Project Search Results
Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
Village of Shiloh- Lebanon avenue sidewalk | Illinois | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Shiloh | St. Clair | $155,857 | $0 | $38,964 | $194,821 | |
Moline-Riverfront Trail Extension | The proposed project involves the extension of Moline's Mississippi Riverfront trail from the foot of 17th Street at Bass Street Landing to the west ROW line for the new I-74 bridge alignment; then heading south and connecting with the existing riverfront trail at River Drive. The length of the trail extension would be approximately 2,800 feet. The trail extension would be a 14-foot wide (including shoulders) multi-use trail to accommodate pedestrian and bicycle traffic along the Mississippi Riverfront. | Illinois | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Moline | Rock Island | $581,592 | $0 | $145,398 | $726,990 |
Canton Park District - Canton Bicycle & Pedestrian Trail - Athletic Park to Big Creek Park | Scope includes phase II design and construction of an 8ft asphalt multi use trail with 2ft shoulders. Trail will be 10ft in big creek park. Trail starts in athletic park. 4ft shoulders will be added along 4th ave for the trail. | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Canton | Fulton | $671,665 | $0 | $167,917 | $839,582 |
Village of Olympia Fields - New Construction of Bike Path/Multi-Use Trail | New construction of 6,6650 lf, 10ft wide, ashpalt paved bike path/multi use trail, 1.25 mile long with proposed limits on vollmer rd between vollmer woods forest preserve to the west and kedzie ave | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Olympia Fields | Cook | $488,800 | $0 | $122,200 | $611,000 |
Silvis-Avenue of the Cities Shared-Use Path | Scope of project would be installation of walking bike trail on north side of Avenue of the Cities from Hospital Road to 12th Street. | Illinois | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Silvis | Rock Island | $150,000 | $0 | $37,500 | $187,500 |
Decatur Park District - Stevens Creek Bike Trail, Phase 2B | 1.5 miles of phase 2B of the stevens creek bike trail will begin with an addendum to the previously approved PEI for the entire trail. This addendum will cover route changes and desing modifications that have been discussed with IDOT and the public over the last several years | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Decatur | Macon | $1,573,520 | $0 | $393,380 | $1,966,900 |
Village of Carol Stream - Lies Road Bike Path Extension | Project involves constructing a 10ft wide bituminous bicycle path along one side of lies rd, from gary ave to shmale rd. Necessary supplmental bikeway signage as well as traffic signal modifications will be included in the proposed improvements | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Carol Stream | DuPage | $152,000 | $0 | $672,000 | $824,000 |
City of Berwyn - Depot District Beautification - Oak Park Avenue | ITPE money will be used to engineer the project, resurface stanley ave, add permanent outdor furniture throughtout, correct ADA non-compliance issues, rebuild sidewalks and add energy efficient st and ped lighting | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Berwyn | Cook | $1,580,485 | $0 | $611,875 | $2,192,360 |
McLean County - Historic Route 66 Bikeway - Shirley to 1.1 miles South | Project includes phase II engineering and construction of the trail surface. Old roadway will be excavated to provide for 8in of aggregate and 3in of hotmix asphalt. A trail head will need to be contrsucted to allow for safe access to the trial | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bloomington | Mclean | $420,000 | $0 | $105,000 | $525,000 |
Forest preserve district of will county- Black Road from Des Plaines River Trail to Rock Run Trail | The Black Road Trail project is a high priority for the District as it will provide a vital link between two regional trails currently separated by Interstate 55 and by the DuPage River. The nearest bicycle/pedestrian route across these major barriers is 4 miles north of the site. This link is identified in the Will County 2030 Transportation Plan and the Northeastern Illinois Greenways and Trails Plan. Air quality will be improved as travelers will be able to use bicycles as alternate means of transportation. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Shorewood & Joliet | Will | $1,644,630 | $0 | $411,158 | $2,055,788 |
Alsip Park District - Cal-Sag Trail East (Alsip Segment) | Cal stag trail east project will provide an alternative means of transportation for a large segment of the south suburban area of chicago. Project will serve residential, business and industrial areas by providing an alternative to vehicular transportation | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Alsip | Cook | $2,394,000 | $0 | $535,050 | $2,929,050 |
Glenview- Milwaukee Av/Lake Av/Sanders Rd (IL-21) multi-use path | This project encompasses the design and construction of 5,700 feet of new and replaced 10-foot wide multi-use path along Milwaukee Avenue from Lilac Avenue to Sanders Road and along Milwaukee Avenue from the trail east of Potter Road to Magnolia Street. Additionally, sidewalk will be installed on Sanders Road from the Milwaukee Avenue intersection to Greenleaf Lane. This project is proposed to occur with planned IDOT intersection improvements, designed as Section 211K(R&N)-1. Milwaukee Avenue is a heavily traveled regional arterial and Lake Avenue is a primary east-west arterial. This project builds a section of the Centennial Trail as outlined in the Village's 2004 Comprehensive Plan. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Glenview | Cook | $523,808 | $0 | $0 | $0 |
Port Byron-Pedestrian and Sidewalk Extension | Remove current non-ADA compliant sidewalks and small sidewalk retaining wall at the Rt. 84/Cherry Street intersection. Construct new sidewalk, ramps (approximately 440 linear feet) and retaining wall (approximately 280 linear feet) to ADA stndards, including properly marked crosswalk at Cherry Street and a properly marked crosswalk across Rt. 84. This is Phase 1 of a multi-phase sidewalk enhancement program that the village is implementing along the Rt. 84 corridor. | Illinois | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Port Byron | Rock Island | $165,200 | $0 | $41,300 | $206,500 |
Kane County Forest Preserve District- Fox River Trail under UPRR from Raymond Dr/Riverview Dr to Poplar Creek | The purpose of the project is to provide a connection of the existing Fox River Trail from the west side of the Union Pacific Railroad track to the east side of the railroad tracks in Raymond Street Forest Preserve. The project is located approximately 200 feet south of Poplar Creek. Flooding in 2008 and 2013 of Poplar Creek damaged the bridge, required closing of the bridge, and ultimately required removal of the bridge and the west-east path connection. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | South Elgin | Kane | $1,774,896 | $0 | $443,724 | $2,218,620 |
Quincy Park District - Bill Klingner Bicycle/Pedestrian Trail | Project addds .7miles of 10ft wide asphalt multi use trail with 3ft crushed limestone shouldersrunning generally east west from 12th-5th st. | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Quincy | Adams | $972,350 | $0 | $1,805,670 | $2,778,020 |
City of Calumet City - New Bike Path/Multi-Use Trail Construction | New 10ft wide asphalt paved bicycle/multi-use trail, approximately .78 miles | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Calumet City | Cook | $191,110 | $0 | $47,780 | $238,980 |
Cook County Forest Preserve District-North Branch Trail Southern Extension | The North Branch Southern Extension Trail completion project is a proposed bike trail project located in northern Cook County. At 19 miles in length, the existing North Branch Bicycle Trail is the Forest Preserve District's longest linear trail system and the most heavily used. This is an important project that relates to the region's trail connectivity and improving people's opportunity to access healthy outdoor recreation. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Chicago | Cook | $1,600,000 | $0 | $400,000 | $2,000,000 |
Village of Frankfort-Pfeiffer rd multi use trail | Project consists of installation of a 10ft wide HMA multi use path in the eastern ROW of Pfeiffer rd (FAU 3751) from Sauk trail (FAU 3753) to the old plank trail | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Frankfort | Will | $388,000 | $0 | $97,000 | $485,000 |
Sumner Park District - Pecatonica Creekside Park Facility | To contrsuct a restroom facility with public water and sewer, an ADA compliant bike path and a paved parking lot for access to the path | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Petaconica | Winnebago | $312,912 | $0 | $85,683 | $398,595 |
City of Alton- College ave sidewalk project | This project will remove an existing deteriorated sidewalk located along the north side of College Avenue that does not comply with ADA/PROWAG requirements and replace it with a new sidewalk that does comply with ADA/PROWAG requirements. The proposed sidewalk runs along the frontage of Rock Springs Park which is a City of Alton public park which will increase the accessibility and utilization of the park. The proposed sidewalk will provide a safe route to two schools that are in close proximity. The existing sidewalks are not only deteriorated, but in some areas they pose a serious safety hazard. | Illinois | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Alton | Madison | $270,000 | $0 | $67,500 | $337,500 |
Highland Park - Robert McClory Trail Paving | Installation of 3 in of asphalt surface over existing fine aggregate path | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Highland Park | Lake | $172,400 | $0 | $43,100 | $215,500 |
City of Galena - River Trail - Phase 3 | The project is proposed to be an aggregate surface, multi use trail (bike/hike/cross country skiing) combination on/off road, recreational trail located between limestone bluffs and the mississipi river. The southern part of the project will include share on rd use with severeal local residents and railroad maintenance vehicles | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Galena | Jo Daviess | $1,802,950 | $0 | $776,138 | $2,579,088 |
City of Aurora - Kautz Road Multi-Use Path Extension 2013 | Work includes earth excavation placement subgrade and asphalt for 5,630 ft of multi use path within an existing ROW. The extension include a striped crosswalk at Mcoy dr with enhanced non motorized traffic awareness devices and sseveral intermediate path connections to existing paths | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Aurora | DuPage | $438,720 | $0 | $109,680 | $548,400 |
City of O'Fallon- Seven hills road sidewalk | The proposed project consists of a 1,300 feet sidewalk extension that would connect two existing sidewalks along Seven Hills Road in O'Fallon, Illinois. The connection of these two sidewalks would create a 3-mile long continuous pedestrian corridor running north and south. This sidewalk would provide linkage for the northeast residential area of O'Fallon to downtown O'Fallon where businesses and access to public transit are located. | Illinois | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | O'Fallon | St. Clair | $240,740 | $0 | $60,185 | $300,925 |
Northbrook - On-Street Bicycle Signage & Pavement Markings | Installation of bike route and destination signage and pavement markings per MUTCD standards and specifications | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Northbrook | Cook | $57,750 | $0 | $14,440 | $72,190 |
Forest Preserve District of DuPage County - Dunham Bike and Pedestrian Trail and Trailhead | Project consists of an off rd, multi use limestone bike/ped trail that will be connected to a trail head made up of an asphalt paring lot, and entrance rd, and a historic train depot. ADA accessible concrete sidewalks and ramps will be connected to the parking lot and lead to the train depot | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Wayne | DuPage | $1,356,930 | $0 | $339,240 | $1,696,170 |
Lake county divison of transportation-Deerfield rd bicycle facility | Proposed improvement consists of an 8ft paved off rd bicycle path connecting the buffalo grove bike path wich terminates at the village limits at milwaukee ave to lake county DOT bike/ped bridge over the des plaines river, the east terminus of the project | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Libertyville | Lake | $284,000 | $0 | $0 | $284,000 |
Grayslake - IL Route 83 Pedestrian Access Improvements | Installment of Portland cement concrete sidewalk, detectable warnings at intersection, and ped crossing signals | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Grayslake | Lake | $312,000 | $0 | $78,000 | $390,000 |
DuPage County Division of Transportation - Elgin O'Hare Western Access Corridor Landscaping Project | Project involves planting of decidious and evergreen trees, ornamental shrubs and grasses and a variety of perennials plasnt and bulbs at each of the 4 project locations to beautify and enhance the interchange areas to provide signature gateways for the municipalities along the EOWA corridor | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Elk Grove Village | DuPage | $550,190 | $0 | $337,898 | $888,088 |
Hanover Park- Hawks Hollo Forest Preserve Trail Connection from Lawrence Ave/County Farm Rd to Lawrence Ave/Morton Rd | This project will provide a connection from the Hanover Shick and Mayfair Station subdivisions in Hanover Park to the bike trail in the Hawk Hollow Forest Preserve, by improving the existing turf trail between Lawrence Avenue and the existing improved trail. The current turf trail is not suited to bicycle travel, and with the new bridge that the Forest Preserve District is constructing near this location over County Farm Road, the ability to conveniently access the existing trails by bicycle will be greatly enhanced. In addition to the Forest Preserve trails, this connection will also create connections to Mallard Lake, Heritage Park, and Greenbrook Elementary School. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hanover Park | DuPage | $80,000 | $0 | $20,000 | $100,000 |
Dolton Park District- Cal-Sag Trail East (Dolton Segment) | Cal stag trail east project will provide an alternative means of transportation for a large segment of the south suburban area of chicago. Project will serve residential, business and industrial areas by providing an alternative to vehicular transportation | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Dolton | Cook | $3,542,000 | $0 | $885,500 | $44,275,000 |
City of Loves Park - Willow Creek Extension | The willow creek path is a multipurpose path for bicyclists and peds. The proposed 460ft asphalt ped path will be 10ft wide linking north to the bridge proposed by the rockford park district and the existing willow creek trail. The proposed trailhead will provides 12 parking spaces and path amenities such as lighting, bollards, benches, bike rakcs, and signs | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Loves Park | Winnebago | $502,120 | $0 | $125,531 | $627,651 |
City of East Peoria-Bike trail pedestrian bridge | Purpose of prject is to install a bike path trail to provide a safe and efficient manner for the public to exercise and travel to various destinations in and around this portion city of east peoria. Currently there are no sidewalks along the prject corridor as well as much of the section of camp st | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | East Peoria | Tazewell | $278,927 | $0 | $66,073 | $345,000 |
Crystal Lake- McHenry County Conservation District Prairie Path at Walkup Rd/Burning Bush Trail/Existing Prairie Path | The proposed project would direct pedestrians along the roadway Burning Bush Trail utilizing signage to a new off-street path at the end of Burning Bush Trail to connect with the existing off-street Prairie Path. A hiking trail currently exists at the end of Burning Bush Trail. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Crystal Lake | McHenry | $109,356 | $0 | $0 | $0 |
Village of Riverside - Burlington Street Streetscape Project | This streetscape project addresses a number of recommendations id in riversides 2013 Central business district plan. Concerns relating to burlington st in the project limits include the following: sidewalks are often interrupted by driveays to servral off st parking lots, a lack of st trees, areas where plantings struggle to survive, and a narrower sidewalk on the south side of burlington st | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Riverside | Cook | $754,660 | $0 | $212,570 | $967,230 |
Village of Carol Stream - Bloomingdale Trail Improvements | New contruction of a 10ft wide bituminous bicycle path along one side of kuhn rd, from army trail rd to lies rd. Necessary supplmental bikeway signage as well as traffic sginal modifications at both the army trail and lie signalized intersections will be included in the proposed improvements, to ensure the trail is properly incorporated into the existing transportation infrastructure | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Carol Stream | DuPage | $133,130 | $0 | $507,710 | $640,840 |
Bensenville- Church Rd from Irving Park Rd to Grove Av | The Village of Bensenville has secured TCM funding for a proposed shared-use path along Church Rd from Grand Ave to Grove Ave. A portion of this path from Grand Ave to Jefferson St is anticipated for construction in 2016, while the remainder of the path from Jefferson St to Grove Ave is anticipated for construction in 2017. This 8-foot wide off-street shared-use path along the west side of Church Road will complete a connectioni of bike path along Church Rd from Grand Ave to IL 19. There is existing pedestrian facilities in this proposed span which will be replaced with a shared-use path. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bensenville | DuPage | $541,620 | $0 | $135,405 | $677,025 |
Sangamon County Highway Department - Sangamon Valley Trail Phase 2 - Stuart Park Connector to Irwin Bridge Road | Project consists of constructing a 10ft wide hot mix ashplast pavement with a 2ft wide turf shoulders from north of the stuart park connector to the south edge of pavement at irwin bridge rd on the abadoned chicago and northwestern railroad corridor | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Springfield | Sangamon | $4,393,090 | $0 | $1,098,280 | $5,491,370 |
City of McHenry | In an effort to improve bicyclist mobility and provide safe pedestrian accomodations from established residential neighborhoods to business and recreational facilities the off-road bike path will be constructed along Knox Drive and through the City's Knox | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | McHenry | McHenry | $358,840 | $0 | $124,710 | $483,550 |
Freeport - Pecatonica Prairie Trail/Tutty's Crossing Trailhead Amenities | The proposed porject will provide alternative regional transportation modes between public facilities and business and transportation centers in freeport and rockford; connects the local vilages of ridott, pecatonica and winnebago; and provides a state scale link as part of the grand illinois trail between chicago and the mississipi river | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Freeport | Stephenson | $1,521,700 | $0 | $398,160 | $1,919,860 |
City of McHenry - Municipal Bike Path | An off rd bike path will be constructed along knox dr and through the city's knox park. The bike path will connect existing bike paths providing a link between IL rt 31 and green st | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | McHenry | McHenry | $358,840 | $0 | $124,710 | $483,550 |
City of McHenry - Miller Road Bike Path | The proposed projects elements will include a new bike path, concrete sidewalk, directional signage, traffic signal modifications, drainage appurtenances, pavement markings, parkway restoration, detectable warnings, curb ramps, and all necessary and collateral work to constrcut the improvements | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | McHenry | McHenry | $354,000 | $0 | $88,600 | $442,600 |
City of O'Fallon- Hincliffe, Shaefer, & Kampmeyer E.S sidewalk | The proposed project will fill in existing sidewalk "gaps" located adjacent to three elementary schools located in O'Fallon School District #90. Sidewalks will be constructed around J.E. Hinchliffe, Marie Schaeffer, and Estelle Kampmeyer Elementary Schools. ADA ramps adjacent to proposed sidewalks will be reconstructed to current ADA standards. The proposed sidewalks will also complete an alternate accessible route that will separate pedestrians from vehicular traffic. | Illinois | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | O'Fallon | St. Clair | $198,712 | $0 | $49,678 | $248,390 |
City of Washington-Cruger rd recreation trail phase I | Project will construct a .8 mile rec trail on the north side of cruger rd between east of N cummings lane and nofsinger rd. This will ensure a dedicated off rd trail for all ped/cyclists. There are currently not any ped/bike accomodations along this corridor and they are forced to conted with vehicles traveling above 45mph | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | Tazewell | $227,556 | $0 | $56,889 | $284,445 |
City of Edwardsville- Quince st shared path | The City of Edwardsvile is applying for funding to construct a bike lane along Quince and Magnolia Street, a distance of approximately 1,000 feet. The southern terminus at the intersection of IL Route 159 and Magnolia Street will connect to the Madison County Transit Nickel Plate Trail, while the northern terminus at the intersection of Quince Street and East Linden Street will connect into the City's new fire and police department facility and Spray and Play Park. Once completed, this project will provide an alternative means of transportation for the residents of Edwardsville by connecting an important City park and service facility to residential areas, schools, parks, commercial areas, and park and ride lots via Madison County's 100-mile long trail system. | Illinois | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Edwardsville | Madison | $189,600 | $0 | $47,400 | $237,000 |
Village of Lena - Sidewalk Program - Phase 2 | This sidewalk would inititate the 2nd phase of lena's sidewalk improvement program. Is focuses on linking lenas two subdivisions , fairway hills and oakwood terrace, to this improved sidewalk network providing safe access to lenas cultural centers, parks, and businesses as well as encourigin a healthy lifestyle for people of all abilitities and in all locations of lena | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lena | Stephenson | $334,276 | $0 | $83,569 | $417,845 |
Highland Park - Bike-Walk 2030 Sharrows & Signage | Project erects bike rt signage and painting lanes and sharrows as id and prioritized in the city's bike walk HP 2030 plan | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Highland Park | Lake | $477,200 | $0 | $119,300 | $596,500 |
City of Aledo - Multi-Use Path | The propsed project consists of an 8ft wide multi use path with 2ft wide turf shoulders. Path will be constructed with a 6ft aggreagte base under a 2ft hot mix asphalt surface. Bollards will be installed at locations wher the path intersects st's to proevent vecicles from accessing the path. Benches will be installed every mile to provide locations for users to rest | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Aledo | Mercer | $671,490 | $0 | $786,207 | $857,697 |
City of Rockford - Rails-to-Trails Over the Rock | The rails to trails over the rock will put in place another vital link in an integrated, regional multi use path network along both sides of the rock river. The scope of work includes the removal of the RR ties and rail from the bridge and replacement with a modern, concrete deck multi use path | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rockford | Winnebago | $740,000 | $0 | $472,700 | $1,212,700 |
DuPage County DOT- Gary Av Trail from Great Western Trail to Army Trail Rd | This project includes construction of an approximately 3 mile long 8-10ft wide multi-purpose trail extending north from the Great Western Trail near St. Charles Road to Army Trail Road (including a small connecor trail to the Lies Road Trail) in Carol Stream, Illinois in DuPage County. The proposed multi-purpose trail adjacent to Gary Avenue is within currently owned county ROW improving both pedestrian and bicycle travel and improving access to transit. Running north-south, the Gary Avenue Trail originates on the south end at a major regional trail -- the 11-mile long Great Western Trail that extends east-west in central DuPage County from Villa Park to West Chicago linking 7 communities and numerous local destinations, including an industrial park, a regional mall (Stradford Square), medium density housing, and Carol Stream Village Hall, and Carol Stream Park District's recreation complex. The proposed Gary Avenue trail connects with the existing Lies Road Trail - a 3-mile trail that runs through central Carol Stream and connects to the West Branch DuPage River Trail. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bloomingdale & Carol Stream | DuPage | $729,840 | $0 | $182,460 | $912,300 |
City of Rolling Meadows - Euclid Avenue Bike Path | Project will consist of a 10ft wide asphalt paved trail within the euclid ave ROW. A low retaining wall will be constructed at a specific location to maintain a uniform path grade and reduce impact on the adjoining landscape | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rolling Meadows | Cook | $691,260 | $0 | $172,820 | $864,080 |
Village of Shiloh - Scott Air Force Base Bicycle Commuter Enhancement - Phase I | Addition of a hot mix asphalt/ portland cement concrete pedestrian/cycle facility along seibert RD | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Shiloh | St. Clair | $226,590 | $0 | $56,680 | $283,270 |
Macon County Highway Department- Baltimore Avenue MTZ Pathway | Project involves constructing a new multi modal path adjacent to the west side of baltimore ave. Path will be constructed of asphalt. Earth embankment and excavation will be required to provide the alingment for the path along with drainiage and signage improvements | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Decatur | Macon | $499,200 | $0 | $124,800 | $624,000 |
O'Fallon - Bike & Pedesterian Access Improvements - Illini Bike Trail to Frank Scott Parkway | Extend Illini bike/ped trail. Extension will be aggregate base with hot mix ashpalt surface and a toip width of 10ft. Establish a designated shared roadway bike rt using pavement markings and signs on existing state st | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | O'Fallon | St. Clair | $448,550 | $0 | $112,140 | $560,690 |
Huntley - IL Route 47 Multi-Use Path | Scope of work includes the construction of a new multi-use path along the east side of IL Rt 47 a distance of 6,200 ft. The scope will also include the construction of a new multi use path along the south side of oak creek parkway to privide connections to existing ped/bicycle facilities | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Huntley | Kane | $1,121,530 | $0 | $280,390 | $1,401,920 |
Lakemoor - Wegner-Darrell Ped/Bike Path | Project encompasses the construction of 1.3mi of 8ft wide asphalt surfaced 2 directional shared bike/ped paths and 1.6mi of 4ft wide dedicatd bike lanes on existing pavements using pavement markings and signage | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lakemoor | Lake | $264,400 | $0 | $66,100 | $330,500 |
City of Carbondale - Downtown Pedestrian and Bicycle Path - Phase II | Construction of phase II of bicycle/ped path connceting dowtown carbondale to SIU campus. Phase I is currently underway and includes the northern portion of the path, beginning at main st and terminating at mill st. | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Carbondale | Jackson | $388,870 | $0 | $97,240 | $486,110 |
Skokie- Old Orchard Rd from Harms Rd to Woods Dr | The proposed improvements along Old Orchard Road consist of the construction of a 10-foot wide bi-directional shared-use, off-street path on the south side of Old Orchard Road between Harms Road and Woods Drive. There are signalized pedestrian crossings at both ends of the project, Skokie Boulevard (west) and Gross Point Road (east). Pedestrian signals will be installed across the south leg of Woods Drive. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Skokie | Cook | $376,000 | $0 | $94,000 | $470,000 |
Rockton - East Rockton Road Pedestrian/Bicycle Facility | The desing of the pathway calls for construction of a 10ft wide paved off road path along and within the ROW of East rockton rd. The path will confomr to applicable ADA and PROWAG regulations. The cross section will consist of 10in of compacted aggregate with 2in of HMA surface. A 2ft clear area on each side of the path will landscaped to match existing vegetation | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rockton | Winnebago | $716,430 | $0 | $179,123 | $895,553 |
Village of Western Springs - Bemis Woods Bike Path Extension to Wolf Road and Ogden Avenue | Wolf rd-ogden ave intersection improvement to accommodate north south bicycle/ped crossing across west approach. Appurtant restoration and draininage adjustments. Tree removalcoordinated with cook cunty froest presere to minimize impacts | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Western Springs | Cook | $391,118 | $0 | $97,780 | $488,898 |
Countryside - Brainard Avenue Multi-Use Path | The project consists of establishing a 10' wide multi-use path along the east side of Brainard ave. The scope of work consists of earth excavating, installment of aggregate base course and hot mix asphalt; stor sewer and drainage improvements. | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Countryside | Cook | $916,550 | $0 | $229,140 | $1,145,690 |
City of Peoria-Northmoor Road Multi use trail | Proposed multi use path will provide ped/bike safe and efficient access to the residential neighborhoods, the multiple schools along the corridor and multiple businesses. The path will provide a separate off path for bikes, which will increase the roadway safety for bikes and motorists. This path connects to rock island/ pimiteoui trail which connects toulon to morton | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Peoria | Peoria | $278,927 | $0 | $111,073 | $390,000 |
Village of Hartford- Central avenue sidewalks | This project is located on Central Avenue in the Village of Hartford in Madison County. The project begins at the intersection of Donna Drive and continues to the north for a distance of 1.613.97 feet, 0.306 miles. New 5 foot sidewalks will be installed on both sides of Central Avenue to provide safe access by residents and non-vehicular traffic. | Illinois | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hartford | Madison | $326,460 | $0 | $81,615 | $408,075 |
City of Prospect Heights - Willow Road Sidewalk Improvement Project | New 1,622ft Willow rd sidewalk that will link several outlet sidewalks ultimately creating a fluid, connecting sidewalk system that will afford cummutersthe ability to travel comfortably | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Prospect Heights | Cook | $284,000 | $0 | $71,000 | $355,000 |
Lake county forest preserve district-Wilson rd underpass | Project consists of the design and construction of a multi use bike/ped underpass with approaches and connecting trails. Project will connect with exising paths. The underpass will allow for safe and easy travel under wilson rd | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Libertyville | Lake | $2,268,000 | $0 | $0 | $2,268,000 |
Skokie - Howard Street Multi-Use Trail | Provide bikepath along the north isde of howard st. Pathway work will include enhancement features such as bike racks, wayfinding signage, aesthetically selected trees, and planting areas. The on st portion west of hamlin will include markings and signage to existing networks | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Skokie | Cook | $630,800 | $0 | $342,600 | $973,400 |
Forest Preserve District of DuPage County - County Farm Road Bridge & Trail Improvements | Construction of a missing segment of the north central dupage regional trail. Construction of a 10' wide beginning on the weast at the existing terminous of the Hawk hollow trail at county farm rd. | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hanover Park | DuPage | $1,280,000 | $0 | $2,698,560 | $3,978,560 |
Village of Hillside - Mannheim Road Regional Connector Bicycle Pathway | Project involves constructing a 10ft wide asphalt multi use path between rosevelt rd and butterfield rd on manheim rd. A pre-fabricated truss bridge, also 10ft wide will be used for the crossing at the I-290 underpass. Pathway includes several resting areas at which permanently secured benches and tress will be placed | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hillside | Cook | $846,980 | $0 | $211,730 | $1,058,620 |
Village of Machesney Park-Alpine multi use path | The multi use path will fill a critical gap within the regional bike path system by providing a connection between the existing willow creek path and exisitng rock river rec path | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Machesney Park | Winnebago | $620,432 | $0 | $219,568 | $840,000 |
Village of Rantoul - Downtown Area Bike Path | Village proposes a 10ft wide off rd hot mix asphalt bike path along the village ROW within the proposed project limts. Path is anticipiated to be used as a multi use path due to its proximity to residnetial neighborhoods, parks, the downtown area, business district, and the amtrak station | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rantoul | Champaign | $641,362 | $0 | $160,341 | $801,703 |
Collinsville - Clay Street Phase I Streetscape Improvements | Specific project elements include ADA accesible curb and sidewalks, brick imprinted crosswalks, ped lighting, decorative signage, street trees and tree gates. Project will be done in conjunction with resurfacing work that city recently received funding for through theSTP | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Collinsville | Madison | $987,000 | $0 | $328,000 | $1,315,000 |
City of Nauvoo - Phase II Sidewalk Project | New ADA copmlpiant concrete sidewlka will be constructed along 9 block in Nauvoo to move both peds and cyclists through Nauvoos downtown business area, to the Nauvoo temple nad down to the lowland areas near the mississipi rover where the Nauvoo historic park district is located | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Nauvoo | Hancock | $159,030 | $0 | $39,760 | $198,790 |
Village of Dieterich - Pedestrian Accessibility Project | Project is 4th phase of long term plan to imporve quality of life for the dieterich residents by imporoving the connectivity for peds and cyclists to the dieterich businesses, parks, schools, and residentail areas | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Dieterich | Effingham | $800,000 | $0 | $200,000 | $1,000,000 |
City of Washington - Washington Road (US Business Route 24) Recreation Trail Connection | Project will contracut a 10ft wide, .6 mile off rd conrete trail extension on the north side of washington rd (US business rt 24) between McClugage rd(IL rt 8) and cummings lane. Trail provieds linkage rec trail west of McClugage rdand existing sidewalk east of cummings lane. | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Washington | Tazewell | $508,050 | $0 | $127,040 | $635,090 |
Schaumburg- Golf Rd Bike Path from Roosevelt Blvd to Ring Rd | The proposed Golf Road Bike Path will complete a section of the Evanston-Elgin Bikeway (Golf Road), a Tier One Corridor recommended in the 2010 NWMC Bicycle Plan. It is located along the north side of Golf Road from Roosevelt Blvd to Ring Road (East). The project will connect to the RTA/Rolling Meadows CMAQ funded project for transit access improvements along the north side of Golf Road and the adjacent employment centers (TIP 03-14-0005). There are no other safe crossings from bike and pedestrians under or over Route 53 between Woodfield Road and Algonquin Road. The proposed bike path will be a separate facility from the roadway constructed within the existing roadway ROW. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Schaumburg, Rolling Meadows | Cook | $1,306,432 | $0 | $326,608 | $1,633,040 |
Champaign County Forest Preserve District - Mahomet - Illinois Route 47 Multi-Use Trail | A 10ft wide portland cement concrete multi use pathway will be constructed along the east side of rt 47 in mahomet in 2 segments. The new 10ft path will be separated and set back form the existing roadway. | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Mahomet | Champaign | $293,780 | $0 | $73,446 | $367,226 |
Lake county Forest Preserve District- Middlefork Savanna Forest Preserve Trail at IL 60 and Academy Dr | The proposed improvement will connect the Townline Community Park to the Middlefork Savanna Forest Preserve by construction an 8-foot wide shared-use path along the west side of Academy Drive from IL Route 60 to Faculty Circle. Crosswalks and pedestrian actuations with countdown pedestrian signal heads will be installed at the intersection of IL Route 60 and Academy Drive. A crosswalk will be installed across the north leg of Academy Drive and Faculty Circle. East of Academy Drive, the 8-foot shared-use path will continue east and cross the Metra railroad tracks on a proposed 12-foot wide, 221-foot long bridge structure. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lake Forest | Lake | $2,066,320 | $0 | $516,580 | $2,582,900 |
Forest Preserve District of Will County - Black Road Bridge Trail, Segment 1 | Black rd bridge trail prject will be desinged as a comprehensive project but constructed in 2 segments. Segement 1 includes phase 1 and 2 engineering for th eoverall project and construction engineering for that portion of the project lying on east of the west frontage rd along I-55 | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Joliet | Will | $888,680 | $0 | $240,830 | $1,204,050 |
Homer Glen- Heroes Bike Trail from Pin Oak Dr (ComEd ROW) to NWX Goodings Grove School & Frontge Rd | The Goodings Grove extension of the Homer Glen Heroes Trail will extend east & south from the existing bike trail at Pin Oak Drive and the ComEd ROW. The total length of the proposed extension is approximately 1,500 linear feet. The Goodings Grove extension will provide a connection to the numerous restaurant and retail facilities at the intersection of 143rd Street & Bell Road as well as provide a connection to the Goodings Grove School and adjacent sports fields. The Goodings Grove extension will provide a direct link to three subdivisions, and an indirect link to eleven additional subdivisions, containing in excess of one thousand homes. As there are no current sidewalk or trail connections to the Goodings Grove School, all students are driven or bused to and from the school. In addition, the trail extension will also provide pedestrian access to the sports fields and area retail facilities. This multi-use path will provide a safe and scenic, non-motorized means of transportation to these locations. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Homer Glen | Will | $249,600 | $0 | $62,400 | $312,000 |
Orland Park- 108th Av from 153rd St to Jillian Rd | This project scope is to replace an existing 5ft concrete sidewalk with an 8ft wide multi-use path. The path will be off street and parallel to 108th Avenue extending from Jillian Road on the south to 153rd Street on the north. This project will link the existing path along 153rd Street to the path along Jillian Road leading to the Metra station. Included will be improved crossings at 153rd Street and 108th Avenue with striping and enhanced striping and signage at 108th Avenue and Jillina Road. All work will be constructed within the existing ROW and meet ADA standards. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Orland Park | Cook | $150,800 | $0 | $0 | $0 |
Palos Heights- Ridgeland Av from College Dr to 135th St | This project includes the installation of a bike path on the East side of Ridgeland Avenue from Rt. 83 to Alan B. Shepard High School. Landscaped medians will be installed on Ridgeland Avenue south of Rt. 83 and North of 135th Street. This bike path is part of the RTA's Ridgeland Avenue Corridor Study to connect bike communities. There are multiple proposed bike routes located along the length of this path which connect to Trinity Christian College and Alan B. Shepherd High School. This portion of the corridor connects the Tinley Creek Trail System south of 135th Street with the Cal- Sag Trail north of Rt. 83. The Cal-Sag Trail consists of a total of 26 miles of mixed use path from Lemont to the Burnham Greenway. The Tinley Creek Trail system consists of 9.4 miles of mixed use path located in the Cook County Forest Preserve. Please see attached partial Ridgeland Avenue Corridor Report applicable to the City of Palos Heights. | Illinois | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Palos Heights | Cook | $788,000 | $0 | $197,000 | $985,000 |
Highland - Sharpshooter's Trail | Segment will construct a 10ft wide asphalt multi use trail for 2,600ft from higland elementary school at poplar st to conventry way | Illinois | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Highland | Madison | $834,000 | $0 | $224,000 | $1,058,000 |
Champaign County Forest Preserve District - Kickapoo Trail | Kickapoo trail consist of 24.5 miles of multi use rec trails constructed on abandoned CSX RR ROW. The Champaign county forest district will own 12.7 miles of the rail corridor within champaign county. The trail will consist of 10ft wide surface of crushed limestone | Illinois | 2014 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Mahomet | Champaign | $2,520,006 | $0 | $630,002 | $3,150,008 |
Village of Riverside - Riverside Train Station | The project will remove exisitng clay tiles, clean and preserve tiles in good condition to be reused as part of the project | Illinois | 2014 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Riverside | Cook | $802,028 | $0 | $200,508 | $1,002,536 |
Rock Island- Milan school district#41 sidewalk curb ramps and signal | Installation of a signalized pedestrian beacon at the intersection of 11th st and 10th ave and installation of ADA compliant sidewalk curb ramps on 10th ave from 9th st to 12th st in rock island | Illinois | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Rock Island | Rock Island | $84,737 | $0 | $21,184 | $105,921 |
Herrin Downtown Streetscaping and Pedestrian Safety Improvements | The improvements will be constructed at each of 5 intersections within the Downtown area. The signalized intersections (Madison, Monroe and Cherry) will have the same scope of work which will consist of: curb bumpouts in two quadrants of the intersection | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Herrin | Williamson | ||||
Rock Island Greenway Extension | This project will provide a separated, non-motorized trail connecting two existing trail sections in Peoria. This continues the extension of the Rock Island Greenway south, from the RR bridge rehabilitation at War Memorial/US 150 to Park Avenue, where striped on-street bike lanes will connect to the existing off-street trail at Glen Oak Park. This will provide a level and accessible route for all users, as well as access to residential areas, businesses, schools, churches and Downtown Peoria. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Peoria | Peoria | $485,170 | $0 | $121,320 | $606,490 |
City of Newton Phase IV - Eagle Trails | The project, located in Newton, is Phase 4 of the Eagle Trails project, which is part of a regional plan. It will consist of 4501 feet of multi-use path creating a safe route for pedestrians/bicyclists & connects to completed Phases 1, 2 & 3 (Aquatic Ctr, Multi-use path & Bridge, & the downtown streetscape) & allows for easy access to 2 existing canoe launches. The project plans to utilize Portland Cement Concrete, sheet piling in the river, rip-rap, safety handrails, & ADA-compliant ramps. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Newton | Jasper | $1,056,000 | $0 | $264,000 | $1,320,000 |
IL Route 50 Shared Path Mall Entrance to Larry Power Road | This project will construct a 10' shared path along IL Route 50 in Bradley from the Northfield Mall Entrance north to Larry Power Road. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Bradley | Kankakee | $333,800 | $0 | $94,700 | $428,500 |
IL 157 Shared Use Path | The project will involve grading, drainage culverts, shared use path construction, retaining wall construction in areas of limited right of way, and ADA ramp and crosswalk signal improvements. Protective wooden guardrail and signage will be used to prote | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Edwardsville, IL | Madison | $943,200 | $0 | $235,800 | $1,179,000 |
Wilmette - Downtown Streetscape Improvements | The streetscape enhancements will be consistent with the Village Center Master Plan and include: Central Business District landscaping (trees, perennials, permanent planter boxes, and tree grates); stamped concrete sidewalk with accent pavers within the d | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Wilmette | Cook | $999,100 | $0 | $249,780 | $1,248,880 |
Charleston to Mattoon Lincoln Prairie Grass Trail Pedestrian/Bicycle Facility Improvements | The cities are jointly applying for ITEP funds for a pedestrian/bicycle facility reconstruction project. The project includes upgrading the existing crushed limestone portions of the “Lincoln Prairie Grass Trail” to an asphalt surface to increase use, reduce travel times & effort required for travel between destinations. The project includes extending the existing trail to provide commuter connections which will evolve the existing multi-use recreation trail to a key transportation facility. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Charleston/Mattoon | Charleston | $800,000 | $0 | $235,000 | $1,035,000 |
City of Alton - Lovejoy E.S. and Alton M.S. SRTS | 4 sidewalk segments along College Ave, Rock Springs Drive and Johnson St. | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Alton | Madison | $336,800 | $0 | $84,200 | $421,000 |
Downtown Area Improvements - South Half | The project scope will consist of proposed streetscape beautification of the downtown area of the Village of Bensenville. Project will consist of decorative concrete, pedestrian cross walks, public benches, planter boxes and other scenic beautification i | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Village of Bensenville | DuPage | $1,045,800 | $0 | $261,460 | $1,307,260 |
Shelbyville - Phase 10 Bike Path | The Phase 10 Bike Path project consists of construction of a multi-use Bike Path. The primary improvements consist of an off-road 10 foot wide PCC path that begins at Hickory Street and ends at the West Business Park. It involves construction concrete su | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | City of Shelbyville | Shelby | $863,720 | $0 | $215,930 | $1,079,650 |
City of Neoga Shared-Use Path Project | Work will progress block by block along the route described above in "Project Limits". Old sidewalk that is deteriorated, excessively sloped, and non-ADA compliant will be removed. Earthwork will be performed within the Right-of-Way to accommodate the f | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | City of Neoga | Cumberland | $1,014,960 | $0 | $253,740 | $1,268,700 |
City of Edwardsville - IL 157 Multi-use Path | The proposed project is a 10' wide asphalt multi-use trail that will connect to existing sidewalks and a bus stop at its southern terminus and the Madison County Transit (MCT) Nature Trail at its northern terminus, providing connections for both pedestrians and bicyclists. | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Edwardsville | Madison | $175,500 | $0 | $94,500 | $270,000 |
Elk Grove Village - Oakton St and Busse Rd Multi-use Path | Installation of a multi-use path along the south side of Oakton St from Crossen Ave to Busse Rd and along the west side of Buses Rd from Oakton to the I-90 overpass | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Elk Grove Village | Cook | $162,545 | $0 | $40,636 | $203,181 |
Channahon- Bridge Street Multi-Use Path | The Bridge Street Multi-Use Path will complete the missing, non-motorized link in the trail system connecting the eastern and western segments of Channahon including Minooka High School that are currently divided by the river system. This project is proposed in three construction phases, we are requesting funding for Phases 1 and 2 of this project. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Channahon | Will | $682,480 | $0 | $170,620 | $853,100 |
DuPage County FPD - North Central DuPage Regional Trail | Connection through Pratt's Wayne Woods Forest Preserve to the Illinois Prairie Path | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | DuPage County FPD | DuPage | $152,000 | $0 | $38,000 | $190,000 |
Kane Co FPD - Great Western Trail Ext | Purchase of ROW from the UP Railroad and construct extension of the Great Western Regional Trail from LeRoy Oakes Forest Preserve to Randall Road | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Kane County FPD | Kane | $680,034 | $0 | $194,309 | $874,343 |
CDOT - Columbia Bridge over Jackson Park Lagoon and 59th St Access Route to Lakefront Trail | Restore historic bike-ped bridge and connecting trails to Lakefront Trail and Stony Island Ave | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Chicago | Cook | $5,098,000 | $0 | $1,274,500 | $6,372,500 |
Romeoville - NGPL Multi-Use Path | 10-foot wide hot mix asphalt trail connection between Normantown Rd and Taylor Rd along to an existing Natural Gas Pipe Line (NGPL) easement | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Romeoville | Will | $813,600 | $0 | $273,400 | $1,087,000 |
City of Silvis - Multi-use Trail 10th St Connection | Construction of 8' wide concrete trail that connects Avenue of the Cities with the Grand Illinois Trail located on Crosstown Avenue; length of proposed project is 3900 feet. | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Silvis | Rock Island Co | $529,640 | $0 | $132,410 | $662,050 |
Schaumburg - Higgins Rd Bike path | Installation of a new shared-use path on the north side of Higgins Rd to complete a gap in the bicycle network, plus ADA improvements at the intersection of Higgins Rd and Plum Grove Rd | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Schaumburg | Cook | $515,760 | $0 | $175,740 | $691,500 |
Bike Path-Effingham Pavement Marking and Signage Project | This project consists of pavement marking and signage along existing city streets to designate a safe travel way for bicyclists. The existing streets that are intended to be utilized are of sufficient width to allow for the separate designated bicycle paths. Also included in this project is a trail head improvement, which consist of a parking lot, so bicyclists and pedestrians can safely use the existing multi-use paths that were constructed utilizing ITEP funds in 2010 and 2013. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Effingham | Effingham | $934,400 | $0 | $233,600 | $1,168,000 |
Niles - Milwaukee Avenue Corridor Improvements - Phase VI | This project improves pedestrian and bicycle safety features and makes Milwaukee Avenue more accommodating and/or accessible for pedestrians and bicyclists. The project elements proposed are brick pavers at crosswalks and along sidewalks, decorative benches, planters, decorative fencing, trash receptacles and permanent landscaping improvements. To mitigate stormwater issues, bio-retention cells and/or bioswales will be installed as part of the project as well as a permeable parking lot. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Niles | Cook | $698,620 | $0 | $174,660 | $873,280 |
Park Street Shared Use Path | This project will create bicycle and pedestrian linkages to the existing transportation system. The shared use path and crosswalk and ramp construction will provide a continuous bicycle and accessible pedestrian route through the north side of the City and will directly connect to other proposed or existing bicycle facilities in the City. All improvements will provide direct access to the park, Carle Hospital, commercial establishments, Downtown Urbana, and low-income residential neighborhoods. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | City of Urbana | Champaign | $426,600 | $0 | $110,400 | $537,000 |
Cook Co DOTH | Extend the Skokie Valley Trail from north of Lake Cook Rd to the southern limit of the Village of Northbrook | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Cook Co DOTH | Cook, Lake | $2,780,936 | $0 | $695,234 | $3,476,170 |
Sangamon Valley Trail Extension | The project consists of a 10-foot wide paved trail with 2-foot wide turf shoulders from north of the Stuart Park Connector to the south edge of pavement at Irwin Bridge Road on the abandoned Chicago & Northwestern Railroad corridor and is approximately 6 miles in length. The trail crosses several township roadways and a county highway. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Sangamon County | Sangamon | $420,800 | $0 | $409,300 | $830,100 |
Romeoville Proposed Metra Station - New Construction | The project entitled “Romeoville Proposed Metra Station – New Construction” includes the construction of a new Metra Commuter Train Station along the Heritage Corridor rail line in Romeoville including non-motorized transportation options to and from the Station. The project includes beautification efforts for safe/ADA compliant facilities for pedestrians and bicyclists to access Station; and designed to establish an enhanced atmosphere while enriching aesthetic value in the Village. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Romeoville | Will | $296,700 | $0 | $138,300 | $435,000 |
Skokie - Skokie Valley Trail Extension-Golf Rd to Dempster St | Construct a new multi-use path to complete a gap in the Skokie Valley Trail (SVT) between Golf Rd and Dempster St | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Skokie | Cook | $2,880,000 | $0 | $840,000 | $3,720,000 |
Country Club Hills - BP Pipeline Shared Use Path | New Multi-use Path within BP Pipelines (North America) Inc. ROW from Flossmoor Rd (Tinley Creek Trail) to 175th St (Community Park) | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Country Club Hills | Cook | $134,400 | $0 | $33,600 | $168,000 |
The 18th to 24th Street segment of the trail will be the third segment of the Bill Klingner Bike/Pedestrian Trail. This segment will continue to run west to east along Cedar Creek. This section of the trail will add another half mile of trails which will cross Cedar Creek at the point where there are several springs throughout this corridor. Once completed, the trail will extend from US 24 to the east all the way to the Mississippi River to the west which is 2 miles. | This project is a multi-use asphalt path joining two communities together with alternate transportation options and helping to complete the State initiative of the Route 66 Trail Concept Plan. This project was previously known as "Williamsville to Sherman Multi-Use Trail". | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Williamsville | Sangamon | $2,237,010 | $0 | $566,760 | $2,803,770 |
Carbondale - Northwest Pedestrian and Bicycle Path | The City of Carbondale is proposing the construction of a mile long bicycle path which connects rural Carbondale to downtown Carbondale. The path will include bicycle amenities and safety level lighting for users. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Carbondale | Jackson | $708,940 | $0 | $422,880 | $1,131,820 |
City of Waterloo - S. Market Shared-use Path | At the intersection of IL Rt 3 and South Marked St, IDOT provided crosswalks through the intersection that lead to the south east quadrant. The proposed shared-use path will begin at this intersection and extend approximately 2,000 feet north to the intersection of Bulldog. | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Waterloo | Monroe | $203,600 | $0 | $96,400 | $300,000 |
Main Street Streetscape - Phase 2 | The proposed project includes the removal and replacement of deteriorated sidewalks and roadside features including parking lanes, sidewalks, and sidewalk ramps. The project is designed to encourage redevelopment in downtown Columbia, improve access to existing businesses for pedestrian and vehicular modes of travel, and beautify the Main Street corridor. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Columbia | Monroe | $998,140 | $0 | $399,160 | $1,397,300 |
Park Ridge - South Northwest Highway Streetscape | The proposed project is a streetscape project which consists of new sidewalk, decorative pavers, trees, planters, landscaping, irrigation, benches, trash cans, bike racks, lighting and other decorative elements that promote both beautification and safety. It is a continuation of a phased streetscape plan in the Uptown area and is located in a dense commercial area that currently has deteriorating and outdated features. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Park Ridge | Cook | $1,289,150 | $0 | $394,700 | $1,683,850 |
Church Street Streetscape Improvements | An ongoing project along Church Street and St. John's Avenue is currently underway which includes roadway reconstruction, centerline realignment and drainage improvements utilizing STP funds. The proposed streetscape improvements will bring new decorative sidewalks and crosswalks with pedestrian lighting to the project providing beautification enhancement. If ITEP funding is approved the Village intends to implement the streetscape improvements by incorporating them in the roadway project. | Illinois | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Johnsburg | McHenry | $1,072,100 | $0 | $268,030 | $1,340,130 |
DuPage County FPD - West Branch DuPage River Trail Ext | Bicycle/Pedestrian Path on the east side of the river south of IL 38, and on the west side of the river north of IL 38 with a neighborhood connector included from the intersection of Forest Ave and IL 59 (Neltnor Blvd) to the existing trail | Illinois | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | DuPage County FPD | DuPage | $2,730,134 | $0 | $1,166,866 | $3,897,000 |
Main Street Streetscape Phase 3 | The purpose of this project is to beautify the downtown corridor and foster pedestrian activities. This will be accomplished by the reconstruction of curbs, driveway pavement, and parking lanes. Wider sidewalks will be constructed to meet ADA standards. | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | City of Columbia | Monroe | ||||
Wood River Streetscape Phase 2 | The City is proposing to continue the enhancement of their Central Business District by improving existing features and providing aesthetic treatments. The proposed improvements include construction of an entryway sign into the Central Business District, | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | City of Wood River | Madison | ||||
Illinois Route 84 Corridor Enhancement Project | Phase II | Over the last several years, the Village of Port Byron has been working to improve the pedestrian experience through the IL Rt 84 Corridor through Downtown. Phase I (which includes 4 intersections) is already underway (TAP Grant awarded) and this extension of that project includes new ADA compliant sidewalks, crosswalks and access ramps, as well as new retaining walls in addition to improved aesthetics ensuring the Rt. 84 corridor is a diverse, dynamic destination for locals and visitors alike. | Illinois | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Village of Port Byron | Rock Island | $1,153,920 | $0 | $288,480 | $1,442,400 |
Village of Mazon - School and Park Accessibility Improvement Project | Since 1999, Mazon’s ordinances have required that sidewalks be completed with any new construction, and that all residential sidewalks be a minimum of four feet wide. However, many residential properties predate that ordinance and do not offer complete si | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Mazon | Grundy | $177,750 | $0 | $44,460 | $222,210 |
Oregon - Washington Street Streetscapes | Oregon’s historic downtown revitalization started in 2005 in conjunction with the IDOT IL RT 64 project which went from the Rock River Bridge to 3rd Street and from 5th Street west to the city limits. There have been four phases to this transportation/ped | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | City of Oregon | Ogle | $233,000 | $0 | $58,250 | $291,250 |
Washington Street Streetscape Improvements | The Village wants to invest in safe, walkable neighborhoods, that balance safety and convenience for everyone using the roadway corridor. Through the process of developing the approved PDR with IDOT, Millstadt has been able to plan for their future Stree | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Millstadt | St. Clair | $253,790 | $0 | $127,850 | $381,640 |
Silvis – Avenue of the Cities Shared Use Path | The path is intended for active transportation use by the general public; specifically providing safe travel for students to the nearby school and senior citizens in the local senior care facilities. Once construction of the path is complete, streetscaping and beautification of the area will include LED lighting, a 60'' brick shoulder, reseeding of grass and pedestrian traffic controls for safe crossings at the intersections with benches, flower beds, signage and planters planned for the future. | Illinois | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Silvis | Rock Island | $340,300 | $0 | $122,580 | $462,880 |
West Frankfort - Downtown Streetscape | The scope of work consists of removal of outdated lights and overhead electric lines, construction of an underground lighting system, erection of new decorative pedestrian lighting, removal of unsightly sidewalk that is in very poor condition and non-ADA | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | West Frankfort | Franklin | $662,400 | $0 | $165,600 | $828,000 |
Highland - Broadway (IL 160) Streetscape Improvements Phase 1 | The proposed scope of this project consists of removal of existing features; construction of wider ADA compliant sidewalks and curb ramps, detectable warning panels, decorative pedestrian and street lighting, decorative sign posts and signs, curb and gutt | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Highland | Madison | ||||
Wood River Streetscape Phase 2 | The City is proposing to continue the enhancement of their Central Business District by improving existing features and providing aesthetic treatments. The proposed improvements include construction of an entryway sign into the Central Business District, | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | City of Wood River | Madison | $412,030 | $0 | $106,010 | $518,040 |
Berkeley - Industrial Pedestrian Connector Project | The Industrial Pedestrian Connector will fill in a gap in the pedestrian network, connect to the Berkeley/Bellwood industrial area, and a detention pond recreational area. The recreational area will be built as part of a detention basin flood control proj | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Berkeley | Cook | $127,590 | $0 | $31,900 | $159,490 |
Business Park Sidewalk Addition | The project generally consists of the construction of a 2,500 linear foot pathway that will connect an existing sidewalk adjacent to the Havana Junior High School to the Havana Business Park located on the east end of Havana's city limits. The pathway will provide the only pedestrian walkway from the City to the Business Park businesses, which include the City’s only grocery store, a farm and home retail center, and other commercial institutions. It also provides safer crossings for pedestrians. | Illinois | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Havana | Mason | $264,130 | $0 | $139,700 | $403,830 |
Riverside - E. Quincy Street / Riverside Road Streetscape Project | This project addresses many recommendations in Riverside’s 2013 Central Business District Plan (CBD). Specific issues for E. Quincy Street include narrow, interrupted sidewalks and a lack of street trees and landscaping. The project also addresses pedestr | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Village of Riverside | Cook | $565,140 | $0 | $141,310 | $706,450 |
Jefferson Street Bridge Underpass | This project is for the construction of a new underpass on the Jefferson Street Bridge. The existing underpass was closed in November 2015 due to safety concerns of the deteriorating structure. Improvements to the vehicular bridge above the underpass have been completed. Replacing the underpass now will establish a life cycle similar to the overhead vehicular bridge and reestablish a critical transportation alternative link for pedestrians and cyclists in the downtown riverfront corridor. | Illinois | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Rockford | Winnebago | $2,000,000 | $0 | $515,020 | $2,515,020 |
Highland - Broadway (IL 160) Streetscape Improvements Phase 1 | The proposed scope of this project consists of removal of existing features; construction of wider ADA compliant sidewalks and curb ramps, detectable warning panels, decorative pedestrian and street lighting, decorative sign posts and signs, curb and gutt | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Highland | Madison | $1,221,680 | $0 | $588,420 | $1,810,100 |
Main Street Streetscape Phase 3 | The purpose of this project is to beautify the downtown corridor and foster pedestrian activities. This will be accomplished by the reconstruction of curbs, driveway pavement, and parking lanes. Wider sidewalks will be constructed to meet ADA standards. | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | City of Columbia | Monroe | $608,720 | $0 | $291,680 | $900,400 |
City of Ottawa Pedestrian/Bicycle Bridge Spanning I-80 | The construction of multi-use bridge across I-80 for pedestrians & bicyclists increase connectivity, provide alternative route of transportation, and significantly improves safety. 20,000 residents live south of I-80 which is a barrier splitting the City. With no dedicated route to cross pedestrians use traffic lanes designated for vehicles. A link is required over I-80 to complete the pedestrian circulation from the residential to commercial end of City of Ottawa. | Illinois | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Ottawa | La Salle | $2,046,400 | $0 | $511,600 | $2,558,000 |
Over the last several years, the Village of Port Byron has been working to improve the pedestrian experience through the IL Rt 84 Corridor through Downtown. Phase I (which includes 4 intersections) is already underway (TAP Grant awarded) and this extension of that project includes new ADA compliant sidewalks, crosswalks and access ramps, as well as new retaining walls in addition to improved aesthetics ensuring the Rt. 84 corridor is a diverse, dynamic destination for locals and visitors alike. | The Great Western Trail: Brickville Rd. to Main St. (IL Rt. 23) includes Phase 2 Engineering, Construction Engineering & Construction of a 1mile asphalt trail. The trail will be 10’ wide with a 2’wide clear zone on each side & meet ADA standards. The project includes replacing & widening 2,715’ of old sidewalk along Main St. (IL Rt. 23) to the middle school, installation of 2,565’ of new trail, appropriate pavement marking, traffic control, interpretive signs & landscaping. | Illinois | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Sycamore Park District | DeKalb | $632,600 | $0 | $158,150 | $790,750 |
Durand Downtown Square Streetscape Project | The proposed Durand Downtown Square Streetscape Project entails the replacement of deteriorated, non-ADA compliant sidewalks, crumbling ramps and railings, along with addressing insufficient and inefficient lighting in the Village’s downtown Square along | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Durand | Winnebago | $1,289,560 | $0 | $659,690 | $1,949,250 |
Winnebago County - Perryville Bike Path Extension (Hart Road to Willow Brook Lane) | The proposed project would extend an existing off road bike path route along Perryville Road which currently begins at Argus Drive, in southeast Rockford, and currently terminates at Hart Road. The existing path is approximately 6.6 miles longs. The proposed project would add approximately another 2.25 miles to the current path and extending a major north/south multi-use path connecting the Village of Machesney Park, the City of Loves Park and the southeast portion of the City of Rockford. | Illinois | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Love Park & Machesney Park | Winnebago | $984,960 | $0 | $246,280 | $1,231,240 |
West Frankfort - Downtown Streetscape | The scope of work consists of removal of outdated lights and overhead electric lines, construction of an underground lighting system, erection of new decorative pedestrian lighting, removal of unsightly sidewalk that is in very poor condition and non-ADA | Illinois | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | West Frankfort | Franklin | ||||
Sangamon Valley Trail - Phase IV | The project consists of providing PE I and PE II Engineering Services required for the design of a 10-foot wide hot-mix asphalt pavement multi-use trail with 2-foot wide turf shoulders 6 miles in length from the north edge of pavement at Loami Road to the | Illinois | 2018 | 103 | (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Curran | Sangamon | $1,076,800 | $0 | $269,200 | $1,346,000 |
Historic Main Street Reconstruction Project | The work proposed in this ITEP application is on US 24/Main Street and is the first phase of a two phase construction project. The second phase will be for work on Capitol Avenue and proposed to be a future ITEP application. Refer to the Detailed Locatio | Illinois | 2018 | 106 | (TASA) 106. Historic preservation and rehabilitation of historic transportation facilities | Mt. Sterling | Brown | $1,546,700 | $0 | $443,000 | $1,989,700 |
Urbana Meadowbrook Park Path | Preliminary engineering, construction engineering, and construction of bike path extensions, including signing, drainage, and a pedestrian overpass, along Windsor Road and in Meadowbrook Park in Urbana. | Illinois | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Urbana | Champaign | $298,400 | $0 | $74,600 | $373,000 |
McLean County- Historic Route 66 Bikepath (Bloomington - Normal Area) | Bikeway will provide a safe and efficient route for non-mptorized travel between communities along Historic Route 66 in McLean county. | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bloomington | Mclean | $0 | $1,414,447 | $385,553 | $1,800,000 |
West Belleville Bike Trail Phase II | This phase will include the construction of a 12' wide asphalt trail with 1' wide aggregate shoulder on each side. The trail will be approximately two (2) miles in length and will connect the first phase of the West Belleville Bike Trail to the Signal Hi | Illinois | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Belleville | St. Clair | $1,293,640 | $0 | $323,410 | $1,617,050 |
Highland - Trail System | Design and construction of a bike/pedestrian trail between Korte Recreation Comlpex to Keopfli Lane Design and construction of a 2000' asphalt bike/ped trail | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Highland | Madison | $57,220 | $0 | $14,305 | $71,525 |
GIT Des Plaines River Trail | Preliminary engineering II, right-of-way acquisition, construction engineering and construction of a bike trail, fencing, pedestrian underpass and signs | Illinois | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Des Plaines | Cook | $904,300 | $0 | $231,700 | $1,136,000 |
Mt. Carroll Brick Streets | Preliminary engineering, construction engineering and construction for the restoration of the brick streets in Mt. Carroll, including gutters and sidewalks. | Illinois | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mount Carroll | Carroll | $192,800 | $0 | $48,200 | $241,000 |
Fairfield Rd Tunnel | Preliminary engineering I and II, construction engineering, construction of a pedestrian/bike tunnel and trail, and installation of landscaping and signs | Illinois | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lake Zurich | Lake | $807,000 | $0 | $201,000 | $1,008,000 |
Sheridan Road Crossing | Phase II engineering, construction engineering and construction of a bike path including signs and landscaping | Illinois | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wilmette | Cook | $91,000 | $0 | $22,000 | $113,000 |
Chicago DOT - North Shore Channel Trail/Lincoln Village-Hood Avenue Pedestrian Bridge | Construction of a 190 ft long, 14ft wide bicycle pedestrian bridge over the North Shore Channel near Hood Avenue including all necessary related tasks including shell piles, retaining walls, trail removal, replacement and approach link trails (asphalt, ap | Illinois | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chicago | Cook | $979,600 | $0 | $244,900 | $1,224,500 |
Quincy Park District - Cedar Creek Linear Park Bicycle/ Pedestrian Trail | Trail from the 5th Street in the west to 12th Street in the east and runs along Cedar Creek Construction of a trail accomodating two way traffic for bicycles and pedestrians | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Quincy | Adams | $80,000 | $0 | $20,000 | $100,000 |
Sangamon County - Valley Trail from Centennial Park to Stuart Park | 5.5 miles from Centennial Park to Stuart Park in Springfield | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Springfield | Sangamon | $143,600 | $2,513,840 | $664,360 | $3,321,800 |
Woodfield Road Bikeway under I-290 | Phase II engineering and construction for a bikeway and a retaining wall to improve the safety of the crossing under I-290. Path users were going against traffic on the shoulder. This project provides the only link to the east side of I-290, linking the | Illinois | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Schaumburg | Cook | $151,201 | $0 | $37,799 | $189,000 |
Bartonville - Pfieffer Road Sidewalk Improvements | Create safer pedestrian access along Pfieffer Road | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bartonville | Peoria | $0 | $533,925 | $133,481 | $667,406 |
Palatine - Bycicle Transportation Plan | Work consists of signed bike routes, shared bike/parking lanes, and bike lanes. This will be achieved by using a combination of pole mounted signage and pavement markings as recommended in the preliminary engineering (Bicycle Transportation Plan). To the | Illinois | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Palatine | Cook | $147,560 | $0 | $36,890 | $184,450 |
Diversey-Belmont Lakefront Path | Preliminary engineering, construction engineering and construction to reconfigure and widen (12') 3500 lf of bike path to improve traffic flow of Lakefront Path; currently runs through parking lot; remove existing ramps from Lakeshore Dr for needed path | Illinois | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chicago | Cook | $371,200 | $0 | $92,800 | $464,000 |
Lincolnwood - Bikeway Plan Lining & Signing | Project calls for striping 5.12 miles of bike lanes on Pratt Avenue, Lincoln Avenue & East Prairie Road. Work will consist of thermoplastic striping for bike lanes within the project limits along with associated signage along the routes and replacement of | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lincolnwood | Cook | $171,360 | $0 | $42,840 | $214,200 |
DuPage River Trail | Phase I engineering for a bike trail | Illinois | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Naperville | Will | $251,000 | $0 | $63,000 | $314,000 |
Peoria Park District - Pimiteoui Trail Extension | Trail and underpass (tunnel) will be located in the City of Peoria, and Village of Peoria Heights, IL on the former Kellar Branch Rail line. The proposed underpass crosses under IL Rt. 40 (Knoxville Ave.). The 2.05 mile trail segment runs from Glen Ave. s | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Peoria | Peoria | $813,000 | $0 | $203,250 | $1,016,250 |
Kankakee River State Park Trail | Engineering and Construction of biketrail in Kankakee River State Park, parallel to IL 102 (7.2 miles), Old Chicago Road southeast to Altorf Road near Kankakee | Illinois | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | $1,450,714 | $0 | $362,678 | $1,813,392 | |
Dellwood West Canal Museum-Trail Access | Preliminary engineering I and II, construction engineering, construction of a ramp, pedestrian bridge and trail and installation of interpretative and directional signs, markers, landscaping and two interpretative pods | Illinois | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lockport | Will | $522,000 | $0 | $131,000 | $653,000 |
Hamel - Bike Trail Connector | This 1.08 mile trail will connect the ends of the 2 bike trails entering the Village from the north & south. The new trail will be asphalt, 8' wide. Along Park St & IL Rte 140, the concrete sidewalk will be widened to 8'. The joint use roadways will be pr | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hamel | Madison | $311,840 | $0 | $77,960 | $389,800 |
Chicago Park District - 59th Street Bike Trail | The project will consist of the placement of a new 12 foot wide, 0.68 mile asphalt bicycle path connecting the Hyde Park neighborhood to the lakefront trail in Jackson Park. Elements will include replacement plantings and sod, detailed signage to guide us | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chicago | Cook | $304,000 | $0 | $76,000 | $380,000 |
Rantoul - 2010 Rantoul Bike Path | The Village of Rantoul proposes to construct a 10-foot wide off-road hot-mix asphalt bike path from E. Grove Avenue at Lon Drive to S. Garrard Street. As part of the project re-grading of the existing swale and the addition of a swale and culvert system a | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rantoul | Champaign | $781,980 | $0 | $195,495 | $977,475 |
Harrisburg - Harrisburg to Eldorado Bike Trail (See also 902209) | Harrisburg to Eldorado Bike Trail | Illinois | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Harrisburg | Saline | $22,500 | $0 | $22,500 | $45,000 |
GIT Hennepin Canal/Sinnissippi Bridge | Construction of pedestrian bridge, fencing open deck covering and signs. | Illinois | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rock Falls, Sterling | Whiteside | $569,000 | $0 | $142,000 | $711,000 |
Des Plaines River Trail Extension | Construction engineering and construction for a bikepath along the Des Plaines River, including landscaping, a new bridge, a new culvert, fencing, and signing. | Illinois | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lincolnshire | Lake | $526,240 | $0 | $131,560 | $657,800 |
(Transferred to FTA) Conrail Biketrail | Engineering and Construction of 6.5 mile bikepath along abandoned Conrail ROW from 83rd Street to 130th Street in Chicago | Illinois | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chicago | Cook | $1,712,000 | $0 | $428,000 | $2,140,000 |
GIT Quad Cities | Preliminary engineering I and II, right-of-way acquisition, construction engineering and construction of a bike trail, culverts, parking lot, pedestrian bridges, railroad crossings, striping and installation of signs, fencing and restrooms. | Illinois | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Moline | Rock Island | $526,500 | $0 | $218,500 | $745,000 |
(Transferred to FTA) City Hall Pedway | Preliminary engineering and construction of underground pedestrian walkways under City Hall to connect with existing pedways in City Hall. | Illinois | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chicago | Cook | $1,760,000 | $0 | $440,000 | $2,200,000 |
GIT- Moraine Hills/McHenry-Lake Segment | Phase I and II engineering, right-of-way acquistion, construction engineering and construction of a bike trail including a pedestrian underpass, feasibility study, wetland delineation and mitigation, fencing, landscaping, signs and pavement markings | Illinois | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | $1,585,000 | $0 | $395,000 | $1,980,000 | |
St. Claire Co/East Belleville Bikeway | Preliminary engineering, and construction for a bikeway through Belleville, with multiple connections to Metrolink, commercial areas, high school, industrial park, college, YMCA, etc. Including a pedestrian overpass and shoulder repair. | Illinois | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Belleville | St. Clair | $1,137,600 | $0 | $284,400 | $1,422,000 |
SIU-E - Delyte Morris Bike Trail Phase 4 | The new 0.7 mile trail will be constructed along Southern Illinois University Edwardsville's main northern entrance into campus. The trail will connect the campus to Madison County Transit's trail network and thus to downtown Edwardsville. The work will c | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Edwardsville | Madison | $240,000 | $0 | $60,000 | $300,000 |
Rock Falls - Riverside Bike & Walk Trailhead Corridor | The proposed construction will include 10' wide hot mix asphalt path with aggregate base and 2' earth shoulders to extend the Hennepin Canal Parkway trail located at the east end of the project to the proposed trailhead to be constructed at the former Rel | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rock Falls | Whiteside | $240,000 | $0 | $60,000 | $300,000 |
Havana Riverfront Pedestrian Trail | Preliminary engineering, construction engineering, and construction of a scenic brick and wood riverwalk, including two bridges and landscaping. | Illinois | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Havana | Mason | $363,200 | $0 | $90,800 | $454,000 |
Carlyle - Pedestrian/Bike Sidewalk Connect Bond Street | PE I & II, Constuction, CE ( & ROW ?) for Bike/Ped provisions | Illinois | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Carlyle | Clinton | $240,700 | $0 | $68,902 | $309,602 |
Dixon Park District- The Lowell Trail, Phase 2 | Phase 2 is the next stage in the master plan to create bike and ped trails to link the existing "Joe Stengel" trail from Polo and the existing Lowell Park Bike Path to the cosre of the city of Dixon's downtown business district. | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dixon | Lee | $0 | $341,481 | $85,370 | $426,851 |
St. Charles - Red Gate Road Multi-Use Path | This project includes a new 0.76 mile multi-use path along proposed Red Gate Road connecting IL 25 and IL 31 across the Fox River. The multi-use path for the proposed river crossing will link the new local path on the west side of the river with the Fox R | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Charles | Kane | $696,300 | $0 | $174,075 | $870,375 |
31st St Bike Path | Phase II engineering, construction engineering and construction of a bike path including curb and gutter, retaining wall, pedestrian bridge and signs | Illinois | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Oak Brook | Dupage | $777,600 | $0 | $194,399 | $971,999 |
Kankakee - Kankakee Riverfront Trail, Phase II | Riverfront Trail Phase II will provide a connection between two completed segments of the Riverfront Trail system. The two completed phases are Phase I through the south end of Kankakee and Phase III through Bradley and Bourbonnais. Riverfront Trail is a | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kankakee | Kankakee | $1,480,810 | $0 | $370,203 | $1,851,013 |
GIT Moraine Hills River Rd | Construction of a bike trail, culverts, fencing, signs and wetland mitigation | Illinois | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mchenry | Mchenry | $772,000 | $0 | $193,000 | $965,000 |
East Moline - Grand Illinois Trail, Breezy Hollow | Along 7th St. there will be painted, 6' bicycle lanes-one on each side of the street and appropriate signage. Along 21st Ave (from 7th St-8th St) there will be a 10' wide separated trail. The bike trail will be HMA Pavement. There will be a modular block | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Moline | Rock Island | $566,510 | $0 | $141,628 | $708,138 |
Cal - Sag Trail (IL Route 83 to 104th Avenue) | The overall project consists of the construction of a 10-foot wide, 33-mile long multi-use trail. Its western terminus links with the Illinois and Michigan Canal, a designated National Heritage Corridor of the National Park Service. The eastern terminus | Illinois | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | River Forest | Cook | $1,782,880 | $0 | $445,720 | $2,228,600 |
Cal - Sag Trail (104th Avenue to 86th Avenue) | The overall project consists of the construction of a 10-foot wide, 33-mile long multi-use trail. Its western terminus links with the Illinois and Michigan Canal, a designated National Heritage Corridor of the National Park Service. The eastern terminus | Illinois | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | River Forest | Cook | $1,826,000 | $0 | $456,500 | $2,282,500 |
Vernon Hills Bikepath | Engineering and construction of three connections to the existing Vernon Hills path system: a connection from the existing Buffalo Grove path system tot he Vernon Hills system, a crossing of RR right of way, and a connection to the existing Libertyville | Illinois | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Vernon Hills | Lake | $650,249 | $0 | $216,751 | $867,000 |
Fox River/Waubonsee Creek Bike Path | utility adjustments, construction engineering and construction of a bike trail including handrails, retaining wall, lighting, landscaping and brick pavers | Illinois | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Oswego | Kendall | $510,400 | $0 | $139,600 | $650,000 |
Bradley - IL 50 Shared Use Path | This project includes constructing an off-road 10' wide asphalt shared path for pedestrians and bicyclists. The project will complete the proposed shared path that will be constructed with the I-57 interchange reconstruction from Armour Road to the Northf | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bradley | Kankakee | $238,170 | $0 | $59,543 | $297,713 |
Williamsville - Sherman to Williamsville Bike Trail | The project consists of the design and construction of a bicycle/pedestrian trail utilizing the railroad bed of the abandoned Illinois Terminal Railroad between Sherman and Williamsville. Project consists signage, railbed clearing & excavation, drainage s | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Williamsville, Sherman | Sangamon | $269,000 | $0 | $67,250 | $336,250 |
Great River Trail Extension | Preliminary engineering, construction engineering and construction for an extension to the Great River Trail, including fencing, new culverts, and a new bridge. | Illinois | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rock Island | Rock Island | $970,560 | $0 | $242,640 | $1,213,200 |
Fulton County - Maple Street to Spoon River Colllege Bike Trail | Bikeway project from Canton at Maple Street, follows Hickory Road (CH 5) 1.4 miles southwest, turns south along CH 22 for .6 miles and ends at Spoon River College. Construction of a multi-use bikeway facility to accommodate pedestrians and bicycles | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Canton | Fulton | $394,880 | $0 | $98,720 | $493,600 |
Plummer Blvd. Bike/Pedestrian Trail Phase II | The Bike/Pedestrian Path will consist of an aggregate base with a 10' wide asphalt surface. The intersections with Park Avenue, Acacia, Glenwood Elementary School and the three Glenwood High parking lot entrances will be graded to conform to ADA standards | Illinois | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chatham | Sangamon | $350,400 | $0 | $87,600 | $438,000 |
Oak Park - Viaduct Improvement Project | Viaduct Imp. Project Oak Park | Illinois | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Oak Park | Cook | $540,000 | $0 | $135,000 | $675,000 |
Lagrange Park Trail Bridge | Preliminary engineering, construction engineering, and construction of a bridge over Salt Creek in Lagrange Park along with a 0.2 mile connector trail which will connect the CCFPD 6.6 mile trail which connects to the DuPage River Greenway | Illinois | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | La Grange Park | Cook | $307,929 | $0 | $76,984 | $384,913 |
Lockport - IL 7 Sidewalk & Pedestrian Bridge Project | This project will consist of the construction of approximately 6000 LF of 5' wide PCC sidewalk along 159th Street (IL-7) from 7th Street to Adelmann Road, The Project will include earth excavation, PCC sidewalk/bicycle path construction, concrete block re | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lockport | Will | $652,800 | $0 | $163,200 | $816,000 |
Urbana - Main Street Bike Lanes and Pedestrian Improvements | Improvements for bicyclists include alteration of the existing roadway through the entire corridor to accomodate on-road bike lanes. The section from Art Bartell Road to Scottswood Drive will undergo a 'road diet' to convert the current 4 lanes of vehicle | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Urbana | Champaign | $625,930 | $0 | $156,483 | $782,413 |
Breese - Old Route 50-East Pedestrian/Bike Factility | Bike/ped trail - revised limits are between Memorial Dr and Mason Dr and includes box culvert at Shoal Creek | Illinois | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Breese | Clinton | $112,474 | $172,045 | $82,224 | $366,743 |
Streetlights on Wilmington US 66 Bridge | Preliminary engineering I and II, construction engineering and construction and installation of pedestrian lighting and Route 66 plaques | Illinois | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wilmington | Will | $57,000 | $0 | $14,000 | $71,000 |
Kirk Road at Prairie Path Crossing Project | This project includes construction of an actuated flashing warning beacon system to warn motorists, traveling on Kirk Road, of trail users crossing the roadway from the Illinois Prairie Path. | Illinois | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Charles | DuPage | $56,980 | $0 | $0 | $56,980 |
Maryville - IL 159 School House Trail, Bike Trail Connection | Sidewalks along the east and west sides of Illinois Route 159 to the Madison's county Transit School House Bike Trail where the trail crosses under the roadway Construction of sidewalks | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Maryville | Madison | $56,730 | $0 | $14,183 | $70,913 |
Illinois Street Beautification in Morris | Construction for the streetscape of Illinois Avenue in Morris. This streetscaping includes a bridge to connect business district to I&M Canal State Trail. | Illinois | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Morris | Grundy | $156,000 | $0 | $39,000 | $195,000 |
Perryville Path-Rockford | Preliminary engineering and construction of a 5.3 mile bicycle path to connect the Midway Village and Museum Center to Rock Valley College. | Illinois | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rockford | Winnebago | $712,000 | $0 | $178,000 | $890,000 |
Historic Route 66 Bikeway | Phase I engineering for a bike trail | Illinois | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mclean | $255,000 | $0 | $64,000 | $319,000 | |
Chatham - Plummer Boulevard Bike/Pedestrian Trail | The project will use a 13 ft access tube (built in 2000) to allow non-motorized traffic to safely travel under the Union Pacific Railroad. The path will create a separated grade bike trail crossing with the Union Pacific RR and will directly link to the I | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chatham | Sangamon | $359,600 | $0 | $89,900 | $449,500 |
IDOT D5 - IL 133 Arthur - Buggy Shoulders | Rehabilitation of shoulders used for Buggies & Bicycles near Amish communities. | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Arthur | Douglas | $0 | $113,877 | $28,470 | $142,347 |
Park City - Greenleaf Avenue Sidewalk and Lighting | North side of the Cornell Avenue intersection, and the city limits located approximately 500 feet north of Greenleaf court. Construction of concrete sidewalk and decorative lighting along Greenleaf Avenue ot or near the Right of Way on the east and west s | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Park City | Lake | $542,790 | $0 | $135,698 | $678,488 |
Canton Park District - Bike/Pedestrian Trail (Big Creek Park Trail) (PE under 402008) | Work includes Phase II design and construction of an eight (8) foot asphalt multi-use trail with two foot shoulders. This new Big Creek Park Trail will link Wallace Park to Lakeland Park and is 2.5 miles long | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Canton | Fulton | $1,442,500 | $0 | $360,625 | $1,803,125 |
Barrington Area Bikeway | Preliminary engineering, construction engineering, and construction for two bikeways throughout Barrington and Deer Creek. | Illinois | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Barrington | Cook | $465,600 | $0 | $116,400 | $582,000 |
Yorkville - Kennedy Road Shared Use Path | The Kennedy Road shared-use path improvements will consist of constructing within existing right of way and acquired easements, a 10 foot wide hot mix asphalt pavement, signage & pavement markings, ADA detectable warning devices, erosion control, portland | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yorkville | Kendall | $1,387,280 | $0 | $346,820 | $1,734,100 |
Oak Park - Bike Network Signage | 32 miles of Oak Park's 100 miles of streets will be identified as bikeways and designated with signage and pavement markings to indicate bike lanes, bike routes, and "shared" lanes. Approximately 180 signs will be posted on the bike network | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Oak Park | Cook | $20,200 | $0 | $5,050 | $25,250 |
Main St O'Fallon Streetscape | Construction engineering and installation of landscaping and bike racks | Illinois | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | O'Fallon | St. Clair | $244,000 | $0 | $62,000 | $306,000 |
Elk Grove Village Bikeway | Construction for signing and utility adjustments to designate a 19 mile village-wide bike route, including three locations for sidewalk/bikeway construction. | Illinois | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Elk Grove Village | Cook | $40,000 | $0 | $10,000 | $50,000 |
Old Shiloh Trail | Preliminary engineering I and II, construction engineering and construction of a bike trail, signs, bike racks, and parking | Illinois | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shiloh | St. Clair | $102,000 | $0 | $26,000 | $128,000 |
Sandoval - Sidewalk Improvements | This project would complete a grid of adequate sidewalks by providing a continuous sidewalk along the west side of U.S. Rt. 51 from the north end of town to the south end of town. The new and replacement sidewalks will be 5' wide concrete meeting the curr | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sandoval | Marion | $187,500 | $0 | $46,875 | $234,375 |
Milan - West Rock River Bridge South Trail Connection | The project involves construction and construction engineering of a 10 foot wide hard-surfaced asphalt multi-use separated corridor trail connecting the existing Hennepin Canal Trail at Mill Creek to the existing 10 foot separated trail accommodation on t | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Milan | Rock Island | $246,280 | $0 | $61,570 | $307,850 |
Chicago Department of Transportation - North Branch Riverwalk Underbridge Connection at Addison | The project would construct a segment of the North Branch Riverwalk/Bike Trail that connects existing trail segments in California Park and Clark Park and travels under a bridge on West Addison Street . The project will complete a missing segment of the | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chicago | Cook | $2,000,000 | $0 | $500,000 | $2,500,000 |
Harrisburg Middle School - Bicycle Path | Illinois | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Harrisburg | Saline | $213,800 | $0 | $109,700 | $323,500 | |
Effingham - Phase III Multi-use Trail | The proposed multi-use path will connect existing multi-use trails located in Effingham to areas and transportation facilities located in the Lake Sara area. Project will include the construction of an off-road, Multi-Use Trail. It will consist of approxi | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Effingham | Effingham | $1,171,560 | $0 | $292,890 | $1,464,450 |
Deerfield North Shore/Green Bay Trail | Preliminary engineering and construction for a 1.9 mile bike trail that will replace existing sidewalks and complete missing segments of Green Bay Trail. | Illinois | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Deerfield | Lake | $565,403 | $0 | $141,351 | $706,754 |
Kane County DOT - Stearns Road Pedestrian/Bike Facil IL25/Strns/Dun | Stearns Rd Ped/Bike Facil IL25/Strns/Dun | Illinois | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kane | $242,400 | $0 | $60,600 | $303,000 | |
DuPage County DOT - South Lisle, Woodridge Trail | This 5.46 mile trail is part of the 31-mile East Branch DuPage River Greenway Trail. This project will construct a 10 ft. wide asphalt trail and designated on-street bikeway connections on very low volume residential streets and includes making improvemen | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lisle | Dupage | $514,700 | $0 | $128,675 | $643,375 |
Carlinville - Loveless Park Sidewalks | Sidewalk through Loveless Park; sidewalk would link Locust Street to Shipman road. Construction of a new sidewalk through Loveless Park | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Carlinville | Macoupin | $41,200 | $0 | $10,300 | $51,500 |
V.L. Gilman Trail Bridge-ILL 56 | Phase I and Ii engineering, construction engineering and construction of a pedestrian bridge and bike trail including fencing, culverts, drainage and landscaping | Illinois | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Aurora | Kane | $1,393,400 | $0 | $347,480 | $1,740,880 |
Sparta - Sidewalk Improvement Phase I | The Sparta Sidewalk Improvements project will connect the existing sidewalk system within the City of Sparta that runs along Route 4/Market Street and throughout the residential streets to the sprouting business district along Hillcrest Drive. Where the p | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sparta | Randolph | $364,760 | $0 | $91,190 | $455,950 |
Rock Springs Trail | Construction of a pedestrian trail adjoining the Fairview Bike Trail: two 90-foot bridges will cross Stevens Creek and a 360-foot bridge will span Sangamon River. 2.54 miles and will also connect Decatur urbanized area with Rock Springs Nature Center, a | Illinois | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Decatur | Macon | $564,500 | $0 | $141,100 | $705,600 |
Mount Vernon - Veterans Park Pedestrian and Bicycling Trail | 27th Street from Ridgeview Road to Veterans Park on Logan street Construction of the Veterans Park multi-purpose trail using an asphalt or concrete surface | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mt Vernon | Jefferson | $370,140 | $0 | $92,535 | $462,675 |
Grand Illinois Trail - Union Trail Segment | The project will be a combination of seperated trail and shared signed roadways. An asphalt 10' separated trail is proposed along Archer Drive from 21st Ave to 30th Avenue and along 30th Avenue and Crosstown Avenue to 18th Street near the intersection of | Illinois | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Moline | Rock Island | $2,531,730 | $0 | $632,938 | $3,164,668 |
Lake County Division of Transportation - Deerfield Road Bike Path West | The 0.34 mile bituminous multi-use path will be located along the south side of Deerfield Road between Milwaukee Avenue (IL 21/US 45) and the Des Plaines River connecting the residents of the Village of Buffalo Grove to the Des Plaines River Trail. The co | Illinois | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Riverwoods | Lake | $215,540 | $0 | $53,885 | $269,425 |
Lan-Oak Park District Safety & Education | Lan-Oak Park Dist. Safety & Education | Illinois | 2008 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Lansing | Cook | $192,464 | $0 | $48,116 | $240,580 |
Newton Phase III - Eagle Trails | This work will consist of removing existing sidewalks that are non-compliant with the ADA standards and constructing new sidewalks that both meet existing safety standards and at the same time are aesthetically pleasing. Lighting of the pedestrian walks | Illinois | 2012 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Newton | Jasper | $980,000 | $0 | $245,080 | $1,225,080 |
Shelbyville - Phase 5 & 6 Main street (Il Rt. 16) streetscape Improvements | The Phase 5 & 6 streetscape project consists of the construction of landscaping (i.e. planters, trees), decorative sidewalks (i.e. unit pavers), American Disability Act (ADA) compliant ramps & crosswalks and sidewalks (i.e. cross slope and trip hazard rep | Illinois | 2012 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Shelbyville | Shelby | $1,232,452 | $0 | $308,115 | $1,540,567 |
Jacksonville Downtown Plaza Project N. Main | This project consists of the reconstruction of North Main Street between Court Street and Douglas Street and from Lafatette/Washington to the Norfolk Railroad. Lafayette and Washington will also be reconstructed between Sandy and Mauvaisterre. The remai | Illinois | 2012 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Jacksonville | Morgan | $2,068,050 | $0 | $516,383 | $2,584,433 |
MGR Scenic Byway Overlook | Land acquisition of land for an overlook | Illinois | 2000 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Godfrey | Madison | $750,000 | $0 | $750,000 | $1,500,000 |
Old Route 66 Historic Study | Engineering for Old US Route 66 Historial Study | Illinois | 1993 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Statewide | Statewide | $607,433 | $0 | $200,868 | $808,301 |
US 66/I-55 Rest Area Information Kiosks | Construction and installation of Route 66 information kiosks, base and display materials | Illinois | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Statewide | Statewide | $86,000 | $0 | $22,000 | $108,000 |
Marshall - Harlan Hall Masonry Restoration | Listed on the National Register of Historic Places and located one block west of the historic Dixie Highway, Harlan Hall will house the National Road Interpretative Center. Restoration will be limited to the exterioor of the building. Joints will be tuck | Illinois | 2010 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Marshall | Clark | $217,380 | $0 | $54,345 | $271,725 |
Bellwood - The Washington Boulevard Project & Prairie Path Revitalization Plan (GS) | Installing street trees and constructing decorative planter boxes along the center of Washington Boulevard, in addition to planting trees on the Prairie Path | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Bellwood | Cook | $61,630 | $0 | $15,408 | $77,038 |
Millstadt - Streetscape on Polk Street and IL Route 58 (Phase 1) | West side from the intersection of Polk Street and Illinois Route 158 to the east side of the intersection of Kossuth Street and IL Route 158 Improvements include replacement of non-policy sidewalk, replacement of all non-policy curb ramps, replacement of | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Millstadt | St. Clair | $200,000 | $0 | $50,000 | $250,000 |
Robbins - Beautification Project in Robbins | Beautification project in Robbins | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Robbins | Cook | $1,000,000 | $0 | $250,000 | $1,250,000 |
Upper Bluff District Lights | Construction for lighting and landscaping in historic district of Joliet. | Illinois | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Joliet | Will | $636,800 | $0 | $159,200 | $796,000 |
Maywood-Lake Street Streetscape | Village of Maywood-Lake St. Streetscape | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Maywood | Cook | $432,000 | $0 | $108,000 | $540,000 |
Plainfield - IL Route 59 Medianscape & Landscaping | IL Rte 59 Medianscape & Landscaping | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Plainfield | Will | $457,700 | $0 | $395,100 | $852,800 |
Oak Park - Roosevelt Road Streetscape | Roosevelt Road (IL 38) - Austin Boulevard to Harlem Avenue Communities of Cicero & Berwyn are also involved in the project. New sidewalks, roadway and pedestrian level lighting, landscaping | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Oak Park | Cook | $3,950,000 | $0 | $987,500 | $4,937,500 |
Elmwood Park - Belmont Scenic & Safety Streetscape Project | Belmont Avenue from 76th Court west through 77th Avenue, to 77th Court Improve pedestrian facilities by installing permanent planter boxes, pedestrian lighting, new sidewalks, decorative colorful stamped concrete | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Elmwood Park | Cook | $322,280 | $0 | $80,570 | $402,850 |
West Frankfort - Downtown Streetscape | West Frankfort - Downtown Streetscape | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | West Frankfort | Franklin | $427,280 | $0 | $106,820 | $534,100 |
(Transferred to FTA) Pritzer Park Seating Wall | Preliminary engineering and construction for a seating wall in Pritzer Park. | Illinois | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Chicago | Cook | $120,000 | $0 | $30,000 | $150,000 |
Northlake - McLean Avenue Improvement | McLean Avenue Imprvmt - Northlake | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Northlake | Cook | $425,000 | $0 | $106,250 | $531,250 |
Oak Forest - Cicero Avenue Green Streets Project | Addition of trees on either side of Cicero Avenue between 163rd Street and 167th Street at a spacing of approximately every 40 feet for 2,700 feet, avoiding streetlights and utilities | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Oak Forest | Cook | $41,660 | $0 | $10,415 | $52,075 |
Champaign - Route 57 & Curtis Road Interchange Enhancement | Rt 57 & Curtis Rd. Interchange Enhancemt | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Champaign | Champaign | $328,000 | $0 | $82,000 | $410,000 |
Hickory Hills - 95th Street Streetscape | 95th Street Streetscape, Hickory Hills | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Hickory Hills | Cook | $1,000,000 | $0 | $250,000 | $1,250,000 |
Wood River - Central Business District Streetscape | Wood River's Central Business District - Ferguson Avenue from 2nd Street to Old St.Louis Road and along Wood River Avenue from Illinois Route 143 to just north of Ferguson Avenue Replacement of existing sidewalks with a collection of stamped and conventio | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Wood River | Madison | $500,000 | $0 | $125,000 | $625,000 |
DesPlaines - Rand Road ITEP Tree Enhancement (GS) | Planting trees along rand road from Central to Ballard (various locations) in the city of Des Plaines | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Des Plaines | Cook | $115,200 | $0 | $28,800 | $144,000 |
Rotary Club Clock Tower (87th/Stony Is) | Rotary Club Clock Tower (87th/Stony Is) | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Chicago | Cook | $63,665 | $0 | $23,000 | $86,665 |
Bloomington - Downtown Bloomington Main Street Beautification | Downtwn Bloomington Main St Beautificatn | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Bloomington | Mclean | $219,170 | $0 | $54,792 | $273,962 |
Springfield - Capitol Avenue Improvements Springfield | Capitol Avenue Improvements Spfld. | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Springfield | Sangamon | $2,500,000 | $0 | $750,000 | $3,250,000 |
District 8 Wildflowers | Wildflower planting along various interchanges. | Illinois | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Multiple | $222,663 | $0 | $55,666 | $278,329 | |
Chicago DOT - Lake Park Avenue Streetscape | Lake Park Ave Streetscape, (Received Local ARA funds and also using $640,000 STE funds) | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Chicago | Cook | $2,500,000 | $0 | $625,000 | $3,125,000 |
Manito On The Move-Phase II | Preliminary engineering I and II, construction engineering and construction of sidewalks, landscaping (perennials, shrubs, planters), fencing and pedestrian lighting | Illinois | 2000 | 5 | (TE) 5. Landscaping and scenic beautification | Manito | Mason | $130,000 | $0 | $33,000 | $163,000 |
Peoria Randolph/Roanoke Lights | Preliminary engineering II, construction engineering, and construction for lighting along certain avenues in Peoria. | Illinois | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Peoria | Peoria | $342,400 | $0 | $85,600 | $428,000 |
US 20 Landscaping | Preliminary engineering, construction engineering and construction for the beautification along US 20, including plantings, shoulder repairs, and utility adjustment. | Illinois | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Rockford | Winnebago | $92,000 | $0 | $23,000 | $115,000 |
Milwaukee Avenue Corridor Improvements - Phase IV | Village has been able to complete construction of improvments in stages, however additional supplemental funds are necessary to complete the final phase of construction in the area where Phase I engineering was completed in the initial 2006 ITEP grant. T | Illinois | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | Niles | Cook | $747,840 | $0 | $186,960 | $934,800 |
Moline - Avenue of the Cities Streetscape | Sidewalks will be widened and incorporate colored and stamped Portland cement concrete to conform to the theme established in the AOCVIS. Approximately 300 feet of curb will be redone. ADA provisions will be met throughout the project area including sid | Illinois | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | Moline | Rock Island | $742,830 | $0 | $185,707 | $928,537 |
Montrose Amenities | Construction for landscaping along Montrose Avenue, including lighting and bike racks. | Illinois | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Chicago | Cook | $133,600 | $0 | $33,400 | $167,000 |
Collinsville - Central Business District Streetscape Improvements, Phase 3 | Clay St. from Combs to Morrison; Main St. from Chestnut to Aurora; Church St. from Seminary to Center; Center from Clay to Church; Seminary from Clay to Church Installation of ADA compliant sidewalks, decorative crosswalks, ornamental identification signa | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Collinsville | Madison | $1,000,000 | $0 | $250,000 | $1,250,000 |
Springfield - Capitol Avenue (11th St to M.L. King Drive) | The plan is to eliminate parallel parking and shift the bus interchange to another location off Capitol Avenue. It incorporates the use of appropriate vegetative landscaping and developing a specific street vocabulary consistent with overall vision for Ca | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Springfield | Sangamon | $2,000,000 | $0 | $500,000 | $2,500,000 |
Ottawa - Entry Corridor Tree Planting | Planting trees along the gateway corridors entering into Ottawa - US 6, IL 23 and IL 71 | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Ottawa | LaSalle | $337,250 | $0 | $84,313 | $421,563 |
Warrenville - IL Route 56 Streetscape | The project is located along Illinois Rt. 56 and the ILL Prairie Path regional bike trail along the south side of Rt. 56 encompassing 3.25 miles. The majority of proposed enhancements are planned at Rt. 56 intersections with IL Rt. 59, Rockwell St., Batav | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Warrenville | Dupage | $994,220 | $0 | $248,555 | $1,242,775 |
Arlington Heights - Davis Street Beautification | The project will connect an existing sidewalk to an existing pedestrian underpass recently refurbished as part of a CMAQ project. An additional 415 lineal feet of walkway is necessary to connect with the underpass. The proposed scope of work includes 2,3 | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Arlington Heights | Cook | $60,850 | $0 | $15,213 | $76,063 |
Round Lake - Metra Corridor Beautification & Pedestrian Access | Metra Corridor Beaut & Ped Access | Illinois | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Round Lake | Lake | $275,180 | $0 | $71,423 | $346,603 |
IDOT Great River Road Overlook at Thebes | Landscaping and signing along the Great River Road. | Illinois | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Thebes | Alexander | $224,000 | $0 | $56,000 | $280,000 |
Wood River Streetscape, Phase 1 | Phase II engineering, construction engineering and constuction of landscaping | Illinois | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Wood River | Madison | $75,000 | $0 | $18,000 | $93,000 |
Chicago Expy Gateway Beautification | Preliminary engineering I and II, construction engineering and installation of landscaping (trees, shrubs, perennial flowers, ground cover), water source and irrigation systems | Illinois | 2000 | 5 | (TE) 5. Landscaping and scenic beautification | Chicago | Cook | $1,992,000 | $0 | $498,000 | $2,490,000 |
Oak Park Ave Station Streetscape | Utility relocation and construction and installation of brick pavers, sidewalks removal and replacement, curb and gutter, fencing, pedestrian lighting, pedestrian crossing gates and signals, planters, landscaping (trees, shrubs and perennials) and irrigat | Illinois | 2000 | 5 | (TE) 5. Landscaping and scenic beautification | Tinley Park | Cook | $217,000 | $0 | $298,000 | $515,000 |
LaGrange Road Streetscape | Preliminary engineering and construction for landscaping and streetscaping along various roads in LaGrange. | Illinois | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | La Grange | Cook | $144,000 | $0 | $36,000 | $180,000 |
Melrose Pk/Stone Pk North Ave Beaut. | Preliminary engineering I and II, construction engineering and construction of brick pavers, landscaping (trees) and pedestrian lighting | Illinois | 2000 | 5 | (TE) 5. Landscaping and scenic beautification | Melrose Park | Cook | $416,000 | $0 | $104,000 | $520,000 |
Niles - Milwaukee Avenue Corridor (IL 21) | Milwaukee Avenue Corridor - Niles | Illinois | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Niles | Cook | $644,700 | $0 | $161,175 | $805,875 |
IDOT D4 - IL 74 Landscaping from East of Farm Creek to East of Washington Street (GS) | Landscaping along I-74 through East Peoria from East of the Farm Creek Diversionary Channel to East of Washington Street Planting trees, shrubs, perennials and prairie grass | Illinois | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | East Peoria | Tazewell | $422,998 | $0 | $158,789 | $581,787 |
Franklin Street Bridge Display | Preliminary engineering and construction for the installation of monuments on both sides of the river on the Franklin Street Bridge (ILL 40) going from Peoria to East Peora. | Illinois | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Multiple | $137,600 | $0 | $34,400 | $172,000 | |
Northfield - Willow Road Enhancements | The scope of work proposed for ITEP funding is the local share of construction and engineering for the new sidewalks, intersection lighting, and a pedestrian crossing signal only. The State share of construction and engineering for these items and other I | Illinois | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | Northfield | Cook | $733,990 | $0 | $183,497 | $917,487 |
Golconda Dam #51 Housing Renovation | Preliminary engineering II, construction engineering, renovation of four houses (including exterior, interior and mechanical work) and construction of a parking lot | Illinois | 2000 | 6 | (TE) 6. Historic preservation | Golconda | Pope | $545,000 | $0 | $138,000 | $683,000 |
Humbolt Park Receptory | Preliminary engineering, construction engineering and construction for the restoration of 1886 receptory and stables; conversion into the Institute of Hispanic Cultures. | Illinois | 1995 | 6 | (TE) 6. Historic preservation | Chicago | Cook | $1,520,000 | $0 | $380,000 | $1,900,000 |
Pana - Chautauqua Pavilion Phase II | Pana Chautauqua Pavilion Phase II | Illinois | 2007 | 6 | (TE) 6. Historic preservation | Pana | Christian | $327,639 | $0 | $50,000 | $377,639 |
Woodstock St Brick Rehabilitation | Preliminary engineering I and II, construction engineering and rehabilitation of the brick pavement including subgrade removal and replacement, base course, pavement removal, bricks, traffic control and aggregate surface course | Illinois | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Huntley | Mchenry | $304,000 | $0 | $76,000 | $380,000 |
Rock Island Trail Wyoming Depot | Building rehabilitation to the Rock Island Trail Depot in Wyoming and preliminary engineering for the bridge rehabilitation over Kickapoo Creek. | Illinois | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Wyoming | Stark | $207,775 | $0 | $51,943 | $259,718 |
Chestnut Street in Aurora | Engineering and construction for restoring one block of brick street on Chestnut Street between West Downer Place | Illinois | 1993 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Aurora | Kane | $39,716 | $0 | $9,929 | $49,645 |
I&M Canal Structural Rehabilitation | Preliminary engineering and construction for the rehabilitation of a historic trestle bridge across the I&M Canal. | Illinois | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Aux Sable | Grundy | $140,000 | $0 | $35,000 | $175,000 |
I & M Canal, cylcle 1 | Preliminary engineering and construction for various projects to restore historic I & M Canal and historic locations along the canal. | Illinois | 1993 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Multiple | $7,241,780 | $0 | $1,810,444 | $9,052,224 | |
Flora B&O Depot Restoration | Renovation of the building including first floor (exterior work), second floor and third floor (exterior, interior demolition, interior partitions, doors, ceilings, floor, walls, casework, stairs, toilet and mechanical), express building (exterior work) a | Illinois | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Flora | Clay | $449,000 | $0 | $112,000 | $561,000 |
Glenarm Sugar Creek Covered Bridge | Bridge rehabilitation of the Sugar Creek Covered Bridge near Glenarm. | Illinois | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Glenarm | Sangamon | $400,000 | $0 | $100,000 | $500,000 |
Wacker Drive Facade Replacement | construction engineering and construction of a viaduct fa?ɬ¨ade reinstallation; added historic lighting, architectural planters, metal railing/ornamental fencing and Wabash Plaza (landscaping) on 6-5-01 | Illinois | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Chicago | Cook | $12,570,000 | $0 | $3,142,000 | $15,712,000 |
Springfield Union Station Rehabilitation | Phase II engineering, construction engineering and construction for a building rehabilitation including parking and landscaping | Illinois | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Springfield | Sangamon | $12,828,800 | $0 | $3,207,200 | $16,036,000 |
Lebanon Brick Streets | Preliminary engineering, construction engineering, and construction for the brick resurfacing of West St. Louis Street which is part the historical district in Lebanon. | Illinois | 1993 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Lebanon | St. Clair | $312,000 | $0 | $78,000 | $390,000 |
Columbia Old Gaul Road Stone Arch Bridge | Preliminary engineering, construction engineering, and construction for bridge restoration, including parking. | Illinois | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Columbia | Monroe | $132,000 | $0 | $33,000 | $165,000 |
(Transferred to FTA) Arlington Heights Transit Station | Preliminary engineering and construction forbeautification of CNW Railroad Station, including landscaping and the restoration of the brick pavement. | Illinois | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Arlington Heights | Lake | $561,600 | $0 | $140,400 | $702,000 |
Coles County-Blakeman Bridge Rehab | Preliminary engineering, construction engineering, and construction for historic bridge renovation. Carries Blakeman Bridge over Embarras River, one mile southeast of Charleston. | Illinois | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Charleston | Coles | $142,682 | $0 | $35,680 | $178,362 |
Pecatonica Prairie Path Engineering | Preliminary engineering for the Pecatonica Prairie Path. | Illinois | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Multiple | $632,000 | $0 | $158,000 | $790,000 | |
North Shore Rail Trail | Construction engineering and construction for reconstruction and resurfacing of 3.75 miles of North Shore Path. | Illinois | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Lake Forest | Lake | $132,000 | $0 | $33,000 | $165,000 |
Great River Trail - Fulton | Preliminary engineering, construction engineering and construction of a 2.94 mile link in the 62 mile Great River Trail. | Illinois | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Fulton | Whiteside | $195,200 | $0 | $48,800 | $244,000 |
Rock Island Pimiteoui Trail Extension | Preliminary engineering II, right-of-way acquisition, utilities, construction engineering and construction of a bike trail, pedestrian bridge, ILL 40, culverts, fencing, rail crossing, landscaping and signs | Illinois | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Peoria | Peoria | $2,858,000 | $0 | $714,500 | $3,572,500 |
Illinois Prairie Path-Berkeley | Preliminary engineering I and II, construction engineering and construction of a trail, pedestrian lighting and landscaping | Illinois | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Berkeley | Cook | $79,500 | $0 | $19,500 | $99,000 |
North Shore Tunnel | Preliminary engineering and construction of a tunnel under Green Bay Road along IL 176 on abandoned rail corridor and 0.64 mile bikepath in Lake Bluff, includes lighting, and sinage. Key connection to North Shore Path, Green Bay Trail, and regional trail | Illinois | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Lake Bluff | Lake | $582,572 | $0 | $145,643 | $728,215 |
Techny Trail Bike Path | Preliminary engineering for the design of 8 miles of bikeway along street ROW and Metra ROW that will connect five Metra stations and four communities: Glenview, Golf, Morton Grove, and Northbrook. | Illinois | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Glenview | Cook | $185,600 | $0 | $46,400 | $232,000 |
Libertyville Bike Path | Preliminary engineering, construction engineering, and construction for 2.31 miles of bikepath. Completes links to existing paths and includes one bike/ped bridge. Key elements to complete linkage with Des Plains River Trail and North Shore Trail. | Illinois | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Libertyville | Lake | $340,949 | $0 | $85,238 | $426,187 |
Vadalabene Nature Trail | Preliminary engineering, construction engineering, and construction for the upgrading of 7.4 miles of bike path in Edwardsville. | Illinois | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Edwardsville | Madison | $1,393,040 | $0 | $348,260 | $1,741,300 |
El Paso Trail | Preliminary engineering, construction engineering, and construction of a 1.9 mile extension to the existing 1.4 mile rail trail in El Paso. | Illinois | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | El Paso | Woodford | $40,000 | $0 | $10,000 | $50,000 |
Boone County Long Prarie Trail II | Preliminary engineering, construction engineering, and construction for a seven mile segment of the Long Prairie Trail including some bridge rehabilitation. | Illinois | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Rockford | Winnebago | $432,800 | $0 | $108,200 | $541,000 |
Rock Island/Pimiteoui Trail | Preliminary engineering for a 7.9 mile bike path between Pioneer Parkway and existing riverfront trail in Detweiller Park. Uses railroads, city, cemetary roads and park roads. Multiple excellent connections. | Illinois | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Peoria | Peoria | $120,000 | $0 | $30,000 | $150,000 |
Benld/Gillespie Trail | Preliminary engineering, construction engineering, and construction for the widening and resurfacing of an existing rail-trail, including signing and fencing. | Illinois | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Benld | Macoupin | $73,600 | $0 | $18,400 | $92,000 |
McHenry Co Extension of Prairie Trail | Preliminary engineering, construction engineering, and construction for 8.5 mile rail-trail to conect north and south segments of Prairie Trail. | Illinois | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Mchenry | $2,162,400 | $0 | $540,600 | $2,703,000 | |
Pecatonica Prairie Path | Construction engineering and construction of the entire length bike path structures (culverts and bridges) and path approaches; minimum right-of-way acquisition and utility relocations needed; rural trail - grading, profiling, leveling and aggregate or oi | Illinois | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Multiple | $2,749,606 | $1,141,394 | $972,750 | $4,863,750 | |
Grafton Valdalabene Prkwy/Visitor Center | Preliminary engineering, construction engineering, and construction for visitors center which serves as parking/rest area for bicyclists on Vadalabene Bikeway. | Illinois | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Grafton | Jersey | $692,000 | $0 | $173,000 | $865,000 |
Morton Community Bikeway | Preliminary engineering, signing, construction engineering, and construction of a new 2.0 mile rail-trail extension in Morton connecting to existing 5.0 mile River Trail from East Peoria, including new culverts. | Illinois | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Morton | Tazewell | $1,150,658 | $0 | $287,754 | $1,438,412 |
Bunn Pk/Lost Bridge Trail | Preliminary engineering I and II, right-of-way acquisition, utilities, construction engineering and construction of a bike trail, pedestrian bridge, drainage, railroad bridge modification, signs and landscaping | Illinois | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Springfield | Sangamon | $434,000 | $0 | $150,000 | $584,000 |
Wheaton CNW Railroad Overpass and Trail | Preliminary engineering, construction engineering, and construction of a one mile bike path, including an overpass, which will connect the Illinois Prairie Path to the DuPage Government center as well as local schools. | Illinois | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Wheaton | Dupage | $40,261 | $0 | $10,065 | $50,326 |
Champaign County Forest Preserve District - Kickapoo Rail-Trail - Champaign and Vermillion County | Proposed trail will consist primarily of a 10' wide surface of crushed limestone with 2' aggregate shoulders. Municipalities along the route may opt to use a hot-mix asphalt surface within their limits. Traffic control measures at the road crossings will | Illinois | 2010 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Champaign | $892,580 | $0 | $223,145 | $1,115,725 | |
Schoolhouse Trail | Preliminary engineering I & II for new bike trailin Madison County that provides a circumferential route around the metro area from East St. Louis to Edwardsville. | Illinois | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Madison | $598,626 | $0 | $149,407 | $748,033 | |
East Peoria Bike Path | Preliminary engineering, construction engineering and construction of a bike path which is the connecting piece of a three phase plan to connect Illinois 116 to Morton by running through East Peoria. | Illinois | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | East Peoria | Tazewell | $1,004,184 | $0 | $251,046 | $1,255,230 |
Mattoon/Charleston Recreation Trail | Preliminary engineering, construction engineering, and construction for a new 12.2 mile bike path along the abandoned Penn Central RR between Mattoon and Charleston. | Illinois | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Charleston, Mattoon | Coles | $584,800 | $0 | $146,200 | $731,000 |
Shawnee Rails to Trails Rv Link | Acquisition of abandoned railroad right-of-way including title work, legal, surveys and appraisal fees | Illinois | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Multiple | $318,000 | $0 | $302,000 | $620,000 | |
Kellogg Trail | Preliminary engineering and construction of a bike trail in Zion | Illinois | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Zion | Lake | $9,280 | $0 | $2,320 | $11,600 |
Bloomington Constitutional Trail | Construction of a new portion of the Constituional Trail in Bloomington. This will include fencing, signing, and a new bridge. | Illinois | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Bloomington | Mclean | $680,000 | $0 | $170,000 | $850,000 |
Harrisburg Rails toTrails Trail | Preliminary engineering, construction engineering and construction of a bike path along abandonded rail road that will connect to the Tunnel Hill Trail in Harrisburg, including parking and landscaping. | Illinois | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Harrisburg | Saline | $297,600 | $0 | $74,400 | $372,000 |
Acquisition of Non-conforming Signs | Acquisition and removal on non-conforming signs | Illinois | 2000 | 9 | (TE) 9. Inventory, control, and removal of outdoor advertising | Statewide | Statewide | $240,000 | $0 | $60,000 | $300,000 |
Billboard Control | Various sign board control across Illinois statewide | Illinois | 1993 | 9 | (TE) 9. Inventory, control, and removal of outdoor advertising | Statewide | Statewide | $443,520 | $0 | $110,880 | $554,400 |
Flora - Completion of FCDC Depot Interior | Additional funds will be used to complete the work started under a previous ITEP project. There are three rooms and a hallway on the first floor of this three-story historic brick depot that need to be completed. Work to include completion of mechanical/ | Illinois | 2010 | 12 | (TE) 12. Establishment of transportation museums | Flora | Clay | $63,900 | $0 | $15,975 | $79,875 |
IHPA - Restoration & Interpretation of Pullman Advance Car & Factory Exhibit Bay | Restoration of the Pullman built private car Advance; conversion of portions of the Administration Building and North Factory Wing at the Pullman State Historic Site(PSHS) into gallery space and the museum exhibits and programming on the history of Robert | Illinois | 2010 | 12 | (TE) 12. Establishment of transportation museums | Chicago | Cook | $1,336,800 | $0 | $334,200 | $1,671,000 |