Project Search Results

Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Back to Search Page
Project Name Description State Year Activity Activity Type City County Federal Funds ARRA Funds Local Funds Total
Licking River Greenway Water Bridge Rehabilitate existing bridge for bike/ped crossing Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Covington Kenton $1,000,000 $0 $250,000 $1,250,000
W Main US25 Streetscape New multiuse pathh & sidewalks for access between downtown & neighborhoods Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Richmond Madison $1,000,000 $0 $250,000 $1,250,000
Trojan Trail Path 10' MU Path connecting multiple schools, businesses Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Glasgow Barren $1,012,724 $0 $253,181 $1,265,905
City of Columbia Sidewalks New & improved sidewalks from the Lindsey Wilson College Campus thru neighborhoods to Sports Complex Kentucky 2014 101 (TAP) 101. Pedestrian and Bicycle facilities Columbia Adair $160,000 $0 $40,000 $200,000
Pinsly Trail Bike\Ped Trail from KSU to downtown Fkft Kentucky 2014 101 (TAP) 101. Pedestrian and Bicycle facilities Frankfort Franklin $233,350 $0 $60,000 $291,688
Main St Revitalization Ph 3 Finish downtown sidewalks and ADA upgrades Kentucky 2014 101 (TAP) 101. Pedestrian and Bicycle facilities Beattyville Lee $663,863 $0 $165,966 $829,829
Heart of Scottsville Streetscape Demo and upgrade to ADA compliance 380' of ADA compliant sidewalk N side of West Main going East from City Hall to the new Justice Center. Also incl new lights & streetscape elements to match earlier phases of same project. Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Scottsville Allen $1,439,898 $0 $359,974 $1,799,872
Glasgow Shared Use Path & Residential Sidewalk Shared Use Path & Residential Sidewalks Kentucky 2014 101 (TAP) 101. Pedestrian and Bicycle facilities Glasgow Barren $776,815 $0 $194,204 $971,019
4th Street Sidewalk Restripe the street & upgrade the sidewalks Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Louisville Jefferson $1,521,420 $0 $380,355 $1,901,775
Turkeyfoot Road Sidewalks 1100lf of new 5' sidewalk on the E side of Turkeyfoot Rd from Farmington Dr to 2681 Turkeyfoot Rd and incl other drainage & utility adjustments all within existing ROW. Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Lakeside Park Kenton $140,000 $0 $35,000 $137,500
Elkton Sidewalk Porject New 5' sidewalk Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Elkton Todd $120,000 $0 $30,000 $150,000
Old Dry Ridge Sidewalks New 5' sidewalks to connect new neighborhoods to existing bike/ped system Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Versailles Woodford $120,000 $0 $30,000 $150,000
Downtown Sidewalk Connections Construct 1,750 ft of 6 ft sidewalk along Main Street to KY 448 (Broadway Street) in Brandenburg. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Brandenburg Meade $222,240 $0 $55,560 $277,800
Green River Sidewalks Install 2,400 linear ft of 6 ft wide sidewalk beginning on the southeast side of Bend Gate Road, running along the east side of North Green River Road (NGRR), crossing Watson Lane and crossing NGRR to the west side of NGRR, continuing east along NGRR, crossing Larkview Drive and connecting to the existing 8 ft wide multi-path near the intersection of Osage Drive and North Green River Road. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Henderson Henderson $188,320 $0 $54,080 $242,400
Guthrie Sidewalks 2017 Construct new 5 ft sidewalks on both sides of East Park St from Nelson Rd to Morris St on the north and from Railroad St to Tower St on the south in Guthrie. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Guthrie Todd $180,000 $0 $45,000 $225,000
KY 8 Sidewalk Phase 2 Upgrade 1,400 linear feet of sidewalk to 5 ft ADA compliant sidewalks and replace noncompliant 5 ft sidewalks on the south side of KY 8 from KY 8 to KY 547 in Silver Grove. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Silver Grove Campbell $178,417 $0 $44,604 $223,021
Marion Sidewalk Project Construct sidewalks at various locations in the City of Marion. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Marion Crittenden $154,560 $0 $38,640 $193,200
KY 240 Pedestrian Improvements Construct new 5 ft sidewalk on KY 240 from Fletcher to Main St including curb and gutter and drainage in Woodburn. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Woodburn Warren $134,552 $0 $33,638 $168,190
Main Street Sidewalks Construct 1,215 ft of new 5 ft sidewalk on the south side of KY 227 (MP 6.43 to MP 6.78). Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Stamping Ground Scott $123,040 $0 $30,760 $153,800
McKee Sidewalk Project Construct 1,690 linear ft of new 6 ft sidewalk and pedestrian bridge along US 421 (MP 13.694 - MP 14.797) and KY 89 (MP 15.317 - MP 15.638) in the City of McKee. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities McKee Jackson $250,740 $0 $62,685 $313,425
Jeffersonville Sidewalk Extension Construct new 5 ft sidewalk along KY 213 connecting US 460 and KY 213 and providing bike/pedestrian access to City Hall and Park Complex in the City of Jeffersonville. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Jeffersonville Montgomery $121,813 $0 $30,453 $152,266
West High Shared Use Trail Construct 4,700 ft of a 12 ft wide shared use trail along Wilmore Rd (K 29) from Cooks Lane to Allie Run and improve the Jessamine Station Road Intersection, including realignment of an offset intersection, installation of traffic and pedestrian signals and 800 linear feet of sidewalk connections. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Nicholasville Jessamine $112,000 $0 $28,000 $140,000
East High Shared Use Trail Construct a shared use trail along West Maple Street (KY 39) from Central Ave. to the proposed Eastern Bypass Trail. The project will include 500 linear ft of on road bike lanes, 3,000 linear ft of 12 ft wide shared use trail, intersection improvements at the Miles Road intersection and 1,800 linear feet of sidewalk connections to the trail. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Nicholasville Jessamine $104,000 $0 $26,000 $130,000
Morton's Gap Multiple Sidewalks Construct multiple sidewalk upgrades and additions throughout the City of Morton's Gap. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Morton's Gap Hopkins $102,400 $0 $25,600 $128,000
Riverfront Commons Highway Avenue Connection Construct a shared use trail along West Maple Street (KY39) from Central Ave. to the proposed Eastern Bypass Trail. The project will include 500LF of on road bike lanes, 3,000 linear feet of 12’ wide shared use trail, intersection improvements at the Miles Road intersection and 1,800 linear feet of sidewalk connections to the trail. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Covington Kenton $100,000 $0 $25,000 $125,000
South Madison Avenue Construct sidewalks on South Madison Avenue from Main Street to Tucker Station Road. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Middletown 0 $100,000 $0 $25,000 $125,000
Burnside Sidewalks 2017 Construct 1,460 linear ft of 5 ft sidewalk on the east side of US 27 (MP 8.632 - MP 9.1) through Burnside. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Burnside Pulaski $73,113 $0 $18,278 $91,391
Sidewalk Upgrade Upgrade 320 ft of sidewalk to ADA compliance on KY 36 from MP 11.995 to MP 12.055 in Owingsville. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Owingsville Bath $27,000 $0 $6,750 $33,750
Old Lebanon Road Sidewalk Construct new 5 ft sidewalk on KY 289 (MP 1.14 to MP 1.59) to connect downtown to the Trace-Pittman Greenway and Medical Center Drive in Campbellsville. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Campbellsville Taylor $113,618 $0 $28,405 $142,023
Pembroke Sidewalks Rehab and develop downtown sidewalks serving the Community Center & Farmer's Market Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Pembroke Christian $140,000 $0 $29,000 $145,000
Warsaw Road Sidewalk Construct 1,745 ft of missing sidewalk between 31 Warsaw Rd and 61 Warsaw Rd servicing Grant County High School and Technical Center Campus in Dry Ridge. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Dry Ridge Grant $256,000 $0 $64,000 $320,000
Rediscover Louisa Riverwalk Construct 8 ft pedestrian path along KY 2566 beginning 0.6 mile from 800 N Lock Ave connecting at Ft. Gay bridge and ending at Madison St (KY 3) in the City of Louisa. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Louisa Lawrence $312,200 $0 $78,050 $390,250
Pennyrile Bicycling Trail Beginning at the Dawson Springs Trailhead this Bicycle route project consists of striping, signage through multiple streets in Dawson Springs to the intersection of S Stevens Dr & KY109 S and then continue to the county line at Old Hospital Road. Kentucky 2015 101 (TAP) 101. Pedestrian and Bicycle facilities Dawson Springs Hopkins $84,231 $0 $21,058 $105,289
Shively Sidewalk Project Construct various sidewalks on Farnsley Road, Mary Catherine Drive and Garrs Lane. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Shively Jefferson $1,404,334 $0 $351,083 $1,755,417
Burlington Multi-Use Path Construct 5,450 ft of new 10 ft multi-use path along KY 18 connecting to an existing path at KY 237 then to Limaburg Rd continuing until it ends at KY 1017 and Oakbrook Drive. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Burlington Boone $1,164,836 $0 $291,209 $1,456,045
US 641 Sidewalk (North 12th Street) Construct new 5 ft sidewalk along US 641 (North 12th Street) from intersection of US 641 and KY 121 to Stadium View Dr and Diuguid Drive including a 100 ft single span pedestrian bridge over Bee Creek in Murray. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Murray Calloway $800,000 $0 $200,000 $1,000,000
Greenway System, Phase 2 Construct new 8 ft trail where previous project terminated through Pardue Ln, Country Club Ln (KY 380), Lafayette Rd (KY 107), rail corridor and terminate at Foston Chapel Rd in Hopkinsville. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Hopkinsville Christian $716,000 $0 $179,000 $895,000
Amsterdam Rd Connection Construct 5 ft sidewalk for 1 mile on south side of Amsterdam Rd from Highwater Rd to Bromley-Crescent Springs Rd. Final section connecting Crescent Springs & Villa Hills. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Crescent Springs Kenton $705,299 $0 $176,325 $881,624
West Main Street (US 460) Construct new sidewalks and urban roadway improvements on West Main Street between Water Street and Elizabeth Street in Georgetown. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Georgetown Scott $600,000 $0 $150,000 $750,000
Greensburg Greenway Belt Construct 2,700 ft of new or upgraded 5 ft sidewalks on West Hodgenville Road to connect Hillview neighborhood to downtown Greensburg. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Greensburg Green $277,256 $0 $69,314 $346,570
North Fort Thomas Ave Sidewalk Construction of 4,000 linear ft of 5 ft sidewalk parallel to North Fort Thomas Avenue (CS 4169 MP 1.433 to MP 2.16) from Covert Run to Northridge Lane in Fort Thomas. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Fort Thomas Campbell $592,300 $0 $148,075 $740,375
John Rowan Boulevard & Connection Multi-use Path Construct 10,124 ft extension of an existing 10 ft shared-use path in the John Rowan Boulevard Corridor from the Bloomfield Rd intersection across US 31E and connecting to the Templin Avenue corridor (KY 1430) in Bardstown. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Bardstown Nelson $552,000 $0 $138,000 $690,000
Mayfield Bike/Ped Path Construct 700 linear ft of an 8 ft shared-use path on west side of 17th St from KY 121 to Park Dr; 600 linear ft of an 8 ft shared-use path on Park Dr from 17th St to north side of Senior Center at N 15th St; and 100 linear ft of an 8 ft shared-use path on west side of 15th St from Senior Ctr to Maple Ave in Mayfield. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Mayfield Graves $506,000 $0 $126,500 $632,500
West End Greenways Connection & Intersection Construct 10 ft bike/ped trail to close the gap between downtown and the west end from Roland Bland Park to Hobson Grove Park in Bowling Green. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Bowling Green Warren $500,000 $0 $125,000 $625,000
Historic Multi-use Trail (Segment C) Construct 12 ft multi-use path, 6 ft sidewalk and multiple trail/sidewalk safety improvements and trail amenities along North Bardstown Road in Mt Washington. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Mt Washington Bullitt $500,000 $0 $125,000 $625,000
Downtown Sidewalk Upgrade Upgrade sidewalks on both sides of the 100 block of S Main Street between Court and Woodford Streets in Lawrenceburg. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Lawrenceburg Anderson $432,000 $0 $108,000 $540,000
South Mill Street Sidewalk Construct new 5 ft sidewalk on north side of South Mill St starting at W 4th Street in London. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities London Laurel $409,482 $0 $102,371 $511,853
Paintsville Sidewalk Improvements Phase 2 Construct sidewalks on both sides of Main Street from the intersection with Euclid Ave proceeding west to West Street in Paintsville. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Paintsville Johnson $400,000 $0 $100,000 $500,000
Scottsville North Court Street Upgrade 190 linear ft of sidewalk on both sides of North Court Street in Scottsville. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities Scottsville Allen $577,124 $0 $144,281 $721,405
West Dixie Street Sidewalk Construct 300 ft of new sidewalk on the south side of West Dixie Street to connect to existing sidewalk and add crosswalk in London. Kentucky 2017 101 (TAP) 101. Pedestrian and Bicycle facilities London Laurel $37,350 $0 $9,338 $46,688
Greensburg Greenway Belt Bike/Ped Striping Kentucky 2014 101 (TAP) 101. Pedestrian and Bicycle facilities Greensburg Green $52,678 $0 $25,075 $77,753
Kuttawa Bike/Ped Trail Ph III Final Section of Bike/Ped Path Kentucky 2014 101 (TAP) 101. Pedestrian and Bicycle facilities Kuttawa Lyon $322,300 $0 $80,575 $402,875
City of Mount Sterling Transportation and Revitalization Project Construct road improvements to make the walking and cycling populations safer. Drainage issues will be addressed and bike lanes will be added. Upgraded sidewalks, lighting, benches, trash receptacles & other eligible amenities may be added. Work will occur at various locations around North and South Maysville Streets in Mount Sterling. Kentucky 2017 102 (TAP) 102. Safe routes for non-drivers Mt Sterling Montgomery $650,000 $0 $162,500 $812,500
Town Branch Commons-Transit Plaza Multiple improvements to transit system. Elements require further eligibility review. Kentucky 2015 102 (TAP) 102. Safe routes for non-drivers Lexington Fayette $2,730,214 $0 $682,554 $3,412,768
Electric Alley Pedestrian Improvements Electric Alley between 5th & 6th St (in between Scott St & Madison Ave). .6 mi, is in the middle of Gateway CTC new campus of rehab's downtown bldgs. Project adds lighting, creates bike/ped path & secures utilities & request to close the alley to vehicle traffic. Kentucky 2015 102 (TAP) 102. Safe routes for non-drivers Covington Kenton $800,000 $0 $200,000 $1,000,000
Bike/Ped Path Upgrade Convert rail bed to trail for bike/ped Kentucky 2014 103 (TAP) 103. Conversion of Abandoned Railway Corridors to Trails Manchester Clay $128,689 $0 $32,172 $160,861
Old Fkft Pike Scenic Byway Viewing area & information on Old Fkft Pike Kentucky 2014 104 (TAP) 104. Scenic Turnouts and Overlooks Lexington Fayette $603,120 $0 $150,780 $753,900
Olmstead Stone Arch Bridge Rehabilitation & Trail Proj Ph 2 Bridge Rehabilitation Kentucky 2014 106 (TAP) 106. Historic Preservation & Rehab of Historic Transportation Facilities Jeffersontown Jefferson $149,072 $0 $37,268 $186,340
Guthrie Transporation Museum Ph3 Phs 1& 2 are complete. Ph3 incl in orig scope. Unable to finish due to cost restraints. 3 incl elevator, egress stair & door, architectural stair & door, glass railings, lighting, plumbing, mechanical, misc finishes, pro fees & kitchenette, storage and mtg space. Construction only. Design complete. Kentucky 2015 106 (TAP) 106. Historic Preservation & Rehab of Historic Transportation Facilities Guthrie Todd $268,488 $0 $67,122 $335,610
Engine Display House Display building for retired train engine Kentucky 2015 106 (TAP) 106. Historic Preservation & Rehab of Historic Transportation Facilities Midway Woodford $193,000 $0 $48,250 $241,250
Tyler Park/Baxter Ave Bridge Study Built in 1910 and still supporting 11,000 vehicles per day, this funding is for an engineering study incl an indepth structural inspection to develop a preservation plan to guide the repair, rehabilitation and maintenance of the future. Kentucky 2015 106 (TAP) 106. Historic Preservation & Rehab of Historic Transportation Facilities Louisville Metro Parks Jefferson $120,000 $0 $30,000 $150,000
Point Park Historic Bow Bridge Restoration Restoration of 1860 Bow Arched Bridge to be a connection in the Point Park River Walk part of the Carrollton Bike/Ped Master Plan. Work includes restoration, design of bridge deck & installation in Point Park. Kentucky 2015 106 (TAP) 106. Historic Preservation & Rehab of Historic Transportation Facilities Carrollton Carroll $100,000 $0 $25,000 $125,000
Campton SRTS 4700' of new and replacement sidewalk from KY191 & KY2491 south and southeast to Campton Elementary School. Kentucky 2014 301 (TAP) 301. Safe routes to school infrastructure Campton Wolfe $250,000 $0 $0 $250,000
Southern Elementary Install 1550 LF of 5' new sidewalk on the north side of Robbins Ave connecting KY22(Main Street) to US27. Kentucky 2014 301 (TAP) 301. Safe routes to school infrastructure Falmouth Pendleton $250,000 $0 $0 $250,000
Project Walk to School Lexington Rd & Clintonville 4200LF of new sidewalk @Ridgeway Dr along south side of Lex Rd & turning on to Clintonville Rd on the west side until it connects w Kristen Ln Kentucky 2015 301 (TAP) 301. Safe routes to school infrastructure Paris Bourbon $515,350 $0 $0 $515,350
Lloyd Sidewalks 3,580' of sidewalk from the east side of KY3116, crossng 9 subdivision streets and reaching Graysbranch Elementary and Greenup County High School. Kentucky 2014 301 (TAP) 301. Safe routes to school infrastructure Lloyd Greenup $240,000 $0 $0 $240,000
Maysville SRTS Sidewalk - West Third Street Upgrade and add new sidewalks Kentucky 2014 301 (TAP) 301. Safe routes to school infrastructure Maysville Mason $200,000 $0 $0 $200,000
US68 Pedestrian Improvement Program 3,575lf of new and upgraded sidewalk. Upgrade east end of US68 at US127 on both sides to KY152. New from KY152 to E Harlow Elementary. Crosswalks at US68/Linden St.& US68/KY152. Include drainage improvements and wayfinding signage where needed. Kentucky 2015 301 (TAP) 301. Safe routes to school infrastructure Harrodsburg Mercer $509,100 $0 $0 $509,100
Vanceburg SRTS Continuing Ph1, starts at Shelton Dr and go to KY59. 3,649' completing a full transit system connecting all schools and businesses. Kentucky 2014 301 (TAP) 301. Safe routes to school infrastructure Vanceburg Lewis $200,000 $0 $0 $200,000
Russellville SRTS Replacement with ADA compliance of multiple sidewalks on the East Side of town on 1st thru 6th streets and Armstrong, Cherry and Bethel Streets. Total of 7,325 LF with ADA compliance. Kentucky 2014 301 (TAP) 301. Safe routes to school infrastructure Russellville Logan $100,000 $0 $0 $100,000
Hyden SRTS 1800' of new and replacement sidewalk along Maple St from KY257 to Kate Ireland Dr., Elm St from Maple to Hickory. Kentucky 2014 301 (TAP) 301. Safe routes to school infrastructure Hyden Leslie $200,000 $0 $0 $200,000
Paintsville SRTS Replacement ADA compliant sidewalks throughout downtown for a total of 2500' for elem & middle school walkers and bikers and student in wheelchair. Kentucky 2014 301 (TAP) 301. Safe routes to school infrastructure Paintsville Johnson $175,000 $0 $0 $175,000
Construction of sidewalk/bike path connecting business district with new city hall, new park and ballfields, and old city park Construction of sidewalk/bike path connecting business district with new city hall, new park and ballfields, and old city park Kentucky 1994 1 (TE) 1. Pedestrian and Bicycle facilities Cold Spring Campbell $40,153 $0 $40,647 $80,800
Construction of a handicapped accessible access to Civil War Fort Duffield located in the City of West Point Construction of a handicapped accessible access to Civil War Fort Duffield located in the City of West Point Kentucky 1994 1 (TE) 1. Pedestrian and Bicycle facilities West Point Hardin $60,000 $0 $15,000 $75,000
Construct a bike and pedestrian trail to the Riverside Landing that will connect with the Trail System in Jefferson County Construct a bike and pedestrian trail to the Riverside Landing that will connect with the Trail System in Jefferson County Kentucky 1996 1 (TE) 1. Pedestrian and Bicycle facilities Louisville Jefferson $100,000 $0 $25,000 $125,000
Replacement of existing swinging bridge with a Timber Pedestrian Bridge for easier access to the senior citizens and daycare center used by the community. Replacement of existing swinging bridge with a Timber Pedestrian Bridge for easier access to the senior citizens and daycare center used by the community. Kentucky 1996 1 (TE) 1. Pedestrian and Bicycle facilities Salyersville Magoffin $45,000 $0 $11,250 $56,250
Pedestrian Trail, Phase II Pedestrian Trail, Phase II Kentucky 1996 1 (TE) 1. Pedestrian and Bicycle facilities Cave City Barren $20,000 $0 $0 $20,000
PIKEVILLE SIDEWALKS & GREENSPACE Sidewalks, beautification, Utility Relocation and greenspace along Division and Pike Streets near downtown Pikeville. PIKEVILLE SIDEWALKS & GREENSPACE Sidewalks, beautification, Utility Relocation and greenspace along Division and Pike Streets near downtown Pikeville. Kentucky 2000 1 (TE) 1. Pedestrian and Bicycle facilities Pikeville Pike $500,000 $0 $312,344 $812,344
Funding for bikeway planning activities, mandated by 1992 state legislation Funding for bikeway planning activities, mandated by 1992 state legislation Kentucky 1994 1 (TE) 1. Pedestrian and Bicycle facilities Statewide Statewide $97,600 $0 $24,400 $122,000
CORBIN CREEKWAY Acquisition, design and construction of a 2100?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢ x 6?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢ wide pathway, landscaping, five pedestrian plazas CORBIN CREEKWAY Acquisition, design and construction of a 2100?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢ x 6?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢ wide pathway, landscaping, five pedestrian plazas Kentucky 2000 1 (TE) 1. Pedestrian and Bicycle facilities Corbin Whitley $361,800 $0 $90,450 $452,250
ADKISSON GREENBELT PARK Acquire property and construct a 2.5 mile segment of the South Owensboro Trail, part of the 15 mile Greenbelt currently under development. ADKISSON GREENBELT PARK Acquire property and construct a 2.5 mile segment of the South Owensboro Trail, part of the 15 mile Greenbelt currently under development. Kentucky 2000 1 (TE) 1. Pedestrian and Bicycle facilities Owensboro Daviess $300,000 $0 $75,000 $375,000
Sidewalks along Dixie Highway-US 42 from US 25 north to existing sidewalk network in Kenton Co. Sidewalks along Dixie Highway-US 42 from US 25 north to existing sidewalk network in Kenton Co. Kentucky 1994 1 (TE) 1. Pedestrian and Bicycle facilities Florence Boone $336,912 $0 $84,228 $421,140
Pedestrian walkway/greenway known as \Canalscape\", Phase I" Pedestrian walkway/greenway known as \Canalscape\", Phase I" Kentucky 1994 1 (TE) 1. Pedestrian and Bicycle facilities Middlesboro Bell $233,600 $0 $104,760 $338,360
Establishment of pedestrian link between US 421 strip businesses and traditional business district, to run from Mound Street to Hospital Road, including lighting, benches, fencing and landscaping Establishment of pedestrian link between US 421 strip businesses and traditional business district, to run from Mound Street to Hospital Road, including lighting, benches, fencing and landscaping Kentucky 1994 1 (TE) 1. Pedestrian and Bicycle facilities Harlan Harlan $206,530 $0 $51,633 $258,163
CARDINAL RUN PARK STUDY FOR MULTI-USE TRAIL CARDINAL RUN PARK STUDY FOR MULTI-USE TRAIL Kentucky 2001 1 (TE) 1. Pedestrian and Bicycle facilities Lexington Fayette $20,000 $0 $5,000 $25,000
Construction of 5-foot concrete sidewalk with drainage along Thomas More Parkway, as part of pedestrian loop from Turkeyfoot Road to Dudley Road connecting several community facilities Construction of 5-foot concrete sidewalk with drainage along Thomas More Parkway, as part of pedestrian loop from Turkeyfoot Road to Dudley Road connecting several community facilities Kentucky 1994 1 (TE) 1. Pedestrian and Bicycle facilities Crestview Hills Kenton $192,000 $0 $48,000 $240,000
WEST LIBERTY MULTI-MODAL CONNECTORS Concrete walkway from Old Mill Park to Hwy 160, swing bridge, gravel path and gate at Hwy 460, loop under Hwy 460 bridge, gravel path and bridge over Long Branch, path from bridge to Treadway Park, Restrooms at Old Mill WEST LIBERTY MULTI-MODAL CONNECTORS Concrete walkway from Old Mill Park to Hwy 160, swing bridge, gravel path and gate at Hwy 460, loop under Hwy 460 bridge, gravel path and bridge over Long Branch, path from bridge to Treadway Park, Restrooms at Old Mill Kentucky 2000 1 (TE) 1. Pedestrian and Bicycle facilities West Liberty Morgan $198,300 $0 $49,575 $247,875
Development and improvements of a riverwalk/bikeway along the Ohio River from downtown to Chickasaw Park Development and improvements of a riverwalk/bikeway along the Ohio River from downtown to Chickasaw Park Kentucky 1994 1 (TE) 1. Pedestrian and Bicycle facilities Louisville Jefferson $1,720,000 $0 $430,000 $2,150,000
Madison & Pike Streetscape Projects; Streetscape enhancement along Pike Street and the 600 block of KY 17 (Madison Ave.) including design and installation of lampposts, curbs, sidewalks, trees and street furniture. Madison & Pike Streetscape Projects; Streetscape enhancement along Pike Street and the 600 block of KY 17 (Madison Ave.) including design and installation of lampposts, curbs, sidewalks, trees and street furniture. Kentucky 2004 1 (TE) 1. Pedestrian and Bicycle facilities Covington Kenton $275,000 $0 $68,750 $343,750
City of Fulton Sidewalk City of Fulton Sidewalk Kentucky 2007 1 (TE) 1. Pedestrian and Bicycle facilities Fulton Fulton $100,000 $0 $25,000 $125,000
US 41 Bike/Ped Path US 41 Bike/Ped Path Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Sebree Webster $318,400 $0 $79,600 $398,000
Rehabilitate the River Suspension (Swinging) Pedestrian Bridge across the Levisa Fork of the Big Sandy River at the community of River Rehabilitate the River Suspension (Swinging) Pedestrian Bridge across the Levisa Fork of the Big Sandy River at the community of River Kentucky 1995 1 (TE) 1. Pedestrian and Bicycle facilities Prestonsburg Johnson $69,000 $0 $515,266 $584,266
CITY OF GUTHRIE WALKING/BICYCLE TRAIL Installing 1 mile of concrete trail within Guthrie in Todd County to link Springmont Subdivision, Pennyrile Village Public Housing to Piggly Wiggly Grocery, the new Dollar General Store, Tiny Town, and the city?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢s ball CITY OF GUTHRIE WALKING/BICYCLE TRAIL Installing 1 mile of concrete trail within Guthrie in Todd County to link Springmont Subdivision, Pennyrile Village Public Housing to Piggly Wiggly Grocery, the new Dollar General Store, Tiny Town, and the city?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢s ball Kentucky 2000 1 (TE) 1. Pedestrian and Bicycle facilities Guthrie Todd $94,000 $0 $23,500 $117,500
Renovation of the Old Bridge located in Elkhorn City. It spans the Russell Fork of the Big Sandy River Renovation of the Old Bridge located in Elkhorn City. It spans the Russell Fork of the Big Sandy River Kentucky 1995 1 (TE) 1. Pedestrian and Bicycle facilities Elkhorn City Pike $41,658 $0 $10,414 $52,072
Freeman Lake Park Trail Enhancement. A five mile trail surrounding Freeman Lake. Freeman Lake Park Trail Enhancement. A five mile trail surrounding Freeman Lake. Kentucky 1995 1 (TE) 1. Pedestrian and Bicycle facilities Elizabethtown Hardin $20,480 $0 $5,120 $25,600
Green Co. American Legion Park Walkway/Bike Path. Green Co. American Legion Park Walkway/Bike Path. Kentucky 1995 1 (TE) 1. Pedestrian and Bicycle facilities Greensburg Green $18,000 $0 $4,500 $22,500
Link pedestrian and vehicular traffic with the Downtown. Link pedestrian and vehicular traffic with the Downtown. Kentucky 1995 1 (TE) 1. Pedestrian and Bicycle facilities Paintsville Johnson $15,200 $0 $3,800 $19,000
Mike Haydon Trail Trail connecting multiple areas Kentucky 2015 1 (TE) 1. Pedestrian and Bicycle facilities Springfield Washington $492,400 $0 $123,100 $615,500
IRVINGTON?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢S PEDESTRIAN ENHANCEMENT PROJECT IRVINGTON?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢S PEDESTRIAN ENHANCEMENT PROJECT Kentucky 2000 1 (TE) 1. Pedestrian and Bicycle facilities Irvington Breckinridge $80,000 $0 $20,000 $100,000
MARION WALKING TRAIL MARION WALKING TRAIL Kentucky 2002 1 (TE) 1. Pedestrian and Bicycle facilities Marion Crittenden $50,000 $0 $12,500 $62,500
FRANKLIN COUNTY SIDEWALK EXTENSION ALONG US 460 Construction of a pedestrian facility adjacent to US 460 in front of Lakeview Park to extend 1750?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢ to the junction of US 460 and KY 2260. This will extend the sidewalk that runs in front of Franklin County FRANKLIN COUNTY SIDEWALK EXTENSION ALONG US 460 Construction of a pedestrian facility adjacent to US 460 in front of Lakeview Park to extend 1750?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢ to the junction of US 460 and KY 2260. This will extend the sidewalk that runs in front of Franklin County Kentucky 2000 1 (TE) 1. Pedestrian and Bicycle facilities Frankfort Franklin $24,000 $0 $6,000 $30,000
Perform a design study for the Clays Mill Road Multi-Use Trail to connect neighborhoods and the existing sidewalk system with Cardinal Run park in Fayette County Perform a design study for the Clays Mill Road Multi-Use Trail to connect neighborhoods and the existing sidewalk system with Cardinal Run park in Fayette County Kentucky 2000 1 (TE) 1. Pedestrian and Bicycle facilities Lexington Fayette $20,000 $0 $5,000 $25,000
Installation of sidewalks along US 421 to aid children walking to school and senior citizens going to medical center Installation of sidewalks along US 421 to aid children walking to school and senior citizens going to medical center Kentucky 1994 1 (TE) 1. Pedestrian and Bicycle facilities Bedford Trimble $16,995 $0 $11,749 $28,744
Newport Riverfront Improvement Project; pedestrian connection from beginning of Riverboat Row to the Columbia Street entrance. Newport Riverfront Improvement Project; pedestrian connection from beginning of Riverboat Row to the Columbia Street entrance. Kentucky 2004 1 (TE) 1. Pedestrian and Bicycle facilities Newport Campbell $300,000 $0 $0 $300,000
Main Street Development Plan; streetscape improvements along US 60 from Locust Lane to Madison Avenue and from Madison to Harrison Avenue. Includes upgrade of storm drain system, design and installation of sidewalk with curb and gutter along both sides o Main Street Development Plan; streetscape improvements along US 60 from Locust Lane to Madison Avenue and from Madison to Harrison Avenue. Includes upgrade of storm drain system, design and installation of sidewalk with curb and gutter along both sides o Kentucky 2004 1 (TE) 1. Pedestrian and Bicycle facilities Middletown Jefferson $300,000 $0 $75,000 $375,000
US-31W Sidewalk Project US-31W Sidewalk Project Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Park City Barren $68,000 $0 $17,000 $85,000
Pedestrian Facilities Project Pedestrian Facilities Project Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Hanson Hopkins $80,000 $0 $20,000 $100,000
Pedestrian Walkway Project Pedestrian Walkway Project Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Eminence Henry $82,500 $0 $20,625 $103,125
Hospital Drive Pedestrian Facilities Hospital Drive Pedestrian Facilities Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Shelbyville Shelby $103,500 $0 $25,875 $129,375
Newburg Middle School Safe Routes to School Program Newburg Middle School Safe Routes to School Program Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Louisville Jefferson $126,550 $0 $31,637 $158,187
Linking Schools and Commerce in Bowling Green Linking Schools and Commerce in Bowling Green Kentucky 2007 1 (TE) 1. Pedestrian and Bicycle facilities Bowling Green Warren $440,000 $0 $110,000 $550,000
KY 1016 Sidewalk Project KY 1016 Sidewalk Project Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Berea Madison $128,828 $0 $32,207 $161,035
Kuttawa Walking/Bicycle Trail Phase II Kuttawa Walking/Bicycle Trail Phase II Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Kuttawa Lyon $148,000 $0 $37,000 $185,000
Tates Creek Trail Project Tates Creek Trail Project Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Richmond Madison $157,500 $0 $39,375 $196,875
Coal Run Sidewalk Project Coal Run Sidewalk Project Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Coal Run Village Pike $192,000 $0 $48,000 $240,000
City of Carrollton Polk Street Extension Project City of Carrollton Polk Street Extension Project Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Carrollton Carroll $247,000 $0 $61,750 $308,750
Elliot County Multi-Use Trail Project Elliot County Multi-Use Trail Project Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Sandy Hook Elliott $295,000 $0 $73,750 $368,750
Kentucky River Walk Trail Kentucky River Walk Trail Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Frankfort Franklin $314,500 $0 $78,625 $393,125
High Point Road Sidewalk High Point Road Sidewalk Kentucky 2007 1 (TE) 1. Pedestrian and Bicycle facilities Shelbyville Shelby $56,300 $0 $14,075 $70,375
INDEPENDENCE SIDEWALKS INDEPENDENCE SIDEWALKS Kentucky 2002 1 (TE) 1. Pedestrian and Bicycle facilities Independence Kenton $50,000 $0 $12,500 $62,500
South Streets Avenue Sidewalk Project South Streets Avenue Sidewalk Project Kentucky 2008 1 (TE) 1. Pedestrian and Bicycle facilities Elkton Todd $196,000 $0 $49,000 $245,000
Town Branch Trail Preservation Town Branch Trail Preservation Kentucky 2007 1 (TE) 1. Pedestrian and Bicycle facilities Lexington Fayette $650,000 $0 $162,500 $812,500
Hyden PedWay Project; project will provide with safe and efficient access to the downtown area. Project consists of restoring dilapidated pedways along US 421/Main Street and encompass refinishing existing pedways with stone and improve lighting along th Hyden PedWay Project; project will provide with safe and efficient access to the downtown area. Project consists of restoring dilapidated pedways along US 421/Main Street and encompass refinishing existing pedways with stone and improve lighting along th Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Hyden Leslie $240,000 $0 $60,000 $300,000
Steadmantown Lane multi-use path; project involves the construction of a continuous walkway connecting the existing walkway on US Hwy 460 to Frankfort City limits; project will create safe access to Lakeview Park for bicyclists, pedestrians and skateboard Steadmantown Lane multi-use path; project involves the construction of a continuous walkway connecting the existing walkway on US Hwy 460 to Frankfort City limits; project will create safe access to Lakeview Park for bicyclists, pedestrians and skateboard Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Frankfort Franklin $84,750 $0 $21,188 $105,938
Town Branch Trail North (Phase 2) Town Branch Trail North (Phase 2) Kentucky 2003 1 (TE) 1. Pedestrian and Bicycle facilities Lexington Fayette $180,000 $0 $45,000 $225,000
Barbourville Streetscape Project Barbourville Streetscape Project Kentucky 2003 1 (TE) 1. Pedestrian and Bicycle facilities Barbourville Knox $200,000 $0 $50,000 $250,000
Construction of 400' X 20' river walk Construction of 400' X 20' river walk Kentucky 2003 1 (TE) 1. Pedestrian and Bicycle facilities Augusta Bracken $250,000 $0 $62,500 $312,500
Beargrass Creek Recreation Trail System Beargrass Creek Recreation Trail System Kentucky 2003 1 (TE) 1. Pedestrian and Bicycle facilities Louisville Jefferson $300,000 $0 $75,000 $375,000
Owensboro Adkisson Greenbelt Trail - Final Phase - Construction of remaining 5 miles (15 total) of the paved trail system that links the community Owensboro Adkisson Greenbelt Trail - Final Phase - Construction of remaining 5 miles (15 total) of the paved trail system that links the community Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Owensboro Daviess $600,000 $0 $150,000 $750,000
Phase II-construction improvements within the historic district of Shelbyville along both sides of Main and Washington Streets along US 60 Phase II-construction improvements within the historic district of Shelbyville along both sides of Main and Washington Streets along US 60 Kentucky 1997 1 (TE) 1. Pedestrian and Bicycle facilities Shelbyville Shelby $250,000 $0 $62,500 $312,500
Historic Burlington Sidewalk Improvements; project provides ped system along streets in and around historic district; replaces existing sidewalk and adds additional; street lighting and crosswalk improvements are included to provide safe street crossings. Historic Burlington Sidewalk Improvements; project provides ped system along streets in and around historic district; replaces existing sidewalk and adds additional; street lighting and crosswalk improvements are included to provide safe street crossings. Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Burlington Boone $352,062 $0 $0 $352,062
Public square improvements in the historic district in Lancaster at the crossroads of two major highways, US 27 and KY 52. Public square improvements in the historic district in Lancaster at the crossroads of two major highways, US 27 and KY 52. Kentucky 1997 1 (TE) 1. Pedestrian and Bicycle facilities Lancaster Garrard $200,000 $0 $50,000 $250,000
Walking trail beginning at Old Mill Dam Road at Tradewater River, crossing the river on a pedestrian bridge and following a north-south direction along the river for about 0.6 mile. Walking trail beginning at Old Mill Dam Road at Tradewater River, crossing the river on a pedestrian bridge and following a north-south direction along the river for about 0.6 mile. Kentucky 1997 1 (TE) 1. Pedestrian and Bicycle facilities Dawson Springs Hopkins $100,000 $0 $25,000 $125,000
Burlington Pedestrian Improvements Phase II - 4,347 ft. of new sidewalk & replacement of 2,850 ft of existing sidewalks, lighting & crosswalk improvements in and around the Burlington National Register Historic District Burlington Pedestrian Improvements Phase II - 4,347 ft. of new sidewalk & replacement of 2,850 ft of existing sidewalks, lighting & crosswalk improvements in and around the Burlington National Register Historic District Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Burlington Boone $430,000 $0 $107,500 $537,500
Route identification signing, a map and brochure and bike racks which will lead to the development of a 65-mile bike route (from Reelfoot Lake in TN thru Fulton, Hickman, Carlisle and Ballard Counties to the US 51 bridge into IL) to be known as the Missis Route identification signing, a map and brochure and bike racks which will lead to the development of a 65-mile bike route (from Reelfoot Lake in TN thru Fulton, Hickman, Carlisle and Ballard Counties to the US 51 bridge into IL) to be known as the Missis Kentucky 1997 1 (TE) 1. Pedestrian and Bicycle facilities Clinton Hickman $20,800 $0 $5,200 $26,000
Brownsboro Farm Pathway - creation of 650' pedestrian path to provide access to City Park Brownsboro Farm Pathway - creation of 650' pedestrian path to provide access to City Park Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Brownsboro Farm Jefferson $20,400 $0 $5,100 $25,500
Installation of sidewalks along US 421 to aid children walking to school and senior citizens going to medical center Installation of sidewalks along US 421 to aid children walking to school and senior citizens going to medical center Kentucky 1997 1 (TE) 1. Pedestrian and Bicycle facilities Bedford Trimble $6,000 $0 $0 $6,000
Owensboro Riverwalk Owensboro Riverwalk Kentucky 2003 1 (TE) 1. Pedestrian and Bicycle facilities Owensboro Daviess $399,970 $0 $100,030 $500,000
Pleasureville Sidewalk Project Pleasureville Sidewalk Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Pleasureville Henry $72,000 $0 $18,000 $90,000
KY12 Bagdad Sidewalk Project; project will provide 4400-foot pedestrian walkway that will interconnect with sidewalks already in place in the business section of Bagdad; project will provde safer pedestrian access by eliminating need to wlak on roadways. KY12 Bagdad Sidewalk Project; project will provide 4400-foot pedestrian walkway that will interconnect with sidewalks already in place in the business section of Bagdad; project will provde safer pedestrian access by eliminating need to wlak on roadways. Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Shelbyville Shelby $66,000 $0 $16,500 $82,500
Newport?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢s Historic Downtown Streetscape along US 27 (Monmouth Street). Newport?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢s Historic Downtown Streetscape along US 27 (Monmouth Street). Kentucky 1997 1 (TE) 1. Pedestrian and Bicycle facilities Newport Campbell $200,000 $0 $50,000 $250,000
London Sidewalks; project will secure and establish safe pathways and sidewalks for pedestrians, especially those with physical limitations, along the downtown business district within the City of London; includes public utility enhancements and the addit London Sidewalks; project will secure and establish safe pathways and sidewalks for pedestrians, especially those with physical limitations, along the downtown business district within the City of London; includes public utility enhancements and the addit Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities London Laurel $500,000 $0 $538,217 $1,038,217
Downtown Albany Pedestrian Improvement Project; project will enhance core of Albany by removing unattractive elements and providing a more comfortable and safe environment for pedestrians; installation of pedestrian-scaled features, relocating utilities u Downtown Albany Pedestrian Improvement Project; project will enhance core of Albany by removing unattractive elements and providing a more comfortable and safe environment for pedestrians; installation of pedestrian-scaled features, relocating utilities u Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Albany Clinton $512,000 $0 $128,000 $640,000
Jeffersonville Sidewalk Project Jeffersonville Sidewalk Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Jeffersonville Montgomery $56,500 $0 $14,125 $70,625
Jenkins Safe Routes to School Project Phase II Jenkins Safe Routes to School Project Phase II Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Jenkins Letcher $16,300 $0 $4,075 $20,375
Jeffers Bend Walking Trail and Environmental Center. Install 2 miles of 5' wide compacted gravel walking trail Jeffers Bend Walking Trail and Environmental Center. Install 2 miles of 5' wide compacted gravel walking trail Kentucky 2003 1 (TE) 1. Pedestrian and Bicycle facilities Hopkinsville Christian $75,000 $0 $18,750 $93,750
Connect a major residential area of Oak Grove to the State Line Road, providing a continuous bike from Oak Grove Pedestrian and Bike Trail Connect a major residential area of Oak Grove to the State Line Road, providing a continuous bike from Oak Grove Pedestrian and Bike Trail Kentucky 2003 1 (TE) 1. Pedestrian and Bicycle facilities Oak Grove Christian $100,000 $0 $25,000 $125,000
Christian Co. Gracey Walking/Bicycle Trail Christian Co. Gracey Walking/Bicycle Trail Kentucky 2007 1 (TE) 1. Pedestrian and Bicycle facilities Hopkinsville Christian $30,000 $0 $7,500 $37,500
Smithfield Road Sidewalk Project - construction of approximately 1,500' of sidewalks along KY 53 connecting existing sidewalks along US 60 and Sanford Lane Smithfield Road Sidewalk Project - construction of approximately 1,500' of sidewalks along KY 53 connecting existing sidewalks along US 60 and Sanford Lane Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Smithfield Shelby $24,000 $0 $6,000 $30,000
City of Brooksville Safe Routes to School City of Brooksville SRTS Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Brooksville Bracken $156,350 $0 $39,087 $195,437
Salyersville Sidewalk Project Salyersville Sidewalk Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Salyersville Magoffin $281,613 $0 $70,403 $352,016
Oakwood Drive and Union Street Sidewalk Improvements Oakwood Drive and Union Street Sidewalk Improvements Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Hartford Ohio $235,292 $0 $58,823 $294,115
Pedway Project Phase II Pedway Project Phase II Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Campton Wolfe $641,000 $0 $160,250 $801,250
Linking Communities, Schools & Parks Safe Routes to School Project Linking Communities, Schools & Parks Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Bowling Green Warren $792,000 $0 $198,000 $990,000
Munfordville Sidewalk Improvements Project Munfordville Sidewalk Improvements Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Munfordville Hart $172,428 $0 $43,107 $215,535
Sidewalk Construction & Replacement Project Sidewalk Construction & Replacement Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Livingston Rockcastle $312,000 $0 $78,000 $390,000
US 60 Sidewalk Construction Project US 60 Sidewalk Construction Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Simpsonville Shelby $320,000 $0 $80,000 $400,000
Utica Trail Project Utica Trail Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Daviess $327,788 $0 $81,947 $409,735
Rockcastle Creek Pedway Project Rockcastle Creek Pedway Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Inez Martin $330,000 $0 $82,500 $412,500
Cardinal Drive Sidewalk Project Cardinal Drive Sidewalk Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Campbellsburg Henry $26,228 $0 $6,557 $32,785
Sanford Lane Sidewalk Project Sanford Lane Sidewalk Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Shelbyville Shelby $29,020 $0 $7,255 $36,275
Pembroke Walking/Bicycle Trail Pembroke Walking/Bicycle Trail Kentucky 2007 1 (TE) 1. Pedestrian and Bicycle facilities Pembroke Christian $52,760 $0 $13,190 $65,950
Heart of Scottsville Streetscape Project Final Phase Heart of Scottsville Streetscape Project Final Phase Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Scottsville Allen $335,750 $0 $83,937 $419,687
Lyndale Road Sidewalk Project; safe walk way for pedestrian traffic while improving the overall appearance of the community in the \Old Edgewood\" section of the city" Lyndale Road Sidewalk Project; safe walk way for pedestrian traffic while improving the overall appearance of the community in the \Old Edgewood\" section of the city" Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Edgewood Kenton $57,600 $0 $14,400 $72,000
Glencoe Sidewalk Construction Project Phase II - replacement and repair of 810' of sidewalks along US 127 and KY 467 Glencoe Sidewalk Construction Project Phase II - replacement and repair of 810' of sidewalks along US 127 and KY 467 Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Glencoe Gallatin $39,000 $0 $9,750 $48,750
Rehabilitate the River Suspension (Swinging) Pedestrian Bridge across the Levisa Fork of the Big Sandy River at the community of River Rehabilitate the River Suspension (Swinging) Pedestrian Bridge across the Levisa Fork of the Big Sandy River at the community of River Kentucky 1997 1 (TE) 1. Pedestrian and Bicycle facilities Prestonsburg Johnson $130,000 $0 $0 $130,000
Mayfield Safe Routes to Schools Project - new construction and improvement of existing sidewalks and bike routes, along with pedestrian education and training Mayfield Safe Routes to Schools Project - new construction and improvement of existing sidewalks and bike routes, along with pedestrian education and training Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Mayfield Graves $80,000 $0 $20,000 $100,000
GRAND RIVER JETTY CONSTRUCTION UPGRADE GRAND RIVER JETTY CONSTRUCTION UPGRADE Kentucky 2002 1 (TE) 1. Pedestrian and Bicycle facilities Grand Rivers Livingston $200,000 $0 $50,000 $250,000
OWB SOUTH TRAIL OWB SOUTH TRAIL Kentucky 2002 1 (TE) 1. Pedestrian and Bicycle facilities Owensboro Daviess $200,000 $0 $50,000 $250,000
TOWN BRANCH TRAIL TOWN BRANCH TRAIL Kentucky 2002 1 (TE) 1. Pedestrian and Bicycle facilities Lexington Fayette $180,000 $0 $45,000 $225,000
Lexington Healthway Trail - Construct 10 mile shared use trail around the Lexington Christian Academy and Shilito Park area Lexington Healthway Trail - Construct 10 mile shared use trail around the Lexington Christian Academy and Shilito Park area Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Lexington Fayette $426,000 $0 $106,500 $532,500
Maple Street Sidewalk Project Maple Street Sidewalk Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Russell Springs Russell $80,000 $0 $20,000 $100,000
Windward Heights Safe Route to School Windward Heights Safe Route to School Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Hancock $93,385 $0 $23,346 $116,731
Dry Ridge Sidewalk Project - Intersection KY 467 to Grant Co. High School Dry Ridge Sidewalk Project - Intersection KY 467 to Grant Co. High School Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Dry Ridge Grant $64,000 $0 $16,000 $80,000
Sidewalk Replacement & Landscaping Project Sidewalk Replacement & Landscaping Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Maysville Mason $114,200 $0 $28,550 $142,750
City of Stanford Sidewalks Construction City of Stanford Sidewalks Construction Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Stanford Lincoln $117,600 $0 $29,400 $147,000
Bowling Green Community Bicycle & Pedestrian Facilities - Shared use paths connecting 8 schools, rec. facilities, neighborhoods and other community businesses and facilities Bowling Green Community Bicycle & Pedestrian Facilities - Shared use paths connecting 8 schools, rec. facilities, neighborhoods and other community businesses and facilities Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Bowling Green Warren $368,000 $0 $92,000 $460,000
Eddyville Safe Routes to School Project Eddyville SRTS Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Eddyville Lyon $131,500 $0 $32,875 $164,375
Taylorsville Streetscape; sidewalks on both sides of the street will be replaced a distance of 522 feet on each street side, for 1044 lineal feet improvements. Main Street in Taylorsville is a KY44 thoroughfare. Taylorsville Streetscape; sidewalks on both sides of the street will be replaced a distance of 522 feet on each street side, for 1044 lineal feet improvements. Main Street in Taylorsville is a KY44 thoroughfare. Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Taylorsville Spencer $194,000 $0 $48,500 $242,500
Renaissance Construction Project - Phase II; construct 5' wide sidewalks to become safe thoroughfare to local churches, schools and businesses Renaissance Construction Project - Phase II; construct 5' wide sidewalks to become safe thoroughfare to local churches, schools and businesses Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Independence Kenton $159,814 $0 $39,954 $199,768
Edmonton Streetscape Improvements Edmonton Streetscape Improvements Kentucky 2002 1 (TE) 1. Pedestrian and Bicycle facilities Edmonton Metcalfe $75,000 $0 $18,750 $93,750
Levi Jackson Wilderness Road State Park Bike/Ped Trail; trail will provide another mode of safe transportation to facilities at Levi Jackson SPR; bicyclists and pedestrians will have access to pool, campground, picnic area, museum, park headquarters, McHa Levi Jackson Wilderness Road State Park Bike/Ped Trail; trail will provide another mode of safe transportation to facilities at Levi Jackson SPR; bicyclists and pedestrians will have access to pool, campground, picnic area, museum, park headquarters, McHa Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Frankfort Laurel $142,400 $0 $35,000 $177,400
Royal Drive Sidewalk; will provide safe pedestrian walkways for neighbors as well as patrons to the local hotels, convention center and shopping complex Royal Drive Sidewalk; will provide safe pedestrian walkways for neighbors as well as patrons to the local hotels, convention center and shopping complex Kentucky 2005 1 (TE) 1. Pedestrian and Bicycle facilities Fort Mitchell Kenton $96,000 $0 $24,000 $120,000
Safe Routes to School Project Safe Routes to School Project Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Monticello Wayne $215,425 $0 $53,856 $269,281
MARION WALKING TRAIL MARION WALKING TRAIL Kentucky 2002 1 (TE) 1. Pedestrian and Bicycle facilities Marion Crittenden $50,000 $0 $12,500 $62,500
MILTON BIKE/PEDESTRIAN TRAIL MILTON BIKE/PEDESTRIAN TRAIL Kentucky 2002 1 (TE) 1. Pedestrian and Bicycle facilities Milton Trimble $50,000 $0 $12,500 $62,500
Burlington Sidewalk Project Phase III Burlington Sidewalk Project Phase III Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Boone Boone $279,317 $0 $69,829 $349,146
Bicycle & Pedestrian Striping, Signage, Signalization Bicycle & Pedestrian Striping, Signage, Signalization Kentucky 2009 1 (TE) 1. Pedestrian and Bicycle facilities Louisville Jefferson $134,000 $0 $33,500 $167,500
Mount Vernon Sidewalk Project-Downtown sidewalk replacement along both sides of US25 Mount Vernon Sidewalk Project-Downtown sidewalk replacement along both sides of US25 Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Mount Vernon Rockcastle $320,000 $0 $80,000 $400,000
Riverfront Pedestrian Plaza Riverfront Pedestrian Plaza Kentucky 2003 1 (TE) 1. Pedestrian and Bicycle facilities Newport Campbell $446,192 $0 $3,714,184 $4,160,376
Bardwell Sidewalk Project - Construct sidewalks along west side of US 51 - 7200 ft Bardwell Sidewalk Project - Construct sidewalks along west side of US 51 - 7200 ft Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Bardwell Carlisle $86,000 $0 $21,500 $107,500
Campbell County A.J. Jolly Bike Trail - Part of 2002 Master recreation plan, multi-use path linking A.J. Jolly Park, subdivisions and surrounding community, 10ft. Wide asphalt route Campbell County A.J. Jolly Bike Trail - Part of 2002 Master recreation plan, multi-use path linking A.J. Jolly Park, subdivisions and surrounding community, 10ft. Wide asphalt route Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Alexandria Campbell $89,000 $0 $22,250 $111,250
Eddyville Sidewalk Improvement Project - replacement/repair of 3,000' of sidewalks along W. Fairview Ave, W.Dale Ave, Dale Street, Main Street, Commerce Street and Knob Street Eddyville Sidewalk Improvement Project - replacement/repair of 3,000' of sidewalks along W. Fairview Ave, W.Dale Ave, Dale Street, Main Street, Commerce Street and Knob Street Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Eddyville Lyon $88,000 $0 $22,000 $110,000
Campbellsville Pedestrian & Bicycle Facilities - Various sidewalks throughout the city, Connect residential areas and schools Campbellsville Pedestrian & Bicycle Facilities - Various sidewalks throughout the city, Connect residential areas and schools Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Campbellsville Taylor $102,000 $0 $25,500 $127,500
JCC PEDESTRIAN FACILITIES JCC PEDESTRIAN FACILITIES Kentucky 2002 1 (TE) 1. Pedestrian and Bicycle facilities Louisville Jefferson $300,000 $0 $75,000 $375,000
Pikeville Multi-Use Trail - upgrade of existing 1.3 mile cross country running trail to a multi-use facility with the creation of a 2-way asphalt bike lane with drainage improvements located at the Bob Amos Park Pikeville Multi-Use Trail - upgrade of existing 1.3 mile cross country running trail to a multi-use facility with the creation of a 2-way asphalt bike lane with drainage improvements located at the Bob Amos Park Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Pikeville Pike $100,000 $0 $25,000 $125,000
Renaissance Construction Project - Phase III - continued replacement of an additional 2830' of deteriorated sidewalks in historical downtown district Renaissance Construction Project - Phase III - continued replacement of an additional 2830' of deteriorated sidewalks in historical downtown district Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Independence Kenton $130,000 $0 $32,500 $162,500
Jeffersontown Bike/Ped Stone Bridge Restoration - Restore Double Arch Stone Bridge over Chenoweth Run Stream, construction of bike land and sidewalks, landscaping and creation of a bike/ped map Jeffersontown Bike/Ped Stone Bridge Restoration - Restore Double Arch Stone Bridge over Chenoweth Run Stream, construction of bike land and sidewalks, landscaping and creation of a bike/ped map Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Jeffersonville Montgomery $168,000 $0 $42,000 $210,000
Smiths Grove Sidewalk Project - construction of 11, 582' of sidewalks connecting several existing sidewalks improving pedestrian access and safety. Smiths Grove Sidewalk Project - construction of 11, 582' of sidewalks connecting several existing sidewalks improving pedestrian access and safety. Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Smiths Grove Warren $175,000 $0 $43,750 $218,750
Litchfield Pedestrian Enhancement Project - completion of approximately 3 mile stretch of sidewalks along KY 259 from the new Litchfield bypass on the south side of the city to the bypass connection on the north side of the city. Litchfield Pedestrian Enhancement Project - completion of approximately 3 mile stretch of sidewalks along KY 259 from the new Litchfield bypass on the south side of the city to the bypass connection on the north side of the city. Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Litchfield Grayson $90,000 $0 $22,500 $112,500
KY 18 and Interstate 71/75 Pedestrian Connection - construction of sidewalks along KY 18 and extending east 3,200' across I-71/75 to sidewalks at Tanners Lane KY 18 and Interstate 71/75 Pedestrian Connection - construction of sidewalks along KY 18 and extending east 3,200' across I-71/75 to sidewalks at Tanners Lane Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Florence Boone $222,000 $0 $55,500 $277,500
KY Lincoln Heritage Trail Enhancement Project KY Lincoln Heritage Trail Enhancement Project Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Frankfort Franklin $250,000 $0 $62,500 $312,500
Graves County Fancy Farm Sidewalk Project - 15,700 ft. of sidewalk along KY 80 and KY 339 in the vicinity of Fancy Farm Elementary Graves County Fancy Farm Sidewalk Project - 15,700 ft. of sidewalk along KY 80 and KY 339 in the vicinity of Fancy Farm Elementary Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Fancy Farm Graves $250,000 $0 $62,500 $312,500
Magoffin County Pedestrian Bridge - construct a ped bridge linking downtown area & Ramey Park Magoffin County Pedestrian Bridge - construct a ped bridge linking downtown area & Ramey Park Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Salyersville Magoffin $287,000 $0 $71,750 $358,750
Fort Thomas Memorial Parkway Shared-Use Path - Located along east side of Memorial Pkwy from Clover Ridge Ave north to corporate city limits, scenic corridor Fort Thomas Memorial Parkway Shared-Use Path - Located along east side of Memorial Pkwy from Clover Ridge Ave north to corporate city limits, scenic corridor Kentucky 2006 1 (TE) 1. Pedestrian and Bicycle facilities Fort Thomas Campbell $200,000 $0 $50,000 $250,000
Maysville Fire Department Education Program Safety Town Maysville Fire Department Education Program Safety Town Kentucky 2007 2 (TE) 2. Safe routes for non-drivers Maysville Mason $48,000 $0 $12,000 $60,000
Develop and coordinate a statewide bicycle and bikeway program. Develop and coordinate a statewide bicycle and bikeway program. Kentucky 1995 2 (TE) 2. Safe routes for non-drivers Statewide Statewide $76,000 $0 $19,000 $95,000
Walk with Us Walk with Us Kentucky 2009 2 (TE) 2. Safe routes for non-drivers Todd $250,000 $0 $62,500 $312,500
Battle of Richmond Project Battle of Richmond Project Kentucky 2003 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Richmond Madison $500,000 $0 $125,000 $625,000
Pine Mountain Trail/Millennium Legacy Trail Pine Mountain Trail/Millennium Legacy Trail Kentucky 2003 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $500,000 $0 $125,000 $625,000
Acquisition of the Applegate Garage Building to use as a Civil War Museum near the Riverfront and Fort Duffield. Acquisition of the Applegate Garage Building to use as a Civil War Museum near the Riverfront and Fort Duffield. Kentucky 1995 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities West Point Hardin $120,000 $0 $30,000 $150,000
Mill Springs Battlefield Acquisition and stabilize the West/Metcalf House Mill Springs Battlefield Acquisition and stabilize the West/Metcalf House Kentucky 1995 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Somerset Pulaski $200,000 $0 $0 $200,000
Protection of Lexington-Frankfort Pike Area through acquisition of historic and scenic easements for properties located on west edge of LFC Urban Service area Protection of Lexington-Frankfort Pike Area through acquisition of historic and scenic easements for properties located on west edge of LFC Urban Service area Kentucky 1994 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Lexington Fayette $1,008,000 $0 $252,000 $1,260,000
Purchase cave and related historic buildings, construct trails and lighting for Natural Karst Research laboratory to improve mitigation of water pollution associated with highway runoff. Purchase cave and related historic buildings, construct trails and lighting for Natural Karst Research laboratory to improve mitigation of water pollution associated with highway runoff. Kentucky 1995 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Horse Cave Hart $350,000 $0 $87,500 $437,500
Preserve 13 miles of US 60 through the acquisition of scenic or historic easements and construct a pedestrian and bicycle path from downtown Versailles 2 miles along US 62 to the county park. Preserve 13 miles of US 60 through the acquisition of scenic or historic easements and construct a pedestrian and bicycle path from downtown Versailles 2 miles along US 62 to the county park. Kentucky 1996 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Versailles Woodford $400,000 $0 $100,000 $500,000
Ward Hall; will allow for the acquisition of Ward Hall, the outbuildings, and 40 acres. On Preservation Kentucky's inaugural \Kentucky's Most Endangered Historic Places\" list" Ward Hall; will allow for the acquisition of Ward Hall, the outbuildings, and 40 acres. On Preservation Kentucky's inaugural \Kentucky's Most Endangered Historic Places\" list" Kentucky 2005 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Georgetown Scott $500,000 $0 $125,000 $625,000
Goddard Covered Bridge Land Preservation; preservation of land surrounding bridge will ensure there will be space to provide for the premier tourism activity in Fleming County (The Annual Covered Bridge Festival); Festival has received \Top 20 Events in t" Goddard Covered Bridge Land Preservation; preservation of land surrounding bridge will ensure there will be space to provide for the premier tourism activity in Fleming County (The Annual Covered Bridge Festival); Festival has received \Top 20 Events in t" Kentucky 2005 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Flemingsburg Fleming $80,000 $0 $20,000 $100,000
Mill Springs Battlefield historic site preservation; funding to assist the Mill Springs Battlefield Assoc., with the purchase of two adjoining tracts of land at the MSBPark Mill Springs Battlefield historic site preservation; funding to assist the Mill Springs Battlefield Assoc., with the purchase of two adjoining tracts of land at the MSBPark Kentucky 2005 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Somerset Pulaski $880,000 $0 $220,000 $1,100,000
Acquisition of additional Shaker land at South Union Shaker Village Historic Site. Acquisition of additional Shaker land at South Union Shaker Village Historic Site. Kentucky 1996 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Russellville Logan $100,000 $0 $25,000 $125,000
SACRAMENTO BATTLEFIELD & CAMP CALHOUN SACRAMENTO BATTLEFIELD & CAMP CALHOUN Kentucky 2002 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Calhoun Mclean $292,500 $0 $73,125 $365,625
Battle of Richmond Preservation Project Battle of Richmond Preservation Project Kentucky 2009 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Richmond Madison $440,000 $0 $110,000 $550,000
Confederate Camp Expansion at Camp Wildcat Confederate Camp Expansion at Camp Wildcat Kentucky 2007 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities London Laurel $17,500 $0 $4,375 $21,875
Lower Howard's Creek Nature & Heritage Preserve Lower Howard's Creek Nature & Heritage Preserve Kentucky 2009 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Winchester Clark $601,000 $0 $150,250 $751,250
Sacramento Battlefield & Camp Calhoun Sacramento Battlefield & Camp Calhoun Kentucky 2000 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Calhoun Mclean $227,000 $0 $56,750 $283,750
Acquisition of Shaker buildings, in the vicinity of Shaker Village. Acquisition of Shaker buildings, in the vicinity of Shaker Village. Kentucky 1993 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities South Union Logan $500,000 $0 $250,000 $750,000
Wayne Co. Battlefield Acquisition & Preservation Wayne Co. Battlefield Acquisition & Preservation Kentucky 2007 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Monticello Wayne $160,000 $0 $40,000 $200,000
Acquisition of Land - Mill Springs Battlefield Acquisition of Land - Mill Springs Battlefield Kentucky 2007 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Somerset Pulaski $560,000 $0 $140,000 $700,000
Lincoln County Traveler's Rest Preservation - 416 acre conservation easement for the historic farm settled by Kentucky's 1st and 5th Governor, Isaac Shelby Lincoln County Traveler's Rest Preservation - 416 acre conservation easement for the historic farm settled by Kentucky's 1st and 5th Governor, Isaac Shelby Kentucky 2006 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Stanford Lincoln $998,000 $0 $249,500 $1,247,500
Traveler's Rest Preservation Phase II Traveler's Rest Preservation Phase II Kentucky 2008 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Stanford Lincoln $750,000 $0 $187,500 $937,500
Acquisition of Original Shaker Complex at South Union Acquisition of Original Shaker Complex at South Union Kentucky 2000 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Russellville Logan $236,000 $0 $59,000 $295,000
TRAIL OF TEARS SITE ACQUISITION TRAIL OF TEARS SITE ACQUISITION Kentucky 2000 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Hopkinsville Christian $350,000 $0 $87,500 $437,500
Middlecreek Battlefield Site Acquisition, design and construction of a parking area & landscaping around kiosk, construction of battlefield loop trail, vista clearing, signs, restoration of Mt. Sterling-Pound Gap Road, clearing & development of graveyard Middlecreek Battlefield Site Acquisition, design and construction of a parking area & landscaping around kiosk, construction of battlefield loop trail, vista clearing, signs, restoration of Mt. Sterling-Pound Gap Road, clearing & development of graveyard Kentucky 1999 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Prestonsburg Floyd $173,750 $0 $250,000 $423,750
Mill Springs Battlefield Acquisition Mill Springs Battlefield Acquisition Kentucky 2000 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Somerset Pulaski $500,000 $0 $125,000 $625,000
Perryville Battlefield Preservation to include acquisition of several battlefield properties Perryville Battlefield Preservation to include acquisition of several battlefield properties Kentucky 1993 3 (TE) 3. Historic Preservation & Rehab of Historic Transportation Facilities Perryville Boyle $1,000,000 $0 $250,000 $1,250,000
US 68 Visitor's Center, Downtown Hardware Store Building; Neal Building Restoration US 68 Visitor's Center, Downtown Hardware Store Building; Neal Building Restoration Kentucky 2005 4 (TE) 4. Scenic Turnouts and Overlooks Carlisle Nicholas $240,000 $0 $60,000 $300,000
Grayson Historic Enhancement Project - Replace historical plaques in the Main Street District, lighting & landscaping Grayson Historic EnhancementProject - Replace historical plaques in the Main Street District, lighting & landscaping Kentucky 2006 4 (TE) 4. Scenic Turnouts and Overlooks Grayson Carter $48,000 $0 $12,000 $60,000
Diamond Point Visitor's Center Diamond Point Visitor's Center Kentucky 2004 4 (TE) 4. Scenic Turnouts and Overlooks Harrodsburg Mercer $87,600 $0 $21,900 $109,500
Hatfield/McCoy Feud Driving Tour; project funding will enhance driving tour and site development and improvements at several feud related sites in the county. The kiosk will feature a map showing the location of the Hatfield/McCoy sites, allowing touris Hatfield/McCoy Feud Driving Tour; project funding will enhance driving tour and site development and improvements at several feud related sites in the county. The kiosk will feature a map showing the location of the Hatfield/McCoy sites, allowing touris Kentucky 2005 4 (TE) 4. Scenic Turnouts and Overlooks Pikeville Pike $100,000 $0 $25,000 $125,000
BIG HILL WELCOME CENTER (COX-SIMPSON HOUSE) - Jim Hayes - Nature Conservancy - contact BIG HILL WELCOME CENTER (COX-SIMPSON HOUSE) - Jim Hayes - Nature Conservancy - contact Kentucky 2002 4 (TE) 4. Scenic Turnouts and Overlooks Mckee Jackson $150,000 $0 $37,500 $187,500
Highway 68/80 Heritage Corridor; project will establish an east-west heritage corridor along the historic transportation route that will emphasize cultural, heritage and safety while bringing economic growth back to the communities; special emphasis will Highway 68/80 Heritage Corridor; project will establish an east-west heritage corridor along the historic transportation route that will emphasize cultural, heritage and safety while bringing economic growth back to the communities; special emphasis will Kentucky 2005 4 (TE) 4. Scenic Turnouts and Overlooks Edmonton Metcalfe $80,000 $0 $20,000 $100,000
Tebbs Bend Toll House Project; Will be WELCOME/EDUCATIONAL CENTER; renovation of toll house located on property entered in the National Register and owned by the Tebbs Bend Battlefield Assoc. Tebbs Bend Toll House Project; Will be WELCOME/EDUCATIONAL CENTER; renovation of toll house located on property entered in the National Register and owned by the Tebbs Bend Battlefield Assoc. Kentucky 2005 4 (TE) 4. Scenic Turnouts and Overlooks Campbellsville Taylor $58,313 $0 $14,578 $72,891
Historical highway marker restoration of 35 markers Historical highway marker restoration of 35 markers Kentucky 2005 4 (TE) 4. Scenic Turnouts and Overlooks Statewide Statewide $20,000 $0 $5,000 $25,000
Henderson Visitor's Center (Project replaces Acquisition & Renovation of Depot) Henderson Visitor's Center (Project replaces Acquisition & Renovation of Depot) Kentucky 2003 4 (TE) 4. Scenic Turnouts and Overlooks Henderson Henderson $300,000 $0 $75,000 $375,000
Bardstown Visitor's Center (Courthouse Renovation) Bardstown Visitor's Center (Courthouse Renovation) Kentucky 2003 4 (TE) 4. Scenic Turnouts and Overlooks Bardstown Nelson $200,000 $0 $50,000 $250,000
Kentucky Gateway Museum Project Kentucky Gateway Museum Project Kentucky 2008 4 (TE) 4. Scenic Turnouts and Overlooks Maysville Mason $85,500 $0 $21,375 $106,875
Western Kentucky African-American Heritage Center/Visitor's Center - Restoration of historic buildings for use as secure depository for artifacts Western Kentucky African-American Heritage Center/Visitor's Center - Restoration of historic buildings for use as secure depository for artifacts Kentucky 2003 4 (TE) 4. Scenic Turnouts and Overlooks Russellville Logan $200,000 $0 $50,000 $250,000
Develop a community heritage tourism signing plan for Frankfort and Franklin County Develop a community heritage tourism signing plan for Frankfort and Franklin County Kentucky 1997 4 (TE) 4. Scenic Turnouts and Overlooks Frankfort Franklin $42,016 $0 $10,234 $52,250
Jenkins Welcome Center Jenkins Welcome Center Kentucky 2007 4 (TE) 4. Scenic Turnouts and Overlooks Whitesburg Letcher $600,000 $0 $150,000 $750,000
Ohio Riverbend Overlook; Reconstruct the existing wall, pave parking area and enhance the aesthetics of the overlook. Ohio Riverbend Overlook; Reconstruct the existing wall, pave parking area and enhance the aesthetics of the overlook. Kentucky 2004 4 (TE) 4. Scenic Turnouts and Overlooks Warsaw Gallatin $35,000 $0 $0 $35,000
PARK CITY HERITAGE WELCOME CENTER PARK CITY HERITAGE WELCOME CENTER Kentucky 2002 4 (TE) 4. Scenic Turnouts and Overlooks Park City Barren $550,000 $0 $137,500 $687,500
LIBERTY WELCOME CENTER LIBERTY WELCOME CENTER Kentucky 2002 4 (TE) 4. Scenic Turnouts and Overlooks Liberty Casey $25,000 $0 $6,250 $31,250
MORGAN IN KENTUCKY HERITAGE TRAIL Layout, design and manufacture of 35 interpretative signs, 35 destination signs, 220 directional signs, and installation of all, research, graphic artist, brochure design, and brochure printing for the Morgan in Kentucky MORGAN IN KENTUCKY HERITAGE TRAIL Layout, design and manufacture of 35 interpretative signs, 35 destination signs, 220 directional signs, and installation of all, research, graphic artist, brochure design, and brochure printing for the Morgan in Kentucky Kentucky 2000 4 (TE) 4. Scenic Turnouts and Overlooks Statewide Statewide $171,360 $0 $42,840 $214,200
Montgomery Co. History Museum & Visitor Center Phase II Montgomery Co. History Museum & Visitor Center Phase II Kentucky 2009 4 (TE) 4. Scenic Turnouts and Overlooks Montgomery $200,000 $0 $50,000 $250,000
Establishment of state scenic roads program Establishment of state scenic roads program Kentucky 1994 4 (TE) 4. Scenic Turnouts and Overlooks Statewide Statewide $400,000 $0 $100,000 $500,000
KY Historical Society Historic Markers - Phase II - provides funding for the purchase of historic markers to be placed throughout the state KY Historical Society Historic Markers - Phase II - provides funding for the purchase of historic markers to be placed throughout the state Kentucky 2006 4 (TE) 4. Scenic Turnouts and Overlooks Frankfort Franklin $64,000 $0 $16,000 $80,000
Enhancement and preservation of scenic and historic areas within corridor through historic preservation, tourism, education, landscaping and other beautification activities Enhancement and preservation of scenic and historic areas within corridor through historic preservation, tourism, education, landscaping and other beautification activities Kentucky 1994 4 (TE) 4. Scenic Turnouts and Overlooks Lexington Fayette $20,514 $0 $359,486 $380,000
Slade Welcome Center Project Slade Welcome Center Project Kentucky 2009 4 (TE) 4. Scenic Turnouts and Overlooks Slade Powell $429,130 $0 $107,282 $536,412
ELLIOTT COUNTY/LAUREL GORGE WELCOME CENTER Construction of a 4200?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢ Welcome Center on former Route 7 & 32 overlooking Laurel Gorge, the hub of Elliott County?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢s Tourism Development project. Included are parking, walkways, canoe launch, indoor interpretive ELLIOTT COUNTY/LAUREL GORGE WELCOME CENTER Construction of a 4200?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢ Welcome Center on former Route 7 & 32 overlooking Laurel Gorge, the hub of Elliott County?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢s Tourism Development project. Included are parking, walkways, canoe launch, indoor interpretive Kentucky 2000 4 (TE) 4. Scenic Turnouts and Overlooks Sandy Hook Elliott $300,000 $0 $131,206 $431,206
To repair 100 damaged or deteriorated highway markers in all 12 highway districts, and to erect seven markers recognizing African-American heritage in Kentucky. To repair 100 damaged or deteriorated highway markers in all 12 highway districts, and to erect seven markers recognizing African-American heritage in Kentucky. Kentucky 1995 4 (TE) 4. Scenic Turnouts and Overlooks Statewide Statewide $33,860 $0 $17,890 $51,750
Trenton Streetscape; will provide new sidewalks, lamp posts, a pedestrian crosswalk on Clarksville Road, and the additional street furniture Trenton Streetscape; will provide new sidewalks, lamp posts, a pedestrian crosswalk on Clarksville Road, and the additional street furniture Kentucky 2005 5 (TE) 5. Vegetation Management Trenton Todd $84,000 $0 $21,000 $105,000
Eminence Streetscape-Phase III; design and construction of new sidewalks, curbs, bury utilities, lighting and landscaping. Eminence Streetscape-Phase III; design and construction of new sidewalks, curbs, bury utilities, lighting and landscaping. Kentucky 2004 5 (TE) 5. Vegetation Management Eminence Henry $372,269 $0 $0 $372,269
RK STREETSCAPE RK STREETSCAPE Kentucky 2002 5 (TE) 5. Vegetation Management Versailles Woodford $150,000 $0 $37,500 $187,500
Midway's Main Street Improvements Project - Final Phase of Main Street improvements, physical and aesthetic renovations on the north side of Main Street from North Winter Street to North Gratz Street and the Gratz/Main Streets intersection. Midway's Main Street Improvements Project - Final Phase of Main Street improvements, physical and aesthetic renovations on the north side of Main Street from North Winter Street to North Gratz Street and the Gratz/Main Streets intersection. Kentucky 2004 5 (TE) 5. Vegetation Management Midway Woodford $500,000 $0 $0 $500,000
RK STREETSCAPE RK STREETSCAPE Kentucky 2002 5 (TE) 5. Vegetation Management Paintsville Johnson $120,000 $0 $30,000 $150,000
RK STREETSCAPE RK STREETSCAPE Kentucky 2002 5 (TE) 5. Vegetation Management Harrodsburg Mercer $100,000 $0 $25,000 $125,000
RK STREETSCAPE RK STREETSCAPE Kentucky 2002 5 (TE) 5. Vegetation Management Russellville Logan $100,000 $0 $25,000 $125,000
Streetscape Streetscape Kentucky 1999 5 (TE) 5. Vegetation Management Murray Calloway $320,000 $0 $80,000 $400,000
Streetscape Streetscape Kentucky 1999 5 (TE) 5. Vegetation Management Shelbyville Shelby $320,000 $0 $80,000 $400,000
RK STREETSCAPE RK STREETSCAPE Kentucky 2002 5 (TE) 5. Vegetation Management Lynch Harlan $100,000 $0 $25,000 $125,000
Bloomfield Scenic Beautification; will relocate utility lines from the front of the downtown buildings to the rear of buildings near the street; will replace sidewalk that is deteriorated and has become dangerous Bloomfield Scenic Beautification; will relocate utility lines from the front of the downtown buildings to the rear of buildings near the street; will replace sidewalk that is deteriorated and has become dangerous Kentucky 2005 5 (TE) 5. Vegetation Management Bloomfield Nelson $88,000 $0 $22,000 $110,000
Plant and establish a wildflower, native plants and grasses area within the I064 EB to US 127 Ramp at Frankfort Plant and establish a wildflower, native plants and grasses area within the I064 EB to US 127 Ramp at Frankfort Kentucky 1999 5 (TE) 5. Vegetation Management Frankfort Franklin $3,195 $0 $799 $3,994
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Somerset Pulaski $240,000 $0 $60,000 $300,000
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Newport Campbell $240,000 $0 $60,000 $300,000
RK Streetscape; Streetscape elements to be addressed are safety, pedestrian surfaces, vehicular and pedestrian interaction, lighting, signage, landscaping and street furniture RK Streetscape; Streetscape elements to be addressed are safety, pedestrian surfaces, vehicular and pedestrian interaction, lighting, signage, landscaping and street furniture Kentucky 2005 5 (TE) 5. Vegetation Management Covington Kenton $436,240 $0 $109,060 $545,300
RK STREETSCAPE RK STREETSCAPE Kentucky 2002 5 (TE) 5. Vegetation Management Benham Harlan $90,000 $0 $22,500 $112,500
NATURE PRESERVE SITE NATURE PRESERVE SITE Kentucky 2002 5 (TE) 5. Vegetation Management Frankfort Bullitt $75,000 $0 $18,750 $93,750
PROVIDE PEDWAY RENOVATION, a new streetscape, and additional improvements to the Railroad Coal Mining Museum along a section of Old US 23 in downtown Jenkins. PROVIDE PEDWAY RENOVATION, a new streetscape, and additional improvements to the Railroad Coal Mining Museum along a section of Old US 23 in downtown Jenkins. Kentucky 2000 5 (TE) 5. Vegetation Management Jenkins Letcher $400,000 $0 $100,000 $500,000
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Paducah Mccracken $425,000 $0 $106,250 $531,250
RK STREETSCAPE RK STREETSCAPE Kentucky 2002 5 (TE) 5. Vegetation Management Maysville Mason $150,000 $0 $37,500 $187,500
Irvine Streetscape - sidewalk beautification along KY 52 and KY 89. Irvine Streetscape - sidewalk beautification along KY 52 and KY 89. Kentucky 2006 5 (TE) 5. Vegetation Management Irvine Estill $21,000 $0 $5,250 $26,250
South Shore Downtown Enhancement Project - Improve existing sidewalks, lighting and other streetscape activities South Shore Downtown Enhancement Project - Improve existing sidewalks, lighting and other streetscape activities Kentucky 2006 5 (TE) 5. Vegetation Management South Shore Greenup $28,000 $0 $7,000 $35,000
Germantown Streetscape Project - replacement of sidewalks and landscaping along with drainage improvements along Highway 10 Germantown Streetscape Project - replacement of sidewalks and landscaping along with drainage improvements along Highway 10 Kentucky 2006 5 (TE) 5. Vegetation Management Germantown Mason $62,000 $0 $15,500 $77,500
Hardin County/Glendale Streetscape Project - Construct sidewalks along W. Railroad Ave. and South Bell Ave., includes street lighting and various other streetscape activities. Hardin County/Glendale Streetscape Project - Construct sidewalks along W. Railroad Ave. and South Bell Ave., includes street lighting and various other streetscape activities. Kentucky 2006 5 (TE) 5. Vegetation Management Glendale Hardin $71,000 $0 $17,750 $88,750
Wilmore Downtown Green Project - sidewalk beautifications, construction of a shared use path, and landscaping in and around the town square Wilmore Downtown Green Project - sidewalk beautifications, construction of a shared use path, and landscaping in and around the town square Kentucky 2006 5 (TE) 5. Vegetation Management Wilmore Jessamine $79,000 $0 $19,750 $98,750
Louisville Preston Improvements Plan - Preston Corridor - artwork for railroad overpass eyesore Louisville Preston Improvements Plan - Preston Corridor - artwork for railroad overpass eyesore Kentucky 2006 5 (TE) 5. Vegetation Management Louisville Jefferson $80,000 $0 $20,000 $100,000
Elkton Streetscape Project - Phase I completed, downtown area, includes sidewalks, street lighting, and street furniture Elkton Streetscape Project - Phase I completed, downtown area, includes sidewalks, street lighting, and street furniture Kentucky 2006 5 (TE) 5. Vegetation Management Elkton Todd $100,000 $0 $25,000 $125,000
Flemingsburg Streetscape Improvements - sidewalk beautifications along Water Street, Main Street, Foxspring Avenue, Mt. Sterling Avenue, South Main Cross and Court Square Flemingsburg Streetscape Improvements - sidewalk beautifications along Water Street, Main Street, Foxspring Avenue, Mt. Sterling Avenue, South Main Cross and Court Square Kentucky 2006 5 (TE) 5. Vegetation Management Flemingsburg Fleming $128,000 $0 $32,000 $160,000
Lebanon Streetscape Improvements - sidewalk beautifications along KY 55 Lebanon Streetscape Improvements - sidewalk beautifications along KY 55 Kentucky 2006 5 (TE) 5. Vegetation Management Lebanon Marion $144,000 $0 $36,000 $180,000
Daviess County Frederica Street Enhancement Project- Conversion of gas station property to a sculpture garden, landscaping, pedestrian facilities, sidewalks, etc. Daviess County Frederica Street Enhancement Project- Conversion of gas station property to a sculpture garden, landscaping, pedestrian facilities, sidewalks, etc. Kentucky 2006 5 (TE) 5. Vegetation Management Owensboro Daviess $153,000 $0 $38,250 $191,250
Lexington Versailles Road Corridor Enhancements - Landscaping for Versailles Road from New Circle Rd. inbound to the Maxwell & High Street Intersection Lexington Versailles Road Corridor Enhancements - Landscaping for Versailles Road from New Circle Rd. inbound to the Maxwell & High Street Intersection Kentucky 2006 5 (TE) 5. Vegetation Management Lexington Fayette $192,000 $0 $48,000 $240,000
RK - Streetscape RK - Streetscape Kentucky 2002 5 (TE) 5. Vegetation Management Morehead Rowan $200,000 $0 $50,000 $250,000
RK STREETSCAPE - Old Washington RK STREETSCAPE - Old Washington Kentucky 2002 5 (TE) 5. Vegetation Management Maysville Mason $250,000 $0 $62,500 $312,500
RK STREETSCAPE RK STREETSCAPE Kentucky 2002 5 (TE) 5. Vegetation Management Stanford Lincoln $200,000 $0 $50,000 $250,000
BRANDENBURG STREETSCAPE IMPROVEMENTS BRANDENBURG STREETSCAPE IMPROVEMENTS Kentucky 2002 5 (TE) 5. Vegetation Management Brandenburg Meade $100,000 $0 $25,000 $125,000
Hazard Streetscape; construction of sidewalk along West Main Street, a ped plaza near City Hall, crosswalk improvements and paking signage throughout downtown Hazard Streetscape; construction of sidewalk along West Main Street, a ped plaza near City Hall, crosswalk improvements and paking signage throughout downtown Kentucky 2005 5 (TE) 5. Vegetation Management Hazard Perry $141,524 $0 $35,381 $176,905
RK STREETSCAPE RK STREETSCAPE Kentucky 2002 5 (TE) 5. Vegetation Management Greensburg Green $200,000 $0 $50,000 $250,000
Guthrie Streetscape; replacement of existing sidewalks, gutters and curbs; creation of crosswalks and makes sidewalks handicap accessible; purchase street lamps and street furniture. Guthrie Streetscape; replacement of existing sidewalks, gutters and curbs; creation of crosswalks and makes sidewalks handicap accessible; purchase street lamps and street furniture. Kentucky 2005 5 (TE) 5. Vegetation Management Guthrie Todd $221,168 $0 $55,292 $276,460
Greensburg Streetscape - Phase III; will complete renovation of public square portion of Greensburg's master plan; includes removing overhead wires and placing underground, replacing streetlights with lamp posts, installing sidewalks using brick inlays an Greensburg Streetscape - Phase III; will complete renovation of public square portion of Greensburg's master plan; includes removing overhead wires and placing underground, replacing streetlights with lamp posts, installing sidewalks using brick inlays an Kentucky 2005 5 (TE) 5. Vegetation Management Greensburg Green $402,038 $0 $100,510 $502,548
Streetscape Streetscape Kentucky 1999 5 (TE) 5. Vegetation Management Frankfort Franklin $700,000 $0 $175,000 $875,000
RK Streetscape RK Streetscape Kentucky 2002 5 (TE) 5. Vegetation Management Dawson Springs Hopkins $200,000 $0 $50,000 $250,000
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Carrollton Carroll $249,499 $0 $62,375 $311,874
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Frankfort Franklin $250,000 $0 $62,500 $312,500
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Murray Calloway $260,000 $0 $65,000 $325,000
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Paintsville Johnson $280,000 $0 $70,000 $350,000
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Danville Boyle $300,000 $0 $75,000 $375,000
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Lynch Harlan $300,000 $0 $75,000 $375,000
Landscape Design and Landscaping on various Interstate Routes in Louisville Landscape Design and Landscaping on various Interstate Routes in Louisville including I-264/US 60 Interchange and hedge screening in the median of I-65 in Louisville Kentucky 1993 5 (TE) 5. Vegetation Management Louisville Jefferson $155,946 $0 $38,987 $194,933
Landscape Design and Landscaping on various Interstate Routes in Louisville Landscape Design and Landscaping on various Interstate Routes in Louisville including I-264/US 60 Interchange and hedge screening in the median of I-65 in Louisville Kentucky 1993 5 (TE) 5. Vegetation Management Louisville Jefferson $321,372 $0 $80,343 $401,715
Landscape Design and Landscaping on various Interstate Routes in Louisville including I-264/US 60 Interchange and hedge screening in the median of I-65 in Louisville Landscape Design and Landscaping on various Interstate Routes in Louisville including I-264/US 60 Interchange and hedge screening in the median of I-65 in Louisville Kentucky 1993 5 (TE) 5. Vegetation Management Louisville Jefferson $1,824,123 $0 $456,031 $2,280,154
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Henderson Henderson $300,000 $0 $75,000 $375,000
RK - Streetscape RK - Streetscape Kentucky 2000 5 (TE) 5. Vegetation Management Hopkinsville Christian $400,000 $0 $100,000 $500,000
RK Streetscape RK Streetscape Kentucky 2002 5 (TE) 5. Vegetation Management Eminence Henry $200,000 $0 $50,000 $250,000
Streetscape Streetscape Kentucky 1999 5 (TE) 5. Vegetation Management Paducah Mccracken $650,000 $0 $162,500 $812,500
Streetscape Project Final Phase Streetscape Project Final Phase Kentucky 2008 5 (TE) 5. Vegetation Management Morehead Rowan $302,300 $0 $75,575 $377,875
Earlington Decorative Lighting Project Earlington Decorative Lighting Project Kentucky 2009 5 (TE) 5. Vegetation Management Earlington Hopkins $38,850 $0 $9,712 $48,562
Landscaping & Beautification Project Landscaping & Beautification Project Kentucky 2009 5 (TE) 5. Vegetation Management Augusta Bracken $40,000 $0 $10,000 $50,000
Courthouse Square Beautification Project Courthouse Square Beautification Project Kentucky 2009 5 (TE) 5. Vegetation Management Wickliffe Ballard $64,630 $0 $16,157 $80,787
Access Hopkinsville Streetscape Project Phase II Access Hopkinsville Streetscape Project Phase II Kentucky 2009 5 (TE) 5. Vegetation Management Hopkinsville Christian $300,000 $0 $75,000 $375,000
Streetscape Renovation Project Phase III Streetscape Renovation Project Phase III Kentucky 2009 5 (TE) 5. Vegetation Management Versailles Woodford $400,000 $0 $100,000 $500,000
Beattyville Streetscape Project Phase II Beattyville Streetscape Project Phase II Kentucky 2009 5 (TE) 5. Vegetation Management Beattyville Lee $600,000 $0 $150,000 $750,000
South Limestone Streetscape Improvements South Limestone Streetscape Improvements Kentucky 2009 5 (TE) 5. Vegetation Management Fayette $750,000 $0 $187,500 $937,500
Fountain Square Beautification Project Fountain Square Beautification Project Kentucky 2009 5 (TE) 5. Vegetation Management Somerset Pulaski $800,000 $0 $200,000 $1,000,000
Downtown Beautification Project Downtown Beautification Project Kentucky 2009 5 (TE) 5. Vegetation Management Harrodsburg Mercer $8,000 $0 $2,000 $10,000
Paducah Streetscape Renaissance Paducah Streetscape Renaissance Kentucky 2003 5 (TE) 5. Vegetation Management Paducah Mccracken $300,000 $0 $75,000 $375,000
Morton's Gap Trail Lighting Project Morton's Gap Trail Lighting Project Kentucky 2009 5 (TE) 5. Vegetation Management Mortons Gap Hopkins $90,000 $0 $22,500 $112,500
Streetscape Project Phase IV Streetscape Project Phase IV Kentucky 2009 5 (TE) 5. Vegetation Management Middletown Jefferson $210,300 $0 $52,575 $262,875
Pikeville Utility Relocation - Phase 3 Pikeville Utilitity Relocation - Phase 3 Kentucky 2003 5 (TE) 5. Vegetation Management Pikeville Pike $500,000 $0 $125,000 $625,000
Kentucky Urban Youth Corp, a partnership among the City of Frankfort, KSU, Social Service Agencies, Transportation Cabinet and FHWA to provide life skills and training to disadvantaged, at-risk youth in the community, including a work component in conjunc Kentucky Urban Youth Corp, a partnership among the City of Frankfort, KSU, Social Service Agencies, Transportation Cabinet and FHWA to provide life skills and training to disadvantaged, at-risk youth in the community, including a work component in conjunc Kentucky 1997 5 (TE) 5. Vegetation Management Frankfort Franklin $50,000 $0 $12,500 $62,500
Transportation Green Pride Phase II Transportation Green Pride Phase II Kentucky 2009 5 (TE) 5. Vegetation Management Greenville Muhlenburg $412,100 $0 $103,025 $515,125
I-264 Fairgrounds & Airport Exits Landscaping Project I-264 Fairgrounds & Airport Exits Landscaping Project Kentucky 2009 5 (TE) 5. Vegetation Management Louisville Jefferson $696,634 $0 $174,158 $870,792
Central Square Streetscape Project Central Square Streetscape Project Kentucky 2009 5 (TE) 5. Vegetation Management Bardstown Nelson $0 $1,900,000 $475,000 $2,375,000
Taylor Co Courthouse Square Renovation Taylor Co Courthouse Square Renovation Kentucky 2007 5 (TE) 5. Vegetation Management Campbellsville Taylor $131,000 $0 $32,750 $163,750
Fleming County Court House Streetscape Fleming County Court House Streetscape Kentucky 2007 5 (TE) 5. Vegetation Management Flemingsburg Fleming $57,500 $0 $14,375 $71,875
Newtown Pike Landscaping Newtown Pike Landscaping Kentucky 2007 5 (TE) 5. Vegetation Management Lexington Fayette $208,000 $0 $52,000 $260,000
Silver Grove Streetscape Improvement Project Silver Grove Streetscape Improvement Project Kentucky 2007 5 (TE) 5. Vegetation Management Silver Grove Campbell $49,000 $0 $12,250 $61,250
Horse Cave Main Street Streetscape Final Phase Horse Cave Main Street Streetscape Final Phase Kentucky 2007 5 (TE) 5. Vegetation Management Horse Cave Hart $40,400 $0 $10,100 $50,500
RK - Streetscape RK - Streetscape Kentucky 2003 5 (TE) 5. Vegetation Management Morehead Rowan $200,000 $0 $50,000 $250,000
Eminence Streetscape - Phase 2 Eminence Streetscape - Phase 2 Kentucky 2003 5 (TE) 5. Vegetation Management Eminence Henry $200,000 $0 $50,000 $250,000
Marion Streetscape through the major commercial district. Street lamps, patterned crosswalks, landscaping and burial of utility lines Marion Streetscape through the major commercial district. Street lamps, patterned crosswalks, landscaping and burial of utility lines Kentucky 2003 5 (TE) 5. Vegetation Management Marion Crittenden $200,000 $0 $50,000 $250,000
Streetscape Improvements Streetscape Improvements Kentucky 2003 5 (TE) 5. Vegetation Management Jackson Breathitt $200,000 $0 $50,000 $250,000
Urban Youth Corp for disadvantaged youth to work in conjunction with enhancement projects at Valley View Ferry and Masterson Station Park in Fayette County Urban Youth Corp for disadvantaged youth to work in conjunction with enhancement projects at Valley View Ferry and Masterson Station Park in Fayette County Kentucky 1997 5 (TE) 5. Vegetation Management Frankfort Fayette $50,000 $0 $12,500 $62,500
Development of the Kentucky Urban Youth Corp. who will assist with the construction and landscaping of the Frankfort Riverview Pedestrian Loop. Development of the Kentucky Urban Youth Corp. who will assist with the construction and landscaping of the Frankfort Riverview Pedestrian Loop. Kentucky 1996 5 (TE) 5. Vegetation Management Frankfort Franklin $64,500 $0 $16,125 $80,625
Danville Streetscape Improvements Project Danville Streetscape Improvements Project Kentucky 2003 5 (TE) 5. Vegetation Management Danville Boyle $200,000 $0 $50,000 $250,000
Streetscape Improvements, Phase III Streetscape Improvements, Phase III Kentucky 2003 5 (TE) 5. Vegetation Management Scottsville Allen $180,000 $0 $45,000 $225,000
Horse Cave Streetscape Enhancement Project Horse Cave Streetscape Enhancement Project Kentucky 2003 5 (TE) 5. Vegetation Management Horse Cave Hart $150,000 $0 $37,500 $187,500
RK STREETSCAPE RK STREETSCAPE Kentucky 2003 5 (TE) 5. Vegetation Management Ashland Boyd $100,000 $0 $25,000 $125,000
Ludlow Streetscape Phase II Ludlow Streetscape Phase II Kentucky 2008 5 (TE) 5. Vegetation Management Ludlow Kenton $398,000 $0 $99,500 $497,500
Main Street/Renaissance Area Improvements. Restore sidewalks, install ADA accessible ingress and egress, remove non-conforming tree stock, bury preservation/restoration of Old Olive Hill High School gymnasium Main Street/Renaissance Area Improvements. Restore sidewalks, install ADA accessible ingress and egress, remove non-conforming tree stock, bury preservation/restoration of Old Olive Hill High School gymnasium Kentucky 2003 5 (TE) 5. Vegetation Management Carrollton Carroll $100,000 $0 $25,000 $125,000
Lynch Renaissance District Streetscape and Sidewalks Lynch Renaissance District Streetscape and Sidewalks Kentucky 2003 5 (TE) 5. Vegetation Management Lynch Harlan $100,000 $0 $25,000 $125,000
Urban Youth Corp for Lexington-Fayette County Urban Youth Corp for Lexington-Fayette County Kentucky 2003 5 (TE) 5. Vegetation Management Frankfort Fayette $100,000 $0 $0 $100,000
Streetscape Amenities including Utility Relocation Streetscape Amenities including Utility Relocation Kentucky 2003 5 (TE) 5. Vegetation Management Greensburg Green $100,000 $0 $0 $100,000
Sharpsburg Landscaping Sharpsburg Landscaping Kentucky 2007 5 (TE) 5. Vegetation Management Sharpsburg Bath $12,000 $0 $3,000 $15,000
Crestview Hills Landscaping Project (Dixie Highway Median Beautification) Crestview Hills Landscaping Project (Dixie Highway Median Beautification) Kentucky 2007 5 (TE) 5. Vegetation Management Crestview Hills Kenton $26,100 $0 $6,525 $32,625
Simpson County Scenic Beautification Simpson County Scenic Beautification Kentucky 2007 5 (TE) 5. Vegetation Management Franklin Simpson $46,000 $0 $11,500 $57,500
Broadway Avenue Streetscape Broadway Avenue Streetscape Kentucky 2003 5 (TE) 5. Vegetation Management Georgetown Scott $200,000 $0 $50,000 $250,000
2nd Street Streetscape Project 2nd Street Streetscape Project Kentucky 2009 5 (TE) 5. Vegetation Management Louisville Jefferson $0 $2,400,000 $600,000 $3,000,000
North Dixie Boulevard Streetscape North Dixie Boulevard Streetscape Kentucky 2008 5 (TE) 5. Vegetation Management Radcliff Hardin $594,220 $0 $148,555 $742,775
Monticello Streetscape Improvements Monticello Streetscape Improvements Kentucky 2007 5 (TE) 5. Vegetation Management Monticello Wayne $750,000 $0 $187,500 $937,500
Bardstown Streetscape Enhancemet Project Bardstown Streetscape Enhancemet Project Kentucky 2008 5 (TE) 5. Vegetation Management Bardstown Nelson $639,000 $0 $159,750 $798,750
Blue Grass Airport Beautification Project Blue Grass Airport Beautification Project Kentucky 2008 5 (TE) 5. Vegetation Management Lexington Fayette $586,000 $0 $146,500 $732,500
I-65/Exit 112 Landscaping & Beautification I-65/Exit 112 Landscaping & Beautification Kentucky 2008 5 (TE) 5. Vegetation Management Shepherdsville Bullitt $480,000 $0 $120,000 $600,000
Corridor Landscaping & Beautification Project Corridor Landscaping & Beautification Project Kentucky 2008 5 (TE) 5. Vegetation Management Florence Boone $404,500 $0 $101,125 $505,625
Campbell St. Streetscape/Transportation Museum Project Campbell St. Streetscape/Transportation Museum Project Kentucky 2008 5 (TE) 5. Vegetation Management Hopkinsville Christian $688,600 $0 $172,150 $860,750
Downtown Covington Streetscape Phase II Downtown Covington Streetscape Phase II Kentucky 2007 5 (TE) 5. Vegetation Management Covington Kenton $720,000 $0 $180,000 $900,000
Scenic beautification along US Highway 641 S. within the city limits of historic Hazel, Ky. Scenic beautification along US Highway 641 S. within the city limits of historic Hazel, Ky. Kentucky 1995 5 (TE) 5. Vegetation Management Hazel Calloway $76,000 $0 $19,000 $95,000
Develop a greenspace in vicinity of the Valley View Ferry. Develop a greenspace in vicinity of the Valley View Ferry. Kentucky 1995 5 (TE) 5. Vegetation Management Lexington Fayette $30,000 $0 $7,500 $37,500
Public Square Beautification Public Square Beautification Kentucky 2008 5 (TE) 5. Vegetation Management Columbia Adair $12,500 $0 $3,125 $15,625
US 431 Scenic Beautification Project US 431 Scenic Beautification Project Kentucky 2008 5 (TE) 5. Vegetation Management Livermore Mclean $24,000 $0 $6,000 $30,000
M.T. Lincoln House Garden M.T.Lincoln House Garden Kentucky 1995 5 (TE) 5. Vegetation Management Frankfort Fayette $25,000 $0 $125,000 $150,000
Beautification and Enhancement alongside US Highway 68-80 for approximately 5 miles Beautification and Enhancement alongside US Highway 68-80 for approximately 5 miles Kentucky 1995 5 (TE) 5. Vegetation Management Cadiz Trigg $24,000 $0 $6,000 $30,000
Streetscape Improvement Project Phase III Streetscape Improvement Project Phase III Kentucky 2008 5 (TE) 5. Vegetation Management Danville Boyle $273,000 $0 $68,250 $341,250
Augusta Ferry landing area Landscaping along Riverside Drive in character with its historic location to include installation of historic lighting, benches and trash receptacles, removal of overhead utilities, etc. Augusta Ferry landing area Landscaping along Riverside Drive in character with its historic location to include installation of historic lighting, benches and trash receptacles, removal of overhead utilities, etc. Kentucky 1995 5 (TE) 5. Vegetation Management Maysville Bracken $75,200 $0 $18,800 $94,000
Health Way North South Trail Landscaping Health Way North South Trail Landscaping Kentucky 2007 5 (TE) 5. Vegetation Management Lexington Fayette $700,000 $0 $175,000 $875,000
Bellevue Historic Downtown Enhancement Project. Installation of historic ornamental lampposts Bellevue Historic Downtown Enhancement Project. Installation of historic ornamental lampposts Kentucky 2003 5 (TE) 5. Vegetation Management Bellevue Campbell $250,000 $0 $62,500 $312,500
Russellville Streetscape Phase II Russellville Streetscape Phase II Kentucky 2007 5 (TE) 5. Vegetation Management Russellville Logan $325,000 $0 $81,250 $406,250
Harlan Sidewalk Replacement & Streetscape Phase II Harlan Sidewalk Replacement & Streetscape Phase II Kentucky 2007 5 (TE) 5. Vegetation Management Harlan Harlan $240,000 $0 $60,000 $300,000
Dixie Highway Pedestrian Facilities & Scenic Beautification Dixie Highway Pedestrian Facilities & Scenic Beautification Kentucky 2007 5 (TE) 5. Vegetation Management Erlanger Kenton $310,150 $0 $77,537 $387,687
Scottsville Streetscape Scottsville Streetscape Kentucky 2007 5 (TE) 5. Vegetation Management Scottsville Allen $287,000 $0 $71,750 $358,750
Owingsville Downtown Revitilization Owingsville Dowtown Revitilization Kentucky 2007 5 (TE) 5. Vegetation Management Owingsville Bath $300,000 $0 $75,000 $375,000
Elkton Historic District Landscape Phase II Elkton Historic District Landscape Phase II Kentucky 2007 5 (TE) 5. Vegetation Management Elkton Todd $300,000 $0 $75,000 $375,000
London Streetscape Phase II London Streetscape Phase II Kentucky 2007 5 (TE) 5. Vegetation Management London Laurel $300,000 $0 $75,000 $375,000
Freedom Park Landscaping & Beautification Project Freedom Park Landscaping & Beautification Project Kentucky 2008 5 (TE) 5. Vegetation Management Louisville Jefferson $1,612,000 $0 $403,000 $2,015,000
LaGrange Historic Preservation & Streetscape LaGrange Historic Preservation & Streetscape Kentucky 2007 5 (TE) 5. Vegetation Management Lagrange Oldham $354,400 $0 $88,600 $443,000
Depot Street Restoration Project Depot Street Restoration Project Kentucky 2008 5 (TE) 5. Vegetation Management Winchester Clark $909,000 $0 $227,250 $1,136,250
Repair 50 and Repaint 63 historical markers & create a website of all Repair 50 and Repaint 63 historical markers & create a website of all Kentucky 1999 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $10,544 $0 $30,056 $40,600
Streetscape Streetscape Kentucky 1999 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Mount Sterling Montgomery $8,685 $0 $2,171 $10,856
JAIL REHABILITATION JAIL REHABILITATION Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Cynthiana Harrison $75,000 $0 $18,750 $93,750
Lower Howard's Creek Nature and Heritage Preserve; archeological and architectural research at historic Martin's Mill; stabilization of the John Martin House and rebuilding historic rock fences adjacent to Lower Howard's Creek Road. Lower Howard's Creek Nature and Heritage Preserve; archeological and architectural research at historic Martin's Mill; stabilization of the John Martin House and rebuilding historic rock fences adjacent to Lower Howard's Creek Road. Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Winchester Clark $200,000 $0 $0 $200,000
Fred M. Vinson Tourist/Welcome Center; rehabilitate the Fred M. Vinson brithplace and jail for use as a Tourist/Welcome Center to act as a resource for economic, tourism, and cultural development of Historic Louisa with an emphasis on Frd M. Vinson and US Fred M. Vinson Tourist/Welcome Center; rehabilitate the Fred M. Vinson brithplace and jail for use as a Tourist/Welcome Center to act as a resource for economic, tourism, and cultural development of Historic Louisa with an emphasis on Frd M. Vinson and US Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Louisa Lawrence $200,000 $0 $0 $200,000
Boone Motor Company Renovation Project; preserve the historic characteristics of the Boone Motor Company Building and stabilize the infrastructure to house a variety of Appalshop programs and activities. Boone Motor Company Renovation Project; preserve the historic characteristics of the Boone Motor Company Building and stabilize the infrastructure to house a variety of Appalshop programs and activities. Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Whitesburg Letcher $200,000 $0 $0 $200,000
Metcalfe County Courthouse Renovation Project; Renovation of Metcalfe County Courthouse, including exterior brick paint removal, HVAC, electrical, plumbing, lighting, stairs, handicap lift, elevator, restrooms and public meeting space. Metcalfe County Courthouse Renovation Project; Renovation of Metcalfe County Courthouse, including exterior brick paint removal, HVAC, electrical, plumbing, lighting, stairs, handicap lift, elevator, restrooms and public meeting space. Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Edmonton Metcalfe $200,000 $0 $0 $200,000
Purchase of a historic L&N Office Car named ?ɬ¢?¢‚Ǩ¬¢?Ǭ•Kentucky?ɬ¢?¢‚Ǩ¬¢?¢‚Äû¬¢ by the Kentucky Railway Museum for use in interpretation of our railroad history Purchase of a historic L&N Office Car named ?ɬ¢?¢‚Ǩ¬¢?Ǭ•Kentucky?ɬ¢?¢‚Ǩ¬¢?¢‚Äû¬¢ by the Kentucky Railway Museum for use in interpretation of our railroad history Kentucky 1998 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities New Haven Nelson $154,000 $0 $38,500 $192,500
STONE FENCE-SHELBY COUNTY HIGH SCHOOL STONE FENCE-SHELBY COUNTY HIGH SCHOOL Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Louisville Shelby $40,000 $0 $10,000 $50,000
AMENDMENT TO INCREASE THOMAS LOGAN HOUSE FUNDING AMENDMENT TO INCREASE THOMAS LOGAN HOUSE FUNDING Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Harrodsburg Mercer $35,000 $0 $8,750 $43,750
Restoration of Hotel Metroplitan to house museum dedicated to preserving and sharing Paducah's African-American history. Complete utility installations and basic interior work necessary to make the building usable. Restoration of Hotel Metroplitan to house museum dedicated to preserving and sharing Paducah's African-American history. Complete utility installations and basic interior work necessary to make the building usable. Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Paducah Mccracken $200,000 $0 $50,000 $250,000
2nd floor renovation of CSX Depot interior for office space 2nd floor renovation of CSX Depot interior for office space Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Ashland Boyd $200,000 $0 $50,000 $250,000
McConnell House Renovation McConnell House Renovation Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Wurtland Greenup $9,714 $0 $330,000 $339,714
Latrobe's Pope Villa Latrobe's Pope Villa Kentucky 2001 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lexington Fayette $400,000 $0 $100,000 $500,000
Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Kentucky 2001 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $160,000 $0 $40,000 $200,000
CRISPUS ATTUCKS HIGH SCHOOL PRESERVATION Former school, built in 1916 by blacks for blacks; major expansion in 1957. Reinforcing exterior walls and windows, roof repair, landscape plantings, restroom renovations for ADA, HVAC, A/E fees. Intended use: c CRISPUS ATTUCKS HIGH SCHOOL PRESERVATION Former school, built in 1916 by blacks for blacks; major expansion in 1957. Reinforcing exterior walls and windows, roof repair, landscape plantings, restroom renovations for ADA, HVAC, A/E fees. Intended use: c Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Hopkinsville Christian $200,000 $0 $50,000 $250,000
MINERVA BAPTIST CHURCH REHABILITATION Interior and exterior restoration of the former Minerva Baptist Church building. MINERVA BAPTIST CHURCH REHABILITATION Interior and exterior restoration of the former Minerva Baptist Church building. Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Maysville Mason $105,648 $0 $30,000 $135,648
DRY-LAID STONE FENCING WORKSHOP FOR DBE ELIGIBLE MASONS DRY-LAID STONE FENCING WORKSHOP FOR DBE ELIGIBLE MASONS Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Fayette $5,492 $0 $1,373 $6,865
KEENE LODGE KEENE LODGE Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Nicholasville Jessamine $90,000 $0 $22,500 $112,500
Folk Art Center Folk Art Center Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Morehead Rowan $877,400 $0 $219,350 $1,096,750
Keene Lodge; completion and restoration of the Keene Lodge located in historic, predominately African-American section - Keene. Lodge will serve as TOURIST/WELCOME CENTER, museum and community center. Keene Lodge; completion and restoration of the Keene Lodge located in historic, predominately African-American section - Keene. Lodge will serve as TOURIST/WELCOME CENTER, museum and community center. Kentucky 2005 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Nicholasville Jessamine $160,000 $0 $0 $160,000
Falmouth Central City Redevelopment Initiative; project constitutes heart of city including the public library, fire station, courthouse, Kennett Tavern and numerous buisnesses; will replace sidewalks, burial of overhead utilities, removal of coal shoots Falmouth Central City Redevelopment Initiative; project constitutes heart of city including the public library, fire station, courthouse, Kennett Tavern and numerous buisnesses; will replace sidewalks, burial of overhead utilities, removal of coal shoots Kentucky 2005 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Falmouth Pendleton $328,000 $0 $82,000 $410,000
Restoration of Old National Guard Armory; will be rehabilitated, restored and preserved; will allow for completion of project currently underway. Restoration of Old National Guard Armory; will be rehabilitated, restored and preserved; will allow for completion of project currently underway. Kentucky 2005 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Carlisle Nicholas $391,000 $0 $97,750 $488,750
Taylor-Masonic Building (formerly the Bus Depot) for use as a Farm Museum. Taylor-Masonic Building (formerly the Bus Depot) for use as a Farm Museum. Kentucky 1996 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lewisport Hancock $40,000 $0 $0 $40,000
Acquire and complete the restoration of the Academy building to preserve the building for future use as a Heritage Tourism Center. Acquire and complete the restoration of the Academy building to preserve the building for future use as a Heritage Tourism Center. Kentucky 1996 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Pikeville Pike $100,000 $0 $25,000 $125,000
South Central Kentucky Cultural Center-Historic Kentucky Pants Factory, Phase II South Central Kentucky Cultural Center-Historic Kentucky Pants Factory, Phase II Kentucky 1996 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Glasgow Barren $200,000 $0 $0 $200,000
American Association Building Restoration, Phase I American Association Building Restoration, Phase I Kentucky 1996 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Middlesborough Bell $200,000 $0 $0 $200,000
Pleasant Retreat, home of William Owsley, Governor or Kentucky 1844-1848 Pleasant Retreat, home of William Owsley, Governor or Kentucky 1844-1848 Kentucky 1996 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lancaster Garrard $200,000 $0 $0 $200,000
Renovation of the KY Coal Mining Museum building Renovation of the KY Coal Mining Museum building Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Benham Harlan $25,628 $0 $0 $25,628
Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $60,000 $0 $15,000 $75,000
South Central Kentucky Cultural Center-Historic Kentucky Pants Factory, Phase III South Central Kentucky Cultural Center-Historic Kentucky Pants Factory, Phase III Kentucky 1998 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Glasgow Barren $320,000 $0 $80,000 $400,000
Battlefield of Richmond preservation and interpretation. Will develop VISITOR'S CENTER at the Herndon House; multi-phase project that will restore 19th century house and brick bldg, create trail system, parking area and vehicular access on 62 acres. Battlefield of Richmond preservation and interpretation. Will develop VISITOR'S CENTER at the Herndon House; multi-phase project that will restore 19th century house and brick bldg, create trail system, parking area and vehicular access on 62 acres. Kentucky 2005 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Richmond Madison $654,400 $0 $163,600 $818,000
Restore Paramount Theater Restore Paramount Theater Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Ashland Boyd $90,000 $0 $22,500 $112,500
Renovation of Salyersville National Bank, an historic building in downtown Salyersville Renovation of Salyersville National Bank, an historic building in downtown Salyersville Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Prestonsburg Magoffin $572,182 $0 $143,046 $715,228
Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $100,000 $0 $25,000 $125,000
Circa 1917 Shaker Store Restoration at South Union Circa 1917 Shaker Store Restoration at South Union Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Russellville Logan $110,600 $0 $27,650 $138,250
Exterior renovation of the Macauley Theater, a Neo-Classic Theater located on US 60 (Original commitment was $150,000, reduced by FHWA because of ineligible items) Exterior renovation of the Macauley Theater, a Neo-Classic Theater located on US 60 (Original commitment was $150,000, reduced by FHWA because of ineligible items) Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Louisville Jefferson $126,100 $0 $31,525 $157,625
Restoration of the Thomas Logan House located on US 127 for use as a living historic museum to support a variety of community activities (e.g. doll making and candle-making classes) Restoration of the Thomas Logan House located on US 127 for use as a living historic museum to support a variety of community activities (e.g. doll making and candle-making classes) Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Harrodsburg Mercer $150,000 $0 $37,500 $187,500
Taylor-Masonic Building (formerly the Bus Depot) for use as a Farm Museum. Taylor-Masonic Building (formerly the Bus Depot) for use as a Farm Museum. Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lewisport Hancock $240,000 $0 $0 $240,000
Restoration of the McConnell House Complex located off US 23 including the house, law office, and slave quarters; landscaping, sidewalks, parking area and access road improvement including associated architect and engineering fees Restoration of the McConnell House Complex located off US 23 including the house, law office, and slave quarters; landscaping, sidewalks, parking area and access road improvement including associated architect and engineering fees Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Greenup Greenup $250,000 $0 $62,500 $312,500
Renovate an old WPA Building in Hyden on KY 257 for use by various community agencies. Renovate an old WPA Building in Hyden on KY 257 for use by various community agencies. Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Hyden Leslie $250,000 $0 $62,500 $312,500
Acquire and complete the restoration of the Academy building to preserve the building for future use as a Heritage Tourism Center. Acquire and complete the restoration of the Academy building to preserve the building for future use as a Heritage Tourism Center. Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Pikeville Pike $500,000 $0 $125,000 $625,000
Woodson Property Improvements, Chapline Building Improvements, Development of Trails and signing at a Civil War Battle of Munfordville fought to gain control of a significant railroad bridge Woodson Property Improvements, Chapline Building Improvements, Development of Trails and signing at a Civil War Battle of Munfordville fought to gain control of a significant railroad bridge Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Munfordville Hart $515,000 $0 $128,750 $643,750
Estill County Courthouse Renovation; project is to restore and preserve the Estill County Courthouse to greatly enhance downtown revitalization efforts; will improve the visual experience for travelers and visitors as they drive along Main Street and Rive Estill County Courthouse Renovation; project is to restore and preserve the Estill County Courthouse to greatly enhance downtown revitalization efforts; will improve the visual experience for travelers and visitors as they drive along Main Street and Rive Kentucky 2005 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Irvine Estill $500,000 $0 $346,000 $846,000
Wall Alley Renovation; will allow for two-way traffic and the relocation of utilities to improve the streetscape along Wall Alley; landscaping and fa?É?í?Ǭ¨ade improvements will be included Wall Alley Renovation; will allow for two-way traffic and the relocation of utilities to improve the streetscape along Wall Alley; landscaping and fa?É?í?Ǭ¨ade improvements will be included Kentucky 2005 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Winchester Clark $420,848 $0 $0 $420,848
Taylor-Masonic Building (formerly the Bus Depot) for use as a Farm Museum. Taylor-Masonic Building (formerly the Bus Depot) for use as a Farm Museum. Kentucky 1998 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lewisport Hancock $250,000 $0 $0 $250,000
Restore the exterior and interior of one of the earliest gas stations in Middletown for use as a Tourist Information Center and Historic Museum Restore the exterior and interior of one of the earliest gas stations in Middletown for use as a Tourist Information Center and Historic Museum Kentucky 1998 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Middletown Jefferson $15,887 $0 $34,113 $50,000
Construction of a reproduction iron cannon carriage for the Civil War Cannon to be displayed at the Columbus-Belmont Park on the bluff above the Mississippi River and near US 51 Construction of a reproduction iron cannon carriage for the Civil War Cannon to be displayed at the Columbus-Belmont Park on the bluff above the Mississippi River and near US 51 Kentucky 1998 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Hickman $38,400 $0 $9,600 $48,000
Barlow-Rich Buildings Barlow-Rich Buildings Kentucky 1998 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Glasgow Barren $100,000 $0 $25,000 $125,000
Restoration of a Mikado Type Steam Locomotive to be used as a Railroad Museum in Paducah Restoration of a Mikado Type Steam Locomotive to be used as a Railroad Museum in Paducah Kentucky 1997 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Paducah Mccracken $100,000 $0 $25,000 $125,000
Market House Theater District Market House Theater District Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Paducah Mccracken $492,000 $0 $123,000 $615,000
South Central Kentucky Cultural Center-Historic Kentucky Pants Factory, Phase I South Central Kentucky Cultural Center-Historic Kentucky Pants Factory, Phase I Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Glasgow Barren $400,000 $0 $750,000 $1,150,000
Acquire and complete the restoration of the Academy building to preserve the building for future use as a Heritage Tourism Center. Acquire and complete the restoration of the Academy building to preserve the building for future use as a Heritage Tourism Center. Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Pikeville Pike $400,000 $0 $100,000 $500,000
Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $80,000 $0 $20,000 $100,000
Duncan Tavern, Phase II Duncan Tavern, Phase II Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Paris Bourbon $80,000 $0 $20,000 $100,000
Fa?É?í?Ǭ¨ade Restoration of old fire station Fa?É?í?Ǭ¨ade Restoration of old fire station Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Mount Sterling Montgomery $60,000 $0 $15,000 $75,000
Environmental studies for proposed Transportation Enhancement Projects throughout the state Environmental studies for proposed Transportation Enhancement Projects throughout the state Kentucky 1994 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $11,352 $0 $138,648 $150,000
Restoration of Albert Sidney Johnston House (built in 1796), located in Old Washington area of Maysville, including repair of sidewalk and landscaping Restoration of Albert Sidney Johnston House (built in 1796), located in Old Washington area of Maysville, including repair of sidewalk and landscaping Kentucky 1994 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Maysville Mason $38,000 $0 $9,500 $47,500
Preservation, investigation and interpretation of a prehistoric Indian Village Site located between I-64 and US 60 Bridge near AC of Grayson Preservation, investigation and interpretation of a prehistoric Indian Village Site located between I-64 and US 60 Bridge near AC of Grayson Kentucky 1994 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Carter $45,000 $0 $11,250 $56,250
Development, preliminary engineering, and inspection for enhancement projects. Development, preliminary engineering, and inspection for enhancement projects. Kentucky 1994 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $71,840 $0 $17,960 $89,800
Acquisition and renovation/development of core properties for the restoration of Camp Nelson (Civil War Camp). Acquisition and renovation/development of core properties for the restoration of Camp Nelson (Civil War Camp). Kentucky 1994 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Nicholasville Jessamine $100,000 $0 $25,000 $125,000
Restoration and interpretation of historic Sandford Duncan Inn, including archaeological and archival research and analysis of house and materials removed in Phase I Restoration and interpretation of historic Sandford Duncan Inn, including archaeological and archival research and analysis of house and materials removed in Phase I Kentucky 1994 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Franklin Simpson $300,000 $0 $75,000 $375,000
Pleasant Retreat, home of William Owsley, Governor or Kentucky 1844-1848 Pleasant Retreat, home of William Owsley, Governor or Kentucky 1844-1848 Kentucky 1994 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lancaster Garrard $420,000 $0 $355,000 $775,000
Preservation of historic William Whitley House to include exterior and structural requirements of building and acquisition of surrounding property to preserve integrity of site Preservation of historic William Whitley House to include exterior and structural requirements of building and acquisition of surrounding property to preserve integrity of site Kentucky 1994 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Franklin $435,000 $0 $108,750 $543,750
Acquisition and renovation/development of core properties for the restoration of Camp Nelson (Civil War Camp). Acquisition and renovation/development of core properties for the restoration of Camp Nelson (Civil War Camp). Kentucky 1994 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Nicholasville Jessamine $751,400 $0 $187,850 $939,250
Breckinridge County - Holt House Historic Bldg rehab for Visitor Center Kentucky 2012 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Addison Breckinridge $500,000 $0 $125,000 $625,000
Manchester B Project; project will restore a bldg to house the Clay County Historical Society who will operate a tourist information and Welcome Center and history museum out of the newly-restored building. Location is on Manchester's primary access corr Manchester B Project; project will restore a bldg to house the Clay County Historical Society who will operate a tourist information and Welcome Center and history museum out of the newly-restored building. Location is on Manchester's primary access corr Kentucky 2005 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Manchester Clay $30,000 $0 $7,500 $37,500
Calhoun Riverfront: A New Perspective; To enhance Calhoun's riverfront by building a bicycle/walking/running track, swings, stone picnic tables, trash cans and a shelter between track and river's edge Calhoun Riverfront: A New Perspective; To enhance Calhoun's riverfront by building a bicycle/walking/running track, swings, stone picnic tables, trash cans and a shelter between track and river's edge Kentucky 2005 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Calhoun Mclean $32,649 $0 $8,162 $40,811
MIDWAY MAIN STREET UTILITY PLAN A study will be performed to facilitate the relocation of existing overhead utility lines to underground and to provide plans and cost estimates for improvements to Main Street. This area is on the National Historic Regis MIDWAY MAIN STREET UTILITY PLAN A study will be performed to facilitate the relocation of existing overhead utility lines to underground and to provide plans and cost estimates for improvements to Main Street. This area is on the National Historic Regis Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Midway Woodford $16,000 $0 $4,000 $20,000
Dry Stone Certification Training Dry Stone Certification Training Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $6,865 $0 $1,717 $8,582
Kennett Tavern - A Regular Stop on an old Stagecoach Route through Kentucky Kennett Tavern - A Regular Stop on an old Stagecoach Route through Kentucky Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Falmouth Pendleton $350,000 $0 $321,250 $671,250
Renovation of the KY Coal Mining Museum building Renovation of the KY Coal Mining Museum building Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Benham Harlan $340,000 $0 $117,035 $457,035
Carnegie Arts Center located at 1028 Scott Blvd in Covington. Carnegie Arts Center located at 1028 Scott Blvd in Covington. Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Covington Kenton $338,470 $0 $84,618 $423,088
American Association Building Restoration, Phase II American Association Building Restoration, Phase II Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Middlesborough Bell $300,000 $0 $325,000 $625,000
Restoration of two historic buildings at 213 and 215 East Second Street in the Historic District for use by the Tourist Commission Restoration of two historic buildings at 213 and 215 East Second Street in the Historic District for use by the Tourist Commission Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Owensboro Daviess $250,000 $0 $428,680 $678,680
Rehabilitation of the 1914 Hopkinsville Post Office building which housed the city/county museum. Rehabilitation of the 1914 Hopkinsville Post Office building which housed the city/county museum. Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Hopkinsville Christian $220,915 $0 $73,180 $294,095
South Central Kentucky Cultural Center-Historic Kentucky Pants Factory, Phase IV South Central Kentucky Cultural Center-Historic Kentucky Pants Factory, Phase IV Kentucky 2000 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Glasgow Barren $100,000 $0 $25,000 $125,000
Acquire & restore the historic Samuel May House located approx. 50' from Ky 321 which bisects the City of Prestonsburg. Acquire & restore the historic Samuel May House located approx. 50' from Ky 321 which bisects the City of Prestonsburg. Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Prestonsburg Floyd $200,000 $0 $300,000 $500,000
Taylor-Masonic Building (formerly the Bus Depot) for use as a Farm Museum. Taylor-Masonic Building (formerly the Bus Depot) for use as a Farm Museum. Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lewisport Hancock $120,000 $0 $692,500 $812,500
Richmond Area Arts Center located on Lancaster Avenue in Richmond, KY. Richmond Area Arts Center located on Lancaster Avenue in Richmond, KY. Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Richmond Madison $74,000 $0 $18,500 $92,500
Renovation of the George W. Mahin house, exterior and interior for use as an African American History Museum and Community Center. Renovation of the George W. Mahin house, exterior and interior for use as an African American History Museum and Community Center. Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Franklin Simpson $50,370 $0 $12,593 $62,963
Develop and conduct training for dry-laid stone wall installation along Paris Pike and other historic stone fenced roadways Develop and conduct training for dry-laid stone wall installation along Paris Pike and other historic stone fenced roadways Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lexington Fayette $34,339 $0 $40,411 $74,750
Restoration of the Clay City National Bank Building. Restoration of the Clay City National Bank Building. Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Clay City Powell $24,842 $0 $6,211 $31,053
STONE FENCE NEAR MAIN CHANCE STONE FENCE NEAR MAIN CHANCE Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lexington Fayette $100,000 $0 $25,000 $125,000
Acquire & restore the historic Samuel May House located approx. 50' from Ky 321 which bisects the City of Prestonsburg. Acquire & restore the historic Samuel May House located approx. 50' from Ky 321 which bisects the City of Prestonsburg. Kentucky 1995 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Prestonsburg Floyd $200,000 $0 $0 $200,000
The Historic Scott County Jail Complex The Historic Scott County Jail Complex Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Georgetown Scott $150,000 $0 $0 $150,000
Signage Program for historic walking tours Signage Program for historic walking tours Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Harrodsburg Mercer $50,000 $0 $12,500 $62,500
ARMORY REHABILITATION TO ROOF ARMORY REHABILITATION TO ROOF Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Carlisle Nicholas $100,000 $0 $25,000 $125,000
Hopkinsville 1924 Fire Station and town clock fa?É?í?Ǭ¨ade restoration. Restore and preserve the fa?É?í?Ǭ¨ade of the building to maintain it's historic integrity Hopkinsville 1924 Fire Station and town clock fa?É?í?Ǭ¨ade restoration. Restore and preserve the fa?É?í?Ǭ¨ade of the building to maintain it's historic integrity Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Hopkinsville Christian $200,000 $0 $50,000 $250,000
Restore Plaza Theatre fa?É?í?Ǭ¨ade Restore Plaza Theatre fa?É?í?Ǭ¨ade Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Glasgow Barren $154,065 $0 $38,517 $192,582
Keene Lodge Visitor's Center Keene Lodge Visitor's Center Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Nicholasville Jessamine $150,000 $0 $37,500 $187,500
L & N 109 Railcar Restoration Project L & N 109 Railcar Restoration Project Kentucky 2009 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Bowling Green Warren $189,500 $0 $47,375 $236,875
Steam Locomotive Restoration Phase II Steam Locomotive Restoration Phase II Kentucky 2009 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Mccreary $600,000 $0 $150,000 $750,000
Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects. GIS of archaeological and Historic structures database. Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects. GIS of archaeological and Historic structures database. Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $128,665 $0 $32,166 $160,831
Walton Gaines Tavern Historic Transportation Museum- acquisition of the Abner Gaines House property & minor restoration repairs (stagecoach stop during the mid 19th Century) Walton Gaines Tavern Historic Transportation Museum- acquisition of the Abner Gaines House property & minor restoration repairs (stagecoach stop during the mid 19th Century) Kentucky 2006 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Walton Boone $300,000 $0 $75,000 $375,000
Carlisle Neal Building Restoration - Final Phase - HVAC, lighting, elevator, restrooms Carlisle Neal Building Restoration - Final Phase - HVAC, lighting, elevator, restrooms Kentucky 2006 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Carlisle Nicholas $280,000 $0 $70,000 $350,000
Depot Relocation Project Depot Relocation Project Kentucky 2009 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Flemingsburg Fleming $119,700 $0 $29,925 $149,625
Hitchins School Rehabilitation Project Hitchins School Rehabilitation Project Kentucky 2009 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Grayson Carter $131,709 $0 $32,927 $164,636
Camp Calhoun Civil War Museum and Visitor Center; structural stabilization of five buildings, corridor/stairs/elevator-ADA, electrical, fire sprinklers, HVAC, design, interior restoration. Camp Calhoun Civil War Museum and Visitor Center; structural stabilization of five buildings, corridor/stairs/elevator-ADA, electrical, fire sprinklers, HVAC, design, interior restoration. Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Calhoun Mclean $150,000 $0 $0 $150,000
Restoration of Old National Guard Armory Restoration of Old National Guard Armory Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Carlisle Nicholas $125,000 $0 $31,250 $156,250
Duncan Tavern, Phase III Duncan Tavern, Phase III Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Paris Bourbon $100,000 $0 $25,000 $125,000
Carnegie Arts Center's building connector which provides handicap access to the facility. Carnegie Arts Center's building connector which provides handicap access to the facility. Kentucky 1999 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Covington Kenton $270,000 $0 $67,500 $337,500
River Heritage Museum, Phase I River Heritage Museum, Phase I Kentucky 1999 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Paducah Mccracken $300,000 $0 $75,000 $375,000
Cumberland Downtown Beautification Project Cumberland Downtown Beautification Project Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Cumberland Harlan $100,000 $0 $25,000 $125,000
Bierbower House Restoration. Restore 1840s home used in underground railroad to house National Underground Railroad Museum Bierbower House Restoration. Restore 1840s home used in underground railroad to house National Underground Railroad Museum Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Maysville Mason $90,000 $0 $22,500 $112,500
Mountain Mission Hospital - Bluegrass Heritage Museum (More Money) Mountain Mission Hospital - Bluegrass Heritage Museum (More Money) Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Winchester Clark $90,000 $0 $22,500 $112,500
U.S. 31W Streetscape Enhancement Project U.S. 31W Streetscape Enhancement Project Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Elizabethtown Hardin $90,000 $0 $22,500 $112,500
Old Todd County Courthouse Preservation Old Todd County Courthouse Preservation Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Elkton Todd $60,000 $0 $15,000 $75,000
In the absence of an historic context defining farm property types and outlining registration requirements, professionals variously emphasize the significance and integrity of farmland, farm buildings or farmscapes in the evaluation process. This has res In the absence of an historic context defining farm property types and outlining registration requirements, professionals variously emphasize the significance and integrity of farmland, farm buildings or farmscapes in the evaluation process. This has res Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $60,000 $0 $15,000 $75,000
Minerva Baptist Church Rehabilitation Minerva Baptist Church Rehabilitation Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Maysville Mason $30,000 $0 $7,500 $37,500
Kentucky portion of an Illinois/Kentucky Ohio River Civil War Heritage trail to include 32 fiberglass interpretive signs, 100,000 copies of guidebook GIS map and Website of project area, edit, design and layout of guidebook and final edit of sign text, in Kentucky portion of an Illinois/Kentucky Ohio River Civil War Heritage trail to include 32 fiberglass interpretive signs, 100,000 copies of guidebook GIS map and Website of project area, edit, design and layout of guidebook and final edit of sign text, in Kentucky 1999 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $100,000 $0 $25,000 $125,000
Downtown Enhancement - Phase 4 Downtown Enhancement - Phase 4 Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Henderson Henderson $200,000 $0 $50,000 $250,000
Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Oversight and inspection of historic building preservation projects to include compliance with ADA and drafting preservation easements for enhancement projects Kentucky 1999 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $76,000 $0 $19,000 $95,000
Arch Street Project. Install new lighting, bury overhead utility lines and reconstruct sidewalks Arch Street Project. Install new lighting, bury overhead utility lines and reconstruct sidewalks Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Madisonville Hopkins $200,000 $0 $50,000 $250,000
OLIVE HILL SCHOOL (amendment) OLIVE HILL SCHOOL (amendment) Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Grayson Carter $200,000 $0 $50,000 $250,000
Restoration of Putney Ranger Station Restoration of Putney Ranger Station Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Harlan Harlan $150,000 $0 $0 $150,000
Adair County Courthouse Fa?É?í?Ǭ¨ade Renovation Adair County Courthouse Fa?É?í?Ǭ¨ade Renovation Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Columbia Adair $150,000 $0 $0 $150,000
Middle Creek National Battlefield. Acquisition of 35.8 acres of battlefield land. Middle Creek National Battlefield. Acquisition of 35.8 acres of battlefield land. Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Prestonsburg Floyd $100,000 $0 $250,000 $350,000
Montgomery County History Museum and Visitor Center; restoration of old fire station, Phase II Montgomery County History Museum and Visitor Center; restoration of old fire station, Phase II Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Mount Sterling Montgomery $100,000 $0 $0 $100,000
LaGrange Historic Welcome Center; rehabilitation of a building to serve as a Visitor's Welcome Center on Poplar Alley. Includes renovation of building, parking, landscaping, indoor interpretive casing and display work, design and oversight. LaGrange Historic Welcome Center; rehabilitation of a building to serve as a Visitor's Welcome Center on Poplar Alley. Includes renovation of building, parking, landscaping, indoor interpretive casing and display work, design and oversight. Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lagrange Oldham $75,000 $0 $0 $75,000
Downtown Hardware Store Building Fa?É?í?Ǭ¨ade; Neal Building Restoration Downtown Hardware Store Building Fa?É?í?Ǭ¨ade; Neal Building Restoration Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Carlisle Nicholas $70,000 $0 $17,500 $87,500
Old Capitol Fountain Restoration; Restore Old State Capitol Fountain to its original and working condition. Old Capitol Fountain Restoration; Restore Old State Capitol Fountain to its original and working condition. Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Franklin $50,000 $0 $12,500 $62,500
Restoration of Old Capitol Fountain Restoration of Old Capitol Fountain Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Franklin $50,000 $0 $0 $50,000
Restoration of the LaGrange Presbyterian Church, including removing mazonite siding, wash, scrape and paint, rebuild windows, tuck point brick and replace shutters. Restoration of the LaGrange Presbyterian Church, including removing mazonite siding, wash, scrape and paint, rebuild windows, tuck point brick and replace shutters. Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lagrange Oldham $30,000 $0 $7,500 $37,500
JAIL REHABILITATION JAIL REHABILITATION Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Cynthiana Harrison $24,400 $0 $93,750 $118,150
Restore an historic stone wall at Licking Riverside near the Veterans Memorial Bridge on the corner of KY 8 and Garrard Restore an historic stone wall at Licking Riverside near the Veterans Memorial Bridge on the corner of KY 8 and Garrard Kentucky 2004 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Covington Kenton $15,000 $0 $3,750 $18,750
Acquire & rehabilitate the Marshall Key House, believed to be a stop on the Underground Railroad and visited by Harriet Beecher Stowe, for use as a museum Acquire & rehabilitate the Marshall Key House, believed to be a stop on the Underground Railroad and visited by Harriet Beecher Stowe, for use as a museum Kentucky 1999 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Maysville Mason $160,000 $0 $40,000 $200,000
Fort Heiman Civil War Preservation Project. Preserve Ft. Heiman and surrounding 200 acres Fort Heiman Civil War Preservation Project. Preserve Ft. Heiman and surrounding 200 acres Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Bowling Green Calloway $600,000 $0 $150,000 $750,000
Ballard Co Courthouse Preservation Ballard Co Courthouse Preservation Kentucky 2007 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Wickliffe Ballard $25,000 $0 $6,250 $31,250
Duncan Tavern, Phase I Duncan Tavern, Phase I Kentucky 1999 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Paris Bourbon $160,000 $0 $40,000 $200,000
Restore a historic hotel \Brown Hotel\" in the center of town." Restore a historic hotel\Brown Hotel\" in the center of town." Kentucky 1999 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities North Middletown Bourbon $136,000 $0 $34,000 $170,000
KHS Historic Highway Marker Restoration KHS Historic Highway Marker Restoration Kentucky 2008 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Franklin $64,000 $0 $16,000 $80,000
Springfield Opera House, Phase II Springfield Opera House, Phase II Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Springfield Washington $425,000 $0 $106,250 $531,250
Restore U.S. Marine Hospital for use as a visitors' center for heritage tourism and a cultural heritage/historic research center Restore U.S. Marine Hospital for use as a visitors' center for heritage tourism and a cultural heritage/historic research center Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Louisville Jefferson $300,000 $0 $75,000 $375,000
McConnell House Restoration Project McConnell House Restoration Project Kentucky 2008 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Greenup Greenup $240,000 $0 $60,000 $300,000
Johnson-Brinton House Restoration Johnson-Brinton House Restoration Kentucky 2008 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Danville Boyle $288,000 $0 $72,000 $360,000
Old Crofton Hotel Building Restoration Old Crofton Hotel Building Restoration Kentucky 2008 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Crofton Christian $300,000 $0 $75,000 $375,000
Big Barn Restoration Big Barn Restoration Kentucky 2008 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Franklin $1,193,667 $0 $241,000 $1,434,667
Centre Square Restoration - Sr. High Building Centre Square Restoration - Sr. High Building Kentucky 2003 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Lebanon Marion $200,000 $0 $50,000 $250,000
Bourbon County Duncan Tavern Historic Center Restoration - continued interior & exterior restoration (replace furnace, replace stucco, woodwork repair, reconstruct HVAC duckwork, repair walkways) Bourbon County Duncan Tavern Historic Center Restoration - continued interior & exterior restoration (replace furnace, replace stucco, woodwork repair, reconstruct HVAC duckwork, repair walkways) Kentucky 2006 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Paris Bourbon $160,000 $0 $40,000 $200,000
Kennett Tavern - A Regular Stop on an old Stagecoach Route through Kentucky Kennett Tavern - A Regular Stop on an old Stagecoach Route through Kentucky Kentucky 1998 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Falmouth Pendleton $187,000 $0 $46,750 $233,750
WEST KY. AFRICAN AMERICAN HERITAGE CENTER/VISITOR'S CENTER WEST KY. AFRICAN AMERICAN HERITAGE CENTER/VISITOR'S CENTER Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Russellville Logan $200,000 $0 $50,000 $250,000
Carnegie Arts Center Access Building Completion Carnegie Arts Center Access Building Completion Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Covington Kenton $125,248 $0 $31,312 $156,560
American Association Building Restoration, Phase III American Association Building Restoration, Phase III Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Middlesborough Bell $300,000 $0 $75,000 $375,000
90 TON STEAM LOCOMOTIVE 90 TON STEAM LOCOMOTIVE Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Whitley City Mccreary $300,000 $0 $75,000 $375,000
RK - Springfield Opera House RK - Springfield Opera House Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Springfield Washington $500,000 $0 $125,000 $625,000
KEENE LODGE RESTORATION KEENE LODGE RESTORATION Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Nicholasville Jessamine $500,000 $0 $125,000 $625,000
Falmouth Kennett Tavern Reconstruction Falmouth Kennett Tavern Reconstruction Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Falmouth Pendleton $180,000 $0 $45,000 $225,000
BELL'S TAVERN BELL'S TAVERN Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Park City Barren $350,000 $0 $87,500 $437,500
OLIVE HILL SCHOOL OLIVE HILL SCHOOL Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Grayson Carter $200,000 $0 $50,000 $250,000
MOUNTAIN MISSION HOSPITAL - Bluegrass Heritage Museum MOUNTAIN MISSION HOSPITAL - Bluegrass Heritage Museum Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Winchester Clark $400,000 $0 $100,000 $500,000
Shaker Wash House Shaker Wash House Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Russellville Logan $400,000 $0 $100,000 $500,000
CRISPUS ATTUCKS HIGH SCHOOL PRESERVATION Former school, built in 1916 by blacks for blacks; major expansion in 1957. Reinforcing exterior walls and windows, roof repair, landscape plantings, restroom renovations for ADA, HVAC, A/E fees. Intended use: c CRISPUS ATTUCKS HIGH SCHOOL PRESERVATION Former school, built in 1916 by blacks for blacks; major expansion in 1957. Reinforcing exterior walls and windows, roof repair, landscape plantings, restroom renovations for ADA, HVAC, A/E fees. Intended use: c Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Hopkinsville Christian $399,406 $0 $100,594 $500,000
River Heritage Museum, Phase II River Heritage Museum, Phase II Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Paducah Mccracken $350,000 $0 $87,500 $437,500
Historic Scott County Jail Complex Historic Scott County Jail Complex Kentucky 2002 6 (TE) 6. Historic Preservation & Rehab of Historic Transportation Facilities Georgetown Scott $240,000 $0 $60,000 $300,000
The Bridges of Bloomfield The Bridges of Bloomfield Kentucky 2003 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Bloomfield Nelson $50,000 $0 $12,500 $62,500
Restore the CSX Train Depot located on Ferry Street in Russell, KY. The building will be a museum dedicated to the city's history and strong link to the railroad system. Restore the CSX Train Depot located on Ferry Street in Russell, KY. The building will be a museum dedicated to the city's history and strong link to the railroad system. Kentucky 1999 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Russell Greenup $30,000 $0 $7,500 $37,500
Capitol Avenue - War Mother's Memorial Bridge Capitol Avenue - War Mother's Memorial Bridge Kentucky 2003 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Franklin $50,000 $0 $12,500 $62,500
Ashland Depot Rehabilitation to Transit Center, Phase II Ashland Depot Rehabilitation to Transit Center, Phase II Kentucky 1997 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Ashland Boyd $271,495 $0 $0 $271,495
Kentucky Railway Museum Railroad Renovation and Preservation Project. 17 miles of railroad and right of way located between New Hope and Boston, KY in Nelson and Larue Counties-Phases I & II Kentucky Railway Museum Railroad Renovation and Preservation Project. 17 miles of railroad and right of way located between New Hope and Boston, KY in Nelson and Larue Counties-Phases I & II Kentucky 1994 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities New Haven Nelson $361,600 $0 $90,400 $452,000
Dover Covered Bridge - Refurbish - Located on KY 3113, 0.25 mi South of KY 8 Dover Covered Bridge - Refurbish - Located on KY 3113, 0.25 mi South of KY 8 Kentucky 1999 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Dover Mason $224,054 $0 $56,014 $280,068
Design for renovation of the Buechel Train Station Design for renovation of the Buechel Train Station Kentucky 1999 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Louisville Jefferson $20,000 $0 $5,000 $25,000
Bowling Green Depot Rehabilitation and adaptive reuse as library annex Bowling Green Depot Rehabilitation and adaptive reuse as library annex Kentucky 1999 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Bowling Green Warren $700,000 $0 $175,000 $875,000
Stanford L&N Depot Stanford L&N Depot Kentucky 1994 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Stanford Lincoln $160,000 $0 $317,500 $477,500
Pedway Bridge Relocation Project Pedway Bridge Relocation Project Kentucky 2007 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Whitesburg Letcher $175,600 $0 $43,900 $219,500
Bowling Green Depot Acquisition and Rehabilitation Bowling Green Depot Acquisition and Rehabilitation Kentucky 1997 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Bowling Green Warren $500,000 $0 $0 $500,000
Preservation and Relocation of the Raymond Motors Building Preservation and Relocation of the Raymond Motors Building Kentucky 2007 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Newport Campbell $272,000 $0 $68,000 $340,000
Preservation of Old Town Covered Bridge to include design engineering and emergency restoration. Preservation of Old Town Covered Bridge to include design engineering and emergency restoration. Kentucky 1996 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Greenup $743,148 $0 $185,786 $928,934
Stabilization, renovation, and preservation of Kentucky?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢s oldest rail lines and restoration of rail cars. PHASE III Stabilization, renovation, and preservation of Kentucky?ɬ¢?¢‚Ǩ¬¢?¢‚Ǩ‚Ñ¢s oldest rail lines and restoration of rail cars. PHASE III Kentucky 1996 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities New Haven Nelson $200,000 $0 $175,000 $375,000
Covered Bridges Covered Bridges Kentucky 2005 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Statewide Statewide $1,000,000 $0 $250,000 $1,250,000
Trolley Barn Restoration (FY08 funds) Trolley Barn Restoration (FY08 funds) Kentucky 2008 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Louisville Jefferson $2,750,000 $0 $687,500 $3,437,500
Restoration of Switzer Covered Bridge Restoration of Switzer Covered Bridge Kentucky 1999 7 (TE) 7. Historic Preservation & Rehab of Historic Transportation Facilities Frankfort Franklin $56,000 $0 $14,000 $70,000
Starting in Central City and extending into Powderly and connecting the city park into Greenville involving a 6 mile area and the purchase of land, blacktop, benches, lights, bridge flooring and guardrails, and plants. Starting in Central City and extending into Powderly and connecting the city park into Greenville involving a 6 mile area and the purchase of land, blacktop, benches, lights, bridge flooring and guardrails, and plants. Kentucky 1999 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Greenville Muhlenberg $213,956 $0 $52,364 $266,320
Construction of a .62 mile trail with landscape, signing, purchase and rehabilitation of a historic L&N depot as a trailhead. Construction of a .62 mile trail with landscape, signing, purchase and rehabilitation of a historic L&N depot as a trailhead. Kentucky 1999 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Lagrange Oldham $320,000 $0 $80,000 $400,000
(Brighton)RAIL TRAIL CONVERSION; Acquisition of property, paving and construction and trail amenities for a 10-mile trail 12-foot wide along abandoned railroad from the Madden Property east towards Man-o-War and I-75 into Clark County and Winchester. (Brighton)RAIL TRAIL CONVERSION; Acquisition of property, paving and construction and trail amenities for a 10-mile trail 12-foot wide along abandoned railroad from the Madden Property east towards Man-o-War and I-75 into Clark County and Winchester. Kentucky 1999 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Lexington Fayette $360,000 $0 $360,000 $720,000
Rails to Trails project that encompasses abandoned railroad land on US 60 West that continues through Morehead and ends at the Rodburn section of the county or around the beginning of KY 32 involves land purchase including 50 ft. on each side. Rails to Trails project that encompasses abandoned railroad land on US 60 West that continues through Morehead and ends at the Rodburn section of the county or around the beginning of KY 32 involves land purchase including 50 ft. on each side. Kentucky 1999 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Morehead Rowan $116,400 $0 $29,100 $145,500
Acquisition and renovation of an abandoned pedestrian bridge owned by CSX railroad. Acquisition and renovation of an abandoned pedestrian bridge owned by CSX railroad. Kentucky 2004 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Bellevue Campbell $6,530 $0 $1,633 $8,163
Walking/Bicycle Trail; walking/bicycle trail along abandoned corridor of the Paducah and Elizabethtown Railroad (1.25 miles). Walking/Bicycle Trail; walking/bicycle trail along abandoned corridor of the Paducah and Elizabethtown Railroad (1.25 miles). Kentucky 2004 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Grand Rivers Livingston $200,000 $0 $50,000 $250,000
Right of way phase of extension of historic horse and pedestrian trail project in Anchorage along the Old Interurban Railroad bed. Right of way phase of extension of historic horse and pedestrian trail project in Anchorage along the Old Interurban Railroad bed. Kentucky 1994 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Anchorage Jefferson $40,000 $0 $10,000 $50,000
Involves survey, design and construction to install .3 mile of lighted trail and 3 resting benches Involves survey, design and construction to install .3 mile of lighted trail and 3 resting benches Kentucky 2003 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails White Plains Hopkins $20,000 $0 $5,000 $25,000
Paducah Greenway Trail Phase II Paducah Greenway Trail Phase II Kentucky 2008 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Paducah Mccracken $500,000 $0 $125,000 $625,000
Trail Lighting Trail Lighting Kentucky 2002 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Greenville Muhlenberg $16,000 $0 $4,000 $20,000
UNIONTOWN RAIL TRAIL CONVERSION UNIONTOWN RAIL TRAIL CONVERSION Kentucky 2002 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Uniontown Union $48,800 $0 $14,800 $63,600
RAIL TRAIL CONVERSION RAIL TRAIL CONVERSION Kentucky 2002 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Mount Sterling Montgomery $50,000 $0 $12,500 $62,500
STURGIS RAIL-TRAIL CONVERSION STURGIS RAIL-TRAIL CONVERSION Kentucky 2002 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Morganfield Union $60,000 $0 $15,000 $75,000
BLACKFORD PEDESTRIAN BRIDGE BLACKFORD PEDESTRIAN BRIDGE Kentucky 2002 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Dixon Webster $100,000 $0 $25,000 $125,000
1.5 mile rail-trail conversion to include paving and fencing and 8-foot wide trail and installing benches for resting 1.5 mile rail-trail conversion to include paving and fencing and 8-foot wide trail and installing benches for resting Kentucky 1999 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails White Plains Hopkins $90,400 $0 $22,600 $113,000
Paducah Greenway Trails System - Construct 11,636 ft. of trail along the Ohio River Earthen Floodwall Paducah Greenway Trails System - Construct 11,636 ft. of trail along the Ohio River Earthen Floodwall Kentucky 2006 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Paducah Mccracken $500,000 $0 $125,000 $625,000
Acquisition and renovation of an abandoned pedestrian bridge owned by CSX railroad. Acquisition and renovation of an abandoned pedestrian bridge owned by CSX railroad. Kentucky 1999 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Bellevue Campbell $160,500 $0 $40,125 $200,625
Kentucky Railway Museum Railroad Renovation and Preservation Project. 17 miles of railroad and right of way located between New Hope and Boston, KY in Nelson and Larue Counties-Phases I & II Kentucky Railway Museum Railroad Renovation and Preservation Project. 17 miles of railroad and right of way located between New Hope and Boston, KY in Nelson and Larue Counties-Phases I & II Kentucky 1995 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails New Haven Nelson $10,900 $0 $2,725 $13,625
Richmond US Hwy 25/421Pedestrian & Bicycle Facilities Project - Repair 624 linear ft. of brick sidewalk, conversion of old L&N rail corridor into a 1/2 mile trail Richmond US Hwy 25/421Pedestrian & Bicycle Facilities Project - Repair 624 linear ft. of brick sidewalk, conversion of old L&N rail corridor into a 1/2 mile trail Kentucky 2006 8 (TE) 8. Conversion of Abandoned Railway Corridors to Trails Richmond Madison $145,000 $0 $36,250 $181,250
Used to assist tourist attractions and historic sites that will now qualify for signage under HB 612 to cover cost of Limited Supplemental and Post Interchange guide signs on interstates and parkways. Enhancement funds will be used to pay for 50% of the Used to assist tourist attractions and historic sites that will now qualify for signage under HB 612 to cover cost of Limited Supplemental and Post Interchange guide signs on interstates and parkways. Enhancement funds will be used to pay for 50% of the Kentucky 1999 9 (TE) 9. Outdoor Advertising Management Statewide Statewide $40,000 $0 $10,000 $50,000
Provide funds to assist in funding TODS and the Fifth Legend Logo Signing for various routes in Kentucky Provide funds to assist in funding TODS and the Fifth Legend Logo Signing for various routes in Kentucky Kentucky 1995 9 (TE) 9. Outdoor Advertising Management Statewide Statewide $16,889 $0 $108,111 $125,000
Cultural and Recreational Signage Cultural and Recreational Signage Kentucky 2004 9 (TE) 9. Outdoor Advertising Management Shelbyville Shelby $3,477 $0 $3,417 $6,894
Used to assist tourist attractions and historic sites that will now qualify for signage under HB 612 to cover cost of Limited Supplemental and Post Interchange guide signs on interstates and parkways. Enhancement funds will be used to pay for 50% of the Used to assist tourist attractions and historic sites that will now qualify for signage under HB 612 to cover cost of Limited Supplemental and Post Interchange guide signs on interstates and parkways. Enhancement funds will be used to pay for 50% of the Kentucky 1999 9 (TE) 9. Outdoor Advertising Management Statewide Statewide $200,000 $0 $50,000 $250,000
Official signage incentive Official signage incentive Kentucky 2005 9 (TE) 9. Outdoor Advertising Management Statewide Statewide $500,000 $0 $125,000 $625,000
Cultural and Recreational Signs Cultural and Recreational Signs Kentucky 2004 9 (TE) 9. Outdoor Advertising Management Versailles Woodford $9,806 $0 $9,807 $19,613
Administrative and Legal Activities for Outdoor Advertising Control & Removal Administrative and Legal Activities for Outdoor Advertising Control & Removal Kentucky 1994 9 (TE) 9. Outdoor Advertising Management Statewide Statewide $160,000 $0 $40,000 $200,000
Radcliff Commercial Corridor Clean-up - Removal of 51 non-conforming signs and aldo 29 metal sign poles and 10 wooden sign poles to reshape image of community Radcliff Commercial Corridor Clean-up - Removal of 51 non-conforming signs and aldo 29 metal sign poles and 10 wooden sign poles to reshape image of community Kentucky 2006 9 (TE) 9. Outdoor Advertising Management Radcliff Hardin $39,000 $0 $9,750 $48,750
Archaeological investigation of Ashland, the Henry Clay Estate in Lexington Archaeological investigation of Ashland, the Henry Clay Estate in Lexington Kentucky 1999 10 (TE) 10. Archaeological Activities Frankfort Fayette $75,000 $0 $18,200 $93,200
Wickliffe Mounds Research Center Wickliffe Mounds Research Center Kentucky 1994 10 (TE) 10. Archaeological Activities Wickliffe Ballard $80,000 $0 $20,000 $100,000
Development of a statewide Civil War Heritage Trail. Development of a statewide Civil War Heritage Trail. Kentucky 1995 10 (TE) 10. Archaeological Activities Statewide Statewide $27,600 $0 $6,900 $34,500
Update of the statewide inventory of bridges with historic significance Update of the statewide inventory of bridges with historic significance Kentucky 1996 10 (TE) 10. Archaeological Activities Statewide Statewide $137,255 $0 $72,745 $210,000
Development of a digitized archaeological site geographic information system linked to existing site inventory as well as other digital data to assist the transportation cabinet, design engineers and archaeologists Development of a digitized archaeological site geographic information system linked to existing site inventory as well as other digital data to assist the transportation cabinet, design engineers and archaeologists Kentucky 1997 10 (TE) 10. Archaeological Activities Statewide Statewide $140,000 $0 $35,000 $175,000
Hickman County Obion Creek Environmental Mitigation Project - Mitigate the impact of the highway upon the Obion Creek, improving water quality and habitat community Hickman County Obion Creek Environmental Mitigation Project - Mitigate the impact of the highway upon the Obion Creek, improving water quality and habitat community Kentucky 2006 11 (TE) 11. Environmental Mitigation Clinton Hickman $102,000 $0 $25,500 $127,500
I-64 Wetland Restoration at Middle Fork of Beargrass Creek I-64 Wetland Restoration at Middle Fork of Beargrass Creek Kentucky 2005 11 (TE) 11. Environmental Mitigation Louisville Jefferson $40,000 $0 $10,000 $50,000
River Heritage Museum; design and construction fo additional 20,000 square feet of exhibit space for museum River Heritage Museum; design and construction fo additional 20,000 square feet of exhibit space for museum Kentucky 2005 12 (TE) 12. Historic Preservation & Rehab of Historic Transportation Facilities Paducah Mccracken $878,850 $0 $219,713 $1,098,563
RK - FLEMING COUNTY MUSEUM COMPLETION RK - FLEMING COUNTY MUSEUM COMPLETION Kentucky 2002 12 (TE) 12. Historic Preservation & Rehab of Historic Transportation Facilities Flemingsburg Fleming $160,000 $0 $40,000 $200,000
New Haven KY Railway Museum Preservation Project - Construct a train shelter at the museum over the tracks, preserve historic railroad equipment (engines, coaches, cars) New Haven KY Railway Museum Preservation Project - Construct a train shelter at the museum over the tracks, preserve historic railroad equipment (engines, coaches, cars) Kentucky 2006 12 (TE) 12. Historic Preservation & Rehab of Historic Transportation Facilities New Haven Nelson $255,000 $0 $63,750 $318,750
Covington Behringer-Crawford Museum - purchase of transportation related exhibits for the museum Covington Behringer-Crawford Museum - purchase of transportation related exhibits for the museum Kentucky 2006 12 (TE) 12. Historic Preservation & Rehab of Historic Transportation Facilities Covington Kenton $500,000 $0 $125,000 $625,000
Transportation Museum & Welcome Center Project Transportation Museum & Welcome Center Project Kentucky 2008 12 (TE) 12. Historic Preservation & Rehab of Historic Transportation Facilities Wilmore Jessamine $463,000 $0 $115,750 $578,750
National Corvette Museum Simulator Theater National Corvette Museum Simulator Theater Kentucky 2007 12 (TE) 12. Historic Preservation & Rehab of Historic Transportation Facilities Bowling Green Warren $198,000 $0 $49,500 $247,500
Trigg County Transportation Museum Stabilization Ph1 Stabilization of Hist Bldg for Trans Museum Kentucky 2013 12 (TE) 12. Historic Preservation & Rehab of Historic Transportation Facilities Cadiz Trigg $250,000 $0 $62,500 $312,500