The Big Sioux trail loop was developed several decades ago to control flooding, but Sioux Falls continues to invest in the trail to connect inter-urban areas. This study includes planning and design processes, appropriate infrastructure, costs, timing, potential obstacles, design standards, implementation policies and funding. It is an aesthetically pleasing plan that presents several options for the trail with maps and graphics to complement it.