Project Search Results
Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
Bowes Rd at Sabino HS - HAWK | Design of HAWK on Bowes Rd for Sabino HS | Arizona | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Tucson | Pima | $26,404 | $0 | $1,596 | $28,000 |
Mary Ann Cleveland Way at Kush Ln - HAWK | Design of HAWK on Mary Ann Cleveland Way at Kush Ln | Arizona | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Tucson | Pima | $25,461 | $0 | $1,539 | $27,000 |
HAWK Signals on SR86 in Sells | Additional funding to multi-funding HAWK project | Arizona | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Tucson | Pima | $56,580 | $0 | $3,420 | $60,000 |
Wickenburg Pedestrian Bridge | Add additional funding to AZ-473 | Arizona | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Wickenburg | Maricopa | $99,421 | $0 | $6,010 | $105,431 |
2nd St at Olive Rd and Highland Ave | Bike/Ped Crossings over Modern Streetcar facility | Arizona | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Tucson | Pima | $99,958 | $0 | $6,042 | $106,000 |
City of Tucson SRTS Program | City of Tucson SRTS Program | Arizona | 2013 | 301 | (TAP) 301. Safe routes to school infrastructure | Tucson | Pima | $257,439 | $0 | $15,561 | $273,000 |
Garden Lakes Elementary, Estrella Vista STEM Academy, Michael Anderson Elementary, Littleton Elementary, Canyon Breeze Elementary Safe Routes to School Studies | Safe Routes to School Studies | Arizona | 2018 | 302 | (TAP) 302. Safe routes to school programs | Avondale | Maricopa | $96,186 | $0 | $5,814 | $102,000 |
ACA, Imagine Prep, and Imagine Rosefield Schools SRTS Support Activity Project | SRTS Support Activity Project | Arizona | 2018 | 302 | (TAP) 302. Safe routes to school programs | Surprise | Maricopa | $15,667 | $0 | $947 | $16,614 |
Kingswood, West Point, and Sonoran Heights Elementary Safe Routes to School Studies | Safe Routes to School Studies | Arizona | 2018 | 302 | (TAP) 302. Safe routes to school programs | Surprise | Maricopa | $73,000 | $0 | $4,413 | $77,413 |
Tumbleweed Elementary, Maryland Elementary, Lowell School, Moon Mountain Elementary SRTS Support Activity Project | SRTS Support Activity Project | Arizona | 2018 | 302 | (TAP) 302. Safe routes to school programs | 0 | Maricopa | $47,150 | $0 | $2,850 | $50,000 |
Anthem and Florence K-8 Safe Routes to School Studies | Safe Routes to School Studies | Arizona | 2018 | 302 | (TAP) 302. Safe routes to school programs | Florence | 0 | $39,606 | $0 | $2,394 | $42,000 |
Frank Elementary School Safe Routes to School Study | Safe Routes to School Study | Arizona | 2018 | 302 | (TAP) 302. Safe routes to school programs | Guadalupe | Maricopa | $22,231 | $0 | $1,344 | $23,575 |
Ashton Ranch, Countryside, Parkview Elementary SRTS Support Activity Project | SRTS Support Activity Project | Arizona | 2018 | 302 | (TAP) 302. Safe routes to school programs | Surprise | Maricopa | $15,677 | $0 | $948 | $16,625 |
SR347 & SR238 Maricopa Sidewalk Improvements Phase I | Project to design and construct 2 contiguous sections of 6-foot concrete sidewalks and curb and gutter where needed, running parallel to SR 347 and SR 238. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Maricopa | Pinal | $479,834 | $0 | $0 | $479,834 |
South Rim Greenway Trail Phase I | Construct a 2.5 mile trail (multi-use) from canyon view Information Plaza to Grand Canyon Village. Will be part of the 32 mile South Rim Greenway. | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Canyon National Park | Coconino | $479,600 | $0 | $95,920 | $575,520 |
Laguna Elementary School Pedestrian Enhancement Project | Design and build 1.2 miles of new sidewalks, vertical curbs & curb extensions, enhanced crosswalks, shade landscaping and pedestrian amenities on both sides of Shannon Road in northwest Tucson. Enhancements will be constructed from two blocks south of La | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $473,916 | $0 | $93,315 | $567,231 |
20th Avenue Multi-Use Path & Street Lighting | Construct approximately 4400 lineal feet of sidewalk, pathway and lighting along 20th Ave. between US 70 and Relation St. in the City of Safford and the Town of Thatcher. A five foot wide sidewalk for the West side of 20th Ave.; a 10 foot wide multi-use p | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Safford | Graham | $486,712 | $0 | $34,427 | $521,139 |
Guadalupe Road - I-10 Right of Way (West) to Tempe City Limits (East) | Construction of concrete curb and gutter with bike lanes on each side and sidewalk on the north side of the street; a multi-use trail on the south side that completes the ?¢‚Ä¢¬•Sun Circle Hiking and Riding Trail?¢‚Ä¢‚Ñ¢ through the town of Guadalupe. | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Guadalupe | Maricopa | $471,500 | $0 | $410,300 | $881,800 |
Mohave Wash Pathway (City) | Construct multi-use path along Mohave Wash between King Ave. & Gordon Drive. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $471,500 | $0 | $28,500 | $500,000 |
SR 77 Navajo Blvd Streetscape | Design and build a continuation of a Round 10 TE project involving streetscape enhancements along Navajo Blvd. (a.k.a. B-40 and historic Route 66) between the Holbrook Midtown TI and the Holbrook East TI (MP 287.7 to 289.8). Project components include pe | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Holbrook | Navajo | $649,252 | $0 | $39,244 | $688,496 |
SR 260 Bypass Sidewalks & Landscaping Camp Verde | Construct six (6) foot wide sidewalk on North and South side of AZ 260 Bypass | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Camp Verde | Yavapai | $321,251 | $0 | $59,021 | $380,272 |
PHX 2nd Ave - Fillmore-Roosevelt Ped Imrop | Improves approximately 1,420 lineal feet of the streetscape along 2nd Avenue between Fillmore and Roosevelt Streets by upgrading pedestrian amenities and landscaping. It will connect to and complete the Round IX enhancement project between Adams and Fillm | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $500,000 | $0 | $537,415 | $1,037,415 |
Cambio Grande | Revitalize the .5-mile of Grande Ave. from St. Mary?¢‚Ä¢‚Äôs Road to the south and Speedway Blvd. to the north. Includes design and Construction of ADA-accessible curb cuts, widened and improved sidewalks, landscaping, historic mural panels and pedestrian ameni | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $466,785 | $0 | $43,715 | $510,500 |
South 10th Ave. Multi-use Path (Phase II) | Project improvements are for a 1.5 mile strech of roadway that connects residents in the area to Tucson City Center. Improvemnets include bike lanes, sidewalks, roadway improvements and street lighting. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $466,710 | $0 | $29,790 | $496,500 |
Rte 66 E Flagstaff Urban Trails Sys: Country Club Dr.-Mall Dr. | Construction of a 2400 foot concrete Flagstaff Urban Trail System (FUTS) trail along the north side of Route 66 from Country Club Drive to Mall Drive. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $466,569 | $0 | $41,297 | $507,866 |
SR 90 Multi Use Path | Construct a 8,000 linear foot (approx. 1.5 miles) multi-use path-way from the East Gate entrance of Fort Huachuca to the intersection of 7th Street to Colorado Dr., and from Colorado Dr. to a connecting point with an existing pathway near intersection of | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $700,289 | $0 | $42,329 | $742,618 |
South Rim Greenway Trail- Grand Canyon NP Phase II | Construct a 2.5 mile trail (multi-use) from canyon view Information Plaza to Grand Canyon Village. Will be part of the 32 mile South Rim Greenway. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Grand Canyon National Park | Coconino | $499,900 | $0 | $275,700 | $775,600 |
I-10 Tucson Valencia Bicycle Lane | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $122,938 | $0 | $7,007 | $129,945 | |
Ash Fork Multi-Use Pathway and Landscaping | Project will construct a meandering 10 foot wide multi-use path with landscaping to beautify the Historical Maintenance Building. The path will be approximately 500 feet long with decorative plaques guiding visitors through a history of the building and | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ash Fork | Yavapai | $122,018 | $0 | $7,375 | $129,393 |
Gila County Sidewalks for Pedestrians | Construct sidewalks, curbs, water turn outs, driveway entrances, hand rails, etc. starting at the Ice House Canyon Bridge and run south until Remington Street and encourage development of a pedestrian system | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Globe | Gila | $499,484 | $0 | $30,192 | $529,676 |
Santa Cruz River Shared Use Path, Phase II | Project proposes Construction of 1.75 miles of a twelve foot wide, meandering, colored asphalt concrete, shared use path within the over bank area of the Santa Cruz River. Proposes pull out /rest areas within the existing natural vegetation together with | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $499,300 | $0 | $400,550 | $899,850 |
West California Avenue Traffic Enhancements | The project consists of the installation of 892 LF of roadway improvements including 5?¢‚Ä¢‚Äô wide sidewalks and will include landscaping and park benches at a pedestrian rest stop. | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Parker | La Paz | $265,505 | $0 | $16,049 | $281,554 |
Somerton Canal Multi-Use Pathway | Construction of a 10' wide path along the western bank of Somerton Canal , including lighting, landscape and benches | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Somerton | Yuma | $484,041 | $0 | $29,258 | $513,299 |
Buffalo Soldier Trail Multi-Use Pathway - Cherokee Ave. to SR 92 | Design and Construction of a multi-use pathway along the north side of Buffalo Soldier Trail between Cherokee Avenue and State Route 92. The path will be 10-feet wide, 5,300 feet long, and constructed of asphalt. Landscaping enhancements will also be incl | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $498,385 | $0 | $30,125 | $528,510 |
Dodge Blvd. Sidewalk, Landscaping & Bike Lane | Construction of five-foot wide bike lanes on both sides of Dodge Blvd. from Ft. Lowell Rd. to River Rd. in Tucson, approximately 3.5 mile. Includes sidewalks with ADA accessible ramps and pedestrian safety rail on both sides of the Rillito River bridge, a | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $497,700 | $0 | $30,950 | $528,650 |
Ehrenberg I-10 Overpass Area Multi-Use Path Enhancement | Phase II is a phased addition to the previously approved ?¢‚Ä¢¬•Riverside Drive Multi-Use Trail.?¢‚Ä¢‚Ñ¢ T This project will serve to construct 1.9 miles of 8 ft. wide asphaltic concrete multi-use path. | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | La Paz | $264,771 | $0 | $16,004 | $280,775 |
Kings Ranch Rd. Multi-Use Path Gold Canyon | Design and Construction of a 10-foot wide, 4-inch thick concrete pathway running parallel to the west of Kings Ranch Road. The 1.76-mile pathway runs from US 60 to Desert Dawn Drive in Gold Canyon. It includes curbs and gutters, relocation of one retai | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Florence | Pinal | $489,314 | $0 | $46,750 | $536,064 |
Shared-use Pathway, The Path to Higher Education | The shared-use pathway will be 10 feet wide, 3700 feet long, and constructed of asphalt with landscape enhancements. Construction of the pathway will provide a safe, grade separated, all-weather corridor for pedestrians, cyclists, and the disabled traveli | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $500,000 | $0 | $62,983 | $562,983 |
Yuma East Wetlands / Shared-Use Pathway | Construct a 1 1/2 mi pathway to complete Yuma's SUP/Lnear Park | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $496,664 | $0 | $30,021 | $526,685 |
Maryland Ave. Bike Route Spot Improvements - Glendale | Construct 10 feet wide multi-use path at east and west ends of Discovery Park. Stripe bike lanes on Maryland Ave. Add additional width for bike lanes - 69th Ave. to 67th Ave. | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glendale | Maricopa | $166,039 | $0 | $10,036 | $176,076 |
Woodlands Village Boulevard Streetscape Improvement Project | The project is for landscaping existing medians, construction of one enhanced pedestrian and bicycle crossing, delineating two additional crossings, and connecting two sidewalk ending points. | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $500,000 | $0 | $233,928 | $733,928 |
Royal Palm Bicycle & Pedestrian Bridge | Design and construct a 10 foot wide ADA accessible bicycle and pedestrian bridge across the Arizona Canal north of Dunlap Avenue between 15th avenue and 19th Avenue. | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $500,000 | $0 | $321,405 | $821,405 |
Los Angeles (Old SR 80) Landscaping/Path | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wellton | Yuma | $492,227 | $0 | $28,057 | $520,284 | |
So. Mtn. Community College Pedestrian Crossing | Construction of a 40-foot long, 10-foot wide pedestrian bridge over the Western Canal linking 3 destinations. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $491,151 | $0 | $120,940 | $612,091 |
SR 85 Ajo Sidewalks & L/S MP 40.6-41.7 | Provides 5 foot sidewalks, native shade trees and landscaping, and three shelters with shaded seating for pedestrians on the west side of Highway 85, from milepost 40.6 to 41.7 located in the unincorporated town of Ajo. Will facilitate pedestrian travel a | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $491,000 | $0 | $29,000 | $520,000 |
Pima CO Sunset Villa Enhancement | Provides 5 foot sidewalks, shade trees, ADA curb ramps, and beautification. Total sidewalk length is 13,600 linear feet. Sidewalks will be provided along bordering major streets as well as on important connector streets through the neighborhood. Sidewalks | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $497,000 | $0 | $88,000 | $585,000 |
Five Points Historic Gateway Pedestrian Safety Enhancement Project | This project will fill gaps in the pedestrian system, including Construction of four foot wide sidewalks, ADA complaint ramps, and pedestrian lighting around the "Five Points" intersection | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $494,398 | $0 | $29,884 | $524,283 |
SR 85 Ajo Sidewalks | Construct 1mi. of sidewalks along the East and West sides of SR85 in Ajo from milepost 41.15 at 4th St. to milepost 42.0 at Malacate St. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ajo | Pima | $294,322 | $0 | $17,790 | $312,112 |
South San Francisco and Beaver Streetscape Pedestrain and Bicycle Improvements Project, from Route 66 to Butler Avenue | The project will provide traffic calming measures and pedestrian, bicycle and transit enhancements including sidewalk bump-outs, pedestrian lighting, etc. from Route 66 to Butler Ave. | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $500,000 | $0 | $664,489 | $1,164,489 |
Main Street Pedestrian Improvements | Repair sidewalks along the historic commercial section of old bisbee. Repair 5 stairwells within the national historic district. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bisbee | Cochise | $188,600 | $0 | $11,400 | $200,000 |
Pinewood Boulevard Pedestrian Bridge | To provide safe and effective connectivity of sidewalks that are currently being constructed on both sides of Munds Wash, a separate prefabricated free-standing pedestrian bridge will be installed. | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $265,846 | $0 | $16,069 | $281,915 |
Old Ft Lowell Neighborhood Path & Landscaping | Construct Sidewalks and install landscaping. | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $189,467 | $0 | $73,122 | $262,589 |
Rio Salado Underpass at ADOT 101 & 202 - Tempe | Construct 1200 ft SUP underneath Loop 202 at the 202/101 Interchange connecting Tempe and Mesa | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tempe | Maricopa | $943,000 | $0 | $399,494 | $1,342,494 |
Central Core Multi-use Path | This project will construct a multi-use path through the central core of town linking the Library to the Civic Center. Seating and landscaping will be provided at spaced locations. Handrails, signage and striping will be provided for safety. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott Valley | Yavapai | $500,000 | $0 | $28,500 | $528,500 |
Prescott SR 89 White Spar Road Bikeway/Walkway Phase 2 | Addition of sidewalk and bicycle lanes for approx 913 ft | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott | Yavapai | $937,983 | $0 | $61,697 | $999,680 |
US 180 Multi-Use Path (Flagstaff) Sechrist School - Freemont Dr. | This project is the first phase of a planned two stage bicycle-pedestrian path along the northeast side of US 180 from the north downtown area to the northwest corner of Flagstaff. The path will be 10' wide, with a total length of 7,500 ft. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $809,100 | $0 | $320,000 | $1,129,100 |
I-40 Multi-use Path, McDonald Ave.- Harrison St./Fairgrounds Ave.- Stockton Hill Rd. | This project will construct a multi-use bicycle and pedestrian pathway to parallel to Eastbound I-40 at approximately Milepost 51.7 to Milepost 52. The overall length of this project is one (1) mile for both section. Landscaping will be istalled withou | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $281,978 | $0 | $17,044 | $299,022 |
N. Main St. - Ocotillo to Willard Park Multi-Use (Cottonwood) | This project will continue improvements to a portion of Scenic 89A. This will include resurfacing and widening of sidewalks, curb replacements, placement of stret furniture and new streetlights (Old fashion-style) and substantial landscaping. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cottonwood | Yavapai | $500,000 | $0 | $26,771 | $526,771 |
Tempe Bike Station at Downtown Tempe Transit Center | Design and construct a Bike Station that will be an attended, indoor secure bicycle parking facility and that includes service amenities such as bicycle repair and supplies, refreshments, restrooms, showers and staff assistance. It will be an integral ele | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tempe | Maricopa | $500,000 | $0 | $158,000 | $658,000 |
East Main Canal Multi-Use Pathway 24th St to 32nd St | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $500,000 | $0 | $28,500 | $528,500 | |
SR 260, Junction of SR 277 to Overgaard | Project will construct a parallel pedestrian facility meandering near the right of way. The proposed facility is a five foot walkway, constructed of asphaltic concrete. The total walkway length is 3.6 miles. | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Overgaard | Maricopa | $283,277 | $0 | $17,123 | $300,400 |
Tucson I-10 Frontage (design) | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tuscon | Pima | $18,700 | $0 | $4,675 | $23,375 | |
US 89 Railhead Ave to Snowflake Multi-use Path | This project will provide a 10' concrete path along a portion of US 89, which will also include landscaping to the medians. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $500,000 | $0 | $28,500 | $528,500 |
Oracle Road Prince - Miracle Mile Ped Improvement | This project will provide continuous sidewalks alond the west side of Oracle Rd between Prince Rd and Miracle Mile Rd. Approximately 1 mile. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $282,000 | $0 | $17,000 | $299,000 |
Grand Ave Frontage RD US 60 Pathway | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | El Mirage | Maricopa | $268,788 | $0 | $67,197 | $335,985 | |
Route 80 - Freemont Street Restoration | This project entails the Construction of boardwalks along both sides of a three and a half block section of the city | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tombstone | Cochise | $963,466 | $0 | $58,237 | $1,021,703 |
State Route 86 Pedestrian Bridges - Town of Sells, Tohono O'odham Nation | Provide 2 pedestrian crossings on the Northside of SR 86 on the Tohono O'odham Nation | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sells | Pima | $822,776 | $0 | $54,733 | $877,509 |
Buffalo Soldier Trail Multi-use Path | The proposed project is a multi-use pathway running 8,031 linear feet (1.5 miles) in an east-west direction along Buffalo Soldier Trail in Sierra Vista | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $500,000 | $0 | $71,235 | $571,235 |
Powerline Trail Multi- Modal Path | Project includes landscaping, lighting, drinking fountains, educational kiosks and other pedestrian amenities. Provides a needed eastern link to the Southeast Regional Library and Riparian Preserve educational facility. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gilbert | Maricopa | $500,000 | $0 | $92,000 | $592,000 |
SR 77 Main Street Improvements - Taylor | Installation of 22,175 square feet of pedestrian sidewalks, 4435 linear feet of curb and gutter, 15 pedestrian lights, decorative benches and bike rack in North-South direction on west side of SR 77 in Taylor between mile markers 357.9 and 358.8. | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Taylor | Navajo | $278,212 | $0 | $16,817 | $295,029 |
Juan Bautista de Anza National Historic Trail, Canoa Rd | Surface transportation connectivity will be enhanced for pedestrians, equestrians, and bicyclists between the Green Valley and Arivaca Jct. Communities. Within the 120 acre trail corridor the project will feature a graded natural surface trail, a commemo | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $500,000 | $0 | $117,820 | $617,820 |
West Main Canal Multi-use Path | Construct a 10 ft wide pathway with pedestrian alighting and amenities along the Main Canal and West Main canal | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $749,921 | $0 | $45,329 | $795,250 |
Pedestrian Amenities on 7th Ave. | The Connections project will address the needs and desires of the traveling public, neighborhood residents, school children, merchants and shoppers by providing pedestrian/bicycle paths, a "ped" hub, shade trees and other landscaping. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $500,000 | $0 | $279,304 | $779,304 |
Central Avenue (Arizona Blvd to Main Street) Pedestrian and Streetscape Improvements | Construct sidewalks, landscaping and site furnishing through the downtown area | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Coolidge | Pinal | $750,000 | $0 | $51,081 | $801,081 |
Rillito Riverpath and Camino de la Tierra Bicycle and Pedestrian Enhancements | Install new bike lanes for 2 miles and a bike/ped bridge | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $750,000 | $0 | $543,860 | $1,293,860 |
Pedestrian-Bicycle Mid-block Crossings Project | Apply regional mid block crossings at 4 arterial roads to serve utility and canal pathways | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gilbert | Maricopa | $750,000 | $0 | $45,334 | $795,334 |
Town of Pima US 70 Pedestrian Bridge Extension | Construction of a sidewalk and pedestrian bridge extension along the south side of US 70 | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pima | Graham | $759,860 | $0 | $45,930 | $805,790 |
Old Downtown Pedestrian Enhancements | Construct 4660 linear ft of 6 ft wide pedestrian walways in downtown Show Low | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Show Low | Navajo | $700,055 | $0 | $47,315 | $747,370 |
2nd Avenue Bicycle, Pedestrian, and Landscaping Enh. | This project will enhance this neighborhood by creating a reduced width street with landscaped shaded sidewalks. It will include 18,000 sq. ft. of new sidewalk, 21,000 sq. ft. of landscaping, 0.3 miles of striped bike lanes, new street furniture and pede | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $500,000 | $0 | $531,747 | $1,031,747 |
Arcadia Portal Multi-Use Trail Enhancement Project | Design and construct a 1/4-mile, 10-wide decorative concrete pathway from 48th Street & Indian School Road to the Arizona Canal. The pathway will follow the historic Cross Cut Canal and will finish a missing link in 11-mile pathway system that spans three | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $500,000 | $0 | $320,282 | $820,282 |
San Xavier Road: Pedestrian Bridge Approaches | Construction of a pedestrian bridge unde I-19, approx 1/4 mile and 6 ft wide | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $788,820 | $0 | $102,680 | $891,500 |
Thunderbird Paseo Shared-use Path | This project is for an ADA compliant 10' wide 1800' long concrete shared use path across Thunderbird Paseo Park from the Marshall Ranch foot bridge to the existing Paseo bike path. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glendale | Maricopa | $272,107 | $0 | $15,510 | $287,617 |
Rio Salado Scottsdale Pathway Links | This project will provide 3/4 of a mile of new multi-use paths , 50 lighting fixtures, 2 rest areas, tables, and landscaping | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tempe | Maricopa | $500,000 | $0 | $28,500 | $528,500 |
Prescott Valley SR 69 - Multi-Use Path MP 287.24 - 288.95 | This project will construct a 9,000 LF 10-foot wide multi-use path with an adjacent 5-foot landscape buffer. The project will parallel Highway 69 through the heavily used commercial center of Prescott Valley. This will include bike racks, signage and s | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott Valley | Yavapai | $935,502 | $0 | $53,324 | $988,826 |
Picture Rocks and Desert Winds Safe Routes to School | Construction of sidewalks, bike lanes, shade landscaping and other safety enhancements along the access roads to Desert Winds Elementary and Picture Rocks Intermediate schools and the Picture Rocks Community Center. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $500,000 | $0 | $295,375 | $795,375 |
Sierra Vista Bike Paths & Landscaping | Construct MultiUse path, including landscaping and irrigation system. | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $285,660 | $0 | $71,415 | $357,075 |
San Carlos Apache Tribe US 70 Enhancement and Tribal Entrance Signage and Other Beautification Enhancements | Construction of .92 mi SUP and two Native American monuments | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | San Carlos | Graham | $827,946 | $0 | $76,940 | $904,886 |
SR 86 Sells Wash Pedestrian Bridge | Extend bridge overhang or construct a new pedestrian bridge along SR86 over Sells Wash | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tohono O'Odham Nation | Pima | $192,700 | $0 | $10,984 | $203,684 |
Country Club Boulevard FUTS Trail - Flagstaff | Construct a 10 ft wide SUP as part of the urban trails system for 900 ft across I 40 underpass | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $638,784 | $0 | $38,611 | $677,395 |
Shared-Use Path: Avenida del Sol & SR90 - Sierra Vista | The project is a shared-use path along the west side of Avenida del Sol between State Route 90 to the southern terminus in the City of Sierra Vista, 10 feet wide, 2800 feet long constructed of asphalt and will connect to other shared-use paths from round | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $500,000 | $0 | $80,921 | $580,921 |
US 60 US 70 Globe Sidewalks Phase I | Construct 2 miles of sidewalk along US 60 | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Globe | Gila | $1,100,000 | $0 | $62,700 | $1,162,700 |
US 60 Main Street Streetscape - Springerville | Sidewalk widening, corner bumpouts and pedestrian amenities along US 60/Main St | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Springerville | Apache | $594,624 | $0 | $127,257 | $721,881 |
Prescott | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott | Yavapai | $80,000 | $0 | $20,000 | $100,000 | |
Landmark Pathways for Gateway Park | Design and build a 1-mile segment of pathway to Yuma?¢‚Ä¢‚Äôs existing 7-Mile Main Canal Multi-Use pathway/Linear Park to Yuma?¢‚Ä¢‚Äôs historic riverfront. The project limits begin east of the Fourth Ave. Bridge crossing, at the end of the new Colorado Trail path pav | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $500,000 | $0 | $20,723 | $520,723 |
Terrace Avenue "Pedestrian Gateway to Mexico" | Sidewalk improvements, approximately 625 lineal feet on each side (i.e. repair, handicap accessibility), new 5?¢‚Ä¢‚Äô sidewalk (approximately 345 lineal feet) pedestrian lighting, decorative crosswalks, landscaping and pedestrian rest area facilities (i.e. benc | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nogales | Santa Cruz | $500,000 | $0 | $30,223 | $530,223 |
Cesar Chavez Multi-use Pathway | Project will consist of 5200 ft of 10 ft wide MUP with pedestrian lighting and amenities | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Somerton | Yuma | $741,434 | $0 | $44,816 | $786,250 |
Central Core Multi-Use Path Phase 3: Off System Request - Prescott Valley | Construct a 10 ft wide .75 mi long MUP along the southside of Lakeshore Dr. | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott Valley | Yavapai | $500,000 | $0 | $169,950 | $669,950 |
Grand Canal Ped. Pathway: Loop 101 to N. 107th Ave. | Construction of a 10-foot wide concrete multi-use pathway at the Grand Canal in West Glendale | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glendale | Maricopa | $500,000 | $0 | $178,268 | $678,268 |
PV Pipeline MUP Ph. I Southern Terminus | Construction of the 1st phase of the PV Pipeline Path. Project includes 5800 linear feet of a 10-ft wide asphalt path, 3 rest areas and 4 striped crosswalks. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott Valley | Yavapai | $500,000 | $0 | $179,650 | $679,650 |
Prescott Valley Pipeline Multi-Use Path, Phase 3 | Phase 3 provides 0.9 miles of connectivity from Phases 1 and 2 - to residences, schools, parks, and for the communities to the south and north. | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott Valley | Yavapai | $499,979 | $0 | $90,221 | $590,200 |
Park Avenue Enhancement: A Collaborative Alternative Transportation Poject | The project focuses on providing safer and more inviting facilities for pedestrians and bicyclists along a two-mile segment of Park Ave. from Fort Lowell Road to Speedway Blvd. | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $498,958 | $0 | $30,160 | $529,118 |
West Valley Multi-modal Transportation Corridor Plan | This project would identify and develop a plan for bicycle and pedestrian linkages between the communities of Avondale, Glendale, Peoria, Phoenix and unincorporated areas of Maricopa County. The Corridor would include 12' wide linkages built to AASHTO s | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $471,500 | $0 | $28,500 | $500,000 |
Golf Course Road and Highline Canal Path Segments | This project will construct approximately 3,348 feet of 10 foot wide shared-use path to complete two sections of previously planned path. | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Safford | Graham | $299,403 | $0 | $18,098 | $317,501 |
Arizona Street Enhancement Project | The project is being planned in conjunction with the reConstruction of Arizona Street incorporating a shared-use path for pedestrians and bicyclists, lighting, benches, etc. | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bisbee | Cochise | $500,000 | $0 | $63,774 | $563,774 |
Sunnyslope Safe Ped Zones /Enhancmnts | Construct safe pedestrian zones using striping and signage. | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $80,000 | $0 | $20,000 | $100,000 |
Pinewood Blvd. Sidewalk | Contruction of 4975 lineal feet of a 5 foot wide concrete sidewalk along the south side of Pinewood Boulevard to separate pedestrians from vehicular traffic, thereby improving pedestrian safety. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Munds Park | Coconino | $500,000 | $0 | $173,941 | $673,941 |
Highway 69 Multi-Use Path, Phase 3 - Western Terminus (Between MP #289 and #290 | Create a 10 foot wide multi-use path within the the Highway 69 corridor to provide safe access, parking, and landscaping for local residents and tourists | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott Valley | Yavapai | $903,347 | $0 | $54,603 | $957,950 |
Canal Multi-use Path (Tempe) | This project is a three-quarters of a mile multi-use path with landscaping, lighting and a public art element along the Tempe Canal. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tempe | Maricopa | $500,000 | $0 | $28,500 | $528,500 |
Pantano Riverpath Bicycle and Ped Enhancements | 670 ft pathway will be constructed to fill in a gap in the 9.5 mile long Pantano Riverpath | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $689,741 | $0 | $44,692 | $734,433 |
Bush Highway Bike Lane | Bike lanes along the Bush highway. | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tonto Basin | Maricopa | $250,000 | $0 | $62,500 | $312,500 |
Paseo Project Phase III (Ryan Rd to Riggs Rd) | Construct multi-use path from Ryan Rd. to Riggs Rd. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chandler | Maricopa | $500,000 | $0 | $28,500 | $528,500 |
Heritage Trail (Chandler Segment) Consolidated Canal | Construction of 10ft.-wide pathway and the enhancement of the canal area through the addition of park benches and other site furniture with landscaping. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gilbert | Maricopa | $500,000 | $0 | $28,500 | $528,500 |
SR 85 Sidewalks AJO | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Pima | $80,000 | $0 | $20,000 | $100,000 | |
Glen Meadows Park Multi Use Path | Project will design and build 1.9 mile segment of pathway which lengthen Safford's Discovery Park Multi-Use Pathway. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Safford | Graham | $287,500 | $0 | $139,435 | $426,935 |
Central City Elderly Pedestrian Improvements | Construct pedestrian improvements. | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $250,000 | $0 | $62,500 | $312,500 |
SR 260 Bike/Ped Paths | Construct bicycle path through the city of Eager | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Eagar | Apache | $254,592 | $0 | $63,648 | $318,240 |
Phase 2: State Route 64 Tusayan Enhancement Project Ph II | Proposed enhancements are part of the final phase of the SR 64 improvement project. Key elements include: installing approximately 2,800 linear feet of a 10?¢‚Ä¢‚Äô wide, meandering multi-use path , completing a full-length connector through Tusayan; pedestrian | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tusayan | Coconino | $923,629 | $0 | $72,179 | $995,808 |
Lost Goldmine Trail | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Pinal | $288,000 | $0 | $16,416 | $304,416 | |
Aviation Highway/Golf Links Path | Construct 2100 linear ft. of 6' to 8' bike path along the North Side of Aviation/Golf Links Rd. from Alvernon Way to Richie Blvd. | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $80,000 | $0 | $4,560 | $84,560 |
Clarkdale Main St. Ped. Walks & Landscaping | Reconstruct .3 miles of sidewalk along Main St. through downtown Clarkdale. Project includes site furniture ,steet trees and enhanced crosswalks. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Clarkdale | Yavapai | $500,000 | $0 | $500,000 | $1,000,000 |
South 10th Ave. Multi-Use Path & Landscaping | Construct sidewalk & bike lanes along 10th Ave, including landscaping. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $500,000 | $0 | $95,302 | $595,302 |
US 60 Multi-use Path & Sidewalks - Show Low | New sidewalk will be installed from the Aquatic center, to US 60/SR260 and from Pioneer College to Whipple Rd, with a third segment from US60/SR 260 to the US 60 Summit Trail | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Show Low | Navajo | $756,522 | $0 | $45,728 | $802,250 |
Tucson Tyndall Ave Enhancement | One quarter mile segment from Sixth Street to University Blvd, one block west of Park Avenue. Tyndall Avenue is located in mid town Tucson on the west edge of the University of Arizona campus. Transforms Tyndall Avenue from an automobile-oriented road wit | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $800,000 | $800,000 | $0 | $800,000 |
SR 77 MP 114 Pedestrian Improvements Phase II Mammoth | Construct six (6) foot wide multi-use concrete pathway .54 mile in length | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $459,002 | $0 | $81,947 | $540,949 |
Downtown Canal Bank Improvements - Scottsdale | Arizona | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Scottsdale | Maricopa | $600,000 | $600,000 | $0 | $600,000 | |
Threeway Bicyclists Stop | Construction of shaded ramadas, picnic tables, restroom facilities, bicycle parking, a public drinking water facility, and an interpretive kiosk on 2 acres of land at the Clifton Ranger District administrative site. Area will be landscaped with native tre | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Duncan | Greenlee | $157,980 | $0 | $57,143 | $215,123 |
US 70 Thatcher Bike/Ped Path | Construct multi-use pathways | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Thatcher | Graham | $208,000 | $0 | $52,000 | $260,000 |
US95 Somerton West Gateway | Construct a shared-use facility with an asphalt concrete pathway, a stabilized decomposed granit shoulder, landscaping, pedestrian lighting, benches and signage at the west entrance to the City of Somerton. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $478,846 | $154,787 | $0 | $633,633 |
FQ Story Historic District Intersection & Walkway Improvements | Construct sidewalk and pedestrian crosswalk at four intersections within the F.Q. Story Historic District- a residential area near downtown phoenix. The project also includes period pedestrian lighting. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $213,746 | $0 | $82,920 | $296,666 |
Cochise County - St. David Pedestrian Pathway | Construct a pedestrian pathway in the St. David area of approximately 3/4th of a mile connecting the sidewalk on the south side of State Highway 80, past the St. David school crosswalk, residential and business site and terminating just beyond the wash lo | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. David | Graham | $214,798 | $0 | $22,984 | $237,782 |
US 93 Multi-Use Landscaping | Construct a multi-use pathway with landscaping enhancements along both sides of US 93 through the community of Wickieup (MP 123.1 to 124.1). Project covers an area of about 20 acres, pathway will be 10 feet wide and concrete along both sides of US 93. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $214,958 | $0 | $12,993 | $227,951 |
Central Core Multi-Use Path | Construction of 1800 feet of multi-use path that will integrate with existing paths. Will include rest stations, benches and drip irrigation. | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott Valley | Yavapai | $627,883 | $627,883 | $0 | $627,883 |
Canal Crossing Project | Project will install four pedestrian bridges along the Gilbert Consolidated and Eastern Canals. Bridges will be 15 feet wide and will comply with AASHTO guidelines. $180,000 Federal Aid. | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gilbert | Maricopa | $270,000 | $270,000 | $0 | $270,000 |
York Valley Pedestrian Walkway | The project will provide 2.25 mile long 10" wide pedestrian walkway along SR 75 through the York Valley. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | York | Greenlee | $270,508 | $270,508 | $0 | $270,508 |
Treat Avenue Pedestrian Bridge and Walkway | Constuction of a half-mile public pedestrian walkway that bisects central Tucson's Boradmoor-Broadway Village Neighborhood. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $295,000 | $295,000 | $0 | $295,000 |
Shared Use Path - Safford | Construct 4600 LF of 10' wide wide AC path | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Safford | Graham | $363,383 | $0 | $21,965 | $385,348 |
Mission Plaza | Arizona | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $216,320 | $0 | $12,330 | $228,650 | |
202L Country Club to Gilbert Rd. Ped. Underpass | Arizona | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mesa | Maricopa | $185,110 | $0 | $0 | $185,110 | |
Sun Circle Multi-use Trail at Guadalupe Bridge | This project consists of a 12' wide path on a 290' long bridge and an 8-10' path on 1,630' of approaches adjacent to Guadalupe road and bridge. The path provides a crossing for pedestrian and slower, less skilled bicycles south of the road who don't wan | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $797,080 | $0 | $53,180 | $850,260 |
Northwest Marana - Santa Cruz River Shared Use Path (Phase III) | Phase 3 includes a 14 foot wide 2.7 mile long shared-use path including 5 rest nodes running along the northeastern bank of the Santa Cruz River and will link to other pathways previously created | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marana | Pima | $500,000 | $0 | $595,835 | $1,095,835 |
Heritage District Downtown Pedestrian Project | Project to improve pedestrian access in Gilbert's downtown Heritage District by installing six-foot concrete sidewalks to provide universal access. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gilbert | Maricopa | $270,000 | $270,000 | $0 | $270,000 |
Pima Wash Multi-use Path / Magnolia Dr. to Acoma Blvd. Multi-use Path | Design and Construction of 3,000 linear feet of 12' concrete bike/ped path on the top bank of the Pima Wash, including rest areas at 500-600 foot intervals, with shade structures, benches and trash receptacles. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lake Havasu City | Mohave | $638,305 | $638,305 | $0 | $638,305 |
Synder Bl Multi-Use Path Avenida del Sol to SR 92 | Construct a shared -use pathway along the north side of Snyder Blvd. Between SR 92 and Avenida Del Sol. Will also include landscape enhancements. | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $650,000 | $650,000 | $0 | $650,000 |
Town of Prescott Valley / Safe Access Route | Design and construct a 10-foot wide path with 3,600 linear feet of concrete and 1,500 linear feet of asphalt, connecting an educational complex consisting of an elementary school, middle school, high school and community college to the Library and Civic C | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott Valley | Yavapai | $661,180 | $661,180 | $0 | $661,180 |
3rd Street Alvernon Bike/Ped. Crossing | This project is for design and Construction of a signalized bike/pedestrian crossing on north Alvernon Way. This will include 250 feet of shared use pathway on the west side of Alvernon with guard rails signage and striping. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $202,750 | $0 | $11,557 | $214,307 |
Peach Springs Downtown Sidewalk & Beautification SR 66 | Design and construct a sidewalk on the south side of historic Route 66 that will connect to an existing sidewalk at Diamond Creek Road and extending about _ mile to the west. The project will also include two pedestrian rest areas. This project will co | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $202,986 | $0 | $12,270 | $215,256 |
Ft. Grant Rd Connectivity | Construction of a ten (10) foot wide shared-use pathway and landscaping for approx. 8/10 mile from Travel Truck Stop to Quail Dr. | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Willcox | Cochise | $393,943 | $0 | $23,823 | $417,766 |
Camelback Core Pedestrian Enhancement Project | Enhance two intersections (Camelback Rd./24th St. and Camelback Rd./20th St.) to promote pedestrian/bike use. Includes: enlarged pedestrian/bike refuge areas and ramps to the crosswalks, 8?¢‚Ä¢‚Äôx12?¢‚Ä¢‚Äô shade structures on corners, defining the crosswalks with col | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $392,491 | $0 | $125,000 | $517,491 |
Bullhead City Lakeside Drive Multi-Purpose Trail | Design and Construction of a 1/2-mile segment of the Colorado River Heritage Greenway Trial to extend a current TEA-021 trail project to Rotary Park. The two phases of the multi-use path will connect four schools, the Boys & Giles Club of Bullhead City, a | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bullhead City | Mohave | $390,796 | $0 | $81,304 | $472,100 |
Koch Field Road & Silver Saddle Road / Doney Park | Project will construct multi-use path along Koch Field Road and Silver Saddle Road. The trail will be a 10ft. paved trail and is just over one mile in length. | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $204,055 | $0 | $45,673 | $249,728 |
Central Avenue Art Walk, Ph. I | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $390,000 | $0 | $97,500 | $487,500 | |
Holbrook T.I. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Holbrook | Navajo | $150,000 | $0 | $37,500 | $187,500 | |
SR 87 Casa Grande Ruins, Multi-use Path & Landscaping | This project will construct a 10' wide multi-use pathway on the east side of Highway 87, and a 5' pathway on the west side and a pedestrian bridge over the Pima Lateral Canal. Landscaping and irrigation will be included. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Coolidge | Pinal | $597,126 | $0 | $36,028 | $633,154 |
US70 Duncan Sandra Day O'Connor Walkway MP 378.9 | Construction of a walkway approximately 1600 ft in length on the southeast side of US 70 mm 378 in the town of Duncan adjacent to Duncan High School. A sign identifying the walkway as the Sandra Day O'Connor Walkway will be placed at the beginning of the | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Duncan | Greenlee | $205,178 | $0 | $12,402 | $217,580 |
Queen Creek Wash MUP | Construct a .75, 10-12 ft wide MUP along the Queen Creek Wash | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Queen Creek | Maricopa | $610,459 | $0 | $41,899 | $652,358 |
US 180 Multi-Purpose Path, Phase II / Forest Ave - Sechrist School | Second and final phase of a planned 10 foot wide paved bicycle-pedestrian path which will extend Sechrist School to the area south of Forest Ave. Planned enhancements include decorative retaining walls, benches, minor landscaping and other improvements. T | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $631,900 | $0 | $115,000 | $746,900 |
Crosscut Canal Multi-Use Path Thomas - Indian School | Construction of a 10 to 12 foot multi-use path along Crosscut Canal | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Scottsdale | Maricopa | $1,632,333 | $1,632,333 | $0 | $1,632,333 |
Yuma Main Canal Shared-Use Pathway Extension | Design and build a half mile multi-use pathway to complete Yuma's East Main Canal Shared-Use Pathway/Linear Park. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $750,000 | $750,000 | $0 | $750,000 |
Paseo Multi-use Path (Chandler) | Construct a 10 foot wide multi-use path along the consolidated canal from Galveston to Pecos Road. The path will be landscaped with seating and rest areas located approx. 1/4 mi. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chandler | Maricopa | $750,000 | $750,000 | $0 | $750,000 |
Old Roma Alley Pedestrian Enhancements & Landscape Beautification | The project will transform an existing service alley in downtown Glendale to a pedestrian-friendly space. This 370-foot long, 20-foot wide pedestrian space will provide downtown linkages to the Old Town Retail and Antique District with the Catlin Court Hi | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glendale | Maricopa | $728,575 | $728,575 | $0 | $728,575 |
Bicycle Rest Areas - 8th St./Adobe Mesa | Construct a Multi-Use path including landscaping and irrigation. | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mesa | Maricopa | $96,159 | $0 | $24,040 | $120,199 |
Beaver Dam Bridge & Walkway Addition / Co Hwy 91 at Beaver Dam Creek | Project proposes to construct an attached fenced walkway of approximately 360 feet long and ten feet wide to the existing Beaver Dam Bridge, will also include the Construction of a 10 foot eide, hard-scaped, concrete walking path. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $499,967 | $0 | $189,642 | $689,609 |
SR 87 McDowell to Shea | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Scottsdale | Maricopa | $364,494 | $0 | $91,124 | $455,618 | |
Tovrea Castle ROW for Bike/Ped Path | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $500,000 | $0 | $125,000 | $625,000 | |
SR 90 SV Multi Use Cochise - Giulio Cesare | 10-foot wide, multi-use path for non-motorized traffic. Parallels SR 90 between Cochise Crossroads shopping center and Giulio Cesare Avenue in Sierra Vista. Project length is approximately 3,450 linear feet. Improvements include an asphalt pathway, lan | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Safford | Cochise | $365,000 | $0 | $25,000 | $390,000 |
All Trails Lead to the Swing Span Pivot | design and Construction of footings,retaining walls,ramps and pathways connecting to existing trails | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $750,000 | $0 | $98,453 | $848,453 |
Cycle to the Salt | Bush Highway bike lanes from Usary Pass Road to Stewart Mtn Dam Road | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $750,000 | $0 | $367,817 | $1,117,817 |
US 60 Ragus to Russell Globe Sidewalks | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Globe | Gila | $500,000 | $0 | $28,500 | $528,500 | |
Rio Salado Pathway | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Maricopa | $500,000 | $0 | $0 | $500,000 | |
Wickenburg US 93 | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wickenburg | Maricopa | $200,000 | $0 | $50,000 | $250,000 | |
Crosscut Canal Multi-Use Path Phase II | Construction of a one- mile non-motorized path that will connect to existing 1.25 mile path | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tempe | Maricopa | $750,000 | $0 | $650,000 | $1,400,000 |
Wickenburg US 60 | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wickenburg | Maricopa | $200,000 | $0 | $50,000 | $250,000 | |
EXPO 2000 | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $200,000 | $0 | $50,000 | $250,000 | |
Northern Ave/Calle Buena Vista Bike Lane | Construct bicycle lanes | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Oro Valley | Pima | $224,000 | $0 | $56,000 | $280,000 |
SR64 Tusayan Enhancement Project | Initial phase of a multi-phased SR 64 improvement project will be on approximately 1.5 acres (.85 miles in lengh from MP 235.15 to MP 236.03). Included is the installation of a concrete multi-use path, a granite trail, pedestrial seating, signs and light | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $759,162 | $0 | $45,888 | $805,050 |
20th St. Multi-Use Path & US 95/20th St. Intersection | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $300,000 | $0 | $17,100 | $317,100 | |
Roosevelt Row Pedestrian Project | The project will improve 1500 linear feet of Roosevelt st by narrowing the roadway in order to create space to widen the sidewalk | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $750,000 | $0 | $50,273 | $800,273 |
Calle Magdalena Path & Landscaping | Construct 5-ft. wide sidewalks on both sides of Calle Magdalena between Avenida del Yaqui & Calle Maravilla. Project includes landscape & irrigation. | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Guadalupe | Maricopa | $225,000 | $0 | $12,830 | $237,830 |
Main Street Pedestrian Improvements (Somerton) | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Somerton | Yuma | $225,000 | $0 | $56,250 | $281,250 | |
SR 60/70 Sidewalks Phase II - Globe | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Globe | Gila | $225,957 | $0 | $56,489 | $282,446 | |
SR 69 Multi-Use Path Prescott Valley | Construction of ten (10) foot wide concrete path connecting to existing path along SR 69 | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott | Yavapai | $756,528 | $0 | $135,450 | $891,978 |
Peach Springs Multi-use Path | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Peach Springs | Mohave | $229,027 | $0 | $13,055 | $242,082 | |
Tucson I-10 Frontage (Construction) | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tuscon | Pima | $221,300 | $0 | $55,325 | $276,625 | |
Santa Cruz Bike Path and Public Art Enhancements | Arizona | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $201,600 | $0 | $50,400 | $252,000 | |
Santa Cruz County - Sonoita Shared-Use Pathway | Provide a safe, shared-use pathway that is accessible to those with disabilities and includes waiting places for children who ride school busses; link businesses, restaurants, churches, community meeting places; improve the landscaping aesthetics at the C | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sonoita | Santa Cruz | $747,369 | $0 | $45,175 | $792,544 |
US260 Camp Verde Main St. Pedestrian Improvements | Construct sidewalks, ped. lighting, benches, drinking fountains, bike racks, and landscaping. | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Camp Verde | Yavapai | $764,243 | $0 | $46,195 | $810,438 |
US191 Safford Sidewalks | Construct sidewalk along US191 in Safford. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Safford | Graham | $420,017 | $420,017 | $0 | $420,017 |
Mohave Wash Pathway (County) | Construct multi-use path and landscaping along Mohave Wash between I-40 & King Ave. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $440,000 | $440,000 | $0 | $440,000 |
Quail Trail Beautification Project | Construction of a 1425 foot long, 25 foot wide combined landscaped and meandering paved pedestrian path starting at Plymouth Rd. travels both East and West along Quail Trail Ave. | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Quartzsite | La Paz | $239,151 | $0 | $30,456 | $269,607 |
Mohave Channel Shared-Use Pathway, Bank Street to Northern Avenue | The 2nd phase of 1.59 miles of shared-use pathway parallel to the southeast bank of the Mohave Channel | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $440,000 | $440,000 | $0 | $440,000 |
Armory Park Pedestrian Enhancements | The project will provide approximately 1,800 lineal feet of new four-foot wide concrete sidewalks, additional ADA ramps and pedestrian lighting along Fourth Avenue from 17th Street to 22nd Street in the Armory Park Historic District. The project will fill | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $467,000 | $467,000 | $0 | $467,000 |
Paseo de la Amistad | Project is a 600 foot pathway from the international port of entry to the city's shopping centers, recreation centers, visitors and rest area, medical facilities, city library, government service building, downtown historic & business districts. Trail wi | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Douglas | Cochise | $467,194 | $467,194 | $0 | $467,194 |
Class 2 Bike Route Signage / Striping | Design and administor bike route plan, which includes signage and striping. | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Peoria | Maricopa | $90,000 | $0 | $22,500 | $112,500 |
Discovery Park Multi-use Path | This project proposes a 1.7 mile, 10' wide multi-use pathway along Discovery Park Blvd. It will incorporate benches, bike rack, pedestrian and bicycle signs for the multi-use pathway. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Safford | Graham | $152,295 | $0 | $135,205 | $287,500 |
South 4th Ave. Multi-use Path | The South Fourth Avenue Streetscape Enhancement Project will enhance a deteriorated one-half mile section of collector street, linking the City of Tucson with the City of South Tucson. Improvements include landscaping, lighting and artwork. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $514,500 | $514,500 | $0 | $514,500 |
Downtown Pedestrian Improvements (Flagstaff) | Pedestrian/bicylcle safety measures will be installed at sidewalk crossings on San Francisco and Baever to improve safety at these rail crossings. Phase II will extend a pedestrian-bicycle link through the southside to the NAU campus and beyond. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $545,158 | $545,158 | $0 | $545,158 |
Somerton Main Street (Somerton Avenue - Bingham Avenue) | Project proposes a multi-use facility with asphaltic concrete pathway within the south side of US 95, beginning at Somerton Ave. and terminating at Bingham Ave. | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Somerton | Yuma | $375,290 | $0 | $22,685 | $397,975 |
Coronado Dr. MUP Carmelita Dr. to Tacoma St. | Construction of multi-use pathway along Coronado Drive from Carmelita Drive to Tacoma Street. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $375,991 | $0 | $53,727 | $429,718 |
Hohokam Middle School Bicycle & Pedestrian Project | Design and build a 10-foot wide colored AC paved pedestrian pathway with shade landscaping along the north side of Tetakusim Road, from South Camino de Oeste to South Sorrel Lane. The project is 1-mile long and includes 6-foot wide asphalt bicycle lanes | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $550,000 | $550,000 | $0 | $550,000 |
Loop 101 Trail, Peoria - Grand Ave. | This project is a segment of multi-use path allowing safe, alternate means of travel along 5,280 linear feet along the New River/ Loop 101 Corridor. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Peoria | Maricopa | $376,760 | $0 | $98,536 | $475,296 |
Tsaile Multi-Use Trail | The Tsaile Multi-Use Pathway will be a combination of Phases II and III of an existing 1/4 mile trail project developed on the Dine College land to serve as a public pedestrian transportation enhancement that will link schools, health care, businesses an | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Johns | Apache | $378,552 | $0 | $22,882 | $401,434 |
Multi-Use Pathway Highway 90 East | Construction of an asphalt multi-use path 10 feet wide and running 2,650 lineal feet in an East/West direction along the SR 90 East between the intersections of Avenida del Sol/SR 90 East and Colonia de Salud/SR 90 East in Sierra Vista. | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $236,198 | $0 | $14,277 | $250,475 |
Spence Ave. Multi-Use Path | Construct a 1/8 mi. long multi-use path on ASU property west of Rural Rd, where spence Ave. once connected to McAllister Ave. The facility will be 12 ' wide path that connects the ASU campus to downtown Tempe. | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tempe | Maricopa | $84,111 | $0 | $27,413 | $111,524 |
Organ Pipe-Intn'l Border | Arizona | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $550,000 | $0 | $0 | $550,000 | |
Sabino High School Bicycle Safety Enhancements | Construct 6-ft bike lanes for a distance of 1.9 miles | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $750,000 | $0 | $52,844 | $802,844 |
Mountain Ave. Bike/Ped Path /Landscaping | Construct multi-use pathways | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $201,570 | $0 | $50,393 | $251,963 |
SR 66 Andy Devine Ave Pathway | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $574,221 | $0 | $34,710 | $608,931 | |
Continental Road/I-19 Bike/Ped Enhancement Tucson | Provides new bicycle lanes,new sidewalks and shade landscaping | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $441,501 | $0 | $84,133 | $525,634 |
SR 90 Ped Walkway - Town of Huachuca | Construct sidewalk, 2800 ft in length, and landscape buffer on the east side of SR90 | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Huachuca | Cochise | $439,297 | $0 | $26,553 | $465,850 |
Rillito Riverpath and Camino de la Tierra Bicycle and Pedestrian Enhancements | Add additional funding to AZ-505 | Arizona | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $99,000 | $0 | $5,985 | $104,985 |
Homer Davis Elementary School Bike/Ped Enhancements | Construct new sidewalks, bike lanes and safety enhancements on both sides Romero Rd | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $436,971 | $0 | $98,930 | $535,901 |
Ash Fork Sidewalk Enhancements - 40B, 3rd St to 8th St | Construction of sidewalk along Historic Route 66, between 3rd and 8th Street, in downtown Ash Fork. Sidewalks will be placed on both sides of roadway, will have width of 5 feet and a total l length of approximately 2150 feet. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ash Fork | Yavapai | $94,601 | $0 | $5,719 | $100,320 |
Old Spanish Trail Bike Lane - Pima County | Construct 2 five-foot bike lanes along the Old Spanish Trail between Houghton rd and the entrance to Saguaro National Park. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $433,780 | $0 | $26,220 | $460,000 |
Glenn Street Neighborhood Improvement Project | Construct pedestrian path and landscaping along Glenn St | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $500,000 | $0 | $118,375 | $618,375 |
Reay Lane SUP Thatcher | Construct a 10 ft wide SUP for 2.8 mi along Reay Ln | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Thatcher | Graham | $500,000 | $0 | $240,450 | $740,450 |
Finnie Flat Road Sidewalks & Landscaping | Construct 2660 lineal feet of sidewalk , curb and gutter from the end of Main St. sidewalk to the towns only grocery-medical center business district. | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Camp Verde | Yavapai | $423,266 | $0 | $73,712 | $496,978 |
Centennial Elem./Flowing Wells Jr. High SR2S Enhancement | Project provides 5-foot sidewalks and ramps to connect the schools with area neighborhoods, and also includes student-designed artwork and bicycle/pedestrian safety products | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $500,000 | $0 | $118,542 | $618,542 |
Campbell Ave Corridor | Provide sidewalks and shade along Campbell Ave between Grant and Fort Lowell | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $417,685 | $0 | $75,430 | $493,115 |
West Flagstaff Multi Use Path | Initial phase of a new multi use path from downtown Flagstaff to the west end of the city. Phase I takes the path from its intersection with the main north-south route along the Rio de Flag, ~ busy Milton Road on a new prefabricated steel bridge on the no | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $500,000 | $0 | $992,000 | $1,492,000 |
I-10/6th Avenue Pedestrian Facilities and Artist-Designed Fence | Join two roadway segments with a matching enhanced pedestrian approach to and on the I-10 bridge. Replace the narrow concrete sidewalks with matching 10 foot wide concrete sidewalks, add decorative elements to the parapet and add an artist-designed fence, | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $344,890 | $0 | $20,850 | $365,740 |
SR 77 Multi-Use Lanes Oracle Rd. Tucson | Construct multi-use path along Oracle Rd. from River Rd. to Ina Rd. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $414,000 | $0 | $23,598 | $437,598 |
SR 260 Multi-Use Path Willis Street - Jct US 60 Constuction | Construction of 10 foot wide paved multi-use path with 2 foot cleared shoulders (8 foot minimum plus 2 foot shoulders where constrained) extending for 2.1 miles along a treed corridor of the SR 260 right of way between the City Park/MP 339.8 and West Will | Arizona | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Show Low | Navajo | $412,389 | $0 | $56,801 | $469,190 |
Gila County & City of Globe Sidewalk for Pedestrians | Construct 3162 LF of sidewalks along Main St | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Globe | Gila | $491,460 | $0 | $60,706 | $552,166 |
Lake Havasu Bikeway, Hiking /Walking Path | Construct multi-use pathways | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lake Havasu City | Mohave | $408,360 | $0 | $102,090 | $510,450 |
Quartzite Plymouth Rd B-10 Quail Trail | 0.56 mile, 25 feet wide Paved Pedestrian Path. Starts at the Business 10 and travels north along the east ROW of Plymouth Road a distance of 2950 feet to the Town Park providing direct access to: Town Hall, Town Library, Police Station, Magistrate Court, | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Quartzsite | La Paz | $338,735 | $0 | $20,475 | $359,210 |
Pine-Strawberry Safety Rest Stops for Pedestrians/Bicyclists | Construct 11safety rest stops for bicycle and pedestrian use, including informational/educational exhibits | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pine | Gila | $478,010 | $0 | $28,893 | $506,903 |
Hancock Rd to Marina Blvd. Multi-Use Path | The proposed project is to construct a second segment of the Colorado River Heritage greenway Project, which is a non-motorized pedestrian/bicycist walkway. The walkway will be approximately 12' wide and travel for three (3) miles. This includes landsca | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bullhead City | Mohave | $338,084 | $0 | $25,436 | $363,520 |
Catalina Highway Bike Lanes | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $443,210 | $0 | $110,802 | $554,012 | |
Liberty Bicycle Boulevard Los Reales Rd to 43rd St | Crate a bicyle blvd utilizing taffic calming, safer crossings and clear way-finding | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $749,968 | $0 | $45,332 | $795,300 |
Kings Ranch Road Pathway Phase 2 | Expand the existing sidewalk 4400 ft along the north and west sides of Kings Ranch Rd | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gold Canyon | Pinal | $457,068 | $0 | $38,023 | $495,091 |
SR 260 PT/LS Rick Lupe Trails of Heroes | Construct a multi use path from Pine Lake Road in the Town of Pinetop-Lakeside to the Hon dah Casino on the Fort Apache Indian Reservation. Links government offices with existing residential areas, resorts, proposed commercial development and the recreati | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lakeside | Navajo | $456,650 | $0 | $27,603 | $484,253 |
Aqua Fria Loop 101 51st to 75th Ave | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glendale | Maricopa | $64,250 | $0 | $16,062 | $80,312 | |
Multi-modal Path North Avenue to Olive Ave - Peoria | Construction of 1 mi of 10 ft wide SUP along the west embankment of New River | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Peoria | Maricopa | $500,000 | $0 | $289,390 | $789,390 |
Arizona Canal Shared-Use Path Scottsdale | Construct .9 mi of 14 ft wide path along the south bank of the Arizona Canal | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Scottsdale | Maricopa | $500,000 | $0 | $1,439,829 | $1,939,829 |
Douglas Pan American Multi-Use Path | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Douglas | Cochise | $330,000 | $0 | $18,810 | $348,810 | |
Colombus Corridor Pedestrian Path | Construction of a 6-foot wide pedestrian path on the east side of Colombus Blvd. between 22nd St. and Timrod St. to provide safe passage to school, bus stops, churches and businesses | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $190,061 | $0 | $11,488 | $201,549 |
Canada del Oro Shared Use-Path Final Phase - Oro Valley | Construction of .5 mi SUP along the CDO wash paralleling the SR77 corridor | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Oro Valley | Pima | $500,000 | $0 | $894,945 | $1,394,945 |
SR179 Sedona Pedestrian Lighting and Landscaping Improvements | Project to improve pedestrian lighting and landscaping along State Route 179 from the west end of the Village of Oak Creek to its intersection with State Route 89A in Sedona. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sedona | Coconino | $450,000 | $0 | $714,957 | $1,164,957 |
Golf Course Road Shared Use Path | Construct a 10 ft wide SUP for 1.35 miles | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Thatcher | Graham | $641,749 | $0 | $38,791 | $680,540 |
Santa Cruz CO Rio Rico Multi Use Path | Transform area near Rio Rico Drive and Interstate 19 into a multi use pathway linking a new Park and Ride station, community fire station, a fitness and swim club, and a senior citizens' center. Design and construct 1.2 miles of a paved and landscaped bic | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nogales | Santa Cruz | $450,000 | $0 | $30,000 | $480,000 |
Fourth St. FUTS Trail from Huntington Dr. to Butler Ave | Construct .5 miles of new 10 ft wide SUP that will be part of the urban trails system | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $646,908 | $0 | $98,103 | $745,011 |
Cave Creek Wash Multi-modal Path | Construct multi-modal pathway. | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $448,775 | $0 | $112,225 | $561,000 |
NAU San Fran St Franklin-Pine Knoll Multi Use | S. San Francisco pedestrian and bicycle path between Franklin Ave. & Mountain View Dr: cyclists and pedestrians will be completely separated by existing landscaping, lighting and benches. Two directional bike path for this area will be eight feet in width | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $447,635 | $0 | $49,445 | $497,080 |
Continental Elementary Safe Routes | Construction of 1.6 miles of bicycle lanes and 0.8 miles of shared use pathway | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $445,850 | $0 | $103,298 | $549,148 |
Rillito River Divided Urban Pathway, Mountain Ave. to First Ave. | This project funds the Construction of a Divided Urban Pathway, 10 foot wide paved path and 6 foot wide decomposed granite path on the south bank of the Rillito River | Arizona | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $444,263 | $0 | $26,854 | $471,117 |
Beverly Ave.Multi-Use Path | Construct multi-use pathway between Harrison and Burbank | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $63,473 | $0 | $3,837 | $67,310 |
17th Ave. Pedestrian Improvements | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $575,000 | $0 | $115,000 | $690,000 | |
US60 MUP MP107.5 to 108.9 - Wickenburg | Project involves the Construction of a ten-foot wide, multi-use path within the right of way of US 60 within the Town of Wickenburg from the Vulture Mine Rd. crossing to Los Altos Drive, a distance of approximately 1.4 miles. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wickenburg | Maricopa | $855,708 | $0 | $51,724 | $907,432 |
I-40 Pedestrian Overpass | Construct a pedestrian overpass over Interstate 40 | Arizona | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Holbrook | Navajo | $503,991 | $0 | $37,935 | $541,926 |
Hermosa Overpass - Hermosa Drive Pedestrian Project | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Holbrook | Navajo | $540,000 | $0 | $135,000 | $675,000 | |
Paseo Bike/Ped Bridge /Path @ Arizona Canal | Construct multi-use pathways | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glendale | Maricopa | $37,457 | $0 | $9,364 | $46,821 |
Maricopa Freeway Enhancement Project-Phx. | Enhance and restore nine (9) overpasses along the elevated section of the maricopa freeway from 16th st. to 19th Ave. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $400,000 | $0 | $213,722 | $613,722 |
State Route 191 Sidewalk Project Phase II - Safford | Construction of .7 miles of 6 ft wide sidewalks along the west side of US 191 in Safford | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Safford | Graham | $249,728 | $0 | $62,815 | $312,543 |
3rd Ave Bike Bridge over Grand Canal | Construct a pedestrian pathway. | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Phoenix | Maricopa | $104,000 | $0 | $26,000 | $130,000 |
John Wayne Parkway (SR 347) Sdwlk Enhancement Project Phase II | The project facilitates a multimodal connection on the north side of town. The south end connects with Phase 1 project that is currently under development along SR 347 in front of the Shopping Center and connects on SR 238 with a residential Development c | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Maricopa | Pinal | $524,214 | $0 | $31,686 | $555,900 |
Andy Devine | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Mohave | $60,000 | $0 | $15,000 | $75,000 | |
Mohave Wash Pathway (State) | Construct multi-use path along Mohave Wash between I-40 & King Ave. | Arizona | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $547,868 | $0 | $33,116 | $580,984 |
Broadway Multi-use Bridge | Construct a340', steel struss bicycle/pedestrian bridge over the Broadway Boulevard Corridor. | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $400,000 | $0 | $100,000 | $500,000 |
SR 89 White Spar Rd. Bikeway & Walkway Phase One | This is phase one of four that will add bicycle and pedestrian transportation facilities between Copper Basin Road and the southern Prescott border along White Spar Road. | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott | Yavapai | $500,888 | $0 | $404,112 | $905,000 |
Yavapai College - Frontier Village | Construct Multi-Use pathway extending through Yavapai College to existing bicylcle/pedestrian routes to frontier Village and beyond the Veteran?É?ìs Administration Medical Center to connect with completed Peavine Trail. Pathway will have landscaping and is | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott | Yavapai | $551,844 | $0 | $33,356 | $585,200 |
Calle Torim Enhancement | Additional funding to STP project for Pasqua Yaqui | Arizona | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $100,000 | $0 | $6,000 | $106,000 |
SR 89A - Clarkdale Sidewalk Enhancement | Construct 6900 LF of sidewalk along the east side of SR 89A | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Clarkdale | Yavapai | $369,951 | $0 | $73,362 | $443,313 |
Prescott W. Gurley Street Pedestrian Enhancements | Construct 2250' of new sidewalk along the southside and 420' along the north side of Gurley St | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott | Yavapai | $395,033 | $0 | $23,878 | $418,911 |
Shared Use Pathway Connectivity Projects | Construct 3 pathway segments 10 ft wide for a total of 4775 ft in length to provide connectivity to existing SUPs | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sierra Vista | Cochise | $540,030 | $0 | $32,643 | $572,673 |
US 95 Somerton Gateway Project | Design and construct a 1000-foot long concrete multi-use path along US 95 between Bingham Avenue and the Somerton Lateral. The project also includes landscaping, pedestrian lighting and street furniture. | Arizona | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $519,167 | $0 | $31,381 | $550,548 |
East Main Canal Multi-Use Pathway | Construct multi-use pathways | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yuma | Yuma | $400,000 | $0 | $100,000 | $500,000 |
Ajo Highway (SR 86) Bicycle Lanes | Provide 6 foot bicycle lanes and new bicycle-safe rumble strips, on both sides of the highway at various gaps on Ajo Highway (SR86) to improve bicycle and pedestrian travel and safety. An unsafe 1-inch lip that exists on the shoulder between old paveme | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $518,000 | $0 | $36,300 | $554,300 |
SR 77 - Mammoth Pedestrian & Landscaping Improvements | Provide pedestrian sidewalks & landscaping along SR77 | Arizona | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mammoth | Pinal | $565,800 | $0 | $34,200 | $600,000 |
I-10 Miracle Mile Sidewalks & Landscaping | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $510,000 | $0 | $29,070 | $539,070 | |
B40 - Andy Devine Pathway & Landscape | Provide 5ft. wide sidewalk, including benches, landscaping and irrigation for pedestrian traffic. | Arizona | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $347,493 | $0 | $21,004 | $368,497 |
Williams Linear Park | Construct pedestrian pathway; recent changes in scope & needed clearances will delay project. | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Williams | Coconino | $145,118 | $0 | $8,272 | $153,390 |
S. San Francisco St. Shared Use Path | Construct a shared -use pathway on the east side of San Francisco St traveling both north and south connecting the Lone Tree bike path and the Franklin Ave bike lanes. | Arizona | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flagstaff | Coconino | $346,686 | $0 | $23,956 | $370,642 |
US 60 Multi-Use Path (Wickenburg) | Construct multi-use path within the right of way of US 60 within the town of Wickenburg from Los Altos Dr. to the entranceway of Sunset Park. A distance of approximately 2.9 miles. | Arizona | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wickenburg | Maricopa | $507,626 | $0 | $30,684 | $538,310 |
San Xavier Road: From Little Nogales to I-19 | Construct 8 ft wide MUP .75 mi long to connect two exisiting pathways | Arizona | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tohono O'Odham Nation | Pima | $420,837 | $0 | $25,438 | $446,275 |
San Carlos Canal Bike/Ped Parkway | Construct multi-use pathways | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Casa Grande | Pinal | $243,248 | $0 | $60,812 | $304,060 |
I-10 18th St. Pedestrian Underpass | Arizona | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $62,040 | $0 | $3,536 | $65,576 | |
Lake Powell Blvd. Sidewalk - Page | Extension of 2600 LF of 6 ft sidewalk along the west and sout sides of Lake Powell Blvd | Arizona | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Page | Coconino | $423,926 | $0 | $65,624 | $489,550 |
Haulapai Mountain Rd Sidewalk/Path | Construct multi-use path | Arizona | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kingman | Mohave | $345,000 | $0 | $86,250 | $431,250 |
Pima Pedestrian Pathway | Pathway will improve the safety and connectivity of this busy pedestrian route and protected pedestrian pathways behind landscaped barriers | Arizona | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Tucson | Pima | $433,450 | $0 | $26,200 | $459,650 |
Woodland Road Sidewalk | Construct sidewalks, curbs and gutter to help Pinetop-Lakeside improve the existing streetscape south along Woodland Road. | Arizona | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pinetop-Lakeside | Navajo | $164,719 | $0 | $18,623 | $183,342 |
I-10 / SR186 Willcox TI Sidewalks | Enhancements include meandering colored 6' foot wide sidewalks (no pedestrian lighting), stamped concrete crosswalks, median and sidewalk area landscaping and structure aesthetic enhancements (graphics).Provides safer and more aesthetically pleasing exper | Arizona | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Safford | Graham | $546,023 | $0 | $33,005 | $579,028 |
Bicycle Pedestrian Statewide Safety Education Project | Provide on site training, print/electronic resources and web applications , technical training and support | Arizona | 2010 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Statewide | Statewide | $750,000 | $0 | $45,977 | $795,977 |
Regional Bicycle & Pedestrian Safety Education Program | Increase the awareness of safety practice as to reduce bike and pedestrian related crashes | Arizona | 2009 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Statewide | Statewide | $477,000 | $0 | $31,832 | $508,832 |
Regional Bicycle and Pedestrian Education Program | This program will include television, radio, and internet advertising and is designed to increase the awareness and implementation of safety practices to reduce the number of bicycle and pedestrian-related crashes and fatalities | Arizona | 2007 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Phoenix | Maricopa | $475,000 | $0 | $28,712 | $503,712 |
Safe Routes to School & Bike/Ped Educ. Program | Comprehensive community-based program will focus on 8 pilot elementary schools in the Tucson region and work directly with children, parents, transportation professionals, teachers, law enforcement, and school districts to develop route maps, surveys of | Arizona | 2002 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Tucson | Pima | $454,590 | $0 | $50,510 | $505,100 |
Pima CO/ Tuc. Bike Ped Safety Program | Educate pedestrians and bicyclists in the Tucson Metropolitan Area on safe walking and bicycling practices in traffic. Works with motoring public to improve safety for pedestrians and bicyclists. Will build upon two existing safety and education TE projec | Arizona | 2003 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Tucson | Pima | $453,840 | $0 | $113,460 | $567,300 |
Regional Safe Routes to School Support Center Project | Provide integrated programs to develop safe routes for children to walk and bike to school, instill lifelong skills regarding healthy and active life choices, traffic safety and travel injury prevention | Arizona | 2007 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Phoenix | Maricopa | $403,865 | $0 | $24,412 | $428,277 |
Pedestrian & Bicycle Safety Program | Procure materials and equipment to implement a pedestrian and biclycle safety education program. | Arizona | 2006 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Avondale | Maricopa | $11,316 | $0 | $684 | $12,000 |
I-10 Davidson Canyon Preserve | Acquisition of 600 acres along Interstate 10 east of Sonoita Highway 83, a state designated scenic route. Preserves the viewshed of Davidson Canyon and the Empire Mountain range. Ensures enhanced surface transportation for pedestrians, equestrians, and bi | Arizona | 2003 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Tucson | Pima | $500,000 | $0 | $3,250,000 | $3,750,000 |
Sonoita - Patagonia Scenic Easement | Purchase scenic ROW for protecting resources along SR 82/83. Property will then be given to a non-profit land trust organization for protection. Land to be aquired is being studied as part of a CMP under development. | Arizona | 1996 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Sonoita | Santa Cruz | $552,000 | $0 | $33,000 | $585,000 |
Navajo Bridge Interpretive Center | Construct Welcome and Visitor center, includingInterpretive signage with outdoor seating. | Arizona | 1992 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | Coconino | $1,688,159 | $0 | $102,041 | $1,790,200 |
Superior Rest Area | Arizona | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Superior | Pinal | $150,000 | $0 | $37,500 | $187,500 | |
Butterfield SR Painted Rocks Petroglyph Site | Construct pathways, parking and interpretive panels. | Arizona | 1996 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Dateland | Maricopa | $83,300 | $0 | $20,825 | $104,125 |
Catlin Court | Construct special paving and landscaping within four alleyways in Catlin Court Historic District, Glendale. Project is for alleyways between Palmaire Ave. and Myrtle Ave. going from 57th Ave. West to 59th Ave. Improvements should make the area safer an | Arizona | 1999 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Glendale | Maricopa | $498,000 | $0 | $520,090 | $1,018,090 |
Nelson Reservior Rest Area | Construct Rest Area, which will include rest rooms, parking, lighting, landscaping and outdoor furniture. | Arizona | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Springerville | Apache | $500,000 | $0 | $60,000 | $560,000 |
Historic Roads Inventory | Arizona | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Statewide | Statewide | $47,150 | $0 | $11,788 | $58,938 | |
Kaibab Forest Scenic Byways Exhibit | Develop scenic byways guide | Arizona | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | Coconino | $17,600 | $0 | $1,064 | $18,664 |
Guidelines for Wayside Interpretive Exhibits | Develop interpretive exhibit guidelines for interpretive panels in Rest Areas/Pullouts along Scenic and Historic Roads | Arizona | 1996 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Statewide | Statewide | $18,860 | $0 | $1,140 | $20,000 |
SR 88 Apache Trail Retaining Wall Study | Document Historic significance of Apache trail and sample of road features.(STUDY ONLY) | Arizona | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | Maricopa | $184,828 | $0 | $11,172 | $196,000 |
I-40 Needle Mountain Welcome Center | Construct an Arizona Office Welcome Center building, approximately 2,600 sq. ft. at MP 2 South of I-40 at Interchange to provide tourism information about Arizona attractions and facilities. Welcome Center will be constructed with new rest area. | Arizona | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Phoenix | Mohave | $571,457 | $0 | $34,573 | $606,030 |
Ash Fork Welcome Center Renovation - Historical Route 66 | The proposal is to renovate the existing Ash Fork ADOT maintenance shop for use as a historical Bldg and Tourist Information Center. The building is approx. 7,100 sq. ft. together with the storage yard. (1.98 acres) | Arizona | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Ash Fork | Yavapai | $224,792 | $0 | $13,587 | $238,379 |
Superior Rest Area | Construct Rest Area in the town of Superior | Arizona | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Superior | Pinal | $226,000 | $0 | $12,882 | $238,882 |
Electronic Pathway Archives / Intrprtv. Programs-Hohokam | Develop and create spatially referenced databases for archaeological site and survey data along ADOT highway corridors. | Arizona | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Hohokam Village | Maricopa | $201,500 | $0 | $12,179 | $213,679 |
Route 66 Interpretive Project/ located at Needles Mountain Rest Area | Design and build a Route 66 travel information kiosk, interpretive path with signage, and iconic nodes for pedestrians adjacent to a Round 9 TE funded welcome center. The rest stop will be funded separately. Federal funding: $622,380 | Arizona | 2004 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Phoenix | Mohave | $622,380 | $0 | $37,620 | $660,000 |
SR 89A Town of Jerome Visitor's Center | Construct ADA accessible Visitor?¢‚Ä¢‚Äôs Center with Pedestrian and street landscape improvements. Center would be built as part of the rest area restroom building, and would serve 1.9 million visitors per year by providing travel information regarding attracti | Arizona | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Jerome | Yavapai | $253,409 | $0 | $16,177 | $269,586 |
89A Vermillion Cliffs Highways | This project would link nine sites along the Arizona Strip on highways SR89 and SR89A, SR389 and I-15. The project includes the design and installation of approximately 25 interpretive panels, the design and Construction of two new scenic pullouts. | Arizona | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | Coconino | $167,000 | $0 | $11,466 | $178,466 |
Monument Valley Rest Area US 163 | Site Construction includes a rest area, rest rooms, a plaza-shade structure, storage, paving, sidewalks, landscaping and outdoor furniture. | Arizona | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Oljato-Monument Valley | Navajo | $500,000 | $0 | $28,500 | $528,500 |
Route 66 Pedestrian & Landscape Improvements / 1st - 3rd St & Praire - Snyder Pedestrian | This project is planned to redevelop a portion of "historic" Route 66. The goal of the project is to preserve these existing historic landmarks and create a connection between these sites along route 66 and the B.N.S.F. Railroad. | Arizona | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Winslow | Navajo | $500,000 | $0 | $1,479,062 | $1,979,062 |
Preserving Historic Vistas | Assist in Acquisition of up to 3.64 Acres needed to complete the creation of Historic Park adjacent to SR202 and preserve historic vistas of the landmark, Tovrea Castle, situated on a desert hilltop adjacent to the Red Mountain Freeway. | Arizona | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Phoenix | Maricopa | $500,000 | $0 | $32,000 | $532,000 |
Guard Rail Rehabilitation On Gila River Bridge | Old Safford Road | Arizona | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Clifton | Greenlee | $224,800 | $0 | $56,200 | $281,000 |
The Garden's at La Posada Rehabilitation Phase III | Develop a historic themed transportation-related garden at La Posada. The basis of the project is Mary Colter?¢‚Ä¢‚Äôs only landscape plan, extending over eight acres between Route 66 (now SR87) and the BNSF mainline/AMTRAK depot in the center of downtown Winslo | Arizona | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Winslow | Navajo | $494,387 | $0 | $507,692 | $1,002,079 |
SR 387 Pinal Avenue Median Landscaping | Install 1.3 miles of native landscaping from the entrance of the Casa Grande Municipal Airport to Val Vista Boulevard. | Arizona | 2000 | 5 | (TE) 5. Landscaping and scenic beautification | Casa Grande | Pinal | $196,698 | $0 | $11,891 | $208,589 |
South 4th Avenue Streetscape | Scenic beautifications | Arizona | 1997 | 5 | (TE) 5. Landscaping and scenic beautification | South Tucson | Pima | $500,000 | $0 | $125,000 | $625,000 |
Fourth Avenue Gateway - Yuma | Project to rehabilitate the POE, construct MUP and pedestrian lighting and beautify the entry gateway | Arizona | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Yuma | Yuma | $942,780 | $0 | $56,987 | $999,767 |
SR 179 Landscaping & Scenic Beautification Village of Oak Creek | Provide landscaping and other amenities identified by the public during NBIP for Adot SR 179 | Arizona | 2005 | 5 | (TE) 5. Landscaping and scenic beautification | Prescott | Yavapai | $474,646 | $0 | $131,690 | $606,336 |
I-10 Neighborhood Art & Landscaping Bario Anita | The project will provide enhancements to the neighborhood and frontage road, through landscaping and artist treatments. Picnic areas and walkways along with trees and shrubs for bicyclists and pedestrians. | Arizona | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Tucson | Pima | $471,500 | $0 | $26,876 | $498,376 |
Route 66 Bicycle Path, Streetscape | Install landscaping including plants, shrubs and irrigation from 44th st. to Southern Ave. | Arizona | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Flagstaff | Coconino | $500,000 | $0 | $125,000 | $625,000 |
US 60 Exit 196 | Install landform graphics at exit 196 of US 60 | Arizona | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | Apache Junction | Maricopa | $766,347 | $0 | $46,322 | $812,669 |
US 93 / I40 Kingman Gateway | Beautify the North gateway to Kingman by adding landscaping on both sides of US 93 from MP 70 to the intersection with 1-40 at MP 71, approx. one mile. Create a more aesthetically pleasing and uniform first impression of Kingman, by installing plants, dec | Arizona | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Kingman | Mohave | $334,700 | $0 | $20,231 | $354,931 |
Silver King Hotel Restoration Phase I | Arizona | 1995 | 6 | (TE) 6. Historic preservation | Florence | Pinal | $500,000 | $0 | $125,000 | $625,000 | |
Old Power House Kingman Visitor Center Restoration | Restore Kingman Visitor Center. | Arizona | 1995 | 6 | (TE) 6. Historic preservation | Kingman | Mohave | $500,000 | $0 | $125,000 | $625,000 |
Historic Street Light Rehabilitation Project | Preserve and enhance historic concrete and metal streetlight poles and luminaries in historic districts of Alvarado, Ashland Place, and Encanto-Palmcroft. These 1920?¢‚Ä¢‚Äôs lights date to the original Construction of these neighborhoods and are essential to th | Arizona | 2004 | 6 | (TE) 6. Historic preservation | Phoenix | Maricopa | $328,133 | $0 | $22,837 | $350,970 |
Exterior Depot Restoration | Arizona | 1999 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Patagonia | Santa Cruz | $110,060 | $0 | $17,100 | $127,160 | |
Trolley Track Extension & Wye | Extension of Trolley Track on 4th Ave. in Tucson | Arizona | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Tucson | Pima | $8,000 | $0 | $8,250 | $16,250 |
Maricopa Plaza RR Station | Arizona | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Maricopa | Pinal | $403,500 | $0 | $100,875 | $504,375 | |
Ajo Historic Depot Restoration Project. | Project includes the purchase and rehabilitation of the Ajo Train Depot. This facility will be rehabilitated to SHPO standards for use by the Ajo Chamber of Commerce, as an official State Tourism Office, and as a business development office for the adja | Arizona | 2008 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Ajo | Pima | $500,000 | $0 | $46,472 | $546,472 |
Winkelman Bridge Restn, Old State Rte 77 | Arizona | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Winkelman | Gila | $350,000 | $0 | $87,500 | $437,500 | |
Old Town Main St. Phase I - Cottonwood | Pedestrian Improvements along main street. | Arizona | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Cottonwood | Yavapai | $87,882 | $0 | $21,971 | $109,853 |
Fairbank Historic RR Townsite | Provide resources to meet train and other passengers at the Intermodel hub. | Arizona | 1996 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Fairbank | Cochise | $470,000 | $0 | $30,000 | $500,000 |
Rails to Trails Phase II Improvements | Design/engineering/reConstruction of the historic railroad trestle over granite creek, 14 foot wide treadway Construction for approximately two miles of railroad, repairs to smaller trestles to include safety railing, signs, fencing, and photovoltaic saf | Arizona | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Prescott | Yavapai | $207,083 | $0 | $12,517 | $219,600 |
Ahamacave Trail | Converting and development of an existing, but abandoned, railroad corridor on the Fort Apache indian Reservation into a non-mototrized recreational trail for various activities. | Arizona | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Colorado Rvr. Indian Reserv. | La Paz | $164,650 | $0 | $32,930 | $197,580 |
City of Prescott, Prescott Rails to Trails Conversion | Conversion of a portion of abandoned Santa Fe, Prescott and Phoenix to a non-motorized trail. Located northeast of Prescott from US 89A to Chino Valley. | Arizona | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Prescott | Yavapai | $398,400 | $0 | $24,081 | $422,481 |
Prescott Valley Rails to Trails Conversion | Arizona | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Prescott Valley | Yavapai | $281,280 | $0 | $16,033 | $297,313 | |
El Paso & SW Greenway, Ph I: 22nd St. to Cushing St. | The project takes an otherwise neglected and abandoned railroad corridor and converts it into a pedestrian oriented transportatino route. | Arizona | 2006 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Tucson | Pima | $457,833 | $0 | $27,674 | $485,507 |
Outdoor Advertising Sign Survey (currently not approved by TERC) | Arizona | 2000 | 9 | (TE) 9. Inventory, control, and removal of outdoor advertising | Statewide | Statewide | $500,000 | $0 | $125,000 | $625,000 | |
Outdoor Advtsg Control Rules, Statewide | Evaluate Statewide Outdoor advertising rules and determine the appropriate guidelines. | Arizona | 1992 | 9 | (TE) 9. Inventory, control, and removal of outdoor advertising | Statewide | Statewide | $22,622 | $0 | $1,378 | $24,000 |
Outdoor Advtsg Sign Inventory, Statewide | Inventory current Outdoor advertising status. | Arizona | 1992 | 9 | (TE) 9. Inventory, control, and removal of outdoor advertising | Statewide | Statewide | $996,478 | $0 | $60,233 | $1,056,711 |
Electronic Archive of Arch Sites | Arizona | 1997 | 10 | (TE) 10. Archaeological planning & research | 0 | Maricopa | $223,721 | $0 | $55,930 | $279,651 | |
Price Freeway Retention Basin | Arizona | 2000 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Mesa | Maricopa | $311,190 | $0 | $77,798 | $388,988 | |
Arizona State Railroad Museum | The project will restore the donated railroad transportation artifacts, design, fabricate and install interacctive interpretive exhibits around and for these artifacts in the Arizona State Railroad Museum. It will also house restoration shops,an art gal | Arizona | 2000 | 12 | (TE) 12. Establishment of transportation museums | Williams | Coconino | $500,000 | $0 | $48,000 | $548,000 |