Trail Old Seward to Tudor/Bragaw PE, Trail Construction Alaska 1997 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $756,712 $0 $80,114 $836,826
HOMER SPIT PEDESTRIAN PATHWAY TE Construct a pedestrian/bike along the Sterling Highway on the Homer Spit from Kachemak Drive to Land's End, approximately 4.3 miles. Add turnouts for Mud Bay viewing and add handicap access facility at the Fishing Hole Lagoon on the south end of the proj Alaska 1997 1 (TE) 1. Pedestrian and bicycle facilities Homer Kenai Peninsula $2,667,418 $0 $264,775 $2,932,193
CHENA RIVER BICYCLE/PED PATH (CENTEN. BRG TO STEESE EXPWY) bicycle/pedestrian path along the Chena River from Peger Road east to the Steese Expressway. Paths along either the south side, north side or along both sides of the Chena River will be considered. Alaska 1993 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $3,004,600 $0 $499,334 $3,503,934
AMATS: TRAIL IMPROVEMENTS; CRAIG DRIVE & EAGLE RIVER This project consists of construction of pedestrian facilities at the following locations: Eagle River Road Walkway from pedestrian overpass to Gruening Middle School, Craig Drive Walkway from Nunaka Valley Elementary to Beaver Place, Meadow Creek Driv Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $558,129 $0 $139,532 $697,661
NORTH POLE BIKE TRAIL REHABILITATION AND CONNECTIONS Rehabilitate and connect bike trails within the City of North Pole. Alaska 2008 1 (TE) 1. Pedestrian and bicycle facilities North Pole Fairbanks North Star $264,875 $0 $26,292 $291,167
AUBURN ROAD BIKE PATH/LANE-TE CONSTRUCT A BIKE LANE/PATH FROM FARMERS LOOP TO PEARL CREEK ELEMENTARY SCHOOL. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $563,281 $0 $95,489 $658,770
CHENA RIVER BICYCLE/PED PATH-STEESE BRDG TO FT WAINWRIGHT Reconstruct 1.0 km of paved pathway and associated riverbank stabilization/revegetation adjacent to the Chena River, between the Steese Expressway Bridge and the entrance to Fort Wainwright Army Base. Alaska 2001 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $563,673 $0 $55,952 $619,625
VALDEZ AIRPORT ROAD BIKE/PEDESTRIAN TRAIL Construct a bicycle/pedestrian trail from the Richardson Hwy to the Valdez Airport terminal building. Alaska 2000 1 (TE) 1. Pedestrian and bicycle facilities Valdez Valdez-Cordova $564,118 $0 $55,995 $620,113
SITKA FERRY TERMINAL WALKWAY Construction of the Starrigavan pedestrian walkway at Sitka Ferry Terminal. Alaska 1998 1 (TE) 1. Pedestrian and bicycle facilities Sitka Sitka $575,370 $0 $57,112 $632,482
KTN-A/P PED. WALKWAY COVER REPLACE (T.E. DESIGN AND CONSTRUCTION OF A TRANSPORTATION ENHANCEMENT PROJECT TO REPLACE THE DILAPIDATED PEDESTRIAN WALKWAY COVER ASHORE AT THE GRAVINA ISLAND SHUTTLE FERRY TERMINAL. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Ketchikan Ketchikan Gateway $509,685 $0 $127,424 $637,109
AMATS: POTTER MARSH TRAIL HEAD ACCESS (PARENT) expand the parking area, add toilets, add caretaker/host site, add 300 feet of raised boardwalk, and add informational signs. Alaska 1998 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $127,358 $0 $12,642 $140,000
NAKNEK/KING SALMON: PATHWAY CONSTRUCTION In Naknek construct approximately 3.5 miles of bike/ped trails from downtown to Donna G. Subdivision. (Mile 4 on the AK Penin. Hwy) In King Salmon construct approximately 2.5 miles of trail from downtown to Flat Nose Henry Road. Alaska 2001 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $504,959 $0 $50,123 $555,083
JNU-LEMON ROAD SIDEWALK Also included will be PE and installation of traffic communication system (PE is funded under PJ 71741 due to different federal ratio). Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau $503,260 $0 $125,816 $629,076
JNU-GLACIER SPUR BIKE PATH Design and construction of a separate bike path along one side of the Mendenhall spur road from the intersection of Mendenhall Back Loop Road to the Mendenhall Glacier parking lot. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau $493,350 $0 $62,499 $555,849
AMATS: MIDTOWN SEGMENT (NORTH SOUTH TRAIL) Trail Enhancement along A Street corridor from proposed midtown park area near 38th Avenue to Fireweed Lane. Alaska 1998 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $278,401 $0 $27,633 $306,034
POW CRAIG TO HIGH SCHOOL PATH CONSTRUCTION Construction of a separated multi-purpose path that will provide safe access from the existing sidewalk and the City of Craig to the new high school on the uphill side of the roadway. Lighting is to be included for the new path. Alaska 2000 1 (TE) 1. Pedestrian and bicycle facilities Craig Prince Of Wales-Outer Ketchikan $483,982 $0 $48,042 $532,024
SEWARD HWY: MP 0-8, PHASE II The project will rehabilitate the existing roadway section to include minor alignment changes, safety and drainage improvements. Turn lanes will be added to the intersection at Herman Lierer Road (Exit Glacier Road). A separated trail is included from Va Alaska 2005 1 (TE) 1. Pedestrian and bicycle facilities Seward Kenai Peninsula $602,863 $0 $60,040 $662,903
SEWARD HWY: DOWLING - TUDOR RECONST The project will widen the New Seward Highway from 4 to 6 lanes from Tudor to Dowling, provide improvement to both frontage roads (Homer and Brayton Drives) to include multi-use trails, replace 5 bridges (New Seward over Dowling Road, and the 4 bridges ov Alaska 2008 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $1,617,379 $0 $114,290 $1,731,668
JUNEAU EAGLE BEACH TRAILHEAD & WAYSIDE Construction of a pathway between the day-use area to the Eagle River trailhead parking lot. Proposed improvements on the south side of the highway include construction of a parking lot, caretaker cabin, visitor contact station, equipment storage shed, i Alaska 1999 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau $464,239 $0 $46,983 $511,222
UNALASKA TE: AIRPORT BEACH RD PATHWAY Construct approximately 2.4 miles of pathway along Airport Beach Road between the intersections of Captains Bay Road and Ballyhoo Road. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Unalaska Aleutians East $1,130,239 $0 $132,402 $1,262,641
TOK BIKE PATH REHABILITATION Rehabilitate the existing bikepath in Tok. Alaska Highway mp 1314-1326 (junction with Tanacross Road) Alaska 2010 1 (TE) 1. Pedestrian and bicycle facilities Tok Southeast Fairbanks $2,591,281 $0 $183,070 $2,774,350
MAT-SU TE: PALMER WASILLA HWY BIKE PATHS Develop pedestrian/bicycle path along the Palmer-Wasilla Hwy from the City of Palmer to Hemmer St. Intention is to provide a seperated path. The work will be phased to avoid ROW problem areas without delaying areas that could be completed in an expeditou Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Mat-Su Anchorage $438,809 $0 $106,992 $545,802
AMATS: C ST, INTERNATIONAL TO TUDOR Widen "C" street from Tudor Road to International Airport Road to 6 lanes and extending widening to Potter Drive with 5 lanes and drop to two lanes just beyong Potter Drive. Adequate right-of-way exists for the widening. In addition an additional north Alaska 1998 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $430,660 $0 $45,746 $476,406
FMATS BIKE PATH REHABILITATION Establish a preventative maintenance program for the FMATS area. Alaska 2010 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star Borough $278,926 $0 $27,687 $306,613
KTN - Waterfront Promenade - Phase III Install a waterfront promenade along Stedman Street sidewalks at two locations before and after the Ketchikan Creek Bridge. This project begins at approximately mile point 2.2 and ends at approximately mile point 2.4, however, the bridge sidewalk from mil Alaska 2012 1 (TE) 1. Pedestrian and bicycle facilities Ketchikan Ketchikan Gateway $988,297 $0 $98,102 $1,086,399
KTN TONGASS AVENUE PEDESTRIAN IMPROVEMENTS PE for reconstruction of pedestrian and transit facilities to include meeting ADA requirements, providing transit stations and a pedestrian bridge across Carlanna Creek. Alaska 1997 1 (TE) 1. Pedestrian and bicycle facilities Ketchikan Ketchikan Gateway $621,151 $0 $67,006 $688,158
NOR REG BIKE PATH REHABILITATION Improve existing bike paths along streets and highways throughout the Northern Region to bring them up to current standards and maintainable condition. Bike paths requiring immediate attention include Chena Pump Road, Farmers Loop Road and the Parks Hig Alaska 2002 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $625,096 $0 $62,049 $687,145
Water Street Improvements The project will widen and modify existing sidewalks for approximately 2,040 feet, from Chapmen Street to the existing Viaduct Tunnel to improve pedestrian capacity and safety and achieve Americans with Disabilities Act (ADA) compliance. Project will incl Alaska 2010 1 (TE) 1. Pedestrian and bicycle facilities Ketchikan Ketchikan Gateway $0 $2,200,000 $90,649 $2,290,649
VALDEZ AREAWIDE BIKE & PED TRAIL PAVEMENT REFURBISHMENT Grind and resurface 7.6 miles of bike path on the Richardson Highway between Meals Avenue and River Road in Valdez. Alaska 2009 1 (TE) 1. Pedestrian and bicycle facilities Valdez Valdez-Cordova $954,770 $954,770 $0 $954,770
Wood River Road pathway Reconstruct 2.8 miles of road from the intersection of Kanakanak Road and Wood River Road to the end of the road at Wood River Landing. Realign the road horizontally and vertically to create improved sight distances and safer driving conditions. Construct Alaska 2010 1 (TE) 1. Pedestrian and bicycle facilities 0 Dillingham $877,318 $877,318 $0 $877,318
DENALI HWY MP 7 WAYSIDE Construct a wayside in the vicinity of MP 6 of the Denali Highway. Alaska 2009 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $441,283 $441,283 $0 $441,283
AIA TERM EXP LANDSIDE ACCESS IMP - PH II This project will complete the work started in Phase I. It will reconfigure the eastbound lanes of International Airport Rd. from the airport to South Aircraft Drive. It will signalize that intersection. It will also rehabilitate International Airport Rd. Alaska 2001 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $418,462 $0 $41,538 $460,000
PARKS HWY MP 72-83 REHAB: WILLOW CR TO KASHWITNA RIVER(ES) Rehabilitate pavement, widen roadway, build passing lanes and bridge improvements, and construct safety improvements as needed. Alaska 2009 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $171,474 $171,474 $0 $171,474
ANCHOR ROAD PEDESTRIAN BEACH ACCESS Construct pedestrian facilities along the Old Sterling Highway and Anchor Point Beach Road from the community of Anchor Point to the beaches at the Anchor River State Recreation Area. Construct trailhead parking area and connecting pathways to school, ba Alaska 2001 1 (TE) 1. Pedestrian and bicycle facilities Anchor Creek 0 $117,746 $0 $11,687 $129,433
HOMER BELUGA TRAIL CONSTRUCTION Construct Phase-I of a paved and handicapped-accessable pedestrian nature trail along Beluga Slough tidal shoreline. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Homer Kenai Peninsula $290,720 $0 $38,971 $329,691
JNU-AURORA HARBOR TO WHITTIER PED FACIL Design and construct six foot wide sidewalk along the Aurora boat harbor and a 10 foot wide pedestrian/bicycle facility between 10th St and Whittier St. Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau $745,603 $0 $188,678 $934,281
BERING STRAITS TRAIL STAKING Install permanent trail markings along trails in Bering Straits Region. These trails are identified in the Bering Straits Trail Staking Plan. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $281,835 $0 $28,476 $310,311
AMATS: TUDOR RD PED OVERCROSSING TIE-IN Provide multi-use trail connection from Phase-I (grade separated crossing at Tudor Road) northward to University trail system. Install concrete undercrossing tunnel beneath Ambassador Drive and regrade Ambassador Drive. Includes landscaping. Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $829,741 $0 $220,160 $1,049,901
CHENA LAKES REC AREA BIKE/PED FACIL-TE Grading, drainage and paving of 1.05 miles of bicycle/pedestrian path, including 0/75 miles rehabilitation of existing path and 0.3 mile of new path. Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $204,140 $0 $53,071 $257,211
JUNEAU MENDENHALL RIVER TRAIL (T.E.) PE and construction of a gravel surfaced multi-purpose trail along existing walking trail alignment. Construct eight foot wode bridge at Montana Creek. Construct gravel surfaced access road and ten space parking lot at River Road trailhead. Provide sig Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau $830,725 $0 $207,591 $1,038,316
SEWARD: PORT AVENUE REHAB & HARBOR PEDESTRIAN PATHWAY Rehabilitate Port Avenue (aka Dock Road) from the Seward Highway (MP 0.0) to the end of the paved road (MP 0.4). Project includes curb, gutter, pedestrian facilities and illumination. Alaska 2001 1 (TE) 1. Pedestrian and bicycle facilities Seward Kenai Peninsula $781,255 $0 $77,549 $858,804
NENANA GOLD SPIKE PARK-TE ENHANCEMENT PROJECT WILL MARK HISTORIC WALKING TRAIL, INSTALL INTERPRETATIVE EXHIBITS, IMPROVE ACCESS, INSTALL BENCHES & LANDSCAPING. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Nenana Yukon-Koyukuk $174,554 $0 $38,776 $213,330
PETERSBURG MITKOF HWY COASTAL PATH PE to construct a separated path on the uphill side of Mitkof Hwy and install lighting along the highway between the ferry terminal and MP 4. Alaska 2001 1 (TE) 1. Pedestrian and bicycle facilities Petersburg Wrangell-Petersburg $170,077 $0 $17,879 $187,956
KODIAK "Y" INTERSECTION IMPROVEMENTS Rehabilitation and intersection improvements on Rezanof Dr from Lower Mill Bay Rd/Center Ave to Marine Way. Includes reconstruction of traffic signal at Marine Way and Rezanof Dr intersection, and addition of a midblock pedestrian crossing between Marine Alaska 2009 1 (TE) 1. Pedestrian and bicycle facilities Kodiak Kodiak Island $922,537 $0 $91,574 $1,014,111
AMATS:Potter Marsh Trailhead & Access Improvements, PH I This project will consist of the construction of trailhead and access improvements at the existing Potter Marsh Trailhead. Work will include improvements to the parking area, pedestrian walkway, sidewalk, vaulted toilet, and related park amenities. Work Alaska 2006 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $941,457 $0 $238,153 $1,179,610
CE: WINTER TRAIL MARKINGS FY97 Mark overland winter trails with permanent trail markers between the villages of Scammon Bay, Hooper Bay, Chevak, Newtok, Nightmute and Tununak. Alaska 1997 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $168,901 $0 $15,766 $184,667
EDGERTON HWY KENNY LAKE MULTI-USE TRAIL Construct a multi-use trail along the Edgerton Highway from approximately MP 4.75 to the Community Hall and Fairgrounds at approximately MP 7.75. Alaska 1998 1 (TE) 1. Pedestrian and bicycle facilities Kenny Lake Valdez-Cordova $158,514 $0 $15,735 $174,249
SHISHMAREF TRAIL STAKING REVISE TERMINI to include the connection to the Park road intersection at MP 237.3 Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Shishmaref Nome $154,760 $0 $15,362 $170,122
WENDELL AVENUE NORTH ADA IMPROVEMENTS Construct new curb ramps and sidewalk on the north side of Wendell Street Alaska 2008 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $976,132 $0 $97,894 $1,074,026
DEEP CREEK BEACH ACCESS Construct a separated paved access pathway along Deep Creek Beach Road from the Sterling Highway down to the beach near the mouth of Deep Creek. Realign and widen the lower portion of Deep Creek Beach Road to facilitate staging for tractor / boat launchi Alaska 2001 1 (TE) 1. Pedestrian and bicycle facilities Kenai Kenai Peninsula $151,935 $0 $15,081 $167,016
USFS: PORTAGE VALLEY BLUE ICE TR SYS CONST, PHASE III AK090 Work to include development and installation of interpretive signs and maps for the entire Trail of Blue Ice Corridor from Portage Lake to Moose Flats Day Use Area. Alaska 2009 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $149,415 $0 $14,831 $164,246
AMATS: OLD GLENN HWY, FIRE LAKE TO S BIRCHWOOD LOOP Project will add widened shoulders, replace pavement throughout the project length, add channelization improvements at South Birchwood Loop Road, truck climbing lanes on one hill, and construct a paved multi-use pathway to connect to existing pathway at Alaska 2008 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $997,074 $0 $98,973 $1,096,047
AMATS: COASTAL TRAIL(SOUTHERN EXT-POTTER) This project will extend the Coastal Trail from its existing southern terminus at Kincaid Park to the Potter Weigh Station on the Seward Highway. This phase of the project includes preliminary engineering and environmental documentation. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $1,039,017 $0 $106,870 $1,145,887
SITKA FERRY TERMINAL STAGING PE, ROW, Utility Relocation, and construction of expansion of the existing staging area. PE for a pedestian walkway. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Sitka Sitka $144,002 $0 $25,147 $169,149
KTN CENTRAL BUSINESS DISTRICT SIDEWALKS PE and construction of pedestrian facilities to include meeting ADA requirements in the central business district of Ketchikan. Alaska 1997 1 (TE) 1. Pedestrian and bicycle facilities Ketchikan Ketchikan Gateway $136,476 $0 $13,549 $150,025
CHITINA BIKE/PEDESTRIAN PATH Construct a bicycle/pedestrian path adjacent to the Edgerton Highway from One Mile Lake to the new wayside in Chitina. Alaska 2000 1 (TE) 1. Pedestrian and bicycle facilities Chitina Valdez-Cordova $136,465 $0 $13,546 $150,011
KENAI SPUR RD UNITY TRAIL & SOLDOTNA SCHOOL TRAIL FY 00 TRAAK project to be added to scope: Soldotna: Soldotna School Trail. Construct a lighted pedestrian bike trail 16 feet in width, 10 feet width paved in the center and 3 feet gravel on each side of the path between Marydale and Redoubt Ave along the Alaska 2001 1 (TE) 1. Pedestrian and bicycle facilities Kenai Kenai Peninsula $136,455 $0 $13,545 $150,000
CE: WINTER TRAIL MARKINGS 1996 Mark overland winter trails in the western area of Central Region with permanent trail markers. Trail markers will ensure winter travelers can safety journey between communities in the area. Install winter trail markers between the villages of Chefornak, Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Chefornak Bethel $136,383 $0 $14,537 $150,920
CE: ADA HWY PEDESTRIAN FACILITY IMPROVEMENTS Identify aspects (curb, cuts, curb ramps, etc.,) that are not in compliance with the American with Disabilities Act Title II regarding public entities accessible to individuals with disabilities and develop construction document to bring existing nonconfo Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $135,900 $0 $38,975 $174,875
MCGRATH RD BIKE/PEDESTRIAN TRAIL-TE Construct a bicycle/pedestrian facility, approximately 2 miles in length, along McGrath Road from just north of the McGrath Estates approach to the Farmers Loop Bicycle Path. Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $1,067,062 $0 $156,121 $1,223,183
NOR REG ADA IMPROVEMENTS (PH VII, AIRPORT WAY) construction of new ADA toilet facilities at existing rest areas in Northern Region". REVISE TERMINI to include replacement facilities at Edgerton Hwy MP 35, Alaska Hwy MP 1250-Deadman Wayside, Elliott Hwy MP 152-Manley Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $1,086,013 $0 $25,356 $1,111,369
BADGER RD RECONSTRUCTION Grading, drainage, surfacing, illumination & signalization of Badger & Holmes Roads. Constr. of Bikepath along Badger Road. Alaska 1993 1 (TE) 1. Pedestrian and bicycle facilities North Pole Fairbanks North Star $1,121,893 $0 $112,259 $1,234,152
CHENA RIVER STATE RECREATION AREA-TE Various mileposts along Chena Hot Springs Road between MP 27-56. Locations include MP 27 (Chena River State Rec. area entrance), MP 36 (Granite Tors Scenic/Interpretive viewpoint), MP 39.5 (Granite Tors Trailhead), MP 48.9 (Angel Rocks Trailhead), of Ch Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $215,367 $0 $21,378 $236,745
AMATS: ANCH TE GLENN HWY BIKE PATH CONS Construct a bike path on the north side of the Glenn Highway between Boniface Boulevard and Muldoon Road including connections to the existing trails at Boniface and Muldoon. This is the final link that will provide a continuous trail from Birchwood to K Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $823,730 $0 $211,514 $1,035,244
JNU-HIGHLAND DR TO EGAN EXPRESSWAY Roadway reconstruction, shoulder widening, construction of sidewalk, and upgrade of existing bike path. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Juneau Juneau $196,823 $0 $19,537 $216,360
AMATS: BICYCLE PLAN IMPLEMENTATION, C ST: 10TH-40TH Project will sign, stripe and mark bike lanes or shoulders on existing roadways within the AMATS boundary area to create a safe, connected network of bicycle facilities as identified in the Anchorage Bicycle Plan. Alaska 2015 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage, Municipality of $48,070 $0 $4,772 $52,842
SITKA - AREAWIDE ADA COMPLIANCE IMPROVEMENTS Design and construction of pedestrian improvements for Sitka's roadway system for compliance with the "Americans with Disabilities Act". Improvements include modifications to existing sidewalks, curbing, and drainage facilities. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Sitka Sitka $254,994 $0 $64,306 $319,300
CHENA RIVER BICYCLE/PED PATH-CENTENNIAL BRDG TO STEESE BRDG Construct approximately .85 miles of bicycle/pedestrian path from the Centennial Bridge to the Steese Highway Bridge. Project will include lighting, signing, drainage, landscaping, irrigation system, and removal of minor obstructions. Alaska 2004 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $260,940 $0 $25,902 $286,842
MAT-SU: KNIK-GOOSE BAY RD REHAB & PATHWAY 11/00 Scope Addition: Extend pathway from Vine Road, MP 5.8 to Settlers Bay, MP 7.0. Alaska 2003 1 (TE) 1. Pedestrian and bicycle facilities Mat-Su Anchorage $1,637,011 $0 $162,595 $1,799,606
AMATS: BUSINESS BLVD AREA PEDEST SAFETY IMP 9/99 Scope Addition: Include some minor reconst of the adjacent Business Blvd to address frost heave problems, the addition of right turn only lanes at the E. & W. Old Glenn Hwy Intxs, and raised /flush medians for left turn chann. The roadway will be re Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $1,620,463 $0 $160,854 $1,781,317
COPPER RIVER HWY - EYAK RIVER PEDESTRIAN BRIDGE Construct a pedestrian/bicycle bridge across the Eyak River and a path connecting the highway turnout at MP 5.5 - 5.7. Alaska 1999 1 (TE) 1. Pedestrian and bicycle facilities Cordova Valdez-Cordova $225,606 $0 $22,394 $248,000
Nor Reg Bicycle/Pedestrian Facilities Rehab and Improvements Bicycle and pedestrian facility preventative maintenance, rehabilitation and improvments statewide. Alaska 2012 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $264,085 $0 $26,214 $290,299
AMATS: FAR NORTH TRAIL IMPROVEMENTS Construct a multi-use trail undercrossing tube beneath Campbell Airstrip Road. Involves upgrading and elevating a segment of the road to achieve clearance for installing the tube. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $799,299 $0 $80,444 $879,743
KTN-PED/BIKE PATH-DEERMOUNT TO SAXMAN PROVIDE A PEDESTRIAN/BIKE PATH ALONG S. TONGASS HWY BETWEEN THE COAST GUARD STATION AND TOTEM ROW IN SAXMAN. Alaska 1994 1 (TE) 1. Pedestrian and bicycle facilities Ketchikan Ketchikan Gateway $1,523,922 $0 $380,692 $1,904,614
NORTHWEST ARCTIC BORO TRAIL STAKING-TE INSTALL PERMANENT TRAIL MARKINGS ALONG TRAILS IN THE NORTHWEST ARCTIC BOROUGH(NWAB). THESE TRAILS ARE IDENTIFIED IN THE NWAB TRAIL STAKING PLAN. Alaska 1995 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $238,968 $0 $24,220 $263,188
NOR REG ADA IMPROVEMENTS - COLLEGE ROAD (PH VI) Project will reconstruct the pedestrian facilities along College Road, including curb ramps and sidewalks. Alaska 2003 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $1,468,191 $0 $145,738 $1,613,929
PSG BOJER WIKAN FISHERMEN'S MEMORIAL PARK Design and construct a memorial park overlooking Hammer Slough as a memorial to those who spent their lives at sea and as a tribute to the nautical history of Petersburg. Contract #1 - Structural, Lighting, and Electrical Contract #2 - Amenities such as Alaska 1998 1 (TE) 1. Pedestrian and bicycle facilities Petersburg Wrangell-Petersburg $257,735 $0 $25,584 $283,319
Parks Highway: Talkeetna Spur Road Ped Improvements Pedestrian safety improvements in the general vicinity of the Parks Highway/Talkeetna Spur Road intersection. Project components include: 1) a lighted Parks Highway underpass from East Helena Ave to the north side of the Susitna Valley Middle/High School Alaska 2012 1 (TE) 1. Pedestrian and bicycle facilities Susitna Matanuska-Susitna $802,145 $0 $79,624 $881,768
Old Seward Highway: Brandon to O'Malley Reconstruction. This project will widen the existing road to accommodate two lanes of traffic in the northbound section, two lanes southbound, a center two-way left-turn land, illumination, curb & gutter, a storm drain, a sidewalk on the east side and a pathway on the we Alaska 2008 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $808,915 $0 $80,295 $889,210
TRUNK RD RECONST, PH I- PARKS HWY TO PALMER-WASILLA HWY Realign Trunk Road to provide 4 lanes between Parks Hwy / Trunk Road Interchange off ramp and the Palmer-Wasilla Hwy to include a round about at Matanuska Farm Drive and other intersection improvements, lighting, signing, striping, and separated pedestria Alaska 2008 1 (TE) 1. Pedestrian and bicycle facilities Palmer Matanuska-Susitna $781,480 $0 $77,572 $859,052
CR: WINTER TRAIL MARKINGS, 2009 Install high-visibility trail markers in the rural communities to improve transportation safety. Alaska 2008 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $61,860 $0 $6,140 $68,000
USFS: PORTAGE VALLEY TRAIL SYSTEM CONSTRUCTION - PHASE I Phase-I includes a segment of Blue Ice Trail from Portage Highway (near Visitor Center) to Williwaw Campground, a segment from Moose Flats to Explorer Pond, and an o Alaska 2001 1 (TE) 1. Pedestrian and bicycle facilities 0 Aleutians East $1,306,319 $0 $129,670 $1,435,989
SEWARD HWY TE:GIRDWOOD-BIRD PT PATHWAY Scope addition to remove toppling rock on the Seward Highway at MP 94. Alaska 1997 1 (TE) 1. Pedestrian and bicycle facilities Seward Kenai Peninsula $265,116 $0 $20,702 $285,818
GOLD HILL ROAD BICYCLE AND PEDESTRIAN FACILITY Construct a bicycle & pedestrian facility along Gold Hill Road. Alaska 2009 1 (TE) 1. Pedestrian and bicycle facilities 0 0 $1,824,538 $0 $181,110 $2,005,648
HAINES COUNCIL GROUNDS TRAIL Design and construction of a trail from the Haines Eagle Viewing Center to the future cultural center at the intersection of the Klukwan Road with the Haines Highway. Construction will include improvements to existing vehicle pullouts and interpretive si Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Haines Haines $1,364,302 $0 $140,686 $1,504,988
SEWARD HWY TE:BIRD POINT PATHWAY/WAYSIDE (DESIGN ONLY) Upgrades and interpretation amenities at Seward Highway turnouts along the recently completed Gird to Bird Reconstruction project. Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities Seward Kenai Peninsula $227,425 $0 $27,575 $255,000
NOR REG ADA IMPROVEMENTS - AIRPORT WAY (PHASE VII) Upgrade pedestrian facilities on the north and south side of Airport Way. Alaska 2004 1 (TE) 1. Pedestrian and bicycle facilities Fairbanks Fairbanks North Star $1,683,636 $0 $167,123 $1,850,760
PARKS HWY DENALI PK PEDESTRIAN ACCESS SAFETY IMP connection to the Park road intersection at MP 237.3 Alaska 1996 1 (TE) 1. Pedestrian and bicycle facilities 0 Denali $278,431 $0 $20,174 $298,605
AMATS: TUDOR RD PEDESTRIAN CROSSING Construction of a multi-purpose trail from the existing trail on the south side of Tudor Road and connecting into the University Lake Trail system to the south. The crossing at Tudor Road will consist of a multi-purpose trail bridge, farther south a tunne Alaska 1993 1 (TE) 1. Pedestrian and bicycle facilities Anchorage Anchorage $1,455,983 $0 $363,996 $1,819,979
KETCHIKAN TOTEM BIGHT STATE HISTORIC SCENIC WAYSIDE Repave, reconfigure, and expand parking facilities. Upgrade pedestrian facilities. Rebuild restrooms, add interpretive displays, and build a picnic area. Delete from project scope the design and construction of a totem pole carving shed. Alaska 1999 1 (TE) 1. Pedestrian and bicycle facilities Ketchikan Ketchikan Gateway $793,586 $0 $78,774 $872,360
CREAMER'S FIELD WILDLIFE REFUGE-TE Grading, drainage, paving, utility relocation, illumination, signal system modifications, landscaping and minor structures within and adjacent to the Creamer's Field Migratory Waterfowl Refuge near Fairbanks. Alaska 1993 3 (TE) 3. Acquisition of scenic or historic easements and sites Fairbanks Fairbanks North Star $1,456,524 $0 $144,581 $1,601,105
DALTON HWY MP 90-100 PE AND CONSTRUCTION FOR REHABILITATION, TOTAL RESURFACING, GRADE RAISING AND CULVERT REPLACEMENT AS NECESSARY. PROJECT WILL ALSO INCLUDE CONSTRUCTION OF FINGER MOUNTAIN WAYSIDE AT MP 98. THE WAYSIDE WILL CONSIST OF AN APPROACH AND PARKING AREA, FOOTPATH Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $135,815 $0 $13,481 $149,296
GLENN HWY: MATANUSKA GLACIER SCENIC OVERLOOK Expand and improve the existing scenic overlook with pathways, landscaping and viewing decks. Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $244,427 $0 $18,573 $263,000
NOME-SOLOMON WAYSIDES-TE Construct a wildlife view area at S S Brdg to inc veiw pltfrm, interpretive signs & parking, & Ft Davis trnouts & interp sgn. Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Nome Nome $294,416 $0 $30,025 $324,441
DELTA JUNCTION SCENIC TURNOUT IMP-TE CONSTRUCT PEDESTRIAN & PICNIC FACILITIES, IMPROVE SANITARY FACILITIES & CIRCULATION TRAILS FOR ACCESSIBILITY. Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Delta Junction Southeast Fairbanks $50,323 $0 $5,496 $55,819
NOR REG FFY02 VAULTED TOILET CONSTRUCTION Alaska Highway MP 1250 (Deadman Lake Wayside), Edgerton Highway MP 35 (Copper River Wayside), Elliott Highway MP 150 (Manley Hotsprings Wayside), Richardson Highway MP 50 (Ladybird Wayside), Tok Cutoff MP 24 (Gold Rush Wayside), Tok Cutoff MP 64 (Porcupin Alaska 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 Yukon-Koyukuk $318,880 $0 $32,253 $351,133
RICHARDSON HWY MP 129-148 REHAB Rehabilitation, reconstruction and resurfacing of the Richardson Highway between MP 129 (Tok Cutoff/Richardson Highway Junction) and MP 148 (Sourdough) and archaeological clearance for use of the Ringling Pit. Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $327,492 $0 $37,628 $365,120
JUNEAU - BROTHERHOOD BRIDGE TO ENGINEER'S CUTOFF Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Juneau Juneau $153,398 $0 $15,227 $168,625
NOR REG TOURIST SIGNAGE-WILLOW LAKE WAYSIDE Construct two wooden observation decks to be sited on gravel pads adjacent to each end of the existing wayside at MP 87.7 of the Richardson Highway. Each deck will be equipped with a pedestal mounted spotting scope, one of which will be ADA compliant. Alaska 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Willow Lake Matanuska-Susitna $48,573 $0 $4,820 $53,393
GLENN HWY: TE KEPLER BRADLEY SCEN.PULLOUT Improve the existing Kepler Bradley rest stop by: resurfacing the entrance approach and parking area, resurfacing and installing a retaining wall on a short trail to Matanuska Lake, installing interpretive displays of the lake and trail system, and instal Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $387,006 $0 $33,798 $420,804
WRANGELL - ZIMOVIA HIGHWAY - BERGER STREET TO MILL PE AND ROW FOR MINOR WIDENING AND RECONSTRUCTION OF THE ZIMOVIA HWY FROM BERGER ST TO THE LUMBER MILL. Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Wrangell Wrangell-Petersburg $527,451 $0 $131,863 $659,314
DALTON HWY MP 335-362 REHABILITATION Clarify the locations of the two project enhancements authorized under the existing scope to be MP 348-Sag River Overlook & MP 415-Deadhorse Wayside. Also, add the construction of a waysde at MP 395-Arctic Coastal Plain. Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $45,485 $0 $4,515 $50,000
CHENA PUMP/TANANA RIVER SCENIC WAYSIDE Upgrade the Chena Pump Road wayside, including sanitary facilities. The project will also include an ADF&G funded boat launch parking area. Alaska 2001 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Fairbanks Fairbanks North Star $84,739 $0 $8,411 $93,150
GOLDSTREAM ROAD REHABILITATION Rehabilitation, reconstruction and resurfacing of the Richardson Highway between MP 129 (Tok Cutoff/Richardson Highway Junction) and MP 148 (Sourdough) and archaeological clearance for use of the Ringling Pit. Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Fairbanks Fairbanks North Star $85,883 $0 $21,472 $107,355
NOR REG TOURIST SIGNAGE - DALTON HIGHWAY Fabrication and installation, under the existing Memorandum of Agreement (MOA) with the Bureau of Land Management (BLM) for placing tourist signs along the Dalton Highway. Preconstruction work was done under PJ# 66682 / TEA-000S(177), Dalton Highway Tour Alaska 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $104,606 $0 $10,383 $114,990
SEA HIGHWAYS SCENIC ENHANCEMENTS FFY00 PE to identify various roads in Haines, Juneau, Skagway, Ketchikan, and Sitka for removal of brush, trees, and other vegetation for the enhancement of scenic pullouts and along roadsides. Alaska 2000 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $169,800 $0 $16,855 $186,655
SE REGION HIGHWAY SCENIC ENHANCEMENTS Removal of brush, trees, and other vegetation in the enhancement of scenic pullouts and along roadsides. Enhancements will improve scenic areas and wildlife safety by removing cover which has grown close to the highways. Wildlife will be easily seen as t Alaska 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $182,098 $0 $18,076 $200,174
NOR REG TOURIST SIGNAGE-PHI (GOLD RUSH) Design, fabricate and install interpretive exhibits in existing waysides along the highway systems. This may include minor site development as needed to assure the signs are placed in visible and appropriate locations. Sign locations are at various loca Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $195,118 $0 $19,367 $214,485
FFY01 SEA REGION SCENIC VIEWSHED ENHANCEMENTS Removal of brush, trees, and other vegetation at scenic viewsheds, behind guardrails, and sight distance areas in Juneau, Haines, Ketchikan, Sitka, and on Prince of Wales Island. Alaska 2001 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $196,413 $0 $19,497 $215,910
CE: SCENIC BYWAYS TOURIST SIGNAGE Install signs designed to assist residents and tourist traffic traveling along the national highway system in identifying the intrinsic qualities of the scenic byway. Seven scenic byway and approximately fifteen interpretive site and route identifier sig Alaska 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $149,044 $0 $17,403 $166,447
NOME-ROCKER GULCH WAYSIDE Provide a parking area, boardwalk and interpretive display near Rocker Gulch located at the intersection of Beam Road and the Nome-Council Highway. Alaska 2000 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Nome Nome $233,507 $0 $23,179 $256,686
PALMER-WASILLA HWY EXTENSION Extend the Palmer Wasilla Highway (PWH) from the Parks Highway to Knik-Goose Bay Road (KGB) at Glenwood Intersection. Project will include: 1) new signal at KGB road, 2) Acquire a new ROW corridor, 3) third lane westbound, 4) parallel pedestrian/bicycle Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Mat-Su Anchorage $209,645 $0 $20,808 $230,453
SHEEP CK ROAD REHAB PE for rehab and resurfacing of 5.4 miles of roadway from the Sheep Ck Parks Connector intersection to 2,500 ft. beyond the Murphy Dome Road/Sheep Ck Road/Goldstream Road intersection. ENHANCEMENT WORK: Construction of a 10' wide, unpaved, all season, mu Alaska 1993 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Fairbanks Fairbanks North Star $225,445 $0 $56,361 $281,806
HNS HWY DALTON CACHE INTERPRETIVE CENTER Following receipt of ATP w/construction from FHWA, DOR&PF will transfer funds to the U.S. Bureau of Land Management (per an executed project agreement , via a lump sum payment), who will in turn transfer the funds to the U.S. General Services Administrati Alaska 2000 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Haines Haines $102,785 $0 $10,203 $112,988
RICHARDSON HWY MP 127-GULKANA RIVER WAYSIDE Construct appropriate access and wayside improvements near the Gulkana River Bridge near MP 127 of the Richardson Highway. Improvements include approaches, parking area development improvement, landscaping, sanitary facilities, footpaths and interpretive Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Gulkana Valdez-Cordova $225,457 $0 $22,388 $247,845
FFY95 STATEWIDE ANNUAL PLANNING WORK PR Design and construct a scenic overlook adjacent to the Homer Ferry Terminal building including paving, restrooms, and interpretive signage. Alaska 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Statewide Statewide $94,866 $0 $9,416 $104,282
K-BEACH RD MP 16.4-22.4 REHABILITATION Rehabilitate surface, drainage, and roadbed and make safety and capacity improvements between MP 16.2 and MP 22.2. Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Kenai Kenai Peninsula $227,426 $0 $22,574 $250,000
PARKS HIGHWAY: MP 44-52 SURFACE REHAB Construction project to rehabilitate the Parks Highway from MP 44 to MP 52. This includes the construction of a grade separated RR X-ing and associated roadway realignment. Design of this project was accomplished unde PJ 58712 / I-0A4-1(7) Parks Highwa Alaska 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $230,000 $0 $57,500 $287,500
ALASKA HWY MP 1386 - NORTH Alaska Hwy MP 1386-1412, reconstruction of highway, replacement of the Little Gerstle bridge and rehabilitation of the (Big) Gerstle River Bridge. Improve parking, access road, landscaping, and interpretive exhibits for historic roadhous Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $216,806 $0 $15,321 $232,127
KENAI SPUR RD MP 8.1-10.7 RECONSTRUCTION Reconstruct the existing roadway as a 4-lane facility with flush median and channelized intersections between Swires Rd (MP 8.1) and Beaver Loop Rd (MP 10.7). Includes a sidewalk on one side and a bike/pedestrian pathway on the other. Alaska 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Kenai Kenai Peninsula $400,237 $0 $100,059 $500,296
JNU CHANNEL DR WAYSIDE CONSTRUCTION PE for construction of a multi-function wayside park and transit node for public use near the DIPAC fish hatchery. Project will provide park area, parking, transit shelter and pullout, lighting, and improved shore access. Alaska 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Juneau Juneau $327,494 $0 $34,256 $361,750
Park Hwy Rest Areas Construct new rest areas between Fairbanks (MP 360) and Bear Creek (MP 262) and Nenana Canyon (MP 239) and the East Fork of the Chulitna River (MP 185). The project will also include toilet facilities and interpretive displays. Alaska 2013 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Northern Region Multiple $93,400 $0 $6,600 $100,000
COPPER RIVER HWY MILLION DOLLAR BRDG-TE RESTORE NORTH SPAN TO PROPER ELEVATION, PROVIDE RAILING, RESTORE ANCHOR BOLTS, BEARINGS, TRUSSES, FLOOR BEAMS, PLUS ADDITIONAL WORK. Alaska 1993 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Cordova Valdez-Cordova $6,696 $0 $665 $7,361
HOMER END-OF-THE-RD SCENIC OVERLOOK Design and construct a scenic overlook adjacent to the Homer Ferry Terminal building including paving, restrooms, and interpretive signage. Alaska 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Homer Kenai Peninsula $8,189 $0 $962 $9,151
DENALI VIEW NORTH SCENIC OVERLOOK Construct a scenic overlook at mile 162.4 of the Parks Highway. This will include sanitary facilities, viewing decks with scopes, trails, interpretative displays and landscaping. Design of this project, including environmental approval, was done under pro Alaska 1993 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Denali National Park Denali $521,293 $0 $61,463 $582,756
NOR REG TOURIST SIGNAGE-TE wayside identification signs on the Elliott Hwy at MP 28 & MP 57 and on the Steese Hwy at MP 57, 60, 86, 94, 107 and 140. Alaska 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $520,218 $0 $52,172 $572,390
OLD GLENN HWY: MATANUSKA RIVER BRIDGE REPLAC Replace bridge approaches, the bridge (#540) and improve the geometrics of the adjacent roadway. The separated pathway along the project length will be reconstruced with pedestrian underpasses(2). The existing bridge will be remain in place. Alaska 1996 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Mat-Su Anchorage $510,445 $0 $53,156 $563,601
DALTON HWY MP 274-289 REHABILITATION Revise scope to include development of the Galbraith Lake Wayside at MP 272. Also included in the scope revision is controlled aerial photography from MP 235 - 362 for use in design of this project as well as in design of other planned Dalton Highway pro Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $266,179 $0 $26,422 $292,601
RICHARDSON HWY MP 306 BIRCH LAKE WAYSIDE Construct a public wayside along the Richardson Highway adjacent to birch Lake, including sanitary facilities, access barriers and landscaping.. Alaska 2001 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Birch Lake Valdez-Cordova $16,492 $0 $1,165 $17,657
PARKS HWY: DENALI VIEW SCENIC OVERLOOKS, (DESIGN ONLY) Phase I: Denali View North. Construct new Denali Scenic View pullout within a previously excavated materials site at MP 162.4. Phase II: Veterans Memorial. Expand existing park facilities at MP 147.1 Phase III: Denali View South. Construct new D Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 Denali $484,871 $0 $48,130 $533,001
SEWARD HWY: BIRD CREEK SCENIC OVERLOOK As part of the nationwide Scenic Byways Program this project will provide improvements to the existing Bird Creek parking and pathway facilities at MP 101.4 on the Seward Highway. Improvements on the north (mountain) side of the highway will include park Alaska 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Seward Kenai Peninsula $479,812 $0 $49,376 $529,188
STEESE HWY MP 147 BIRCH CREEK WAYSIDE Construct a wayside/parking area near the Birch Creek Bridge near MP 147 of the Steese Highway. Project will also include a boat launch and sanitary facility. The boat launch portion of the project will be funded by other agencies and will not use feder Alaska 2001 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Fairbanks Fairbanks North Star $43,986 $0 $4,367 $48,353
DAVIS DOME WAYSIDE Construct a new wayside at Davis Dome on Boundry Spur near the Canadian Border and improve 3 others along the the Taylor Hwy as funding allows (MP 82 - Walker fork Campgroud, MP 49- West Fork Campground and MP 35- Mt Fairplay Wayside). The project may inc Alaska 1992 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Chicken Southeast Fairbanks $23,350 $0 $2,318 $25,668
CHENA HOT SPRINGS RD WIDEN -2ND CONTRACT Reconstruct and widen Chena Hot Springs Road from Nordale to the Steese Highway. Associated with main PJ# 63204 Chena Hot Springs Widening under this same federal project number. Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Fairbanks Fairbanks North Star $463,492 $0 $46,010 $509,502
PARKS HWY: MP 41-44 CRUSEY TO LUCUS Rehabilitate the Parks Highway from Crusey Street to Lucas Road. Project will include pavement rehabilitation, driveway consolidation, improvements to drainage system and pedestrian facilities, and landscaping. Scope does not include the illimination o Alaska 2009 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Wasilla Wasilla $761,102 $0 $53,782 $814,884
POW-HYDABURG HIGHWAY PAVING Provide a hard surface on the Hydaburg Highway from the intersection of the Hollis Highway to Hydaburg, a distance of 23 miles.. Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Hydaburg Prince Of Wales-Outer Ketchikan $29,398 $0 $2,918 $32,316
DALTON HWY MP 111 SOUTH REHAB PE and construction for rehabilitation, gravel surfacing, new construction and improvements to waysides, and an RV site. Alaska 1992 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $31,625 $0 $4,025 $35,650
FFY94 TRANSPORTATION PLANNING WORK PROG Upgrade three existing highway waysides on the Sterling Highway at MP 135 and MP 137, Ninilchik River and Deep Creek North and South. Work will enlarge and improve parking including landscaping, trails, handpump water well, vaulted toilets, kiosks, inform Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Statewide Statewide $149,504 $0 $14,840 $164,344
ELLIOTT HWY MP 7 NORTH REHAB RECONSTRUCT AND WIDEN CHSR FROM OLD STEESE HIGHWAY TO NORDALE ROAD (4 LANES TO STEELE CREEK RD). Alaska 1992 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Fairbanks Fairbanks North Star $38,994 $0 $3,871 $42,865
JUNEAU GLACIER HIGHWAY SALMON CREEK TO VANDERBILT Design and construction of improvements to Glacier Hwy. between Salmon Creek and the Vanderbilt Hill intersection with Lemon Road along existing alignment. Alaska 1993 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Juneau Juneau $428,236 $0 $42,509 $470,745
DALTON HWY MP 57 -YUKON CROSSING WAYSIDE Improve existing access road and parking area to serve as a wayside, interpretation displays about the Yukon River area and pipeline crossing, a nature trail and two viewing platforms. Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $407,565 $0 $40,456 $448,021
GLENN HWY MP 118-127 RECONSTRUCTION Rehabilitation, reconstruction and resurfacing of the Richardson Highway between MP 129 (Tok Cutoff/Richardson Highway Junction) and MP 148 (Sourdough) and archaeological clearance for use of the Ringling Pit. Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers 0 0 $35,520 $0 $2,510 $38,030
LAKE LOUISE WAYSIDES IMPROVE TRAILHEAD PARKING AT MILE 16 & 19. IMP INCLUDE CONSTRUCTION PARKING AREAS, INSTALL INFORMATIONAL KIOSK, INTERPRETATIVE SIGNS, LANDSCAPING. Alaska 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Lake Louise Matanuska-Susitna $420,474 $0 $41,738 $462,212
SEWARD HWY: MP 59.3-65.5 RECONSTRUCTION Reconstruction of the Seward Hwy from MP 59.3 to 65.5. PE through Design approval was done under Pj. 53045 / F-031-1(20) Seward Hwy MP 50 - 65.5. Consists of reconstructing approximately six miles of the Seward Highway near the Hope Wye. The work will Alaska 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Seward Kenai Peninsula $37,360 $0 $2,640 $40,000
CHITINA VISITOR WAYSIDE-TE Construct roadside improvements at approximately MP 33 on the Edgerton Highway at Chitina, including parking, pedestrian facilities, and historic and scenic interpretative signs. Sanitation facilities are also being considered. Alaska 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Chitina Valdez-Cordova $422,229 $0 $45,516 $467,745
FNSB ABANDONED VEHCL REMOVAL PROGRAM-TE Remove and dispose of inoperable and abandoned vehicles. Alaska 1994 5 (TE) 5. Landscaping and scenic beautification 0 0 $44,430 $0 $4,410 $48,840
CORDOVA/VALDEZ JUNK CAR REMOVAL-TE Removal and disposal of inoperal and abandoned vehicles. Alaska 1995 5 (TE) 5. Landscaping and scenic beautification Cordova Valdez-Cordova $185,206 $0 $18,384 $203,590
NORTHERN LIGHTS BOULEVARD LANDSCAPING Landscaping improvements on Northern Lights Blvd., from Lake Otis Parkway to Muldoon Road. Alaska 1997 5 (TE) 5. Landscaping and scenic beautification Fairbanks Fairbanks North Star $403,423 $0 $46,064 $449,487
COPPER VALLEY ABANDONED VEHICLE REMOVAL Upgrade three existing highway waysides on the Sterling Highway at MP 135 and MP 137, Ninilchik River and Deep Creek North and South. Work will enlarge and improve parking including landscaping, trails, handpump water well, vaulted toilets, kiosks, inform Alaska 1993 5 (TE) 5. Landscaping and scenic beautification Cordova Valdez-Cordova $32,242 $0 $3,200 $35,442
AMATS: MULDOON RD PEDESTRIAN & LANDSCAPING, (PARENT) Revised Phasing (2003) Ph-I Pathway on east side of Muldoon Rd from 20th Ave to 16th Ave. Ph-II Landscaping from BOP to DeBarr Ph-III Landscaping, Pathway, & Ped Amenities from DeBarr to Glenn Hwy. Alaska 1998 5 (TE) 5. Landscaping and scenic beautification Anchorage Anchorage $471,614 $0 $46,814 $518,428
LAVELLE YOUNG WHEELHOUSE SITING Develop a permanent site for the historic Lavelle Young Wheelhouse for display at Alaskaland, including a structural deck, setting the wheelhouse and a replica helm. Alaska 2001 6 (TE) 6. Historic preservation Fairbanks Fairbanks North Star $70,615 $0 $7,009 $77,624
SEWARD RAILCAR PRESERVATION Preservation of a 1916 Alaska Railroad railcar. The railcar is to used as a visitor center/museum. Work to include restrooms. Alaska 2000 6 (TE) 6. Historic preservation Seward Kenai Peninsula $1,902 $0 $188 $2,090
SKAGWAY FERRY TERMINAL EXHIBIT - GOLD RUSH FABRICATION AND INSTALLATION OF AN EXHIBIT DESCRIBING THE KLONDIKE GOLD RUSH IN SKAGWAY FERRY TERMINAL. Alaska 1993 6 (TE) 6. Historic preservation Skagway Skagway-Hoonah-Angoon $34,232 $0 $3,397 $37,629
NHS ROADSIDE HISTORICAL INTERPRETIVE SIGNAGE Develop a comprehensive framework, guidelines and procedures for a statewide historic markers program. Design, construct and install interpretive signs, with minor wayside improvements at various locations along the National Highway System. These signs Alaska 1998 6 (TE) 6. Historic preservation Statewide Statewide $119,161 $0 $10,292 $129,453
MCCARTHY/KENNICOTT MINE HIST PRESERV-TE EMERGENCY STABILIZATION REPAIRS TO HISTORIC STRUCTURES A THE THE KENNICOTT MINE. Alaska 1994 6 (TE) 6. Historic preservation Kennicott Valdez-Cordova $1,204 $0 $119 $1,323
EARTHQUAKE PARK INTERPRETIVE FACILITY-AN Enhance Earthquake Park pedestrian amenities. Add two trail turnouts with interpretive displays along the trail connecting the existing Northern Lights Boulevard parking area to the Coastal Trail. Realign and upgrade the Coastal Trail intersection to im Alaska 1995 6 (TE) 6. Historic preservation Anchorage Anchorage $589,879 $0 $64,430 $654,309
UNALASKA TE: HOLY ASCENSION CHURCH To renovate or otherwise deter degradation to the structure and finishes of the Russian Orthodox Church located in Unalaska, Alaska. This church, one of the oldest structures in Alaska, has neen in a state of increasing deterioration for some time. Alaska 1994 6 (TE) 6. Historic preservation Unalaska Aleutians East $1,351,743 $0 $492,284 $1,844,027
SEWARD HISTORICAL STREET LIGHTING Landscape scenic viewpoints and provide antique street lights in the historic portion of downtown Seward between the corner of Adams and Fourth Streets and the historic Railroad Terminal on Railway Avenue. Alaska 1994 6 (TE) 6. Historic preservation Seward Kenai Peninsula $294,595 $0 $29,243 $323,838
GOLD RUSH HISTORICAL SIGNS Design and construct approximately 30 highway wayside historical markers at various Central Region locations. Minor wayside improvements may be needed to install markers in appropriate/accessible sites. Alaska 1998 6 (TE) 6. Historic preservation Skagway Skagway-Hoonah-Angoon $90,970 $0 $9,030 $100,000
LAVELLE YOUNG WHEELHOUSE RESTORATION-TE RESTORE THE WHEELHOUSE THAT WAS SALVAGED FROM THE LAVELLE YOUNG RIVER STEAMER. Alaska 1994 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Fairbanks Fairbanks North Star $122,922 $0 $12,203 $135,125
PETERSBURG MITKOF HWY FERRY TERMINAL SOUTH RESURFACING PE to remove the existing pavement surface and resurface the Mitkof Highway with a new layer of asphalt concrete. Some culvert crossings may be replaced due to degradation. The length of resurfacing will coincide with the length of Petersburg's new wate Alaska 2001 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Petersburg Wrangell-Petersburg $3,217,717 $0 $319,402 $3,537,119
AMHS VESSEL INTERPRETIVE DISPLAYS PE, fabrication, and installation of interpretive exhibits aboard Southeast mainline AMHS ferries. Exhibits will commemorate Klondike Gold Rush activities. Alaska 1998 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities 0 0 $45,560 $0 $4,522 $50,082
AMATS: CAMPBELL CREEK TRAIL/C ST & AK RR Provide for the construction of connections between the existing Campbell Creek Trail and adjacent neighborhoods at 'C' Street and the Alaska Railroad to provide a safe and maintainable route. 5/22/94 Construction of a paved bike path along Campbell Cree Alaska 1994 8 (TE) 8. Conversion of abandoned railway corridors to trails Anchorage Anchorage $816,010 $0 $204,005 $1,020,015
SIT CASTLE HILL T.E. Stage I - monument reconstruction, will correct foundation and structural problems associated with settling of the rock walls. Stage II will address pedestrian access to the monument. Alaska 1995 10 (TE) 10. Archaeological planning & research Sitka Sitka $1,421,049 $0 $143,958 $1,565,007
BADGER RD MP 0-.6 RECON & ENVIRON RESTORATION Reconstruction of the first 0.6 miles of Badger Rd from 2 to 4 lanes, including a separate bike/ped path and environmental restoration. PH2, Ph3, and Ph7 accomplished under PJ 60379. Alaska 1994 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity North Pole Fairbanks North Star $52,542 $0 $5,216 $57,758
SOLDOTNA TE: WATER QUALITY MITIGATION (MARYDALE) Provide for the design and construction of a storm drain outfall at Marydale Street at the terminus of Riverwatch Road, including a sedimentation basin. The outfall is required by Alaska Department of Environmental Conservation to assure adequate water Alaska 1995 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Soldotna Kenai Peninsula $604,471 $0 $73,001 $677,472
TANANA VALLEY RAILROAD TRAINHOUSE/MUSEUM Construct a structure to house and support operations of the restored Tanana Valley Railroad Engine #1 and to include a museum at Alaskaland. Alaska 2001 12 (TE) 12. Establishment of transportation museums Fairbanks Fairbanks North Star $1,965,376 $0 $195,090 $2,160,466