Project Search Results
Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
Downtown Riverwalk - Squirrel Ct. Improvements | Construction | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Auburn Hills | Oakland | $94,620 | $0 | $63,080 | $157,700 |
Livernois Streetscape Enhancement Project | Boulevard Landscaping | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Detroit | Wayne | $976,222 | $0 | $525,658 | $1,501,880 |
Metro Connector Trail | Non-Motorized Pathway | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Novi | Oakland | $979,642 | $0 | $237,978 | $1,217,620 |
SEMCOG North Dixie Highway Bicycle Lane Facilities | 6 feet of paved shoulders for bicycle lanes | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Frenchtown Twp | Monroe | $178,065 | $0 | $59,355 | $237,420 |
GVMC TAP: Interurban Trail & Kentwood Trail Connector | Shared Use Path & Refuge Island | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Wyoming | Kent | $54,033 | $0 | $18,767 | $72,800 |
Old US-27 Non-motorized Path in Dewitt Township | Non-motorized Path Construction | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Dewitt Twp | Clinton | $429,653 | $0 | $95,274 | $524,927 |
M-17 (Washtenaw Avenue) HAWK Signal | HAWK signal and refurbished median island/mid-block crossing | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Ypsilanti | Washtenaw | $137,228 | $0 | $71,300 | $208,528 |
24th Avenue Non-Motorized Pathway | Non-Motorized Pathway | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Jamestown Twp | Ottawa | $72,000 | $0 | $48,000 | $120,000 |
Flint River Trail - Stepping Stone Falls to Bluegill Boat Launch - MPO-Funded Section | HMA Shared Use Pathway | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Genesee Twp | Genesee | $282,315 | $0 | $84,182 | $366,497 |
Midtown Detroit Greenway Loop & Cass Ave. Non-motorized Improvements | Greenway Const.: widened walkway (shared use path), improved lighting, bike lane | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Detroit | Wayne | $1,250,000 | $0 | $632,097 | $1,882,097 |
Macatawa Greenway Nonmotorized Path | Multi-Purpose Trail | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Zeeland | Ottawa | $941,268 | $0 | $710,080 | $1,651,348 |
Downtown Riverwalk - Squirrel Ct. Improvements | Construction | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Auburn Hills | Oakland | $99,970 | $0 | $66,647 | $166,617 |
Uptown Bay City Riverwalk Extension | Nonmotorized path | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bay City | Bay | $179,512 | $0 | $61,670 | $241,182 |
Nashville M-66 Streetscape Improvements | Streetscape Construction | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Nashville | Barry | $384,732 | $0 | $85,313 | $470,045 |
East / West Trail Phase III | Non-motorized trail construction | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Kentwood | Kent | $164,730 | $0 | $113,310 | $278,040 |
Downtown Pedestrian & Bicycle Crossings | pedestrian crossings | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Clawson | Oakland | $267,405 | $0 | $143,987 | $411,392 |
South Lansing Pathway (Phases 2 & 3) | Regional trail construction | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lansing | Ingham | $372,319 | $0 | $82,561 | $454,880 |
M-47 Nonmotorized Path- B and C Phases | Nonmotorized Path | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Tittabawassee Twp | Saginaw | $201,300 | $0 | $103,700 | $305,000 |
Rouge River Gateway Trail Extension Phase I | Non-motorized path | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Dearborn | Wayne | $502,000 | $0 | $575,102 | $1,077,102 |
SEMCOG Water Street Non-Motorized Path | Non-motorized path construction. | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Port Huron | St. Clair | $108,128 | $0 | $58,223 | $166,351 |
University Drive Pathway Connection | Pathway | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Auburn Hills | Oakland | $533,317 | $0 | $990,445 | $1,523,762 |
One Crossing, One Woodhaven (MDOT PE) | Connections and Amenities | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Woodhaven | Wayne | $280,000 | $0 | $70,000 | $350,000 |
Sunrise Side Path Extension | Multi-Use Pathway | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Alabaster | Iosco | $718,160 | $0 | $179,540 | $897,700 |
TCRPC: Old US-27 Sidewalk in Dewitt Township | Sidewalk Construction | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Dewitt Twp | Clinton | $201,654 | $0 | $50,414 | $252,068 |
North Drake Road Non-Motorized | Sidewalk & Trailway | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Oshtemo | Kalamazoo | $167,442 | $0 | $81,950 | $249,392 |
Niles Township - IN -MI River Valley Trail | Construct an off-road non-motorized facility | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Niles | Berrien | $42,463 | $0 | $10,616 | $53,079 |
SEMCOG Conner Creek Warren Connection | 8 Mile Median Improvements, Bike Lane Improvements on Van Dyke and Outer Drive | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Warren | Macomb | $371,526 | $0 | $166,839 | $538,365 |
Knapp Street Trail Connection | Knapp Street Trail Connection | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Grand Rapids | Kent | $379,756 | $0 | $95,169 | $474,925 |
Moores River Drive Regional Network Connection | Nonmotorized path, water quality, bike lanes | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lansing | Ingham | $366,817 | $0 | $293,739 | $660,556 |
South Lansing Pathway (Phases 2 & 3) | Pathway along Consumers Power corridor and Bike Lanes on Pleasant Grove Rd | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lansing | Ingham | $551,485 | $0 | $122,290 | $673,775 |
Livernois Complete Street ADA Ramps | Road Diet, Ped. and Bike portion | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Ferndale | Oakland | $14,893 | $0 | $3,723 | $18,616 |
M-21 Over GTW Railroad Bridge Nonmotorized Path | Nonmotorized Path | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Grand Rapids Twp | Kent | $494,374 | $0 | $109,626 | $604,000 |
Boyne City to US-31 Non-Motorized Trail - Phase 1 | Separate Non-Motorized Pathway | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Boyne City | Charlevoix | $768,900 | $0 | $229,600 | $998,500 |
North Dixie Highway Median and Bicycle Pathway | Non-Motorized Enhancement / Traffic Calming | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Monroe | Monroe | $88,000 | $0 | $22,328 | $110,328 |
Fifth Street Commercial Corridor Improvement | Streetscape and Bike Lane Construction | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Leoni Twp | Jackson | $265,807 | $0 | $58,942 | $324,749 |
Livernois Complete Street | Road Diet, Ped. and Bike portion | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Ferndale | Oakland | $118,092 | $0 | $134,544 | $252,636 |
City of Royal Oak Bike Route Signing and Pavement Markings | Pavement markings and permanent signing | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Royal Oak | Oakland | $112,380 | $0 | $28,095 | $140,475 |
Island Park Access Corridor & HistoricPreservation | Pedestrian Access and Historic Preservation | Michigan | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Eaton Rapids | Eaton | $332,763 | $0 | $110,921 | $443,684 |
GVMC: Alpine Avenue (M-37) Sidewalk Extension | Sidewalk Construction | Michigan | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Alpine Twp | Kent | $118,845 | $0 | $50,933 | $169,778 |
Wilson Avenue Pedestrian Refuge Island | Road widening and pedestrian island construction | Michigan | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Grandville | Kent | $118,400 | $0 | $42,804 | $161,204 |
Oregon Avenue Sidewalk | New Sidewalk Installation | Michigan | 2013 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Portage | Kalamazoo | $29,504 | $0 | $6,542 | $36,046 |
Genesee Valley Trail | Non-motorized Trail | Michigan | 2014 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Flint | Genesee | $423,217 | $0 | $108,311 | $531,528 |
Alanson to Mackinaw City Trail- Replacement of Carp Lake River Bridge | Bridge replacement on nonmotorized trail | Michigan | 2015 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Carp Lake Twp | Emmet | $238,322 | $0 | $61,718 | $300,040 |
Grand River Walkway | Regional Trail Construction | Michigan | 2014 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Grand Rapids | Kent | $193,122 | $0 | $87,586 | $280,708 |
Fred Meijer Grand River Valley Trail, Phase 2 | Trail Development | Michigan | 2015 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Ionia | Ionia | $1,530,323 | $0 | $680,304 | $2,210,627 |
Alanson to Mackinaw City Trail Surfacing Project | Non-motorized trail | Michigan | 2015 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Littlefield | Emmet | $1,450,093 | $0 | $321,554 | $1,771,646 |
Nayanquing Point State Trail/Fraser Township Path- Design Phase | Construct Nonmotorized Path | Michigan | 2015 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Fraser Twp | Bay | $18,784 | $0 | $7,513 | $26,297 |
Pere Marquette Trail | Nonmotorized Trail | Michigan | 2014 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Baldwin | Lake | $804,427 | $0 | $577,874 | $1,382,301 |
North Bank Trail - Phase 2B | Regional trail construction | Michigan | 2018 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Crockery Twp | Ottawa | $1,145,200 | $0 | $490,800 | $1,636,000 |
Alpena to Hillman Trail Phase 1 - Design Phase | Trail Development including drainage, surfacing and bridge improvement | Michigan | 2015 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Alpena | Alpena | $117,280 | $0 | $29,320 | $146,600 |
Ford Highland Park - Automobile Heritage Welcome C | Purchase of historic building | Michigan | 2014 | 104 | (TAP) 104. Construction of turnouts, overlooks, and viewing areas | Highland Park | Wayne | $400,000 | $0 | $100,000 | $500,000 |
South Leroy Street Streetscape and Road Improvements | Decorative paving, landscape plantings, site furnishings, and other road work. | Michigan | 2014 | 105 | (TAP) 105. Inventory, control, or removal of outdoor advertising | Fenton | Genesee | $157,851 | $0 | $67,650 | $225,501 |
West Nine Mile Road | Streetscape Improvement | Michigan | 2013 | 105 | (TAP) 105. Inventory, control, or removal of outdoor advertising | Ferndale | Oakland | $590,134 | $0 | $217,519 | $807,653 |
I-75 BL (M-72) Au Sable Bridge - Design Phase | Historic Preservation /Rehabilitation | Michigan | 2014 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Grayling | Crawford | $28,710 | $0 | $26,111 | $54,820 |
Preservation of Pine Island Dr. Bridge over the Rogue River | Historic Preservation and Rehabilitation | Michigan | 2014 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Algoma | Kent | $195,296 | $0 | $66,553 | $261,848 |
Burroughs St. Bridge @ The Flat River | Historic Preservation / Rehabilitation | Michigan | 2015 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Vergennes Twp | Kent | $262,480 | $0 | $65,620 | $328,100 |
U.S. Coast Guard Station Historic Restoration | Restoration of the former U.S Coast Guard Station | Michigan | 2014 | 107 | (TAP) 107. Vegetation management practices in transportation rights-of-way to improve roadway safety, prevent against invasive species, and provide erosion control | Ludington | Mason | $632,398 | $0 | $158,099 | $790,497 |
SRTS Creekside Intermediate School and Wylie Elementary | Sidewalks, Pedestrian Refuge Island and Bike/Walk Programs-Toll Credits | Michigan | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Dexter | Washtenaw | $201,250 | $0 | $0 | $201,250 |
SRTS Beach Middle School and South Meadows Elementary School | Sidewalks, ADA Ramps, Pavement Markings, Educational Programs | Michigan | 2015 | 301 | (TAP) 301. Safe routes to school infrastructure | Chelsea | Washtenaw | $369,290 | $0 | $0 | $369,290 |
SRTS Norway Elementary School and Norway Middle School | Sidewalk replacement, including ramps, crosswalks, and signing-Toll Credits | Michigan | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Norway | Dickinson | $370,783 | $0 | $0 | $370,783 |
SRTS Webberville Elementary School and Middle/High School | Sidewalks and Crosswalks | Michigan | 2015 | 301 | (TAP) 301. Safe routes to school infrastructure | Webberville | Ingham | $441,073 | $0 | $0 | $441,073 |
SRTS Donald L. Pavlik Middle School | sidewalks and pavement markings-Toll Credits | Michigan | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Alma | Gratiot | $367,852 | $0 | $130,218 | $498,070 |
SRTS NonInfrastructure Grants | SRTS NonInfrastructure Grants-Toll Credits | Michigan | 2014 | 302 | (TAP) 302. Safe routes to school programs | Lansing | Ingham | $605,886 | $0 | $0 | $605,886 |
TCRPC - Lake Lansing Road - Hagadorn Road to I-69BR | The Ingham County Road Department will install paved shoulders on Lake Lansing Road from Hagadorn Road to Saginaw Highway (I-69BR). The work, which also includes a 4-lane to 3-lane conversion, is being paired with a road resurfacing project. The addition of paved shoulders will provide a safer and more forgiving roadway for bicycle commuters traveling from the Haslett area to East Lansing and the City of Lansing. | Michigan | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Meridian Twp | Ingham | ||||
IBT - Border-to-Border / Iron Belle Trail Segment D | Nonmotorized Trail | Michigan | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Scio Twp | Washtenaw | $2,000,000 | $0 | $857,211 | $2,857,211 |
IBT - Border-to-Border / Iron Belle Trail Segment D (SEMCOG) | Nonmotorized Trail | Michigan | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Scio Twp | Washtenaw | $885,904 | $0 | $379,746 | $1,265,650 |
IBT- Otsego County Trail | Nonmotorized Trail | Michigan | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Gaylord | Otsego | $1,379,558 | $0 | $1,128,729 | $2,508,287 |
SEMCOG: Marquette St. Sidewalk | The city of Westland will construct 0.5 of a mile of sidewalk along the south side of Marquette Street from Newburgh Road to Wayne Road. This added sidewalk will provide a safer route for students travelling to Westland John Glenn High School. | Michigan | 2019 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Westland | Wayne | ||||
Fred Meijer Flat River Valley Rail Trail - South Phase (north of Lowell and east to Saranac) | Trail Construction | Michigan | 2018 | 103 | (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Vergennes Twp | Kent | $750,000 | $0 | $449,372 | $1,199,372 |
Caledonia Trails - Phase 1A | Non-motorized trails | Michigan | 2016 | 103 | (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Caledonia Twp | Kent | $458,900 | $0 | $196,672 | $655,572 |
Michigan Airline Trailway Acquisition | acquisition of 2.75 miles of railroad right of way | Michigan | 2016 | 103 | (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Wixom | Oakland | $652,500 | $0 | $1,957,500 | $2,610,000 |
Nayanquing Point State Trail/Fraser Township Path | Construct Nonmotorized Path | Michigan | 2016 | 103 | (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Fraser Twp | Bay | $535,011 | $0 | $213,989 | $749,000 |
Fred Meijer Flat River Valley Rail Trail - North Phase (north & south of Belding) | Trail Construction | Michigan | 2018 | 103 | (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Eureka Twp | Montcalm | $750,000 | $0 | $363,468 | $1,113,468 |
Paul Henry Trail Extension | Nonmotorized Trail Development | Michigan | 2016 | 103 | (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Middleville | Barry | $550,871 | $0 | $346,900 | $897,771 |
Albion Brick Pavement Reconstruction | Brick pavement reconstruction, associated sidewalk repairs, trees and grates | Michigan | 2017 | 106 | (TASA) 106. Historic preservation and rehabilitation of historic transportation facilities | Albion | Calhoun | $1,060,052 | $0 | $265,013 | $1,325,065 |
M-86 Historic Bridge Relocation - Construction | Historic Preservation | Michigan | 2016 | 106 | (TASA) 106. Historic preservation and rehabilitation of historic transportation facilities | Pokagon | Cass | $1,769,967 | $0 | $392,485 | $2,162,452 |
Historic Brick Preservation of Weston Street | Rehabilitation of historic brick street | Michigan | 2018 | 106 | (TASA) 106. Historic preservation and rehabilitation of historic transportation facilities | Grand Rapids | Kent | $391,154 | $0 | $251,385 | $642,539 |
SRTS Ann Arbor STEAM | The City of Ann Arbor in conjunction with Ann Arbor Public School District will complete a pedestrian safety project for the benefit of students attending A2STEAM. | Michigan | 2019 | 301 | (TASA) 301. Safe routes to school infrastructure | Ann Arbor | Washtenaw | ||||
SRTS East China School Routes | crosswalks and sidewalks | Michigan | 2018 | 301 | (TASA) 301. Safe routes to school infrastructure | Marine City | St. Clair | $449,493 | $0 | $0 | $449,493 |
SRTS - Les Cheneaux Schools | Safe Routes to School | Michigan | 2016 | 301 | (TASA) 301. Safe routes to school infrastructure | Clark Twp | Mackinac | $133,364 | $0 | $0 | $133,364 |
SRTS - Madison School District Safe Routes to School | The Lenawee County Road Commission in conjunction with Madison School District will complete a pedestrian safety project for the benefit of students attending Madison Elementary and Madison Middle Schools. | Michigan | 2019 | 301 | (TASA) 301. Safe routes to school infrastructure | Madison Twp | Lenawee | ||||
SRTS Thompson International Academy, Yeshiva Beth Yehudah and Beth Jacob School | Sidewalks, curb ramps and a pedestrian crossing. | Michigan | 2017 | 301 | (TASA) 301. Safe routes to school infrastructure | Southfield | Oakland | $600,000 | $0 | $0 | $600,000 |
Design Phase SRTS Eisenhower, Brownell, Holmes, Eagles Nest | Pedestrian Safety Improvements | Michigan | 2017 | 301 | (TASA) 301. Safe routes to school infrastructure | Flint | Genesee | $79,099 | $0 | $0 | $79,099 |
SRTS Village of Mancelona | Infrastructure | Michigan | 2018 | 301 | (TASA) 301. Safe routes to school infrastructure | Mancelona | Antrim | $399,565 | $0 | $0 | $399,565 |
SRTS North Star Academy | Shared pathway construction | Michigan | 2016 | 301 | (TASA) 301. Safe routes to school infrastructure | Marquette Twp | Marquette | $528,393 | $0 | $0 | $528,393 |
SRTS Lewton, Averill, and Fairview Elementaries and STEM Academy | sidewalks, signage, and crossing improvements | Michigan | 2016 | 301 | (TASA) 301. Safe routes to school infrastructure | Lansing | Ingham | $579,007 | $0 | $0 | $579,007 |
Safe Routes to School Program Administration - Fiscal Year 2019 | State-wide Safe Routes to School (SRTS) Program Administration FY 2019 - FY 2018 TAP AWARD | Michigan | 2018 | 302 | (TASA) 302. Safe routes to school programs | Statewide | Statewide | $1,759,371 | $0 | $0 | $1,759,371 |
Safe Routes to School Program Administration - Fiscal Year 2020 | State-wide Safe Routes to School (SRTS) Program Administration- Year 2 of 6 | Michigan | 2019 | 302 | (TASA) 302. Safe routes to school programs | Statewide | Statewide | ||||
Safe Routes to School Program Administration - Fiscal Year 2019 | State-wide Safe Routes to School (SRTS) Program Administration FY 2019 - FY 2018 TAP AWARD | Michigan | 2018 | 302 | (TASA) 302. Safe routes to school programs | Statewide | Statewide | ||||
SRTS Noninfrastructure Grant Funding | SRTS Noninfrastructure Grants | Michigan | 2016 | 302 | (TASA) 302. Safe routes to school programs | Statewide | Statewide | $657,651 | $0 | $0 | $657,651 |
Lakeshore Trail Phase I | Construction of a nonmotorized pathway | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Muskegon | Muskegon | $799,370 | $0 | $799,370 | $1,598,740 |
M-28 Shoulder Paving | Increased Paved Shoulder Width from 3 ft to 5 ft to accomodate nonmotorized | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pentland | Luce | $81,988 | $0 | $20,497 | $102,485 |
M-59 Riverwalk Crossing | Construction of walkway under bridge | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Waterford | Oakland | $121,346 | $0 | $62,512 | $183,858 |
Paw Paw Lake Trail Project | Pave 6' Wide Shoulders for bike Trail | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Coloma | Berrien | $80,141 | $0 | $43,153 | $123,293 |
Royal Oak Transit Ctr | Transportation enhancements | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Royal Oak | Oakland | $81,763 | $0 | $20,441 | $102,204 |
Connector Trail | Pedestrian Trail | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | South Lyon | Oakland | $81,522 | $0 | $20,381 | $101,903 |
Non-Motorized Pedestrian Bicycle Path North of US-10, Phase 2 | Construct a connector bike path from Jefferson Avenue to the Midland Mall area. | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Midland | Midland | $81,427 | $0 | $66,181 | $147,608 |
Multi Use Bikeway | Streetscape | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Peck | Sanilac | $122,933 | $0 | $55,231 | $178,164 |
M-26 Bicycle Lanes - Phase II | Paved shoulder widening for bicycle lanes | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Osceola | Houghton | $485,971 | $0 | $121,493 | $607,463 |
Columbiaville Streetscape Improvement Project | Streetscape | Michigan | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Columbiaville | Lapeer | $81,057 | $0 | $20,264 | $101,321 |
Heritage Route Enhancement | Benches, Trash Receptacles, Planters & Historic Lights | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Goodrich | Genesee | $123,563 | $0 | $30,891 | $154,453 |
Nankin Mills Way Station | Create way station w/scenic turnout | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Westland | Wayne | $124,000 | $0 | $31,000 | $155,000 |
M-13 Bike Path & Ped Bridge | Sidewalk, bike path & Ped bridge | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pinconning | Bay | $121,430 | $0 | $80,953 | $202,383 |
Schaefer RR Viaduct | Grade walkway/bikeway & landscape | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | River Rouge | Wayne | $126,260 | $0 | $31,565 | $157,825 |
Gratiot Rd (M-46) Sidewalks | Construct sidewalks to park & school | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Thomas | Saginaw | $108,051 | $0 | $58,181 | $166,233 |
Dollar Bay Ped Facility | Proposed ped sidewalk in downtown | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Osceola | Houghton | $86,853 | $0 | $21,713 | $108,567 |
Phase I: Community & Neighborhood Development Initiative: The Seven Mile Project | Sidewalk expansion, samped concrete crossings, trees, benches, & other amenities | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $597,873 | $0 | $151,406 | $749,279 |
Sunrise Side Pathway, Phase I, Sections A & B | New construction at shared-use path connecting the Twp to the City of Tawas | Michigan | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Alabaster | Iosco | $641,928 | $0 | $0 | $641,928 |
M-57 Improvements | Lanscaping | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Carson City | Montcalm | $99,566 | $0 | $66,377 | $165,943 |
Northland Drive Pedestrian Pathway | 10' wide bituminous pathway | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cedar Springs | Kent | $93,910 | $0 | $23,478 | $117,388 |
Business Route M-28 Pedestrian Facilities | Construction of Pedestrian Facilities for Grade Separation | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Negaunee | Marquette | $93,895 | $0 | $23,474 | $117,368 |
Kalamazoo River-Trail Project | The development of trails along the Kalamazoo River and support facilities | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Albion | Calhoun | $589,061 | $0 | $229,079 | $818,140 |
US 41 Aesthetic and Pedestrian Facility Improvements | Improve Aesthetics and Pedestrian Accessibility | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Menominee | Menominee | $583,978 | $0 | $145,995 | $729,973 |
Delta Co. Enhancement Project | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Escanaba | Delta | $98,854 | $0 | $24,714 | $123,568 |
Linear Park and South Rail Yard Project | A continuation of Marquettes Nonmotorized Trail Network through its Downtown | Michigan | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marquette | Marquette | $582,961 | $0 | $368,891 | $951,852 |
Kent Street Bridge Relocation | Relocation of historic brdge, completion of a nonmotorized trail loop and paving | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Portland | Ionia | $580,040 | $0 | $654,087 | $1,234,127 |
M-35 Menominee Bike Pathway - Phase B | Non-motorized Pathway | Michigan | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Menominee | Menominee | $580,000 | $0 | $145,000 | $725,000 |
W Spring Lake Rd Bike Path | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ferrysburg | Ottawa | $92,274 | $0 | $23,069 | $115,343 |
Hines Park/6 Mile Rd Bikeway | Construct 10' Wide Paved Bikepath | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Northville | Oakland | $92,205 | $0 | $23,051 | $115,257 |
Flushing Nonmotorized Pathway | Installation of pathway & Ped bridge | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flushing | Genesee | $665,456 | $0 | $285,570 | $951,027 |
Southwest Area Nonmotorized Plan | Dev. decision framework for MDOT Region & TSC's for nonmotorized trans. | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Barry | $491 | $0 | $123 | $614 |
Tri-Centennial State Park and Harbor Non-motorized Trail | Nonmotorized (Bike) Trail, safety lighting, corridor landscaping, furnishings | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $563,131 | $0 | $286,630 | $849,760 |
Paw Paw LK Rd | 1.8m bit paved shoulders | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Coloma | Berrien | $92,598 | $0 | $47,702 | $140,301 |
W Chicago Blvd/M-50 Corridor Enhancement | Nonmotorized shared path, decorative street lighting, and landscaping | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tecumseh | Lenawee | $561,123 | $0 | $860,850 | $1,421,973 |
Three Mile Road Bike Path | Construct 10' wide paved independent bike path within existing Three Mile ROW | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Bay | Grand Traverse | $98,124 | $0 | $24,531 | $122,655 |
Whitmore Lk Ped/Bike Facility | Construct 10'-12' facility | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ann Arbor | Washtenaw | $98,000 | $0 | $42,000 | $140,000 |
China Twp Bike Path | Construct Nonmotorized Path | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Clair | St. Clair | $608,827 | $0 | $260,926 | $869,752 |
Zilwaukee Multi-Use Trail | Trail construction | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Zilwaukee | Saginaw | $96,945 | $0 | $24,236 | $121,181 |
M-25 Paved Shoulders, Huron City Road to M-53 in Port Austin (Phase 3) | Hot Mix Asphalt shoulder construction for use as a multiuse non-motorized path. | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Huron | Huron | $610,877 | $0 | $216,149 | $827,026 |
Lake Harbor Road Bike Path | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Norton Shores | Muskegon | $97,403 | $0 | $41,744 | $139,147 |
Grand Valley Pedestrian Bridge ("Blue Bridge") | Restoration of an historic railroad (now pedestrian) bridge | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Rapids | Kent | $606,048 | $0 | $505,155 | $1,111,203 |
Reeds Lake Trail Extension | Boardwalk and nonmotorized trail | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Grand Rapids | Kent | $96,876 | $0 | $343,469 | $440,345 |
Wilder Rd Corridor Sidewalk | Construct 5ft concrete sidewalk | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bangor | Bay | $97,696 | $0 | $57,377 | $155,073 |
Traverse Area Rec Trail Phase III | Construct 10ft paved path in RR ROW | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Traverse City | Grand Traverse | $628,000 | $0 | $157,000 | $785,000 |
M-25 Non-motorized Shoulders - Sanilac County | Pave existing gravel shoulders for non-motorized use | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sanilac | Sanilac | $616,846 | $0 | $154,211 | $771,057 |
Seward Avenue Bikeway | Bike lanes and bike paths | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Rapids | Kent | $619,514 | $0 | $212,540 | $832,054 |
Main St Enhancement | New sidewalk, Landscaping, fencing | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mattawan | Van Buren | $96,650 | $0 | $45,482 | $142,132 |
Hale Beautification Project | Construct Pedestrian Facilities & Decorative Lighting along M-56 in Hale | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Plainfield | Iosco | $622,107 | $0 | $207,369 | $829,476 |
Stadium Dr (I-94 BL) Nonmotorized Path/Corridor Beautification | Nonmotorized facility and corridor beautification | Michigan | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $624,000 | $0 | $156,000 | $780,000 |
St Joseph Nonmotorized Improvements | Nonmotorized Path/Bridge Construction | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Joseph | Berrien | $625,217 | $0 | $491,242 | $1,116,459 |
North Ohio/Fairview Pathway Project | Pathway for nonmotorized transportation | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gaylord | Otsego | $95,793 | $0 | $41,054 | $136,847 |
Kalamazoo River Valley Trailway (KRVT) | Development and construction of non-motorized trail | Michigan | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $627,316 | $0 | $627,316 | $1,254,632 |
Huron Valley Trail System | Construct East Unit of Trail System | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | South Lyon | Oakland | $617,600 | $0 | $570,092 | $1,187,692 |
Safety Path Construction | 8ft concrete path | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Brandon | Oakland | $86,500 | $0 | $86,500 | $173,000 |
Northside Parks Ped/Bike Path | Construct 10ft bituminous path | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Battle Creek | Calhoun | $90,994 | $0 | $22,749 | $113,743 |
M-11 Plaster Creek Trail Phase II | 10-12ft multi use asphalt path | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Rapids | Kent | $555,923 | $0 | $139,000 | $694,923 |
Elizabeth Lake Rd Bike Path | Construct nonmotorized facility | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pontiac | Oakland | $88,627 | $0 | $22,157 | $110,784 |
M-66 Pedestrian Facility & M-32 | Pedestrian Facility & Streetscape | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Jordan | Charlevoix | $104,927 | $0 | $26,232 | $131,159 |
Saginaw Road Bicycle/Pedestrian Path | Pave two seven foot wide road shoulders for pedestrain and bicycle path. | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fremont | Tuscola | $524,624 | $0 | $131,156 | $655,780 |
Grand River Dr Bike Path | Construct 4' paved shoulders | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cascade | Kent | $88,470 | $0 | $88,470 | $176,939 |
Heartside Nonmotorized Trail | Constructioin/Improvement | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Rapids | Kent | $105,092 | $0 | $26,273 | $131,365 |
Gateway Bagley Pedestrian Bridge Plaza Project | Plaza Enhancements | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $1,536 | $0 | $1,536 | $3,072 |
Watersmeet ped & bicycle path | Walkway from Watersmeet to the Lac Vieux Desert Casino complex | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Crystal Falls | Gogebic | $105,123 | $0 | $26,281 | $131,403 |
Bike Racks for Buses | Greenways Promotion/Healthy Living and Bike Mobility in Detroit | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $528,718 | $0 | $149,125 | $677,843 |
Saginaw Road Bicycle/Pedestrian Path | Pave two seven foot wide road shoulders for pedestrian and bicycle path | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Vassar | Tuscola | $520,791 | $0 | $131,393 | $652,184 |
Old Interurban Trail | Separate nonmotorized facility | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Meridian | Ingham | $105,472 | $0 | $56,793 | $162,265 |
Passenger Shelter Improvements | Passenger Shelter Upgrade & Signs | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flint | Genesee | $105,808 | $0 | $26,452 | $132,260 |
M-123 to Paradise | Upgrade Shoulders for Nonmotorized Traffic | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Whitefish | Chippewa | $87,806 | $0 | $21,951 | $109,757 |
East China Twp Bike/Ped Trail | Construct paved trail within right of way | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | East China | St. Clair | $106,717 | $0 | $106,717 | $213,433 |
M-35 Nonmotorized Path | Construct nonmotorized path along M-35 from residential areas to schools &parks | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gladstone | Delta | $106,737 | $0 | $26,684 | $133,421 |
Nonmotorized Facility | Construct bike/ped path | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wixom | Oakland | $87,600 | $0 | $58,400 | $146,000 |
Fred Meijer Heartland Trail - Phase VII | 10' wide HMA (bituminous) paved nonmotorized path on abandoned RR ROW | Michigan | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Home | Montcalm | $721,843 | $0 | $996,831 | $1,718,674 |
M-25 Non Motorized Path, Brown Roadside Park to SVL Caseville | Hot Mix Asphalt shoulder widening for use as a multiuse non-motorized path | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Caseville | Huron | $712,867 | $0 | $201,065 | $913,932 |
Pedestrian/ Bike Path | Bike/Pedestrian Path | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wixom | Oakland | $100,391 | $0 | $43,025 | $143,415 |
Lakeport Park, Phase 2 | Construct continuation of paved trail, including pedestrian bridge over creek | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Burtchville | St. Clair | $530,699 | $0 | $227,442 | $758,141 |
Washtenaw Ave Nonmotorized Path | Construct nonmotorized path on NE side of Washtenaw Ave | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ann Arbor | Washtenaw | $538,027 | $0 | $1,317,239 | $1,855,266 |
Saginaw Township - Kochville Township Path | Multi-Use Path | Michigan | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Saginaw | Saginaw | $555,114 | $0 | $116,180 | $671,293 |
River Trail South Extension (Hawk Island to Maguire Park) | Construction of boardwalk and asphalt trail | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lansing | Ingham | $553,848 | $0 | $600,002 | $1,153,850 |
Trumbull Streetscape and Bike Lanes | Aesthetics improvements and non-motorized accommodation for Wayne State University and Henry Ford Health System area | Michigan | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $690,995 | $0 | $172,749 | $863,744 |
Center Rd. Multi-Use Pathway Bridge over the Tittabawassee River | Multi-Use Pathway Bridge | Michigan | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Saginaw | Saginaw | $550,495 | $0 | $137,624 | $688,118 |
Petoskey Pedestrian tunnel | Replace Metal Culvert with Precast Tunnel | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Petoskey | Emmet | $101,218 | $0 | $25,305 | $126,523 |
Grand Blanc Township Pathway Extension to Hill Road | Build a 10' wide trail to allow non-motorized connection from Grand Blanc Road | Michigan | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Blanc | Genesee | $692,115 | $0 | $296,621 | $988,736 |
M-25 | Nonmotorized path eliminate gaps in path | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fort Gratiot | St. Clair | $101,424 | $0 | $39,583 | $141,006 |
Ontonagon Ped Facilities | Proposed ped sidewalk | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ontonagon | Ontonagon | $88,984 | $0 | $59,323 | $148,307 |
Flat Rock East/West Connector | Final development phase of bike path/trails | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flat Rock | Wayne | $693,783 | $0 | $502,395 | $1,196,178 |
Torch Lake/Eastport Enhancement Project | construction of 8-foot wide paved shoulders | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Torch Lake | Antrim | $547,512 | $0 | $136,878 | $684,389 |
James S. Miner Bikeway Link | Construct nonmotorized trail and restore a wrought iron bridge | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Owosso | Shiawassee | $699,393 | $0 | $233,131 | $932,524 |
Lovers Lane Bikeway Trail | 10' wide nonmotorized multi-use path | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Portage | Kalamazoo | $90,003 | $0 | $38,573 | $128,576 |
Roadstream Crossings | Construction | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Mason | $102,800 | $0 | $102,800 | $205,600 |
Grayling Bicycle Turnpike | Construction of Bike Pathway | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grayling | Crawford | $541,960 | $0 | $135,490 | $677,450 |
Vanwormer | Sidewalks and Landscape | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Thomas | Saginaw | $103,563 | $0 | $192,331 | $295,894 |
Romeo Trail and Trail Head for the Macomb Orchard Trail | Trail and Trailhead Park | Michigan | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Romeo | Macomb | $103,594 | $0 | $25,899 | $129,493 |
Connecting Loop Sidewalk | Sidewalk Construction | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bridgman | Berrien | $102,000 | $0 | $68,000 | $170,000 |
Laketown Twp Nonmotorized Path | Eng & Design & Construct paths | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Laketown | Allegan | $346,207 | $0 | $250,702 | $596,909 |
M-37 Nonmotorized Facility | Pave Nonmotorized Facility | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Peninsula | Grand Traverse | $461,233 | $0 | $102,277 | $563,511 |
Tecumseh Enhancement Project | Improvements | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dundee | Monroe | $127,231 | $0 | $47,058 | $174,289 |
Jackson Rd Bike Ln/Path | Construct bike lane/path | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ann Arbor | Washtenaw | $70,000 | $0 | $50,690 | $120,690 |
Gratiot Ave | Pedestrian & bicycle path | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marysville | St. Clair | $150,000 | $0 | $50,000 | $200,000 |
Paul Henry Thornapple Trail | Paving the former RR corridor for use as a multi-use non-motorized trail | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gaines | Kent | $384,791 | $0 | $96,198 | $480,988 |
Chassell Twp School Pathway | Pedestrian Pathway | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chassell | Houghton | $70,000 | $0 | $30,000 | $100,000 |
McClellan Ave. Bike Path | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marquette | Marquette | $382,831 | $0 | $95,708 | $478,539 |
S Commerce Rd Bike Path | Construct nonmotorized | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Commerce | Oakland | $380,800 | $0 | $163,200 | $544,000 |
Corktown Mexicantown Greenlink | Bicycle lanes / signed routes | Michigan | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $379,441 | $0 | $94,860 | $474,301 |
Aurelius Road Corridor | Convert 4 travel lanes with nonmotorized facilities | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lansing | Ingham | $385,450 | $0 | $96,362 | $481,812 |
Savidge Street Corridor | Improvement & Beautification Project | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Spring Lake | Ottawa | $377,109 | $0 | $377,109 | $754,218 |
Bike Lockers at Transit Facilities | Add bike lockers and locks at transit transfer locations | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pontiac | Oakland | $13,840 | $0 | $3,460 | $17,300 |
Metropark/I-275 Trail Connector | Asphalt surfaced bike/ped trail | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Huron | Wayne | $375,000 | $0 | $125,000 | $500,000 |
US-131 Pedestrian Tunnel | Construction of a pedestrain culvert under US-131, to connect the Kal-Have Trail | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $374,755 | $0 | $93,689 | $468,444 |
Southwest Detroit and Dearborn Greenway | Nonmotorized, multi-use path construction | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $373,763 | $0 | $102,004 | $475,767 |
Grand Traverse Greenway Trail Aquisition | Abandoned Railroad Corridor Aquisition | Michigan | 2018 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flint | Genesee | $175,000 | $0 | $525,000 | $700,000 |
Niles Township - IN-MI River Valley Trail | Construct an off-road non-motorized facility | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Niles | Berrien | $372,547 | $0 | $316,462 | $689,009 |
E Grand Lk Rd Bike/Ped Facility | Build nonmotorized as paved shoulders | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Presque Isle | Presque Isle | $68,249 | $0 | $53,624 | $121,873 |
Bryant Road Multi-use Path | Multi-use Path Installation | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ludington | Mason | $69,209 | $0 | $17,302 | $86,511 |
28th St/US-131 Pedestrian Lighting | Install Pedestrian Lighting along both sides of 28th street | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wyoming | Kent | $68,152 | $0 | $17,038 | $85,190 |
Leffingwell Nonmotorized Trail | Construction 10 ft trail | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Rapids | Kent | $70,000 | $0 | $30,000 | $100,000 |
Harbor Club Sidewalk | Walkway | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Suttons Bay | Leelanau | $12,413 | $0 | $12,413 | $24,825 |
Maiden Lane | 1.8m bit paved shoulders | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Joseph | Berrien | $72,750 | $0 | $24,250 | $97,000 |
Path & Improvements on US-12 | Bike Paths, Decorative Street Lights and Terrace Trees | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sturgis | St. Joseph | $72,703 | $0 | $18,176 | $90,878 |
State Park Dr Bridge Trailway | Construction of Ped/Bike trailway | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bangor | Bay | $146,763 | $0 | $62,899 | $209,662 |
Pedestrian Signage | Motorists advisory of pedestrian crossings | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flint | Genesee | $10,438 | $0 | $2,609 | $13,047 |
Okemos Rd. Holt Rd. To Jolly Rd | Nonmotorized Facility | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mason | Ingham | $146,956 | $0 | $36,739 | $183,695 |
Garfield Rd Pedestrian Bridge | Installation of a pedestrian & bicycle bridge over the Harrington Drain | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fraser | Macomb | $72,000 | $0 | $18,000 | $90,000 |
Mott Lake Nonmotorized Pathway and Bridge - Phase 1 | Construct a 10' wide asphalt pathway along Mott Lake to complete gap in exist sy | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Brighton | Genesee | $399,904 | $0 | $172,834 | $572,739 |
Conner Playfield (and Detroit City Airport) Non-Motorized Facility Project | Construct shared-use non-motorized pathway, plantings & user amentities in Conne | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $1,438,343 | $0 | $359,586 | $1,797,929 |
Victorian Streetscape | Reconstruct ped facilities & lighting | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | West Branch | Ogemaw | $397,559 | $0 | $170,382 | $567,941 |
Woodmere Ave Link to TART Trail | Construct TART Trail connector improved access | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Traverse City | Grand Traverse | $147,910 | $0 | $63,390 | $211,300 |
Harger Non Motorized Path | Conversion of railroad bed into non-motorized path | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Buena Vista | Saginaw | $1,339,953 | $0 | $334,988 | $1,674,941 |
Nonmotorized Pathways/Sidewalks | Construct 5' concrete pathways/sdwlks | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Allendale | Ottawa | $70,840 | $0 | $30,360 | $101,200 |
Meridian Rd Bike Path V-B | Extend nonmotorized facility 4,100ft | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grosse Ile | Wayne | $70,625 | $0 | $70,625 | $141,250 |
Avon-Livernois Non-motorized improvements | Nonmotorized and Aesthetic improvements incl, pedestrian pathways, landscaping | Michigan | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rochester Hills | Oakland | $149,390 | $0 | $104,599 | $253,988 |
Saginaw Street Non-Motorized Pedestrian Pathway | Non-Motorized Pedestrian Pathway Removal & Replacement | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pontiac | Oakland | $387,779 | $0 | $197,576 | $585,356 |
M-15 Heritage Route | Nonmotorized path and streetscape | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Goodrich | Genesee | $387,085 | $0 | $109,178 | $496,262 |
Farmington Rd M-5 Bridge | Roadside & bridge landscaping | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Farmington Hills | Oakland | $71,653 | $0 | $19,047 | $90,700 |
Huron Valley Trail System | Construct Connection between Trails | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lyon | Oakland | $400,000 | $0 | $100,000 | $500,000 |
Kalamazoo River Valley Trailway (KRVT) | Phases 4, Development and construction of non-motorized trail | Michigan | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $368,063 | $0 | $122,688 | $490,751 |
Waverly Road Regional Recreational Network Connection, Phase 1 | bike lanes, nonmotorized path, bridge widening for peds. | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lansing | Ingham | $152,930 | $0 | $33,912 | $186,842 |
Bicycle Path | Bicycle Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Troy | Oakland | $356,789 | $0 | $89,197 | $445,987 |
Augusta Drive | Addition of 3 Ft Paved Shoulders | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Augusta | Kalamazoo | $15,200 | $0 | $3,800 | $19,000 |
Tri-County Bicycle Parking | Inverted "U" rack parking for bicycles | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lansing | Ingham | $15,375 | $0 | $15,375 | $30,750 |
Non-Motorized Bridge Over M-53 (North of 32 Mile Rd) | Eng & Design and construction of non-motorized bridge | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Romeo | Macomb | $1,788,049 | $0 | $1,009,530 | $2,797,579 |
Civic Arena Sidewalk Project | Construct 7' concrete Sidewalk | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cadillac | Wexford | $15,851 | $0 | $15,851 | $31,701 |
Nonmotorized Trail Development | Segments of an overall city trail system | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Norway | Dickinson | $157,954 | $0 | $143,817 | $301,771 |
Charlevoix to Bay Shore Trail | Build Nonmotorized Trail on N Side of US-31 | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hayes | Charlevoix | $1,936,010 | $0 | $484,003 | $2,420,013 |
Zilwaukee Multi-Use Trail | Trail Construction -- Phase II, Phase III and Phase IV | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Zilwaukee | Saginaw | $357,487 | $0 | $89,372 | $446,859 |
Luna Pier Rd Beautification | Construct sidewalks for peds & landscape | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Luna Pier | Monroe | $16,136 | $0 | $4,034 | $20,170 |
Muskegon Lkshore Trail | Construct 10' paved segment & 12' segment | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Muskegon | Muskegon | $66,000 | $0 | $16,500 | $82,500 |
Karlin Rd (CR-137) Bike Path | Construct 5ft paved path on each shoulder | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Green Lake | Grand Traverse | $158,947 | $0 | $55,846 | $214,794 |
Detroit Wayne County Port Authority -Riverwalk | Construct Riverwalk and Appurtenances | Michigan | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $159,370 | $0 | $159,370 | $318,740 |
Freeland/Webster Rds Sidewalks | Install sidewalks & crosswalks | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tittabawassee | Saginaw | $16,995 | $0 | $16,995 | $33,990 |
US-27BR Path & Bridge | Nonmotorized, Hard-Surfaced, Shared-Used Path & Bridge | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Clare | Clare | $349,087 | $0 | $87,272 | $436,359 |
Charlevoix Ave Roadside Parks | Develop Scenic & Interpretive Parks | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Resort | Emmet | $347,713 | $0 | $115,904 | $463,617 |
Irish Road Pathway - ROW and Construction . | Seperated Pathway | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Davison | Genesee | $347,311 | $0 | $234,901 | $582,211 |
Downtown Streetscape | Landscaping, sidewalks & amenities | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ortonville | Oakland | $158,365 | $0 | $105,576 | $263,941 |
Paint Creek Trail Ext Phase II | Construct path to connect existing path | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rochester | Oakland | $152,500 | $0 | $152,500 | $305,000 |
M-57 Sidewalk Construction | Construct sidewalk | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Greenville | Montcalm | $67,146 | $0 | $16,787 | $83,933 |
Southwest Quadrant Pathway | Separate Multi-use Pathway Facilities | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Escanaba | Delta | $155,222 | $0 | $38,806 | $194,028 |
US-31/M-52 Munson Ave | Bikepath | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Traverse City | Grand Traverse | $14,705 | $0 | $8,636 | $23,341 |
US-31 | Construct an 8' wide path | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Petoskey | Emmet | $365,633 | $0 | $91,408 | $457,042 |
I-96/Latson Interchange Nonmotorized Path | Nonmotorized path | Michigan | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Genoa | Livingston | $1,600,000 | $0 | $400,000 | $2,000,000 |
Flint River Trail - Applewood Extension | Non-motorized bike and pedestrian trail | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flint | Genesee | $364,696 | $0 | $141,826 | $506,522 |
Mt. Morris Rd. & Saginaw St. | 5' bike lanes from city limit to city limit and streetscape enhancement items. | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mt. Morris | Genesee | $153,798 | $0 | $38,449 | $192,247 |
Lincoln Street Bike Lanes | 5' paved shoulders for nonmotorized travel | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Norton Shores | Muskegon | $153,923 | $0 | $51,308 | $205,231 |
Ice Cream Bike Lanes | Bike Lanes (extended shoulders with markings) | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Richland | Montcalm | $67,980 | $0 | $15,074 | $83,055 |
Middle Rouge Pkwy Bike Trial | Bike Trail | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Westland | Wayne | $360,000 | $0 | $90,000 | $450,000 |
South Main St Nonmotorized Path | Nonmotorized path/crossing over Malletts Creek | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ann Arbor | Washtenaw | $154,140 | $0 | $38,535 | $192,675 |
Platte Road Bicycle Lanes | Paved shoulders for Bicycle Lanes to include permanent pavement markings. | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Benzonia | Benzie | $361,430 | $0 | $90,357 | $451,787 |
Townsend Rd Bike Path | Construct ped/bike path | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Johns | Clinton | $15,000 | $0 | $15,000 | $30,000 |
Mattawan Sidewalk Project | Install New Sidewalks, Replace Storm Drains | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mattawan | Van Buren | $15,000 | $0 | $10,862 | $25,862 |
148th Ave Nonmotorized Path | Construct a nonmotorized path within the road ROW | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Spring Lake | Ottawa | $360,660 | $0 | $90,165 | $450,825 |
M-35 Shoulder widening for bicyclists. | Widening of existing 3' paved shoulders to cyclist-friendly 8' paved shoulders | Michigan | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Forsyth | Marquette | $360,211 | $0 | $90,053 | $450,264 |
I-75 | Landscaping Beautification | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grayling | Crawford | $67,600 | $0 | $16,900 | $84,500 |
Huron Pkwy Ped/Bike Path | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ann Arbor | Washtenaw | $67,500 | $0 | $67,500 | $135,000 |
S Union St & Cass St Streetscape | Sidewalk Enhancement | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Traverse City | Grand Traverse | $362,398 | $0 | $362,398 | $724,795 |
US-23 Bike/Pedestrian Path | Construction of a bike/pedestrian path | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Au Sable | Iosco | $127,060 | $0 | $68,417 | $195,477 |
M-15 Heritage Route Trailway | Trail system along M-15 corridor to connect to existing Vassar trail system | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Vassar | Tuscola | $145,382 | $0 | $56,537 | $201,919 |
M-59 Crosstown Trail | Non-motorized path | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Howell | Livingston | $1,210,162 | $0 | $785,205 | $1,995,367 |
Kent Trails Reconstruction | Reconstruct Kent Trail to current ASSHTO shared use path standards. | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wyoming | Kent | $440,326 | $0 | $440,326 | $880,652 |
Red Arrow Highway Non-Motorized Enhancement Project | 6' wide HMA shoulder | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Watervliet | Berrien | $133,553 | $0 | $200,330 | $333,884 |
Fallasburg Covered Bridge | Re-Hab of Fallasburg Bridge | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Vergennes | Kent | $133,698 | $0 | $33,425 | $167,123 |
Thomas Township Non-motorized Trail | Non-motorized path construction | Michigan | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Thomas | Saginaw | $49,935 | $0 | $33,290 | $83,224 |
Kalamazoo River Valley Trailway | Development and construction of non-motorized trail | Michigan | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $967,332 | $0 | $241,833 | $1,209,165 |
Newburgh Rd Sidewalk | Sidewalk construction | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Westland | Wayne | $134,394 | $0 | $54,894 | $189,288 |
M-66/Main St Improvements | M-66/Main St Improvements | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Stanton | Montcalm | $437,925 | $0 | $215,694 | $653,619 |
Dixie Hwy & Tin Lizzy Ln | Construct sidewalk | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bridgeport | Saginaw | $5,250 | $0 | $1,750 | $7,000 |
Elm St Plaza & Walkway down Elm St to the Detroit River | Brick Pavers, Lighting, Landscape, Trash Containers, Benches | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wyandotte | Wayne | $78,378 | $0 | $78,378 | $156,756 |
White Pine Trail - Bridge Replacements | White Pine Trail - Bridge Replacement - Early Design Work | Michigan | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Reed City | Osceola | $51,372 | $0 | $45,119 | $96,491 |
M-25 Nonmotorized Path (Phase 2) | Hot Mix Asphalt shoulder widening for use as a multiuse non-motorized path. | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rubicon | Huron | $435,364 | $0 | $108,841 | $544,205 |
M-59 Multi-Use Path | Construction of a 10' wide asphalt multi-use path | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Highland | Oakland | $435,207 | $0 | $112,108 | $547,315 |
M-53 Pedestrian Crossings; 21 mile rd and 22 mile rd | Construct foundations, embankments, bridges and sidewalks | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shelby | Macomb | $987,500 | $0 | $1,481,250 | $2,468,750 |
US-2 Nonmotorized - Design | Non-motrized path design | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Crystal Falls | Iron | $53,904 | $0 | $31,047 | $84,951 |
M-43 Non-Motorized Facilities | non-motorized pathways, bike lanes, crosswalks, ped. islands | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Lansing | Ingham | $431,671 | $0 | $287,781 | $719,452 |
Spring Arbor Sidewalk | Construct Sidewalk in Spring Arbor | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Spring Arbor | Jackson | $136,527 | $0 | $34,132 | $170,659 |
I-275 Bike Path | Reconstruction | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Novi | Oakland | $437,191 | $0 | $109,298 | $546,489 |
Woodmere Ave. Sidewalks and streetscaping | Construct 5 foot wide sidewalks and raised curb and guttered medians with bricks | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Traverse City | Grand Traverse | $136,947 | $0 | $45,649 | $182,595 |
Phase II | Bituminous pedestrian / bicycle trail (11' wide) | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Portsmouth | Bay | $131,939 | $0 | $56,545 | $188,485 |
M-26 8' paved shoulders - Design | Adding 5' of HMA shoulders | Michigan | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hancock | Houghton | $28,673 | $0 | $7,168 | $35,841 |
Clarkston Main St Landscape | Replace Sidewalks, Lights & Landscape | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Clarkston | Oakland | $458,529 | $0 | $114,632 | $573,161 |
Village of Beaverton M-18 Pathway | Concrete pathway, including lighting, safety fence, and guardrail modifications | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Beaverton | Gladwin | $127,388 | $0 | $85,553 | $212,941 |
US-2 Nonmotorized - Construction | Non-motrized path construction | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Crystal Falls | Iron | $457,167 | $0 | $147,032 | $604,199 |
Ward St Bridge-to-Bay Trail | Extend multi-use trail to link King Rd Pk & high school | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marine City | St. Clair | $76,036 | $0 | $42,770 | $118,807 |
9 Mile Rd Pathway | Construct Nonmotorized Pathway | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Novi | Oakland | $128,000 | $0 | $32,000 | $160,000 |
Paul Henry Thornapple Trail | Construct a non-motorized trail | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gaines | Kent | $455,446 | $0 | $113,862 | $569,308 |
Detroit Wayne County Port Authority Public Dock & Terminal nonmotorized project | Riverwalk, landscaping, lighting, seating etc | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $884,116 | $0 | $221,029 | $1,105,145 |
M-44 Non-Motorized Bridge Addition | Non-motorized bridge addition | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Plainfield | Kent | $939,187 | $0 | $506,101 | $1,445,288 |
Saginaw Township - Kochville Township Path | Multi-Use Path | Michigan | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Saginaw | Saginaw | $18,536 | $0 | $9,981 | $28,518 |
Red Apple Paved Shoulders | Paved Shoulders | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Filer | Manistee | $129,965 | $0 | $48,069 | $178,034 |
M-21 Non-Motorized Bridge Addition | Non-motorized bridge addition | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ada | Kent | $908,933 | $0 | $468,238 | $1,377,171 |
Ped/Bike Path | Construct asphalt ped/bike path | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fruitport | Muskegon | $130,050 | $0 | $41,068 | $171,118 |
Bootjack Rd Shoulders | Bikepath | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hancock | Houghton | $130,099 | $0 | $32,525 | $162,624 |
Merchant Street Area Recreation Trail | Construction of 10' wide concrete recreation trail | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Port Huron | St. Clair | $130,418 | $0 | $32,605 | $163,023 |
N Park Nonmotorized Pathway | Construction of 11' pathway | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Walker | Kent | $130,598 | $0 | $43,533 | $174,130 |
E Grand Lake Rd Bicycle & Pedestrian Facility | Building a nonmotorized facility as paved shoulders along road ROW | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Presque Isle | Presque Isle | $131,029 | $0 | $87,353 | $218,382 |
W Front St Streetscape III | W Front St Streetscape | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Monroe | Monroe | $129,625 | $0 | $32,406 | $162,031 |
Commercial Spur Development | Restroom facility & 3000 lft nonmotorized trail | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Montague | Muskegon | $72,876 | $0 | $31,233 | $104,109 |
Forty Mile Point Lighthouse Nonmotorized Path Extension | Non Motorized Pathway Construction | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rogers City | Presque Isle | $426,161 | $0 | $322,251 | $748,412 |
DeWitt Revitilization | Sidewalks & Crosswalks, Plant Trees | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | DeWitt | Clinton | $75,993 | $0 | $37,429 | $113,422 |
Muskegon Area Transit Bicycle | Purchase & Install bicycle racks on transit system buses & trolleys | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Muskegon | Muskegon | $8,000 | $0 | $2,000 | $10,000 |
Niles Amtrak Station | Paving, Painting, Lights & Bike Racks | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Niles | Berrien | $141,640 | $0 | $35,410 | $177,050 |
River Raisin Pedestrian Bridge | Construct Separate Pedestrian Bridge | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Blissfield | Lenawee | $141,775 | $0 | $39,988 | $181,763 |
Nonmotorized Underpass - Riley St. | Reconstruct nonmotorized facility for safety & widening | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Holland | Ottawa | $403,045 | $0 | $403,045 | $806,090 |
M-26 Pedestrian Underpass | Pedestrian/Bicycle Tunnel Underpass | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Houghton | Houghton | $402,259 | $0 | $100,565 | $502,824 |
M-26 8' paved shoulders - Construction | Adding 5' of HMA shoulders | Michigan | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hancock | Houghton | $400,024 | $0 | $100,006 | $500,030 |
Tri-Cities Pedestrian Bike Path Connector | Construct Bike Path | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ferrysburg | Ottawa | $1,129,003 | $0 | $282,251 | $1,411,254 |
M-21 Multi-Use Path | Construction of a multi-use path | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flint | Genesee | $141,131 | $0 | $0 | $141,131 |
Greenfield Rd Enhancement | Roadway enhancement Project | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Southfield | Oakland | $73,867 | $0 | $49,245 | $123,112 |
Gibraltar Multi Use Path, Middle Gibraltar Rd to North Gibraltar Rd | 10 foot Multi Use Path to Marsh (Asphalt) | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gibraltar | Wayne | $73,317 | $0 | $21,612 | $94,929 |
W Jefferson Streetscape | Reduce roadway cross-section to lanes | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Trenton | Wayne | $1,178,226 | $0 | $580,320 | $1,758,546 |
City of Lapeer Linear Path Extension | Path construction, bridge construction, landscaping, and signage | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lapeer | Lapeer | $144,269 | $0 | $37,301 | $181,569 |
E. Stadium Blvd. Bridges Non-motorized Enhancement Elements | adding on-road bike lanes, sidepaths & retaining walls during bridge con | Michigan | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ann Arbor | Washtenaw | $1,180,582 | $0 | $295,146 | $1,475,728 |
Laketon Ave Trail | Construct 10' bit ped/bike path | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Muskegon | Muskegon | $144,358 | $0 | $36,090 | $180,448 |
Grand River Drive Bike Path | Construction of 4' paved shoulders | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lowell | Kent | $400,000 | $0 | $400,000 | $800,000 |
Sidewalk to Avalanche Preserve | Construct sidewalk | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Boyne City | Charlevoix | $72,987 | $0 | $31,280 | $104,268 |
White Pine Trail Staging Area and Improvements | Constuction of a staging area and trail paving | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Howard City | Montcalm | $143,060 | $0 | $35,765 | $178,825 |
15 M RD Bike Path | Bike path | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Big Rapids | Mecosta | $137,686 | $0 | $59,008 | $196,694 |
Miller & Morrish Rd Intersection | Lane Configuration for Bike Paths | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Swartz Creek | Genesee | $140,552 | $0 | $93,701 | $234,254 |
Fulton Street Boulevard | Boulevard Construction, Ornamental Lights & Streetscape | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Rapids | Kent | $140,284 | $0 | $0 | $140,284 |
6th St Sidewalk Extension | Pedestrian Sidewalk W/Landscaping | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Calumet | Houghton | $75,776 | $0 | $40,802 | $116,578 |
W Silver Lake Rd-Bike Path | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Traverse City | Grand Traverse | $75,446 | $0 | $18,861 | $94,307 |
Marquette/Lakeshore Improvements | Nonmotorized Paths & Streetscaping | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marquette | Marquette | $138,807 | $0 | $150,374 | $289,180 |
Pathway M-93 / I-75 Business Loop | Construction of Bike Path | Michigan | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grayling | Crawford | $418,944 | $0 | $118,164 | $537,107 |
Saline Rd/Main St Pathway | Ped/Bike path extension w/ bridge | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ann Arbor | Washtenaw | $75,184 | $0 | $75,184 | $150,367 |
Historic Brick Street Rehabilitation and Restoration of Cherry Street | Rehabilitation and Restoration of a historic brick street | Michigan | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Rapids | Kent | $417,329 | $0 | $410,999 | $828,328 |
Grand River Edges Rail-Trail Acquisition | Acquisition of abandoned rail corridor for future nonmotorized connection | Michigan | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Rapids | Kent | $1,208,500 | $0 | $1,029,463 | $2,237,963 |
Calhoun County Trailway - Phase 1, Segment 1 | Multi-use Trailway/Linear Park | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Emmett | Calhoun | $1,075,592 | $0 | $758,950 | $1,834,542 |
Pedestrain Approaches on Jerusalem Bayou Bridge | Nonmotorized Approaches | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Spring Lake | Ottawa | $139,342 | $0 | $175,883 | $315,225 |
M-43 Gull Rd Nonmotorized Path | Construction of 10' Bit path | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Richland | Kalamazoo | $414,687 | $0 | $103,672 | $518,359 |
Charlevoix Bike Path | Ten ft wide nonmotorized trail along N. side of US-31 | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hayes | Charlevoix | $412,607 | $0 | $504,297 | $916,904 |
Western Gateway Improvements Project | Development of the Western Gateway Project | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $412,241 | $0 | $103,957 | $516,198 |
Farmington Rd Bike Path | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Farmington Hills | Oakland | $410,539 | $0 | $102,635 | $513,173 |
Scenic Turnout | Scenic Turnout | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Peninsula | Grand Traverse | $74,963 | $0 | $18,741 | $93,704 |
Clay Twp Bike/Ped Trail | Construct paved trail along rds | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Clay | St. Clair | $140,217 | $0 | $60,093 | $200,310 |
M-119 Pathway - Pleasantview Rd to Harbor Springs | Multi-Use Pathway and Native tree plantings | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Little Traverse | Emmet | $1,065,981 | $0 | $268,223 | $1,334,203 |
Kalamazoo River Valley Trailway (KRVT) | Development and construction of non-motorized trail | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $1,025,529 | $0 | $620,043 | $1,645,572 |
M-24 Trailway Tunnel | Culvert installation for pedestrian crossing of M-24 | Michigan | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lapeer | Lapeer | $46,933 | $0 | $31,289 | $78,222 |
Milford to Kensington Metropark Non-Motorized Connector | Construction of 10-foot wide non-motorized trail | Michigan | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Milford | Oakland | $609,355 | $0 | $1,929,624 | $2,538,979 |
Old Interurban Pathway - Phase II | Bituminous Cross Country Trail | Michigan | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Meridian | Ingham | $224,165 | $0 | $111,632 | $335,797 |
US-23 (Chisholm St.) Aesthetic and nonmotorized project | Aesthetic Improvement and Nonmotorized pathway | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Alpena | Alpena | $31,285 | $0 | $24,581 | $55,865 |
I-275 Bike Path | Reconstruction | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Novi | Oakland | $2,855,300 | $0 | $717,096 | $3,572,397 |
M-29 Streetscape and Bike Path | ADA enhancements, streetscape, and bike path plan development | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Clair | St. Clair | $82,389 | $0 | $0 | $82,389 |
Lentz & Reed Sts Sidewalk | Install new sidewalk | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nashville | Barry | $26,400 | $0 | $16,879 | $43,279 |
Kneeland Ave Sidewalk | Construct Sidewalk/Bike Path | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Albert | Montmorency | $29,614 | $0 | $9,871 | $39,485 |
Forest Road Bike Lanes | Pave Shoulders for Bike Lanes | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lansing | Ingham | $207,200 | $0 | $51,800 | $259,000 |
Chocolay Township US-41 Corridor Enhancement Project | Non-motorized pathway, pedestrian tunnel and natural plantings | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chocolay | Marquette | $207,581 | $0 | $51,895 | $259,476 |
Conner Creek Greenway - Southern Terminus | Non-motorized pathway | Michigan | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $241,417 | $0 | $60,354 | $301,772 |
I-94/Huron St Nonmotorized Path | Study Nonmotorized Crossing Options | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | York | Washtenaw | $54,257 | $0 | $13,564 | $67,822 |
Lk Antoine Bike Path | Widen rd & construct path | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Iron Mountain | Dickinson | $235,200 | $0 | $58,800 | $294,000 |
Wilderness Trail Project | Construct pedestrian bridge | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Joseph | Berrien | $37,196 | $0 | $20,029 | $57,225 |
Hillsdale St Ped/Bike Path | Construct sidewalk & landscape | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hillsdale | Hillsdale | $46,101 | $0 | $37,719 | $83,820 |
Lakeshore Trail | Contrust nonmotorized Trail | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Muskegon | Muskegon | $240,000 | $0 | $60,000 | $300,000 |
Marysville Projects | Sidewalks | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marysville | St. Clair | $37,282 | $0 | $15,978 | $53,260 |
M-71 Bicycle Underpass | Bicycle Link at Shiawassee River | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Owosso | Shiawassee | $37,500 | $0 | $23,975 | $61,475 |
Center Street & Lake Avenue Nonmotorized Path | HMA Nonmotorized Path | Michigan | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | North Muskegon | Muskegon | $208,722 | $0 | $139,148 | $347,870 |
Lake Erie Metro Park | Asphalt Bike Path Connector-3 Areas | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gibraltar | Wayne | $37,743 | $0 | $9,436 | $47,179 |
Croswell-Lexington Bike Path | Construct bike path w/landscaping | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Croswell | Sanilac | $30,000 | $0 | $30,000 | $60,000 |
Bike Racks & Lockers | Bike racks & lockers at 3 sites | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lansing | Ingham | $37,848 | $0 | $9,462 | $47,310 |
Maiden Lane Park Bridge | Construct Pedestrian Bridge | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Joseph | Berrien | $37,952 | $0 | $20,436 | $58,388 |
US-31 BR Nonmotorized Path | Provide 2-10' path on bridge | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pentwater | Oceana | $40,823 | $0 | $10,206 | $51,029 |
Northwest Portage Bikeway Extension | Construction of 10-foot wide multi-use non-motorized asphalt trail | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Portage | Kalamazoo | $200,000 | $0 | $200,000 | $400,000 |
Filer City Rd. Sidewalk | Bike/Ped-Sidewalk | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Filer | Manistee | $38,045 | $0 | $16,305 | $54,350 |
Kent Rail Connectors | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Rapids | Kent | $34,875 | $0 | $24,235 | $59,110 |
Ocqueoc River Nonmotorized Bridge | Construct Bicycle/Pedestrian Bridge | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Millersburg | Presque Isle | $38,400 | $0 | $9,600 | $48,000 |
Ogemaw Trails Master Plan | Development of a nonmotorized master plan | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | West Branch | Ogemaw | $16,002 | $0 | $10,668 | $26,669 |
S Multi-use Trail Connection Project | Trail Improvement | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mackinaw City | Cheboygan | $34,762 | $0 | $8,691 | $43,453 |
Lansing River Trail | River Trail | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lansing | Ingham | $206,817 | $0 | $169,214 | $376,031 |
M-15 Non-motorized Path | 8' paved shoulder for non-motorized use | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tuscola | Tuscola | $227,041 | $0 | $56,760 | $283,801 |
Pedestrian Amenities on 8 mile Rd | Construct Pedestrian Amenities | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Detroit | Wayne | $44,000 | $0 | $11,000 | $55,000 |
M-54/Saginaw Rd | Streetscape | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Blanc | Genesee | $200,460 | $0 | $50,115 | $250,575 |
Friday & Mountain Rds Shoulder | Bituminous Paved Shoulders | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Coloma | Berrien | $45,301 | $0 | $19,415 | $64,715 |
Mission St Beautification | Brick Pavers, Sidewalks & Trees | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mt. Pleasant | Isabella | $35,549 | $0 | $68,165 | $103,714 |
Howell Crosstown Trail Study | Feasibility study for potential non-motorized transportation facility | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Howell | Livingston | $39,800 | $0 | $9,950 | $49,750 |
Homer Linear Park Pathway | Construct Pathway system to Link Parks | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Homer | Calhoun | $240,137 | $0 | $60,034 | $300,171 |
Grand River Ave Pedestrian Corridor | Develop Pedestrians Walkways | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lyon | Oakland | $201,969 | $0 | $134,646 | $336,615 |
Southside Ped/Bike Facility | Construct Ped/Bike facilities | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Battle Creek | Calhoun | $28,035 | $0 | $28,035 | $56,070 |
S Mitchell St Sidewalks | Sidewalk Construction | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cadillac | Wexford | $27,500 | $0 | $27,500 | $55,000 |
Bridge to Bay Trail | Construct 8' Wide Pave Path/Bikeway | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cottrellville | St. Clair | $28,345 | $0 | $24,146 | $52,491 |
I-275 Bike Path | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wayne | Wayne | $234,304 | $0 | $56,295 | $290,598 |
Northville Bike Path | Construct Asphalt Bike Path | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Northville | Oakland | $203,081 | $0 | $87,035 | $290,116 |
Linden County Park Nonmotorized Pathway | Const. 10'' wd. aspalt path w/in Linden County Park, generally along Linden Rd. | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fenton | Genesee | $203,460 | $0 | $130,081 | $333,541 |
Macatawa Nonmotorized Plan | Develop in MACC area | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Park | Ottawa | $26,250 | $0 | $12,929 | $39,179 |
Old US-31 (Oceana Dr) | Construct sidewalks | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rothbury | Oceana | $28,875 | $0 | $9,625 | $38,500 |
M-43 Nonmotorized Path | Construct 12' Nonmotorized Path | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Comstock | Kalamazoo | $204,076 | $0 | $51,019 | $255,095 |
Bike Racks on Buses | Purchase & Mount Bike Racks on Buses | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $29,192 | $0 | $7,298 | $36,490 |
M-66 Pathway | Installation of 8' ped/bike pathway | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | McBain | Missaukee | $43,455 | $0 | $43,455 | $86,910 |
E Chicago St Sidewalk Extension | Construct Sidewalk Extension | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Coldwater | Branch | $36,470 | $0 | $9,117 | $45,587 |
Randall St Sidewalk | Construct sidewalk | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Coopersville | Ottawa | $36,500 | $0 | $22,371 | $58,871 |
SE Michigan Greenways | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lansing | Ingham | $32,230 | $0 | $24,314 | $56,544 |
Silver Creek Pathway | Nonmotorized path | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chocolay | Marquette | $44,773 | $0 | $11,193 | $55,966 |
Bagley Bikeway | Construct bike path on east side | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Alpena | Alpena | $29,369 | $0 | $11,421 | $40,790 |
M-72 Corridor Enhancement | Streetscape including 10' multi-use path | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grayling | Crawford | $231,172 | $0 | $77,057 | $308,229 |
Black Lake Road Bike Lanes | Non-motorized Paved Shoulders | Michigan | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Norton Shores | Muskegon | $227,523 | $0 | $118,580 | $346,104 |
Veterans Memorial Park | Scenic Beautification at Bridge Viewing Area | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Houghton | Houghton | $36,850 | $0 | $16,556 | $53,406 |
Portage Creek Trailway | Nonmotorized Transportation Facility-Construction | Michigan | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $237,500 | $0 | $237,500 | $475,000 |
Chocolay Township US-41 Corridor Enhancement Project | Non-motorized pathway, pedestrian tunnel and natural plantings | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chocolay | Marquette | $1,363,606 | $0 | $266,409 | $1,630,015 |
US-31/M-72/M-37/Grandview Pkwy | Muncie Pedestrian Bridge | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Traverse City | Grand Traverse | $211,200 | $0 | $52,800 | $264,000 |
I-69BL (Saginaw St) Non-Motorized Pathway | Non-Motorized Pathway Construction | Michigan | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Lansing | Ingham | $770,152 | $0 | $379,329 | $1,149,481 |
Michigan Ave Pathway | Construct Ped/Bike Pathway | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marysville | St. Clair | $33,922 | $0 | $33,922 | $67,843 |
Edu Way Sidewalk Construction | Sidewalk construction | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cassopolis | Cass | $42,146 | $0 | $25,831 | $67,977 |
Nonmotorized Facilities | Inventory & develop plan | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ypsilanti | Washtenaw | $19,558 | $0 | $10,075 | $29,633 |
Kalamazoo Pathway Network | Development of Comprehensive Plan | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $98,220 | $0 | $29,338 | $127,558 |
Davitt St Bike Path | Paved Bike Path | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sault Ste Marie | Chippewa | $42,000 | $0 | $14,000 | $56,000 |
US-23/M-17 Crossing Study | Nonmotorized Underpass Crossing Study | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pittsfield | Washtenaw | $37,445 | $0 | $9,361 | $46,806 |
SE Mich Bike Map Study | Development of Bike Routes Map | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lansing | Ingham | $40,925 | $0 | $10,231 | $51,156 |
Gratiot Blvd Ped Bike Pathway | Remove sidewalk & replace w/ 8' bit path | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marysville | St. Clair | $40,000 | $0 | $19,701 | $59,701 |
Negaunee Pedestrian Facility | Construction of Retaining Wall, Curb, Gutter & Sidewalk | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Negaunee | Marquette | $45,001 | $0 | $11,250 | $56,251 |
Silver Lake Sand Dunes Area Nonmotorized Trail | HMA Trail, retaining walls and other trail amenities | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Golden | Oceana | $232,031 | $0 | $154,688 | $386,719 |
M-124 Bike Path | Bike path adjacent to roadway | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Norvell | Jackson | $238,868 | $0 | $59,717 | $298,586 |
Division St Ped/Bike Path | Construct 8' asphalt ped/bike path | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Boyne City | Charlevoix | $45,031 | $0 | $36,843 | $81,874 |
Lansing St Bicycle Path | Construction of separate pedestrian/bicycle path | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Johns | Clinton | $32,822 | $0 | $17,673 | $50,495 |
M-57 and Flint River Trail Extension | Provision of Facilities for Pedestrains and Bicyclists | Michigan | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Montrose | Genesee | $223,639 | $0 | $216,094 | $439,733 |
Truman Parkway Bike/Hike Path | The east side of Truman Parkway. | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bay City | Bay | $32,451 | $0 | $21,634 | $54,085 |
Pinckney Sidewalk Dev | Sidewalk installation | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pinckney | Livingston | $32,408 | $0 | $10,234 | $42,642 |
Bike Racks | Bike racks for transit vehicles | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flint | Genesee | $44,000 | $0 | $11,000 | $55,000 |
Plymouth Rd Pedestrian/Bikeway | Bike Path | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ann Arbor | Washtenaw | $27,000 | $0 | $42,231 | $69,231 |
West Branch Sidewalk/Retaining Wall | Sidewalk, Retaining Wall, Minor Grading | Michigan | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | West Branch | Ogemaw | $41,126 | $0 | $27,417 | $68,543 |
US-31 Bike Path | Construct bike path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Garfield | Grand Traverse | $223,388 | $0 | $55,847 | $279,235 |
Willoughby & Aurelius Rds Sidewalks | Install Sidewalks | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Aurelius | Ingham | $40,000 | $0 | $40,000 | $80,000 |
Harger Line Trail- Trailhead | Trailhead Construction | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Saginaw | Saginaw | $39,942 | $0 | $9,985 | $49,927 |
Wattles Rd Bike Lane | Bit. Bike Lane w/ Pavement Marking and Signing | Michigan | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Emmett | Calhoun | $215,303 | $0 | $92,273 | $307,575 |
Woodruff Rd Multi-Use Path | Construct Paved Multi-Use Pathway | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Brownstown | Wayne | $236,000 | $0 | $59,000 | $295,000 |
I-275 Bike Path | Reconstruction | Michigan | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Novi | Oakland | $711,013 | $0 | $177,752 | $888,765 |
Kalamazoo River Valley Trailway | Trailway study | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalamazoo | Kalamazoo | $35,000 | $0 | $15,000 | $50,000 |
US-41 Non-Motorized Path Resurfacing (Construction) | HMA resurfacing | Michigan | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chocolay | Marquette | $26,824 | $0 | $6,706 | $33,530 |
Southside Ped/Bike Facility | Concrete Sidewalk Construction | Michigan | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Battle Creek | Calhoun | $39,486 | $0 | $39,486 | $78,972 |
Shepherd Trail | Non-motorized trail | Michigan | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shepherd | Isabella | $212,360 | $0 | $82,375 | $294,735 |
Red Cedar Greenway Master Plan | Planning for nonmotorized facilities | Michigan | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Lansing | Ingham | $35,810 | $0 | $10,100 | $45,911 |
Downtown Development | Concrete sidewalk,curb&gutter etc | Michigan | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lake City | Missaukee | $219,977 | $0 | $54,994 | $274,972 |
S Airport Rd Bike/Ped Bikepath | Bike/Ped Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Traverse City | Grand Traverse | $34,000 | $0 | $8,500 | $42,500 |
Gateway Enhance & Bridge Study | Study to determine Cost Effective Method | Michigan | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sault Ste Marie | Chippewa | $35,982 | $0 | $8,995 | $44,977 |
Ripley Bike Path | Bike path | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Alpena | Alpena | $45,000 | $0 | $15,000 | $60,000 |
M-93 Bicycle Lanes | Paved shoulder widening for bicycle lanes | Michigan | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grayling | Crawford | $46,772 | $0 | $13,192 | $59,964 |
Flint River Trailway - U of M | 10' wide bot. trailway ext and bridge connection through U of M | Michigan | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flint | Genesee | $219,974 | $0 | $54,994 | $274,968 |
Ashmun Street Streetscape, TE Grant Section | _Streetscape - Construction pedestrian facilities | Michigan | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sault Ste Marie | Chippewa | $200,000 | $0 | $133,333 | $333,333 |
NW Mich Greenways Project | Regional Greenways Planning | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bear Lake | Kalkaska | $45,019 | $0 | $44,981 | $90,000 |
Washenaw Ave Sidewalk Gap | Construct Concrete Sidewalk | Michigan | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ann Arbor | Washtenaw | $45,000 | $0 | $45,000 | $90,000 |
M-43 Saginaw Hwy | Nonmotorized facility | Michigan | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Delhi | Eaton | $237,628 | $0 | $59,407 | $297,035 |
Honey Creek Ave | Bike Path | Michigan | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cannon | Kent | $46,780 | $0 | $11,695 | $58,475 |
Bicycle Safety Education Project | Study, develop, implement and evaluate a bike safety education project | Michigan | 2013 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Grand Rapids | Kent | $901,321 | $0 | $225,330 | $1,126,651 |
Pere Marquette Trail Case Study | Economic & Community Benefit Study | Michigan | 1999 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Homer | Midland | $204,493 | $0 | $83,579 | $288,073 |
US-31 Scenic Corridor and Landscaping | Aquire right of way for scenic strips (150 feet on each side) and landscaping. | Michigan | 2002 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Bertrand | Berrien | $30,125 | $0 | $7,531 | $37,656 |
White Rock Motorist Park (Additional Scenic Land Purchase) | Acquisition of Scenic Property | Michigan | 2003 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Sherman | Huron | $224,899 | $0 | $56,225 | $281,124 |
M-28 Agate Falls Roadside Park | Purchase ROW from MDNR | Michigan | 1995 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Ontonagon | Ontonagon | $15,763 | $0 | $3,941 | $19,704 |
Falling Waters Non-motorized Trail | Acquisition | Michigan | 2005 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Spring Arbor | Jackson | $69,650 | $0 | $29,850 | $99,500 |
US-31 Scenic Strips | Acquire 150' right-of-way on each side for Scenic Strips | Michigan | 1999 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Bertrand | Berrien | $33,836 | $0 | $8,462 | $42,298 |
I-69 Scenic Strips | Acquire 150' Right-of-way on each side for Scenic Strips | Michigan | 1999 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Kinderhook | Branch | $44,622 | $0 | $11,155 | $55,777 |
Lk MI Roadside Park | Barrier free viewing deck | Michigan | 1995 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Charlevoix | Charlevoix | $8,985 | $0 | $2,246 | $11,232 |
Mackinac Island State Park | Development rights & scenic easements | Michigan | 2001 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Mackinac Island | Mackinac | $415,800 | $0 | $139,283 | $555,083 |
Mich Heritage Route Brochure | Produce brochure for Heritage Route | Michigan | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Lansing | Ingham | $2,000 | $0 | $500 | $2,500 |
Agate Falls Roadside Park | Construct Walks & Viewing Decks | Michigan | 1996 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Interior | Ontonagon | $46,753 | $0 | $11,688 | $58,441 |
State Entry Sign at Indiana Border | Entry Sign | Michigan | 1999 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | New Buffalo | Berrien | $48,000 | $0 | $12,000 | $60,000 |
White Rock Motorist Park | Develop a motorist park | Michigan | 2001 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Sherman | Huron | $176,497 | $0 | $39,794 | $216,291 |
M-185 Mackinac Island State Park | Acquisition of development rights or scenic easements along M-185 | Michigan | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Mackinac Island | Mackinac | $112,900 | $0 | $28,225 | $141,125 |
US-2; Engadine Roadside Park | Install Interpretive path and picnic area | Michigan | 2001 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Moran | Mackinac | $1,141 | $0 | $253 | $1,394 |
M-61/M-18 Streetscape | Streetscape | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Gladwin | Gladwin | $144,500 | $0 | $113,536 | $258,036 |
State Entry Signs (US-2 & US-45) | Placement of Michigan Entry Signs | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Breitung | Dickinson | $7,321 | $0 | $1,623 | $8,945 |
Cass Lake Rd Improvements | Construct Pedestrian/bikeway | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Keego Harbor | Oakland | $140,000 | $0 | $145,714 | $285,714 |
I-75/M-13 Connector | Interchange Landscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Monitor | Bay | $242,642 | $0 | $60,661 | $303,303 |
Belleville Streetscape | Streetscape/Road Replacement/Water Main Replacement | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Belleville | Wayne | $416,559 | $0 | $178,525 | $595,084 |
Entry-Mi/Wi Border Enhancement | brick pavers, landscape plants & Sign | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Menominee | Menominee | $51,187 | $0 | $12,797 | $63,984 |
Thompson Scenic Roadside Park Improvements | Landscaping, accessibility and interpretation of historic grindstones | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Port Austin | Huron | $32,573 | $0 | $0 | $32,573 |
Ford Rd.Transportation Aesthetics Project | Streetscape | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Canton | Wayne | $413,789 | $0 | $840,038 | $1,253,827 |
E 32nd St | Tree Planting | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Holland | Allegan | $11,916 | $0 | $5,107 | $17,023 |
44th Street Corridor Enhancement Phase III | Streetscape enhancements to the 44th Street corridor | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Kentwood | Kent | $97,721 | $0 | $32,574 | $130,295 |
Ionia Downtown Beautification | Plant Perennial Flower Beds | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Ionia | Ionia | $53,333 | $0 | $26,268 | $79,601 |
Nine Mile & Woodward Avenue Median Enhancement | Median beautification & pedestrian safety enhancements | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Ferndale | Oakland | $144,586 | $0 | $36,147 | $180,733 |
M-203 Calumet Historic Route | Streetscape | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Calumet | Houghton | $319,839 | $0 | $79,960 | $399,798 |
E Michigan Ave Streetscape | Streetscaping | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $182,512 | $0 | $60,837 | $243,349 |
Woodward Ave Enhancement | Improve right-of-ways | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Pleasant Ridge | Oakland | $53,490 | $0 | $35,660 | $89,150 |
I-94/US-23 Interchange | Enhanced roadside landscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Pittsfield | Washtenaw | $223,671 | $0 | $55,918 | $279,588 |
Center Rd M-25 Streetscape | Streetscape | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Hampton | Bay | $218,489 | $0 | $0 | $218,489 |
Main Street Streetscape | Streetscape improvements | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Potterville | Eaton | $418,817 | $0 | $179,493 | $598,310 |
City of Hillsdale Streetscape | Streetscape | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Hillsdale | Hillsdale | $412,271 | $0 | $120,783 | $533,055 |
Lawrence Ave Streetscaping M-79 & BL-I69 | Basic Streetscaping work on Lawrence Ave | Michigan | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Charlotte | Eaton | $41,901 | $0 | $25,141 | $67,041 |
Streetscaping along US-41 | Brick paving between curb & sidewalk | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Menominee | Menominee | $33,200 | $0 | $8,300 | $41,500 |
Onaway "Steers the World" Streetscape | Streetscape Improvements | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Onaway | Presque Isle | $19,003 | $0 | $4,751 | $23,754 |
Walter P. Chrysler Freeway (I-75) | Provide & install landscaping and fencing along I-75 | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $223,923 | $0 | $55,981 | $279,904 |
Historic Streetlight Project | Install Streetlights in Historical District | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Constantine | St. Joseph | $70,802 | $0 | $17,701 | $88,503 |
Colfax Avenue Retaining Wall Upgrades | Retaining wall replacement | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Benton Harbor | Berrien | $96,000 | $0 | $24,000 | $120,000 |
Marshall Lighting Project | Install Historical Lighting System | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Marshall | Calhoun | $319,419 | $0 | $79,855 | $399,274 |
Caesar Chavez Ave. (formerly Oakland Ave.) Improvement | Installation of Landscape Amenities | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Pontiac | Oakland | $420,272 | $0 | $105,068 | $525,339 |
S Wayne Rd Streetscape Improvements | Streetscape project to include brick pavers, sidewalks, irrigation and landscapi | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Wayne | Wayne | $148,269 | $0 | $37,067 | $185,336 |
I-275 Interchange Landscaping | General Landscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Romulus | Wayne | $392,368 | $0 | $87,006 | $479,374 |
Wilson Memorial Dr Improvements US-41 | Streetscape Improvements | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Chassell | Houghton | $392,529 | $0 | $160,329 | $552,858 |
17 M Rd Right of Way Landscaping | Landscaping & beautification | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Sterling Heights | Macomb | $138,919 | $0 | $34,730 | $173,649 |
Leelanau Co Scenic Turnouts | Enhance 3 scenic turnouts | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Suttons Bay | Leelanau | $183,126 | $0 | $48,679 | $231,805 |
M-53 Downtown Streetscape | Install trees,lights & brick paving | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Marlette | Sanilac | $238,775 | $0 | $128,571 | $367,346 |
M-53 Landscape Improvements | Landscape improvements | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Marlette | Sanilac | $5,587 | $0 | $1,963 | $7,550 |
Longsdorf Ave Reconstruction | Road reconstruction with landscaping enhancements for beautification | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Riverview | Wayne | $277,310 | $0 | $69,328 | $346,638 |
M-1 Rail Streetscape | Sidewalks, Curbs, Tree planting, Signage, Street lights, Trash receptacles | Michigan | 2014 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $5,000,000 | $0 | $1,250,000 | $6,250,000 |
M-55 Streetscape in Lake City | Streetscape improvements, including walkways, streetlights, & landscaping | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Lake City | Missaukee | $184,915 | $0 | $58,394 | $243,309 |
Village of Breckenridge M-46 Streetscape | Streetscape | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Breckenridge | Gratiot | $197,879 | $0 | $49,469 | $247,348 |
Division Avenue Enhancement | Landscape/streetscape Enhancement Program | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Gaines | Kent | $273,671 | $0 | $273,671 | $547,341 |
N Woodward Loop Project | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Pontiac | Oakland | $411,050 | $0 | $411,050 | $822,100 |
Woodward Ave Corridor | Landscape & Beautification of median | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Royal Oak | Oakland | $80,000 | $0 | $20,000 | $100,000 |
Farwell Streetscape | Streetscape | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Farwell | Clare | $130,742 | $0 | $32,686 | $163,428 |
Newaygo State Street M-37 Streetscape | Streetscape including sidewalk, pavers, lighting, trees | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Newaygo | Newaygo | $224,702 | $0 | $96,301 | $321,003 |
Woodward Ave Median | Median Landscaping Project | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Huntington Woods | Oakland | $80,000 | $0 | $20,000 | $100,000 |
Litchfield Downtown Streetscape Enhancement Project | sidewalk and lighting improvements and pedestrian amenities | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Litchfield | Hillsdale | $177,243 | $0 | $170,293 | $347,536 |
Beautification of Medians | Landscaping of medians & parkways | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Troy | Oakland | $198,035 | $0 | $49,509 | $247,544 |
Main St Tree Planting | Tree Planting Program along Main | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Onsted | Lenawee | $12,531 | $0 | $3,133 | $15,663 |
Mesick Streetscape/M-115 & M-37 | Downtown Streetscape Improvements | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Mesick | Wexford | $295,126 | $0 | $571,462 | $866,588 |
UCCA Woodward Streetscape Improvement Phase Three | Streetscape Improvements including new trees, street lighting, sidewalks, etc. | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $1,463,044 | $0 | $365,761 | $1,828,805 |
Perry St. Interchange Landscaping | Landscaping entire interchange | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Big Rapids | Mecosta | $131,145 | $0 | $32,786 | $163,931 |
US-10 & M-20 Interchange | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Saginaw | Bay | $80,000 | $0 | $20,000 | $100,000 |
M-50 Streetscape in Britton | Streetscape Enhancement | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Britton | Lenawee | $295,497 | $0 | $116,001 | $411,498 |
Capitol Loop Streetscape | Streetscape & beautification | Michigan | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $2,034,426 | $0 | $508,607 | $2,543,033 |
Woodward Ave Landscape | Landscaping & beautification of median | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Birmingham | Oakland | $80,000 | $0 | $20,000 | $100,000 |
Grand River Avenue Streetscaping | Decorative streetlighting, sidewalk trees, boulevard islands, crosswalks, etc. | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $1,486,230 | $0 | $419,193 | $1,905,423 |
Ann Arbor Tree Planting | Tree Planting Enhancement | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Ann Arbor | Washtenaw | $13,014 | $0 | $3,254 | $16,268 |
Streetscape Improvements to Madison Avenue and Hall Street | Curb and gutter, ornamental street lighting, street trees, benches, bulb outs. | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Grand Rapids | Kent | $0 | $660,369 | $0 | $660,369 |
Woodward Avenue | Streetscape | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $398,720 | $0 | $99,680 | $498,400 |
Ashmun Bridge Beautification | Landscape, trees, & sidewalks | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Sault Ste Marie | Chippewa | $39,833 | $0 | $9,958 | $49,791 |
City of Hancock Downtown Streetscape | Lighting, stamped-concrete cross walks, landscaping, & partial sidewalk replace. | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Hancock | Houghton | $224,801 | $0 | $96,343 | $321,144 |
Landscape M-45 | Landscape New Blvd on M-45 | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Allendale | Ottawa | $197,808 | $0 | $65,936 | $263,744 |
I-94 BL (Main Street) Streetscape | Decorative sidewalk, lighting, landscaping, other appurtenances | Michigan | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Benton Harbor | Berrien | $1,173,119 | $0 | $293,298 | $1,466,417 |
Northwestern Hwy. Landscape Development | Landscape Development in the median | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Farmington Hills | Oakland | $381,739 | $0 | $254,493 | $636,232 |
Broadway Street/M-13 Streetscaping | Streetscape enhancements: brick-pattern crosswalks, ornamental streetlighting | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Bay City | Bay | $129,928 | $0 | $94,086 | $224,015 |
US-131 (State St) Beautification | Landscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Big Rapids | Mecosta | $382,669 | $0 | $95,667 | $478,336 |
Downtown Dorr Streetscape Enhancement Project | Nonmotorized and transportation aesthetics | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Dorr | Allegan | $177,084 | $0 | $147,976 | $325,061 |
Eureka Ave. Beautification Project | Eureka Ave. Beautification | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Wyandotte | Wayne | $272,210 | $0 | $272,210 | $544,420 |
Fife Lake Downtown Revitalization | Streetscape | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Fife Lake | Grand Traverse | $383,206 | $0 | $95,802 | $479,008 |
Downtown Plainwell M-89 and Main Street Streetscape Project | Decorative lights, sidewalk, trees, and landscaping | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Plainwell | Allegan | $20,163 | $0 | $5,041 | $25,204 |
Jonesville Roadside Park | Landscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Fayette | Hillsdale | $12,820 | $0 | $3,205 | $16,025 |
W Ave/M-50 Corridor Streetscape | Study to determine streetscape Eng & Designs | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Jackson | Jackson | $42,095 | $0 | $9,335 | $51,430 |
Streetscape Project | Streetscape to include Lights & Sidewalks | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Ironwood | Gogebic | $271,700 | $0 | $67,925 | $339,625 |
City of Flint Gateways Enhancement | Removal and replacement of R.O.W. fence and gateway aesthetics | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Flint | Genesee | $1,461,945 | $0 | $365,486 | $1,827,431 |
Mound Rd Beautification | Landscape Mound Rd Medians | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Warren | Macomb | $224,364 | $0 | $96,156 | $320,520 |
Main Street Phase II Streetscape Enhancements | Landscaping | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Birch Run | Saginaw | $79,007 | $0 | $320,602 | $399,609 |
Okemos Road Streetscape | Remove pavement; Construct curb & gutter, landscaped median, sprinkler system | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Meridian | Ingham | $386,008 | $0 | $165,432 | $551,440 |
US-131 BR - North Park and North Westnedge Gateway | Brick pavers, Decorative Pedestrian-Level Lighting, Landscaping, Other Amenities | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Kalamazoo | Kalamazoo | $78,934 | $0 | $35,463 | $114,398 |
US-127BR Streetscape | Streetscape Project | Michigan | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Ithaca | Gratiot | $133,641 | $0 | $33,410 | $167,051 |
US-131BR Landscaping | Landscaping | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Clam Lake | Wexford | $78,812 | $0 | $19,703 | $98,515 |
District 5 Landscape Fund | Provide landscaping funds | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Grand Rapids | Kent | $12,258 | $0 | $3,064 | $15,322 |
Mich Ave/Wayne Rd Intersection | Streetscape Improvements | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Wayne | Wayne | $132,948 | $0 | $33,237 | $166,185 |
US-131/Cedar Street Combined Continuation | Enhancement of recently completed pathway & bridge & connection to downtown proj | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Kalkaska | Kalkaska | $276,559 | $0 | $69,140 | $345,698 |
Center Avenue Heritage Route Streetscape | Transportation and streetscape enhancements | Michigan | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Bay City | Bay | $963,838 | $0 | $271,855 | $1,235,692 |
Townsend Dr Beautification | Planting trees along roadway | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Houghton | Houghton | $25,701 | $0 | $8,567 | $34,268 |
US-31/M-72 Intersection Enhancement | Landscaping | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Acme | Grand Traverse | $134,112 | $0 | $33,528 | $167,640 |
Clawson Main St & 14 Mile | Streetscaping | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Clawson | Oakland | $149,660 | $0 | $80,586 | $230,246 |
BL-75 from North bound off-ramp to M-72 East/ BL-75 Intersection | Streetscaping w/ new lighting, multi-use path, decorative paving, landscaping | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Grayling | Crawford | $387,380 | $0 | $528,037 | $915,416 |
Village of Kingston M-46 Streetscape | Improving mobility of non-motorized travelers, traffic calming, and streetscapin | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Kingston | Tuscola | $215,813 | $0 | $150,348 | $366,161 |
Eureka/Racho Rds Beautification | Tree Planting along right-of-way | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Taylor | Wayne | $276,559 | $0 | $118,525 | $395,084 |
E Outer Dr Tree Planting | Tree Planting in Center Median | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $54,263 | $0 | $23,255 | $77,518 |
Washtenaw Ave | Planting Trees | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Ann Arbor | Washtenaw | $5,458 | $0 | $5,458 | $10,916 |
Brick St Reconstruction | Reconstruction | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Grand Rapids | Kent | $98,400 | $0 | $24,600 | $123,000 |
Eight Mile Road Beautification | Streetscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Royal Oak | Oakland | $79,586 | $0 | $30,950 | $110,536 |
Downtown Streetscape - Flint and Broadway | Streetscape Improvments | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Lake Orion | Oakland | $444,948 | $0 | $1,908,190 | $2,353,138 |
I-75 Corridor Management Plan | Corridor Management Plan | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Gaylord | Otsego | $40,925 | $0 | $10,231 | $51,156 |
Downtown Streetscape Project | New streetscape in two-block downtown business district | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | New Era | Oceana | $221,699 | $0 | $147,780 | $369,479 |
Merrill M-46 Streetscape | Lighting, Pavers & Landscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Merrill | Saginaw | $244,881 | $0 | $77,331 | $322,212 |
US-31 Corridor | Develop Corridor Management Plan | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Niles | Berrien | $40,925 | $0 | $10,231 | $51,156 |
M-52 Roadside Improvements | Roadside landscaping and entryway sign installation | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Fairfield | Lenawee | $45,465 | $0 | $11,366 | $56,832 |
1994 Wildflower Program | Planting | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $131,997 | $0 | $32,999 | $164,996 |
Downtown Streetscape Phase 4 | Remove & replace | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Ferndale | Oakland | $275,264 | $0 | $148,219 | $423,483 |
Grandville Streetscape | Streetscape Improvements | Michigan | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | Grandville | Kent | $945,171 | $0 | $945,170 | $1,890,341 |
M-1/M-102 Interchange Lighting | Replace existing lighting with aesthetic lighting | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Ferndale | Oakland | $945,172 | $0 | $296,566 | $1,241,738 |
I-75 Landscaping in Hamtramck | Landscape | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Hamtramck | Wayne | $31,484 | $0 | $974 | $32,458 |
Breckenridge M-46 Streepscape | Streetscaping | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Breckenridge | Gratiot | $182,466 | $0 | $0 | $182,466 |
Johnson Street Streetscape | Decorative sidewalk, crosswalks, streetlights, fencing, walls and landscaping. | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Saginaw | Saginaw | $950,979 | $0 | $300,309 | $1,251,288 |
Downtown Streetscape | Streetscape including sidewalks, trees and grates, pavers and lighting. | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Caledonia | Kent | $294,360 | $0 | $73,590 | $367,950 |
I-75 Beautification Project | Granding & Landscaping of I-75 at Northline | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Southgate | Wayne | $200,000 | $0 | $177,358 | $377,358 |
Main St Streetscape | Streetscape Improvements | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Lowell | Kalkaska | $73,657 | $0 | $73,657 | $147,313 |
Main Street Streetscape | Streetscape & Lighting Enhancements | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Middleville | Barry | $405,272 | $0 | $135,091 | $540,363 |
M-46 Streetscape | Streetscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Breckenridge | Gratiot | $206,272 | $0 | $45,740 | $252,013 |
I-75 at Birch Run Rd. Interchange | Beautification | Michigan | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Birch Run | Saginaw | $57,058 | $0 | $80,095 | $137,153 |
Mio Streetscape Project | Streetscape with trees, decorative lighting, and colored, stamped concrete | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Big Creek | Oscoda | $520,416 | $0 | $173,472 | $693,888 |
Tree Planting & Sign Acquisition | Planting of trees & acquis of signs | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Westland | Wayne | $50,000 | $0 | $50,000 | $100,000 |
Melvindale Downtown Development | Install Street Lights,Pavers & Benches | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Melvindale | Wayne | $192,086 | $0 | $48,022 | $240,108 |
US-131 Mancelona Streetscape | Streetscape | Michigan | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Mancelona | Antrim | $105,116 | $0 | $38,878 | $143,994 |
Grand River Ave | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | East Lansing | Ingham | $1,111,218 | $0 | $277,805 | $1,389,023 |
Ford Rd/Central City Parkway Streetscape Project | Streetscape work to improve appearance of transportation corridor | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Westland | Wayne | $344,836 | $0 | $344,836 | $689,673 |
M-32 (Mill Street) Streetscape | Streetscape work | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | East Jordan | Charlevoix | $73,990 | $0 | $18,497 | $92,487 |
M-13 Streetscape Phase II - City of Pinconning | Street Scape, ornamental lighting, decorative pavement, site furnishing | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Pinconning | Bay | $343,765 | $0 | $108,557 | $452,323 |
US-31/33 Streetscape Improvements | Site construction/Streetscape Improvements | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Berrien Springs | Berrien | $343,680 | $0 | $85,920 | $429,600 |
US-10/Mackinaw Landscaping | Landscaping | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Monitor | Bay | $52,500 | $0 | $22,500 | $75,000 |
W Jamet St Streetscape | Streetscape | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Mackinaw City | Emmet | $28,209 | $0 | $28,209 | $56,418 |
Fordney Street Enhancement | Pedestrian safety improvements and beautification | Michigan | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | Saginaw | Saginaw | $343,000 | $0 | $129,293 | $472,293 |
Telegraph Rd Streetscaping | Streetscaping Improvements | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Flat Rock | Wayne | $35,780 | $0 | $35,780 | $71,560 |
Bridgeport Interchange I-75 | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Saginaw | Saginaw | $88,522 | $0 | $22,131 | $110,653 |
Dix-Vernor Streetscape | Streetscape paired with road project | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Dearborn | Wayne | $342,663 | $0 | $228,442 | $571,105 |
US-23 Au Sable River Decorative Bridge Improvements | Placement of ornamental steel or aluminum railings with a powder blue finish | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Au Sable | Iosco | $49,824 | $0 | $12,456 | $62,280 |
Wyoming Rd Beautification | Beautification in Royal Oak Township | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Royal Oak | Oakland | $31,570 | $0 | $10,523 | $42,093 |
44th St Corridor Enhancement Phase II | Streetscape enhancements to intersection and median of 44th Street | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Kentwood | Kent | $58,467 | $0 | $19,489 | $77,956 |
M-39 Entry Islands | Install 4 Landscaped Entry Islands | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Allen Park | Wayne | $58,422 | $0 | $17,451 | $75,872 |
Old 27 S Enhancement | Sidewalk with brick pavers, ornamental trash, benches, lighting, trees and shrub | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Otsego Lake | Otsego | $104,267 | $0 | $44,686 | $148,953 |
Warren Ave Landscaping | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $58,320 | $0 | $14,580 | $72,900 |
Turner Gateway Beautification Project | Streetscape | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Grand Rapids | Kent | $340,808 | $0 | $85,676 | $426,484 |
Streetscaping | Placement of Decorative Lights, Trees w/Grates & Other Amenities | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Beaverton | Gladwin | $346,134 | $0 | $86,533 | $432,667 |
Fennville Downtown (M-89) Streetscape | Streetscape - Sidewalks, Plantings, Benches, Decorative lighting, Etc. | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Fennville | Allegan | $303,152 | $0 | $346,048 | $649,199 |
Anthony Wayne Drive Streetscape | Streetscape | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $525,705 | $0 | $131,426 | $657,131 |
Michigan Ave Streetscape Improvements | Streetscape Enhancements | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Big Rapids | Mecosta | $400,000 | $0 | $641,883 | $1,041,883 |
I-69 M-24 Interchange | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Lapeer | Lapeer | $146,541 | $0 | $36,635 | $183,176 |
Edgerton Street & Ensley Street Streetscape Improvements | Streetscape & Lighting Enhancements | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Edgerton | Montcalm | $324,450 | $0 | $139,050 | $463,500 |
Natural Landscape Tree Planting along I-96 | Plant Spruce in locations to provide a living snow fence | Michigan | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Boston | Ionia | $64,220 | $0 | $16,055 | $80,275 |
Blue Star Hwy & Washington Ave | landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Saugatuck | Allegan | $10,165 | $0 | $6,776 | $16,941 |
Saginaw Road Streetscape Improvements | Streetscape Improvements | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Sanford | Midland | $303,000 | $0 | $101,000 | $404,000 |
Living Snowfence & Beautification, I-96 | Plant 5' tall coniferous trees for beautification and snowfence | Michigan | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Coopersville | Ottawa | $44,165 | $0 | $11,041 | $55,206 |
I-75 Wildflower Planting | Wildflower Planting | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Gaylord | Otsego | $1,775 | $0 | $394 | $2,168 |
Capitol Loop Streetscape - Michigan Avenue phase | Streetscaping including, Planter Island, pavers, concrete, trees, lighting, etc. | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $2,000,000 | $0 | $759,128 | $2,759,128 |
I-75 & Linwood Rd Interchange | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Auburn | Bay | $109,057 | $0 | $27,264 | $136,321 |
Streetscape & City Hall Facade | Streetscape & City Hall Improvements | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Ypsilanti | Washtenaw | $350,000 | $0 | $350,000 | $700,000 |
West Superior St. Aesthetic Improvements | Decorative pedestrian lighting, sidewalk treatments | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Wayland | Allegan | $199,897 | $0 | $102,977 | $302,874 |
Springport Streetscape | Streetscape | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Springport | Jackson | $234,451 | $0 | $86,715 | $321,166 |
Chandler Park Dr Tree Planting | Tree planting in Center median | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $16,966 | $0 | $7,271 | $24,237 |
Mitchell St. Traffic Calming/Streetscape Improvement Project | Traffic Calming Enhancements-Bumpouts, crosswalk treatments, landscaping, etc. | Michigan | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Cadillac | Wexford | $738,231 | $0 | $1,051,542 | $1,789,773 |
Central Business Streetscape | Streetscape in business dist. | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Mt. Clemens | Macomb | $290,000 | $0 | $124,286 | $414,285 |
84th Street Streetscape: Byron Center Beautification | Streetscape | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Byron | Kent | $289,896 | $0 | $201,453 | $491,349 |
St. Joseph Street (M-22) Enhancement (phase 1) | Streetscape and Non-motorized path construction | Michigan | 2013 | 5 | (TE) 5. Landscaping and scenic beautification | Suttons Bay | Leelanau | $313,680 | $0 | $135,477 | $449,157 |
Village of Maybee Downtown Streetscape | Streetscape | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Maybee | Monroe | $86,783 | $0 | $38,115 | $124,898 |
Wayne Rd Corridor Improvements | Tree planting Project | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Wayne | Wayne | $46,456 | $0 | $11,614 | $58,070 |
M-18 Streetscape, Denton Twp | Streetscape | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Denton | Roscommon | $196,014 | $0 | $28,002 | $224,016 |
Main Street Enhancement | Main Street Landscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Eaton Rapids | Eaton | $249,308 | $0 | $66,272 | $315,579 |
US-24 Telegraph / I-94 Single Point Urban Interchange Landscaping | Landscaping at newly reconstructed interchanges at I-94/US-24/Ecorse and in the | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Taylor | Wayne | $726,182 | $0 | $391,021 | $1,117,203 |
M-13/M-84 Bay City Lighting | Decorative lighting paired with roadwork/sidwalk/moving utility project | Michigan | 2013 | 5 | (TE) 5. Landscaping and scenic beautification | Bay City | Bay | $87,356 | $0 | $21,829 | $109,185 |
Third St Beautification Project | Streetscape Central Business District | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Rogers City | Presque Isle | $159,829 | $0 | $39,957 | $199,786 |
Washington Street Streetscaping and Non-Motorized Trail Project | Decorative lighting, landscaping, cross-walk/signal, non-motorized trail | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Marquette | Marquette | $722,885 | $0 | $815,168 | $1,538,053 |
Crystal Falls Superior Ave Streetscape Project | Scenic Beautification and Streetscape amenities | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Crystal Falls | Iron | $516,791 | $0 | $172,264 | $689,055 |
Ypsilanti Streetscape Improvements Phase II | Streetscape Improvements | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Ypsilanti | Washtenaw | $105,691 | $0 | $105,691 | $211,382 |
US-27/M-20 | Landscaping and colorful perennials | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Union | Isabella | $106,164 | $0 | $23,155 | $129,319 |
Nicolet Streetcape Improvements | Streetscape W/Benches, Trees & Fencing | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Mackinaw City | Cheboygan | $17,139 | $0 | $4,285 | $21,423 |
State Street Street Lighting | Street Lighting on State St from Pierce St to Village Park west of Center St | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Fife Lake | Grand Traverse | $168,816 | $0 | $72,350 | $241,166 |
I-275/Ford Rd Interchange | Landscaping of Interchange Area | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Canton | Wayne | $231,151 | $0 | $57,788 | $288,938 |
M-52/Main Street Streetscaping | Brick pavers, decorative level lighting, trees, trash recepticles, benches, etc | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Manchester | Washtenaw | $567,180 | $0 | $175,358 | $742,537 |
3rd/University Avenue Corridor Streetscape | streetscape improvements | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Flint | Genesee | $717,797 | $0 | $307,970 | $1,025,768 |
Richardson-Prairie-Kalamazoo | Beautification | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Vicksburg | Kalamazoo | $65,567 | $0 | $16,392 | $81,959 |
State Fair Transit Ctr | Addition of pedestrian amenities | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $48,000 | $0 | $12,000 | $60,000 |
Village of Reese M-81 Streetscape | Improving M-81 corridor through Downtown Reese w/ lights, sidewalks, landscaping | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Reese | Tuscola | $509,807 | $0 | $339,871 | $849,678 |
M-37 Landscaping | Landscaping on M-37 Blvd | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Grand Rapids | Kent | $159,837 | $0 | $35,443 | $195,281 |
Native Plantings in the I-94/I-69 interchange | Native Plantings | Michigan | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Marshall | Calhoun | $87,536 | $0 | $21,884 | $109,420 |
Mexicantown-International Crossing | Landscaping of Mexicantown area | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $508,000 | $0 | $127,000 | $635,000 |
Michigan Ave/Pinckney Rd Streetscape/M-155 | Installation of trees, planting, asphalt removal, curbs, lighting, and ped. amen | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Howell | Livingston | $106,472 | $0 | $106,472 | $212,944 |
I-94/Ecorse Interchange | Beautification from Inkster Rd | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Taylor | Wayne | $88,886 | $0 | $29,629 | $118,514 |
Cross Street Corridor Nonmotorized Enhancement Project | Streetscape and non-motorized | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Ypsilanti | Washtenaw | $58,712 | $0 | $15,520 | $74,232 |
Downtown/Gateway Streetscaping Project | Streetscaping | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | L'Anse | Baraga | $250,000 | $0 | $612,069 | $862,069 |
St. Louis Streetscape | Decorative lighting, benches, trees with grates & guards, and stamped concrete | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | St. Louis | Gratiot | $233,329 | $0 | $58,332 | $291,662 |
Landscaping M-37 | Landscape planting in corridor | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Kentwood | Kent | $102,414 | $0 | $25,603 | $128,017 |
Five Lakes Tree Planting | Replace trees that were destroyed in the September windstorm. | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Livingston | Otsego | $59,200 | $0 | $14,800 | $74,000 |
Clare M-115 Streetscape | Streetscape | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Clare | Clare | $309,659 | $0 | $77,415 | $387,074 |
M-32 Streetscape | Streetscape the western gateway into the City of Alpena including trees and deco | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Alpena | Alpena | $331,921 | $0 | $149,124 | $481,044 |
Grand Blanc Road Streetscape | Brickpavers,trees decorative streetlights,landscaping,sidewalk,street amentities | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Grand Blanc | Genesee | $547,507 | $0 | $392,625 | $940,132 |
M-84 Enhancements - Saginaw Charter Township & Kochville Township | Streetscape Eng & Design and Construction | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Saginaw | Saginaw | $564,480 | $0 | $426,403 | $990,883 |
Phase II Downtown Streetscape Project- Lafayette Street Improvements | Beautification | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | South Lyon | Oakland | $162,618 | $0 | $224,472 | $387,090 |
M-50 Streetscape | Streetscape project to construct lighting and landscaping | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Brooklyn | Jackson | $329,723 | $0 | $106,429 | $436,152 |
Landscape W of Detroit Metro Airport | Tree Planting on State Trunkline include 3 interchanges | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Romulus | Wayne | $328,872 | $0 | $82,218 | $411,090 |
Mid Town Inkster Streetscape | Streetscape enhancement | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Inkster | Wayne | $479,323 | $0 | $119,831 | $599,154 |
M-22 Scenic Turnouts | Construct 2 barrier free ped decks | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Traverse City | Leelanau | $18,266 | $0 | $4,567 | $22,833 |
M-50 from Chicago Street to Riverside Drive | Streetscape project to construct lighting and landscape features | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Brooklyn | Jackson | $310,681 | $0 | $77,670 | $388,352 |
Main St Enhancement | Landscape/infrastructure improve | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Plymouth | Wayne | $101,610 | $0 | $25,402 | $127,012 |
Division Avenue Enhancement - Phase 2 | Landscape/streetscape Enhancement | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Gaines | Kent | $288,882 | $0 | $288,882 | $577,764 |
Center St Streetscape | Streetscape improvements and refurbishments | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Douglas | Allegan | $200,250 | $0 | $66,750 | $267,000 |
Downtown Streetscape | Streetscape | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Chesaning | Saginaw | $163,213 | $0 | $163,213 | $326,426 |
Holly Streetscape | Streetscape enhancment | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Holly | Oakland | $327,168 | $0 | $109,056 | $436,224 |
M-45/Lk Michigan Dr | Landscaping & Streetscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Allendale | Ottawa | $100,246 | $0 | $26,648 | $126,893 |
DDA Phase II Streetscape | Decorative street lighting, brick pavers, and decor accent walls | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Melvindale | Wayne | $311,977 | $0 | $77,994 | $389,971 |
Streetscaping | Decorative Lights, Trees w/Grates & Other Amenities | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Hayes | Clare | $311,498 | $0 | $77,874 | $389,372 |
Western Avenue Streetscape | Improving streetscape | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Muskegon | Muskegon | $325,460 | $0 | $126,568 | $452,028 |
Downtown Northville Streetscape Enhancement Project | Sidewalk improvements, retrofit street lighting, and new trees and perennials | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Northville | Wayne | $685,880 | $0 | $685,880 | $1,371,760 |
N. Clinton Ave. Streetscape | Installation of new street lights, concrete/concrete pavers, crosswalks, landsca | Michigan | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | St. Johns | Clinton | $543,460 | $0 | $135,865 | $679,325 |
Clio & Dodge Rd Rest Area | Landscape | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Vienna | Genesee | $100,578 | $0 | $25,145 | $125,723 |
Mission St Enhancement | Install brick pavers, trees & Sidewalks | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Mt. Pleasant | Isabella | $100,780 | $0 | $100,780 | $201,560 |
US-31/ Colby Rd | Landscaping | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Whitefish | Muskegon | $90,915 | $0 | $22,729 | $113,644 |
Johannesburg Town Center Streetscape | Construction of Sidewalks, Decorative Lighting, Trees, and Amenities | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Charlton | Otsego | $288,769 | $0 | $119,294 | $408,063 |
W Grand Boulevard/Woodward | Perform median enhancement | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $52,000 | $0 | $13,000 | $65,000 |
Tree & Picnic Table Enhancement | Place 8 Handicap Accessible Picnic Tables & Plant 200 Trees | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Mackinac Island | Mackinac | $25,134 | $0 | $6,283 | $31,417 |
Wildflower Planting | Planting | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $91,172 | $0 | $22,793 | $113,965 |
Bridgman Lake Street Aesthetics Enhancement Project | Sidewalk, landscaping, and lighting upgrade | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Bridgman | Berrien | $555,100 | $0 | $298,900 | $854,000 |
M-42 Streetscape in Manton | Streetscaping | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Manton | Wexford | $287,277 | $0 | $85,809 | $373,086 |
State St. M-15 & Flint St Streetscape Master Plan | Streetscape Master Plan for M-15 & Flint St | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Davison | Genesee | $24,552 | $0 | $14,419 | $38,971 |
US-223 Corridor Enhancement | Corridor Enhancement / Streetscape / Lighting | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Blissfield | Lenawee | $542,704 | $0 | $267,302 | $810,005 |
Downtown Streetscape Project | Streetscaping | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Lake Linden | Houghton | $160,685 | $0 | $349,751 | $510,436 |
M-25 & M-90 Landscaping | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Lexington | Sanilac | $1,420 | $0 | $1,420 | $2,840 |
Kelly Road Median Landscaping | Landscaping of twelve medians islands | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Eastpointe | Macomb | $88,917 | $0 | $48,417 | $137,334 |
Lower Woodward Cross Streets Improvement Project | Aesthetic upgrades to sidewalk, curb, installation of ornamental street lighting | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $705,255 | $0 | $176,314 | $881,569 |
Main St Enhancement | Streetscape | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Eaton Rapids | Eaton | $145,689 | $0 | $41,092 | $186,781 |
US-10/Bay City Rd Interchange | Landscaping | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Midland | Bay | $336,813 | $0 | $84,203 | $421,016 |
Moross/Mound/Dix Rds Tree Planting | Plant trees in boulevard median | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $48,960 | $0 | $12,240 | $61,200 |
Metamora Streetscape Improvement Project | Streetscape Project | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Metamora | Lapeer | $196,002 | $0 | $130,668 | $326,670 |
Downtown Coldwater Streetscape Enhancement Project | Streetscape | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Coldwater | Branch | $103,909 | $0 | $146,134 | $250,043 |
I-69 Southbound Landscape for Turkeyville Rest Area | Landscape for Turkeyville Rest Area Facility | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Marshall | Calhoun | $49,233 | $0 | $12,308 | $61,541 |
Mound Rd Landscaping | Landscape Mound Rd Medians | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Sterling Heights | Macomb | $160,256 | $0 | $40,064 | $200,320 |
Grand Island Harbor Scenic Turnout | Replace Interpretive Display | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Munising | Alger | $10,079 | $0 | $2,520 | $12,598 |
US-12 (Michigan Ave.) Corridor | Tree planting & landscape improvements | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Wayne | Wayne | $180,125 | $0 | $45,031 | $225,156 |
Plymouth Rd Corridor | Improvements within ROW | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Livonia | Wayne | $193,408 | $0 | $236,388 | $429,796 |
Sturgis Downtown Streetscape Project | Streetscape enhancements | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Sturgis | St. Joseph | $193,847 | $0 | $416,641 | $610,488 |
I-75 Bus. Spur in Sault Ste. Marie | Tree plant on I-75 | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Sault Ste Marie | Chippewa | $179,992 | $0 | $44,998 | $224,989 |
Woodward Avenue Streetscape Enhancement Project, Phase 4 | Streetscape Enhancements | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $2,594,532 | $0 | $840,369 | $3,434,901 |
Oakland Ave Streetscape | Streetscape improvements on Oakland Ave | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Highland Park | Wayne | $335,924 | $0 | $83,981 | $419,904 |
State Entry Sign | Sign Installation | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Port Huron | St. Clair | $59,078 | $0 | $14,773 | $73,851 |
I-675 Bypass Landscaping | Rehabilitate Existing Landscape | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Saginaw | Saginaw | $334,998 | $0 | $83,750 | $418,748 |
US-31 State Entry Sign | Entry Sign | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Bertrand | Berrien | $63,030 | $0 | $15,758 | $78,788 |
City of Ithaca Streetscape | Streetscape | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Ithaca | Gratiot | $103,400 | $0 | $25,850 | $129,250 |
Shepherd Streetscape | Streetscape | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Shepherd | Isabella | $307,902 | $0 | $76,976 | $384,878 |
Delray Community/I-75 Screen Wall | Screening wall to improve aesthetics | Michigan | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $161,348 | $0 | $40,337 | $201,686 |
West Vernor / Woodmere to Clark Streetscape | Streetscape (sidewalk, lighting and landscaping) | Michigan | 2013 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $3,523,796 | $0 | $781,392 | $4,305,188 |
Landscaping I-75 & M54 | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Grand Blanc | Genesee | $89,095 | $0 | $22,274 | $111,368 |
Pontiac Trail Streetscape | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Walled Lake | Oakland | $201,354 | $0 | $63,586 | $264,940 |
W Outer Dr Tree Planting | Tree planting in Center Median | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $103,566 | $0 | $44,386 | $147,952 |
I-94 Entryway Landscaping | Landscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | New Buffalo | Berrien | $48,800 | $0 | $12,200 | $61,000 |
Gratiot streetscape - sidewalk improvement, benches, lighting, tree grates, tree | Mill and resurface w/ signs, pavement marking, signal upgrade and landscaping | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $2,656,731 | $0 | $664,183 | $3,320,915 |
M-90 Downtown Streetscape Improvement | Reconstruct sidewalks, crosswalks, install dec. lighting, trees, benches and rd | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Brown City | Sanilac | $160,836 | $0 | $181,984 | $342,820 |
M-39 Landscaping | Landscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Dearborn | Wayne | $536,385 | $0 | $118,942 | $655,326 |
I-196/Chicago Dr Interchange | Interchange beautification | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Zeeland | Ottawa | $164,281 | $0 | $41,070 | $205,351 |
Eaton Rapids Main Street Transportation Improvements | Transportation enhancements | Michigan | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Eaton Rapids | Eaton | $41,619 | $0 | $34,052 | $75,670 |
Landscape Schoenherr Rd Median | Landscape Median of Schoenherr Rd | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Sterling Heights | Macomb | $88,000 | $0 | $22,000 | $109,999 |
I-75 Five Lakes Tree Planting | Replace Storm Damaged Trees | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Livingston | Otsego | $36,144 | $0 | $9,036 | $45,180 |
I-194/M-66 & I-94 BL/Dickman Rd Interchange Landscaping | Landscaping in Interchange | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Battle Creek | Calhoun | $84,648 | $0 | $21,162 | $105,810 |
Downtown Streetscape Improvements Project | Streetscape including plantings and pedestrian amenities | Michigan | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | Ironwood | Gogebic | $322,047 | $0 | $202,021 | $524,068 |
Wildflowers & Trees Brochures | Update & Print Brochures for Public Distribution | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $19,814 | $0 | $4,953 | $24,767 |
Schoenherr Rd ROW Landscaping, Metropolitan Parkway Median Landscaping | Landscaping; Median tree planting | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Sterling Heights | Macomb | $113,404 | $0 | $29,270 | $142,674 |
Great Sand Bay Shoreline Restoration | Restorative planting and roadside park improvements | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Eagle Harbor | Keweenaw | $32,026 | $0 | $29,563 | $61,589 |
Wildflowers & Trees Brochures- reprint | Update & Print Brochures for Public Distribution | Michigan | 2014 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $5,814 | $0 | $1,453 | $7,267 |
M-33 Streetscape - Comins in Clinton Township | Streetscape | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Comins | Oscoda | $257,286 | $0 | $28,992 | $286,278 |
E Mich Ave Streetscape | Streetscaping | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $190,626 | $0 | $63,542 | $254,168 |
Southfield Rd (M-39) Enhancement | Install landscape & reconfigure lanes | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Allen | Hillsdale | $84,695 | $0 | $28,232 | $112,926 |
US-12 Streetscape | Streetscape | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Clinton | Lenawee | $750,890 | $0 | $780,727 | $1,531,617 |
Superior Rd Beautification | Tree Planting along right-of-way | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Taylor | Wayne | $84,945 | $0 | $36,405 | $121,350 |
Main St Landscape | Streetscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Frankenmuth | Saginaw | $249,008 | $0 | $195,649 | $444,658 |
Landscaping Ionia St Off-ramp | Landscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Grand Rapids | Kent | $112,906 | $0 | $25,037 | $137,943 |
Jackson Road Landscaping | Enhancement | Michigan | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Scio | Washtenaw | $92,105 | $0 | $23,026 | $115,131 |
M-44 Blvd | Landscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Plainfield | Kent | $112,796 | $0 | $25,338 | $138,134 |
Entryway Landscaping US-31 | Landscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Bertrand | Berrien | $112,741 | $0 | $28,185 | $140,926 |
Downtown Edmore Streetscape | Streetscape Improvement | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Edmore | Montcalm | $60,000 | $0 | $38,361 | $98,361 |
US-131 BR (Mitchell St) | Landscaping & aesthetic improvements | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Cadillac | Wexford | $157,593 | $0 | $39,398 | $196,991 |
Grand River Downtown Improvement | Install trees grates curb ext ped cross | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Laingsburg | Shiawassee | $23,990 | $0 | $7,997 | $31,986 |
Divison Avenue and 28th Street Gateway Project | Transportation Aesthetic | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Grand Rapids | Kent | $35,054 | $0 | $8,764 | $43,818 |
5 Mile and Beech Daly Roads Streetscape | Aesthetic and safety Improvements | Michigan | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | Redford | Wayne | $402,129 | $0 | $380,096 | $782,224 |
Capitol Loop M. L. K. | Capitol Loop Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $180,633 | $0 | $45,158 | $225,791 |
Williamston Streetscape/M-43 Grand River | Provide aesthetic improvements to the downtown corridor | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Williamston | Ingham | $402,458 | $0 | $329,392 | $731,850 |
Saugatuck/Douglas Intersection | Landscape Intersection | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Saugatuck | Allegan | $10,509 | $0 | $2,627 | $13,137 |
I-96 Topsoil Replacement | Earth excavation, topsoil replacement | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $23,812 | $0 | $5,953 | $29,765 |
Louvigny Streetscape Project | Enhance landscape-install concrete sidewalk pavers, trees, lights, sod & benches | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Mackinaw City | Emmet | $112,155 | $0 | $52,779 | $164,934 |
Village of Deerfield Downtown Streetscape Enhancement | Streetscape enhancement along the central business district and at major access | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Deerfield | Lenawee | $204,750 | $0 | $51,187 | $255,937 |
Auburn Rd Streetscape | Streetscape Improvements | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Auburn Hills | Oakland | $750,000 | $0 | $1,173,077 | $1,923,077 |
Norway Main Street Streetscape | sidewalks, lighting, landscaping | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Norway | Dickinson | $204,875 | $0 | $204,875 | $409,750 |
Eureka Ave Landscaped Median | Landscape Median Viaducts | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Wyandotte | Wayne | $36,451 | $0 | $36,451 | $72,902 |
Greenfield Road Landscaping | Landscape median boulevard | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Southfield | Oakland | $23,694 | $0 | $5,923 | $29,617 |
M-28 Agate Falls Roadside Park | Improve walkways & trails | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Ontonagon | Ontonagon | $40,646 | $0 | $10,161 | $50,807 |
Metropolitan Parkway Landscaping | Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Sterling Heights | Macomb | $157,895 | $0 | $39,474 | $197,369 |
M-19 Entry corridor, Ubly | Gateway Landscape along M-19 at southern entrance to the Village of Ubly | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Ubly | Huron | $36,539 | $0 | $21,460 | $57,999 |
Pewabic Pottery Area Streetscape Improvement Project | Streetscape Improvements | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $179,488 | $0 | $44,872 | $224,360 |
1993 Wildflower Planting | Wildflower Planting | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $119,817 | $0 | $29,954 | $149,771 |
Streetscape Rath Ave & James St | Install walkways, site lighting, trees & grates. | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Ludington | Mason | $248,641 | $0 | $82,880 | $331,522 |
Business Corridor Streetscape | Planting trees & decorative pavers | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Berkley | Oakland | $357,105 | $0 | $153,045 | $510,150 |
Greg Banton Circle | Beautification & Landscaping | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Homer | Calhoun | $10,720 | $0 | $5,280 | $16,000 |
2008 M-113 Streetscape Project | Streetscape | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Kingsley | Grand Traverse | $175,093 | $0 | $267,108 | $442,201 |
Woodside Ave Streetscaping | Streetscape w/Trees, Benches & Fixtures | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Essexville | Bay | $35,024 | $0 | $8,756 | $43,780 |
Freeway Corridor Management Plan | Develop Corridor Management Plan | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Kalamazoo | Kalamazoo | $55,661 | $0 | $13,915 | $69,576 |
M-19/32 Mile Rd to Oak St | Streetscape & Landscape Improvements | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Richmond | Macomb | $118,925 | $0 | $142,412 | $261,337 |
M-59 Corridor Streetscape Plan | Develop landscape/streetscape | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Howell | Livingston | $67,111 | $0 | $39,415 | $106,526 |
Wildflower Planting | Wildflower planting | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Alamo | Kalamazoo | $118,896 | $0 | $29,724 | $148,620 |
Newberry Downtown Streetscape | Contruct boulevards, sidewalks, pavers, lighting & trees | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Newberry | Luce | $314,947 | $0 | $78,737 | $393,684 |
W Portage Ave Screetscape | Roadway Upgrade & Streetscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Sault Ste Marie | Chippewa | $355,971 | $0 | $131,661 | $487,632 |
M-53 Through Almont | Lighting & Landscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Almont | Lapeer | $118,563 | $0 | $118,563 | $237,127 |
W MI Ave Enhancement | Landscaping beautification | Michigan | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Marshall | Calhoun | $23,335 | $0 | $10,001 | $33,335 |
Lay Avenue Streetscape Enhancement | Streetscape Enhancement | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Iron River | Iron | $259,920 | $0 | $419,226 | $679,146 |
Division Dr Aesthetic Project | Tree & Wildflower Planting | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Marshall | Calhoun | $55,778 | $0 | $18,593 | $74,371 |
Webberville Streetscape | Street enhancement including brick pavers, planters, decorative lights, etc. | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Webberville | Ingham | $259,705 | $0 | $165,097 | $424,802 |
U-12 (Michigan Ave) Landscaping | Landscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Dearborn | Wayne | $114,450 | $0 | $28,163 | $142,612 |
Clare Welcome Center | Landscape planting & Irrigation | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Grant | Clare | $84,546 | $0 | $19,892 | $104,438 |
Warren Avenue Streetscape Phase II | Landscape enhancements, parking/pedestrian bumpouts, colored-stamped concrete | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Dearborn | Wayne | $759,540 | $0 | $759,540 | $1,519,080 |
Eaton Rapids Main Street Transportation Improvements | Transportation enhancements | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Eaton Rapids | Eaton | $0 | $842,076 | $0 | $842,076 |
Downtown Streetscape Renovation | Renovation of Downtown | Michigan | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Dansville | Ingham | $147,874 | $0 | $36,968 | $184,842 |
Beaverton Streetscape | Ornamental lighting, pedestrian crossings, 10' paths and brick paving. | Michigan | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Beaverton | Gladwin | $114,764 | $0 | $73,070 | $187,834 |
Downtown Streetscape Project | New streetscape in 5 block downtown business district | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Central Lake | Antrim | $351,878 | $0 | $87,970 | $439,848 |
Landscape Gerald R. Ford International Airport | Airport/W Michigan Gateway Landscape Enhancement Program | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Cascade | Kent | $761,100 | $0 | $761,100 | $1,522,200 |
Mich Ave Corridor Improvements | Tree planting program & landscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Wayne | Wayne | $168,759 | $0 | $42,190 | $210,949 |
M-37 Streetscape in Buckley | Streetscape improvements | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Buckley | Wexford | $15,457 | $0 | $3,864 | $19,321 |
Partnership Park Redevelopment | Streetscape improvements including decorative street lighting and development of | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Jackson | Jackson | $259,264 | $0 | $202,910 | $462,174 |
I-196/32nd Ave Interchange | Landscaping Cloverleafs | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Hudsonville | Ottawa | $117,073 | $0 | $29,268 | $146,341 |
Kalamazoo Area Pedestrian and Gateway Improvements | Ped. improvements, aesthetic treatments; welcome, wayfinding signs (non-part.) | Michigan | 2014 | 5 | (TE) 5. Landscaping and scenic beautification | Kalamazoo | Kalamazoo | $117,266 | $0 | $78,177 | $195,443 |
Watervliet Rest Area | Landscaping | Michigan | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Watervliet | Berrien | $118,368 | $0 | $29,592 | $147,960 |
Kearsley Streetscape | Streetscape improvements in the Flint Cultural Center area | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Flint | Genesee | $353,297 | $0 | $468,324 | $821,621 |
M-81 Streetscape | Ornamental lighting and decorative paving | Michigan | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Caro | Tuscola | $111,300 | $0 | $166,950 | $278,250 |
M-13 Streetscape, Pinconning | Street scape, ornamental lighting, decorative pavement, site furnishings, landsa | Michigan | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Pinconning | Bay | $414,299 | $0 | $24,531 | $438,830 |
N Westnedge Ave Wildflower Beautification Project | Wildflower plantings | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Cooper | Kalamazoo | $72,218 | $0 | $18,055 | $90,273 |
Oscoda Roadside Park Boardwalk | Construct a boardwalk that will be handicap accessible | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Oscoda | Iosco | $142,161 | $0 | $35,540 | $177,701 |
M-45 Lake Michigan Dr - Phase II | Landscaping of New Blvd | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Allendale | Ottawa | $574,295 | $0 | $191,432 | $765,727 |
Old US-27/Business I-75 & M-32 Streetscape and Pedestrian Master Plan | Streetscape & Pedestrian Master Plan for Old 27/Bus I-75 & Portion of M-32 | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Gaylord | Otsego | $25,700 | $0 | $17,133 | $42,833 |
M-37 Streetscape in Buckley - Part 1 | Streetscape improvements | Michigan | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Buckley | Wexford | $249,131 | $0 | $62,283 | $311,414 |
I-94 W - Landscape for Marshall Rest Area | Landscape for Marshall Rest Area Facility | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Marengo | Calhoun | $16,906 | $0 | $4,226 | $21,132 |
Rest Area Tree Planting | Planting of shade trees | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Lansing | Ingham | $18,679 | $0 | $4,670 | $23,349 |
Village of Lake Odessa - Fourth Avenue Streetscape and Reconstruction | Streetscape, Road Reconstruction and Utility Improvements | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Lake Odessa | Ionia | $254,568 | $0 | $264,959 | $519,527 |
Cedarville Streetscape | Lighting, Electrical & Landscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Clark | Mackinac | $29,062 | $0 | $19,374 | $48,436 |
E Belle Ave, 100ft E of M-52 | Landscaping & Signage | Michigan | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | St. Charles | Saginaw | $24,000 | $0 | $8,000 | $32,000 |
I-69 Entryway/Interchange Landscaping | Landscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Kinderhook | Branch | $191,397 | $0 | $47,849 | $239,246 |
US-12/I-275 Landscaping | Landscaping | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Canton | Wayne | $174,086 | $0 | $43,521 | $217,607 |
Woodward Ave/M-1 Streetscape | Streetscape to include landscaping, trees, pathway, irrigation,benches and trash | Michigan | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Pleasant Ridge | Oakland | $158,124 | $0 | $67,767 | $225,891 |
Arts District Beautification Project | Sidewalks, Roadway and Bike Lane Construction, Landscaping | Michigan | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Benton Harbor | Berrien | $744,607 | $0 | $188,365 | $932,971 |
M-19 Streetscape | Landscaping & Streetscaping | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Yale | St. Clair | $92,000 | $0 | $92,000 | $183,999 |
M-65 Streetscape | Streetscape | Michigan | 2013 | 5 | (TE) 5. Landscaping and scenic beautification | Whittemore | Iosco | $174,283 | $0 | $63,653 | $237,936 |
Median Landscape | Typical blvd (median only) tree planting | Michigan | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Detroit | Wayne | $110,311 | $0 | $24,461 | $134,772 |
Sojourner Truth Parkway (I-194/M-66) Gateway Screening Wall | Gateway and Downtown Enhancement | Michigan | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Battle Creek | Calhoun | $142,040 | $0 | $213,060 | $355,100 |
West Road Streetscape Project-Riverside Drive to Veteran's Parkway | Streetscape improvements and ornamental lighting | Michigan | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Trenton | Wayne | $158,967 | $0 | $39,742 | $198,709 |
8 Mile RD Median Landscaping | Plants Perennials & Evergreens | Michigan | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Ferndale | Oakland | $16,083 | $0 | $6,893 | $22,975 |
International Gateway Signage | Placement of New "Welcome to Michigan" sign | Michigan | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Sault Ste Marie | Chippewa | $48,000 | $0 | $12,000 | $60,000 |
City of Grayling M-72/I-75 BL Streetscape | Streetscape Items, brick pavers, trees, and decorative lights | Michigan | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Grayling | Crawford | $199,946 | $0 | $49,987 | $249,933 |
Eureka Rd Improvements | Tree Planting | Michigan | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Southgate | Wayne | $191,778 | $0 | $127,852 | $319,630 |
Houghton Streetscape and Historic Preservation Project | Construction of brick surface, historic light fixtures, sidewalks | Michigan | 2009 | 6 | (TE) 6. Historic preservation | Houghton | Houghton | $108,596 | $0 | $42,774 | $151,370 |
Ellis Barn Preservation/US-24 | Preservation of a transportation related historical structure by relocation | Michigan | 2002 | 6 | (TE) 6. Historic preservation | Springfield | Calhoun | $570,796 | $0 | $142,699 | $713,495 |
Lighthouse Documentary | Film completion, broadcast and VHS distribution | Michigan | 2001 | 6 | (TE) 6. Historic preservation | Lansing | Ingham | $40,000 | $0 | $10,000 | $50,000 |
US-12 (Chicago Street) | Historic District - Lighting | Michigan | 2001 | 6 | (TE) 6. Historic preservation | Coldwater | Branch | $138,200 | $0 | $34,550 | $172,749 |
Historic Walkway Preservation | Historic rehabilitation of the Schoolcraft and Johnston houses and Kemp building | Michigan | 2001 | 6 | (TE) 6. Historic preservation | Sault Ste Marie | Chippewa | $76,000 | $0 | $19,000 | $95,000 |
Cherry St Restoration | Rehabilitation & Restoration | Michigan | 2001 | 6 | (TE) 6. Historic preservation | Grand Rapids | Kent | $145,349 | $0 | $118,922 | $264,271 |
Waterworks Park Perimeter | Research historic resourses, lighting & Landscaping | Michigan | 1993 | 6 | (TE) 6. Historic preservation | Detroit | Wayne | $6,750 | $0 | $6,750 | $13,500 |
The Road Building Project | Planning for an exhibit | Michigan | 1998 | 6 | (TE) 6. Historic preservation | Dearborn | Wayne | $86,854 | $0 | $21,713 | $108,567 |
Village of Laurium Historic Preservation - Const | Historic Preservation including Granitoid Pavement, curbing, sidwalks, lighting | Michigan | 2013 | 6 | (TE) 6. Historic preservation | Laurium | Houghton | $731,065 | $0 | $182,766 | $913,831 |
Henry Ford Museum Depot | Historic Depot Restoration | Michigan | 1994 | 6 | (TE) 6. Historic preservation | Dearborn | Wayne | $122,640 | $0 | $30,660 | $153,300 |
Houghton Streetscape and Historic Preservation Project | Design of brick surfact, historic light fixture, sidewalks | Michigan | 2009 | 6 | (TE) 6. Historic preservation | Houghton | Houghton | $829,749 | $0 | $527,549 | $1,357,298 |
MotorCities Wayside Exhibits | Wayside interpretive signage | Michigan | 2006 | 6 | (TE) 6. Historic preservation | Detroit | Wayne | $260,321 | $0 | $65,080 | $325,402 |
Historic Brick Restoration of S. Nottawa St. - P1 | historic brick street restoration | Michigan | 2014 | 6 | (TE) 6. Historic preservation | Sturgis | St. Joseph | $470,482 | $0 | $307,047 | $777,529 |
Streetscape International Cross, 21st St. | Landscape & Beautification | Michigan | 1995 | 6 | (TE) 6. Historic preservation | Detroit | Wayne | $347,058 | $0 | $86,765 | $433,823 |
M-34 Main Streetscape | Landscaping, Hist lights, brick paving | Michigan | 1995 | 6 | (TE) 6. Historic preservation | Hudson | Lenawee | $210,755 | $0 | $140,503 | $351,258 |
Village of Laurium Historic Preservation | Historic Preservation including Granitoid Pavement, curbing, sidwalks, lighting | Michigan | 2012 | 6 | (TE) 6. Historic preservation | Laurium | Houghton | $73,302 | $0 | $18,326 | $91,628 |
Quincy St Hist Dist Streetscaping | Streetscaping & restoration | Michigan | 1995 | 6 | (TE) 6. Historic preservation | Hancock | Houghton | $54,356 | $0 | $13,589 | $67,945 |
Michigan Historic Bridge Inventory | Historic bridge inventory survey of bridges built 1956-1965, update1995 survey | Michigan | 2006 | 6 | (TE) 6. Historic preservation | Lansing | Ingham | $232,757 | $0 | $58,189 | $290,946 |
Historic Facade Restoration | Restore historic facade on buildings | Michigan | 1994 | 6 | (TE) 6. Historic preservation | Linden | Genesee | $106,190 | $0 | $26,547 | $132,737 |
Centennial Celebration | Publications historic commemorative items, displays | Michigan | 2004 | 6 | (TE) 6. Historic preservation | Statewide | Statewide | $93,055 | $0 | $23,264 | $116,318 |
US-31/Mitchell Street Bridge Restoration - Const | Replacement restoration of concrete components and safety improvments | Michigan | 2013 | 6 | (TE) 6. Historic preservation | Petoskey | Emmet | $1,606,209 | $0 | $356,172 | $1,962,381 |
Mandatory Boiler Inspection & Repair of Steam Locomotive Pere Maquette 1225 | Maintenance of an historic transportation artifact | Michigan | 2011 | 6 | (TE) 6. Historic preservation | Owosso | Shiawassee | $346,104 | $0 | $178,296 | $524,400 |
Archways to Our Past | Film completion,Broadcast,Purchase & VHS distribution | Michigan | 1999 | 6 | (TE) 6. Historic preservation | Lansing | Ingham | $41,324 | $0 | $10,331 | $51,656 |
Michigan Ave/US-12 | Sdwks, 300 trees/100 grates, lighting | Michigan | 2001 | 6 | (TE) 6. Historic preservation | Detroit | Wayne | $235,240 | $0 | $105,688 | $340,928 |
Wealthy St. Steetscape | Sreetscape | Michigan | 2001 | 6 | (TE) 6. Historic preservation | Grand Rapids | Kent | $110,988 | $0 | $43,162 | $154,151 |
Rehabilitation/Restoration of Cherry St | Rehabilitation/Restoration of a Historic Brick Street | Michigan | 2002 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Grand Rapids | Kent | $303,913 | $0 | $211,194 | $515,107 |
W First Streetscape IV | Ped crosswalk safety & Streetscape | Michigan | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Monroe | Monroe | $307,190 | $0 | $165,410 | $472,600 |
McCamly Street Bridge Restoration | Restoration of deteriorated substructure, arches, sidewalls, railings and lighti | Michigan | 2005 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Battle Creek | Calhoun | $230,650 | $0 | $199,151 | $429,801 |
M-36 Bridge | Historic bridge repair | Michigan | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Mason | Ingham | $293,870 | $0 | $65,165 | $359,035 |
Michigan Ave Restoration | Replace existing brick pavement, curb, and gutter with new | Michigan | 2002 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Owosso | Shiawassee | $190,439 | $0 | $47,810 | $238,249 |
Union Station in Durand | Rehabilitate Historic Railroad Station | Michigan | 1999 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Durand | Shiawassee | $114,244 | $0 | $28,561 | $142,805 |
Quincy Mine Engine House Rehabilitation | Rehabilitation of historic Quincy & Torch Lake RR engine house (1889/1911) | Michigan | 2010 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Franklin | Houghton | $297,059 | $0 | $74,265 | $371,323 |
Merrick St Bridge | Rehabilitation of Merrick St Bridge | Michigan | 1999 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Adrian | Lenawee | $247,676 | $0 | $61,919 | $309,595 |
Holly Grand Trunk Depot | restoration of Depot & Sidewalk replacement | Michigan | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Holly | Oakland | $87,450 | $0 | $24,665 | $112,115 |
Restore Historic Brick St | Restore Historic Brick St | Michigan | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Grand Rapids | Kent | $161,358 | $0 | $112,130 | $273,488 |
Elberta Historic Waterfront Park | Repairs & stabilization | Michigan | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Elberta | Benzie | $200,000 | $0 | $50,000 | $250,000 |
Durand Union Station Stabilization | Durand Basement | Michigan | 1993 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Durand | Shiawassee | $98,363 | $0 | $24,591 | $122,954 |
Weston Brick St Rehab | Rehabilitate & Restore Historic Brick St | Michigan | 1999 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Grand Rapids | Kent | $152,454 | $0 | $101,636 | $254,090 |
Ionia Ave Brick St Rehab | Rehabilitate & Restore Historic Brick St | Michigan | 1999 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Grand Rapids | Kent | $159,655 | $0 | $106,437 | $266,092 |
6th St Bridge | Rehabilitation of historic Bridge | Michigan | 1999 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Grand Rapids | Kent | $264,866 | $0 | $176,578 | $441,444 |
Union Station Roof Restoration | Restoration | Michigan | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Durand | Shiawassee | $346,280 | $0 | $86,570 | $432,850 |
Hist Brick St Rehab | Rehab & restoration | Michigan | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Grand Rapids | Kent | $237,760 | $0 | $59,440 | $297,200 |
Historic Bridge At Bullock Creek | Restore & Relocate "Pratt Truss" Bridge | Michigan | 1996 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Mt. Haley | Midland | $126,006 | $0 | $67,849 | $193,855 |
M-203 Calumet Historic Route | Install brick surface & streetscape features on M-203 | Michigan | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Calumet | Houghton | $389,776 | $0 | $97,444 | $487,221 |
Rehabilitation/Restoration of Cherry St. from Hollister Ave. to Warren Ave. | Rehabilitation/Restoration of a Historic Brick Street | Michigan | 2006 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Grand Rapids | Kent | $389,871 | $0 | $97,468 | $487,339 |
Brick St Construction | Brick St Construction | Michigan | 1993 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Grand Rapids | Kent | $91,200 | $0 | $22,800 | $114,000 |
Lapeer Depot Preservation | Historic rehabilitation of train station | Michigan | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Lapeer | Lapeer | $143,792 | $0 | $47,931 | $191,723 |
Wealthy St Brick Restoration | Rehab & Restore of a historic brick street | Michigan | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Grand Rapids | Kent | $128,816 | $0 | $63,898 | $192,714 |
Coates Hwy Monument Rehabilitation | Rehabilitation and restoration of existing monuments | Michigan | 2002 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Manistee | Manistee | $18,694 | $0 | $4,673 | $23,367 |
M-156 Bridge over Silver Creek | Bridge Rehabilitation & Landscaping | Michigan | 1999 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Morenci | Lenawee | $293,221 | $0 | $82,291 | $375,511 |
Pere Marquette Railroad Depot Historic Restoration | Historical restoration based on U.S. Dept. of Interior National Park Service Sta | Michigan | 2004 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Bay City | Bay | $706,472 | $0 | $178,323 | $884,795 |
Saginaw Valley Rail Trail | Construction of 140' bridge over Swan Creek | Michigan | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Swan Creek | Saginaw | $166,753 | $0 | $71,466 | $238,219 |
Alpena to Cheboygan Rail-Trail Surfacing Project | Build a 10' wide crushed stone non-motorized trail from Alpena to Cheboygan | Michigan | 2009 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Alpena | Alpena | $1,427,846 | $0 | $992,232 | $2,420,078 |
White Pine Trail | Paving of rail trail | Michigan | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Plainfield | Kent | $632,000 | $0 | $158,000 | $790,000 |
Pere Marquette Rail Trail | Asphalt Recreational Rail Trail | Michigan | 1999 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Wise | Isabella | $632,223 | $0 | $1,159,609 | $1,791,832 |
US-127 over US-10BR/Pere Marquette Rail-Trail | Trees, lights, bench, trash cans & 700' of path | Michigan | 2005 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Vernon | Isabella | $99,321 | $0 | $24,830 | $124,151 |
Trestle Bridge Renovation | Renovate Historic RR Bridge | Michigan | 1999 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Allegan | Allegan | $93,655 | $0 | $280,965 | $374,620 |
Fred Meijer Heartland Trail | Pave RR Corridor & Restore Bridge | Michigan | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Stanton | Montcalm | $247,793 | $0 | $106,197 | $353,990 |
Evart Recreation Trail | Rail Trail Depot Rehab. | Michigan | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Evart | Osceola | $168,584 | $0 | $122,078 | $290,663 |
Ottawa/Muskegon Trail | Surfacing of Trail | Michigan | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Muskegon | Muskegon | $321,307 | $0 | $80,327 | $401,634 |
I-275 Metro Trail Crossing at Northline | Reconstruct rail crossing | Michigan | 2011 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Romulus | Wayne | $28,000 | $0 | $7,000 | $35,000 |
Ottawa-Muskegon Trail | Trail Development | Michigan | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Muskegon | Ottawa | $91,000 | $0 | $91,000 | $182,000 |
Saginaw Valley Rail-Trail | Develop Glassphalt Nonmotorized Trail | Michigan | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Swan Creek | Saginaw | $163,775 | $0 | $54,592 | $218,367 |
Fred Meijer Heartland Trail | 3.1 m wide path | Michigan | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Greenville | Montcalm | $689,233 | $0 | $172,308 | $861,542 |
Riverwalk & Park | Riverwalk & Parkway along abandoned RR | Michigan | 1999 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Litchfield | Hillsdale | $90,400 | $0 | $22,600 | $113,000 |
Apple Blossom Trail | Construction of a pedestrian & bicycle path along an abandoned RR corridor | Michigan | 2002 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Iron River | Iron | $195,200 | $0 | $48,800 | $244,000 |
Baw Beese Trail | Construction 10' wide nonmotorized path | Michigan | 1999 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Hillsdale | Hillsdale | $48,557 | $0 | $12,139 | $60,696 |
Vicksburg Trailway | Construct Trailway in RR Right-of-way | Michigan | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Vicksburg | Kalamazoo | $82,783 | $0 | $35,478 | $118,261 |
Grand Rapids to Cadillac Trail | Acquisition of Railroad ROW | Michigan | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Grand Rapids | Kent | $400,000 | $0 | $301,754 | $701,754 |
M-119 Nonmotorized Trail | Prepare & Pave | Michigan | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Bear Creek | Emmet | $22,500 | $0 | $12,115 | $34,615 |
Macomb Orchard Trail | Development and acquisition of abandoned railway into a hike/bike trail | Michigan | 2002 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Mt. Clemens | Macomb | $1,030,995 | $0 | $362,241 | $1,393,236 |
Harger Line Non-motorized trail | Purchase of rail right-of-way for the conversion to a non-motorized path. | Michigan | 2004 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Buena Vista | Saginaw | $187,420 | $0 | $46,855 | $234,275 |
Rails to Trails Conservancy | Develop implemtation plan for linked trails | Michigan | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Lake City | Livingston | $46,125 | $0 | $15,375 | $61,500 |
Bellaire Biking Hiking Path | Paving a RR grade for bike/hike path | Michigan | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Bellaire | Antrim | $13,390 | $0 | $13,390 | $26,780 |
Kentwood Rail Trail Phase II | Develop nonmotorized trail | Michigan | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Kentwood | Kent | $69,890 | $0 | $69,890 | $139,780 |
Eastern Ave Trail | Construction of necessary trail to link necessary connections within city | Michigan | 2002 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Allegan | Allegan | $50,000 | $0 | $24,627 | $74,627 |
Frederik Meijer Kenowa Trail | Nonmotorized bituminous and boardwalk trail | Michigan | 2011 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Byron | Ottawa | $1,480,086 | $0 | $1,603,427 | $3,083,513 |
Bay-Zilwaukee Rail Trail Purchase (CS&M) | Purchase of Right-Of-Way | Michigan | 2009 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Kochville | Saginaw | $215,589 | $0 | $71,863 | $287,451 |
Polly Ann Trail Extension Project | Construct and resurface a trail within a railway and utility corridor | Michigan | 2008 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Orion | Oakland | $294,463 | $0 | $126,198 | $420,661 |
White Pine Trail State Park | Asphalt paving of 8 miles of rail trail | Michigan | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Algoma | Kent | $846,748 | $0 | $211,687 | $1,058,435 |
Oxford St Trail | Renovate RR Bridge & Construct Trail | Michigan | 1999 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Grand Rapids | Kent | $948,038 | $0 | $237,009 | $1,185,047 |
Stegman Creek Historic Culvert Preservation | Historic Culvert preservation | Michigan | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Rockford | Kent | $70,131 | $0 | $59,741 | $129,872 |
Rail Trail Connector | Construct paved ped/bike trail | Michigan | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | South Lyon | Oakland | $149,488 | $0 | $64,066 | $213,555 |
CSX Nonmotorized Trailway | Construct 8ft wide bikeway w/parking lot | Michigan | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Fort Gratiot | St. Clair | $149,346 | $0 | $76,936 | $226,282 |
Paint Creek Trail | Construct safety path | Michigan | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Rochester | Oakland | $184,250 | $0 | $184,250 | $368,500 |
Alpena to Cheboygan Rail-Trail Surfacing Project | Build a 10' wide crushed stone non-motorized trail from Alpena to Cheboygan | Michigan | 2009 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Alpena | Alpena | $137,646 | $0 | $34,412 | $172,058 |
North Bank Trail - Phase 1 | Bike path on abandoned railroad bed | Michigan | 2011 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Spring Lake | Ottawa | $390,784 | $0 | $249,846 | $640,630 |
Pere Marquette Rail-Trail III | Rail-Trail improvements | Michigan | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Geneva | Midland | $420,000 | $0 | $268,525 | $688,525 |
Genesee Valley Trail - trail aquisition | Abandoned Railroad Corridor Aquistion | Michigan | 2009 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Flint | Genesee | $293,477 | $0 | $73,369 | $366,847 |
Ionia/Clinton/Shiawassee Nonmotorized Trail | Purchase of the Central Michigan Corridor for non-motorized trail use | Michigan | 2007 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | St. Johns | Clinton | $1,039,034 | $0 | $259,759 | $1,298,793 |
Pere Marquette State Trail (formerly Clare-Baldwin Trail Devel.) | Improve corridor to open for trail | Michigan | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Clare | Clare | $240,000 | $0 | $160,000 | $400,000 |
Fred Meijer Flat River Valley Rail Trail - Belding | Trail and Trailhead Construction | Michigan | 2013 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Belding | Ionia | $828,203 | $0 | $207,051 | $1,035,254 |
Kentwood Rail Trail | Develop Asphalt Trail with Parking/Staging Areas | Michigan | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Kentwood | Kent | $42,950 | $0 | $42,950 | $85,900 |
White Pine Trail, Phase II | Trail Corridors Improvements | Michigan | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Reed City | Osceola | $122,049 | $0 | $52,307 | $174,356 |
Falling Waters Trail Acquisition | Acquire 8.3 miles Inactive RR Corridor | Michigan | 1999 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Concord | Jackson | $120,000 | $0 | $30,000 | $150,000 |
White Pine Trail Development | Construct Nonmotorized Trail & Reconstruct RR Bridges | Michigan | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Plainfield | Kent | $121,480 | $0 | $30,370 | $151,850 |
Lakeshore Trail - Laketon Phase II | Construction of a non-motorized transportation route | Michigan | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Muskegon | Muskegon | $200,000 | $0 | $81,690 | $281,690 |
TART Trails Leelanau CRC | Asphalt paving of 2.1 miles and limestone surfacing of 4.4 miles of existing trail | Michigan | 2012 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Bingham | Leelanau | $470,049 | $0 | $234,880 | $704,928 |
Iron Ore Heritage Trail - Bridge over US-41 | Non-motorized trail construction | Michigan | 2012 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Negaunee | Marquette | $37,800 | $0 | $32,187 | $69,987 |
Reed City Railtrail Staging Area | Bit. Access Rd. Parking Lot, Restrooms, Picnic Pavilion & Lighting | Michigan | 2006 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Reed City | Osceola | $210,349 | $0 | $52,587 | $262,936 |
US-10 BR | Property Acquisition | Michigan | 2012 | 9 | (TE) 9. Inventory, control, and removal of outdoor advertising | Midland | Midland | $36,715 | $0 | $9,179 | $45,893 |
Archaeological Investigation | Excavation & analysis | Michigan | 1998 | 10 | (TE) 10. Archaeological planning & research | Oronoko | Berrien | $59,865 | $0 | $22,142 | $82,007 |
Archaeological Records Management | Processing Archaeological Inventory & Artifacts | Michigan | 1999 | 10 | (TE) 10. Archaeological planning & research | Lansing | Ingham | $21,722 | $0 | $5,431 | $27,153 |
Michigan Statewide GIS for Cultural Resources Management (CR-GIS) | Cultural Resources Planning | Michigan | 2010 | 10 | (TE) 10. Archaeological planning & research | East Lansing | Ingham | $3,071 | $0 | $1,254 | $4,325 |
Dune Activation and Archaeological Site Formation | Original archaeological research to develop a predictive model for interpret. | Michigan | 2005 | 10 | (TE) 10. Archaeological planning & research | Statewide | Statewide | $194,656 | $0 | $48,664 | $243,320 |
Documentation of Historic Shipwrecks, Whitefish Point Underwater Preserve | Historic archaelogical survey with interpretive publication and exhibits | Michigan | 2002 | 10 | (TE) 10. Archaeological planning & research | Whitefish | Chippewa | $163,286 | $0 | $54,429 | $217,715 |
Archeological Records Mgt | Archaeological site inventory, artifact & archival records | Michigan | 2001 | 10 | (TE) 10. Archaeological planning & research | Lansing | Ingham | $34,960 | $0 | $8,740 | $43,700 |
Hart-Montague Trail Reconstruction | Trail reconstruction of the state's first paved rail trail | Michigan | 2015 | 10 | (TE) 10. Archaeological planning & research | Hart | Oceana | $2,173,147 | $0 | $1,684,054 | $3,857,201 |
US-12 Archaeological & Archival | Conduct archaeological investigation | Michigan | 2001 | 10 | (TE) 10. Archaeological planning & research | Jonesville | Hillsdale | $41,201 | $0 | $10,300 | $51,501 |
Archaelogical Deep Testing Model | Research & Develop Archaeological Deep Testing Model | Michigan | 1999 | 10 | (TE) 10. Archaeological planning & research | Lansing | Ingham | $115,265 | $0 | $28,816 | $144,082 |
Statewide Archaelogical | Historic Archaeological Survey | Michigan | 1993 | 10 | (TE) 10. Archaeological planning & research | Lansing | Ingham | $204,304 | $0 | $45,304 | $249,607 |
M-25 (Port Sanilac) Motorist Park Slope Stabilization Project | Place materials to help stabilize slope & protect scenic bluff. | Michigan | 2004 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Sanilac | Sanilac | $173,902 | $0 | $0 | $173,902 |
US-10 Culvert Replacement | Culvert replacement at two locations | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Yates | Lake | $333,223 | $0 | $73,891 | $407,114 |
Parker Creek Water Quality | Restore Creek to Original Stream Bed | Michigan | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Paradise | Grand Traverse | $69,600 | $0 | $17,400 | $87,000 |
Erosion Control of Highway Runoff into the Saginaw River | ARTICULATING BLOCK Construction for Erosion Control of Highway Runoff | Michigan | 2002 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Zilwaukee | Saginaw | $225,530 | $0 | $56,383 | $281,913 |
Great Sand Bay Shoreline Restoration | Restorative planting and roadside park improvements | Michigan | 2009 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Eagle Harbor | Keweenaw | $375,231 | $0 | $93,808 | $469,038 |
Kent Co Rd/Stream Crossing | WRI will inventory & rank all crossings | Michigan | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Grand Rapids | Kent | $38,760 | $0 | $9,690 | $48,450 |
I -94 Coloma Interchange | Beautify interchange with grading and planting | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Coloma | Berrien | $64,092 | $0 | $16,023 | $80,115 |
Harris Road Runoff Improvement | Culverts, grade, gravel, pave, add bituminous curb, add spillways | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Benzonia | Benzie | $64,721 | $0 | $16,180 | $80,901 |
Bioretention Islands on Plainfield Ave from Leonard St to 200 ft N. of Ann St | construction of seven (7) bio retention islands | Michigan | 2012 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Grand Rapids | Kent | $146,667 | $0 | $142,825 | $289,492 |
US-31 Storm Sewer Improvements | Improve Drainage Outlet and replace storm sewer | Michigan | 2002 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Manistee | Manistee | $302,041 | $0 | $75,510 | $377,552 |
Betsie River Watershed Rd | Inventory & cost est of 150 crossings | Michigan | 1998 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Beulah | Benzie | $24,000 | $0 | $24,000 | $48,000 |
M-25 at Suerwier Road - Water Quality Improvement | Energy Dissipation, Culvert Replacement, Slope Stabilization & Restoration | Michigan | 2009 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Sanilac | Sanilac | $178,970 | $0 | $44,743 | $223,713 |
Watershed Road Crossing | Road & stream crossing improvements | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Manistee | Manistee | $137,215 | $0 | $137,215 | $274,431 |
Betsie River Watershed | Diversion outlets, revegetation, & erosion control | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Leland | Benzie | $105,019 | $0 | $82,515 | $187,535 |
Roadstream Crossings | Improvements | Michigan | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Wexford | Wexford | $74,145 | $0 | $74,145 | $148,289 |
Mt Fredric Rd Crossings | Stream Crossing Improvement | Michigan | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Frederic | Crawford | $37,105 | $0 | $10,466 | $47,571 |
M-25 Erosion repair | Erosion Repair & Rip Rap Disipator | Michigan | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Delaware | Sanilac | $26,492 | $0 | $6,623 | $33,115 |
Porcupine & Martin Lake Projects | Erosion & Pollution Control | Michigan | 1994 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Elmira | Otsego | $35,000 | $0 | $8,750 | $43,750 |
Howell Rd Culvert Repair | Culvert Repair | Michigan | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Pinckney | Livingston | $20,800 | $0 | $5,200 | $26,000 |
Viking Club Rd Crossing | Erosion & Pollution Control | Michigan | 1993 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Otsego Lake | Otsego | $8,000 | $0 | $6,035 | $14,035 |
West Branch Big Creek | Road/Stream Crossing Rehabilitation | Michigan | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Lovells | Crawford | $100,170 | $0 | $25,043 | $125,213 |
Rouge Park Improvement | Mitigate severe erosion into Rouge River | Michigan | 1994 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Detroit | Wayne | $125,590 | $0 | $31,397 | $156,987 |
N-66 Storm Water Relief | Install Storm Sewer Pipe | Michigan | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Ionia | Ionia | $187,500 | $0 | $750,000 | $937,500 |
Squaw Bay Culvert Replacement | Culvert Replacement to Stop Erosion | Michigan | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Alpena | Alpena | $127,200 | $0 | $31,800 | $159,000 |
M-13 Gabion Wall Construction | Gabion Wall Construction | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Portsmouth | Bay | $212,462 | $0 | $36,205 | $248,667 |
Cty Rd #510 Soil Erosion Control | Soil Erosion Control & Mitigation | Michigan | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Ishpeming | Marquette | $127,500 | $0 | $100,179 | $227,679 |
Cut River Historic Bridge Restoration and Erosion Control | Historic preservation work on bridge / address water quality issues below bridge | Michigan | 2006 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Hendricks | Mackinac | $1,023,864 | $0 | $255,966 | $1,279,830 |
Road/Stream Crossings | Road Crossing | Michigan | 1993 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Traverse City | Grand Traverse | $99,737 | $0 | $99,737 | $199,474 |
Rondo Road Water Quality | Gravel, grade, cobble ditches & sediment basins | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Mentor | Cheboygan | $75,200 | $0 | $18,800 | $94,000 |
Founders Park Recreation Area | Construct Storm Water Quality Pond | Michigan | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Farmington Hills | Oakland | $240,000 | $0 | $60,000 | $300,000 |
M-139 Rain Garden | Rain garden installation | Michigan | 2014 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Niles | Berrien | $75,668 | $0 | $18,917 | $94,585 |
Village of Empire M-22 Streetscape and Water Quality Enhancement | Streetscaping and constuction/instillation of underground water filter systems. | Michigan | 2005 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Empire | Leelanau | $452,917 | $0 | $179,157 | $632,074 |
McMurphy Rd Thunder Bay River Crossing | Replace ex. CSP culvert w/ 42' Conspan and associated approach and channel work. | Michigan | 2002 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Avery | Montmorency | $186,816 | $0 | $46,704 | $233,520 |
E Beltline Wetland Repair | Repair/Improve outlet area to wetland | Michigan | 2002 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Grand Rapids | Kent | $5,107 | $0 | $0 | $5,107 |
McGregor Rd Erosion and Pollution Control | Erosion & pollution control | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Elmira | Otsego | $50,883 | $0 | $12,721 | $63,604 |
Brooks Creek Erosion Control | Erosion & Pollution Control | Michigan | 1994 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Sheridan | Newaygo | $33,649 | $0 | $14,421 | $48,070 |
Study & Evaluation Methods | Highway Runoff Study | Michigan | 1993 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Saginaw | Saginaw | $8,000 | $0 | $2,000 | $10,000 |
M-13 Erosion Runoff Mitigation | Gabion Wall construction for erosion Control | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Portsmouth | Bay | $82,555 | $0 | $115,430 | $197,985 |
M-25 Erosion Repair | Slope Erosion & Scour Repair | Michigan | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Sanilac | Sanilac | $119,620 | $0 | $29,905 | $149,525 |
US-31 Turtle Fence | Install Fencing | Michigan | 2007 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Muskegon | Muskegon | $277,130 | $0 | $69,283 | $346,413 |
Newaygo Co. Rd/Stream Crossing | Culvert inventory to determine water pollution | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | White Cloud | Newaygo | $62,168 | $0 | $41,446 | $103,614 |
Manistee River Watershed | Inventory & cost est of 700 crossings | Michigan | 1998 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Manistee | Manistee | $60,000 | $0 | $60,000 | $119,999 |
Brown Bridge Rd. Stream Bank Protection | Stream bank protection | Michigan | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Union | Grand Traverse | $113,352 | $0 | $28,338 | $141,689 |
Developing Predictive Models for Wildlife Crossing Sites in Michigan | Research to identify wildlife crossings on highways along I-75 & US-127 | Michigan | 2003 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Mt. Pleasant | Isabella | $108,754 | $0 | $27,189 | $135,943 |
Marsh Rd at Bancroft Creek | Erosion Control from Highway Runoff | Michigan | 1994 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Paradise | Grand Traverse | $48,800 | $0 | $12,200 | $61,000 |
M-24 Water Quality Improvements | Water Quality Improvements | Michigan | 2010 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Caro | Tuscola | $105,492 | $0 | $37,582 | $143,074 |
Holland/Macatawa River Water Quality Improvements | Ditch/Drainage repairs effecting the Macatawa River | Michigan | 2002 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Holland | Ottawa | $24,678 | $0 | $6,170 | $30,848 |
Cook Drain Phase II | Create open channel to improve water quality | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Allegan | Allegan | $142,460 | $0 | $61,054 | $203,514 |
Teal Lake Sedimentation Vault | Construction of a Sedimentation Vault | Michigan | 2007 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Negaunee | Marquette | $114,643 | $0 | $28,661 | $143,304 |
Manistee River Crossing CS | Reduction of sedimentation | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Frederic | Crawford | $110,329 | $0 | $0 | $110,329 |
Mayfield Rd Culvert Replacement | Culvert (small bridge) replace. & storm water detention basins w/ overland fill | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Traverse City | Grand Traverse | $119,600 | $0 | $37,306 | $156,906 |
Parmater Road at Flott Lake | Erosion & pollution control | Michigan | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Elmira | Otsego | $48,492 | $0 | $12,123 | $60,615 |
M-25 Erosion Repair | Slope Erosion Repair & Runoff Ditches | Michigan | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Delaware | Sanilac | $24,028 | $0 | $6,007 | $30,035 |
Coolbough Creek Erosion Control | Erosion & Pollution Control | Michigan | 1994 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Everett | Newaygo | $24,078 | $0 | $10,319 | $34,397 |
Beaver Creek Erosion Control | Stream Crossing Improvements | Michigan | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Beaver Creek | Crawford | $83,165 | $0 | $20,791 | $103,956 |
Pere Marquette Watershed Rd/Stream Crossings | Crossing improvements | Michigan | 1998 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | 0 | Mason | $110,891 | $0 | $90,729 | $201,620 |
Watson & Watson Outlet Drain Contract A | Roadway Stormwater Runoff Treatment and Soil Erosion Prevention | Michigan | 2008 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Delhi | Eaton | $109,561 | $0 | $733,216 | $842,776 |
Walker Tavern Historic Site | Develop cultural resource plan | Michigan | 2001 | 12 | (TE) 12. Establishment of transportation museums | Cambridge | Lenawee | $100,000 | $0 | $35,135 | $135,135 |
Steam-Locomotive Repair Museum | Construct locomotive repair shop & museum | Michigan | 2001 | 12 | (TE) 12. Establishment of transportation museums | Owosso | Shiawassee | $115,560 | $0 | $28,890 | $144,450 |
Ford Stories at Greenfield Village | Develop Memorial Garden & Restore Historic Buildings | Michigan | 1999 | 12 | (TE) 12. Establishment of transportation museums | Dearborn | Wayne | $942,107 | $0 | $464,023 | $1,406,130 |
St. Louis Streetscape/Historical Society Depot Restoration | Streetscaping on Main St. and Railroad Depot Rehabilitation on Crawford St. | Michigan | 2006 | 12 | (TE) 12. Establishment of transportation museums | St. Louis | Gratiot | $482,824 | $0 | $210,874 | $693,698 |