Project Search Results

Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Back to Search Page
Project Name Description State Year Activity Activity Type City County Federal Funds ARRA Funds Local Funds Total
Downtown Revitalization - Phase 3 Construction and reconstruction of sidewalks along Southwest Front Street from South First Street to Second Street. Project also includes curb and gutter, ADA, bike racks, pedestrian crosswalks, landscaping, pedestrian lighting and signage. Tennessee 2013 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Milan Gibson $392,052 $0 $98,013 $490,065
Walker Avenue Streetscape - Phase 2 Construction and reconstruction of sidewalks, curb and gutter along Walker Avenue from Bristor to Patterson Street. Project also includes ADA upgrades, pedestrian amenities, pedestrian lighting, signage, drainage improvements and utility relocation Tennessee 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Memphis Shelby $458,830 $0 $114,707 $573,537
Walters State Community College Pedestrian Facilities - Phase 1 Construction of walkways within the WSCC campus area connecting downtown and the Greeneville Historical Walkway. Project also includes landscaping, retaining walls, crosswalks, crosswalk lighting, pedestrian plaza, ADA upgrades, drainage and bike racks Tennessee 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Greeneville Greene $1,000,000 $0 $250,000 $1,250,000
Downtown Improvements - Phase 4 Reconstruction of sidewalks along W. Main Street from Bible Hill Road to Jennings Avenue. Project includes drainage, curb and gutter, landscaping, pedestrian lighting, ADA, utility relocations, signage and crosswalks Tennessee 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Parsons Decatur $496,656 $0 $124,164 $620,820
West 7th Multi-Modal Streetscape Construction a 10-foot wide multi-modal facility on the north side of West 7th Street and dedicated bike lanes and a 5-foot sidewalk on the south side from Pop Geers Park to North High Street. Project also includes ADA upgrades, crosswalk signalization, utility relocation, landscaping, pedestrian amenities and pedestrian lighting. Tennessee 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Columbia Maury $959,050 $0 $239,763 $1,198,813
Downtown Connector - Phase 1 Construction of a multi-modal facility from East Church Street to the entrance of Rock Creek Park. Proejct also includes landscaping, ADA upgrades, utility relocation, crosswalks, signage, fencing, pedestrian amenities and pedestrian lighting and NEPA work. Tennessee 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Lewisburg Marshall $701,138 $0 $175,285 $876,423
Downtown Revitalization - Phase 3 Construction and reconstruction of approximately 875 linear feet of sidewalks along West College Street and North Main Street. Project includes curb and gutter, ADA, utility relocation, landscaping, pedestrian lighting and pedestrian amenities. Tennessee 2013 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Dickson Dickson $595,461 $0 $148,865 $744,326
Pedestrian Inter-Connector - Phase 3 Construction of a multi-modal facility along Dolly Parton Parkway and Middle Creek. Project also includes a pedestrian bridge, pedestrian lighting, landscaping, signage and pedestrian amenities. Tennessee 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Sevierville Sevier $528,765 $0 $132,191 $660,956
Kingsport Greenbelt, Eastern Extension - Phase 1 Construction of approximately 5,280 linear feet of a 10-foot wide trail from the existing greenbelt eastward along Reedy Creek to a trailhead at Cleek Road. Project includes pedestrian beings, ADA upgrades and pedestrian amenities. Tennessee 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Kingsport Sullivan $752,000 $0 $188,000 $940,000
Historical Sidewalks - Phase 2 Construction of sidewalks on the east side of Tennessee Street and the north side of West Main Street. Project also includes drainage modifications, ADA upgrades, striping and landscaping Tennessee 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Savannah Hardin $243,913 $0 $60,978 $304,891
Caine Lnae Greenway Connector Construction of multi-modal facilities along Caine Lane from Shallowford Road to the Cromwell Public Housing Development. Project also includes ADA upgrades, crosswalks, pedestrian signalizaiton, utility relocation, landscaping, pedestrian lighting, signage and pedestrian amenities. Tennessee 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Chattanooga Hamilton $374,928 $0 $93,732 $468,660
Duck Pond Walking/Biking Trail Construction of a 10-foot wide multi-modal path from the intersection of Springbrook and Park Road to a trailhead at the Alcoa Elementary School. Project also includes signage, crosswalks, pedestrian bridge, retaining wall, bank stabilization, pedestrian lighting and pedestrian amenities. Tennessee 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Alcoa Blount $827,810 $0 $206,953 $1,034,763
Court Square Project Access improvements to the inner perimeter of the court square. Project includes sidewalk replacement, ADA upgrades, signage, curb and gutter, pedestrian lighting, drainage and landscaping. Tennessee 2013 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Lexington Henderson $360,592 $0 $90,148 $450,740
North Square Sidewalk Improvements Sidewalk improvements along N. Main Street, N. Spring Street and the south side of Lane Pkwy. Project also includes ADA upgrades, utility relocation, pedestrian signalization, pedestrian lighting, crosswalks and landscaping Tennessee 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Shelbyville Bedford $361,444 $0 $90,361 $451,805
Red River East Trail - Phase 1 Construction of a 3,200 linear foot multi-modal facility beginning at a vehicular/pedestrian bridge on US Highway 41-A and terminating at a proposed trailhead. Project also includes landscaping, signage, benches and trash receptacles. Tennessee 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Clarksville Montgomery $832,666 $0 $208,167 $1,040,833
Coops Creek Greenway - Phase 2 Extension of the greenway from the Phase 1 termini to the elementary school campus trailhead. Project also includes pedestrian bridges, ADA upgrades, pedestrian amenities, landscaping, pedestrian signals and pedestrian lighting Tennessee 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Dunlap Sequatchie $591,141 $0 $147,785 $738,926
Pedestrian Enhancement s- Phase 2 Replacement of sidewalks in the central business district. Project also includes ADA upgrades, landscaping, pedestrian lighting, crosswalks, curb and gutter, drainage improvements, a retaining wall and striping. Tennessee 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Ducktown Polk $348,581 $0 $87,145 $435,726
Bike and Pedestrian Connector - Phases 2 A & B Construction of a bicycle and pedestrian facility from the intersection of Milton Wilson Road and Memphis Arlington Road to Jetway Drive. Project includes bike lanes, sidewalks, pavement markings, signage, drainage, a retaining wall, curb and gutter, pede Tennessee 2013 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Arlington Shelby $777,491 $0 $194,372 $971,863
Incline Railway Rehabilitation Project Renovation to the observation decks and replacement of the station roof Tennessee 2014 106 (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities Lookout Mountain Hamilton $159,300 $0 $39,825 $199,125
Downtown Improvements Construction of pedestrian improvements in the downtown area on Central Avenue. Project also includes drainage improvements, ADA upgrades, signage and landscaping. Tennessee 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities LaFollette Campbell $416,928 $0 $104,232 $521,160
Downtown Pedestrian Improvements - Phase 1 Construction of pedestrian improvements in the downtown area along South Second Street and Houston Avenue. Project also includes utility relocation, landscaping, irrigation, pedestrian lighting and pedestrian amenities. Tennessee 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Selmer McNairy $400,098 $0 $100,025 $500,123
Downtown Sidewalk Improvements Renovation and replacement of sidewalks throughout the downtown area. Project also includes curb and gutter, ADA upgrades, utility relocation, an irrigation system, pedestrian lighting, signage and pedestrian amenities. Tennessee 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Tazewell Claiborne $416,355 $0 $104,089 $520,444
Mercury Boulevard Sidewalks - Phase 2 Construction of sidewalks along Mercury Blvd (US 70S/SR-1) from Middle Tennessee Blvd to Apollo Drive. Project also includes ADA compliance, pedestrian signals, crosswalks and school flashing speed limit signals. Tennessee 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Murfreesboro Rutherford $1,000,000 $0 $250,000 $1,250,000
Trail - Phase 3 Construction of extensions to the battlefield interpretive trail system, including ADA accessibility, landscaping, interpretive signage and pedestrian amenities. Tennessee 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Parkers Crossroads Henderson $255,000 $0 $63,750 $318,750
Downtown Enhancements - Phase 4 Construction of sidewalks along Viking Drive beginning at existing sidewalks at a housing unit to Humboldt High School and sidewalks along Spangler Drive beginning at the high school and terminating at Spangler Park. Project also includes ADA upgrades, crosswalks and signage. Tennessee 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Humboldt Gibson $439,200 $0 $109,800 $549,000
Connectivity Project - Phase 3 Construction of sidewalk improvements in downtown Hartsville along East Main Street and SR-141. Project also includes retaining wall, ADA upgrades, crosswalk signalization, utility relocation, landscaping, pedestrian lighting and pedestrian amenities. Tennessee 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Hartsville Trousdale $558,923 $0 $139,731 $698,654
Lakeview Road Pedestrian Connection Construction of sidewalks along Lakeview Road from near the intersection of SR-64 and terminating at the UT Martin Somerville Campus. Project also includes drainage, ADA, signage, striping, landscaping, pedestrian lighting and pedestrian amenities. Tennessee 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Somerville Fayette $513,200 $0 $128,300 $641,500
Greenway Multi-Modal Trail Connector Construction of a 10-foot wide multi-modal trail from the Neshoba Park to the existing trailhead just east of Kimbrough Road and from Cameron Brown Park to the proposed trailhead just west of Farmington Blvd. Project also includes a trailhead, a pedestrian bridge, landscaping, pedestrian amenities and signage. Tennessee 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Germantown Shelby $588,501 $0 $147,125 $735,626
Highway 51 Connection - Phase 1 Construction of sidewalks along the west side of Hwy 51 from Tatlock Avenue to Lanny Bridges Road and along the east side of Hwy 51 from Lanny Bridges Road to TN College of Applied Technology. Project also includes ADA upgrades, curb and gutter, pavement markings and signage. Tennessee 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Covington Tipton $948,763 $0 $237,191 $1,185,954
Atoka Greenway - Phase 2 Construction of a multi-modal trail from Phase 1 to Pioneer Park. Project also includes landscaping, signage, drainage improvements, crosswalks, ADA upgrades and a pedestrian bridge. Tennessee 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Atoka Tipton $516,688 $0 $129,172 $645,860
Trail Connector - Phase 2 Construction of a trail along N. Tennessee Avenue (SR-9) from Tank Springs Road to E. Central Avenue and along E. Central Avenue to the existing greenway. Project also includes curb and gutter, ADA upgrades, signage, landscaping, pedestrian lighting and pedestrian amenities. Tennessee 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities LaFollette Campbell $993,733 $0 $248,433 $1,242,166
New Pedestrian Pathway Connections for the Planned Business District. This project consists of the construction of thirteen new pedestrian pathway connections within the Central Business District Sidewalk System. Locations of connections will be along E. Tulsa, Rutgers, S. Tulane, Racoon, Badger, Tuskegee, Laboratory, E. Tennessee 2000 1 (TE) 1. Pedestrian and bicycle facilities Oak Ridge Anderson $588,000 $0 $12,000 $600,000
Ft. Defiance Pedestrian Trail 4,500 l.f. of trail construction parallel to US 41-A/79 from the Red River Bridge to the Ft. Defiance property. Project also includes scenic overview, and secondary routes throughout fortress area and flatboat landing areas. Tennessee 2006 1 (TE) 1. Pedestrian and bicycle facilities Clarksville Montgomery $682,000 $0 $170,500 $852,500
Downtown Revitalization Project - Phase I Construction and reconstruction of sidewalks in the downtown area. Project also includes curb and gutter, landscaping, pedestrian amenities and drainage improvements. Tennessee 2009 1 (TE) 1. Pedestrian and bicycle facilities Dickson Dickson $941,214 $0 $235,303 $1,176,517
Martin Downtown Improvement Project Sidewalk and curb replacement along Lindell St; bulb-out construction , curb and sidewalk construction around Festival Park, landscaping and mini park. Project includes landscaping. Tennessee 2005 1 (TE) 1. Pedestrian and bicycle facilities Martin Weakley $406,516 $0 $101,629 $508,145
Extension of the Alcoa Greenway Project provides for 2 extensions to Alcoa's greenway. Phase I begins at Springbrook Corporate Center Lake, crosses Highway 129 and connects to the St. Ives Subdivision. The second phase, Pistol Creek Greenway Extension, Phase 4, and will begin at the i Tennessee 2001 1 (TE) 1. Pedestrian and bicycle facilities Alcoa Blount $336,943 $0 $84,236 $421,179
Shelbyville Greenway Project Phase II will include the construction of 2,075 linear feet of walkway, landscaping, lighting, signage, and the reconstruction of a small section of existing sidewalk throughout the City of Shelbyville, connecting with the Shelbyville River Walk. Project Tennessee 2000 1 (TE) 1. Pedestrian and bicycle facilities Shelbyville Bedford $88,200 $0 $71,800 $160,000
The Savannah Seamless Sidewalk Project Sidewalk construction and reconstruction along both sides of US 64 from Blankenship to past East End Drive for a total project length of 2,668 l.f. Project includes installation of handicap ramps. Tennessee 2005 1 (TE) 1. Pedestrian and bicycle facilities Savannah Hardin $81,425 $0 $20,356 $101,781
Pulaski Heritage Trail This project consists of the construction of the Pulaski Heritage Trail which will extend the existing Pleasant Run Walkway in a southeasterly direction to the Pulaski Recreation Center, utilizing existing sidewalk in areas to create numerous significant Tennessee 2000 1 (TE) 1. Pedestrian and bicycle facilities Pulaski Giles $326,962 $0 $47,994 $374,956
Phase III Pedestrian Trail Phase 3 will consist of sidewalk construction and reconstruction along Old A. J. Highway from an existing trail at an old railroad bed to Municipal Drive for a total project length of 6,035 l.f. Project includes two pedestrian bridges. Tennessee 2005 1 (TE) 1. Pedestrian and bicycle facilities Jefferson City Jefferson $303,808 $0 $75,952 $379,760
Historic Huntingdon Greenways Trail Construct 3.1 Miles of Greenway winding through the historic areas of Huntingdon; Provide landscaping for the Railroad Museum and Park; Restore an old Chessie Caboose. CABOOSE NOT HISTORIC. RECOMMEND PAYING FOR TRAIL ONLY Tennessee 1997 1 (TE) 1. Pedestrian and bicycle facilities Huntingdon Carroll $150,000 $0 $37,500 $187,500
Gatlinburg Streetscape Improvement, Riverwalk Phase III Project consists of sidewalk construction, railings, lighting and landscaping along Highway 321/441 from Dudley Creek Road intersection to a location approximately 1,000 feet north at the developed entrance to the city. Tennessee 2000 1 (TE) 1. Pedestrian and bicycle facilities Gatlinburg Sevier $407,584 $0 $101,896 $509,480
Development of Kingsport Greenbelt and Enhancement of Area Highway Aesthetics A $155,636.00 grant to construct an approximately 2,600-foot pedestrian and bicycle trail Tennessee 1996 1 (TE) 1. Pedestrian and bicycle facilities Kingsport Sullivan $155,636 $0 $38,909 $194,545
Sundquist Trail Grant to construct a two-mile-long pedestrian and bicycle trail through the city park Tennessee 1996 1 (TE) 1. Pedestrian and bicycle facilities Winchester Franklin $140,000 $0 $35,000 $175,000
J. L. Seets Pedestrian Pathway Construction of 3,350 linear feet of sidewalks throughout McKenzie. Project also includes construction of curb, gutter and handicap ramps. Tennessee 2008 1 (TE) 1. Pedestrian and bicycle facilities McKenzie Carroll $384,776 $0 $96,194 $480,970
Main Street Skywalks/Trailhead Renovation of the Skywalk in Morristown by upgrading the railing to 6\ and adding a kickplate on the bottom of the current skywalks. Project will include the installation of an elevator in an existing alley on the south side of Main Street." Tennessee 2002 1 (TE) 1. Pedestrian and bicycle facilities Morristown Hamblen $154,000 $0 $38,500 $192,500
City of Henderson: Sugar Creek Greenway and Sidewalk Connector Project Greenway construction from downtown to a natural scenic area along Sugar Creek for a distance of 5,300 l.f. Project also includes sidewalk connections along Hwy. 100, street trees, signage and boardwalks. Tennessee 2005 1 (TE) 1. Pedestrian and bicycle facilities Henderson Chester $362,969 $0 $90,742 $453,711
Kingsport Metro Area Bike Route and the Kingsport Greenbelt Completion Project involves the completion of the remaining sections of the Kingsport Bicycle/Pedestrian Trail: Section 3B (Industry Drive to Heritage Riverfront Park), and Section 4A (Cloud Park to Cherokee Village). Tennessee 2001 1 (TE) 1. Pedestrian and bicycle facilities Kingsport Sullivan $778,356 $0 $194,589 $972,945
Dandridge Historic District Sidewalk Program Listed on National Register. The construction of sidewalks along Hwy 25/70 from Treadway Drive to the intersection of Hwy 92, then continuing on to Gay Street. Construction will commence along Hwy 25/70 from Hill Street to Swift Way. Tennessee 1998 1 (TE) 1. Pedestrian and bicycle facilities Dandridge Jefferson $140,000 $0 $35,000 $175,000
White House Greenway System Construction a pedestrian/bicycle trail from the Municipal Park on SR-76 and ending at the White House High School near Meadows Road and Tyree Springs Road, a distance of approximately 2.0 miles. Tennessee 1998 1 (TE) 1. Pedestrian and bicycle facilities White House Robertson $150,000 $0 $37,500 $187,500
Ten Mile Creek Greenway, Knoxville From the northern side of I-75/I-40 to two endings: Parkside Drive and Kingston Pike connecting a school, two churches and the YMCA to the Commercial areas of Sam's and Walmart and on to Crestwood Hills and other nearby neighborhoods. The greenway then Tennessee 1998 1 (TE) 1. Pedestrian and bicycle facilities Knoxville Knox $687,641 $0 $76,405 $764,046
Arlington Depot Square Project The construction of sidewalks along Chester St., Mott St., and Quintard St. The project will also provide trees, landscaping, brick pavers and other scenic beautification. Total project length is 3200 lf. Tennessee 2002 1 (TE) 1. Pedestrian and bicycle facilities Arlington Shelby $142,648 $0 $35,662 $178,310
Gallaher View Road Connector Greenway Underpass Construct concrete box culvert at Sta. 1+520 on Gallagher View Road to be used as a greenway underpass as a part of the LIC project #47206-1501-04 Tennessee 1999 1 (TE) 1. Pedestrian and bicycle facilities Knoxville Knox $31,986 $0 $7,996 $39,982
Winchester Downtown Revitalization Project Replacement and reconstruction of 1,500 l.f. of sidewalks. Project also includes crosswalks, ADA ramps, lighting, signage, landscaping and utility relocation. Tennessee 2006 1 (TE) 1. Pedestrian and bicycle facilities Winchester Franklin $388,265 $0 $97,066 $485,331
Parsons Downtown Improvements - Phase III Construction of 2,100 linear feet of sidewalks along SR 412. Project also includes curb and gutter, landscaping and pedestrian amenities. Tennessee 2010 1 (TE) 1. Pedestrian and bicycle facilities Parsons Decatur $702,544 $0 $175,636 $878,180
Downtown Sidewalk Improvements Renovation and replacement of sidewalks throughout the downtown area. Project also includes curb and gutter, ADA upgrades, utility relocation, an irrigation system, pedestrian lighting, signage and pedestrian amenities. Tennessee 2012 1 (TE) 1. Pedestrian and bicycle facilities Tazewell Claiborne $466,604 $0 $116,651 $583,255
Lower Second Creek Greenway (From the Convention Center to Volunteer Landing) Construction of greenway from Convention Center to Volunteer Landing for a total project length of 1,800 l.f. Tennessee 2005 1 (TE) 1. Pedestrian and bicycle facilities Knoxville Knox $369,842 $0 $92,461 $462,303
Lynchburg Community Walkway This project consists of the construction of the Lynchburg Community Walkway which will begin at the Distillery, travel along Hwy. 55 and Main Street, terminating at the intersection with Craig Street. Tennessee 2000 1 (TE) 1. Pedestrian and bicycle facilities Lynchburg Moore $43,000 $0 $7,000 $50,000
Walker Springs Road Connector Greenway Underpass Construct concrete box culvert at Sta. 10+502 on Walker Springs Road to be used as a greenway underpass as a part of the LIC project #47206-1501-04 Tennessee 1999 1 (TE) 1. Pedestrian and bicycle facilities Knoxville Knox $30,570 $0 $7,642 $38,212
Greenbelt Pedestrian Bridge Construction of a 620 linear foot trail and bridge across the Holston River. Project also includes a retaining wall, pedestrian amenities and landscaping. Tennessee 2011 1 (TE) 1. Pedestrian and bicycle facilities Kingsport Sullivan $652,577 $0 $163,144 $815,721
Greenbelt Trail Improvements, Nonconnah Creek Greenbelt Construction of a 12ft wide trail beginning at the Town s western border and extending approximately 7,600 linear feet to a trail head parking lot at Bailey Station Road then proceeding to Schilling Farms Middle School. Project includes 3 pedestrian brid Tennessee 2002 1 (TE) 1. Pedestrian and bicycle facilities Collierville Shelby $703,699 $0 $175,925 $879,624
Highway 64 Beautification Project - Phase IIA Streetscape Enhancements Phase IIA includes the replacement of 2,000 l.f. of sidewalk on Main Street (Highway 64) from Magnolia Street to beyond North Oak Street. Project also includes landscaping, site amenities, and drainage improvements. Tennessee 2006 1 (TE) 1. Pedestrian and bicycle facilities Adamsville McNairy $480,000 $0 $120,000 $600,000
City of Baxter Walkway Project Sidewalk reconstruction along Elmore Town Rd., 1st Ave., 2nd Ave., and 3rd Ave. Tennessee 2005 1 (TE) 1. Pedestrian and bicycle facilities Baxter Putnam $390,160 $0 $97,540 $487,700
Powell Greenway Bike-Pedestrian Trail Tennessee 1994 1 (TE) 1. Pedestrian and bicycle facilities Powell Knox $480,216 $0 $120,054 $600,270
Walking Trail/Riverwalk Phase I of the Riverwalk will provide a connection from the Pigeon Forge Middle School and will continue past a library, park, outlet mall and numerous businesses and historical sites. The trail will go under the Parkway (US 441) following the west prong Tennessee 2000 1 (TE) 1. Pedestrian and bicycle facilities Pigeon Forge Sevier $796,205 $0 $195,803 $992,008
Germantown Greenbelt Trail, Ph. I A $150,000.00 grant to construct a pedestrian and bicycle trail/greenbelt from Poplar Estates Park (Memphis/Germantown Boundary) to east of Germantown Road along the Wolf River Tennessee 1996 1 (TE) 1. Pedestrian and bicycle facilities Germantown Shelby $150,000 $0 $37,500 $187,500
Halls Downtown Improvements - Phase I Streetscape project including sidewalk construction and reconstruction, brick paver crosswalks, street lighting, pavement marking for street parking, landscaping, and side amenities along West Main St., South Front St., and West Tigrett St. Tennessee 2005 1 (TE) 1. Pedestrian and bicycle facilities Halls Lauderdale $160,736 $0 $40,184 $200,920
Parker's Crossroads Trail Project - Ph 2 Construction of an interpretive trail system on the Parker's Crossroads Battlefield. Project also includes interpretive signage and pedestrian amenities. Tennessee 2012 1 (TE) 1. Pedestrian and bicycle facilities Parker's Crossroads Henderson $330,831 $0 $82,707 $413,538
City of Memphis Bicycling Network, Phase I This project will establish Phase I of a 42 mile city-wide bicycle route, provide for bicycle parking and storage facilities at seven (7) key locations along the route, and establish a city-wide bicycle safety education program. Tennessee 2000 1 (TE) 1. Pedestrian and bicycle facilities Memphis Shelby $121,429 $0 $30,357 $151,786
Jackson Square Townsite Reconfiguration - Ph 1 Revitalization of the historic Jackson Square into a landscaped pedestrian plaza and parking area. Project will also include ADA upgrades, landscaping, pedestrian lighting, pedestrian amenities, signage and a fountain. Tennessee 2012 1 (TE) 1. Pedestrian and bicycle facilities Oak Ridge Anderson $798,687 $0 $199,671 $998,358
Downtown Sidewalk Improvements Construction of 4,670 linear feet of trail along SR-147. Tennessee 2009 1 (TE) 1. Pedestrian and bicycle facilities Tiptonville Lake $329,280 $0 $82,320 $411,600
Cleveland/Bradley County Mouse Creek Greenway Greenway will be a multi-use, 10-foot wide paved trail, beginning in downtown Cleveland from 25th Street to Tinsley Park, for a distance of approximately 7,600 l.f. Tennessee 2001 1 (TE) 1. Pedestrian and bicycle facilities Cleveland Bradley $706,200 $0 $176,550 $882,750
Mississippi River Cycling/Hiking Corridor Bicycle Trail, 6-Cty Bike Rte Tennessee 1995 1 (TE) 1. Pedestrian and bicycle facilities Memphis Shelby $164,000 $0 $41,000 $205,000
Town of Kenton - Transportation Enhancement Streetscape Project Project consists of streetscaping improvements, i.e. landscape islands, meandering walkways, traffic realignment and lighting beginning at the intersection of SR 5 and SR 89 W extending along an existing city street east a distance of 423 l.f. 66 ft west Tennessee 2005 1 (TE) 1. Pedestrian and bicycle facilities Kenton Gibson $157,886 $0 $39,471 $197,357
Riverfront Linear Walking/Bicycle Path - PHASE IV This phase begins on the west side of the City's Cherokee Industrial Park and connects to Phase II of the Linear Walking/ Bicycle path now under construction and continues westward 1.15 miles following Watauga River behind North American Corp. to the Syc Tennessee 1999 1 (TE) 1. Pedestrian and bicycle facilities Elizabethton Carter $144,000 $0 $36,000 $180,000
Pikeville Transportation Improvements Project includes installation of sidewalks along Cleveland Ave. Tennessee 2000 1 (TE) 1. Pedestrian and bicycle facilities Pikeville Bledsoe $87,660 $0 $21,915 $109,575
Street Renovation Restoration of historic concrete on approximately 40 city blocks of concrete streets, new sidewalk construction, along with repair of existing sidewalks, plant flowering trees between sidewalks and streets, and landscaping at TN/AL state line on the new Tennessee 1999 1 (TE) 1. Pedestrian and bicycle facilities South Pittsburg Marion $144,000 $0 $36,000 $180,000
Cowan Community Walkway Project - Phase II Construction and reconstruction of 6,940 linear feet of sidewalks and drainage improvements throughout Cowan Tennessee 2008 1 (TE) 1. Pedestrian and bicycle facilities Cowan Franklin $172,400 $0 $43,100 $215,500
Dyer County Courthouse Square Improvements Construction and reconstruction of sidewalks, curbs and gutters inside the perimeter of the Courthouse Square. Project also includes pedestrian amenities, drainage improvements, crosswalks, ADA ramps, landscaping, and pedestrian lighting. Tennessee 2008 1 (TE) 1. Pedestrian and bicycle facilities Dyersburg Dyer $722,918 $0 $180,729 $903,647
Huntingdon Streetscape Program Streetscape improvements along the Town Square area. Project will remove and replace current hazardous sidewalks. Project will also include lighting, aesthetic and drainage improvements. Tennessee 2002 1 (TE) 1. Pedestrian and bicycle facilities Huntingdon Carroll $720,000 $0 $180,000 $900,000
Preservation and Interpretation of the Battle of Shiloh Acquisition of historic battlefield properties at Shiloh and Fallen Timbers Tennessee 2008 3 (TE) 3. Acquisition of scenic or historic easements and sites Shiloh Hardin $1,000,000 $0 $250,000 $1,250,000
Preservation of the Ft. Donelson Battlefield Acquisition of additional portions of the Ft. Donelson Battlefield Tennessee 2008 3 (TE) 3. Acquisition of scenic or historic easements and sites Dover Stewart $1,000,000 $0 $250,000 $1,250,000
Cumberland Trail Viewshed Acquisition This project proposes the acquisitions of viewsheds within the eleven county corridor of the Cumberland Trail. Tennessee 2002 3 (TE) 3. Acquisition of scenic or historic easements and sites Statewide Statewide $3,500,000 $0 $875,000 $4,375,000
Parker's Crossroads National Battlefield Project - Phase II Acquisition of 52 acres between I-40 and Wildersville Road. Project also includes the construction of a 4,500 l.f. off-road trail and interpretive signs. Tennessee 2006 3 (TE) 3. Acquisition of scenic or historic easements and sites Parker's Crossroads Henderson $841,407 $0 $210,352 $1,051,759
Carter Cotton Gin Battlefield Acquisition Acquisition of the Carter Cotton Gin Battlefield site. Tennessee 2011 3 (TE) 3. Acquisition of scenic or historic easements and sites Franklin Williamson $960,000 $0 $240,000 $1,200,000
Town of Linden Welcome Center Welcome Center construction on Hwy 412 across from Linden City Hall. Tennessee 2005 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Linden Perry $96,624 $0 $24,156 $120,780
Tennessee Trails and Byways Installation of wayfinding signs along TN trails and Byways Tennessee 2010 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Statewide Statewide $200,000 $0 $50,000 $250,000
Welcome Center and Interpretive Displays for Johnsonville State Historic Park Construction of a 5,000 s.f. Welcome Center adjacent to the Johnsonville State Historic Park. Project includes landscaping and displays. Tennessee 2006 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers New Johnsonville Humphreys $1,456,250 $1,456,250 $0 $1,456,250
Roane County Visitor Center and Transportation Museum - Phase II Continued restoration of Roane Co Courthouse for use as a visitors ctr on the first floor and a transportation museum on the 2nd floor. Project includes upgrading the 2nd floor courtroom for use as a transportation museum, renovation of existing office s Tennessee 2004 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Kingston Roane $280,640 $0 $70,160 $350,800
Visitor Center Visitor Center improvements to include ADA accessibility, pedestrian lighting, parking facilities, pedestrian amenities, and landscaping. Tennessee 2009 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Munford Tipton $426,731 $0 $106,682 $533,413
McKenzie (Welcome Center) Two-part project. Part 1 - construct 14,500 sf of new ADA sidewalk along College Drive from Baker Road to Cedar Street and 1,500 sf of replacement to existing sidewalks in the downtown area to complete a link between the college and historic facilities Tennessee 2001 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers McKenzie Carroll $119,120 $0 $29,780 $148,900
TN Overhill Heritage Corridor/Driving Tour 3 Cty. Driving Tour* Tennessee 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Athens McMinn $18,500 $0 $4,625 $23,125
Visitors Center at the Gray Fossil Sit Construction of a 50,000 sf visitors center adjacent to SR 75 in Washington County to include exhibits, educational activities and a working paleontological excavation associated with a major paleontological site discovered during the reconstruction of SR Tennessee 2003 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Gray Washington $8,000,000 $0 $2,000,000 $10,000,000
Parker's Crossroads Visitor Center Renovation of a 3,271 square foot log cabin for a Visitor Center located on Hwy 22 at Exit 108 off I-40. Tennessee 2007 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Parker's Crossroads Henderson $302,699 $0 $75,674 $378,373
Smith County Welcome Center The project consists of the construction of a facility to be utilized as the Carthage, Smith County Welcome Center and will be located on the north side of the Veterans Memorial Bridge just off the Carthage by-pass on Upper Ferry Road. Tennessee 2000 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Carthage Smith $294,750 $0 $32,750 $327,500
Oldham Theater Welcome Center Convert lobby area of theater to a Welcome Center, construct part of a 2.5 mile sidewalk which will connect Liberty Square Streetscape to the Calfkiller Riverwalk, construct a parking lot and provide regional and local signs to direct motorists to the ce Tennessee 2001 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Sparta White $399,000 $0 $99,750 $498,750
Historic Rugby Welcome Center Construction of a welcome center facility, 1560 sf, along SR-52 which will be located directly adjacent to the existing Schoolhouse exhibit bldg. Tennessee 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Rugby Morgan $175,000 $0 $43,750 $218,750
Battle of Nashville Monument Parking Area Project consists of the construction of parking facilities for the public to view the Battle of Nashville Monument. It would be located at the southwest quadrant of Granny White Pike and Battlefield Drive. Tennessee 2000 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Nashville Davidson $40,842 $0 $10,210 $51,052
Passport to TN History, companion (Brochure) Preparation of Brochure Tennessee 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Statewide Statewide $24,800 $0 $6,200 $31,000
The Hermitage - Replant the Past Project-Phase 1 and Phase 2 Phase 1:Landscaping of US 70 (SR-24) and Rachel Lane to an area 50ft wide producing a sound barrier to the historic site. Phase 2: Landscaping of historic US Hwy 70 right-of-way. Tennessee 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Nashville Davidson $490,000 $0 $122,500 $612,500
Virtual Mapping/Kiosk Project for Scott County O & W Welcome Center Digitized mapping/brochure system of the Big South Fork National River and Recreation Area and the surrounding transportation system via computer based web design software and kiosks. Project includes work stations, plasma screens, projectors, server, ari Tennessee 2006 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Huntsville Scott $250,000 $0 $62,500 $312,500
Big South Fork Outdoor Recreation Visitor Center Construction of a 4000 sf visitor center located at the intersection of I-40 and US-127 North at exit #317 (the Crossville/Jamestown exit.) Project includes landscaping, paving, road upgrade, fixtures and displays Tennessee 2004 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Crossville Cumberland $596,000 $0 $149,000 $745,000
Ft. Defiance Interpretive Center Project consists of upgrading the park's interpretation with a Visitor Center, wayside signs and overlook. Tennessee 2006 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Clarksville Montgomery $1,299,560 $0 $324,890 $1,624,450
Visitor Center Construction of a visitor center in downtown Baxter. Tennessee 2009 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Baxter Putnam $356,917 $0 $89,229 $446,146
Scott County O & W Welcome Center Project provides for the construction of a Welcome Center and an Oneida and Western Railroad Display Museum in Scott County to be located at the junction of U.S. 63 and U.S. Highway 27. Project will also include parking facilities, landscaping and sidewalk Tennessee 2001 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Huntsville Scott $260,906 $0 $28,990 $289,896
Cannon County Cultural Tourism Complex Construction of a Welcome center, 10,910 sf, that will be an addition to the existing Arts Center. The Arts Center is located on Highway 70S west of Highway 145. Tennessee 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Woodbury Cannon $199,547 $0 $49,887 $249,434
Cumberland Valley Civil War Heritage Driving Trail Project This project will create a Civil War Heritage Trail in six counties: Macon, Robertson, Smith, Sumner, Trousdale and Wilson. Project includes directional and interpretive signage, trail brochure and archeological research. Tennessee 2005 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Gallatin Sumner $123,360 $0 $30,840 $154,200
Stewart County Visitor Center Construction of a 15,000 s.f. visitor center located on US Highway 79 Tennessee 2006 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Dover Stewart $1,045,000 $1,045,000 $0 $1,045,000
Tiptonville Visitor Center and Pedestrian Trail Renovation of an existing bldg at the intersection of 2 scenic highways (Hwy 21 and 78) for the use as a Visitor Ctr and construction of a trail from the visitors center through town, along the Mississippi River Levee to the new Mississippi River Park. P Tennessee 2004 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Tiptonville Lake $438,958 $0 $109,740 $548,698
Obion County Courthouse Beautification - Phases I and II Construction of 579 linear feet of sidewalk around the Courthouse. Project also includes landscaping, a retaining wall, sprinkler system and pedestrian amenities. Tennessee 2010 5 (TE) 5. Landscaping and scenic beautification Union City Obion $137,609 $0 $34,402 $172,011
Landscpg, I-40, AK St. Line to Exit #1 Landscaping, I-40 @Arkansas State Line to Exit 1 Tennessee 1994 5 (TE) 5. Landscaping and scenic beautification Memphis Shelby $33,300 $0 $8,325 $41,625
Landscpg, I-65, AL St. Line to SR-273 Landscpg, I-65, AL St. Line to SR-273 Tennessee 1994 5 (TE) 5. Landscaping and scenic beautification Elkton Giles $180,000 $0 $45,000 $225,000
Wharf Street Greenway Lighting Project Installation of decorative pedestrian lights along the greenway connecting the downtown area to the riverfront. Tennessee 2008 5 (TE) 5. Landscaping and scenic beautification Lenoir City Loudon $44,822 $0 $11,205 $56,027
Landscpg, I-155, MO St. Line to SR-181 Landscpg, I-155, MO St. Line to SR-181 Tennessee 1995 5 (TE) 5. Landscaping and scenic beautification Finley Dyer $7,646 $0 $1,912 $9,558
Revitalization of Decaturville Streetscape project to provide concrete improvement to the crosswalks along Main Street at Pleasant Street and White Oak; decorative lighting along Main Street and Pleasant Street; and installation of handicap railing along sidewalks on Pleasant Street. Tennessee 2001 5 (TE) 5. Landscaping and scenic beautification Decaturville Decatur $75,567 $0 $18,892 $94,459
Town Square Beautification Project - Phase III Construction of 825 linear feet of sidewalks along Main Street and the Town Square. Project also includes pedestrian lighting, ADA upgrades, drainage improvements and landscaping. Tennessee 2011 5 (TE) 5. Landscaping and scenic beautification Erin Houston $418,200 $0 $104,550 $522,750
Claiborne County Welcome Signs Erect Welcome Signs at four locations: Hwy 63 at Campbell/Claiborne County Line, Hwy 25E at Tennessee/Kentucky State Line, Hwy 25E at Grainger/Claiborne County Line and Hwy 33 at Union/Claiborne County Line. Tennessee 2007 5 (TE) 5. Landscaping and scenic beautification Tazewell Claiborne $41,624 $0 $10,406 $52,030
Landscpg, I-155, MO St. Line to SR-181 Landscaping, I-155, MISSOURI STATE LINE TO SR-182 Tennessee 1994 5 (TE) 5. Landscaping and scenic beautification Lenox Dyer $35,730 $0 $8,933 $44,663
Sweetwater Highway Beautification Installation of welcome signs with landscaping. Project includes 2 large welcome signs, 3 smaller welcome signs, and landscaping. Tennessee 2002 5 (TE) 5. Landscaping and scenic beautification Sweetwater Monroe $10,000 $0 $2,500 $12,500
Macon County Welcome Center Construction of a 4,000 s.f. Welcome Center in Lafayette. Tennessee 2006 5 (TE) 5. Landscaping and scenic beautification LaFayette Macon $250,000 $0 $62,500 $312,500
The Pride of Sharon The proposed project is a vacant lot 498 X 80 feet belonging to the Town of Sharon located on SR-45. The purpose is to landscape with trees, shrubs and flowers and the construction of two picnic pavilions, the addition of ornamental yard lights, a grave Tennessee 1997 5 (TE) 5. Landscaping and scenic beautification Sharon Weakley $10,000 $0 $2,500 $12,500
Landscaping, I-75, S. of St. Line Landscpg, I-75, S. of St. Line-St. Line Tennessee 1994 5 (TE) 5. Landscaping and scenic beautification Williamsburg Campbell $52,093 $0 $13,023 $65,116
Landscaping for Pedestrian Walkway Along SR-12 Landscpg, SR-12, Tiny Town Rd-KY St. Line Tennessee 1993 5 (TE) 5. Landscaping and scenic beautification Clarksville Montgomery $208,000 $0 $52,000 $260,000
Landscpg, I-24, SR-156 to GA St. Line Landscpg, I-24, SR-156 to GA St. Line Tennessee 1995 5 (TE) 5. Landscaping and scenic beautification Jasper Marion $51,684 $0 $12,921 $64,605
Landscpg, I-55, MClemore Ave to AK St. Line Landscpg, I-55, MClemore Ave to AR St. Line Tennessee 1994 5 (TE) 5. Landscaping and scenic beautification Memphis Shelby $36,019 $0 $9,004 $45,023
Plough Boulevard Landscape, Phase I Phase 1 is Landscaping 90 acres from the Memphis International Airport Entrance to Brooks Road and the purchase and erection of two gateway signs. The landscaping will focus on the south section of the Boulevard. Tennessee 1997 5 (TE) 5. Landscaping and scenic beautification Memphis Shelby $250,000 $0 $62,500 $312,500
US Highway 411 @ CBD Landscaping An $8,000.00 grant to provide landscaping for the reconstructed US-411 through Vonore s business district Tennessee 1996 5 (TE) 5. Landscaping and scenic beautification Vonore Monroe $8,000 $0 $2,000 $10,000
Landscpg, I-40, Foothills Pkwy-NC St. Line Landscpg, I-40, Foothills Pkwy-NC St. Line Tennessee 1994 5 (TE) 5. Landscaping and scenic beautification Del Rio Cocke $45,193 $0 $11,298 $56,491
Landscpg, I-24, KY St. Line to SR-13 Landscpg, I-24, KY St. Line to SR-13 Tennessee 1994 5 (TE) 5. Landscaping and scenic beautification Clarksville Montgomery $114,876 $0 $28,719 $143,595
Pedestrian Lighting Enhancement Project Installation of 500 pedestrian lights along 25,000 linear feet of sidewalks. Tennessee 2009 5 (TE) 5. Landscaping and scenic beautification Huntingdon Carroll $588,336 $0 $147,084 $735,420
City of Trenton Transportation Corridor Enhancements Project consists of landscaping and maintenance of islands, improvement of Historic District Signs, and beautification of entry corridors along scenic highway 45, Hwy. 104, Hwy. 77 and Hwy. 54. Tennessee 2000 5 (TE) 5. Landscaping and scenic beautification Trenton Gibson $42,500 $0 $10,625 $53,125
Landscpg, I-24, SR-156 to GA St. Line Landscpg, I-24, SR-156 to GA St. Line Tennessee 1994 5 (TE) 5. Landscaping and scenic beautification Jasper Marion $47,790 $0 $11,948 $59,738
Rippavilla Restoration, Phase 3 Complete the restoration of Rippavilla Tennessee 1997 6 (TE) 6. Historic preservation Sprng Hill Maury $95,000 $0 $23,750 $118,750
Uffington House @ Historic Rugby Acq. An $80,000.00 grant to aid in the creation of the historic Uffington House museum in the historic district of Rugby Tennessee 1996 6 (TE) 6. Historic preservation Rugby Morgan $80,000 $0 $20,000 $100,000
Hartsville/Trousdale County Courthouse Rehabilitation Construction of 900 linear feet of sidewalks along River, Foxall, Court and Main Streets. Project also includes ADA accessibility, crosswalks, landscaping and pedestrian amenities. Tennessee 2007 6 (TE) 6. Historic preservation Hartsville Trousdale $543,022 $543,022 $0 $543,022
Rehabilitation of the Historic Nance House Not on national register. Rehabilitation of the Nance House. They will retain the circa 1900 frame addition and other turn-of-the-century details while removing the post-WWII additions which do not contribute to the architectural significance of the h Tennessee 1998 6 (TE) 6. Historic preservation Rutledge Grainger $131,000 $0 $32,750 $163,750
Spring City Railroad Depot The renovation of the Spring City Depot Tennessee 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Spring City Rhea $60,000 $0 $15,000 $75,000
Cowan RR Depot Park Imprvmnts* Grant to aid in the improvement and expansion of the Cowan Railroad Park Tennessee 1996 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Cowan Franklin $13,200 $0 $3,300 $16,500
Loudon County Train Depot The building is eligible for inclusion on the NRHP. It will serve as a trailhead for individuals who tour the historic district. The existing parking facilities are designated for upgrading under the proposed project. RECOMMEND NOT PAYING FOR PARKING, Tennessee 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Lenoir City Loudon $150,000 $0 $37,500 $187,500
Collinwood Railroad Station Renovation Project Renovation and preservation of the Collinwood Railroad Station, to establish a permanent branch of the Wayne County Public Library, and to set up a museum depicting the history of Collinwood. Tennessee 1999 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Collinwood Wayne $75,200 $0 $18,800 $94,000
Morgan Sq. Hist. RR Dist. Rehab, Ph. I Restoration of Historic Buildings Tennessee 1994 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Greeneville Greene $1,500,000 $0 $375,000 $1,875,000
Elizabethton Covered Bridge Project Repair/restore/preserve Elizabethton's 118 year old Covered Bridge (oldest bridge in state still used daily by vehicular traffic). Scope will also include lighting and installation of a pigeon anti-roosting net. Tennessee 2001 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Elizabethton Carter $98,000 $0 $24,500 $122,500
L&N Depot Sprinkler System Grant to provide a fire-protecting sprinkler system for the historic L and N depot Tennessee 1996 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Etowah McMinn $20,000 $0 $5,000 $25,000
Blythe Ferry/Cherokee Memorial Development Project proposes to develop an overlook at old Blythe Ferry which will also serve as a memorial to the Cherokee Indians (future site of Cherokee Indian monument & genealogical library). This will consist of grading and paving current dirt lot, building a Tennessee 2001 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Decatur Meigs $156,510 $0 $39,128 $195,638
RR Depot/Baggage Bldg. Restn. A $225,000.00 grant for the restoration of the railroad depot, baggage building and loading pavilion in Cumberland Gap Tennessee 1996 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Cumberland Gap Claiborne $225,000 $0 $56,250 $281,250
Morgan Sq. Hist. RR Dist. Rehab, Ph. II Grant for the rejuvenation of four interconnected former railroad hotels Tennessee 1995 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Greeneville Greene $1,500,000 $0 $375,000 $1,875,000
Pave Existing Walkway (Rail-Trail) Bicycle - Pedestrian Trail Tennessee 1994 8 (TE) 8. Conversion of abandoned railway corridors to trails Erin Houston $52,000 $0 $13,000 $65,000
Town of Jasper Multi-purpose Trail Phase II is the construction of a multi-purpose trail beginning on the abandoned railroad corridor(at the end of phase I) behind the Senior Apt complex on the edge of the park. The trail will extend to the edge of the new elementary school. Also construct Tennessee 2001 8 (TE) 8. Conversion of abandoned railway corridors to trails Jasper Marion $120,252 $0 $30,063 $150,315
Walking Trail Tellico Plains Rail-Trail @ Rec. Fac., Banks St. Tennessee 1995 8 (TE) 8. Conversion of abandoned railway corridors to trails Tellico Plains Monroe $18,720 $0 $4,680 $23,400
Archaeo., SR-48, Bridge @ Piney Rvr Archaeo., SR-48, Bridge @ Piney Rvr Tennessee 1992 10 (TE) 10. Archaeological planning & research Pinewood Dickson $5,365 $0 $1,341 $6,706
Archaeo., Jeff. St., Bridge @ Cumberland R. Archaeo., Jeff. St., Bridge @ Cumberland R. Tennessee 1992 10 (TE) 10. Archaeological planning & research Nashville Davidson $32,556 $0 $8,139 $40,695
Battle of Johnsonville research Project provides funds to continue the remote sensing surveys and diving investigations the Historical Commission has been conducting for the past few years to locate the vessels lost during the 1864 conflagration. Project also includes publication of a Tennessee 2001 10 (TE) 10. Archaeological planning & research New Johnsonville Humphreys $65,460 $0 $16,365 $81,825
Cove Lake Highway Mitigation Project Cove Lake is the water storage facility for Caryville. The lake must be dredged to improve its capacity, due to the construction of I-75 and the widening of 25W. Tennessee 1999 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Caryville Campbell $500,000 $0 $125,000 $625,000
Walkway Lighting and Spring Grotto Project The construction of a 10,000 gallon concrete stormwater retention basin to provide mitigation of water runoff from highways and paths. The water will be filtered and used as a primary water source for the Spring (Grotto) and the fountain in the Courtyard Tennessee 1999 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Jonesborough Washington $121,471 $0 $1,029 $122,500
Depot museum 509 Plaza Historical Railroad Exhibit Installation and refurbishment of 1913 Baldwin 4-6-0 steam locomotive and tender. Project includes construction of Exhibit Plaza to include exhibit lighting, spectator and visitor amenities, landscaping and historical railroad interpretive materials and Tennessee 2004 12 (TE) 12. Establishment of transportation museums Cookeville Putnam $7,101 $0 $1,775 $8,876
Tennessee Valley Railroad Museum Finish rehabilitation of and facility for locomotive driving wheel lathe, horizontal milling machine and vertical turret lathe; rehabilitation/restoration of steam locomotives 630, and 349, a Pullman 'Maitland', a Railway Post Office Car 40; a Chickamauga Tennessee 1999 12 (TE) 12. Establishment of transportation museums Chattanooga Hamilton $73,600 $0 $18,400 $92,000
Little River R/R and Lumber Co. Museum Project provides for the construction of an outdoor oriented museum, a parking area, reproduction of three original platforms to complement and expand upon the existing indoor museum housed in the Old Walland Depot. Project will include approx. 500 l.f. o Tennessee 2001 12 (TE) 12. Establishment of transportation museums Townsend Blount $85,118 $0 $21,280 $106,398
Tennessee Valley Railroad Museum, Inc., Phase 4 Rehabilitation/restoration of steam locomotive 4501 Tennessee 2000 12 (TE) 12. Establishment of transportation museums Chattanooga Hamilton $81,600 $0 $20,400 $102,000
Historic Casey Jones Home and Railroad Museum Construction of a 7,000 sf transportation museum to be built adjacent to the historic Casey Jones Home. Tennessee 2005 12 (TE) 12. Establishment of transportation museums Jackson Madison $648,816 $0 $162,204 $811,020