Project Search Results
Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
FISH CREEK TRAIL EXTENSION - ANCHORAGE | Alaska | 2017 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Statewide | Various Boroughs | $800,000 | $0 | $208,000 | $1,008,000 | |
AMATS: MOUNTAIN VIEW DRIVE PATHWAY RECONSTRUCTION | Alaska | 2017 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Statewide | Various Boroughs | $117,975 | $0 | $29,494 | $147,469 | |
AMATS: FISH CREEK TRAIL REHAB: TURNAGAIN BLVD TO KONA LN | Project will analyze existing pathways for rehabilitation needs community-wide and promote specific projects to rehabilitate those existing pathways. The scope is primarily expected to include pavement replacement with a focus on trails that form the Anchorage Bicycle Plan Core Bicycle Network. | Alaska | 2017 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Anchorage | Anchorage, Municipality of | $692,308 | $0 | $173,077 | $865,385 |
AMATS: MULTI-MODAL VOLUME COUNTERS | Expansion of the Municipality of Anchorages ability to collect and report multi-modal volumes on roadways, paths, and trails within the Municipality of Anchorage.  This project would include additional devices and reporting capabilities (including possible polling of some field devices) with the goal of assessing areas in regards to: travel demand, route identification, traffic patterns, and seasonal use to include vehicles, bicyclists, pedestrians, and other non-motorized forms of transportation. Valuable information would be directed to support on-road and off-road planning and design activities as related to applicable: safety concerns, fulfillment of existing plan objectives and goals, facility designs, and area connectivity concerns and/or improvements.  This project does not include installation. | Alaska | 2016 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Anchorage | Anchorage, Municipality of | $389,000 | $0 | $97,250 | $486,250 |
CITY OF FAIRBANKS BICYCLE AND PEDESTRIAN COUNT EQUIPMENT | Alaska | 2016 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Various | Fairbanks North Star Borough | $54,425 | $0 | $5,402 | $59,827 | |
Cross Trail | Extend Cross Trail - High School to Baranof, Charles, Yaw & Pherson Streets in Sitka, AK. WFL PJ is AK SITKA 2013(1). Match will be provided by the City & Borough of Sitka. | Alaska | 2014 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Sitka | Sitka | $824,188 | $0 | $81,812 | $906,000 |
AMATS: BICYCLE PLAN IMPLEMENTATION (MOA OWNED) - PARENT | Alaska | 2013 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Anchorage | Anchorage, Municipality of | $82,702 | $0 | $8,209 | $90,911 | |
CITY OF FAIRBANKS SIDEWALK CONDITION SURVEY | Alaska | 2016 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Various | Fairbanks North Star Borough | $47,741 | $0 | $4,739 | $52,480 | |
AMATS: ASD BIKE SHARING EDUCATION TRAILER PROGRAM | Project will purchase four bicycle fleets and two transportation trailers for a bicycle sharing education program used by the Anchorage School Distrct Physical Education Department ot instruct studies in grades 5-12 on bicycle safety, rider skills, and encourage the use of bicycles as transportation. | Alaska | 2016 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Anchorage | Anchorage, Municipality of | $136,048 | $0 | $34,012 | $170,060 |
Transfer to WFL for AK SITKA 2017(1) Sitka Sea Walk Phase 2. Please note, the AK176 56C0 funds 100% federal no match. TAP funds match will be provided by Sitka & NPS. Susan Law 360-619-7840 | Alaska | 2017 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Anchorage | 0 | $1,360,000 | $0 | $340,000 | $1,700,000 | |
Transfer USFS Tongass Nat Forest AK Region for the W. Glacier Trail Enhan;project awarded via competitive TAP. Contacts: borr@fs.fed.us /907-789-6244 & marcheta.moulton@alaska.gov 80%match 73426.50 | Alaska | 2017 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Juneau | 0 | $293,706 | $0 | $73,427 | $367,133 | |
Transfer to WFL for AK FS CNF 164(1) INHT Portage Curve Multi-modal Connector. Project is adjacent to Seward Hwy between Mile Post 75-82, Rural interstate. Match is WFL responsibility; Susan Law 360-619-7846 | Alaska | 2017 | 101 | (TAP) 101. Pedestrian and Bicycle facilities | Anchorage | 0 | $1,000,000 | $0 | $250,000 | $1,250,000 | |
AMATS: NON-MOTORIZED PLANS UPDATE | Project will study and inventory existing conditions; begin a process of education and citizen engagement; institute new municipal policies and means of enforcement; provide improvements to transit facilities; fund a Safe Routes to School program coordinator; update the Anchorage Bike Plan, Anchorage Pedestrian Plan, and Anchorage Trails Plans; and start a smart lighting project. | Alaska | 2017 | 102 | (TAP) 102. Safe routes for non-drivers | Anchorage | Anchorage, Municipality of | $304,000 | $0 | $76,000 | $380,000 |
AMATS: VISION ZERO PROGRAM | Project will study and inventory existing conditions; begin a process of education and citizen engagement; institute new municipal policies and means of enforcement; provide improvements to transit facilities; fund a Safe Routes to School program coordinator; update the Anchorage Bike Plan, Anchorage Pedestrian Plan, and Anchorage Trails Plans; and start a smart lighting project. | Alaska | 2017 | 102 | (TAP) 102. Safe routes for non-drivers | Anchorage | Anchorage, Municipality of | $288,000 | $0 | $72,000 | $360,000 |
AMATS: SMART LIGHTING PILOT PROGRAM | Project will study and inventory existing conditions; begin a process of education and citizen engagement; institute new municipal policies and means of enforcement; provide improvements to transit facilities; fund a Safe Routes to School program coordinator; update the Anchorage Bike Plan, Anchorage Pedestrian Plan, and Anchorage Trails Plans; and start a smart lighting project. | Alaska | 2017 | 102 | (TAP) 102. Safe routes for non-drivers | Anchorage | Anchorage, Municipality of | $160,000 | $0 | $40,000 | $200,000 |
EYAK MOUNTAIN TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $17,190 | $0 | -$3,115 | $14,075 |
GRANITE TORS TRAIL - NORTHERN REGION | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $20,491 | $0 | $24,791 | $45,282 |
FAIRBANKS SOUTH DOG PARK LOOP TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $26,086 | $0 | $6,522 | $32,608 |
FOX TRAILS | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $32,550 | $0 | $8,138 | $40,688 |
POINT BRIDGE TURNPIKE REPAIR | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $36,753 | $0 | $3,648 | $40,401 |
FIXING MT. BALDY | Widen and realign the multi-use paths along Egan Expressway, including the crossing of Duck Creek, and correct other deficiencies including badly deteriorated pavement. Upgrades include the replacement of two narrow bridges. | Alaska | 2014 | 201 | (TAP) 201. Trails | Juneau | Juneau, City and Borough of | $9,452 | $0 | $2,363 | $11,815 |
NAPAIMUTE WINTER TRAIL SYSTEM | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $47,186 | $0 | $11,797 | $58,983 |
LOOKOUT MOUNTAIN MAINTENANCE BLDG - PH II | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $30,000 | $0 | $7,500 | $37,500 |
SKYLINE RIDGE PARK TRAIL RESTORATION | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $49,217 | $0 | $12,304 | $61,521 |
BATTERY POINT TRAIL HARDENING | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $47,466 | $0 | $4,712 | $52,178 |
CARIBOU HILLS CABIN HOPPERS SNOWCAT | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $100,000 | $0 | $25,000 | $125,000 |
JIM CREEK MOTORIZED RECREATION TRAILS | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $71,779 | $0 | $17,945 | $89,723 |
EAGLECREST MOUNTAIN BIKE TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $49,995 | $0 | $12,499 | $62,493 |
MATANUSKA GREENBELT CENTRAL SINGLE TRACK | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $20,939 | $0 | $5,235 | $26,174 |
MAXEY GROOM/FUEL TANK | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Juneau, City and Borough of | $29,888 | $0 | $8,085 | $37,973 |
YCC TALKEETNA LAKES PARK X LAKE LP TRAIL MAINT AND LAKE PORT | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $36,354 | $0 | $11,701 | $48,055 |
ALASKA STATE PARKS - NORTHERN AREA TRAIL DOZER ACQUISITION | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $41,923 | $0 | $20,231 | $62,154 |
LOOKOUT MOUNTAIN MAINTENANCE BUILDING | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $48,365 | $0 | $20,391 | $68,756 |
MILE 16 BIKE TRAIL PHASE II | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $49,999 | $0 | $4,963 | $54,962 |
FY 2013 REC TRAILS PROG ADMIN ALLOWANCE PER 23 U.S.C 206D2H | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $106,955 | $0 | $10,617 | $117,572 |
AK TRAILS MOBILE TOOL TRAILER UPGRADE AND REPLACEMENT | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $18,833 | $0 | $4,708 | $23,541 |
WILSON PARK PUMP/TRACK/TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $31,583 | $0 | $9,227 | $40,811 |
ESKA WEST ATV TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $36,227 | $0 | $10,870 | $47,097 |
2014 TRAILS CONFERENCE | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $35,250 | $0 | $8,813 | $44,063 |
GOVERNMENT PEAK SINGLE TRACK PHASE 1 | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $48,030 | $0 | $12,500 | $60,530 |
SOUTH DENALI TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $49,750 | $0 | $4,938 | $54,688 |
TRAIL INFORMATION PUBLIC OUTREACH PHASE 1 | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $40,993 | $0 | $6,632 | $47,625 |
BONFIRE LAKE TO HAPPY RIVER MAINTENANCE PROJECT | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $49,891 | $0 | $12,473 | $62,364 |
TSALTESHI TRAILS IMPROVEMENT PROJECT II | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $50,000 | $0 | $12,500 | $62,500 |
MACLAREN SUMMIT TRAIL EXTENSION | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $50,000 | $0 | $12,500 | $62,500 |
ISBERG RECREATION TRAILHEAD | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $48,379 | $0 | $12,095 | $60,474 |
EAST REDSHIRT/CROSS PARK TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2013 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $49,494 | $0 | $4,913 | $54,407 |
HERRING COVE TO BEAVER LAKE TRAIL REPAIR | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $29,617 | $0 | $7,404 | $37,021 |
TONSINA CABIN AT CAINES HEAD SRA | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $45,545 | $0 | $5,061 | $50,606 |
CAINES HEAD SRA: TONSINA SECTION | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $43,441 | $0 | $4,312 | $47,753 |
DPOR TRAIL VIDEO GUIDES | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $37,076 | $0 | $3,703 | $40,778 |
FNSB EQUIPMENT PURCHASE | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $37,043 | $0 | $9,261 | $46,304 |
RILKE SCHULE TRAIL CONNECTION TO MEADOW PARK | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $33,782 | $0 | $8,445 | $42,227 |
CHUGACH STATE PARK TRAIL EQUIPMENT PURCHASE | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $23,140 | $0 | $2,298 | $25,438 |
JONES POINT TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $15,086 | $0 | $8,668 | $23,753 |
CURRY RIDGE TRAIL PHASE III | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $77,505 | $0 | $9,473 | $86,978 |
MIRROR LAKE SINGLE TRACK - PHASE 1 | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $48,990 | $0 | $12,247 | $61,237 |
OLNES POND ATV TRAIL HARDENING / CLEARING | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $140,359 | $0 | $15,562 | $155,921 |
IMPROVEMENTS AT JODHPUR MOTOCROSS RIDING AREA | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $96,002 | $0 | $10,667 | $106,669 |
FY 2018 RECREATIONAL TRAILS PROGRAM ADMINISTRATIVE ALLOWANCE | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2018 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $10,000 | $0 | $933 | $10,933 |
Snowmachine trail DSP | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $240,462 | $0 | $29,800 | $283,262 | |
Bluff Cabin Trail | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $92,228 | $0 | $10,249 | $102,477 | |
Mastodon Construction | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $91,426 | $0 | $10,159 | $101,585 | |
Mirror Lake Phase II | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $50,000 | $0 | $5,556 | $55,556 | |
Lagoon Trail Repair | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $50,000 | $0 | $5,556 | $55,556 | |
Saddle Trail | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $50,000 | $0 | $5,556 | $55,556 | |
Slikok Expansion | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $50,000 | $0 | $5,556 | $55,556 | |
Iditarod NHT (Crow Pass) Phase 1 | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $49,998 | $0 | $5,574 | $55,571 | |
Girdwood Mountain Bike Park Phase 1 | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $49,995 | $0 | $5,555 | $55,550 | |
Winner Creek Trail | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $49,918 | $0 | $5,546 | $55,464 | |
DPOR NORTHERN TRAINING AND TRAIL ASSESSMENT | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $10,402 | $0 | $1,156 | $11,558 |
Settlers Cove Trail Access Improvements (Ketchikan) | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $47,808 | $0 | $5,706 | $53,514 | |
Iditarod National Historic Trail - Part 1 | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $49,822 | $0 | $5,686 | $55,508 | |
Training and Assessment | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $13,313 | $0 | $1,478 | $14,791 | |
Tutka Backdoor Access and Continuity | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $18,100 | $0 | $2,135 | $20,235 | |
Mt. Riley Trail Restoration (Haines) | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $19,272 | $0 | $2,166 | $21,438 | |
Fort Abercrombie Trail | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $14,415 | $0 | $1,602 | $16,017 | |
Rabbit Lake Trail Impro vements | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $33,601 | $0 | $3,901 | $37,502 | |
Morgan's Landing | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $36,294 | $0 | $4,092 | $40,386 | |
Tanana Lakes phase IV | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $41,975 | $0 | $4,664 | $46,639 | |
Eshamy Bay PUC | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $45,596 | $0 | $5,064 | $50,660 | |
Mastodon Hardening II | Alaska | 2018 | 201 | (TASA) 201. Trails | 0 | 0 | $23,900 | $0 | $2,656 | $26,555 | |
Transfer to return required 1% of funds set aside for the Rec Trails Program (RTP) to FHWA HQ for RTP program administration. Required per 23USC213(f)(2), FAST Act PL114-94. AK has chosen to transfer full 1% of APPN. Contact is Christopher Douwes. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | 0 | $15,279 | $0 | $0 | $15,279 | |
JNU GLACIER HWY MULTI-USE SEPARATED PATH TO UAS | Construct new, multi-use pathway from the west side of the entrance to Swampy Acres to UAS along the north side of Glacier Highway. The multi-use path will terminate at the UAS pedestrian bridge near Auke Lake and this project will also include paving of the Auke Lake parking lot. The replacement of the bridge and section of separated, multi-use pathway between Riverside Drive and Swampy Acres will be completed as part of the Brotherhood Bridge and Separated Multi-Use Path to UAS, Stage I (Need ID 2141, AKSAS 67987) Project. | Alaska | 2010 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Juneau | Juneau, City and Borough of | $1,219,453 | $0 | $121,047 | $1,340,500 |
JNU WHITTIER STREET/EGAN DR INTERSECTION | Design and construction of additional turn lanes and extension of existing turn lanes of the Whittier St./Egan Expressway intersection. | Alaska | 1995 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Juneau | Juneau | $15,693 | $0 | $1,558 | $17,251 |
VALDEZ AIRPORT ROAD BIKE/PEDESTRIAN TRAIL | Construct a bicycle/pedestrian trail from the Richardson Hwy to the Valdez Airport terminal building. | Alaska | 2000 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Valdez | Valdez-Cordova | $564,118 | $0 | $55,995 | $620,113 |
KTN-A/P PED. WALKWAY COVER REPLACE (T.E. | DESIGN AND CONSTRUCTION OF A TRANSPORTATION ENHANCEMENT PROJECT TO REPLACE THE DILAPIDATED PEDESTRIAN WALKWAY COVER ASHORE AT THE GRAVINA ISLAND SHUTTLE FERRY TERMINAL. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Ketchikan | Ketchikan Gateway | $509,685 | $0 | $127,424 | $637,109 |
JNU-LEMON ROAD SIDEWALK | Also included will be PE and installation of traffic communication system (PE is funded under PJ 71741 due to different federal ratio). | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Juneau | Juneau | $503,260 | $0 | $125,816 | $629,076 |
JNU-GLACIER SPUR BIKE PATH | Design and construction of a separate bike path along one side of the Mendenhall spur road from the intersection of Mendenhall Back Loop Road to the Mendenhall Glacier parking lot. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Juneau | Juneau | $493,350 | $0 | $62,499 | $555,849 |
MAT-SU TE: PALMER WASILLA HWY BIKE PATHS | Develop pedestrian/bicycle path along the Palmer-Wasilla Hwy from the City of Palmer to Hemmer St. Intention is to provide a seperated path. The work will be phased to avoid ROW problem areas without delaying areas that could be completed in an expeditou | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Mat-Su | Anchorage | $438,809 | $0 | $106,992 | $545,802 |
AMATS: PEDESTRIAN SAFETY ENHANCEMENTS | Design the following remaining two pedestrian safety enhancements. 1. A paved walkway on the east side of the Old Glenn Highway from Birchwood Road to Ski Road in Peters Creek. 2. A paved walkway from the Muldoon Road - East 10th Avenue intersection to | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Anchorage | Anchorage | $367,865 | $0 | $91,966 | $459,831 |
BROWN ELEMENTARY BICYCLE/PED-TE | CONSTRUCT A SEPARATED BIKE/PED FACILITY ALONG LAKLOEY DR FROM MP 2.3 BADGER TO TICASUK BROWN ELEM. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Fairbanks | Fairbanks North Star | $322,664 | $0 | $56,434 | $379,098 |
JUNEAU - RIVERSIDE DRIVE PED/BIKE ACCESS IMPROVEMENTS | INSTALL A BIKE/PEDESTRIAN FACILITY BETWEEN MENDENHALL LOOP RD AND RIVERSIDE DR ON EGAN DRIVE. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Juneau | Juneau | $309,314 | $0 | $77,330 | $386,644 |
AUBURN ROAD BIKE PATH/LANE-TE | CONSTRUCT A BIKE LANE/PATH FROM FARMERS LOOP TO PEARL CREEK ELEMENTARY SCHOOL. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Fairbanks | Fairbanks North Star | $563,281 | $0 | $95,489 | $658,770 |
HOMER BELUGA TRAIL CONSTRUCTION | Construct Phase-I of a paved and handicapped-accessable pedestrian nature trail along Beluga Slough tidal shoreline. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Homer | Kenai Peninsula | $290,720 | $0 | $38,971 | $329,691 |
KTN-MARRIED MAN'S TRAIL CONSTRUCTION | GRANT FUNDS TO C&B OF KETCHIKAN TO PURCHASE MATERIALS TO CONSTRUCT A BOARDWALK LINKING UPLAND WAY AND UPPER CK. ST. BRDWALKS D&C | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Ketchikan | Ketchikan Gateway | $11,840 | $0 | $2,960 | $14,800 |
AMHS BICYCLE RACKS | PROVIDE IMPROVED STORAGE FOR KAYAKS, BICYCLES AND OTHER ALTERNATE MEANS OF CONVEYANCE ABOARD THE VESSELS. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $14,244 | $0 | $3,561 | $17,805 |
SE REGIONWIDE PEDESTRIAN FACIL ACCESS | IDENDIFY DEFICIENCIES IN ACCESSIBILITY FOR DISABLED USERS OF EXISTING TRANS FAC. IN SE D&C | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $28,389 | $0 | $2,818 | $31,207 |
JNU-HIGHLAND DR TO EGAN EXPRESSWAY | Roadway reconstruction, shoulder widening, construction of sidewalk, and upgrade of existing bike path. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Juneau | Juneau | $196,823 | $0 | $19,537 | $216,360 |
NENANA GOLD SPIKE PARK-TE | ENHANCEMENT PROJECT WILL MARK HISTORIC WALKING TRAIL, INSTALL INTERPRETATIVE EXHIBITS, IMPROVE ACCESS, INSTALL BENCHES & LANDSCAPING. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Nenana | Yukon-Koyukuk | $174,554 | $0 | $38,776 | $213,330 |
CE: ADA HWY PEDESTRIAN FACILITY IMPROVEMENTS | Identify aspects (curb, cuts, curb ramps, etc.,) that are not in compliance with the American with Disabilities Act Title II regarding public entities accessible to individuals with disabilities and develop construction document to bring existing nonconfo | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $135,900 | $0 | $38,975 | $174,875 |
PELICAN BOARDWALK IMPROVEMENTS (T.E.) | PE through PS&E for removing existing and construction of new boardwalk hand rails and other repairs to the existing facility. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Pelican | Skagway-Hoonah-Angoon | $78,408 | $0 | $7,651 | $86,059 |
SITKA - AREAWIDE ADA COMPLIANCE IMPROVEMENTS | Design and construction of pedestrian improvements for Sitka's roadway system for compliance with the "Americans with Disabilities Act". Improvements include modifications to existing sidewalks, curbing, and drainage facilities. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Sitka | Sitka | $254,994 | $0 | $64,306 | $319,300 |
AMATS: ANCH TE GLENN HWY BIKE PATH CONS | Construct a bike path on the north side of the Glenn Highway between Boniface Boulevard and Muldoon Road including connections to the existing trails at Boniface and Muldoon. This is the final link that will provide a continuous trail from Birchwood to K | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Anchorage | Anchorage | $823,730 | $0 | $211,514 | $1,035,244 |
JUNEAU MENDENHALL RIVER TRAIL (T.E.) | PE and construction of a gravel surfaced multi-purpose trail along existing walking trail alignment. Construct eight foot wode bridge at Montana Creek. Construct gravel surfaced access road and ten space parking lot at River Road trailhead. Provide sig | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Juneau | Juneau | $830,725 | $0 | $207,591 | $1,038,316 |
KTN-PED/BIKE PATH-DEERMOUNT TO SAXMAN | PROVIDE A PEDESTRIAN/BIKE PATH ALONG S. TONGASS HWY BETWEEN THE COAST GUARD STATION AND TOTEM ROW IN SAXMAN. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Ketchikan | Ketchikan Gateway | $1,523,922 | $0 | $380,692 | $1,904,614 |
CHENA HOT SPRINGS ROAD YUKON QUEST TRAIL PARKING AREAS | Construct trailhead parking areas on Chena Hot Springs Road between Nordale Road (MP 7) and Chena Hot Springs Resort (MP 56), and on Nordale Road at the trail crossing. Project will provide access to the Yukon Quest Winter Trail. This project will inclu | Alaska | 2000 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Fairbanks | Fairbanks North Star | $653,926 | $0 | $65,611 | $719,537 |
BETHEL: CHIEF EDDIE HOFFMAN HWY REHAB & SEPARATED PATHWAY | Scope Revision: Construct a 4.2 mile, separated pathway along the north side of Eddie Hoffman Highway from the airport to Watson's Corner, then north along Ridgecrest Drive to the High School. Rehabilitate the Chief Eddie Hoffman Highway from Mile 0.0 to | Alaska | 2000 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Bethel | Bethel | $727,760 | $0 | $72,240 | $800,000 |
HOMER SPIT PEDESTRIAN PATHWAY TE | Construct a pedestrian/bike along the Sterling Highway on the Homer Spit from Kachemak Drive to Land's End, approximately 4.3 miles. Add turnouts for Mud Bay viewing and add handicap access facility at the Fishing Hole Lagoon on the south end of the proj | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Homer | Kenai Peninsula | $2,667,418 | $0 | $264,775 | $2,932,193 |
AMATS: CAMPBELL CREEK CONNECTION | Campbell Creek Trail Old Seward to Tudor/Bragaw PE, Trail Construction | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Anchorage | Anchorage | $756,712 | $0 | $80,114 | $836,826 |
NORTH POLE BICYCLE/PEDESTRIAN PATH | Construct a separated bicycle/pedestrian path along Hurst Road from the existing Badger Road Bike Path east toward Nelson Road in the North Pole area. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | North Pole | Fairbanks North Star | $743,139 | $0 | $74,265 | $817,404 |
KTN TONGASS AVENUE PEDESTRIAN IMPROVEMENTS | PE for reconstruction of pedestrian and transit facilities to include meeting ADA requirements, providing transit stations and a pedestrian bridge across Carlanna Creek. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Ketchikan | Ketchikan Gateway | $621,151 | $0 | $67,006 | $688,158 |
KENAI SPUR RD MP 0.0 TO MP 2.8 | Establish project to reconstruct Kenai Spur Rd to current standards for a 4-lane urban roadway from the Sterling Hwy intersection through Soldotna, MP 0.0 to 1.9; and a rural 4-lane divided highway from MP 1.9 to 2.8. Design through location approval was | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Kenai | Kenai Peninsula | $396,642 | $0 | $39,371 | $436,013 |
SEWARD HWY TE:GIRDWOOD-BIRD PT PATHWAY | Scope addition to remove toppling rock on the Seward Highway at MP 94. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Seward | Kenai Peninsula | $265,116 | $0 | $20,702 | $285,818 |
CE: WINTER TRAIL MARKINGS FY97 | Mark overland winter trails with permanent trail markers between the villages of Scammon Bay, Hooper Bay, Chevak, Newtok, Nightmute and Tununak. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $168,901 | $0 | $15,766 | $184,667 |
KTN CENTRAL BUSINESS DISTRICT SIDEWALKS | PE and construction of pedestrian facilities to include meeting ADA requirements in the central business district of Ketchikan. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Ketchikan | Ketchikan Gateway | $136,476 | $0 | $13,549 | $150,025 |
NOR REG ADA IMPROVEMENTS - PHASE I | Construct curb ramps and construct or repair sidewalks at various location s in the City of Fairbanks. Design accomplished under PJ# 67052 - N.R. ADA Improvements. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $132,233 | $0 | $13,145 | $145,378 |
SEWARD HWY: POTTER MARSH INDIAN PATH | After further discussions with FHWA it has been determined that it would be appropriate to close this project at the current expenditure level, and complete the environmental document under project 53577 Seward Hwy MP 100-115 Passing Lanes . The Passing | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Seward | Kenai Peninsula | $127,313 | $0 | $12,637 | $139,950 |
SHANNON PARK-LADD SCHOOL BICYCLE/PEDESTRIAN PATH | Construct a short bicycle/pedestrian path connecting Shannon Drive and "F" Street in the area of Ladd Elementary School and Tanana Jr. High School in Faibanks. The project may include illumination and a connection to Ladd Elementary and Tanana Jr. High S | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Fairbanks | Fairbanks North Star | $90,504 | $0 | $10,683 | $101,187 |
WRANGELL PETROGLYPH BEACH ACCESS | PE and reconstruction of the trail from Evergreen-Stikine Road ("Airport Road") to the Petroglpyh Beach in Wrangell within existing public right of way. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Wrangell | Wrangell-Petersburg | $59,131 | $0 | $5,870 | $65,001 |
SEWARD HWY: BIRD FLATS - BIRD POINT PATHWAY | As requested by FHWA this project will be closed at current expenditures and the environmental document will be completed under project 53577 Seward Hwy MP 100-115 Passing Lanes. The Passing Lanes project will have "and Pathway" added to the name along w | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Seward | Kenai Peninsula | $16,315 | $0 | $1,152 | $17,467 |
AMATS: SHIP CREEK TRAIL (PARENT) | o Phase-II Construct trail from a new parking area east of Post Road to Tyson Elementary School in Mountain View. o Phase-III Construct trail from near Anchorage Trad | Alaska | 1997 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Anchorage | Anchorage | $2,206,024 | $0 | $218,976 | $2,425,000 |
MCCARTHY FOOTBRIDGE-TE | Design and construct a footbridge across the Kennicott River at approximately MP 93 of the Edgerton Highway to connect the highway with the community of McCarthy and the Kennicott Mine area. Construction of two new vault toilets, one on each side of the | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Kennicott | Valdez-Cordova | $2,030,494 | $0 | $262,085 | $2,292,579 |
POW CRAIG TO HIGH SCHOOL PATH CONSTRUCTION | Construction of a separated multi-purpose path that will provide safe access from the existing sidewalk and the City of Craig to the new high school on the uphill side of the roadway. Lighting is to be included for the new path. | Alaska | 2000 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Craig | Prince Of Wales-Outer Ketchikan | $483,982 | $0 | $48,042 | $532,024 |
FMATS: BIRCH HILL BICYCLE AND PEDESTRIAN FACILITY | Alaska | 2010 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Fairbanks | Fairbanks North Star Borough | $553,417 | $0 | $54,934 | $608,351 | |
Cross Trail Construction - High School to Baranof, Charles, Yaw and Pherson Streets | New construction of approximately 4345 feet of compacted gravel multiuse trail. The new construction begins at the Yaw Drive Extension trail head and connects to the existing improved section of cross trail which begins at the City and Borough of Sitka/Me | Alaska | 2012 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Sitka | Sitka | $16,874 | $0 | $1,675 | $18,549 |
SGY-RIVER FOOTBRIDGE REPLACEMENT (T.E.) | REPLACE EXISTING SKAGWAY RIVER FOOT BRIDGE WITH A NEW FOOT BRIDGE APPROX. 800 FT. SOUTH OF EXISTING SITE. D & C | Alaska | 1994 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Skagway | Skagway-Hoonah-Angoon | $49,986 | $0 | $13,434 | $63,420 |
NOR REG ADA IMPROVEMENTS - AIRPORT WAY (PHASE VII) | Upgrade pedestrian facilities on the north and south side of Airport Way. | Alaska | 2004 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Fairbanks | Fairbanks North Star | $1,683,636 | $0 | $167,123 | $1,850,760 |
CHENA RIVER BICYCLE/PED PATH-CENTENNIAL BRDG TO STEESE BRDG | Construct approximately .85 miles of bicycle/pedestrian path from the Centennial Bridge to the Steese Highway Bridge. Project will include lighting, signing, drainage, landscaping, irrigation system, and removal of minor obstructions. | Alaska | 2004 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Fairbanks | Fairbanks North Star | $260,940 | $0 | $25,902 | $286,842 |
FFY04/05 ANNUAL PLANNING WORK PROGRAM | Upgrade and hard surface 6.5 miles of pathways. 11/03: Scope reduced to 3 miles due to overwhelming ROW and environmental issues associated with a portion of the project. | Alaska | 2004 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Statewide | Statewide | $105,712 | $0 | $10,493 | $116,205 |
AMATS: SHIP CREEK TRAIL, PHASE III | Construct a new paved pedestrian and bicycle trail segment at Ship Creek beginning at the end of the pathway constructed under the Ship Creek Trail Phase II near the Anchorage Trade Center, east to Post Road. Project includes a grade separation over ARR | Alaska | 2004 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Anchorage | Anchorage | $34,940 | $0 | $3,467 | $38,407 |
KENAI RIVER TRAIL IMPROVEMENTS (TCSP & PLD) | Improve the road from the north side of the Million Dollar Bridge at MP 49 of the Copper River Highway to a trailhead location, to be determined during the environmental process, and construct a rail to trail project between the selected trailhead site an | Alaska | 2009 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $50,294 | $0 | $4,992 | $55,286 |
AMATS: CHESTER CREEK TRAIL CONNECTION & UAA SPUR TRAIL | Provide a paved multi-use trail connection between the existing tunnel undercrossing at Ambassador Drive and the existing Chester Creek Trail paralleling Northern Lights Boulevard, continuing west to Goose Lake Park (approx. 2.3 miles in length). Also pr | Alaska | 2009 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Anchorage | Anchorage | $84,746 | $0 | $8,412 | $93,158 |
USFS: PORTAGE VALLEY BLUE ICE TR SYS CONST, PHASE III AK090 | Work to include development and installation of interpretive signs and maps for the entire Trail of Blue Ice Corridor from Portage Lake to Moose Flats Day Use Area. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $149,415 | $0 | $14,831 | $164,246 |
KODIAK "Y" INTERSECTION IMPROVEMENTS | Rehabilitation and intersection improvements on Rezanof Dr from Lower Mill Bay Rd/Center Ave to Marine Way. Includes reconstruction of traffic signal at Marine Way and Rezanof Dr intersection, and addition of a midblock pedestrian crossing between Marine | Alaska | 2009 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Kodiak | Kodiak Island | $922,537 | $0 | $91,574 | $1,014,111 |
PARKS HWY MP 72-83 REHAB: WILLOW CR TO KASHWITNA RIVER(ES) | Rehabilitate pavement, widen roadway, build passing lanes and bridge improvements, and construct safety improvements as needed. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $171,474 | $171,474 | $0 | $171,474 |
DENALI HWY MP 7 WAYSIDE | Construct a wayside in the vicinity of MP 6 of the Denali Highway. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $441,283 | $441,283 | $0 | $441,283 |
VALDEZ AREAWIDE BIKE & PED TRAIL PAVEMENT REFURBISHMENT | Grind and resurface 7.6 miles of bike path on the Richardson Highway between Meals Avenue and River Road in Valdez. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Valdez | Valdez-Cordova | $954,770 | $954,770 | $0 | $954,770 |
GOLD HILL ROAD BICYCLE AND PEDESTRIAN FACILITY | Construct a bicycle & pedestrian facility along Gold Hill Road. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and Bicycle facilities | 0 | 0 | $1,824,538 | $0 | $181,110 | $2,005,648 |
AMATS: MULDOON RD PEDESTRIAN & LANDSCAPING, PHASE III | Provide enhanced pedestrian amenities along Muldoon Road as well as landscaping. The project also includes extending the sidewalk on the east side of Muldoon from 16th to 20th Avenues. | Alaska | 2011 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Anchorage | Anchorage, Municipality of | $1,004,784 | $0 | $99,765 | $1,104,548 |
PARKS HWY MP 231 ENHANCEMENTS | Construct dedicated pedestrian facilities at McKinley Village, including intersection improvements, a rest area, and trail and pedestrian facility connections and replacing the Nenana River Park Boundary Bridge #0694. | Alaska | 2011 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Northern Region | Denali Borough | $462,330 | $0 | $32,670 | $495,000 |
2ND AVE/WILBUR WIDENING AK092 | PE and Utilities for minor improvements which include shoulders for on-street parking, bike lanes, curbs, gutters, and sidewalks. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Fairbanks | Fairbanks North Star | $104,078 | $0 | $10,331 | $114,409 |
BICYCLE/PEDESTRIAN FACILITIES REHAB AND IMPROVEMENTS | Bicycle and pedestrian facility preventative maintenance, rehabilitation and improvements statewide. | Alaska | 2015 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Statewide | Various Boroughs | $72,776 | $0 | $7,224 | $80,000 |
AMATS: BICYCLE PLAN IMPLEMENTATION, C ST: 10TH-40TH | Project will sign, stripe and mark bike lanes or shoulders on existing roadways within the AMATS boundary area to create a safe, connected network of bicycle facilities as identified in the Anchorage Bicycle Plan. | Alaska | 2015 | 1 | (TE) 1. Pedestrian and Bicycle facilities | Anchorage | Anchorage, Municipality of | $48,070 | $0 | $4,772 | $52,842 |
CREAMER'S FIELD WILDLIFE REFUGE-TE | Grading, drainage, paving, utility relocation, illumination, signal system modifications, landscaping and minor structures within and adjacent to the Creamer's Field Migratory Waterfowl Refuge near Fairbanks. | Alaska | 1993 | 3 | (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities | Fairbanks | Fairbanks North Star | $1,456,524 | $0 | $144,581 | $1,601,105 |
SEWARD HWY: BIRD TO GIRD - IV | Consists of excavation, grading, paving, railroad grade seperation to complete the Seward Highway from Bird Creek to Girdwood reconstruction. | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Seward | Kenai Peninsula | $633,540 | $0 | $44,768 | $678,308 |
SEWARD HWY TE:CORRIDOR ENH, PH I | Construct transportation enhancements along the Seward Highway at Potter Creek Trailhead, Indian Creek and Bird Ridge Trailhead in coordination with the Department of Natural Resources (National Highway System). Design through PS&E done under 51042 /TE-0A | Alaska | 1993 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Seward | Kenai Peninsula | $1,253,694 | $0 | $124,501 | $1,378,195 |
NOR REG TOURIST SIGNAGE-TE | wayside identification signs on the Elliott Hwy at MP 28 & MP 57 and on the Steese Hwy at MP 57, 60, 86, 94, 107 and 140. | Alaska | 1995 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $520,218 | $0 | $52,172 | $572,390 |
CE: SCENIC BYWAYS TOURIST SIGNAGE | Install signs designed to assist residents and tourist traffic traveling along the national highway system in identifying the intrinsic qualities of the scenic byway. Seven scenic byway and approximately fifteen interpretive site and route identifier sig | Alaska | 1995 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $149,044 | $0 | $17,403 | $166,447 |
GLENN HWY MP 172-189 REHABILITATION | . | Alaska | 2000 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $303,724 | $0 | $21,462 | $325,186 |
FFY95 STATEWIDE ANNUAL PLANNING WORK PR | Design and construct a scenic overlook adjacent to the Homer Ferry Terminal building including paving, restrooms, and interpretive signage. | Alaska | 1995 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Statewide | Statewide | $94,866 | $0 | $9,416 | $104,282 |
HOMER END-OF-THE-RD SCENIC OVERLOOK | Design and construct a scenic overlook adjacent to the Homer Ferry Terminal building including paving, restrooms, and interpretive signage. | Alaska | 1995 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Homer | Kenai Peninsula | $8,189 | $0 | $962 | $9,151 |
DALTON HWY MP 274-289 REHABILITATION | Revise scope to include development of the Galbraith Lake Wayside at MP 272. Also included in the scope revision is controlled aerial photography from MP 235 - 362 for use in design of this project as well as in design of other planned Dalton Highway pro | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $266,179 | $0 | $26,422 | $292,601 |
NOR REG TOURIST SIGNAGE-WILLOW LAKE WAYSIDE | Construct two wooden observation decks to be sited on gravel pads adjacent to each end of the existing wayside at MP 87.7 of the Richardson Highway. Each deck will be equipped with a pedestal mounted spotting scope, one of which will be ADA compliant. | Alaska | 1998 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Willow Lake | Matanuska-Susitna | $48,573 | $0 | $4,820 | $53,393 |
SIT-ERLER ST TO PETERSON ST - HALIBUT PT | DESIGN AND CONSTRUCT ROADWAY TO AASHTO STANDARDS ALONG EXISTING ALIGNMENT. INCLUDES CURB, GUTTER, AND SIDEWALK WITH PARKING ON ONE SIDE. ALSO UNDERGROUND UTILITIES AND RECREATIONAL ENHANCEMENTS WILL BE ADDRESSED AS REQUIRED. | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Sitka | Sitka | $961,422 | $0 | $131,526 | $1,092,948 |
SEWARD HWY TE: MCHUGH CREEK OVERLOOK | As part of the nationwide Scenic Byways Program this project will include expanded parking, construction of additional recreational and pedestrian facilities, and installation of interpretive signs. Both the project design and construction are already fu | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Seward | Kenai Peninsula | $985,092 | $0 | $69,612 | $1,054,704 |
HNS EAGLE VIEWING AREAS/TURNOUTS (T.E.) | Design and construction of eagle viewing and interpretation areas within the highway right of way along the Haines Highway. Work may include interpretive displays, kiosks, landscaping, observation decks and blinds, boardwalks and sanitary facilities, and | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Haines | Haines | $869,078 | $0 | $88,383 | $957,461 |
SEWARD HWY TE: CORRIDOR ENHANCEMENTS | Phase-I: Upgrade existing Chugach State Park sites at: 1) Potter Creek Trailhead, MP 115.1 2) Indian Creek Scenic Overlook, MP 102.9 3) Bird Ridge Trailhead, MP 102.1 Phase-II: Upgrade existing park site at: 4) McHugh Cree | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Seward | Kenai Peninsula | $836,680 | $0 | $83,052 | $919,732 |
WRANGELL - ZIMOVIA HIGHWAY - BERGER STREET TO MILL | PE AND ROW FOR MINOR WIDENING AND RECONSTRUCTION OF THE ZIMOVIA HWY FROM BERGER ST TO THE LUMBER MILL. | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Wrangell | Wrangell-Petersburg | $527,451 | $0 | $131,863 | $659,314 |
PARKS HWY: DENALI VIEW SCENIC OVERLOOKS, (DESIGN ONLY) | Phase I: Denali View North. Construct new Denali Scenic View pullout within a previously excavated materials site at MP 162.4. Phase II: Veterans Memorial. Expand existing park facilities at MP 147.1 Phase III: Denali View South. Construct new D | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | Denali | $484,871 | $0 | $48,130 | $533,001 |
LAKE LOUISE WAYSIDES | IMPROVE TRAILHEAD PARKING AT MILE 16 & 19. IMP INCLUDE CONSTRUCTION PARKING AREAS, INSTALL INFORMATIONAL KIOSK, INTERPRETATIVE SIGNS, LANDSCAPING. | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Lake Louise | Matanuska-Susitna | $420,474 | $0 | $41,738 | $462,212 |
NOR REG TOURIST SIGNAGE - DALTON HIGHWAY | Fabrication and installation, under the existing Memorandum of Agreement (MOA) with the Bureau of Land Management (BLM) for placing tourist signs along the Dalton Highway. Preconstruction work was done under PJ# 66682 / TEA-000S(177), Dalton Highway Tour | Alaska | 1998 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $104,606 | $0 | $10,383 | $114,990 |
JNU CHANNEL DR WAYSIDE CONSTRUCTION | PE for construction of a multi-function wayside park and transit node for public use near the DIPAC fish hatchery. Project will provide park area, parking, transit shelter and pullout, lighting, and improved shore access. | Alaska | 1998 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Juneau | Juneau | $327,494 | $0 | $34,256 | $361,750 |
NOR REG TOURIST SIGNAGE - NOME CITY SIGNS | Fabrication and installation of approximately 12 (twelve) tourist information/interpretive signs and a Welcome to Nome sign in the Nome municipality by means of a Memorandum of Agreement (MOA) with the City of Nome. Project was designed under PJ# 66682 / | Alaska | 1999 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Nome | Nome | $59,131 | $0 | $5,869 | $65,000 |
FFY99 SEA HIGHWAYS SCENIC ENHANCEMENTS | Removal of brush, trees, and other vegetation in the enhancement of scenic pullouts and along roadsides in Haines, Juneau, and Skagway. | Alaska | 1999 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $76,415 | $0 | $7,585 | $84,000 |
HNS HWY DALTON CACHE INTERPRETIVE CENTER | Following receipt of ATP w/construction from FHWA, DOR&PF will transfer funds to the U.S. Bureau of Land Management (per an executed project agreement , via a lump sum payment), who will in turn transfer the funds to the U.S. General Services Administrati | Alaska | 2000 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Haines | Haines | $102,785 | $0 | $10,203 | $112,988 |
SEA HIGHWAYS SCENIC ENHANCEMENTS FFY00 | PE to identify various roads in Haines, Juneau, Skagway, Ketchikan, and Sitka for removal of brush, trees, and other vegetation for the enhancement of scenic pullouts and along roadsides. | Alaska | 2000 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $169,800 | $0 | $16,855 | $186,655 |
NOME-ROCKER GULCH WAYSIDE | Provide a parking area, boardwalk and interpretive display near Rocker Gulch located at the intersection of Beam Road and the Nome-Council Highway. | Alaska | 2000 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Nome | Nome | $233,507 | $0 | $23,179 | $256,686 |
PARKS HWY MP 185 EAST FORK WAYSIDE | Rehabilitate the existing East Fork Wayside, including sanitation facilities, parking areas, picnic shelters and pathways. | Alaska | 2000 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Fairbanks | Fairbanks North Star | $821,763 | $0 | $54,069 | $875,832 |
HATCHER PASS SCENIC OVERLOOKS, PHASE I | Phase I of the Hatcher Pass Scenic Overlooks projects. This project provides improvements at the Independence Mine State Historical Park Trailhead at MP 1.5 of Gold Cord Road. This includes improved parking, upgraded and paved pedestrian pathw | Alaska | 2000 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Willow | Matanuska-Susitna | $1,256,104 | $0 | $124,683 | $1,380,787 |
Park Hwy Rest Areas | Construct new rest areas between Fairbanks (MP 360) and Bear Creek (MP 262) and Nenana Canyon (MP 239) and the East Fork of the Chulitna River (MP 185). The project will also include toilet facilities and interpretive displays. | Alaska | 2013 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Northern Region | Multiple | $93,400 | $0 | $6,600 | $100,000 |
WORTHINGTON GLACIER SCENIC VIEWING AREA-TE | IMP SCENIC VIEW AREA ON RICH HWY @MP28.IMP INCLUDING UPGRADE EXISTING GRAVEL ACCESS RD, PARKING AREA, RESURF TRAILS, SANITARY FAC, INTERP DISPLAYS. | Alaska | 1993 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Valdez | Valdez-Cordova | $1,662,559 | $0 | $165,533 | $1,828,092 |
OLD GLENN HWY: MATANUSKA RIVER BRIDGE REPLAC | Replace bridge approaches, the bridge (#540) and improve the geometrics of the adjacent roadway. The separated pathway along the project length will be reconstruced with pedestrian underpasses(2). The existing bridge will be remain in place. | Alaska | 1996 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Mat-Su | Anchorage | $510,445 | $0 | $53,156 | $563,601 |
GLENN HWY MP 118-127 RECONSTRUCTION | Rehabilitation, reconstruction and resurfacing of the Richardson Highway between MP 129 (Tok Cutoff/Richardson Highway Junction) and MP 148 (Sourdough) and archaeological clearance for use of the Ringling Pit. | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $35,520 | $0 | $2,510 | $38,030 |
DELTA JUNCTION SCENIC TURNOUT IMP-TE | CONSTRUCT PEDESTRIAN & PICNIC FACILITIES, IMPROVE SANITARY FACILITIES & CIRCULATION TRAILS FOR ACCESSIBILITY. | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Delta Junction | Southeast Fairbanks | $50,323 | $0 | $5,496 | $55,819 |
CHENA PUMP/TANANA RIVER SCENIC WAYSIDE | Upgrade the Chena Pump Road wayside, including sanitary facilities. The project will also include an ADF&G funded boat launch parking area. | Alaska | 2001 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Fairbanks | Fairbanks North Star | $84,739 | $0 | $8,411 | $93,150 |
FFY01 SEA REGION SCENIC VIEWSHED ENHANCEMENTS | Removal of brush, trees, and other vegetation at scenic viewsheds, behind guardrails, and sight distance areas in Juneau, Haines, Ketchikan, Sitka, and on Prince of Wales Island. | Alaska | 2001 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $196,413 | $0 | $19,497 | $215,910 |
GLENN HWY: MATANUSKA GLACIER SCENIC OVERLOOK | Expand and improve the existing scenic overlook with pathways, landscaping and viewing decks. | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $244,427 | $0 | $18,573 | $263,000 |
GOLDSTREAM ROAD REHABILITATION | Rehabilitation, reconstruction and resurfacing of the Richardson Highway between MP 129 (Tok Cutoff/Richardson Highway Junction) and MP 148 (Sourdough) and archaeological clearance for use of the Ringling Pit. | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Fairbanks | Fairbanks North Star | $85,883 | $0 | $21,472 | $107,355 |
DALTON HWY MP 90-100 | PE AND CONSTRUCTION FOR REHABILITATION, TOTAL RESURFACING, GRADE RAISING AND CULVERT REPLACEMENT AS NECESSARY. PROJECT WILL ALSO INCLUDE CONSTRUCTION OF FINGER MOUNTAIN WAYSIDE AT MP 98. THE WAYSIDE WILL CONSIST OF AN APPROACH AND PARKING AREA, FOOTPATH | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $135,815 | $0 | $13,481 | $149,296 |
SEWARD HWY: MP 0-8 SEWARD TO GROUSE CRK (PARENT) | Repave and reconstruct the Seward Highway from MP 0 to MP 8 with alignment, drainage, erosion and safety improvements, and construction of a trail to Bear Lake Road. Replacement of 3 bridges (#0596, #0597, #0598) over Resurrection River and new railroad | Alaska | 2001 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Seward | Kenai Peninsula | $545,820 | $0 | $54,180 | $600,000 |
STEESE HWY PEDRO MONUMENT HISTORICAL WAYSIDE | Construct wayside improvements including a walking trail, covered shelter, sanitary facilities and interpretive exhibits. | Alaska | 2001 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Fairbanks | Fairbanks North Star | $607,995 | $0 | $60,352 | $668,347 |
ELLIOTT HWY MP 7 NORTH REHAB | RECONSTRUCT AND WIDEN CHSR FROM OLD STEESE HIGHWAY TO NORDALE ROAD (4 LANES TO STEELE CREEK RD). | Alaska | 1992 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Fairbanks | Fairbanks North Star | $38,994 | $0 | $3,871 | $42,865 |
RICHARDSON HWY MP 129-148 REHAB | Rehabilitation, reconstruction and resurfacing of the Richardson Highway between MP 129 (Tok Cutoff/Richardson Highway Junction) and MP 148 (Sourdough) and archaeological clearance for use of the Ringling Pit. | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $327,492 | $0 | $37,628 | $365,120 |
GLENN HWY: TE KEPLER BRADLEY SCEN.PULLOUT | Improve the existing Kepler Bradley rest stop by: resurfacing the entrance approach and parking area, resurfacing and installing a retaining wall on a short trail to Matanuska Lake, installing interpretive displays of the lake and trail system, and instal | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $387,006 | $0 | $33,798 | $420,804 |
DALTON HWY MP 111 SOUTH REHAB | PE and construction for rehabilitation, gravel surfacing, new construction and improvements to waysides, and an RV site. | Alaska | 1992 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $31,625 | $0 | $4,025 | $35,650 |
K-BEACH RD MP 16.4-22.4 REHABILITATION | Rehabilitate surface, drainage, and roadbed and make safety and capacity improvements between MP 16.2 and MP 22.2. | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Kenai | Kenai Peninsula | $227,426 | $0 | $22,574 | $250,000 |
RICHARDSON HWY MP 127-GULKANA RIVER WAYSIDE | Construct appropriate access and wayside improvements near the Gulkana River Bridge near MP 127 of the Richardson Highway. Improvements include approaches, parking area development improvement, landscaping, sanitary facilities, footpaths and interpretive | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Gulkana | Valdez-Cordova | $225,457 | $0 | $22,388 | $247,845 |
ALASKA HWY MP 1386 - NORTH | Alaska Hwy MP 1386-1412, reconstruction of highway, replacement of the Little Gerstle bridge and rehabilitation of the (Big) Gerstle River Bridge. Improve parking, access road, landscaping, and interpretive exhibits for historic roadhous | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $216,806 | $0 | $15,321 | $232,127 |
NOR REG FFY02 VAULTED TOILET CONSTRUCTION | Alaska Highway MP 1250 (Deadman Lake Wayside), Edgerton Highway MP 35 (Copper River Wayside), Elliott Highway MP 150 (Manley Hotsprings Wayside), Richardson Highway MP 50 (Ladybird Wayside), Tok Cutoff MP 24 (Gold Rush Wayside), Tok Cutoff MP 64 (Porcupin | Alaska | 2002 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | Yukon-Koyukuk | $318,880 | $0 | $32,253 | $351,133 |
FFY94 TRANSPORTATION PLANNING WORK PROG | Upgrade three existing highway waysides on the Sterling Highway at MP 135 and MP 137, Ninilchik River and Deep Creek North and South. Work will enlarge and improve parking including landscaping, trails, handpump water well, vaulted toilets, kiosks, inform | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Statewide | Statewide | $149,504 | $0 | $14,840 | $164,344 |
JUNEAU - BROTHERHOOD BRIDGE TO ENGINEER'S CUTOFF | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Juneau | Juneau | $153,398 | $0 | $15,227 | $168,625 | |
HATCHER PASS SCENIC OVERLOOKS, PHASE II | Revise scope to include only three locations between MP 7 and 14 - Gateway Scenic Overlook, Government Peak Picnic Area and Gold Mint Trailhead. Improvements to include: paved viewing areas, viewing deck, interpretive signing and kiosks, vaulted toilets, | Alaska | 2003 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Willow | Matanuska-Susitna | $609,941 | $0 | $60,545 | $670,486 |
RICHARDSON HWY MP 306 BIRCH LAKE WAYSIDE | Construct a public wayside along the Richardson Highway adjacent to birch Lake, including sanitary facilities, access barriers and landscaping.. | Alaska | 2001 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Birch Lake | Valdez-Cordova | $16,492 | $0 | $1,165 | $17,657 |
STEESE HWY MP 147 BIRCH CREEK WAYSIDE | Construct a wayside/parking area near the Birch Creek Bridge near MP 147 of the Steese Highway. Project will also include a boat launch and sanitary facility. The boat launch portion of the project will be funded by other agencies and will not use feder | Alaska | 2001 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Fairbanks | Fairbanks North Star | $43,986 | $0 | $4,367 | $48,353 |
HATCHER PASS SCENIC OVERLOOKS (PARENT) | Scope/Termini Addition: Construct 0.5 mile access road and parking area / public trailhead at MP 11 of the Hatcher Pass Road. | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Willow | Matanuska-Susitna | $448,256 | $0 | $52,995 | $501,251 |
POW-HYDABURG HIGHWAY PAVING | Provide a hard surface on the Hydaburg Highway from the intersection of the Hollis Highway to Hydaburg, a distance of 23 miles.. | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Hydaburg | Prince Of Wales-Outer Ketchikan | $29,398 | $0 | $2,918 | $32,316 |
SEWARD HWY: MP 59.3-65.5 RECONSTRUCTION | Reconstruction of the Seward Hwy from MP 59.3 to 65.5. PE through Design approval was done under Pj. 53045 / F-031-1(20) Seward Hwy MP 50 - 65.5. Consists of reconstructing approximately six miles of the Seward Highway near the Hope Wye. The work will | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Seward | Kenai Peninsula | $37,360 | $0 | $2,640 | $40,000 |
DALTON HWY MP 335-362 REHABILITATION | Clarify the locations of the two project enhancements authorized under the existing scope to be MP 348-Sag River Overlook & MP 415-Deadhorse Wayside. Also, add the construction of a waysde at MP 395-Arctic Coastal Plain. | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $45,485 | $0 | $4,515 | $50,000 |
SEWARD HWY: TURNAGAIN PASS RECREATION AREA | SEWARD HWY MP 68.1 TURNAGIN PASS, PEProj. name change to: Seward HWY: Turnagain Pass Rec Area MP62.241-67.551 | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $1,232,387 | $0 | $87,085 | $1,319,472 |
DALTON HWY MP 111-175 REHAB (111-144 CONST) | Rehabilitation of the Dalton Hwy between approx. MP 111-174 (Kanuti Flats & Coldfoot). The project may include localized embankment reconstruction and upgrades, guardrail and culvert repairs and repla | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $143,278 | $0 | $14,222 | $157,500 |
DALTON HWY MP 57 -YUKON CROSSING WAYSIDE | Improve existing access road and parking area to serve as a wayside, interpretation displays about the Yukon River area and pipeline crossing, a nature trail and two viewing platforms. | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $407,565 | $0 | $40,456 | $448,021 |
NOR REG TOURIST SIGNAGE-PHI (GOLD RUSH) | Design, fabricate and install interpretive exhibits in existing waysides along the highway systems. This may include minor site development as needed to assure the signs are placed in visible and appropriate locations. Sign locations are at various loca | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $195,118 | $0 | $19,367 | $214,485 |
DAVIS DOME WAYSIDE | Construct a new wayside at Davis Dome on Boundry Spur near the Canadian Border and improve 3 others along the the Taylor Hwy as funding allows (MP 82 - Walker fork Campgroud, MP 49- West Fork Campground and MP 35- Mt Fairplay Wayside). The project may inc | Alaska | 1992 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Chicken | Southeast Fairbanks | $23,350 | $0 | $2,318 | $25,668 |
PARKS HWY: MP 41-44 CRUSEY TO LUCUS | Rehabilitate the Parks Highway from Crusey Street to Lucas Road. Project will include pavement rehabilitation, driveway consolidation, improvements to drainage system and pedestrian facilities, and landscaping. Scope does not include the illimination o | Alaska | 2009 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Wasilla | Wasilla | $761,102 | $0 | $53,782 | $814,884 |
PARKS HIGHWAY: MP 39-41 REHB-SEWARD MERIDIAN TO CRUSEY | 11/99 Amend Scope - to include the design and construction of an interchange at Seward Meridian Road. | Alaska | 1996 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Wasilla | Matanuska-Susitna | $838,676 | $0 | $59,264 | $897,940 |
DENALI VIEW SCENIC OVERLOOKS (VETERAN'S | Upgrade the Veteran's Memorial rest stop facilities at MP 147 on the Parks Highway and pave the newly constructed facility at MP 162. Design of this construction project was completed under PJ 51040, TE-0A4-3(9). | Alaska | 1995 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Denali National Park | Denali | $1,615,669 | $0 | $163,175 | $1,778,844 |
SGY-GOLD RUSH CENTENNIAL ENHANCEMENTS | Expand and improve the existing turnout overlooking the historic Dyea townsite; design and construct interpretive signage at various turnouts on the Klondike Highway. Design and place a "Welcome to Alaska" sign near the US-Canada border. | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Skagway | Skagway-Hoonah-Angoon | $282,222 | $0 | $28,937 | $311,159 |
NOME-SOLOMON WAYSIDES-TE | Construct a wildlife view area at S S Brdg to inc veiw pltfrm, interpretive signs & parking, & Ft Davis trnouts & interp sgn. | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Nome | Nome | $294,416 | $0 | $30,025 | $324,441 |
COPPER RIVER HWY MP O-6.5 REHAB | Alaska | 1994 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Cordova | Valdez-Cordova | $80,704 | $0 | $8,011 | $88,715 | |
CHENA HOT SPRINGS RD WIDEN -2ND CONTRACT | Reconstruct and widen Chena Hot Springs Road from Nordale to the Steese Highway. Associated with main PJ# 63204 Chena Hot Springs Widening under this same federal project number. | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Fairbanks | Fairbanks North Star | $463,492 | $0 | $46,010 | $509,502 |
PARKS HIGHWAY: MP 52-57 REHB-BIG LK-LITTLE SU | Reconstruction of the Parks Highway from MP 52 to 57 to current standards to include a separated pedestrian/bicycle pathway and a RR grade separation at the Houston RR Xing. Design accomplished under parent project 58712 / I-OA4-1(7) Parks Hwy MP 44-57. | Alaska | 1996 | 4 | (TE) 4. Scenic Turnouts and Overlooks | 0 | 0 | $748,617 | $0 | $52,898 | $801,515 |
NEW SEWARD HWY: 36TH AVE TO 5TH/6TH AVE | Repave the road from curb to curb. The road will be rotomilled approximately two inches with a two inch asphalt overlay. Drainage improvement near Cal Worthington, and striping will be included in the project. | Alaska | 1997 | 4 | (TE) 4. Scenic Turnouts and Overlooks | Anchorage | Anchorage | $994,874 | $0 | $70,303 | $1,065,177 |
NORTHERN LIGHTS BOULEVARD LANDSCAPING | Landscaping improvements on Northern Lights Blvd., from Lake Otis Parkway to Muldoon Road. | Alaska | 1997 | 5 | (TE) 5. Vegetation Management | Fairbanks | Fairbanks North Star | $403,423 | $0 | $46,064 | $449,487 |
CORDOVA/VALDEZ JUNK CAR REMOVAL-TE | Removal and disposal of inoperal and abandoned vehicles. | Alaska | 1995 | 5 | (TE) 5. Vegetation Management | Cordova | Valdez-Cordova | $185,206 | $0 | $18,384 | $203,590 |
FNSB ABANDONED VEHCL REMOVAL PROGRAM-TE | Remove and dispose of inoperable and abandoned vehicles. | Alaska | 1994 | 5 | (TE) 5. Vegetation Management | 0 | 0 | $44,430 | $0 | $4,410 | $48,840 |
CREAMER'S FIELD WILDLIFE REFUGE, PH II-TE | RESTORE HISTORIC DAIRY BUILDINGS, IMPROVE ACCESS THROUGH BUILDINGS, AND PROVIDE EXHIBITS AND INTERPRETIVE DISPLAYS. | Alaska | 1995 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Fairbanks | Fairbanks North Star | $7,117 | $0 | $706 | $7,823 |
SEWARD RAILCAR PRESERVATION | Preservation of a 1916 Alaska Railroad railcar. The railcar is to used as a visitor center/museum. Work to include restrooms. | Alaska | 2000 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Seward | Kenai Peninsula | $1,902 | $0 | $188 | $2,090 |
MCCARTHY/KENNICOTT MINE HIST PRESERV-TE | EMERGENCY STABILIZATION REPAIRS TO HISTORIC STRUCTURES A THE THE KENNICOTT MINE. | Alaska | 1994 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Kennicott | Valdez-Cordova | $1,204 | $0 | $119 | $1,323 |
SEWARD HISTORICAL STREET LIGHTING | Landscape scenic viewpoints and provide antique street lights in the historic portion of downtown Seward between the corner of Adams and Fourth Streets and the historic Railroad Terminal on Railway Avenue. | Alaska | 1994 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Seward | Kenai Peninsula | $294,595 | $0 | $29,243 | $323,838 |
UNALASKA TE: HOLY ASCENSION CHURCH | To renovate or otherwise deter degradation to the structure and finishes of the Russian Orthodox Church located in Unalaska, Alaska. This church, one of the oldest structures in Alaska, has neen in a state of increasing deterioration for some time. | Alaska | 1994 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Unalaska | Aleutians East | $1,351,743 | $0 | $492,284 | $1,844,027 |
KENAI FT. KENAY MISSION ST IMPROVE TE | Enhance the City of Kenai's Mission Street between Overland Avenue and Alaska Avenue by upgrading approximately 800' of roadway to Urban standards to improve access to the Russian Orthodox Church. | Alaska | 1997 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Kenai | Kenai Peninsula | $68,001 | $0 | $6,748 | $74,749 |
COPPER RIVER & NW R/R HISTORIC STRUCTURE | Replace/stabilize historic structures or sites associated with the Copper River and Northwest Railroad. | Alaska | 1992 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Cordova | Valdez-Cordova | $7,793 | $0 | $774 | $8,567 |
CREAMER'S REFUGE BARN RESTORATION | Provide critical structural restoration and repairs on the historic barns at Creamer's Wildlife Refuge in Fairbanks. | Alaska | 1999 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Fairbanks | Fairbanks North Star | $110,683 | $0 | $10,987 | $121,670 |
GOLD RUSH HISTORICAL SIGNS | Design and construct approximately 30 highway wayside historical markers at various Central Region locations. Minor wayside improvements may be needed to install markers in appropriate/accessible sites. | Alaska | 1998 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Skagway | Skagway-Hoonah-Angoon | $90,970 | $0 | $9,030 | $100,000 |
LAVELLE YOUNG WHEELHOUSE SITING | Develop a permanent site for the historic Lavelle Young Wheelhouse for display at Alaskaland, including a structural deck, setting the wheelhouse and a replica helm. | Alaska | 2001 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Fairbanks | Fairbanks North Star | $70,615 | $0 | $7,009 | $77,624 |
EARTHQUAKE PARK INTERPRETIVE FACILITY-AN | Enhance Earthquake Park pedestrian amenities. Add two trail turnouts with interpretive displays along the trail connecting the existing Northern Lights Boulevard parking area to the Coastal Trail. Realign and upgrade the Coastal Trail intersection to im | Alaska | 1995 | 6 | (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities | Anchorage | Anchorage | $589,879 | $0 | $64,430 | $654,309 |
LAVELLE YOUNG WHEELHOUSE RESTORATION-TE | RESTORE THE WHEELHOUSE THAT WAS SALVAGED FROM THE LAVELLE YOUNG RIVER STEAMER. | Alaska | 1994 | 7 | (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities | Fairbanks | Fairbanks North Star | $122,922 | $0 | $12,203 | $135,125 |
YAKUTAT RR TRAIL: SCHOOL TO AIRPORT | Design and construction of a bicycle/pedestrian/cross country ski trail from the school to the airport, making use of the old railroad bed and right of way. | Alaska | 1994 | 8 | (TE) 8. Conversion of Abandoned Railway Corridors to Trails | Yakutat | Yakutat | $525,393 | $0 | $65,331 | $590,724 |
SIT CASTLE HILL T.E. | Stage I - monument reconstruction, will correct foundation and structural problems associated with settling of the rock walls. Stage II will address pedestrian access to the monument. | Alaska | 1995 | 10 | (TE) 10. Archaeological Activities | Sitka | Sitka | $1,421,049 | $0 | $143,958 | $1,565,007 |
NEW SEWARD / DIMOND SEDIMENTATION BASINS | Construction of two sedimentation basins to treat storm drainage discharge into Little Campbell Creek, in the area of the New Seward Highway and Dimond Blvd, as funding allows. Design was performed with funding by the Municipality of Anchorage. | Alaska | 1993 | 11 | (TE) 11. Environmental Mitigation | Anchorage | Anchorage | $1,066,129 | $0 | $387,829 | $1,453,958 |
DALTON HWY CULVERTS MP 260-321 AK090 | Replace existing culverts at various locations between MP 260 and 321 of the Dalton Highway. Replace the culvert at MP 313.7 (Oksrukuyik Creek #2) with a bridge. | Alaska | 2009 | 11 | (TE) 11. Environmental Mitigation | 0 | 0 | $6,034 | $0 | $599 | $6,633 |
Richardson Hwy MP 110 Tazlina Wayside Riverbank Stabilization | Improve the Tazlina Wayside including river bank stabilization. | Alaska | 2013 | 11 | (TE) 11. Environmental Mitigation | Tazlina | Valdez-Cordova | $221,720 | $0 | $52,009 | $273,729 |
SOLDOTNA TE: WATER QUALITY MITIGATION (MARYDALE) | Provide for the design and construction of a storm drain outfall at Marydale Street at the terminus of Riverwatch Road, including a sedimentation basin. The outfall is required by Alaska Department of Environmental Conservation to assure adequate water | Alaska | 1995 | 11 | (TE) 11. Environmental Mitigation | Soldotna | Kenai Peninsula | $604,471 | $0 | $73,001 | $677,472 |
TANANA VALLEY RAILROAD TRAINHOUSE/MUSEUM | Construct a structure to house and support operations of the restored Tanana Valley Railroad Engine #1 and to include a museum at Alaskaland. | Alaska | 2001 | 12 | (TE) 12. Historic Preservation & Rehab of Historic Transportation Facilities | Fairbanks | Fairbanks North Star | $1,965,376 | $0 | $195,090 | $2,160,466 |