Project Search Results
Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
AMATS: ASD BIKE SHARING EDUCATION TRAILER PROGRAM | Project will purchase four bicycle fleets and two transportation trailers for a bicycle sharing education program used by the Anchorage School Distrct Physical Education Department ot instruct studies in grades 5-12 on bicycle safety, rider skills, and encourage the use of bicycles as transportation. | Alaska | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Anchorage | Anchorage, Municipality of | $136,048 | $0 | $34,012 | $170,060 |
Transfer through BIA to Craig Tribal Assoc Craig Community Sidewalk Prgn Ph1. FHWA contact is Danny Capri, 360-619-7960; danny.capri@dot.gov, Tribal is Anna Guthrie 907-826-3998 tribal.admin@craigtribe.org | Alaska | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Craig | 0 | $464,144 | $0 | $116,036 | $580,180 | |
Transfer USFS Tongass Nat Forest AK Region for the W. Glacier Trail Enhan;project awarded via competitive TAP. Contacts: borr@fs.fed.us /907-789-6244 & marcheta.moulton@alaska.gov 80%match 73426.50 | Alaska | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Juneau | 0 | $293,706 | $0 | $73,427 | $367,133 | |
FISH CREEK TRAIL EXTENSION - ANCHORAGE | Alaska | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Statewide | Various Boroughs | $800,000 | $0 | $208,000 | $1,008,000 | |
10TH AVE BIKE BOULEVARD PHASE II - ANCHORAGE | Alaska | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Statewide | Various Boroughs | $512,800 | $0 | $347,263 | $860,063 | |
Transfer to WFL for PJ AK FS CNF 164(1) INHT Portage Curve Multi-modal Connector. Match by the National Forest Service. A LOAt trans. responsibility for the funds is available. Susan Law WFL 360-619-7840 | Alaska | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Anchorage | 0 | $101,000 | $0 | $25,250 | $126,250 | |
Third Ave Sidewalk | Alaska | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Kotzebue | Northwest Arctic | $760,000 | $0 | $100,000 | $860,000 | |
Transfer to WFL for Cross Trail PJ is AK SITKA 2013(1). Match from C&B of Sitka.Contact is Peter Field; peter.field@dot.gov or 360-619-7619. | Alaska | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Sitka | 0 | $824,188 | $0 | $206,047 | $1,030,235 | |
AMATS: BICYCLE PLAN IMPLEMENTATION (MOA OWNED) - PARENT | Alaska | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Anchorage | Anchorage, Municipality of | $82,702 | $0 | $8,209 | $90,911 | |
CITY OF FAIRBANKS BICYCLE AND PEDESTRIAN COUNT EQUIPMENT | Alaska | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Various | Fairbanks North Star Borough | $54,425 | $0 | $5,402 | $59,827 | |
Cross Trail | Extend Cross Trail - High School to Baranof, Charles, Yaw & Pherson Streets in Sitka, AK. WFL PJ is AK SITKA 2013(1). Match will be provided by the City & Borough of Sitka. | Alaska | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Sitka | Sitka | $824,188 | $0 | $81,812 | $906,000 |
Transfer to WFL for AK SITKA 2017(1) Sitka Sea Walk Phase 2. Please note, the AK176 56C0 funds 100% federal no match. TAP funds match will be provided by Sitka & NPS. Susan Law 360-619-7840 | Alaska | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Anchorage | 0 | $1,360,000 | $0 | $340,000 | $1,700,000 | |
AMATS: MOUNTAIN VIEW DRIVE PATHWAY RECONSTRUCTION | Alaska | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Statewide | Various Boroughs | $117,975 | $0 | $29,494 | $147,469 | |
ADA Compliance | Alaska | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Palmer | Matanuska-Susitna | $300,000 | $0 | $15,000 | $315,000 | |
CITY OF FAIRBANKS SIDEWALK CONDITION SURVEY | Alaska | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Various | Fairbanks North Star Borough | $47,741 | $0 | $4,739 | $52,480 | |
AMATS: FISH CREEK TRAIL REHAB: TURNAGAIN BLVD TO KONA LN | Project will analyze existing pathways for rehabilitation needs community-wide and promote specific projects to rehabilitate those existing pathways. The scope is primarily expected to include pavement replacement with a focus on trails that form the Anchorage Bicycle Plan Core Bicycle Network. | Alaska | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Anchorage | Anchorage, Municipality of | $692,308 | $0 | $173,077 | $865,385 |
New Street light | Alaska | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Russian Mission | 0 | $75,000 | $0 | $3,800 | $78,800 | |
Transfer to WFL for AK FS CNF 164(1) INHT Portage Curve Multi-modal Connector. Project is adjacent to Seward Hwy between Mile Post 75-82, Rural interstate. Match is WFL responsibility; Susan Law 360-619-7846 | Alaska | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Anchorage | 0 | $1,000,000 | $0 | $250,000 | $1,250,000 | |
SOUNDVIEW PEDESTRIAN ACCESS - HOMER | Alaska | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Statewide | Various Boroughs | $518,825 | $0 | $207,530 | $726,355 | |
AMATS: MULTI-MODAL VOLUME COUNTERS | Expansion of the Municipality of Anchorages ability to collect and report multi-modal volumes on roadways, paths, and trails within the Municipality of Anchorage.  This project would include additional devices and reporting capabilities (including possible polling of some field devices) with the goal of assessing areas in regards to: travel demand, route identification, traffic patterns, and seasonal use to include vehicles, bicyclists, pedestrians, and other non-motorized forms of transportation. Valuable information would be directed to support on-road and off-road planning and design activities as related to applicable: safety concerns, fulfillment of existing plan objectives and goals, facility designs, and area connectivity concerns and/or improvements.  This project does not include installation. | Alaska | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Anchorage | Anchorage, Municipality of | $389,000 | $0 | $97,250 | $486,250 |
AMATS: BICYCLE STORAGE PURCHASE | Project will study and inventory existing conditions; begin a process of education and citizen engagement; institute new municipal policies and means of enforcement; provide improvements to transit facilities; fund a Safe Routes to School program coordinator; update the Anchorage Bike Plan, Anchorage Pedestrian Plan, and Anchorage Trails Plans; and start a smart lighting project. | Alaska | 2017 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Anchorage | Anchorage, Municipality of | $40,000 | $0 | $10,000 | $50,000 |
AMATS: VISION ZERO PROGRAM | Project will study and inventory existing conditions; begin a process of education and citizen engagement; institute new municipal policies and means of enforcement; provide improvements to transit facilities; fund a Safe Routes to School program coordinator; update the Anchorage Bike Plan, Anchorage Pedestrian Plan, and Anchorage Trails Plans; and start a smart lighting project. | Alaska | 2017 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Anchorage | Anchorage, Municipality of | $288,000 | $0 | $72,000 | $360,000 |
FIXING MT. BALDY | Widen and realign the multi-use paths along Egan Expressway, including the crossing of Duck Creek, and correct other deficiencies including badly deteriorated pavement. Upgrades include the replacement of two narrow bridges. | Alaska | 2014 | 201 | (TAP) 201. Trails | Juneau | Juneau, City and Borough of | $9,452 | $0 | $2,363 | $11,815 |
HOWI TRAIL DAYS ACROSS THE BAY | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $40,638 | $0 | $10,159 | $50,797 |
TSALTESHI TRAILS EQUIPMENT | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $50,000 | $0 | $12,500 | $62,500 |
LOOKOUT MOUNTAIN MAINTENANCE BLDG - PH II | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2015 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $30,000 | $0 | $7,500 | $37,500 |
PALMER BIKE PARKE: PHASE 1 | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $50,000 | $0 | $12,500 | $62,500 |
TANANA LAKES TRAIL PHASE III | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $50,000 | $0 | $12,500 | $62,500 |
WATERHOLE & STRAIGHT IN TRAILS | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $8,374 | $0 | $2,093 | $10,467 |
METHODIST CAMP TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2014 | 201 | (TAP) 201. Trails | Statewide | Various Boroughs | $9,895 | $0 | $982 | $10,877 |
2016 RTP ADMIN ALLOWANCE | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $93,978 | $0 | $30,209 | $124,187 |
HATCHER PASS MULTI-USE TRAIL REPAIRS | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $47,486 | $0 | -$24,298 | $23,188 |
GRANITE CREEK TRAIL IMPROVEMENTS | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $55,061 | $0 | $5,464 | $60,525 |
NORTHERN REGION TRAIL TRAINING AND ASSESSMENT | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $13,307 | $0 | $1,321 | $14,628 |
BARTLETT GLACIER TRAIL CONSTRUCTION | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $49,945 | $0 | $5,549 | $55,494 |
CURRY RIDGE TRAIL PHASE III | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $77,505 | $0 | $9,473 | $86,978 |
WILLOW PARK TRAIL | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $26,347 | $0 | $2,927 | $29,275 |
SADDLE TRAIL REROUTE, PHASE II | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $46,458 | $0 | $4,612 | $51,070 |
Transfer to return required 1% of funds set aside for the Rec Trails Program (RTP) to FHWA HQ for RTP program administration. Required per 23USC213(f)(2), FAST Act PL114-94. AK has chosen to transfer full 1% of APPN. Contact is Christopher Douwes. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | 0 | $15,279 | $0 | $0 | $15,279 | |
CAINES HEAD SRA: TONSINA SECTION | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $43,441 | $0 | $4,312 | $47,753 |
SHOUP TRAIL REOPENING | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $39,573 | $0 | $4,400 | $43,973 |
RILKE SCHULE TRAIL CONNECTION TO MEADOW PARK | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2016 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $33,782 | $0 | $8,445 | $42,227 |
2017 DNR TRAIL GUIDE VIDEOS (CAINES HEAD REED LAKE) | This program provides funding for various small recreational trail projects statewide. The program is administered by ADNR. | Alaska | 2017 | 201 | (TASA) 201. Trails | Statewide | Various Boroughs | $60,876 | $0 | $6,206 | $67,082 |
EGAN DRIVE MULTI-USE PATH REPAIR/BRIDGE NO.6011 REPLACEMENT | Crack sealing, surface treatment drainage, signage, guardrail, illumination and other refurbishments to prolong the life of road pavement and bridges and their safety related structures. Project includes NHS Lane Delineators, Destination & Distance Signing, Pavement Markings and Signalization, Abandoned Vehicle Program, Road Surfacing and Transfer and Road Surface Treatments. | Alaska | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Southcoast Region | Various Boroughs | $122,810 | $0 | $12,191 | $135,000 |
KENAI SPUR RD MP 0.0 TO MP 2.8 | Establish project to reconstruct Kenai Spur Rd to current standards for a 4-lane urban roadway from the Sterling Hwy intersection through Soldotna, MP 0.0 to 1.9; and a rural 4-lane divided highway from MP 1.9 to 2.8. Design through location approval was | Alaska | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kenai | Kenai Peninsula | $396,642 | $0 | $39,371 | $436,013 |
JUNEAU MENDENHALL RIVER PEDESTRIAN CROSSING | Locate, design, and construct an eight foot wide suspension or clear span bridge over the Mendenhall River to provide a Dimond Park access point to the Mendenhall River Trail and Green Belt located across the river. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau | $2,228,056 | $0 | $112,165 | $2,340,221 |
MAT-SU TE: BIG LAKE PED/BIKE PATH | Reduce scope to construct only the section of pathway along the Parks Highway from approximately MP 47 to the Big Lake Road intersection. Project includes pedestrian undercrossing of the Alaska Railroad and a traffic signal at the Parks Highway/Pittman R | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mat-Su | Anchorage | $2,052,251 | $0 | $306,865 | $2,359,116 |
STEESE HWY TRAILHEADS & CAMPGROUNDS | Construct McKayh Creek, Cripple Creek, Birch Creek Put-in, Birch Creek Take-out, Eagle & Twelve-Mile Summits. Construction of a turnout and recreation off-ramp at McKay Creek Trailhead; trails, access roads, and restroom facilites at Cripple Creek Campgr | Alaska | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $384,928 | $0 | $38,213 | $423,141 |
SEWARD HWY: SIX MILE TRAIL | Construct a pedestrian/bike pathway from Six Mile Creek to Johnson Trailhead parking area near Granite Creek. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Seward | Kenai Peninsula | $374,906 | $0 | $31,492 | $406,398 |
AMATS: PEDESTRIAN SAFETY ENHANCEMENTS | Design the following remaining two pedestrian safety enhancements. 1. A paved walkway on the east side of the Old Glenn Highway from Birchwood Road to Ski Road in Peters Creek. 2. A paved walkway from the Muldoon Road - East 10th Avenue intersection to | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $367,865 | $0 | $91,966 | $459,831 |
MCCARTHY FOOTBRIDGE-TE | Design and construct a footbridge across the Kennicott River at approximately MP 93 of the Edgerton Highway to connect the highway with the community of McCarthy and the Kennicott Mine area. Construction of two new vault toilets, one on each side of the | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kennicott | Valdez-Cordova | $2,030,494 | $0 | $262,085 | $2,292,579 |
CHENA HOT SPRINGS ROAD YUKON QUEST TRAIL PARKING AREAS | Construct trailhead parking areas on Chena Hot Springs Road between Nordale Road (MP 7) and Chena Hot Springs Resort (MP 56), and on Nordale Road at the trail crossing. Project will provide access to the Yukon Quest Winter Trail. This project will inclu | Alaska | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $653,926 | $0 | $65,611 | $719,537 |
AMATS: SHIP CREEK TRAIL, PHASE IV | Construct a new paved pedestrian and bicycle trail segment at Ship Creek, beginning at the end of the pathway constructed under the Ship Creek Trail Phase III near Post Road continuing to Viking Drive where the Ship Creek Phase II project left off. The p | Alaska | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $2,604,697 | $0 | $258,551 | $2,863,248 |
SEWARD HWY REC IMP, BIRD CREEK CAMPGROUND (SEC 117) AK067 | This project will relocate and improve RV facilities in Alaska State Parks along the Seward Highway in conjuction with Seward Highway improvement projects. Highway upgrade projects are phased over several years and will impact existing Alaska State Park facilities. The highway upgrades include construction of rock quarries, separated pathways, and passing lanes in Chugach State Park, resulting in the relocation of various Park facilities. | Alaska | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Central Region | Anchorage, Municipality of | $543,534 | $0 | $38,408 | $581,942 |
KENAI RIVER BRIDGE ACCESS ROAD PATHWAY | Construct a pedestrian/bike path parallel to the Kenai River Bridge Access Road between Kalifornsky Beach Road and the Kenai Spur Rd, approximately 3.3 miles. | Alaska | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kenai | Kenai Peninsula | $367,203 | $0 | $36,449 | $403,652 |
FFY98/99 ANNUAL WORK PROGRAM | Construction of the Starrigavan pedestrian walkway at Sitka Ferry Terminal. | Alaska | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $686,184 | $0 | $83,122 | $769,306 |
USFS: PORTAGE VALLEY TRAIL SYSTEM CONST, PHASE II | Install two segments of pedestrian trial on new alignments. Includes clearing, grading, drainage, geotextile, trail surfacing, stone retaining walls, pedestrian bridges at creek crossings, boardwalks, and interpretive and regulatory signs. Design was ac | Alaska | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Aleutians East | $702,063 | $0 | $240,814 | $942,878 |
AMATS: MULDOON RD PEDESTRIAN & LANDSCAPING, PHASE III | Provide enhanced pedestrian amenities along Muldoon Road as well as landscaping. The project also includes extending the sidewalk on the east side of Muldoon from 16th to 20th Avenues. | Alaska | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage, Municipality of | $1,004,784 | $0 | $99,765 | $1,104,548 |
BROWN ELEMENTARY BICYCLE/PED-TE | CONSTRUCT A SEPARATED BIKE/PED FACILITY ALONG LAKLOEY DR FROM MP 2.3 BADGER TO TICASUK BROWN ELEM. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $322,664 | $0 | $56,434 | $379,098 |
AMATS: PED SAFETY ENHANCE @ PETERS CREEK | Construct a paved walkway on the east side of the Old Glenn Highway from Birchwood Road to Ski Road in Peters Creek. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $707,060 | $0 | $70,188 | $777,248 |
INVENTORY OF OUTDOOR ADVERTISING | PROVIDE A PEDESTRIAN/BIKE PATH ALONG S. TONGASS HWY BETWEEN THE COAST GUARD STATION AND TOTEM ROW IN SAXMAN. | Alaska | 1992 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $318,464 | $0 | $193,670 | $512,134 |
JNU GLACIER HWY MULTI-USE SEPARATED PATH TO UAS | Construct new, multi-use pathway from the west side of the entrance to Swampy Acres to UAS along the north side of Glacier Highway. The multi-use path will terminate at the UAS pedestrian bridge near Auke Lake and this project will also include paving of the Auke Lake parking lot. The replacement of the bridge and section of separated, multi-use pathway between Riverside Drive and Swampy Acres will be completed as part of the Brotherhood Bridge and Separated Multi-Use Path to UAS, Stage I (Need ID 2141, AKSAS 67987) Project. | Alaska | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau, City and Borough of | $1,219,453 | $0 | $121,047 | $1,340,500 |
JUNEAU - RIVERSIDE DRIVE PED/BIKE ACCESS IMPROVEMENTS | INSTALL A BIKE/PEDESTRIAN FACILITY BETWEEN MENDENHALL LOOP RD AND RIVERSIDE DR ON EGAN DRIVE. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau | $309,314 | $0 | $77,330 | $386,644 |
PALMER PED/BIKE PATH COPE INDURSTRIAL WA | Develop pedestrian/bicycle pathway along Cope Industrial Way. The pathway will begin by connecting into the existing sidewalk on South Chugach Way and proceed along to Springer Inner Loop Road. This project is split off from parent project 51206 Palmer- | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mat-Su | Anchorage | $302,821 | $0 | $42,049 | $344,870 |
PARKS CHENA RIDGE INTERCHANGE | Construction of a new interchange, including upgrading portions of Chena Pump and Chena Ridge Roads and the construction of two bridges. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $298,289 | $0 | $21,078 | $319,367 |
BETHEL: CHIEF EDDIE HOFFMAN HWY REHAB & SEPARATED PATHWAY | Scope Revision: Construct a 4.2 mile, separated pathway along the north side of Eddie Hoffman Highway from the airport to Watson's Corner, then north along Ridgecrest Drive to the High School. Rehabilitate the Chief Eddie Hoffman Highway from Mile 0.0 to | Alaska | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bethel | Bethel | $727,760 | $0 | $72,240 | $800,000 |
NORTH POLE BICYCLE/PEDESTRIAN PATH | Construct a separated bicycle/pedestrian path along Hurst Road from the existing Badger Road Bike Path east toward Nelson Road in the North Pole area. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | North Pole | Fairbanks North Star | $743,139 | $0 | $74,265 | $817,404 |
TUDOR ROAD PEDESTRIAN FACILITIES | Construct pedestrian facility improvements along Tudor Road from Bering Street to Campbell Airstrip. Project design completed under ADA TE: Highway Pedestrian Facility Improvements, 51237 , TE-OOOS(155). | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $537,133 | $0 | $139,635 | $676,768 |
JNU BACKLOOP SHARED USE PATH REHABILITATION | Rehabilitate/reconstruct the shared use path along Back Loop Rd. from Mendenhall Loop Rd. to the Mendenhall River Elementary School entrance (approximately 1 mile) including repaving, widening to meet current design standards, addressing ADA deficiencies (such as cross slope), and drainage improvements. | Alaska | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau, City and Borough of | $752,073 | $0 | $74,653 | $826,726 |
AMATS: CAMPBELL CREEK CONNECTION | Campbell Creek Trail Old Seward to Tudor/Bragaw PE, Trail Construction | Alaska | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $756,712 | $0 | $80,114 | $836,826 |
HOMER SPIT PEDESTRIAN PATHWAY TE | Construct a pedestrian/bike along the Sterling Highway on the Homer Spit from Kachemak Drive to Land's End, approximately 4.3 miles. Add turnouts for Mud Bay viewing and add handicap access facility at the Fishing Hole Lagoon on the south end of the proj | Alaska | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Homer | Kenai Peninsula | $2,667,418 | $0 | $264,775 | $2,932,193 |
CHENA RIVER BICYCLE/PED PATH (CENTEN. BRG TO STEESE EXPWY) | bicycle/pedestrian path along the Chena River from Peger Road east to the Steese Expressway. Paths along either the south side, north side or along both sides of the Chena River will be considered. | Alaska | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $3,004,600 | $0 | $499,334 | $3,503,934 |
AMATS: TRAIL IMPROVEMENTS; CRAIG DRIVE & EAGLE RIVER | This project consists of construction of pedestrian facilities at the following locations: Eagle River Road Walkway from pedestrian overpass to Gruening Middle School, Craig Drive Walkway from Nunaka Valley Elementary to Beaver Place, Meadow Creek Driv | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $558,129 | $0 | $139,532 | $697,661 |
NORTH POLE BIKE TRAIL REHABILITATION AND CONNECTIONS | Rehabilitate and connect bike trails within the City of North Pole. | Alaska | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | North Pole | Fairbanks North Star | $264,875 | $0 | $26,292 | $291,167 |
AUBURN ROAD BIKE PATH/LANE-TE | CONSTRUCT A BIKE LANE/PATH FROM FARMERS LOOP TO PEARL CREEK ELEMENTARY SCHOOL. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $563,281 | $0 | $95,489 | $658,770 |
CHENA RIVER BICYCLE/PED PATH-STEESE BRDG TO FT WAINWRIGHT | Reconstruct 1.0 km of paved pathway and associated riverbank stabilization/revegetation adjacent to the Chena River, between the Steese Expressway Bridge and the entrance to Fort Wainwright Army Base. | Alaska | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $563,673 | $0 | $55,952 | $619,625 |
VALDEZ AIRPORT ROAD BIKE/PEDESTRIAN TRAIL | Construct a bicycle/pedestrian trail from the Richardson Hwy to the Valdez Airport terminal building. | Alaska | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Valdez | Valdez-Cordova | $564,118 | $0 | $55,995 | $620,113 |
SITKA FERRY TERMINAL WALKWAY | Construction of the Starrigavan pedestrian walkway at Sitka Ferry Terminal. | Alaska | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sitka | Sitka | $575,370 | $0 | $57,112 | $632,482 |
KTN-A/P PED. WALKWAY COVER REPLACE (T.E. | DESIGN AND CONSTRUCTION OF A TRANSPORTATION ENHANCEMENT PROJECT TO REPLACE THE DILAPIDATED PEDESTRIAN WALKWAY COVER ASHORE AT THE GRAVINA ISLAND SHUTTLE FERRY TERMINAL. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ketchikan | Ketchikan Gateway | $509,685 | $0 | $127,424 | $637,109 |
AMATS: POTTER MARSH TRAIL HEAD ACCESS (PARENT) | expand the parking area, add toilets, add caretaker/host site, add 300 feet of raised boardwalk, and add informational signs. | Alaska | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $127,358 | $0 | $12,642 | $140,000 |
NAKNEK/KING SALMON: PATHWAY CONSTRUCTION | In Naknek construct approximately 3.5 miles of bike/ped trails from downtown to Donna G. Subdivision. (Mile 4 on the AK Penin. Hwy) In King Salmon construct approximately 2.5 miles of trail from downtown to Flat Nose Henry Road. | Alaska | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $504,959 | $0 | $50,123 | $555,083 |
JNU-LEMON ROAD SIDEWALK | Also included will be PE and installation of traffic communication system (PE is funded under PJ 71741 due to different federal ratio). | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau | $503,260 | $0 | $125,816 | $629,076 |
JNU-GLACIER SPUR BIKE PATH | Design and construction of a separate bike path along one side of the Mendenhall spur road from the intersection of Mendenhall Back Loop Road to the Mendenhall Glacier parking lot. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau | $493,350 | $0 | $62,499 | $555,849 |
AMATS: MIDTOWN SEGMENT (NORTH SOUTH TRAIL) | Trail Enhancement along A Street corridor from proposed midtown park area near 38th Avenue to Fireweed Lane. | Alaska | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $278,401 | $0 | $27,633 | $306,034 |
POW CRAIG TO HIGH SCHOOL PATH CONSTRUCTION | Construction of a separated multi-purpose path that will provide safe access from the existing sidewalk and the City of Craig to the new high school on the uphill side of the roadway. Lighting is to be included for the new path. | Alaska | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Craig | Prince Of Wales-Outer Ketchikan | $483,982 | $0 | $48,042 | $532,024 |
SEWARD HWY: MP 0-8, PHASE II | The project will rehabilitate the existing roadway section to include minor alignment changes, safety and drainage improvements. Turn lanes will be added to the intersection at Herman Lierer Road (Exit Glacier Road). A separated trail is included from Va | Alaska | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Seward | Kenai Peninsula | $602,863 | $0 | $60,040 | $662,903 |
SEWARD HWY: DOWLING - TUDOR RECONST | The project will widen the New Seward Highway from 4 to 6 lanes from Tudor to Dowling, provide improvement to both frontage roads (Homer and Brayton Drives) to include multi-use trails, replace 5 bridges (New Seward over Dowling Road, and the 4 bridges ov | Alaska | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $1,617,379 | $0 | $114,290 | $1,731,668 |
JUNEAU EAGLE BEACH TRAILHEAD & WAYSIDE | Construction of a pathway between the day-use area to the Eagle River trailhead parking lot. Proposed improvements on the south side of the highway include construction of a parking lot, caretaker cabin, visitor contact station, equipment storage shed, i | Alaska | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau | $464,239 | $0 | $46,983 | $511,222 |
UNALASKA TE: AIRPORT BEACH RD PATHWAY | Construct approximately 2.4 miles of pathway along Airport Beach Road between the intersections of Captains Bay Road and Ballyhoo Road. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Unalaska | Aleutians East | $1,130,239 | $0 | $132,402 | $1,262,641 |
TOK BIKE PATH REHABILITATION | Rehabilitate the existing bikepath in Tok. Alaska Highway mp 1314-1326 (junction with Tanacross Road) | Alaska | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tok | Southeast Fairbanks | $2,591,281 | $0 | $183,070 | $2,774,350 |
MAT-SU TE: PALMER WASILLA HWY BIKE PATHS | Develop pedestrian/bicycle path along the Palmer-Wasilla Hwy from the City of Palmer to Hemmer St. Intention is to provide a seperated path. The work will be phased to avoid ROW problem areas without delaying areas that could be completed in an expeditou | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mat-Su | Anchorage | $438,809 | $0 | $106,992 | $545,802 |
AMATS: C ST, INTERNATIONAL TO TUDOR | Widen "C" street from Tudor Road to International Airport Road to 6 lanes and extending widening to Potter Drive with 5 lanes and drop to two lanes just beyong Potter Drive. Adequate right-of-way exists for the widening. In addition an additional north | Alaska | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $430,660 | $0 | $45,746 | $476,406 |
FMATS BIKE PATH REHABILITATION | Establish a preventative maintenance program for the FMATS area. | Alaska | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star Borough | $278,926 | $0 | $27,687 | $306,613 |
KTN - Waterfront Promenade - Phase III | Install a waterfront promenade along Stedman Street sidewalks at two locations before and after the Ketchikan Creek Bridge. This project begins at approximately mile point 2.2 and ends at approximately mile point 2.4, however, the bridge sidewalk from mil | Alaska | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ketchikan | Ketchikan Gateway | $988,297 | $0 | $98,102 | $1,086,399 |
KTN TONGASS AVENUE PEDESTRIAN IMPROVEMENTS | PE for reconstruction of pedestrian and transit facilities to include meeting ADA requirements, providing transit stations and a pedestrian bridge across Carlanna Creek. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ketchikan | Ketchikan Gateway | $621,151 | $0 | $67,006 | $688,158 |
NOR REG BIKE PATH REHABILITATION | Improve existing bike paths along streets and highways throughout the Northern Region to bring them up to current standards and maintainable condition. Bike paths requiring immediate attention include Chena Pump Road, Farmers Loop Road and the Parks Hig | Alaska | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $625,096 | $0 | $62,049 | $687,145 |
Water Street Improvements | The project will widen and modify existing sidewalks for approximately 2,040 feet, from Chapmen Street to the existing Viaduct Tunnel to improve pedestrian capacity and safety and achieve Americans with Disabilities Act (ADA) compliance. Project will incl | Alaska | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ketchikan | Ketchikan Gateway | $0 | $2,200,000 | $90,649 | $2,290,649 |
VALDEZ AREAWIDE BIKE & PED TRAIL PAVEMENT REFURBISHMENT | Grind and resurface 7.6 miles of bike path on the Richardson Highway between Meals Avenue and River Road in Valdez. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Valdez | Valdez-Cordova | $954,770 | $954,770 | $0 | $954,770 |
Wood River Road pathway | Reconstruct 2.8 miles of road from the intersection of Kanakanak Road and Wood River Road to the end of the road at Wood River Landing. Realign the road horizontally and vertically to create improved sight distances and safer driving conditions. Construct | Alaska | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Dillingham | $877,318 | $877,318 | $0 | $877,318 |
DENALI HWY MP 7 WAYSIDE | Construct a wayside in the vicinity of MP 6 of the Denali Highway. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $441,283 | $441,283 | $0 | $441,283 |
AIA TERM EXP LANDSIDE ACCESS IMP - PH II | This project will complete the work started in Phase I. It will reconfigure the eastbound lanes of International Airport Rd. from the airport to South Aircraft Drive. It will signalize that intersection. It will also rehabilitate International Airport Rd. | Alaska | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $418,462 | $0 | $41,538 | $460,000 |
PARKS HWY MP 72-83 REHAB: WILLOW CR TO KASHWITNA RIVER(ES) | Rehabilitate pavement, widen roadway, build passing lanes and bridge improvements, and construct safety improvements as needed. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $171,474 | $171,474 | $0 | $171,474 |
ANCHOR ROAD PEDESTRIAN BEACH ACCESS | Construct pedestrian facilities along the Old Sterling Highway and Anchor Point Beach Road from the community of Anchor Point to the beaches at the Anchor River State Recreation Area. Construct trailhead parking area and connecting pathways to school, ba | Alaska | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchor Creek | 0 | $117,746 | $0 | $11,687 | $129,433 |
HOMER BELUGA TRAIL CONSTRUCTION | Construct Phase-I of a paved and handicapped-accessable pedestrian nature trail along Beluga Slough tidal shoreline. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Homer | Kenai Peninsula | $290,720 | $0 | $38,971 | $329,691 |
JNU-AURORA HARBOR TO WHITTIER PED FACIL | Design and construct six foot wide sidewalk along the Aurora boat harbor and a 10 foot wide pedestrian/bicycle facility between 10th St and Whittier St. | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau | $745,603 | $0 | $188,678 | $934,281 |
BERING STRAITS TRAIL STAKING | Install permanent trail markings along trails in Bering Straits Region. These trails are identified in the Bering Straits Trail Staking Plan. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $281,835 | $0 | $28,476 | $310,311 |
AMATS: TUDOR RD PED OVERCROSSING TIE-IN | Provide multi-use trail connection from Phase-I (grade separated crossing at Tudor Road) northward to University trail system. Install concrete undercrossing tunnel beneath Ambassador Drive and regrade Ambassador Drive. Includes landscaping. | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $829,741 | $0 | $220,160 | $1,049,901 |
CHENA LAKES REC AREA BIKE/PED FACIL-TE | Grading, drainage and paving of 1.05 miles of bicycle/pedestrian path, including 0/75 miles rehabilitation of existing path and 0.3 mile of new path. | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $204,140 | $0 | $53,071 | $257,211 |
JUNEAU MENDENHALL RIVER TRAIL (T.E.) | PE and construction of a gravel surfaced multi-purpose trail along existing walking trail alignment. Construct eight foot wode bridge at Montana Creek. Construct gravel surfaced access road and ten space parking lot at River Road trailhead. Provide sig | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau | $830,725 | $0 | $207,591 | $1,038,316 |
SEWARD: PORT AVENUE REHAB & HARBOR PEDESTRIAN PATHWAY | Rehabilitate Port Avenue (aka Dock Road) from the Seward Highway (MP 0.0) to the end of the paved road (MP 0.4). Project includes curb, gutter, pedestrian facilities and illumination. | Alaska | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Seward | Kenai Peninsula | $781,255 | $0 | $77,549 | $858,804 |
NENANA GOLD SPIKE PARK-TE | ENHANCEMENT PROJECT WILL MARK HISTORIC WALKING TRAIL, INSTALL INTERPRETATIVE EXHIBITS, IMPROVE ACCESS, INSTALL BENCHES & LANDSCAPING. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nenana | Yukon-Koyukuk | $174,554 | $0 | $38,776 | $213,330 |
PETERSBURG MITKOF HWY COASTAL PATH | PE to construct a separated path on the uphill side of Mitkof Hwy and install lighting along the highway between the ferry terminal and MP 4. | Alaska | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Petersburg | Wrangell-Petersburg | $170,077 | $0 | $17,879 | $187,956 |
KODIAK "Y" INTERSECTION IMPROVEMENTS | Rehabilitation and intersection improvements on Rezanof Dr from Lower Mill Bay Rd/Center Ave to Marine Way. Includes reconstruction of traffic signal at Marine Way and Rezanof Dr intersection, and addition of a midblock pedestrian crossing between Marine | Alaska | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kodiak | Kodiak Island | $922,537 | $0 | $91,574 | $1,014,111 |
AMATS:Potter Marsh Trailhead & Access Improvements, PH I | This project will consist of the construction of trailhead and access improvements at the existing Potter Marsh Trailhead. Work will include improvements to the parking area, pedestrian walkway, sidewalk, vaulted toilet, and related park amenities. Work | Alaska | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $941,457 | $0 | $238,153 | $1,179,610 |
CE: WINTER TRAIL MARKINGS FY97 | Mark overland winter trails with permanent trail markers between the villages of Scammon Bay, Hooper Bay, Chevak, Newtok, Nightmute and Tununak. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $168,901 | $0 | $15,766 | $184,667 |
EDGERTON HWY KENNY LAKE MULTI-USE TRAIL | Construct a multi-use trail along the Edgerton Highway from approximately MP 4.75 to the Community Hall and Fairgrounds at approximately MP 7.75. | Alaska | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kenny Lake | Valdez-Cordova | $158,514 | $0 | $15,735 | $174,249 |
SHISHMAREF TRAIL STAKING | REVISE TERMINI to include the connection to the Park road intersection at MP 237.3 | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shishmaref | Nome | $154,760 | $0 | $15,362 | $170,122 |
WENDELL AVENUE NORTH ADA IMPROVEMENTS | Construct new curb ramps and sidewalk on the north side of Wendell Street | Alaska | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $976,132 | $0 | $97,894 | $1,074,026 |
DEEP CREEK BEACH ACCESS | Construct a separated paved access pathway along Deep Creek Beach Road from the Sterling Highway down to the beach near the mouth of Deep Creek. Realign and widen the lower portion of Deep Creek Beach Road to facilitate staging for tractor / boat launchi | Alaska | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kenai | Kenai Peninsula | $151,935 | $0 | $15,081 | $167,016 |
USFS: PORTAGE VALLEY BLUE ICE TR SYS CONST, PHASE III AK090 | Work to include development and installation of interpretive signs and maps for the entire Trail of Blue Ice Corridor from Portage Lake to Moose Flats Day Use Area. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $149,415 | $0 | $14,831 | $164,246 |
AMATS: OLD GLENN HWY, FIRE LAKE TO S BIRCHWOOD LOOP | Project will add widened shoulders, replace pavement throughout the project length, add channelization improvements at South Birchwood Loop Road, truck climbing lanes on one hill, and construct a paved multi-use pathway to connect to existing pathway at | Alaska | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $997,074 | $0 | $98,973 | $1,096,047 |
AMATS: COASTAL TRAIL(SOUTHERN EXT-POTTER) | This project will extend the Coastal Trail from its existing southern terminus at Kincaid Park to the Potter Weigh Station on the Seward Highway. This phase of the project includes preliminary engineering and environmental documentation. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $1,039,017 | $0 | $106,870 | $1,145,887 |
SITKA FERRY TERMINAL STAGING | PE, ROW, Utility Relocation, and construction of expansion of the existing staging area. PE for a pedestian walkway. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sitka | Sitka | $144,002 | $0 | $25,147 | $169,149 |
KTN CENTRAL BUSINESS DISTRICT SIDEWALKS | PE and construction of pedestrian facilities to include meeting ADA requirements in the central business district of Ketchikan. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ketchikan | Ketchikan Gateway | $136,476 | $0 | $13,549 | $150,025 |
CHITINA BIKE/PEDESTRIAN PATH | Construct a bicycle/pedestrian path adjacent to the Edgerton Highway from One Mile Lake to the new wayside in Chitina. | Alaska | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chitina | Valdez-Cordova | $136,465 | $0 | $13,546 | $150,011 |
KENAI SPUR RD UNITY TRAIL & SOLDOTNA SCHOOL TRAIL | FY 00 TRAAK project to be added to scope: Soldotna: Soldotna School Trail. Construct a lighted pedestrian bike trail 16 feet in width, 10 feet width paved in the center and 3 feet gravel on each side of the path between Marydale and Redoubt Ave along the | Alaska | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kenai | Kenai Peninsula | $136,455 | $0 | $13,545 | $150,000 |
CE: WINTER TRAIL MARKINGS 1996 | Mark overland winter trails in the western area of Central Region with permanent trail markers. Trail markers will ensure winter travelers can safety journey between communities in the area. Install winter trail markers between the villages of Chefornak, | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chefornak | Bethel | $136,383 | $0 | $14,537 | $150,920 |
CE: ADA HWY PEDESTRIAN FACILITY IMPROVEMENTS | Identify aspects (curb, cuts, curb ramps, etc.,) that are not in compliance with the American with Disabilities Act Title II regarding public entities accessible to individuals with disabilities and develop construction document to bring existing nonconfo | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $135,900 | $0 | $38,975 | $174,875 |
MCGRATH RD BIKE/PEDESTRIAN TRAIL-TE | Construct a bicycle/pedestrian facility, approximately 2 miles in length, along McGrath Road from just north of the McGrath Estates approach to the Farmers Loop Bicycle Path. | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $1,067,062 | $0 | $156,121 | $1,223,183 |
NOR REG ADA IMPROVEMENTS (PH VII, AIRPORT WAY) | construction of new ADA toilet facilities at existing rest areas in Northern Region". REVISE TERMINI to include replacement facilities at Edgerton Hwy MP 35, Alaska Hwy MP 1250-Deadman Wayside, Elliott Hwy MP 152-Manley | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $1,086,013 | $0 | $25,356 | $1,111,369 |
BADGER RD RECONSTRUCTION | Grading, drainage, surfacing, illumination & signalization of Badger & Holmes Roads. Constr. of Bikepath along Badger Road. | Alaska | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | North Pole | Fairbanks North Star | $1,121,893 | $0 | $112,259 | $1,234,152 |
CHENA RIVER STATE RECREATION AREA-TE | Various mileposts along Chena Hot Springs Road between MP 27-56. Locations include MP 27 (Chena River State Rec. area entrance), MP 36 (Granite Tors Scenic/Interpretive viewpoint), MP 39.5 (Granite Tors Trailhead), MP 48.9 (Angel Rocks Trailhead), of Ch | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $215,367 | $0 | $21,378 | $236,745 |
AMATS: ANCH TE GLENN HWY BIKE PATH CONS | Construct a bike path on the north side of the Glenn Highway between Boniface Boulevard and Muldoon Road including connections to the existing trails at Boniface and Muldoon. This is the final link that will provide a continuous trail from Birchwood to K | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $823,730 | $0 | $211,514 | $1,035,244 |
JNU-HIGHLAND DR TO EGAN EXPRESSWAY | Roadway reconstruction, shoulder widening, construction of sidewalk, and upgrade of existing bike path. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Juneau | Juneau | $196,823 | $0 | $19,537 | $216,360 |
AMATS: BICYCLE PLAN IMPLEMENTATION, C ST: 10TH-40TH | Project will sign, stripe and mark bike lanes or shoulders on existing roadways within the AMATS boundary area to create a safe, connected network of bicycle facilities as identified in the Anchorage Bicycle Plan. | Alaska | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage, Municipality of | $48,070 | $0 | $4,772 | $52,842 |
SITKA - AREAWIDE ADA COMPLIANCE IMPROVEMENTS | Design and construction of pedestrian improvements for Sitka's roadway system for compliance with the "Americans with Disabilities Act". Improvements include modifications to existing sidewalks, curbing, and drainage facilities. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sitka | Sitka | $254,994 | $0 | $64,306 | $319,300 |
CHENA RIVER BICYCLE/PED PATH-CENTENNIAL BRDG TO STEESE BRDG | Construct approximately .85 miles of bicycle/pedestrian path from the Centennial Bridge to the Steese Highway Bridge. Project will include lighting, signing, drainage, landscaping, irrigation system, and removal of minor obstructions. | Alaska | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $260,940 | $0 | $25,902 | $286,842 |
MAT-SU: KNIK-GOOSE BAY RD REHAB & PATHWAY | 11/00 Scope Addition: Extend pathway from Vine Road, MP 5.8 to Settlers Bay, MP 7.0. | Alaska | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mat-Su | Anchorage | $1,637,011 | $0 | $162,595 | $1,799,606 |
AMATS: BUSINESS BLVD AREA PEDEST SAFETY IMP | 9/99 Scope Addition: Include some minor reconst of the adjacent Business Blvd to address frost heave problems, the addition of right turn only lanes at the E. & W. Old Glenn Hwy Intxs, and raised /flush medians for left turn chann. The roadway will be re | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $1,620,463 | $0 | $160,854 | $1,781,317 |
COPPER RIVER HWY - EYAK RIVER PEDESTRIAN BRIDGE | Construct a pedestrian/bicycle bridge across the Eyak River and a path connecting the highway turnout at MP 5.5 - 5.7. | Alaska | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cordova | Valdez-Cordova | $225,606 | $0 | $22,394 | $248,000 |
Nor Reg Bicycle/Pedestrian Facilities Rehab and Improvements | Bicycle and pedestrian facility preventative maintenance, rehabilitation and improvments statewide. | Alaska | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $264,085 | $0 | $26,214 | $290,299 |
AMATS: FAR NORTH TRAIL IMPROVEMENTS | Construct a multi-use trail undercrossing tube beneath Campbell Airstrip Road. Involves upgrading and elevating a segment of the road to achieve clearance for installing the tube. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $799,299 | $0 | $80,444 | $879,743 |
KTN-PED/BIKE PATH-DEERMOUNT TO SAXMAN | PROVIDE A PEDESTRIAN/BIKE PATH ALONG S. TONGASS HWY BETWEEN THE COAST GUARD STATION AND TOTEM ROW IN SAXMAN. | Alaska | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ketchikan | Ketchikan Gateway | $1,523,922 | $0 | $380,692 | $1,904,614 |
NORTHWEST ARCTIC BORO TRAIL STAKING-TE | INSTALL PERMANENT TRAIL MARKINGS ALONG TRAILS IN THE NORTHWEST ARCTIC BOROUGH(NWAB). THESE TRAILS ARE IDENTIFIED IN THE NWAB TRAIL STAKING PLAN. | Alaska | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $238,968 | $0 | $24,220 | $263,188 |
NOR REG ADA IMPROVEMENTS - COLLEGE ROAD (PH VI) | Project will reconstruct the pedestrian facilities along College Road, including curb ramps and sidewalks. | Alaska | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $1,468,191 | $0 | $145,738 | $1,613,929 |
PSG BOJER WIKAN FISHERMEN'S MEMORIAL PARK | Design and construct a memorial park overlooking Hammer Slough as a memorial to those who spent their lives at sea and as a tribute to the nautical history of Petersburg. Contract #1 - Structural, Lighting, and Electrical Contract #2 - Amenities such as | Alaska | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Petersburg | Wrangell-Petersburg | $257,735 | $0 | $25,584 | $283,319 |
Parks Highway: Talkeetna Spur Road Ped Improvements | Pedestrian safety improvements in the general vicinity of the Parks Highway/Talkeetna Spur Road intersection. Project components include: 1) a lighted Parks Highway underpass from East Helena Ave to the north side of the Susitna Valley Middle/High School | Alaska | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Susitna | Matanuska-Susitna | $802,145 | $0 | $79,624 | $881,768 |
Old Seward Highway: Brandon to O'Malley Reconstruction. | This project will widen the existing road to accommodate two lanes of traffic in the northbound section, two lanes southbound, a center two-way left-turn land, illumination, curb & gutter, a storm drain, a sidewalk on the east side and a pathway on the we | Alaska | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $808,915 | $0 | $80,295 | $889,210 |
TRUNK RD RECONST, PH I- PARKS HWY TO PALMER-WASILLA HWY | Realign Trunk Road to provide 4 lanes between Parks Hwy / Trunk Road Interchange off ramp and the Palmer-Wasilla Hwy to include a round about at Matanuska Farm Drive and other intersection improvements, lighting, signing, striping, and separated pedestria | Alaska | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Palmer | Matanuska-Susitna | $781,480 | $0 | $77,572 | $859,052 |
CR: WINTER TRAIL MARKINGS, 2009 | Install high-visibility trail markers in the rural communities to improve transportation safety. | Alaska | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $61,860 | $0 | $6,140 | $68,000 |
USFS: PORTAGE VALLEY TRAIL SYSTEM CONSTRUCTION - PHASE I | Phase-I includes a segment of Blue Ice Trail from Portage Highway (near Visitor Center) to Williwaw Campground, a segment from Moose Flats to Explorer Pond, and an o | Alaska | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Aleutians East | $1,306,319 | $0 | $129,670 | $1,435,989 |
SEWARD HWY TE:GIRDWOOD-BIRD PT PATHWAY | Scope addition to remove toppling rock on the Seward Highway at MP 94. | Alaska | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Seward | Kenai Peninsula | $265,116 | $0 | $20,702 | $285,818 |
GOLD HILL ROAD BICYCLE AND PEDESTRIAN FACILITY | Construct a bicycle & pedestrian facility along Gold Hill Road. | Alaska | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | 0 | $1,824,538 | $0 | $181,110 | $2,005,648 |
HAINES COUNCIL GROUNDS TRAIL | Design and construction of a trail from the Haines Eagle Viewing Center to the future cultural center at the intersection of the Klukwan Road with the Haines Highway. Construction will include improvements to existing vehicle pullouts and interpretive si | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Haines | Haines | $1,364,302 | $0 | $140,686 | $1,504,988 |
SEWARD HWY TE:BIRD POINT PATHWAY/WAYSIDE (DESIGN ONLY) | Upgrades and interpretation amenities at Seward Highway turnouts along the recently completed Gird to Bird Reconstruction project. | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Seward | Kenai Peninsula | $227,425 | $0 | $27,575 | $255,000 |
NOR REG ADA IMPROVEMENTS - AIRPORT WAY (PHASE VII) | Upgrade pedestrian facilities on the north and south side of Airport Way. | Alaska | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairbanks | Fairbanks North Star | $1,683,636 | $0 | $167,123 | $1,850,760 |
PARKS HWY DENALI PK PEDESTRIAN ACCESS SAFETY IMP | connection to the Park road intersection at MP 237.3 | Alaska | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Denali | $278,431 | $0 | $20,174 | $298,605 |
AMATS: TUDOR RD PEDESTRIAN CROSSING | Construction of a multi-purpose trail from the existing trail on the south side of Tudor Road and connecting into the University Lake Trail system to the south. The crossing at Tudor Road will consist of a multi-purpose trail bridge, farther south a tunne | Alaska | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anchorage | Anchorage | $1,455,983 | $0 | $363,996 | $1,819,979 |
KETCHIKAN TOTEM BIGHT STATE HISTORIC SCENIC WAYSIDE | Repave, reconfigure, and expand parking facilities. Upgrade pedestrian facilities. Rebuild restrooms, add interpretive displays, and build a picnic area. Delete from project scope the design and construction of a totem pole carving shed. | Alaska | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ketchikan | Ketchikan Gateway | $793,586 | $0 | $78,774 | $872,360 |
CREAMER'S FIELD WILDLIFE REFUGE-TE | Grading, drainage, paving, utility relocation, illumination, signal system modifications, landscaping and minor structures within and adjacent to the Creamer's Field Migratory Waterfowl Refuge near Fairbanks. | Alaska | 1993 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Fairbanks | Fairbanks North Star | $1,456,524 | $0 | $144,581 | $1,601,105 |
DALTON HWY MP 90-100 | PE AND CONSTRUCTION FOR REHABILITATION, TOTAL RESURFACING, GRADE RAISING AND CULVERT REPLACEMENT AS NECESSARY. PROJECT WILL ALSO INCLUDE CONSTRUCTION OF FINGER MOUNTAIN WAYSIDE AT MP 98. THE WAYSIDE WILL CONSIST OF AN APPROACH AND PARKING AREA, FOOTPATH | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $135,815 | $0 | $13,481 | $149,296 |
GLENN HWY: MATANUSKA GLACIER SCENIC OVERLOOK | Expand and improve the existing scenic overlook with pathways, landscaping and viewing decks. | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $244,427 | $0 | $18,573 | $263,000 |
NOME-SOLOMON WAYSIDES-TE | Construct a wildlife view area at S S Brdg to inc veiw pltfrm, interpretive signs & parking, & Ft Davis trnouts & interp sgn. | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Nome | Nome | $294,416 | $0 | $30,025 | $324,441 |
DELTA JUNCTION SCENIC TURNOUT IMP-TE | CONSTRUCT PEDESTRIAN & PICNIC FACILITIES, IMPROVE SANITARY FACILITIES & CIRCULATION TRAILS FOR ACCESSIBILITY. | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Delta Junction | Southeast Fairbanks | $50,323 | $0 | $5,496 | $55,819 |
NOR REG FFY02 VAULTED TOILET CONSTRUCTION | Alaska Highway MP 1250 (Deadman Lake Wayside), Edgerton Highway MP 35 (Copper River Wayside), Elliott Highway MP 150 (Manley Hotsprings Wayside), Richardson Highway MP 50 (Ladybird Wayside), Tok Cutoff MP 24 (Gold Rush Wayside), Tok Cutoff MP 64 (Porcupin | Alaska | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | Yukon-Koyukuk | $318,880 | $0 | $32,253 | $351,133 |
RICHARDSON HWY MP 129-148 REHAB | Rehabilitation, reconstruction and resurfacing of the Richardson Highway between MP 129 (Tok Cutoff/Richardson Highway Junction) and MP 148 (Sourdough) and archaeological clearance for use of the Ringling Pit. | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $327,492 | $0 | $37,628 | $365,120 |
JUNEAU - BROTHERHOOD BRIDGE TO ENGINEER'S CUTOFF | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Juneau | Juneau | $153,398 | $0 | $15,227 | $168,625 | |
NOR REG TOURIST SIGNAGE-WILLOW LAKE WAYSIDE | Construct two wooden observation decks to be sited on gravel pads adjacent to each end of the existing wayside at MP 87.7 of the Richardson Highway. Each deck will be equipped with a pedestal mounted spotting scope, one of which will be ADA compliant. | Alaska | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Willow Lake | Matanuska-Susitna | $48,573 | $0 | $4,820 | $53,393 |
GLENN HWY: TE KEPLER BRADLEY SCEN.PULLOUT | Improve the existing Kepler Bradley rest stop by: resurfacing the entrance approach and parking area, resurfacing and installing a retaining wall on a short trail to Matanuska Lake, installing interpretive displays of the lake and trail system, and instal | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $387,006 | $0 | $33,798 | $420,804 |
WRANGELL - ZIMOVIA HIGHWAY - BERGER STREET TO MILL | PE AND ROW FOR MINOR WIDENING AND RECONSTRUCTION OF THE ZIMOVIA HWY FROM BERGER ST TO THE LUMBER MILL. | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Wrangell | Wrangell-Petersburg | $527,451 | $0 | $131,863 | $659,314 |
DALTON HWY MP 335-362 REHABILITATION | Clarify the locations of the two project enhancements authorized under the existing scope to be MP 348-Sag River Overlook & MP 415-Deadhorse Wayside. Also, add the construction of a waysde at MP 395-Arctic Coastal Plain. | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $45,485 | $0 | $4,515 | $50,000 |
CHENA PUMP/TANANA RIVER SCENIC WAYSIDE | Upgrade the Chena Pump Road wayside, including sanitary facilities. The project will also include an ADF&G funded boat launch parking area. | Alaska | 2001 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Fairbanks | Fairbanks North Star | $84,739 | $0 | $8,411 | $93,150 |
GOLDSTREAM ROAD REHABILITATION | Rehabilitation, reconstruction and resurfacing of the Richardson Highway between MP 129 (Tok Cutoff/Richardson Highway Junction) and MP 148 (Sourdough) and archaeological clearance for use of the Ringling Pit. | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Fairbanks | Fairbanks North Star | $85,883 | $0 | $21,472 | $107,355 |
NOR REG TOURIST SIGNAGE - DALTON HIGHWAY | Fabrication and installation, under the existing Memorandum of Agreement (MOA) with the Bureau of Land Management (BLM) for placing tourist signs along the Dalton Highway. Preconstruction work was done under PJ# 66682 / TEA-000S(177), Dalton Highway Tour | Alaska | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $104,606 | $0 | $10,383 | $114,990 |
SEA HIGHWAYS SCENIC ENHANCEMENTS FFY00 | PE to identify various roads in Haines, Juneau, Skagway, Ketchikan, and Sitka for removal of brush, trees, and other vegetation for the enhancement of scenic pullouts and along roadsides. | Alaska | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $169,800 | $0 | $16,855 | $186,655 |
SE REGION HIGHWAY SCENIC ENHANCEMENTS | Removal of brush, trees, and other vegetation in the enhancement of scenic pullouts and along roadsides. Enhancements will improve scenic areas and wildlife safety by removing cover which has grown close to the highways. Wildlife will be easily seen as t | Alaska | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $182,098 | $0 | $18,076 | $200,174 |
NOR REG TOURIST SIGNAGE-PHI (GOLD RUSH) | Design, fabricate and install interpretive exhibits in existing waysides along the highway systems. This may include minor site development as needed to assure the signs are placed in visible and appropriate locations. Sign locations are at various loca | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $195,118 | $0 | $19,367 | $214,485 |
FFY01 SEA REGION SCENIC VIEWSHED ENHANCEMENTS | Removal of brush, trees, and other vegetation at scenic viewsheds, behind guardrails, and sight distance areas in Juneau, Haines, Ketchikan, Sitka, and on Prince of Wales Island. | Alaska | 2001 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $196,413 | $0 | $19,497 | $215,910 |
CE: SCENIC BYWAYS TOURIST SIGNAGE | Install signs designed to assist residents and tourist traffic traveling along the national highway system in identifying the intrinsic qualities of the scenic byway. Seven scenic byway and approximately fifteen interpretive site and route identifier sig | Alaska | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $149,044 | $0 | $17,403 | $166,447 |
NOME-ROCKER GULCH WAYSIDE | Provide a parking area, boardwalk and interpretive display near Rocker Gulch located at the intersection of Beam Road and the Nome-Council Highway. | Alaska | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Nome | Nome | $233,507 | $0 | $23,179 | $256,686 |
PALMER-WASILLA HWY EXTENSION | Extend the Palmer Wasilla Highway (PWH) from the Parks Highway to Knik-Goose Bay Road (KGB) at Glenwood Intersection. Project will include: 1) new signal at KGB road, 2) Acquire a new ROW corridor, 3) third lane westbound, 4) parallel pedestrian/bicycle | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Mat-Su | Anchorage | $209,645 | $0 | $20,808 | $230,453 |
SHEEP CK ROAD REHAB | PE for rehab and resurfacing of 5.4 miles of roadway from the Sheep Ck Parks Connector intersection to 2,500 ft. beyond the Murphy Dome Road/Sheep Ck Road/Goldstream Road intersection. ENHANCEMENT WORK: Construction of a 10' wide, unpaved, all season, mu | Alaska | 1993 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Fairbanks | Fairbanks North Star | $225,445 | $0 | $56,361 | $281,806 |
HNS HWY DALTON CACHE INTERPRETIVE CENTER | Following receipt of ATP w/construction from FHWA, DOR&PF will transfer funds to the U.S. Bureau of Land Management (per an executed project agreement , via a lump sum payment), who will in turn transfer the funds to the U.S. General Services Administrati | Alaska | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Haines | Haines | $102,785 | $0 | $10,203 | $112,988 |
RICHARDSON HWY MP 127-GULKANA RIVER WAYSIDE | Construct appropriate access and wayside improvements near the Gulkana River Bridge near MP 127 of the Richardson Highway. Improvements include approaches, parking area development improvement, landscaping, sanitary facilities, footpaths and interpretive | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Gulkana | Valdez-Cordova | $225,457 | $0 | $22,388 | $247,845 |
FFY95 STATEWIDE ANNUAL PLANNING WORK PR | Design and construct a scenic overlook adjacent to the Homer Ferry Terminal building including paving, restrooms, and interpretive signage. | Alaska | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Statewide | Statewide | $94,866 | $0 | $9,416 | $104,282 |
K-BEACH RD MP 16.4-22.4 REHABILITATION | Rehabilitate surface, drainage, and roadbed and make safety and capacity improvements between MP 16.2 and MP 22.2. | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Kenai | Kenai Peninsula | $227,426 | $0 | $22,574 | $250,000 |
PARKS HIGHWAY: MP 44-52 SURFACE REHAB | Construction project to rehabilitate the Parks Highway from MP 44 to MP 52. This includes the construction of a grade separated RR X-ing and associated roadway realignment. Design of this project was accomplished unde PJ 58712 / I-0A4-1(7) Parks Highwa | Alaska | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $230,000 | $0 | $57,500 | $287,500 |
ALASKA HWY MP 1386 - NORTH | Alaska Hwy MP 1386-1412, reconstruction of highway, replacement of the Little Gerstle bridge and rehabilitation of the (Big) Gerstle River Bridge. Improve parking, access road, landscaping, and interpretive exhibits for historic roadhous | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $216,806 | $0 | $15,321 | $232,127 |
KENAI SPUR RD MP 8.1-10.7 RECONSTRUCTION | Reconstruct the existing roadway as a 4-lane facility with flush median and channelized intersections between Swires Rd (MP 8.1) and Beaver Loop Rd (MP 10.7). Includes a sidewalk on one side and a bike/pedestrian pathway on the other. | Alaska | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Kenai | Kenai Peninsula | $400,237 | $0 | $100,059 | $500,296 |
JNU CHANNEL DR WAYSIDE CONSTRUCTION | PE for construction of a multi-function wayside park and transit node for public use near the DIPAC fish hatchery. Project will provide park area, parking, transit shelter and pullout, lighting, and improved shore access. | Alaska | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Juneau | Juneau | $327,494 | $0 | $34,256 | $361,750 |
Park Hwy Rest Areas | Construct new rest areas between Fairbanks (MP 360) and Bear Creek (MP 262) and Nenana Canyon (MP 239) and the East Fork of the Chulitna River (MP 185). The project will also include toilet facilities and interpretive displays. | Alaska | 2013 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Northern Region | Multiple | $93,400 | $0 | $6,600 | $100,000 |
COPPER RIVER HWY MILLION DOLLAR BRDG-TE | RESTORE NORTH SPAN TO PROPER ELEVATION, PROVIDE RAILING, RESTORE ANCHOR BOLTS, BEARINGS, TRUSSES, FLOOR BEAMS, PLUS ADDITIONAL WORK. | Alaska | 1993 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Cordova | Valdez-Cordova | $6,696 | $0 | $665 | $7,361 |
HOMER END-OF-THE-RD SCENIC OVERLOOK | Design and construct a scenic overlook adjacent to the Homer Ferry Terminal building including paving, restrooms, and interpretive signage. | Alaska | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Homer | Kenai Peninsula | $8,189 | $0 | $962 | $9,151 |
DENALI VIEW NORTH SCENIC OVERLOOK | Construct a scenic overlook at mile 162.4 of the Parks Highway. This will include sanitary facilities, viewing decks with scopes, trails, interpretative displays and landscaping. Design of this project, including environmental approval, was done under pro | Alaska | 1993 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Denali National Park | Denali | $521,293 | $0 | $61,463 | $582,756 |
NOR REG TOURIST SIGNAGE-TE | wayside identification signs on the Elliott Hwy at MP 28 & MP 57 and on the Steese Hwy at MP 57, 60, 86, 94, 107 and 140. | Alaska | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $520,218 | $0 | $52,172 | $572,390 |
OLD GLENN HWY: MATANUSKA RIVER BRIDGE REPLAC | Replace bridge approaches, the bridge (#540) and improve the geometrics of the adjacent roadway. The separated pathway along the project length will be reconstruced with pedestrian underpasses(2). The existing bridge will be remain in place. | Alaska | 1996 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Mat-Su | Anchorage | $510,445 | $0 | $53,156 | $563,601 |
DALTON HWY MP 274-289 REHABILITATION | Revise scope to include development of the Galbraith Lake Wayside at MP 272. Also included in the scope revision is controlled aerial photography from MP 235 - 362 for use in design of this project as well as in design of other planned Dalton Highway pro | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $266,179 | $0 | $26,422 | $292,601 |
RICHARDSON HWY MP 306 BIRCH LAKE WAYSIDE | Construct a public wayside along the Richardson Highway adjacent to birch Lake, including sanitary facilities, access barriers and landscaping.. | Alaska | 2001 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Birch Lake | Valdez-Cordova | $16,492 | $0 | $1,165 | $17,657 |
PARKS HWY: DENALI VIEW SCENIC OVERLOOKS, (DESIGN ONLY) | Phase I: Denali View North. Construct new Denali Scenic View pullout within a previously excavated materials site at MP 162.4. Phase II: Veterans Memorial. Expand existing park facilities at MP 147.1 Phase III: Denali View South. Construct new D | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | Denali | $484,871 | $0 | $48,130 | $533,001 |
SEWARD HWY: BIRD CREEK SCENIC OVERLOOK | As part of the nationwide Scenic Byways Program this project will provide improvements to the existing Bird Creek parking and pathway facilities at MP 101.4 on the Seward Highway. Improvements on the north (mountain) side of the highway will include park | Alaska | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Seward | Kenai Peninsula | $479,812 | $0 | $49,376 | $529,188 |
STEESE HWY MP 147 BIRCH CREEK WAYSIDE | Construct a wayside/parking area near the Birch Creek Bridge near MP 147 of the Steese Highway. Project will also include a boat launch and sanitary facility. The boat launch portion of the project will be funded by other agencies and will not use feder | Alaska | 2001 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Fairbanks | Fairbanks North Star | $43,986 | $0 | $4,367 | $48,353 |
DAVIS DOME WAYSIDE | Construct a new wayside at Davis Dome on Boundry Spur near the Canadian Border and improve 3 others along the the Taylor Hwy as funding allows (MP 82 - Walker fork Campgroud, MP 49- West Fork Campground and MP 35- Mt Fairplay Wayside). The project may inc | Alaska | 1992 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Chicken | Southeast Fairbanks | $23,350 | $0 | $2,318 | $25,668 |
CHENA HOT SPRINGS RD WIDEN -2ND CONTRACT | Reconstruct and widen Chena Hot Springs Road from Nordale to the Steese Highway. Associated with main PJ# 63204 Chena Hot Springs Widening under this same federal project number. | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Fairbanks | Fairbanks North Star | $463,492 | $0 | $46,010 | $509,502 |
PARKS HWY: MP 41-44 CRUSEY TO LUCUS | Rehabilitate the Parks Highway from Crusey Street to Lucas Road. Project will include pavement rehabilitation, driveway consolidation, improvements to drainage system and pedestrian facilities, and landscaping. Scope does not include the illimination o | Alaska | 2009 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Wasilla | Wasilla | $761,102 | $0 | $53,782 | $814,884 |
POW-HYDABURG HIGHWAY PAVING | Provide a hard surface on the Hydaburg Highway from the intersection of the Hollis Highway to Hydaburg, a distance of 23 miles.. | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Hydaburg | Prince Of Wales-Outer Ketchikan | $29,398 | $0 | $2,918 | $32,316 |
DALTON HWY MP 111 SOUTH REHAB | PE and construction for rehabilitation, gravel surfacing, new construction and improvements to waysides, and an RV site. | Alaska | 1992 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $31,625 | $0 | $4,025 | $35,650 |
FFY94 TRANSPORTATION PLANNING WORK PROG | Upgrade three existing highway waysides on the Sterling Highway at MP 135 and MP 137, Ninilchik River and Deep Creek North and South. Work will enlarge and improve parking including landscaping, trails, handpump water well, vaulted toilets, kiosks, inform | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Statewide | Statewide | $149,504 | $0 | $14,840 | $164,344 |
ELLIOTT HWY MP 7 NORTH REHAB | RECONSTRUCT AND WIDEN CHSR FROM OLD STEESE HIGHWAY TO NORDALE ROAD (4 LANES TO STEELE CREEK RD). | Alaska | 1992 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Fairbanks | Fairbanks North Star | $38,994 | $0 | $3,871 | $42,865 |
JUNEAU GLACIER HIGHWAY SALMON CREEK TO VANDERBILT | Design and construction of improvements to Glacier Hwy. between Salmon Creek and the Vanderbilt Hill intersection with Lemon Road along existing alignment. | Alaska | 1993 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Juneau | Juneau | $428,236 | $0 | $42,509 | $470,745 |
DALTON HWY MP 57 -YUKON CROSSING WAYSIDE | Improve existing access road and parking area to serve as a wayside, interpretation displays about the Yukon River area and pipeline crossing, a nature trail and two viewing platforms. | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $407,565 | $0 | $40,456 | $448,021 |
GLENN HWY MP 118-127 RECONSTRUCTION | Rehabilitation, reconstruction and resurfacing of the Richardson Highway between MP 129 (Tok Cutoff/Richardson Highway Junction) and MP 148 (Sourdough) and archaeological clearance for use of the Ringling Pit. | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | 0 | $35,520 | $0 | $2,510 | $38,030 |
LAKE LOUISE WAYSIDES | IMPROVE TRAILHEAD PARKING AT MILE 16 & 19. IMP INCLUDE CONSTRUCTION PARKING AREAS, INSTALL INFORMATIONAL KIOSK, INTERPRETATIVE SIGNS, LANDSCAPING. | Alaska | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Lake Louise | Matanuska-Susitna | $420,474 | $0 | $41,738 | $462,212 |
SEWARD HWY: MP 59.3-65.5 RECONSTRUCTION | Reconstruction of the Seward Hwy from MP 59.3 to 65.5. PE through Design approval was done under Pj. 53045 / F-031-1(20) Seward Hwy MP 50 - 65.5. Consists of reconstructing approximately six miles of the Seward Highway near the Hope Wye. The work will | Alaska | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Seward | Kenai Peninsula | $37,360 | $0 | $2,640 | $40,000 |
CHITINA VISITOR WAYSIDE-TE | Construct roadside improvements at approximately MP 33 on the Edgerton Highway at Chitina, including parking, pedestrian facilities, and historic and scenic interpretative signs. Sanitation facilities are also being considered. | Alaska | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Chitina | Valdez-Cordova | $422,229 | $0 | $45,516 | $467,745 |
FNSB ABANDONED VEHCL REMOVAL PROGRAM-TE | Remove and dispose of inoperable and abandoned vehicles. | Alaska | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | 0 | 0 | $44,430 | $0 | $4,410 | $48,840 |
CORDOVA/VALDEZ JUNK CAR REMOVAL-TE | Removal and disposal of inoperal and abandoned vehicles. | Alaska | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Cordova | Valdez-Cordova | $185,206 | $0 | $18,384 | $203,590 |
NORTHERN LIGHTS BOULEVARD LANDSCAPING | Landscaping improvements on Northern Lights Blvd., from Lake Otis Parkway to Muldoon Road. | Alaska | 1997 | 5 | (TE) 5. Landscaping and scenic beautification | Fairbanks | Fairbanks North Star | $403,423 | $0 | $46,064 | $449,487 |
COPPER VALLEY ABANDONED VEHICLE REMOVAL | Upgrade three existing highway waysides on the Sterling Highway at MP 135 and MP 137, Ninilchik River and Deep Creek North and South. Work will enlarge and improve parking including landscaping, trails, handpump water well, vaulted toilets, kiosks, inform | Alaska | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Cordova | Valdez-Cordova | $32,242 | $0 | $3,200 | $35,442 |
AMATS: MULDOON RD PEDESTRIAN & LANDSCAPING, (PARENT) | Revised Phasing (2003) Ph-I Pathway on east side of Muldoon Rd from 20th Ave to 16th Ave. Ph-II Landscaping from BOP to DeBarr Ph-III Landscaping, Pathway, & Ped Amenities from DeBarr to Glenn Hwy. | Alaska | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Anchorage | Anchorage | $471,614 | $0 | $46,814 | $518,428 |
LAVELLE YOUNG WHEELHOUSE SITING | Develop a permanent site for the historic Lavelle Young Wheelhouse for display at Alaskaland, including a structural deck, setting the wheelhouse and a replica helm. | Alaska | 2001 | 6 | (TE) 6. Historic preservation | Fairbanks | Fairbanks North Star | $70,615 | $0 | $7,009 | $77,624 |
SEWARD RAILCAR PRESERVATION | Preservation of a 1916 Alaska Railroad railcar. The railcar is to used as a visitor center/museum. Work to include restrooms. | Alaska | 2000 | 6 | (TE) 6. Historic preservation | Seward | Kenai Peninsula | $1,902 | $0 | $188 | $2,090 |
SKAGWAY FERRY TERMINAL EXHIBIT - GOLD RUSH | FABRICATION AND INSTALLATION OF AN EXHIBIT DESCRIBING THE KLONDIKE GOLD RUSH IN SKAGWAY FERRY TERMINAL. | Alaska | 1993 | 6 | (TE) 6. Historic preservation | Skagway | Skagway-Hoonah-Angoon | $34,232 | $0 | $3,397 | $37,629 |
NHS ROADSIDE HISTORICAL INTERPRETIVE SIGNAGE | Develop a comprehensive framework, guidelines and procedures for a statewide historic markers program. Design, construct and install interpretive signs, with minor wayside improvements at various locations along the National Highway System. These signs | Alaska | 1998 | 6 | (TE) 6. Historic preservation | Statewide | Statewide | $119,161 | $0 | $10,292 | $129,453 |
MCCARTHY/KENNICOTT MINE HIST PRESERV-TE | EMERGENCY STABILIZATION REPAIRS TO HISTORIC STRUCTURES A THE THE KENNICOTT MINE. | Alaska | 1994 | 6 | (TE) 6. Historic preservation | Kennicott | Valdez-Cordova | $1,204 | $0 | $119 | $1,323 |
EARTHQUAKE PARK INTERPRETIVE FACILITY-AN | Enhance Earthquake Park pedestrian amenities. Add two trail turnouts with interpretive displays along the trail connecting the existing Northern Lights Boulevard parking area to the Coastal Trail. Realign and upgrade the Coastal Trail intersection to im | Alaska | 1995 | 6 | (TE) 6. Historic preservation | Anchorage | Anchorage | $589,879 | $0 | $64,430 | $654,309 |
UNALASKA TE: HOLY ASCENSION CHURCH | To renovate or otherwise deter degradation to the structure and finishes of the Russian Orthodox Church located in Unalaska, Alaska. This church, one of the oldest structures in Alaska, has neen in a state of increasing deterioration for some time. | Alaska | 1994 | 6 | (TE) 6. Historic preservation | Unalaska | Aleutians East | $1,351,743 | $0 | $492,284 | $1,844,027 |
SEWARD HISTORICAL STREET LIGHTING | Landscape scenic viewpoints and provide antique street lights in the historic portion of downtown Seward between the corner of Adams and Fourth Streets and the historic Railroad Terminal on Railway Avenue. | Alaska | 1994 | 6 | (TE) 6. Historic preservation | Seward | Kenai Peninsula | $294,595 | $0 | $29,243 | $323,838 |
GOLD RUSH HISTORICAL SIGNS | Design and construct approximately 30 highway wayside historical markers at various Central Region locations. Minor wayside improvements may be needed to install markers in appropriate/accessible sites. | Alaska | 1998 | 6 | (TE) 6. Historic preservation | Skagway | Skagway-Hoonah-Angoon | $90,970 | $0 | $9,030 | $100,000 |
LAVELLE YOUNG WHEELHOUSE RESTORATION-TE | RESTORE THE WHEELHOUSE THAT WAS SALVAGED FROM THE LAVELLE YOUNG RIVER STEAMER. | Alaska | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Fairbanks | Fairbanks North Star | $122,922 | $0 | $12,203 | $135,125 |
PETERSBURG MITKOF HWY FERRY TERMINAL SOUTH RESURFACING | PE to remove the existing pavement surface and resurface the Mitkof Highway with a new layer of asphalt concrete. Some culvert crossings may be replaced due to degradation. The length of resurfacing will coincide with the length of Petersburg's new wate | Alaska | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Petersburg | Wrangell-Petersburg | $3,217,717 | $0 | $319,402 | $3,537,119 |
AMHS VESSEL INTERPRETIVE DISPLAYS | PE, fabrication, and installation of interpretive exhibits aboard Southeast mainline AMHS ferries. Exhibits will commemorate Klondike Gold Rush activities. | Alaska | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | 0 | 0 | $45,560 | $0 | $4,522 | $50,082 |
AMATS: CAMPBELL CREEK TRAIL/C ST & AK RR | Provide for the construction of connections between the existing Campbell Creek Trail and adjacent neighborhoods at 'C' Street and the Alaska Railroad to provide a safe and maintainable route. 5/22/94 Construction of a paved bike path along Campbell Cree | Alaska | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Anchorage | Anchorage | $816,010 | $0 | $204,005 | $1,020,015 |
SIT CASTLE HILL T.E. | Stage I - monument reconstruction, will correct foundation and structural problems associated with settling of the rock walls. Stage II will address pedestrian access to the monument. | Alaska | 1995 | 10 | (TE) 10. Archaeological planning & research | Sitka | Sitka | $1,421,049 | $0 | $143,958 | $1,565,007 |
BADGER RD MP 0-.6 RECON & ENVIRON RESTORATION | Reconstruction of the first 0.6 miles of Badger Rd from 2 to 4 lanes, including a separate bike/ped path and environmental restoration. PH2, Ph3, and Ph7 accomplished under PJ 60379. | Alaska | 1994 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | North Pole | Fairbanks North Star | $52,542 | $0 | $5,216 | $57,758 |
SOLDOTNA TE: WATER QUALITY MITIGATION (MARYDALE) | Provide for the design and construction of a storm drain outfall at Marydale Street at the terminus of Riverwatch Road, including a sedimentation basin. The outfall is required by Alaska Department of Environmental Conservation to assure adequate water | Alaska | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Soldotna | Kenai Peninsula | $604,471 | $0 | $73,001 | $677,472 |
TANANA VALLEY RAILROAD TRAINHOUSE/MUSEUM | Construct a structure to house and support operations of the restored Tanana Valley Railroad Engine #1 and to include a museum at Alaskaland. | Alaska | 2001 | 12 | (TE) 12. Establishment of transportation museums | Fairbanks | Fairbanks North Star | $1,965,376 | $0 | $195,090 | $2,160,466 |