Project Search Results
Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
Recreational Trails Program Grant issued to Friends of Kenilworth Aquatic Gardens | maintenance of natural surface trails within Kenilworth Aquatic Gardens, and removal of litter, trash, and invasive species along the Anacostia River Trail. | District Of Columbia | 2019 | 201 | (RTP) 201. Trails | Washington | D.C. | $178,750 | $0 | ||
Recreational Trails Program Grant issued to Student Conservation Association | maintenance of natural surface trails in Pope Branch Park, Fort Mahan, Fort Dupont, and Rock Creek Park. | District Of Columbia | 2019 | 201 | (RTP) 201. Trails | Washington | D.C. | $226,765 | $0 | ||
Trail Improvements - 14th Street Bridge to East Basin Drive | Widen and repave the trail from 14th St.E.Basin Drive | District Of Columbia | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $146,858 | $0 | $36,714 | $183,572 |
Planter Space Creation | Create new and expand existingplanting locations | District Of Columbia | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $327,928 | $0 | $66,453 | $394,381 |
Rock Creek Park Military Road Feasibility Study | Military Road is the primary east-west connector through Rock Creek Park and it currently is inhospitable to pedestrians and bicyclists. A feasibility study funded through this grant will evaluate conceptual alignments for the construction of a multiuse trail, which was identified as a priority in the 2016 NPS paved Trails Study and recommend in moveDC. | District Of Columbia | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $217,000 | $0 | $50,000 | $273,754 |
Chevy Chase Bus Station | District Of Columbia | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $696,332 | $0 | $141,109 | $837,441 | |
USRC Pedestrian Enhancements | A variety of enhancements to the pedestrian walkway on the Bus Deck level of the Union Station Parking Garage | District Of Columbia | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $354,400 | $0 | $71,817 | $426,217 |
Permeable Sidewalks (II) | New funds from COG to continue work under previous contract | District Of Columbia | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $191,304 | $0 | $38,767 | $230,071 |
14th Street Bridge Multi-use Trail Improvements (Construction) | District Of Columbia | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $152,640 | $0 | $30,932 | $183,572 | |
Trail Improvements - 14th Street Bridge to East Basin Drive | Widen and repave the trail from 14th St.E.Basin Drive | District Of Columbia | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $18,708 | $0 | $3,791 | $22,500 |
Constitution Ave and 18th St NW Crosswalk and Path Improvement | District Of Columbia | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $129,108 | $0 | $26,163 | $155,271 | |
Chevy Chase Bus Station | rehabilitation of facility 5720 Connecticut Ave, NW to meet all current and anticipated future needs for provision of bus service, bus operator comfort, and passenger comfort at the facility. | District Of Columbia | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $666,689 | $0 | $166,672 | $833,361 |
Impervious Pavement Removal | Task Order to DOTID ED0D3A | District Of Columbia | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $206,987 | $0 | $116,945 | $323,933 |
Chevy Chase Bus Station | rehabilitation of facility 5720 Connecticut Ave, NW to meet all current and anticipated future needs for provision of bus service, bus operator comfort, and passenger comfort at the facility. | District Of Columbia | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $101,427 | $0 | $25,357 | $126,783 |
Capital Crescent and C&O Canal - Georgetown Trail Improvements | Project includes creating a trailhead and improving stairs to access the C and O Canal | District Of Columbia | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | D.C. | $162,750 | $0 | $30,000 | $197,804 |
Washington Union Station Roman Legionnaires and Interior Restoration | District Of Columbia | 2018 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Washington | D.C. | $259,992 | $0 | $127,686 | $387,678 | |
Union Station Legionnaires and Interior Restoration | Building on restoration efforts funded with previous TAP grants, this project will fund vital restoration of the station vestibules and entryway statues | District Of Columbia | 2019 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Washington | D.C. | $260,400 | $0 | $97,500 | $368,691 |
USRC Rostral Column and Balustrade Restoration | To implement the necessary rehabilitation efforts on the historic rostral columns and balustrades to restore these historic icons to their original splendor. | District Of Columbia | 2015 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Washington | D.C. | $49,890 | $0 | $10,110 | $60,000 |
USRC Rostral Column and Balustrade Restoration | To implement the necessary rehabilitation efforts on the historic rostral columns and balustrades to restore these historic icons to their original splendor. | District Of Columbia | 2016 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Washington | D.C. | $357,545 | $0 | $72,455 | $430,000 |
Taft Bridge Lion Statue Restoration | District Of Columbia | 2018 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Washington | D.C. | $16,516 | $0 | $3,347 | $19,863 | |
Hazard Tree Removal | Remove hazardous trees from DC right of way | District Of Columbia | 2014 | 107 | (TAP) 107. Vegetation management practices in transportation rights-of-way to improve roadway safety, prevent against invasive species, and provide erosion control | Washington | D.C. | $416,165 | $0 | $84,334 | $500,500 |
Jay St NE Smart Bio-Retention | District Of Columbia | 2018 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Washington | D.C. | $286,611 | $0 | $58,080 | $344,691 | |
Cultural Heritage Trails | Develop multi-modal cultural & heritage trail system serving tourism and economic objectives of the Nation's Capital | District Of Columbia | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $866,800 | $0 | $216,700 | $1,083,500 |
C & O Canal Fletcher Boat House Bridge | Transportation improvements to the vehicular bridge at Fletcher's | District Of Columbia | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $171,714 | $0 | $0 | $171,714 |
Heritage Trails Program | Historic walking trails planning and design | District Of Columbia | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $531,744 | $0 | $107,756 | $639,500 |
Nat'l Mall Sidewalk Improvements | Construct missing sections of sidewalks on the National Mall. | District Of Columbia | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $501,727 | $0 | $101,673 | $603,400 |
Pedestrian Bridge Over C & O Canal | Additional funds for consultant | District Of Columbia | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $102,096 | $0 | $0 | $102,096 |
Impervious Pavement Removal | Removal of impervious surfaces replaced with trees, mulch, landscaping based on site. | District Of Columbia | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $800,000 | $0 | $200,000 | $1,000,000 |
National Mall Sidewalk Improvements | Construct missing sections of sidewalks on the National Mall | District Of Columbia | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $58,205 | $0 | $11,795 | $70,000 |
FY93 Wheelchair/Bicycle Ramps | District Of Columbia | 1992 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $32,000 | $0 | $8,000 | $40,000 | |
Sidewalk Construction | completing sidewalk connections citywide | District Of Columbia | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $3,029,357 | $3,029,357 | $0 | $3,029,357 |
FY93 Wheelchair/Bicycle Ramps | District Of Columbia | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Washington | D.C. | $218,286 | $0 | $54,571 | $272,857 | |
Washington Area Bicycle Association | bicycle safety, education and outreach | District Of Columbia | 2010 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Washington | D.C. | $118,000 | $0 | $23,912 | $141,912 |
National Park Service | District Of Columbia | 2005 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Washington | D.C. | $41,575 | $0 | $8,425 | $50,000 | |
DDOT IPMA | Watha T. Daniels Library Public Art | District Of Columbia | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $149,670 | $0 | $30,330 | $180,000 |
Georgetown ANC 2E | Georgetown Streetlight Refurbishment | District Of Columbia | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $44,568 | $0 | $9,032 | $53,600 |
Phimister Proctor Museum | District Of Columbia | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Wahsington | D.C. | $105,782 | $0 | $21,436 | $127,218 | |
16th Street Landscaping | District Of Columbia | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $207,875 | $0 | $42,125 | $250,000 | |
Streetscape: River Terrace Community | District Of Columbia | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $20,788 | $0 | $4,212 | $25,000 | |
North of Mass. Ave. Business Improvement District | landscaping to compliment roadwork that is being done. | District Of Columbia | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $166,300 | $0 | $33,700 | $200,000 |
FY94 2nd Corridor Tree Improvement Plan Connecticut Ave/Rhode Island Ave. | District Of Columbia | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $24,000 | $0 | $6,000 | $30,000 | |
Tivoli North Business Association | iron fences around tree boxes/landscaping | District Of Columbia | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $47,493 | $0 | $9,624 | $57,117 |
Landscaping Park Over Ramp to I-395 | District Of Columbia | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $7,000 | $0 | $0 | $7,000 | |
Moms on a Mission | District Of Columbia | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $25,000 | $0 | $6,250 | $31,250 | |
14th Street Heights | District Of Columbia | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $70,678 | $0 | $14,322 | $85,000 | |
Streetscape: Hanover | District Of Columbia | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $29,103 | $0 | $5,897 | $35,000 | |
Mt. Pleasant Main Street | implementation of safety and aesthetic improvements | District Of Columbia | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $201,223 | $0 | $40,777 | $242,000 |
Capitol Hill Historic Markers | District Of Columbia | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $51,969 | $0 | $10,531 | $62,500 | |
Pedestrian/Landscaping African/American Civil War Memorial | District Of Columbia | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $1,028,527 | $0 | $1,265,410 | $2,293,937 | |
Corridor Tree Improvement Plan | District Of Columbia | 1992 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $24,000 | $0 | $6,000 | $30,000 | |
16th Street Landscaping | District Of Columbia | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $960,000 | $0 | $240,000 | $1,200,000 | |
Department of Parks and Recreation | 2nd & H Street NW Pocket Park | District Of Columbia | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $53,507 | $0 | $10,843 | $64,350 |
FY94 Corridor Tree Improvement Plan Connecticut Ave/Rhode Island Ave. | District Of Columbia | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $255,188 | $0 | $63,797 | $318,985 | |
FY94 Corridor Tree Improvement Plan Florida Ave./East Capitol St. | District Of Columbia | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $24,000 | $0 | $6,000 | $30,000 | |
Georgetown BID | District Of Columbia | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $100,000 | $0 | $25,000 | $125,000 | |
FY94 2nd Corridor Tree Improvement | District Of Columbia | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $30,196 | $0 | $43,729 | $73,925 | |
Downtown BID | landscaping of Chinatown park | District Of Columbia | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $58,923 | $0 | $11,941 | $70,864 |
Corridor Tree Improvement Plan Minnesota Ave/Massachusetts Avenue | District Of Columbia | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $224,677 | $0 | $56,169 | $280,846 | |
N Street group | District Of Columbia | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $30,000 | $0 | $6,250 | $36,250 | |
Ward 5 Community Landscaping Projects | District Of Columbia | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Wahsington | D.C. | $89,646 | $0 | $18,166 | $107,812 | |
Upshur Street landscaping | District Of Columbia | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $100,000 | $0 | $25,000 | $125,000 | |
Kasky Studio, Inc. | Landscaping around public art sculpture Carter G. Woodson Park | District Of Columbia | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Washington | D.C. | $332,600 | $0 | $67,400 | $400,000 |
DDOT | District Of Columbia | 2006 | 6 | (TE) 6. Historic preservation | Washington | D.C. | $166,300 | $0 | $33,700 | $200,000 | |
C & O Canal Road Retaining Wall Chain Bridge to Georgetown | District Of Columbia | 1996 | 6 | (TE) 6. Historic preservation | Washington | D.C. | $5,721,650 | $0 | $0 | $5,721,650 | |
Shaw/Mt. Vernon Square Historic | District Of Columbia | 2004 | 6 | (TE) 6. Historic preservation | Washington | D.C. | $498,900 | $0 | $101,100 | $600,000 | |
Historic Street and Bridge Lighting | Restore & replace lights in the historical area on historical | District Of Columbia | 1999 | 6 | (TE) 6. Historic preservation | Washington | D.C. | $144,000 | $0 | $36,000 | $180,000 |
Historic Street and Bridge Lighting | Restore & repolace lights in the historial area on | District Of Columbia | 2000 | 6 | (TE) 6. Historic preservation | Washington | D.C. | $1,262,217 | $0 | $255,783 | $1,518,000 |
C & O Canal Road Retaining Wall Chain Bridge to Georgetown | Rehabilitation of retaining wall along C & O Canal | District Of Columbia | 1999 | 6 | (TE) 6. Historic preservation | Washington | D.C. | $391,000 | $0 | $0 | $391,000 |
Taft Bridge Lion Sculptures | District Of Columbia | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Washington | D.C. | $94,567 | $0 | $23,642 | $118,209 | |
Union Station Washington Terminal Passenger Platforms & Canopies | Continue historic Union Station platform & canopy improvements (Ph 11), | District Of Columbia | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Washington | D.C. | $2,000,000 | $0 | $500,000 | $2,500,000 |
Q St Bridge Buffalo | District Of Columbia | 2006 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Washington | D.C. | $49,890 | $0 | $10,110 | $60,000 | |
Bicycle Path & Sitting Park Metropolitan Branch Trail | District Of Columbia | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Washington | D.C. | $21,000 | $0 | $5,250 | $26,250 | |
Barney Circle Archeology Phase III | To complete Phase 3 Archeological Report for the | District Of Columbia | 2000 | 10 | (TE) 10. Archaeological planning & research | Washington | D.C. | $160,000 | $0 | $40,000 | $200,000 |
Alaska Stormwater Management Phase II | Stormwater Management | District Of Columbia | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Washington | D.C. | $1,733,831 | $0 | $351,354 | $2,085,185 |
Alaska Stormwater (33B) | Stormwater Management | District Of Columbia | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Washington | D.C. | $29,755 | $0 | $6,030 | $35,785 |
Shaw EcoVillage | District Of Columbia | 2005 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Washington | D.C. | $59,170 | $0 | $11,990 | $71,160 | |
Aspira, Inc. | District Of Columbia | 2005 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Washington | D.C. | $41,575 | $0 | $8,425 | $50,000 |