Project Name Description State Year Activity Activity Type City County Federal Funds ARRA Funds Local Funds Total
Sidewalks & Wheelchair Ramps Rts 5,9&10 Advertised Massachusetts 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Hampshire $1,666,030 $0 $416,508 $2,082,538
BARNSTABLE- INTERSECTION IMPROVEMENTS AT IYANOUGH ROAD (ROUTE 28) AND YARMOUTH ROAD Work on this project consists of intersection reconstruction and traffic signal upgrades. The intent of the project is to improve safety and reduce congestion for all users at the intersection of Iyanough Road (Route 28) and Yarmouth Road. Additional approach turn lanes are required at the intersection to alleviate congestion and improve corridor/intersection level of service. A new traffic signal system will be installed. New rails, gates and signals will be installed for the rail crossing. A shared use path will be constructed on the west side of Yarmouth Road crossing at Route 28, then connecting to Engine House Road at the entrance to the intermodal center. The remaining quadrants will have new sidewalks. Also included in the project are to new pavement markings and signage. Massachusetts 2019 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Barnstable Barnstable
AMESBURY - POWOW RIVERWALK CONSTRUCTION Advertised Massachusetts 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Amesbury Essex $275,229 $0 $68,807 $344,036
CMRPC Region - Bike Racks Installation in 2015 STIP Massachusetts 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Worcester $80,000 $0 $20,000 $100,000
LOWELL- IMPROVEMENTS ON ROUTE 38 AT FOUR INTERSECTIONS Advertised Massachusetts 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Lowell Middlesex $281,909 $0 $225,527 $56,382
HINGHAM- RECONSTRUCTION & RELATED WORK ON DERBY STREET, FROM POND PARK ROAD TO CUSHING STREET Advertised Massachusetts 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Hingham Plymouth $597,428 $0 $149,357 $746,785
FITCHBURG- LUNENBURG- LEOMINSTER- RECONSTRUCTION OF SUMMER STREET AND NORTH STREET Advertised Massachusetts 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Multiple Worcester $96,605 $0 $24,151 $120,756
NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L. This project's improvements include minor widening of the section of roadway south of Route 9 to a more consistent cross-section. The pavement will be reconstructed utilizing reclaimed base course. Cement concrete sidewalks will be constructed on both sides of the roadway throughout the length of the project. The existing signals will be upgraded and, if warrants are met, new signals will be installed at Lake Street, Rutledge Road and Pine Street. The project begins on Route 27 (North Main Street) at North Avenue and extends northerly 2.2 miles to the Wayland town line, excluding the Route 9 interchange. Massachusetts 2019 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Natick Middlesex
SOUTHBOROUGH- RECONSTRUCTION OF MAIN STREET (ROUTE 30), FROM SEARS ROAD TO PARK STREET Advertised Massachusetts 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Southborough Worcester $1,456,250 $0 $1,165,000 $291,250
FITCHBURG- LUNENBURG- LEOMINSTER- RECONSTRUCTION OF SUMMER STREET AND NORTH STREET Advertised Massachusetts 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Multiple Worcester $86,238 $0 $68,990 $17,248
WAREHAM- RECONSTRUCTION OF ROUTE 6 & 28, FROM 500 FT. EAST OF TYLER AVENUE TO RED BROOK ROAD (1.65 MILES) Advertised Massachusetts 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Wareham Plymouth $611,551 $0 $489,241 $122,310
AMHERST- HADLEY- NORTHAMPTON- TRANSIT SIGNAL PRIORITY UPGRADES AT VARIOUS LOCATIONS Advertised Massachusetts 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Multiple Hampshire $792,630 $0 $634,104 $158,526
CHATHAM- IMPROVEMENTS ON MAIN STREET (ROUTE 28), FROM GEORGE RYDER ROAD TO BARN HILL ROAD Advertised Massachusetts 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Chatham Barnstable $205,809 $0 $164,647 $41,162
LUDLOW- RECONSTRUCTION OF CENTER STREET (ROUTE 21), FROM SEWALL STREET TO BEACHSIDE DRIVE Advertised Massachusetts 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Ludlow Hampden $320,000 $0 $80,000 $400,000
BILLERICA- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 3A (BOSTON ROAD) AND ALLEN ROAD Advertised Massachusetts 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Billerica Middlesex $221,053 $0 $55,263 $276,316
NEW BEDFORD- CORRIDOR IMPROVEMENTS AND RELATED WORK ON KINGS HIGHWAY, FROM CHURCH STREET TO THE KINGS HIGHWAY BRIDGE (N-06-036) OVER ROUTE 140 This project was proposed to address ongoing safety and congestion issues due to the lack of roadway capacity and left turn lanes at several key inter-sections. Traffic signal improvements are also planned at 4 intersections. In addition, the project will provide improved bicycle and pedestrian access. Massachusetts 2019 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities New Bedford Bristol
SPRINGFIELD- NORTH END PEDESTRIAN PATH CONSTRUCTION (UNDER THE CONNECTICUT RIVER RAILROAD), BETWEEN PLAINFIELD STREET AND BIRNIE AVENUE, INCLUDES CONSTRUCTION OF NEW UNDERPASS S-24-044 Advertised Massachusetts 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Springfield Hampden $6,640,845 $0 $5,312,676 $1,328,169
SHREWSBURY - RESURFACING & RELATED WORK ON MAIN STREET, FROM I-290 RAMPS EASTERLY TO MAPLE AVENUE Advertised Massachusetts 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Shrewsbury Worcester $787,376 $0 $196,844 $984,220
PAXTON- RECLAMATION ON ROUTE 31 (HOLDEN ROAD) Advertised Massachusetts 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Paxton Worcester $465,574 $0 $372,459 $93,115
WARE- INTERSECTION IMPROVEMENTS @ MAIN STREET, WEST STREET, NORTH STREET, SOUTH STREET & CHURCH STREET This project will improve vehicular, bicycle and pedestrian safety and reduce vehicular queues at the intersections of Main Street and West Street and Main Street and South Street. Work will include resurfacing of the intersection approaches, improved pedestrian and bicycle accommodations and access, new signage and pavement markings. A traffic signal will be installed at the Main Street and West Street intersection, which will be coordinated with the existing signals. Massachusetts 2019 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Ware Hampshire
WORCESTER- BLACKSTONE CANAL STREETSCAPE IMPROVEMENTS ON HARDING STREET Advertised Massachusetts 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Worcester Worcester $504,204 $0 $403,363 $100,841
CHELMSFORD-INTERSECTION IMPROVEMENTS AT ROUTE 129 AND RIVERNECK ROAD The project involves the reconstruction of Route 129 from Golden Cove Road to Industrial Avenue including rehabilitating the roadway surface, widening to include two 5 foot bike lanes and adding sidewalks on both sides. The intersection at Billerica Road will be realigned to form a T intersection. A rapid flashing beacon will be installed at the crosswalk near Industrial Avenue. Retaining walls will be installed to minimize impacts at River Meadow Brook and at the cemetery. A box culvert will be installed at the River Meadow Brook crossing of Billerica Road which will include a wildlife crossing. New drainage and stormwater detention will be included in the design. Massachusetts 2019 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Chelmsford Middlesex
INTERSECTION IMPROVEMENTS AT 2 LOCATIONS: CRANBERRY HIGHWAY (ROUTE 6A) AND MAIN STREET; CHATHAM ROAD (ROUTE 28) AND MAIN STREET Advertised Massachusetts 2015 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Orleans Barnstable $143,011 $0 $35,753 $178,764
RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 Advertised Massachusetts 2015 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Medway Norfolk $2,038,975 $0 $509,744 $2,548,719
FRAMINGHAM- NATICK- COCHITUATE RAIL TRAIL CONSTRUCTION INCLUDING PEDESTRIAN BRIDGE, N-03-014, OVER ROUTE 9 & F-07-033=N-03-029 OVER ROUTE 30 Advertised Massachusetts 2018 103 (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users Multiple Middlesex $7,152,508 $0 $5,722,006 $1,430,502
SALEM- CANAL STREET RAIL TRAIL CONSTRUCTION (PHASE 2) Advertised Massachusetts 2018 103 (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users Salem Essex $2,787,456 $0 $2,229,965 $557,491
ACCELERATED BRIDGE PROGRAM - GANS DEBT SERVICE In 2015 STIP Massachusetts 2015 106 (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities Statewide Statewide $3,000,000 $0 $0 $3,000,000
Downey Elementary SRTS Advertised Massachusetts 2014 301 (TAP) 301. Safe routes to school infrastructure Westwood Norfolk $549,000 $0 $137,250 $686,250
NEW BEDFORD- IMPROVEMENTS AT ASHLEY AND LINCOLN ELEMENTARY SCHOOLS (SRTS) Advertised Massachusetts 2018 301 (TAP) 301. Safe routes to school infrastructure New Bedford Bristol $1,545,600 $0 $1,236,480 $309,120
Beebe School SRTS Inactive project Massachusetts 2014 301 (TAP) 301. Safe routes to school infrastructure Malden Middlesex $462,000 $0 $115,500 $577,500
Memorial Elementary SRTS Advertised Massachusetts 2014 301 (TAP) 301. Safe routes to school infrastructure Manchester by the Sea Essex $500,000 $0 $125,000 $625,000
NEWBURYPORT- IMPROVEMENTS AT NOCK MIDDLE SCHOOL & MOLIN UPPER ELEMENTARY SCHOOL (SRTS) Project includes the installation of a High-intensity Activated crossWalk (HAWK) signal between Summit Place and Kent Street and corridor traffic calming measures along High Street (Routes 113) from Toppans Lane to Buck Street. Five-foot striped bike lanes in both directions along High Street, ADA-compliant ramps with perpendicular crossings, and new crosswalks and stopline pavement markings are also part of the project. Massachusetts 2019 301 (TAP) 301. Safe routes to school infrastructure Newburyport Essex
SRTS Statewide Plannning&Design in 2015 STIP Massachusetts 2015 302 (TAP) 302. Safe routes to school programs Statewide Statewide $600,000 $0 $0 $600,000
Safe Routes to School (SRTS) Education This funding is for the administation and management of the existing Safe Routes to School Program in Massachusetts in order to improve and grow the program in the areas of safety, education, encouragement, enforcement, and evaluation. The Massachusetts Safe Routes to School (SRTS) Program is a federally-funded program that works with communities, schools, students, and families to promote active transportation among elementary and middle school students across the Commonwealth. The three-year contract funded with TAP enables the program to continue working with communities ·promoting active transportation. Massachusetts 2019 302 (TAP) 302. Safe routes to school programs Statewide Multiple
SAFE ROUTES TO SCHOOL EDUCATION (2017) Advertised Massachusetts 2017 302 (TAP) 302. Safe routes to school programs Statewide Statewide $480,000 $0 $120,000 $600,000
Swansea Bicycle Facility Massachusetts 1997 1 (TE) 1. Pedestrian and bicycle facilities Swansea Bristol $63,600 $0 $15,900 $79,500
Dennis J. Moran Park Massachusetts 1997 1 (TE) 1. Pedestrian and bicycle facilities Natick Middlesex $90,896 $0 $22,724 $113,620
DW Field Park (Phase I) Massachusetts 1995 1 (TE) 1. Pedestrian and bicycle facilities Brockton Plymouth $95,200 $0 $23,800 $119,000
North Beach Street Massachusetts 1995 1 (TE) 1. Pedestrian and bicycle facilities Nantucket Nantucket $26,400 $0 $6,600 $33,000
PowWow River Walk (Phases 1 & 2) Massachusetts 1999 1 (TE) 1. Pedestrian and bicycle facilities Amesbury Essex $44,000 $0 $11,000 $55,000
Wareham Bikeway Massachusetts 1998 1 (TE) 1. Pedestrian and bicycle facilities Wareham Plymouth $12,000 $0 $3,000 $15,000
MetroWest Bike Map Ashland, Framingham, Marlborough, Natick, Southborough, Sudbury, Wayland, Wellesley, Weston Massachusetts 1995 1 (TE) 1. Pedestrian and bicycle facilities Multiple $7,440 $0 $1,860 $9,300
Downtown Streetscape Massachusetts 1996 1 (TE) 1. Pedestrian and bicycle facilities Framingham Middlesex $144,000 $0 $36,000 $180,000
Franklin County Bikeway Phase 1 Section A Deerfield, Montague Massachusetts 2004 1 (TE) 1. Pedestrian and bicycle facilities Franklin $25,600 $0 $6,400 $32,000
Calvary Street Footbridge Massachusetts 1996 1 (TE) 1. Pedestrian and bicycle facilities Waltham Middlesex $144,000 $0 $36,000 $180,000
Village Center (Phase I) Massachusetts 1996 1 (TE) 1. Pedestrian and bicycle facilities Erving Franklin $111,015 $0 $27,754 $138,769
Cliff Road Bike Path Construction In Year 2012 STIP Massachusetts 2012 1 (TE) 1. Pedestrian and bicycle facilities Nantucket Nantucket $221,520 $0 $55,380 $276,900
Blackstone River Bikeway - Quinsigamond This enhancement project seeks to design a feasible off-road alignment for the Blackstone River Bikeway in the Quinsigamond Village section of Morcester. The off-road alignment would connect the existing off-road Bikeway terminus at the new Millbury St. b Massachusetts 2005 1 (TE) 1. Pedestrian and bicycle facilities Worcester Worcester $192,000 $0 $48,000 $240,000
Rte. 12 Streetscape and Quality Improvements Massachusetts 2006 1 (TE) 1. Pedestrian and bicycle facilities Auburn Worcester $181,240 $0 $45,310 $226,550
WORCESTER - MAIN STREET BUSINESS DISTRICT STREETSCAPE IMRPOVEMENTS In 2017 STIP Massachusetts 2017 1 (TE) 1. Pedestrian and bicycle facilities Worcester Worcester $1,481,612 $0 $370,403 $1,852,015
Interchange reconstruction @I-93, Year 1 In 2013 STIP Massachusetts 2013 1 (TE) 1. Pedestrian and bicycle facilities Methuen Essex $150,800 $0 $37,700 $188,500
Reconstruction of Sutton Street In 2013 STIP Massachusetts 2013 1 (TE) 1. Pedestrian and bicycle facilities Northbridge Worcester $139,200 $0 $34,800 $174,000
MBTA Station Kiosks Massachusetts 1999 1 (TE) 1. Pedestrian and bicycle facilities Suffolk $750,000 $0 $187,500 $937,500
City Hall Plaza Massachusetts 1996 1 (TE) 1. Pedestrian and bicycle facilities Pittsfield Berkshire $28,000 $0 $7,000 $35,000
Pre-Engineered Pedestrian Bridge Massachusetts 1997 1 (TE) 1. Pedestrian and bicycle facilities Lenox Berkshire $80,000 $0 $20,000 $100,000
Mahican Mohawk Trail of Peace Massachusetts 1995 1 (TE) 1. Pedestrian and bicycle facilities Williamstown Berkshire $40,400 $0 $10,100 $50,500
West Central Street (Route 135) Massachusetts 1996 1 (TE) 1. Pedestrian and bicycle facilities Natick Middlesex $60,000 $0 $15,000 $75,000
Canalway Wayside and Directional Signs Massachusetts 2005 1 (TE) 1. Pedestrian and bicycle facilities Lowell Middlesex $300,000 $0 $120,024 $420,024
Reconstruction of Baldwinville Rd from Rt 202/68 to Patriots Rd In 2012 STIP; Yr 1 of 2, streetscape and shoulders Massachusetts 2012 1 (TE) 1. Pedestrian and bicycle facilities Templeton Worcester $107,030 $0 $26,758 $133,788
Nobadeer Road Bike Path Massachusetts 1998 1 (TE) 1. Pedestrian and bicycle facilities Nantucket Nantucket $18,480 $0 $4,620 $23,100
Shank Painter Pond Massachusetts 1999 3 (TE) 3. Acquisition of scenic or historic easements and sites Provincetown Barnstable $197,302 $0 $449,326 $646,628
Northside Militia Training Field Massachusetts 1996 3 (TE) 3. Acquisition of scenic or historic easements and sites Charlton Worcester $75,996 $0 $18,999 $94,995
Reedy Meadow Scenic Acquistion Massachusetts 1997 3 (TE) 3. Acquisition of scenic or historic easements and sites Lynnfield Essex $220,000 $0 $55,000 $275,000
Mohawk Trail Scenic Byway Land Protection Massachusetts 2010 3 (TE) 3. Acquisition of scenic or historic easements and sites Greenfield Franklin $50,000 $0 $0 $50,000
Scenic Farm Byway (Phase 3) Massachusetts 1999 3 (TE) 3. Acquisition of scenic or historic easements and sites Statewide Statewide $67,144 $0 $16,786 $83,930
Berkshire Gateway Improvements Massachusetts 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Lee Berkshire $453,600 $0 $113,400 $567,000
Essex Unified Signage System (MAPC & MVPC) Massachusetts 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Essex Essex $94,000 $0 $23,500 $117,500
BLACKSTONE VISITOR CENTER Advertised Massachusetts 2015 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Worcester Worcester $180,831 $0 $45,208 $226,039
Basketball Hall of Fame/ Tourist Info Center Massachusetts 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Springfield Hampden $32,000 $0 $8,000 $40,000
Essex Heritage Signage (MVPC & MAPC) Massachusetts 1996 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Essex Essex $269,600 $0 $67,400 $337,000
Tri-Community Bikeway Massachusetts 2007 5 (TE) 5. Landscaping and scenic beautification Sutton Worcester $398,289 $0 $112,337 $510,626
Princeton Town Common Phase 2 Massachusetts 1998 5 (TE) 5. Landscaping and scenic beautification Princeton Worcester $24,000 $0 $6,000 $30,000
Beacon Street Historic and Landscaping Massachusetts 2004 5 (TE) 5. Landscaping and scenic beautification Brookline Norfolk $1,836,637 $0 $459,159 $2,295,796
Main Street Enhancement Massachusetts 1997 5 (TE) 5. Landscaping and scenic beautification Hudson Worcester $212,800 $0 $53,200 $266,000
Shaker Village Enhancements Massachusetts 1997 6 (TE) 6. Historic preservation Hancock Berkshire $360,000 $0 $90,000 $450,000
Historic Complex Preservation Massachusetts 1996 6 (TE) 6. Historic preservation Pelham Hampshire $60,036 $0 $15,009 $75,045
Restoration of Historic Railroad Cars Massachusetts 1998 6 (TE) 6. Historic preservation Lenox Berkshire $128,000 $0 $32,000 $160,000
Restoration of B&M Depot Headhouse Massachusetts 1998 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Lowell Middlesex $41,298 $0 $10,325 $51,623
Orchard St. Stone Arch Bridge Rehabilitation Massachusetts 1999 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Millis Norfolk $287,344 $0 $71,836 $359,180
Moody Street Bridge Rehabilitation Massachusetts 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Waltham Middlesex $168,000 $0 $42,000 $210,000
Great River Bridge Massachusetts 2007 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Westfield Hampden $4,775,354 $0 $1,193,839 $5,969,193
Trolley Feasibility Study - Northern Middlesex Ext. Massachusetts 1995 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Lowell Middlesex $48,000 $0 $12,000 $60,000
Swamp Locks Chamber Restoration (Lowell Hamilton Canal Walkway) Massachusetts 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Lowell Middlesex $174,899 $0 $43,725 $218,624
S.S. Nobska Restoration (Phase 2) Massachusetts 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Statewide Statewide $800,000 $0 $200,000 $1,000,000
Gill Bridge Rehab Work included involves rehab of existing steel truss carrying Avenue A over CT River, project adds a bike lane; funded through Accelerated Bridge Program and TE; Total project cost is $48,461,390 Massachusetts 2008 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Gill Franklin $335,456 $0 $83,864 $419,320
Lowell-Hamilton Canal Walkway Massachusetts 2009 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Lowell Middlesex $300,000 $0 $120,024 $420,024
Tugboat Luna Massachusetts 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Boston Suffolk $540,000 $0 $135,000 $675,000
B&M RR North & South Tower Reconstruction Massachusetts 2000 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Lowell Middlesex $528,572 $0 $132,144 $660,716
Historic Canal Restoration Massachusetts 1995 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities South Hadley Hampshire $66,589 $0 $16,647 $83,236
Bird Island Lighthouse Massachusetts 1996 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Marion Plymouth $28,000 $0 $7,000 $35,000
Schooner Ernestina Restoration Massachusetts 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities New Bedford Bristol $100,000 $0 $25,000 $125,000
Railroad Station Rehabilitation Community still interested in renovation; increased deterioration and costs over time Massachusetts 1998 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Stoughton Norfolk $16,400 $0 $4,100 $20,500
Railroad Station Massachusetts 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Greenfield Franklin $139,430 $0 $34,857 $174,287
Trolley Car Restoration Massachusetts 1995 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Shelburne Falls Franklin $160,000 $0 $40,000 $200,000
Railroad Depot Restoration Massachusetts 1995 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Chester Hampden $104,000 $0 $26,000 $130,000
Clipper City Rail Trail along the City Branch (Phase II) Advertised Massachusetts 2015 8 (TE) 8. Conversion of abandoned railway corridors to trails Newburyport Essex $2,496,000 $0 $624,000 $3,120,000
Granite Railway Massachusetts 1998 8 (TE) 8. Conversion of abandoned railway corridors to trails Quincy Norfolk $360,000 $0 $90,000 $450,000
Manhan - Norwottuck Link Massachusetts 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Northampton Hampshire $84,000 $0 $21,000 $105,000
Bruce Freeman Rail Trail (Phases 2A & 2C) Commonwealth Ave. to Sudbury T/L. Phase 2C includes 0.5 miles from the Concord Rotary to the Sudbury T/L, but this phase will not be constructed until Phase 2D in Sudbury is constructed. Concord Rotary portion is designated as Phase 2B (0.67 miles) and is Massachusetts 2009 8 (TE) 8. Conversion of abandoned railway corridors to trails Acton Middlesex $400,000 $0 $100,000 $500,000
Cochituate Rail Trail In 2013 STIP Massachusetts 2013 8 (TE) 8. Conversion of abandoned railway corridors to trails Framingham Middlesex $634,185 $0 $158,546 $792,731
Newburyport Rail Trail (Phase 2) Massachusetts 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Newburyport Essex $80,000 $0 $20,000 $100,000
Williamsburg-Norwottuck Rail Trail Ext. Massachusetts 1996 8 (TE) 8. Conversion of abandoned railway corridors to trails Hampshire $63,360 $0 $15,840 $79,200
Chicopee Riverwalk Massachusetts 1996 8 (TE) 8. Conversion of abandoned railway corridors to trails Chicopee Hampden $67,200 $0 $16,800 $84,000
Assabet River Rail Trail Massachusetts 1998 8 (TE) 8. Conversion of abandoned railway corridors to trails Hudson Worcester $554,000 $0 $138,500 $692,500
ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL CONSTRUCTION, INCLUDES BRIDGES, A-02-042 & M-10-012, A-02-034 & MPB WALL Advertised Massachusetts 2015 8 (TE) 8. Conversion of abandoned railway corridors to trails Acton Middlesex $997,663 $0 $249,416 $1,247,079
Manhan Rail Trail (Northampton & Easthampton) Massachusetts 1996 8 (TE) 8. Conversion of abandoned railway corridors to trails Northampton Hampshire $48,240 $0 $12,060 $60,300
CT River Parkland Link Bikeway (Phase 1B) From Depot St. to Unity Park in abandoned RR ROW Massachusetts 2002 8 (TE) 8. Conversion of abandoned railway corridors to trails Montague Franklin $991,950 $0 $247,987 $1,239,938
Abandoned Railway Corridor between Marginal & Porter St. Massachusetts 1998 8 (TE) 8. Conversion of abandoned railway corridors to trails Boston Suffolk $384,000 $0 $96,000 $480,000
Rail Trail Massachusetts 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Belchertown Hampshire $140,240 $0 $35,060 $175,300
Norwottuck & Manhan Railtrails Massachusetts 1998 8 (TE) 8. Conversion of abandoned railway corridors to trails Northampton Hampshire $88,800 $0 $22,200 $111,000
Salisbury Rail Trail Massachusetts 2008 8 (TE) 8. Conversion of abandoned railway corridors to trails Salisbury Essex $119,200 $0 $29,800 $149,000
Minuteman Bikeway Massachusetts 1995 8 (TE) 8. Conversion of abandoned railway corridors to trails Cambridge Middlesex $157,780 $0 $39,445 $197,225
Marblehead Trail (Phase 2) Massachusetts 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Salem Essex $16,000 $0 $4,000 $20,000
Nashua River Rail Trail Massachusetts 1995 8 (TE) 8. Conversion of abandoned railway corridors to trails Ayer Middlesex $20,000 $0 $5,000 $25,000
Southwick Rail Trail (Pt. Grove Rd to Westfield TL) Massachusetts 1998 8 (TE) 8. Conversion of abandoned railway corridors to trails Southwick Hampden $80,000 $0 $20,000 $100,000
Manhan Rail Trail Massachusetts 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Easthampton Hampshire $472,000 $0 $118,000 $590,000
Marblehead Branch Rail-Trail Massachusetts 1996 8 (TE) 8. Conversion of abandoned railway corridors to trails Salem Essex $216,000 $0 $54,000 $270,000
Rt 1 Rail Trail Connector (Gillis Bridge) Provides bike-ped crossing @ N terminus of Rt 1 bridge over Merrimack River Massachusetts 2011 8 (TE) 8. Conversion of abandoned railway corridors to trails Salisbury Essex $220,876 $0 $44,175 $265,051
Manhan Rail Trail Ext. South St to Coleman Rd Design force account Massachusetts 2011 8 (TE) 8. Conversion of abandoned railway corridors to trails Easthampton Hampshire $23,944 $0 $5,986 $29,930
Deerfield Franklin Co. Bikeway Phase 1a 1.2 miles, includes rehabbed bridge Deerfield and Montague Massachusetts 2004 8 (TE) 8. Conversion of abandoned railway corridors to trails Franklin $1,148,617 $0 $296,754 $1,445,371
Manhan Rail Trail Massachusetts 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Easthampton Hampshire $80,000 $0 $20,000 $100,000
Norwottuck Rail Trail Massachusetts 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Northampton Hampshire $2,456,000 $0 $614,000 $3,070,000
Southwick Rail Trail (CT Line to Pt. Grove Rd) Massachusetts 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Southwick Hampden $91,997 $0 $22,999 $114,996
Cochituate Rail Trail 1.4 mile rail trail Massachusetts 2010 8 (TE) 8. Conversion of abandoned railway corridors to trails Framingham Middlesex $634,185 $0 $158,546 $792,731
Milford Upper Charles River Trail (Phase 2) Massachusetts 2006 8 (TE) 8. Conversion of abandoned railway corridors to trails Milford Worcester $148,080 $0 $37,020 $185,100
Rails to Trails Study Massachusetts 1995 8 (TE) 8. Conversion of abandoned railway corridors to trails Newburyport Essex $16,000 $0 $4,000 $20,000
Salisbury Rail Trail Massachusetts 1998 8 (TE) 8. Conversion of abandoned railway corridors to trails Salisbury Essex $119,200 $0 $29,800 $149,000
Bruce Freeman Rail Trail (Phase 2A ) Advertised Massachusetts 2014 8 (TE) 8. Conversion of abandoned railway corridors to trails Acton, Carlisle, Westford Middlesex $7,030,400 $0 $1,757,600 $8,788,000
Milford Upper Charles River Trail (Phase I) Massachusetts 2004 8 (TE) 8. Conversion of abandoned railway corridors to trails Milford Worcester $1,445,842 $0 $382,581 $1,828,423
Central Artery Archaeology Project Project would enhance appreciation of the archaeology conducted as part of the CA/T project. Massachusetts 2003 10 (TE) 10. Archaeological planning & research Statewide Statewide $116,000 $0 $24,000 $140,000
Archeological Collections/Records Massachusetts 2009 10 (TE) 10. Archaeological planning & research Statewide Statewide $318,195 $0 $79,549 $397,744
MACRIS - Historic GIS Database Massachusetts 1996 10 (TE) 10. Archaeological planning & research Statewide Statewide $209,976 $0 $52,494 $262,470
GRIPP Massachusetts 1997 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Statewide Statewide $90,000 $0 $22,500 $112,500
Stormwater retrofits & related work @various locations Stormwater mitigation Massachusetts 2011 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity District 5 Multiple $402,294 $0 $80,459 $482,753
District 6 Stormwater Retrofits In 2013 Stip Massachusetts 2013 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity District 6 Multiple $400,000 $0 $100,000 $500,000
Drainage Improvements on Rt.70 improves runoff and water quality, in conjunction with Dep't of Conservation and Recreation - Boylston and Clinton Massachusetts 2011 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Boylston Worcester $1,458,215 $0 $364,553 $1,822,769
Stormwater retrofits @various locations In 2015 STIP Massachusetts 2013 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Statewide Statewide $1,600,000 $0 $400,000 $2,000,000
Buzzard's Bay Shellfish Restoration Massachusetts 1998 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Marion Plymouth $113,804 $0 $28,451 $142,255
Statewide Stormwater Retrofits In 2013 STIP Massachusetts 2013 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Multiple $1,600,000 $0 $400,000 $2,000,000
Wareham Street Drainage Improvements Massachusetts 1999 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Middleborough Plymouth $210,000 $0 $52,500 $262,500
District 3 Stormwater Retrofits In 2013 STIP Massachusetts 2013 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity District 3 Multiple $1,600,000 $0 $400,000 $2,000,000
District 4 Stormwater Retrofits In 2013 STIP Massachusetts 2013 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity District 4 Multiple $1,600,000 $0 $400,000 $2,000,000
Stormwater retrofits & related work @various locations Stormwater mitigation Massachusetts 2011 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity District 3 Multiple $1,619,856 $0 $404,964 $2,024,820
District 5 Stormwater Retrofits In 2013 STIP Massachusetts 2013 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity District 5 Multiple $400,000 $0 $100,000 $500,000
First Flush Basins Massachusetts 1998 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Tisbury Dukes $122,108 $0 $30,527 $152,635
Runnins River Stormwater Massachusetts 1996 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Seekonk Bristol $200,000 $0 $50,000 $250,000
Lake Maspenock Stormwater Massachusetts 1997 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Hopkinton Middlesex $98,054 $0 $24,514 $122,568
Namasket River Stormwater Pollution Mitigation Mitigates pollution at five locations along the Namasket River Massachusetts 2011 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Middleborough Plymouth $46,877 $0 $11,719 $58,596
Stormwater retrofits & related work @various locations Stormwater mitigation Massachusetts 2011 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity District 4 Multiple $1,637,759 $0 $409,439 $2,047,199
Rte. 28 Storwater Runoff Massachusetts 1996 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Yarmouth Barnstable $145,600 $0 $36,400 $182,000
Main Street/East Bay Stormwater Massachusetts 1996 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Barnstable Barnstable $224,004 $0 $56,001 $280,005
Merrimack River Estuary Study Massachusetts 1995 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Newburyport Essex $85,520 $0 $21,380 $106,900
Farm Pond Study Massachusetts 1995 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Oak Bluffs Dukes $18,000 $0 $4,500 $22,500
Stormwater Retrofits on I-93, I-495, I-195, Route 3/18 Advertised Massachusetts 2015 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Braintree, Mansfield, Milton, Weymouth Bristol $1,296,360 $0 $324,090 $1,620,450
Stormwater Retrofits on Route 2A, Route 146 and Route 122 Advertised Massachusetts 2015 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Shirley, Uxbridge, Worcester Worcester $600,000 $0 $150,000 $750,000
Nemasket River Mitigation Massachusetts 2011 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Middleborough Plymouth $294,000 $0 $73,600 $367,600
Three Bay Stormwater Massachusetts 1997 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Barnstable Barnstable $4,628 $0 $1,157 $5,785
Stormwater Retrofits-Various Locations in 2014 STIP Massachusetts 2014 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Statewide Statewide $1,500,000 $0 $0 $1,500,000
Puritan Rd. Storm Water Runoff Massachusetts 1996 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Weymouth Plymouth $12,000 $0 $3,000 $15,000
D1-D2 Stormwater Retrofits In 2013 STIP Massachusetts 2013 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Multiple $1,200,000 $0 $300,000 $1,500,000
Lower County Road (Swan River Road) Massachusetts 1996 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Dennis Barnstable $76,795 $0 $19,199 $95,994
West Main Street Stormwater - site 1 Massachusetts 1997 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Hopkinton Middlesex $33,600 $0 $8,400 $42,000
Stormwater retrofits & related work @various locations Stormwater mitigation Massachusetts 2011 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity District 6 Multiple $801,284 $0 $160,257 $961,541
Restoration of Historic Jamaica Pond Massachusetts 1998 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Boston Suffolk $384,000 $0 $96,000 $480,000
Stormwater retrofits @various locations In 2014 STIP Massachusetts 2013 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Statewide Statewide $1,600,000 $0 $400,000 $2,000,000
District 1 Stormwater Retrofits In 2013 STIP Massachusetts 2013 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity District 1 Multiple $1,200,000 $0 $300,000 $1,500,000
Commonwealth Museum Project would improve a new permanent exhibit that celebrates the relationship between transportation and Massachusetts history. Massachusetts 2006 12 (TE) 12. Establishment of transportation museums Boston Suffolk $288,678 $0 $72,169 $360,847
Berkshire Scenic Rail Museum Massachusetts 1996 12 (TE) 12. Establishment of transportation museums Lenox Berkshire $36,800 $0 $9,200 $46,000