Sidewalks & Wheelchair Ramps Rts 5,9&10 | Advertised | Massachusetts | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hampshire | $1,666,030 | $0 | $416,508 | $2,082,538 | |
BARNSTABLE- INTERSECTION IMPROVEMENTS AT IYANOUGH ROAD (ROUTE 28) AND YARMOUTH ROAD | Work on this project consists of intersection reconstruction and traffic signal upgrades. The intent of the project is to improve safety and reduce congestion for all users at the intersection of Iyanough Road (Route 28) and Yarmouth Road. Additional approach turn lanes are required at the intersection to alleviate congestion and improve corridor/intersection level of service. A new traffic signal system will be installed. New rails, gates and signals will be installed for the rail crossing. A shared use path will be constructed on the west side of Yarmouth Road crossing at Route 28, then connecting to Engine House Road at the entrance to the intermodal center. The remaining quadrants will have new sidewalks. Also included in the project are to new pavement markings and signage. | Massachusetts | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Barnstable | Barnstable | ||||
AMESBURY - POWOW RIVERWALK CONSTRUCTION | Advertised | Massachusetts | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Amesbury | Essex | $275,229 | $0 | $68,807 | $344,036 |
CMRPC Region - Bike Racks Installation | in 2015 STIP | Massachusetts | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Worcester | $80,000 | $0 | $20,000 | $100,000 | |
LOWELL- IMPROVEMENTS ON ROUTE 38 AT FOUR INTERSECTIONS | Advertised | Massachusetts | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lowell | Middlesex | $281,909 | $0 | $225,527 | $56,382 |
HINGHAM- RECONSTRUCTION & RELATED WORK ON DERBY STREET, FROM POND PARK ROAD TO CUSHING STREET | Advertised | Massachusetts | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hingham | Plymouth | $597,428 | $0 | $149,357 | $746,785 |
FITCHBURG- LUNENBURG- LEOMINSTER- RECONSTRUCTION OF SUMMER STREET AND NORTH STREET | Advertised | Massachusetts | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Multiple | Worcester | $96,605 | $0 | $24,151 | $120,756 |
NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L. | This project's improvements include minor widening of the section of roadway south of Route 9 to a more consistent cross-section. The pavement will be reconstructed utilizing reclaimed base course. Cement concrete sidewalks will be constructed on both sides of the roadway throughout the length of the project. The existing signals will be upgraded and, if warrants are met, new signals will be installed at Lake Street, Rutledge Road and Pine Street. The project begins on Route 27 (North Main Street) at North Avenue and extends northerly 2.2 miles to the Wayland town line, excluding the Route 9 interchange. | Massachusetts | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Natick | Middlesex | ||||
SOUTHBOROUGH- RECONSTRUCTION OF MAIN STREET (ROUTE 30), FROM SEARS ROAD TO PARK STREET | Advertised | Massachusetts | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Southborough | Worcester | $1,456,250 | $0 | $1,165,000 | $291,250 |
FITCHBURG- LUNENBURG- LEOMINSTER- RECONSTRUCTION OF SUMMER STREET AND NORTH STREET | Advertised | Massachusetts | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Multiple | Worcester | $86,238 | $0 | $68,990 | $17,248 |
WAREHAM- RECONSTRUCTION OF ROUTE 6 & 28, FROM 500 FT. EAST OF TYLER AVENUE TO RED BROOK ROAD (1.65 MILES) | Advertised | Massachusetts | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Wareham | Plymouth | $611,551 | $0 | $489,241 | $122,310 |
AMHERST- HADLEY- NORTHAMPTON- TRANSIT SIGNAL PRIORITY UPGRADES AT VARIOUS LOCATIONS | Advertised | Massachusetts | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Multiple | Hampshire | $792,630 | $0 | $634,104 | $158,526 |
CHATHAM- IMPROVEMENTS ON MAIN STREET (ROUTE 28), FROM GEORGE RYDER ROAD TO BARN HILL ROAD | Advertised | Massachusetts | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Chatham | Barnstable | $205,809 | $0 | $164,647 | $41,162 |
LUDLOW- RECONSTRUCTION OF CENTER STREET (ROUTE 21), FROM SEWALL STREET TO BEACHSIDE DRIVE | Advertised | Massachusetts | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Ludlow | Hampden | $320,000 | $0 | $80,000 | $400,000 |
BILLERICA- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 3A (BOSTON ROAD) AND ALLEN ROAD | Advertised | Massachusetts | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Billerica | Middlesex | $221,053 | $0 | $55,263 | $276,316 |
NEW BEDFORD- CORRIDOR IMPROVEMENTS AND RELATED WORK ON KINGS HIGHWAY, FROM CHURCH STREET TO THE KINGS HIGHWAY BRIDGE (N-06-036) OVER ROUTE 140 | This project was proposed to address ongoing safety and congestion issues due to the lack of roadway capacity and left turn lanes at several key inter-sections. Traffic signal improvements are also planned at 4 intersections. In addition, the project will provide improved bicycle and pedestrian access. | Massachusetts | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | New Bedford | Bristol | ||||
SPRINGFIELD- NORTH END PEDESTRIAN PATH CONSTRUCTION (UNDER THE CONNECTICUT RIVER RAILROAD), BETWEEN PLAINFIELD STREET AND BIRNIE AVENUE, INCLUDES CONSTRUCTION OF NEW UNDERPASS S-24-044 | Advertised | Massachusetts | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Springfield | Hampden | $6,640,845 | $0 | $5,312,676 | $1,328,169 |
SHREWSBURY - RESURFACING & RELATED WORK ON MAIN STREET, FROM I-290 RAMPS EASTERLY TO MAPLE AVENUE | Advertised | Massachusetts | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Shrewsbury | Worcester | $787,376 | $0 | $196,844 | $984,220 |
PAXTON- RECLAMATION ON ROUTE 31 (HOLDEN ROAD) | Advertised | Massachusetts | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Paxton | Worcester | $465,574 | $0 | $372,459 | $93,115 |
WARE- INTERSECTION IMPROVEMENTS @ MAIN STREET, WEST STREET, NORTH STREET, SOUTH STREET & CHURCH STREET | This project will improve vehicular, bicycle and pedestrian safety and reduce vehicular queues at the intersections of Main Street and West Street and Main Street and South Street. Work will include resurfacing of the intersection approaches, improved pedestrian and bicycle accommodations and access, new signage and pavement markings. A traffic signal will be installed at the Main Street and West Street intersection, which will be coordinated with the existing signals. | Massachusetts | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Ware | Hampshire | ||||
WORCESTER- BLACKSTONE CANAL STREETSCAPE IMPROVEMENTS ON HARDING STREET | Advertised | Massachusetts | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Worcester | Worcester | $504,204 | $0 | $403,363 | $100,841 |
CHELMSFORD-INTERSECTION IMPROVEMENTS AT ROUTE 129 AND RIVERNECK ROAD | The project involves the reconstruction of Route 129 from Golden Cove Road to Industrial Avenue including rehabilitating the roadway surface, widening to include two 5 foot bike lanes and adding sidewalks on both sides. The intersection at Billerica Road will be realigned to form a T intersection. A rapid flashing beacon will be installed at the crosswalk near Industrial Avenue. Retaining walls will be installed to minimize impacts at River Meadow Brook and at the cemetery. A box culvert will be installed at the River Meadow Brook crossing of Billerica Road which will include a wildlife crossing. New drainage and stormwater detention will be included in the design. | Massachusetts | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Chelmsford | Middlesex | ||||
INTERSECTION IMPROVEMENTS AT 2 LOCATIONS: CRANBERRY HIGHWAY (ROUTE 6A) AND MAIN STREET; CHATHAM ROAD (ROUTE 28) AND MAIN STREET | Advertised | Massachusetts | 2015 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Orleans | Barnstable | $143,011 | $0 | $35,753 | $178,764 |
RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 | Advertised | Massachusetts | 2015 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Medway | Norfolk | $2,038,975 | $0 | $509,744 | $2,548,719 |
FRAMINGHAM- NATICK- COCHITUATE RAIL TRAIL CONSTRUCTION INCLUDING PEDESTRIAN BRIDGE, N-03-014, OVER ROUTE 9 & F-07-033=N-03-029 OVER ROUTE 30 | Advertised | Massachusetts | 2018 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Multiple | Middlesex | $7,152,508 | $0 | $5,722,006 | $1,430,502 |
SALEM- CANAL STREET RAIL TRAIL CONSTRUCTION (PHASE 2) | Advertised | Massachusetts | 2018 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Salem | Essex | $2,787,456 | $0 | $2,229,965 | $557,491 |
ACCELERATED BRIDGE PROGRAM - GANS DEBT SERVICE | In 2015 STIP | Massachusetts | 2015 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Statewide | Statewide | $3,000,000 | $0 | $0 | $3,000,000 |
Downey Elementary SRTS | Advertised | Massachusetts | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Westwood | Norfolk | $549,000 | $0 | $137,250 | $686,250 |
NEW BEDFORD- IMPROVEMENTS AT ASHLEY AND LINCOLN ELEMENTARY SCHOOLS (SRTS) | Advertised | Massachusetts | 2018 | 301 | (TAP) 301. Safe routes to school infrastructure | New Bedford | Bristol | $1,545,600 | $0 | $1,236,480 | $309,120 |
Beebe School SRTS | Inactive project | Massachusetts | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Malden | Middlesex | $462,000 | $0 | $115,500 | $577,500 |
Memorial Elementary SRTS | Advertised | Massachusetts | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Manchester by the Sea | Essex | $500,000 | $0 | $125,000 | $625,000 |
NEWBURYPORT- IMPROVEMENTS AT NOCK MIDDLE SCHOOL & MOLIN UPPER ELEMENTARY SCHOOL (SRTS) | Project includes the installation of a High-intensity Activated crossWalk (HAWK) signal between Summit Place and Kent Street and corridor traffic calming measures along High Street (Routes 113) from Toppans Lane to Buck Street. Five-foot striped bike lanes in both directions along High Street, ADA-compliant ramps with perpendicular crossings, and new crosswalks and stopline pavement markings are also part of the project. | Massachusetts | 2019 | 301 | (TAP) 301. Safe routes to school infrastructure | Newburyport | Essex | ||||
SRTS Statewide Plannning&Design | in 2015 STIP | Massachusetts | 2015 | 302 | (TAP) 302. Safe routes to school programs | Statewide | Statewide | $600,000 | $0 | $0 | $600,000 |
Safe Routes to School (SRTS) Education | This funding is for the administation and management of the existing Safe Routes to School Program in Massachusetts in order to improve and grow the program in the areas of safety, education, encouragement, enforcement, and evaluation. The Massachusetts Safe Routes to School (SRTS) Program is a federally-funded program that works with communities, schools, students, and families to promote active transportation among elementary and middle school students across the Commonwealth. The three-year contract funded with TAP enables the program to continue working with communities ·promoting active transportation. | Massachusetts | 2019 | 302 | (TAP) 302. Safe routes to school programs | Statewide | Multiple | ||||
SAFE ROUTES TO SCHOOL EDUCATION (2017) | Advertised | Massachusetts | 2017 | 302 | (TAP) 302. Safe routes to school programs | Statewide | Statewide | $480,000 | $0 | $120,000 | $600,000 |
Swansea Bicycle Facility | Massachusetts | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Swansea | Bristol | $63,600 | $0 | $15,900 | $79,500 | |
Dennis J. Moran Park | Massachusetts | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Natick | Middlesex | $90,896 | $0 | $22,724 | $113,620 | |
DW Field Park (Phase I) | Massachusetts | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Brockton | Plymouth | $95,200 | $0 | $23,800 | $119,000 | |
North Beach Street | Massachusetts | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nantucket | Nantucket | $26,400 | $0 | $6,600 | $33,000 | |
PowWow River Walk (Phases 1 & 2) | Massachusetts | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Amesbury | Essex | $44,000 | $0 | $11,000 | $55,000 | |
Wareham Bikeway | Massachusetts | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wareham | Plymouth | $12,000 | $0 | $3,000 | $15,000 | |
MetroWest Bike Map | Ashland, Framingham, Marlborough, Natick, Southborough, Sudbury, Wayland, Wellesley, Weston | Massachusetts | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | $7,440 | $0 | $1,860 | $9,300 | |
Downtown Streetscape | Massachusetts | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Framingham | Middlesex | $144,000 | $0 | $36,000 | $180,000 | |
Franklin County Bikeway Phase 1 Section A | Deerfield, Montague | Massachusetts | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Franklin | $25,600 | $0 | $6,400 | $32,000 | |
Calvary Street Footbridge | Massachusetts | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Waltham | Middlesex | $144,000 | $0 | $36,000 | $180,000 | |
Village Center (Phase I) | Massachusetts | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Erving | Franklin | $111,015 | $0 | $27,754 | $138,769 | |
Cliff Road Bike Path Construction | In Year 2012 STIP | Massachusetts | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nantucket | Nantucket | $221,520 | $0 | $55,380 | $276,900 |
Blackstone River Bikeway - Quinsigamond | This enhancement project seeks to design a feasible off-road alignment for the Blackstone River Bikeway in the Quinsigamond Village section of Morcester. The off-road alignment would connect the existing off-road Bikeway terminus at the new Millbury St. b | Massachusetts | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Worcester | Worcester | $192,000 | $0 | $48,000 | $240,000 |
Rte. 12 Streetscape and Quality Improvements | Massachusetts | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Auburn | Worcester | $181,240 | $0 | $45,310 | $226,550 | |
WORCESTER - MAIN STREET BUSINESS DISTRICT STREETSCAPE IMRPOVEMENTS | In 2017 STIP | Massachusetts | 2017 | 1 | (TE) 1. Pedestrian and bicycle facilities | Worcester | Worcester | $1,481,612 | $0 | $370,403 | $1,852,015 |
Interchange reconstruction @I-93, Year 1 | In 2013 STIP | Massachusetts | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Methuen | Essex | $150,800 | $0 | $37,700 | $188,500 |
Reconstruction of Sutton Street | In 2013 STIP | Massachusetts | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Northbridge | Worcester | $139,200 | $0 | $34,800 | $174,000 |
MBTA Station Kiosks | Massachusetts | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Suffolk | $750,000 | $0 | $187,500 | $937,500 | ||
City Hall Plaza | Massachusetts | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pittsfield | Berkshire | $28,000 | $0 | $7,000 | $35,000 | |
Pre-Engineered Pedestrian Bridge | Massachusetts | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lenox | Berkshire | $80,000 | $0 | $20,000 | $100,000 | |
Mahican Mohawk Trail of Peace | Massachusetts | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Williamstown | Berkshire | $40,400 | $0 | $10,100 | $50,500 | |
West Central Street (Route 135) | Massachusetts | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Natick | Middlesex | $60,000 | $0 | $15,000 | $75,000 | |
Canalway Wayside and Directional Signs | Massachusetts | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lowell | Middlesex | $300,000 | $0 | $120,024 | $420,024 | |
Reconstruction of Baldwinville Rd from Rt 202/68 to Patriots Rd | In 2012 STIP; Yr 1 of 2, streetscape and shoulders | Massachusetts | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Templeton | Worcester | $107,030 | $0 | $26,758 | $133,788 |
Nobadeer Road Bike Path | Massachusetts | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nantucket | Nantucket | $18,480 | $0 | $4,620 | $23,100 | |
Shank Painter Pond | Massachusetts | 1999 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Provincetown | Barnstable | $197,302 | $0 | $449,326 | $646,628 | |
Northside Militia Training Field | Massachusetts | 1996 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Charlton | Worcester | $75,996 | $0 | $18,999 | $94,995 | |
Reedy Meadow Scenic Acquistion | Massachusetts | 1997 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Lynnfield | Essex | $220,000 | $0 | $55,000 | $275,000 | |
Mohawk Trail Scenic Byway Land Protection | Massachusetts | 2010 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Greenfield | Franklin | $50,000 | $0 | $0 | $50,000 | |
Scenic Farm Byway (Phase 3) | Massachusetts | 1999 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Statewide | Statewide | $67,144 | $0 | $16,786 | $83,930 | |
Berkshire Gateway Improvements | Massachusetts | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Lee | Berkshire | $453,600 | $0 | $113,400 | $567,000 | |
Essex Unified Signage System (MAPC & MVPC) | Massachusetts | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Essex | Essex | $94,000 | $0 | $23,500 | $117,500 | |
BLACKSTONE VISITOR CENTER | Advertised | Massachusetts | 2015 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Worcester | Worcester | $180,831 | $0 | $45,208 | $226,039 |
Basketball Hall of Fame/ Tourist Info Center | Massachusetts | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Springfield | Hampden | $32,000 | $0 | $8,000 | $40,000 | |
Essex Heritage Signage (MVPC & MAPC) | Massachusetts | 1996 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Essex | Essex | $269,600 | $0 | $67,400 | $337,000 | |
Tri-Community Bikeway | Massachusetts | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Sutton | Worcester | $398,289 | $0 | $112,337 | $510,626 | |
Princeton Town Common Phase 2 | Massachusetts | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Princeton | Worcester | $24,000 | $0 | $6,000 | $30,000 | |
Beacon Street Historic and Landscaping | Massachusetts | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Brookline | Norfolk | $1,836,637 | $0 | $459,159 | $2,295,796 | |
Main Street Enhancement | Massachusetts | 1997 | 5 | (TE) 5. Landscaping and scenic beautification | Hudson | Worcester | $212,800 | $0 | $53,200 | $266,000 | |
Shaker Village Enhancements | Massachusetts | 1997 | 6 | (TE) 6. Historic preservation | Hancock | Berkshire | $360,000 | $0 | $90,000 | $450,000 | |
Historic Complex Preservation | Massachusetts | 1996 | 6 | (TE) 6. Historic preservation | Pelham | Hampshire | $60,036 | $0 | $15,009 | $75,045 | |
Restoration of Historic Railroad Cars | Massachusetts | 1998 | 6 | (TE) 6. Historic preservation | Lenox | Berkshire | $128,000 | $0 | $32,000 | $160,000 | |
Restoration of B&M Depot Headhouse | Massachusetts | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Lowell | Middlesex | $41,298 | $0 | $10,325 | $51,623 | |
Orchard St. Stone Arch Bridge Rehabilitation | Massachusetts | 1999 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Millis | Norfolk | $287,344 | $0 | $71,836 | $359,180 | |
Moody Street Bridge Rehabilitation | Massachusetts | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Waltham | Middlesex | $168,000 | $0 | $42,000 | $210,000 | |
Great River Bridge | Massachusetts | 2007 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Westfield | Hampden | $4,775,354 | $0 | $1,193,839 | $5,969,193 | |
Trolley Feasibility Study - Northern Middlesex Ext. | Massachusetts | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Lowell | Middlesex | $48,000 | $0 | $12,000 | $60,000 | |
Swamp Locks Chamber Restoration (Lowell Hamilton Canal Walkway) | Massachusetts | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Lowell | Middlesex | $174,899 | $0 | $43,725 | $218,624 | |
S.S. Nobska Restoration (Phase 2) | Massachusetts | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Statewide | Statewide | $800,000 | $0 | $200,000 | $1,000,000 | |
Gill Bridge Rehab | Work included involves rehab of existing steel truss carrying Avenue A over CT River, project adds a bike lane; funded through Accelerated Bridge Program and TE; Total project cost is $48,461,390 | Massachusetts | 2008 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Gill | Franklin | $335,456 | $0 | $83,864 | $419,320 |
Lowell-Hamilton Canal Walkway | Massachusetts | 2009 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Lowell | Middlesex | $300,000 | $0 | $120,024 | $420,024 | |
Tugboat Luna | Massachusetts | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Boston | Suffolk | $540,000 | $0 | $135,000 | $675,000 | |
B&M RR North & South Tower Reconstruction | Massachusetts | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Lowell | Middlesex | $528,572 | $0 | $132,144 | $660,716 | |
Historic Canal Restoration | Massachusetts | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | South Hadley | Hampshire | $66,589 | $0 | $16,647 | $83,236 | |
Bird Island Lighthouse | Massachusetts | 1996 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Marion | Plymouth | $28,000 | $0 | $7,000 | $35,000 | |
Schooner Ernestina Restoration | Massachusetts | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | New Bedford | Bristol | $100,000 | $0 | $25,000 | $125,000 | |
Railroad Station Rehabilitation | Community still interested in renovation; increased deterioration and costs over time | Massachusetts | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Stoughton | Norfolk | $16,400 | $0 | $4,100 | $20,500 |
Railroad Station | Massachusetts | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Greenfield | Franklin | $139,430 | $0 | $34,857 | $174,287 | |
Trolley Car Restoration | Massachusetts | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Shelburne Falls | Franklin | $160,000 | $0 | $40,000 | $200,000 | |
Railroad Depot Restoration | Massachusetts | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Chester | Hampden | $104,000 | $0 | $26,000 | $130,000 | |
Clipper City Rail Trail along the City Branch (Phase II) | Advertised | Massachusetts | 2015 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Newburyport | Essex | $2,496,000 | $0 | $624,000 | $3,120,000 |
Granite Railway | Massachusetts | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Quincy | Norfolk | $360,000 | $0 | $90,000 | $450,000 | |
Manhan - Norwottuck Link | Massachusetts | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Northampton | Hampshire | $84,000 | $0 | $21,000 | $105,000 | |
Bruce Freeman Rail Trail (Phases 2A & 2C) | Commonwealth Ave. to Sudbury T/L. Phase 2C includes 0.5 miles from the Concord Rotary to the Sudbury T/L, but this phase will not be constructed until Phase 2D in Sudbury is constructed. Concord Rotary portion is designated as Phase 2B (0.67 miles) and is | Massachusetts | 2009 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Acton | Middlesex | $400,000 | $0 | $100,000 | $500,000 |
Cochituate Rail Trail | In 2013 STIP | Massachusetts | 2013 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Framingham | Middlesex | $634,185 | $0 | $158,546 | $792,731 |
Newburyport Rail Trail (Phase 2) | Massachusetts | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Newburyport | Essex | $80,000 | $0 | $20,000 | $100,000 | |
Williamsburg-Norwottuck Rail Trail Ext. | Massachusetts | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Hampshire | $63,360 | $0 | $15,840 | $79,200 | ||
Chicopee Riverwalk | Massachusetts | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Chicopee | Hampden | $67,200 | $0 | $16,800 | $84,000 | |
Assabet River Rail Trail | Massachusetts | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Hudson | Worcester | $554,000 | $0 | $138,500 | $692,500 | |
ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL CONSTRUCTION, INCLUDES BRIDGES, A-02-042 & M-10-012, A-02-034 & MPB WALL | Advertised | Massachusetts | 2015 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Acton | Middlesex | $997,663 | $0 | $249,416 | $1,247,079 |
Manhan Rail Trail (Northampton & Easthampton) | Massachusetts | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Northampton | Hampshire | $48,240 | $0 | $12,060 | $60,300 | |
CT River Parkland Link Bikeway (Phase 1B) | From Depot St. to Unity Park in abandoned RR ROW | Massachusetts | 2002 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Montague | Franklin | $991,950 | $0 | $247,987 | $1,239,938 |
Abandoned Railway Corridor between Marginal & Porter St. | Massachusetts | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Boston | Suffolk | $384,000 | $0 | $96,000 | $480,000 | |
Rail Trail | Massachusetts | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Belchertown | Hampshire | $140,240 | $0 | $35,060 | $175,300 | |
Norwottuck & Manhan Railtrails | Massachusetts | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Northampton | Hampshire | $88,800 | $0 | $22,200 | $111,000 | |
Salisbury Rail Trail | Massachusetts | 2008 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Salisbury | Essex | $119,200 | $0 | $29,800 | $149,000 | |
Minuteman Bikeway | Massachusetts | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Cambridge | Middlesex | $157,780 | $0 | $39,445 | $197,225 | |
Marblehead Trail (Phase 2) | Massachusetts | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Salem | Essex | $16,000 | $0 | $4,000 | $20,000 | |
Nashua River Rail Trail | Massachusetts | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Ayer | Middlesex | $20,000 | $0 | $5,000 | $25,000 | |
Southwick Rail Trail (Pt. Grove Rd to Westfield TL) | Massachusetts | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Southwick | Hampden | $80,000 | $0 | $20,000 | $100,000 | |
Manhan Rail Trail | Massachusetts | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Easthampton | Hampshire | $472,000 | $0 | $118,000 | $590,000 | |
Marblehead Branch Rail-Trail | Massachusetts | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Salem | Essex | $216,000 | $0 | $54,000 | $270,000 | |
Rt 1 Rail Trail Connector (Gillis Bridge) | Provides bike-ped crossing @ N terminus of Rt 1 bridge over Merrimack River | Massachusetts | 2011 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Salisbury | Essex | $220,876 | $0 | $44,175 | $265,051 |
Manhan Rail Trail Ext. South St to Coleman Rd | Design force account | Massachusetts | 2011 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Easthampton | Hampshire | $23,944 | $0 | $5,986 | $29,930 |
Deerfield Franklin Co. Bikeway Phase 1a | 1.2 miles, includes rehabbed bridge Deerfield and Montague | Massachusetts | 2004 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Franklin | $1,148,617 | $0 | $296,754 | $1,445,371 | |
Manhan Rail Trail | Massachusetts | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Easthampton | Hampshire | $80,000 | $0 | $20,000 | $100,000 | |
Norwottuck Rail Trail | Massachusetts | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Northampton | Hampshire | $2,456,000 | $0 | $614,000 | $3,070,000 | |
Southwick Rail Trail (CT Line to Pt. Grove Rd) | Massachusetts | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Southwick | Hampden | $91,997 | $0 | $22,999 | $114,996 | |
Cochituate Rail Trail | 1.4 mile rail trail | Massachusetts | 2010 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Framingham | Middlesex | $634,185 | $0 | $158,546 | $792,731 |
Milford Upper Charles River Trail (Phase 2) | Massachusetts | 2006 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Milford | Worcester | $148,080 | $0 | $37,020 | $185,100 | |
Rails to Trails Study | Massachusetts | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Newburyport | Essex | $16,000 | $0 | $4,000 | $20,000 | |
Salisbury Rail Trail | Massachusetts | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Salisbury | Essex | $119,200 | $0 | $29,800 | $149,000 | |
Bruce Freeman Rail Trail (Phase 2A ) | Advertised | Massachusetts | 2014 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Acton, Carlisle, Westford | Middlesex | $7,030,400 | $0 | $1,757,600 | $8,788,000 |
Milford Upper Charles River Trail (Phase I) | Massachusetts | 2004 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Milford | Worcester | $1,445,842 | $0 | $382,581 | $1,828,423 | |
Central Artery Archaeology Project | Project would enhance appreciation of the archaeology conducted as part of the CA/T project. | Massachusetts | 2003 | 10 | (TE) 10. Archaeological planning & research | Statewide | Statewide | $116,000 | $0 | $24,000 | $140,000 |
Archeological Collections/Records | Massachusetts | 2009 | 10 | (TE) 10. Archaeological planning & research | Statewide | Statewide | $318,195 | $0 | $79,549 | $397,744 | |
MACRIS - Historic GIS Database | Massachusetts | 1996 | 10 | (TE) 10. Archaeological planning & research | Statewide | Statewide | $209,976 | $0 | $52,494 | $262,470 | |
GRIPP | Massachusetts | 1997 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Statewide | Statewide | $90,000 | $0 | $22,500 | $112,500 | |
Stormwater retrofits & related work @various locations | Stormwater mitigation | Massachusetts | 2011 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | District 5 | Multiple | $402,294 | $0 | $80,459 | $482,753 |
District 6 Stormwater Retrofits | In 2013 Stip | Massachusetts | 2013 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | District 6 | Multiple | $400,000 | $0 | $100,000 | $500,000 |
Drainage Improvements on Rt.70 | improves runoff and water quality, in conjunction with Dep't of Conservation and Recreation - Boylston and Clinton | Massachusetts | 2011 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Boylston | Worcester | $1,458,215 | $0 | $364,553 | $1,822,769 |
Stormwater retrofits @various locations | In 2015 STIP | Massachusetts | 2013 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Statewide | Statewide | $1,600,000 | $0 | $400,000 | $2,000,000 |
Buzzard's Bay Shellfish Restoration | Massachusetts | 1998 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Marion | Plymouth | $113,804 | $0 | $28,451 | $142,255 | |
Statewide Stormwater Retrofits | In 2013 STIP | Massachusetts | 2013 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Multiple | $1,600,000 | $0 | $400,000 | $2,000,000 | |
Wareham Street Drainage Improvements | Massachusetts | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Middleborough | Plymouth | $210,000 | $0 | $52,500 | $262,500 | |
District 3 Stormwater Retrofits | In 2013 STIP | Massachusetts | 2013 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | District 3 | Multiple | $1,600,000 | $0 | $400,000 | $2,000,000 |
District 4 Stormwater Retrofits | In 2013 STIP | Massachusetts | 2013 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | District 4 | Multiple | $1,600,000 | $0 | $400,000 | $2,000,000 |
Stormwater retrofits & related work @various locations | Stormwater mitigation | Massachusetts | 2011 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | District 3 | Multiple | $1,619,856 | $0 | $404,964 | $2,024,820 |
District 5 Stormwater Retrofits | In 2013 STIP | Massachusetts | 2013 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | District 5 | Multiple | $400,000 | $0 | $100,000 | $500,000 |
First Flush Basins | Massachusetts | 1998 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Tisbury | Dukes | $122,108 | $0 | $30,527 | $152,635 | |
Runnins River Stormwater | Massachusetts | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Seekonk | Bristol | $200,000 | $0 | $50,000 | $250,000 | |
Lake Maspenock Stormwater | Massachusetts | 1997 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Hopkinton | Middlesex | $98,054 | $0 | $24,514 | $122,568 | |
Namasket River Stormwater Pollution Mitigation | Mitigates pollution at five locations along the Namasket River | Massachusetts | 2011 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Middleborough | Plymouth | $46,877 | $0 | $11,719 | $58,596 |
Stormwater retrofits & related work @various locations | Stormwater mitigation | Massachusetts | 2011 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | District 4 | Multiple | $1,637,759 | $0 | $409,439 | $2,047,199 |
Rte. 28 Storwater Runoff | Massachusetts | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Yarmouth | Barnstable | $145,600 | $0 | $36,400 | $182,000 | |
Main Street/East Bay Stormwater | Massachusetts | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Barnstable | Barnstable | $224,004 | $0 | $56,001 | $280,005 | |
Merrimack River Estuary Study | Massachusetts | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Newburyport | Essex | $85,520 | $0 | $21,380 | $106,900 | |
Farm Pond Study | Massachusetts | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Oak Bluffs | Dukes | $18,000 | $0 | $4,500 | $22,500 | |
Stormwater Retrofits on I-93, I-495, I-195, Route 3/18 | Advertised | Massachusetts | 2015 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Braintree, Mansfield, Milton, Weymouth | Bristol | $1,296,360 | $0 | $324,090 | $1,620,450 |
Stormwater Retrofits on Route 2A, Route 146 and Route 122 | Advertised | Massachusetts | 2015 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Shirley, Uxbridge, Worcester | Worcester | $600,000 | $0 | $150,000 | $750,000 |
Nemasket River Mitigation | Massachusetts | 2011 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Middleborough | Plymouth | $294,000 | $0 | $73,600 | $367,600 | |
Three Bay Stormwater | Massachusetts | 1997 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Barnstable | Barnstable | $4,628 | $0 | $1,157 | $5,785 | |
Stormwater Retrofits-Various Locations | in 2014 STIP | Massachusetts | 2014 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Statewide | Statewide | $1,500,000 | $0 | $0 | $1,500,000 |
Puritan Rd. Storm Water Runoff | Massachusetts | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Weymouth | Plymouth | $12,000 | $0 | $3,000 | $15,000 | |
D1-D2 Stormwater Retrofits | In 2013 STIP | Massachusetts | 2013 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Multiple | $1,200,000 | $0 | $300,000 | $1,500,000 | |
Lower County Road (Swan River Road) | Massachusetts | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Dennis | Barnstable | $76,795 | $0 | $19,199 | $95,994 | |
West Main Street Stormwater - site 1 | Massachusetts | 1997 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Hopkinton | Middlesex | $33,600 | $0 | $8,400 | $42,000 | |
Stormwater retrofits & related work @various locations | Stormwater mitigation | Massachusetts | 2011 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | District 6 | Multiple | $801,284 | $0 | $160,257 | $961,541 |
Restoration of Historic Jamaica Pond | Massachusetts | 1998 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Boston | Suffolk | $384,000 | $0 | $96,000 | $480,000 | |
Stormwater retrofits @various locations | In 2014 STIP | Massachusetts | 2013 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Statewide | Statewide | $1,600,000 | $0 | $400,000 | $2,000,000 |
District 1 Stormwater Retrofits | In 2013 STIP | Massachusetts | 2013 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | District 1 | Multiple | $1,200,000 | $0 | $300,000 | $1,500,000 |
Commonwealth Museum | Project would improve a new permanent exhibit that celebrates the relationship between transportation and Massachusetts history. | Massachusetts | 2006 | 12 | (TE) 12. Establishment of transportation museums | Boston | Suffolk | $288,678 | $0 | $72,169 | $360,847 |
Berkshire Scenic Rail Museum | Massachusetts | 1996 | 12 | (TE) 12. Establishment of transportation museums | Lenox | Berkshire | $36,800 | $0 | $9,200 | $46,000 |