Project Search Results
Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
SAFE SIDEWALKS-CONRAD | Sidewalk work on 2nd Ave South between Maryland St and Michigan St. Speed signs near the intersection of Wisconsin St and 1st Ave South. Crosswalk signs near the intersection of Main Street and 3rd Ave South. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Conrad | Pondera | $97,181 | $0 | $15,062 | $112,243 |
N 7th Ave Sidewalks-Bozeman | Design and construction of ADA compliant sidewalks. Along North 7th Avenue connecting to the sidewalk north of Griffin Drive southward to connect to the sidewalk south of Nikles Drive in Bozeman. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bozeman | Gallatin | $172,094 | $0 | $26,675 | $198,769 |
Overlook Dr Path-GTF | Design and construction of approximately 1,330 lineal feet of bicycle and pedestrian path. In Great Falls along the south side of Overlook Drive between the Broadwater Overlook Park and 10th Avenue South. | Montana | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Great Falls | Cascade | $491,766 | $0 | $72,903 | $564,669 |
SIDEWALKS-CASCADE | Installation of ADA compliant sidewalks, curb and gutter along 4th Ave N between 4th St N and 2nd St N, along 3rd St S between 2nd Ave S and Central Ave, and along Central Ave (S-330) between 1st St and the Missouri River Bridge. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Cascade | Cascade | $163,883 | $0 | $24,174 | $188,057 |
Hwy 135 Path - St. Regis | Design and construction of 3,345 lineal feet of 10' wide sidewalk and 1,612 lineal feet of 8' wide asphalt trail. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | St. Regis | Mineral | $465,013 | $0 | $72,077 | $537,090 |
Fairgrounds Sidewalks - Glasgow | Design and construction of sidewalks and 3 ADA compliant parking spaces. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Glasgow | Valley | $234,321 | $0 | $36,320 | $270,641 |
Highway 89 Path - S of Livingston | Design and construction of a bicycle and pedestrian path. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Livingston | Park | $1,574,721 | $0 | $191,090 | $1,765,811 |
Makawasha Ave Walks-Crw Agency | Design and construction of approximately 1,690 lineal feet of concrete sidewalk. Located in Crow Agency along the south side of Makawasha Avenue between Bala Street and Mapata Avenue. | Montana | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Crow Agency | Big Horn | $400,982 | $0 | $0 | $400,982 |
SIDEWALK CONNECTIONS-BUTTE | Installation of ADA compliant sidewalks on Stuart Ave (L-47-1390) between George St and the west entrance to the East Middle School. Anticipated Project Let Date = June of 2018. Estimated PE Phase End Date = December of 2020. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Butte | Silver Bow | $113,675 | $0 | $17,619 | $131,294 |
Sidewalks-Fairfield | Design and construction of sidewalks, crosswalks, curb and gutter. The Project is located in Fairfield along 2nd Avenue North between 6th and 7th Streets North, along 1st Avenue North from mid-block eastward to 7th Street North, along 5th Street North from 1st Avenue North southward approximately 100 feet, along 6th Street North between 1st Avenue North and Central Avenue, along Division Lane from Central Avenue West southward approximately 450 feet, and along Central Avenue West from Division Lane to Parkway. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Fairfield | Teton | $269,117 | $0 | $41,713 | $310,830 |
Bitterroot Trail Safety-Msla | Design and construction of bike/ped safety improvements to eight street crossings along the Bitterroot Branch Trail. In Missoula along the Bitterroot Branch Trail between North Avenue and 1st Street. | Montana | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Missoula | Missoula | $285,580 | $0 | $29,563 | $315,143 |
O St-Bennett St Connector-Liv | Design and construction of a shared-use path (widened shoulder) and sidewalks. Along Park St between O St and Bennett St (widened shoulder), and along O St between Callender St and Park St (sidewalk) in Livingston. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Livingston | Park | $245,704 | $0 | $38,048 | $283,752 |
Hwy 2 Ped Bridge - Malta | Design and construction of a bicycle and pedestrian bridge. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Malta | Phillips | $1,750,223 | $0 | $263,247 | $2,013,470 |
Nyhagen Rd Path-Cut Bank | Design and construction of an 8-ft wide asphalt multi-use path. Project begins at the terminus of the sidewalk along S-213, just west of Central Avenue. The path extends east, crosses Central Avenue and continues east along the south side of Nyhagen Road for approximately 0.9 miles. The path then turns south along the western edge of City of Cut Bank property, School District property, and Glacier County Historical Society property for 0.5 miles and ending at Old Kevin Highway in Cut Bank. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Cut Bank | Glacier | $536,934 | $0 | $83,225 | $620,159 |
Round Butte Rd Path-Ronan | Design and construction of sidewalks and/or asphalt path. From the Ronan Middle School along Round Butte Road westward to the existing path west of the RR tracks in Ronan. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Ronan | Lake | $788,946 | $0 | $0 | $788,946 |
Path Pavement Preservation-Boz | Design and construction of pavement preservation consisting of patching, fog sealing, and ADA upgrades at the intersections. The Project shall be located in Bozeman on: the Highland Boulevard Path along the west side of Highland Boulevard between Main Street and Kagy Boulevard; the South 19th Avenue Path along the east side of South 19th Avenue between College Street and the FWP office north of Lincoln Street; the Library Path (Gallagator Trail) from the east side of the Bozeman Public Library to South Church Avenue; the College Street Path on the south side of College Street between South 11th Avenue and South 29th Avenue; and the Oak Street Path along the south side of Oak Street between Rouse Avenue and the 5th Avenue corridor. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bozeman | Gallatin | $159,669 | $0 | $24,749 | $184,418 |
Sidewalks-Twin Bridges | Design and construction of ADA compliant sidewalk, crosswalks, curb and gutter. The Project is located in Twin Bridges along West 6th Avenue between Wray and Main Streets, along North Bridge between West 5th and 6th Avenues, along West 5th Avenue between North Bridge and Main Streets, along Wray Street between West 8th and West 6th Avenues, and along West 8th Avenue from Wray Street eastward to mid-block. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Twin Bridges | Madison | $288,188 | $0 | $43,588 | $331,776 |
MULTI-USE PATH-LAME DEER | Multi-Use path along Lame Deer School Access Road to BIA Route 4 (approximately 0.48 miles). | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lame Deer | Rosebud | $568,942 | $0 | $0 | $568,942 |
Three Mile Drive Path - Kalispell | Design and construction of approximately 3,152 lineal feet of hard-surfaced bicycle and pedestrian path. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Kalispell | Flathead | $499,248 | $0 | $74,236 | $573,484 |
PARK DR 4TH AVE N PED XING-GTF | Transportation Alternatives (TA) project in Great Falls at the intersection of Park Drive (U-5208) and 4th Ave North. Bike/ped crossing extending across Park Drive (from 4th Ave N) to the Gibson Park Entrance. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Great Falls | Cascade | $193,810 | $0 | $30,038 | $223,848 |
S-373 Ped Bridge-Woodside | Design and construction of a bicycle and pedestrian bridge. Located in Ravalli County adjacent to S-373 (Woodside Cutoff Rd) between Woodside and Corvallis. The bridge will cross the Bitterroot River. | Montana | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Woodside | Ravalli | $2,185,384 | $0 | $332,034 | $2,517,418 |
Hwy 78 Path & Walks-Columbus | Design and construction of multi-use paths, sidewalks, roadway crossing improvements (rectangular rapid flashing beacon, crosswalk markings & signage). The Project is located in Columbus along East Pike Avenue (S-306) between Quarry Street and North 3rd Street, along Highway 78 (P-78) between Ich-Ke-Pe Park and East 1st Avenue South, along East Pike Avenue (P-78) between Diamond Street and North 9th Street, and along North 9th Street (P-78) between East Pike Avenue and Granite Peak Park. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Columbus | Stillwater | $807,857 | $0 | $125,219 | $933,076 |
Downtown ADA Ramps - Helena | Design and construction of approximately 170 ADA ramps. Located in the greater Last Chance Gulch Area, also, along, Helena Avenue from Last Chance Gulch to just east of Montana Avenue, and along Last Chance Gulch (the street) as far north as Lyndale Avenue. | Montana | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Helena | Lewis & Clark | $593,082 | $0 | $91,928 | $685,010 |
Hwy 287 Sidewalks - Ennis | Design and construction of ADA compliant concrete sidewalks. | Montana | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Ennis | Madison | $430,408 | $0 | $57,625 | $488,033 |
Sidewalks Phase II-Cascade | Design and construction of sidewalks and ADA curb ramps. Along 3rd Street between 4th and 5th Avenues S, along 2nd Street between 4th Avenue S and Central Avenue, and along 3rd Avenue S between 1st and 3rd Streets in Cascade. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Cascade | Cascade | $298,752 | $0 | $46,307 | $345,059 |
Benton Avenue Path-Helena | Design and construction of a 0.73 mile long multi-use path. The project includes railroad crossing improvements, landscaping, chain link fence, curb & gutter and ADA upgrades. Along the east side of Benton Avenue from the intersection with the Centennial trail just north of the access road to the City of Helena Transfer Station, north across the railroad tracks and continuing north to the terminus of the existing paved multi-use path near the intersection of Benton Avenue and Elmwood Lane in Helena. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Helena | Lewis & Clark | $988,173 | $0 | $153,168 | $1,141,341 |
Bike/Ped Path II Hwy 93-Kalispell | Design and construction of a bicycle and pedestrian path approximately 892 feet in length. Along the west side of US 93 adjacent to the Kalispell Youth Complex (opposite Flathead Community College) in Kalispell. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Kalispell | Flathead | $195,970 | $0 | $30,375 | $226,345 |
PEDESTRIAN CROSSINGS-CORVALLIS | Rectangular rapid-flashing beacons (RRFBs) to be installed at the following locations: At the intersection of the Woodside Cutoff Rd (S-373) and Old Corvallis Rd, On the East Side Highway (S-269) at the primary school crosswalk, and On the East Side Highway (S-269) between the Edna Thomas School and the athletic field. Vehicle speed signs to be installed on the East Side Highway north of Edna Thomas School/athletic field crossing and just north of the intersection with 2nd Street. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Corvallis | Ravalli | $115,186 | $0 | $17,854 | $133,040 |
West Bank Trail Imprvts-GTF | Design and construction of a hard-surfaced bicycle and pedestrian path. In Great Falls along the east side of West Bank Park. | Montana | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Great Falls | Cascade | $213,786 | $0 | $33,137 | $246,923 |
W SIDE TRAIL XINGS-BOZEMAN | Roadway crossing improvements (including widened sidewalks, curb ramps, refuge island, rectangular rapid flashing beacons and crosswalk markings) at three locations in Bozeman: On Babcock Street at the intersection with Fowler Ave, on Durston Road between Hunters Way and Greenway Ave, and on Oak Street at the intersection with Hunters Way. Anticipated Project Let Date = June of 2018. Estimated PE Phase End Date = December of 2020. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bozeman | Gallatin | $141,813 | $0 | $21,981 | $163,794 |
Hwy 93 Path - Kalispll | Design and construction of approximately 3,840 lineal feet of hard-surface bicycle and pedestrian path. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Kalispell | Flathead | $185,737 | $0 | $25,447 | $211,184 |
MULTI-USE PATH-HEART BUTTE | Multi-Use path extending approximately 0.3 miles from Heart Butte School to Heart Butte Road. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Heart Butte | Pondera | $387,787 | $0 | $0 | $387,787 |
BECRAFT LANE SIDEWALK-LOCKWOOD | Installation of ADA compliant sidewalks, curb and gutter along Becraft Lane (L-56-1528) between Old Hardin Road and Noblewood Drive. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lockwood | Yellowstone | $498,252 | $0 | $300,867 | $799,119 |
Uptown ADA Ramps - Butte | Design and construction of approximately 31,000 square feet concrete sidewalks, ADA ramps and corners. | Montana | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Butte | Silver Bow | $165,688 | $0 | $25,682 | $191,370 |
5th & E Street Walks - Livingston | Design and construction of ADA compliant sidewalks and ADA curb ramps. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Livingston | Park | $255,490 | $0 | $39,601 | $295,091 |
7th Ave NW Sidewalks-Choteau | Design and construction of sidewalks, curb ramps, driveway and alley approaches. Along the west side of 7th Avenue NW between the high school and 7th Street NW in Choteau. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Choteau | Teton | $191,568 | $0 | $29,693 | $221,261 |
7th Ave ADA Ramps - Lewistown | Design and construction of ADA ramps. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lewistown | Fergus | $421,226 | $0 | $65,291 | $486,517 |
City Loop Path - Lewistown | Design and construction of a paved surface on approximately 1.69 miles of existing gravel bicycle and pedestrian trail. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lewistown | Fergus | $150,533 | $0 | $23,333 | $173,866 |
Main Street ADA-Deer Lodge | Design and construction of ADA compliant sidewalk and corners. Along Main Street between Texas and California Streets in Deer Lodge. | Montana | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Deer Lodge | Powell | $791,387 | $0 | $122,666 | $914,053 |
Main Street ADA Ramps - Shelby | Design and construction of 10,280 square feet of concrete sidewalk and 11 ADA compliant curb ramps. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Shelby | Toole | $644,491 | $0 | $99,286 | $743,777 |
MULTI-USE PATH-SE PABLO | Multi-Use path on the east side of US-93 from Division Street to the existing path (near the pedestrian bridge). Some sidewalk along Big Knife Lane to tie the new path to the existing sidewalk. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Pablo | Lake | $45,497 | $0 | $0 | $45,497 |
14TH ST SE 9TH AVE SE PATH-SID | Transportation Alternatives (TA) project in Sidney along 14th St SE (U-10402) and 9th Ave SE (U-10407). Shared Use Path begins at intersection of 4th Ave SE & 14th St SE, extends along 14th St SE to 9th Ave SE, then up 9th Ave SE to 10th Street SE. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Sidney | Richland | $765,702 | $0 | $118,683 | $884,385 |
Broadwater Ave Path - Billings | Design and construction of approximately one-quarter mile of bicycle and pedestrian path. | Montana | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Billings | Yellowstone | $450,156 | $0 | $69,839 | $519,995 |
Durston Road Sidewalks - Bozeman | Design and construction of ADA compliant sidewalks. | Montana | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bozeman | Gallatin | $100,895 | $0 | $15,639 | $116,534 |
FAIRGROUNDS RD PATH-HAMILTON | Transportation Alternatives (TA) project in Hamilton along Fairgrounds Road (from Old Corvallis Road to Daly Avenue). Shared use path to include lighting, retaining wall and fencing. | Montana | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hamilton | Ravalli | $530,375 | $0 | $82,208 | $612,583 |
School Sidewalks - Arlee | Design and construction of approximately 1,450 lineal feet of ADA compliant concrete sidewalks, | Montana | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Arlee | Lake | $187,766 | $0 | $0 | $187,766 |
Balsam St Sidewalk - Libby | Design and construction of ADA compliant concrete sidewalk. | Montana | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Libby | Lincoln | $225,081 | $0 | $34,888 | $259,969 |
4th Ave East Walks - Polson | Design and construction of sidewalks, curb, and ADA compliant crosswalks. | Montana | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Polson | Lake | $275,664 | $0 | $0 | $275,664 |
Lewis & King St Walks-E Helena | Design and construction of ADA compliant sidewalks. Along the north side of East Lewis St between Lake Helena Dr and Oak Ave and along the south side of East King St and west side of North Montana Ave between the Radley School and East Clinton St in East Helena. | Montana | 2017 | 301 | (TAP) 301. Safe routes to school infrastructure | East Helena | Lewis & Clark | $338,261 | $0 | $52,432 | $390,693 |
S-228 Path - Highwood | Design and construction of 760' of bicycle and pedestrian path. | Montana | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | Highwood | Chouteau | $210,128 | $0 | $32,570 | $242,698 |
Elem School Bike Ped - Bozeman | Design and construction of sidewalks, shared use path, bike racks, and bike rack pads. | Montana | 2015 | 301 | (TAP) 301. Safe routes to school infrastructure | Bozeman | Gallatin | $418,486 | $0 | $61,981 | $480,467 |
Gerald Ave Sidewalk Impvt-Msla | Design and construction of ADA ramps, bulb-outs, rectangular rapid flashing beacons, signing, striping, and storm drain modifications at the intersections of 5th Street/Gerald Avenue and 6th Street/Gerald Avenue. Also, design and construction of a raised crosswalk across Gerald Avenue between Eddy Avenue and Connell Avenue in front of the main entrance to Hellgate High School. | Montana | 2018 | 301 | (TAP) 301. Safe routes to school infrastructure | Missoula | Missoula | $378,863 | $0 | $58,724 | $437,587 |
City Park Walking Paths-Baker | The local agency will construct concrete sidewalks, ramps, picnic areas and concrete bridge; install sprinkler system, picnic tables and landscaping. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Baker | Fallon | $20,537 | $0 | $5,134 | $25,671 |
Sidewalks-Forsyth | This project primarily involves the removal and replacement of approximately 503 meters (1650 ft.) concrete sidewalk and the rehabilitation of about 30 meters (100 ft.) of underground vaults. Work will also include the placement of crushed base course, | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Forsyth | Rosebud | $74,612 | $0 | $74,612 | $149,224 |
River Trail-Deer Lodge | Design and construction of approx. 3.75 miles x 10 ft wide trail system utilizing existing trails where possible in and around Deer Lodge. | Montana | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Deer Lodge | Powell | $246,598 | $0 | $37,223 | $283,821 |
Aronson Bypass Trl - Billings | Design and construction of a 10 foot-wide X 1,500 foot-long hard surfaced bicycle and pedestrian trail. Construction date is estimated to be 7/2013. | Montana | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Billings | Yellowstone | $130,289 | $0 | $20,194 | $150,483 |
Crooked Falls Trl-Gtf | Design and construction of a 6' to 8' wide pedestrain/bicycle trail to extend River's Edge Trail from the Lewis and Clark Overlook to Cochrane Dam. The first segment of trail will be paved, with the remainder being graveled. A 10-foot wide asphalt trail | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Great Falls | Cascade | $237,270 | $0 | $269,318 | $506,588 |
Sidewalk Ramps-Missoula | Installation of accessible curb ramps on existing public sidewalks within the City of Missoula. The following on system routes: Scott Street (U8109) between Toole and Phillips Streets. South 5th Street (U8114/P117) between Russell and Arthur Avenues. Sout | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $0 | $350,000 | $47,275 | $397,275 |
Jensen Lane Path-Polson | Design and construction for a pedestrian path that includes: Approximately 1,020-feet of concrete path that is 6-foot wide in accordance with current design standards and ADA requirements. | Montana | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Polson | Lake | $32,307 | $0 | $0 | $32,307 |
U.S.2-Saco | Construction only for a sidewalk project that is approximately 1,455 feet in length and 10-feet wide. | Montana | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Saco | Phillips | $61,991 | $0 | $6,000 | $67,991 |
School Sidewalks - Florence | Design and construction of approximately 2,490 LF of hard-surfaced sidewalks and paths. Project includes signs and striping of crosswalks near the Florence Elementary School. Near the Florence Elementary School along Old Highway 93 between Tie Chute Lane | Montana | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hamilton | Ravalli | $283,143 | $0 | $43,887 | $327,030 |
Sidewalks-Columbus | This project is described as the removal of 399.5 square meters [4300 sq. ft.] of old sidewalk and the construction of 589.9 square meters [6350 sq. ft.] of new sidewalk. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Columbus | Stillwater | $39,935 | $0 | $9,984 | $49,919 |
Blacktail Creek Project-Butte | This project primarily involves the construction of a 3 meter (10-ft.) wide, 2,225 meter (7,300-ft.) long asphalt pavement pathway, two parking areas, two pedestrian footbridges over Blacktail Creek, earthen embankment stormwater sedimentation basins, st | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Butte | Butte Silver Bow | $899,627 | $0 | $220,142 | $1,119,769 |
Continental Drive Path-Butte | Design and construction for a pedestrian path that includes: grading, fill material, drainage culverts, sub-grade preparation, asphalt paving, striping, appropriate signs, planting native vegetation, pedestrian benches and as needed installation of safet | Montana | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Butte | Butte Silver Bow | $126,548 | $0 | $19,615 | $146,163 |
County Museum Walkway-Hardin | The design and construction of approximately 2,800 lineal feet 6-foot wide walkways using pressure treated lumber. | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hardin | Big Horn | $91,543 | $0 | $0 | $91,543 |
Bike/Ped Path - Troy | Design and construction of 1 mile hard surfaced bike/ped path. Project includes storm drainage improvements. The project is located in Troy near the abandoned BNSF spur line between the intersection of Highway 2 and Haul Road extending north to Roosevelt | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Libby | Lincoln | $313,463 | $0 | $48,588 | $362,051 |
Courthouse Sidewalks - Broadus | Design and construction of approximately 880 lineal feet ADA compliant concrete sidewalks. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Broadus | Powder River | $139,901 | $0 | $22,685 | $162,586 |
Gallatin River Tr - E Manhattan | Design and construct bicycle/pedestrian trail. | Montana | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Manhattan | Gallatin | $414,233 | $0 | $7,372 | $421,605 |
Highland Dr Sidewalk-Glasgow | The project includes design and construction of a concrete drain structure, six foot sidewalk and an eight foot bike path. Total length of the project is approximately 2,862 linear feet. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glasgow | Valley | $139,803 | $0 | $40,537 | $180,340 |
Sierra Road Path | asphalt path about 10-feet wide and approximately 3600 feet in length | Montana | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Lewis & Clark | $187,738 | $0 | $33,252 | $220,990 |
Sidewalks & Landscaping - Msla | Construction only to install approximately 9600 SF of 5' wide sidewalk and renovate disturbed landscaping. | Montana | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $27,849 | $0 | $40,000 | $67,849 |
Clements Rd/North Av Path-Msla | Design and construction for a pedestrian walkway that includes: gravel base and asphalt surfacing for a walkway approximately 1.5 miles in length and topsoil and seeding for about 2.3 acres to replant disturbed land in accordance with current design stan | Montana | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $212,172 | $0 | $26,683 | $238,855 |
Sidewalks II - Laurel | Design and construction of ADA compliant sidewalks, ADA crossings, a retaining wall, curb and gutter. | Montana | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Laurel | Yellowstone | $91,653 | $0 | $14,207 | $105,860 |
Sidewalk II - Ft. Benton | Design and construction of approximately 3,500 square feet of concrete sidewalk. Project includes the removal of the existing deteriorated sidewalk. In Fort Benton on the west side of Front Street between 12th and 13th Streets. | Montana | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fort Benton | Chouteau | $37,890 | $0 | $5,873 | $43,763 |
Roman Crk Rd Path | Design and construction of a 1.25 mile X 8-10 ft wide pathway along north along Roman Creek Road beginning at the Frenchtown Frontage Road Walkway. Including top soil and seeding of all disturbed areas. The local agency will engage a project engineer fo | Montana | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $154,572 | $0 | $24,102 | $178,674 |
Fairgrounds Sidewalks-Havre | Design and construction for a sidewalk project that includes: Placing about 225 lineal feet, 6-foot wide concrete in one area, placing about 45 lineal feet of 12-foot wide concrete sidewalk and constructing five handicapped parking spaces. in accordance | Montana | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Havre | Hill | $19,344 | $0 | $2,997 | $22,341 |
City Hall Sidewalks-Wolf Point | Design and construction for a sidewalk project that includes: Removal of deteriorated sidewalk and replace with about 700 lineal feet of five foot wide concrete sidewalk, curb and gutter and adjustment of existing sprinkler heads. All construction will | Montana | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wolf Point | Roosevelt | $54,715 | $0 | $8,601 | $63,316 |
Sidewalks-Absarokee | Design and construction for a sidewalk project that includes: Removal of deteriorated concrete sidewalk, sub grade preparation and installation of new concrete sidewalk that is about six-feet wide and approximately 3565 feet in length in accordance with | Montana | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Absarokee | Stillwater | $100,541 | $0 | $11,183 | $111,724 |
Sidewalks-Chester | The design and construction for approximately 2,537 lineal feet of 6 to 8 foot wide concrete sidewalk in accordance with current design standards and ada requirements. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chester | Liberty | $76,912 | $0 | $23,216 | $100,128 |
23rd Street South Walks - Great Falls | Design and construction of 11,705 square feet of concrete sidewalk, two bus loading/unloading pads, 420 linear feet of curb and gutter, and ADA compliant curb ramps. The project includes irrigation system upgrades. In Great Falls along 23rd St S twixt 1 | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Great Falls | Cascade | $263,995 | $0 | $40,919 | $304,914 |
Sidewalks-Colstrip | 300 linear feet of sidewalk removal and replacement plus another 720 linear feet of new sidewalk construction | Montana | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Colstrip | Rosebud | $25,270 | $0 | $3,884 | $29,154 |
Civic Center Ped Trail | Design and construction of bike/ped path | Montana | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Butte | Butte Silver Bow | $239,109 | $0 | $37,063 | $276,172 |
Sidewalks - Crow Agency | Design and construction of sidewalks, landscaping and signage. | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Crow Agency | Big Horn | $433,052 | $0 | $67,124 | $500,176 |
City Trail Sys Phase 1 - Helena | Design and construction of a bicycle/pedestrian bridge and hard-surfaced shared use paths. Project includes striping bike lanes, sidewalk replacement, benches, lighting, and signs. | Montana | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Lewis & Clark | $1,132,455 | $0 | $175,531 | $1,307,986 |
3 Park Sidewalks -Helena | Design and construction of approximately 1575 linear feet of sidewalks at 3 Helena Park locations, to include ADA requirements. | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Lewis & Clark | $76,723 | $0 | $11,892 | $88,615 |
Sw Park Sidewalks-Hardin | Design and construction of concrete sidewalks to include ADA features. In Hardin around the periphery and across the interior of Southwest (South?) Park adjacent to Lewis Avenue, 1st Street, Miles Avenue and Division Street. | Montana | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hardin | Big Horn | $66,216 | $0 | $10,264 | $76,480 |
1996 School Sidewalks-Blgs | The design and construction of concrete sidewalks, curb and gutter, street widening on 17th Street West and Colton Boulevard, and curb bulbing at the intersections of 32nd Street West with Colton Boulevard and Boulder Avenue. Associated work such as new | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Billings | Yellowstone | $121,708 | $0 | $256,665 | $378,373 |
Sidewalks-Malta | The design and construction for the removal of old sidewalk and installation of new concrete sidewalks and curbs along eight blocks and near the high school. Construction will occur on right-of-way owned by the Montana Department of Transportation and t | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Malta | Phillips | $123,551 | $0 | $31,455 | $155,006 |
Farm To Market Road Path | asphalt path about 10-feet wide and about 5,940-feet long | Montana | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalispell | Flathead | $143,015 | $0 | $23,149 | $166,164 |
Bike/Ped Fac-Sherian County | The design and construction of sidewalks in the County and a bike/pedestrian path in Plentywood. The County portion is for removal and replacement of deteriorated sidewalks in Medicine Lake, Westby, Reserve and Antelope. The City portion is for an 8-10 | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Plentywood | Sheridan | $158,583 | $0 | $51,280 | $209,863 |
Greenough Drive Sidewalks-Msla | Design and construction of sidewalks, bike lanes, and curb and gutter. In Missoula along both sides of Greenough Drive between Madison Avenue and the Water Works Hill Trailhead. Proposed construction date is September 17, 2010. | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $221,066 | $221,066 | $0 | $221,066 |
College & Huffine Path-Bozeman | Design and construction of a 10' wide shared use path. Project will include signage, three bridges (or other type water crossings), and protected crosswalks. | Montana | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bozeman | Gallatin | $491,420 | $0 | $76,171 | $567,591 |
19th St W Walks - Billings | Design and construction of hard-surfaced ADA compliant sidewalks, curb extensions, beacons, and a ladder style crosswalk. | Montana | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Billings | Yellowstone | $136,392 | $0 | $21,142 | $157,534 |
Montana St Ped Bridge | 80 foot pedestrian bridge over Montana Street | Montana | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Butte | Butte Silver Bow | $135,498 | $0 | $42,944 | $178,442 |
Clark Fork-Missoula | Design and construction of bike/ped path | Montana | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $220,130 | $0 | $714,029 | $934,159 |
Laknar Ln Path - Dillon | Design and construction of approx 1.12 miles of paved path, striping, rumble strips and easement aquisition. The majority of the project will utilize the existing ROW. ROW involvement is anticipated to require obtaining easements from two property owners. | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dillon | Beaverhead | $208,676 | $0 | $19,898 | $228,574 |
1996 Sidewalks-Park City | This project primarily involves the removal of approximately 175 sq. meters (1,875 sq. feet) of existing concrete sidewalk and the construction of 772 sq. meters (8,300 sq. feet) of new concrete sidewalk. Work will also include subgrade preparation, ere | Montana | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Park City | Stillwater | $37,724 | $0 | $5,847 | $43,571 |
Gardiner North - Sidewalks | Design and construction of approximately 2,000 feet of sidewalk. | Montana | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gardiner | Park | $76,582 | $0 | $11,870 | $88,452 |
Sidewalks - Froid | Removal of old sidewalks, design and installation of 336 sq yds of concrete sidewalks, 300 sq yds of concrete curb and gutter, and ADA ramps. In Froid along the south side of Main Street (S-405) between 1st and 2nd Avenues South, and along the west side o | Montana | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wolf Point | Roosevelt | $80,779 | $0 | $12,520 | $93,299 |
Fairgounds Bike/Ped - Hamilton | Design and construction of sidewalks, bike racks, concrete pads, sheltered benches, a drinking fountain, ADA compliant restroom, and ADA access ramps to public buildings. | Montana | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hamilton | Ravalli | $180,184 | $0 | $27,929 | $208,113 |
SRTS Sidewalks - Scobey | Design and construction of approximately 1,950 lineal feet of concrete sidewalk to include ADA features. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Scobey | Daniels | $80,609 | $0 | $12,494 | $93,103 |
Benton Ave Sidewalks-Helena | Reconstruction of sidewalks and pedestrian crossings to include 3400 sq ft of sidewalk, curb and gutter, signage, and mailbox relocations as needed. In Helena on the east side of Benton Avenue between Clarke Street and Lawrence Street. | Montana | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Lewis & Clark | $73,683 | $0 | $11,421 | $85,104 |
Homesteader Park-Huntley | This project is the design and construction of a pedestrian trail with an asphalt surface. An existing barbed wire fence will be removed. | Montana | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Huntley | Yellowstone | $76,918 | $0 | $19,229 | $96,147 |
Fairgrounds L'Scape/S'Walk-Gtf | The design and installation of landscaping and an irrigation system, as well as approximately 2,700 lineal feet of sidewalk, in accordance with current design standards and ADA requirements, adjoining and within the Montana ExpoPark. | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Great Falls | Cascade | $157,415 | $0 | $24,692 | $182,107 |
Ponderosa School Path - Billings | Design and construction of approximately 2,000 lineal feet of hard surfaced bicycle and pedestrian path. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Billings | Yellowstone | $217,114 | $0 | $33,652 | $250,766 |
2nd St Ne/Nw Walks - Cut Bank | Design and construction of approximately 1,400 lineal feet of ADA compliant concrete sidewalks to include street crossings. Project includes the installation of 2-4 radar speed signs near the elementary schools. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cut Bank | Glacier | $98,510 | $0 | $573 | $99,083 |
Joslyn St Path - Helena | Design and construction of a bicycle and pedestrian path approximately 3,400 feet in length. | Montana | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Lewis & Clark | $433,496 | $0 | $67,193 | $500,689 |
Lolo Trail - Missoula | Design and construction of approximately 4,300 lineal feet of hard-surfaced bicycle and pedestrian path. | Montana | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $433,922 | $0 | $67,258 | $501,180 |
2001 Sidewalks-East Helena | 630-lineal feet of new five to six foot wide concrete sidewalk | Montana | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Helena | Lewis & Clark | $19,320 | $0 | $2,994 | $22,314 |
S Central Bike/Ped Trl-Sidney | Design and construct bike/ped path | Montana | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sidney | Richland | $122,559 | $0 | $11,875 | $134,434 |
Sidewalks | Design and construction of sidewalks | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sweetgrass | Toole | $6,007 | $0 | $931 | $6,938 |
East Main St Sidewalks - Laurel (Dist Managed) | Replacement of deteriorated sidewalk at spot locations along East Main Street (P-4). Anticipated letting of Spring 2012. In Laurel on both sides of East Main Street (P-4) between 1st Avenue and Ohio Avenue. | Montana | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Laurel | Yellowstone | $199,266 | $0 | $30,887 | $230,153 |
9th-10th Connector | Retaining wall to reduce right of way acquisition associated with alignment of River's Edge Trail. | Montana | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Great Falls | Cascade | $50,750 | $0 | $7,866 | $58,616 |
K Williams Expansion Trl - Msla | Design and construction of a 1,320 foot long hard-surfaced bicycle and pedestrian path. | Montana | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $434,124 | $0 | $67,291 | $501,415 |
Sidewalks-Manhattan | Design and construction of sidewalks and possible repairs of existing sidewalks if funds allow. In Manhattan along the east side of South Broadway Street between Main Street and Lexington Avenue and, along the south side of Main Street between 7th Street | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bozeman | Gallatin | $73,773 | $0 | $11,435 | $85,208 |
Smith School Sidewalks - Helena | Install approximately 250 LN FT of 5' wide sidewalks, curb bulbs on California Street, and ADA ramps. | Montana | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Lewis & Clark | $37,235 | $0 | $5,395 | $42,630 |
Bike/Ped Trail-Whitefish | The design and construction of a 10 foot wide bike/pedestrian trail system through Whitefish that includes widening of shoulders, pavement markings, signing and planting of trees in accordance with current design standards and ADA requirements. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Whitefish | Flathead | $122,948 | $0 | $30,737 | $153,685 |
Oddfellows Park-Great Falls | The design and construction of park improvements to include landscaping, river landing, trailhead parking area, and other amenities for hiker/bikers. An irrigation system will be installed as will information signs. | Montana | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Great Falls | Cascade | $50,893 | $0 | $9,287 | $60,180 |
North Higgins Bike/Ped-Msla | Design and construction of sidewalks, bike lanes, and period lighting. The project includes street funiture, landscaping and bulbouts at the intersections. In Missoula along both sides of Higgins Avenue (U-8119) between Broadway and Railroad Streets. Anti | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $0 | $1,250,000 | $338,777 | $1,588,777 |
Ped Bridge - W of Opportunity | Design and construction of a bicycle and pedestrian bridge. | Montana | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anaconda | Deer Lodge | $66,041 | $0 | $10,236 | $76,277 |
Bike/Ped Path - Sheperd | The design, construction and right-of-way easement acquisition for a bike/pedestrian path approximately 2.6 miles in length, ten-foot wide with an asphalt surface in accordance with current design standards and ADA requirements. | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shepherd | Yellowstone | $8,906 | $0 | $1,381 | $10,287 |
Bike/Ped Path Hwy 93 - Kalispell | Design and construction of approximately one mile of hard-surfaced bicycle and pedestrian path 8 to 10 feet-wide to include ADA features, benches, trees, signing and landscaping. On the east side of Highway 93 (N-5) between East Wyoming Street and Meridi | Montana | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalispell | Flathead | $184,238 | $0 | $212,795 | $397,033 |
Black Eagle Falls Trail-Gtf | Design and construction for a paved bicycle pedestrian project about 2,950' in length that includes: earthwork, gravel sub-base, paving; topsoil and seeding adjacent to the trail; a paved trailhead parking area with a path connecting to trail; a very sho | Montana | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Great Falls | Cascade | $123,101 | $0 | $19,260 | $142,361 |
Florence-North | Design and construction of bike/ped path | Montana | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Florence | Ravalli | $93,500 | $0 | $14,493 | $107,993 |
School District Sidewalks 2 - Shelby | Design and construction of sidewalks, alley aprons and ADA features. | Montana | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shelby | Toole | $8,931 | $0 | $1,384 | $10,315 |
Gabel Rd Bike/Ped Path-Blgs | Design and construction of bike/ped path | Montana | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Billings | Yellowstone | $95,431 | $0 | $4,827 | $100,258 |
Copper Sands Rd Path - Anaconda | Design and construction of bicycle and pedestrian paths at two locations in Anaconda. | Montana | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Anaconda | Deer Lodge | $43,222 | $0 | $6,698 | $49,920 |
Bike Ped Path - Box Elder | Construction of an approximately one mile long hard-surfaced path to include protective barriers where the path crosses Box Elder Creek. Parallels Laredo Road east and south of the town of Box Elder. | Montana | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Box Elder | Hill | $158,318 | $0 | $24,540 | $182,858 |
Main Street Enhancement | new concrete sidewalk about 12-feet wide and about 570-feet long, curb and gutter, tree grates, trees, irrigation system, pedestrian benches, trash receptacles and conduit for future lighting | Montana | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Victor | Ravalli | $121,926 | $0 | $11,674 | $133,600 |
South Helena Interchange | Design and construction bike/ped paths | Montana | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Lewis & Clark | $435,000 | $0 | $67,426 | $502,426 |
Frontage Road Walkway-Frenchtown | Design and construction of bike/ped path | Montana | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Frenchtown | Missoula | $263,703 | $0 | $40,875 | $304,578 |
Jackson St Sidewalks-Billings | Design and construct sidewalks | Montana | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Billings | Yellowstone | $81,385 | $0 | $117,998 | $199,383 |
Upgrade Sidewalks (Ada Req.), 3 Locs. | Design and construction of sidewalks | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Butte | Butte Silver Bow | $134,286 | $0 | $33,574 | $167,860 |
1997 Woodland Park Path-Kal | Design and construction for a pedestrian path project that includes: Sub-base preparation and construction of an 8-foot wide asphalt path that is approximately 4,500-feet long in an existing city park. All path construction will be in accordance with c | Montana | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalispell | Flathead | $76,612 | $0 | $11,875 | $88,487 |
North Reserve St-Msla | Construction only that includes complete reconstruction of the existing roadway to a 4 lane PCCP surfacing limited access facility with dedicated left turn lanes at major intersections. Bicycle paths and sidewalks on the east and west side of the roadwa | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $277,220 | $0 | $42,984 | $320,204 |
Three Forks - Urban | Design and construction of concrete sidewalks and asphalt bike/ped trail. | Montana | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Three Forks | Gallatin | $43,470 | $0 | $6,738 | $50,208 |
Sidewalks - Manhattan | Design and construction of 360 lineal feet of sidewalk to connect to an existing path. | Montana | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Manhattan | Gallatin | $48,102 | $0 | $48,102 | $96,204 |
Madison St Bridge Trail - Msla | Design and construction of an 8-foot wide, 520 foot long gravel surfaced connector trail. | Montana | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $4,013 | $0 | $6,603 | $10,616 |
Arrowhead School Path - Billings | Design and construction of approximately 1200 lineal feet of hard-surfaced bicycle and pedestrian path. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Billings | Yellowstone | $80,166 | $0 | $12,425 | $92,591 |
Sidewalks 4 - Big Timber | Construction of approximately 1000 lineal feet of ADA compliant concrete sidewalk. Three sites in Big Timber: an ADA corner on the southeast corner of 3rd Ave and Hooper St, sidewalk on the south side of 5th Ave twixt Hooper and Poplar Sts, sidewalk on t | Montana | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Big Timber | Sweet Grass | $78,439 | $0 | $12,158 | $90,597 |
Sidewalk Replacement-Stanford | The design and construction for a sidewalk project at three locations. 1) Judith Basin County Courthouse, 2) Senior Citizens Center and 3) along Main Street. This includes removal of old concrete replacing it with new. New steps to the courthouse and | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Stanford | Judith Basin | $37,752 | $0 | $9,438 | $47,190 |
Bike/Ped Path-Chinook | The design and construction of a Bike/Pedestrian Facility from U.S. 2 to the fairgrounds in Chinook. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chinook | Blaine | $25,321 | $0 | $6,330 | $31,651 |
Mt 16 - Culbertson | Design and construction of sidewalks and ADA featues in the Town of Culbertson. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Culbertson | Roosevelt | $158,770 | $0 | $24,610 | $183,380 |
Sidewalks-Hot Springs | Design and construction for a sidewalk/landscaping project that includes: Removal of about 1,230-LF of deteriorated concrete sidewalk and installation of approximately 4,040-LF of new concrete sidewalk, installation of about six pedestrian benches and tw | Montana | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hot Springs | Sanders | $133,022 | $0 | $0 | $133,022 |
Bike/Ped - Bozeman | Design and construction of hard-surfaced bicycle and pedestrian path, ADA accessible curbs, signage, striping, curb and gutter. | Montana | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bozeman | Gallatin | $240,934 | $0 | $37,345 | $278,279 |
US 93 Path - Arlee | Design and construction of a hard-surfaced bicycle and pedestrian path approximately .85 miles in length. | Montana | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Arlee | Lake | $185,026 | $0 | $28,679 | $213,705 |
17th Ave Sidewalks - Forsyth | Design and construction of approximately 600 linear feet of 5 foot-wide concrete sidewalks and curb. The project includes an underground sprinkler system and sidewalk lighting. | Montana | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Forsyth | Rosebud | $185,056 | $0 | $28,684 | $213,740 |
Custer Park Sidewalks-Hardin | Design and construction/reconstruction of new sidewalks to replace existing damaged sidewalks on two sides and in the middle of Custer Park, to include ADA ramps at all intersections The project is located in Hardin on the south side of 4th Street West be | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hardin | Big Horn | $78,946 | $0 | $12,236 | $91,182 |
Sidewalks II - Butte | Design and construction of approximately 52,000 square feet of ADA compliant sidewalk. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Butte | Silver Bow | $680,969 | $0 | $105,551 | $786,520 |
Sidewalks-Savage/Lambert | Design and construction for a sidewalk project in Savage and Lambert that includes: removal of about 515-feet of deteriorated concrete sidewalk, new sidewalk and curb and gutter approximately 1,120-feet in length at various locations within both towns in | Montana | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Savage | Richland | $77,915 | $0 | $7,380 | $85,295 |
Sidewalk 1st Ave S-Gtf | Design and installation of 500 linear feet of concrete sidewalk & curb, two bulbout corners, 4 ADA ramps, trees, period lights, bicycle rack and other minor landscape features. In Great Falls on the south side of 1st Avenue South (U-5234) between 2nd and | Montana | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Great Falls | Cascade | $997,367 | $0 | $154,593 | $1,151,960 |
Sidewalks | Design and construction of sidewalks | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Stevensville | Ravalli | $54,887 | $0 | $13,722 | $68,609 |
Heights Bike Trail-Billings | The design and construction of a two mile, ten foot wide, hard surfaced pedestrian/bike facility. The project will include appropriate signing and will be constructed along an existing utility right-of-way in Billings Heights. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Billings | Yellowstone | $209,284 | $0 | $52,321 | $261,605 |
Bike/Ped Paths - Gallatin Co. | Design and construction of approximately 8,605 lineal feet of hard-surface bicycle and pedestrian path to include ADA features. | Montana | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Belgrade | Gallatin | $430,425 | $0 | $59,045 | $489,470 |
Rocky Pt/Hillcrest Path-Polson | Design and construction to include widening along Rocky Point Road and Hillcrest Drive. The project is approximately 16,500 feet long with widening to be 8-10 feet. The project also includes stripping and signing. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Polson | Lake | $245,467 | $0 | $0 | $245,467 |
US 93 Path II - Arlee | Construction of a hard-surfaced bicycle and pedestrian path approximately 1.5 miles in length. | Montana | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Arlee | Lake | $138,208 | $0 | $7,146 | $149,145 |
Sidewalks | Design and construction of sidewalks | Montana | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Judith Gap | Wheatland | $249,827 | $0 | $59,238 | $309,065 |
Kim Williams Expansion Trail - Missoula | Design and construction of a 1,320 foot long hard-surfaced bicycle and pedestrian path. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $434,124 | $0 | $67,291 | $501,415 |
Cote Lane Walkway-Msla | Design and construction for a pedestrian walkway that includes: Sub-base preparation, grading and placing asphalt surfacing on a walkway that is about 10-feet wide, adjacent to the roadway for an approximate distance of 1.0 miles. All work will be in ac | Montana | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $66,769 | $0 | $36,692 | $103,461 |
Sidewalks - Medicine Lk & Westby | Medicine Lake-approximately 60 lineal feet of concrete sidewalks, curb and gutter. Westby-approximately 350 lineal feet of concrete sidewalks, curb and gutter, and ADA ramps. | Montana | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Westby | Sheridan | $47,503 | $0 | $5,363 | $52,867 |
Bike/Ped Trail-Silver Park | Design and construction of 10' wide hard surfaced bike/ped trails including excavation, installation of irrigation, lighting, benches, trash receptacles and landscaping. In Missoula at Silver Park, creating a connection to the Riverfront Trail System and | Montana | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Missoula | Missoula | $564,340 | $0 | $87,473 | $651,813 |
Mullan Rd Walkway-Frenchtown | Construct a 4-foot widening of Mullan Road from the Frenchtown school east, for a distance of 2,100 feet on both sides of the road. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Frenchtown | Missoula | $33,603 | $0 | $8,401 | $42,004 |
Missouri River Footbridge | The Design and Construction work to include re-decking of the second span of the existing bridge; install chainlink barrier fence and reconstruction of the bridge approach. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fort Benton | Chouteau | $50,325 | $0 | $12,581 | $62,906 |
Riverview Rd Path - Seeley Lake | Design and construction of a 10' wide shared use path approximately .75 miles in length. | Montana | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Seeley Lake | Missoula | $122,265 | $0 | $18,951 | $141,216 |
Bike/Ped Path - Darby | Construction of a hard surface ped/bike path in Darby Memorial Park and Library. Includes landscaping and street furniture. | Montana | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Darby | Ravalli | $93,711 | $0 | $12,881 | $106,592 |
Churchill Rd Sidewalk | Design and construction of approximately 1,900 lineal feet of concrete sidewalk and street crossings at Bethal Drive, Pleasant Street, and the east end of the project. | Montana | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Churchill | Gallatin | $123,940 | $0 | $19,211 | $143,151 |
Baltrusch Trail - Havre | Paving of a 5100 ' x 6 ' wide paved multiuse, ADA accessible path. The trail begins near the intersection of 17th Street and 12th Avenue and travels to the east until it reaches the the dike and then travels along the dike to the northeast to intersect wi | Montana | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Havre | Hill | $59,513 | $0 | $9,225 | $68,738 |
City Hall Sidewalks - Plentywood | Construction of approximately 72 lineal feet of 11.25 foot-wide concrete sidewalk. Project includes the removal of the existing deteriorated sidewalk. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Plentywood | Sheridan | $51,837 | $0 | $8,035 | $59,872 |
1996 Lawrence Park Tr-Kal | Design and construction for an asphalt surfaced pedestrian/bicycle trail approximately 1,600 feet long and 10-foot wide including two bike racks, four pedestrian benches, one pedestrian bridge and appropriate signing in accordance with current design sta | Montana | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Kalispell | Flathead | $327,280 | $0 | $50,775 | $378,055 |
Bike/Ped Walkway-Wpt | The Local Agency will design and construct a walkway that meets ADA requirements. Construction includes excavation, curb and gutter and new walkway along the east edge of 6th Avenue within the existing City of Wolf Point right of way. | Montana | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wolf Point | Roosevelt | $183,946 | $0 | $190,453 | $374,399 |
5th St South Streetscape - Gtf | Install 294 lineal feet of concrete sidewalk, curb & gutter, ramps, plant 12 trees, install 4 period lights, and 8 granite benches. | Montana | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Great Falls | Cascade | $143,441 | $0 | $20,483 | $163,924 |
Courthouse Walks - Deer Lodge | Design and construction of 305 square yards of concrete sidewalks and 273 linear feet of curb and gutter. Installation of an irrigation system, planting of trees and shrubs, and the restoration of the statue of Lieutenant John Mullan. | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Deer Lodge | Powell | $91,050 | $0 | $14,113 | $105,163 |
Richland County Sidewalks | Design and construction for a sidewalk project that includes: Removal of deteriorated sidewalk about 830-SY, installation of about 1,040-SY of new concrete sidewalk approximately 8-feet wide and installation of curb and gutter and asphalt patching at ne | Montana | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Richland | $76,247 | $0 | $11,818 | $88,065 | |
Sidewalks-E.Helena | Design and construction of approximately 673 lineal feet of concrete sidewalks. Work includes valley gutter and ADA features. In East Helena: 1) On the north side of Main Street between 2nd and 1st Streets. 2) On the north side of Main Street west of | Montana | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Helena | Lewis & Clark | $51,948 | $0 | $8,052 | $60,000 |
City Sidewalks - Livingston | Construction of approximately 3,950 lineal feet of concrete sidewalks and 32 ADA curb ramps. 625 lineal feet of sidewalk and 4 ADA curb ramps are on-system (U-routes). | Montana | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | Livingston | Park | $158,584 | $0 | $24,581 | $183,165 |
Old Hwy 200 Trail - Milltown | Design and construction of a hard-surfaced bicycle and pedestrian trail approximately 3,250 feet in length. | Montana | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | Milltown | Missoula | $137,796 | $0 | $21,358 | $159,154 |
Bike/Ped Path-Cascade | Design and construct bike/ped path | Montana | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cascade | Cascade | $100,001 | $0 | $32,734 | $132,735 |
Bike/Ped Safety Campaign - Blgs | Design and production of a safety campaign aimed at educating bicyclists, pedestrians, and motorists on how to travel safely. The campaign will include, television ads, print advertisements, billboards, radio ads, and other print media to be released in | Montana | 2012 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Billings | Yellowstone | $92,165 | $0 | $14,286 | $106,451 |
Historic Building Acq-Havre | Property acquisition only for the purchase of the Old Main Post Office building in accordance with current right-of-way property acquisition procedures. | Montana | 1996 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Havre | Hill | $89,610 | $0 | $13,890 | $103,500 |
Interpretive Sites-Choteau Co | Construction to include the fabrication overlook railings with sign mounts, the manufacture of 15 overlook signs and 20 levee signs, the fabrication of levee sign supports. A small structure will be constructed at each location to provide a viewing platf | Montana | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Chouteau | $58,440 | $0 | $9,058 | $67,498 | |
Visitor Center - Cooke City | Installation of interpretive displays in the Cooke City Visitor Center. The project includes lighting, fencing, and the establishment of a ground cover on the Visiitor Center property. Located at 206 Main Street in Cooke City. | Montana | 2013 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Cooke City | Park | $70,152 | $0 | $10,874 | $81,026 |
Transportation Exhibit-Billings | This project involves the development and construction of an indoor exhibit. Work will include research, oral interviews, and the construction of building displays. | Montana | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Billings | Yellowstone | $19,703 | $0 | $3,054 | $22,757 |
White Arm Park-Lodge Grass | Installation of landscape features to include native ground covers, benches, trash receptacles and fencing. In Lodge Grass at White Arm Park adjacent to Main Street. White Arm Park in Lodge Grass adjacent to Main Street (S-463). | Montana | 2010 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Lodge Grass | Big Horn | $25,703 | $0 | $3,984 | $29,687 |
Sprinkler System - Black Eagle | Installation of a sprinkler system. On the grounds of the Black Eagle Community Center at 2332 Smelter Ave, Black Eagle | Montana | 2010 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Great Falls | Cascade | $19,182 | $0 | $3,081 | $22,263 |
Lscape Central Park-Cut Bank | Design and installation of wall panels, brick pillars, steel fencing, planters, river rock borders, trees and canopies. The project is located on City property in Cut Bank east of the intersection of Main Street and Central Avenue. East of the intersectio | Montana | 2010 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Cut Bank | Glacier | $155,481 | $0 | $24,100 | $179,581 |
Buffalo Road Signs | Purchase and installation of an informational sign system consisting of approximately 20 aluminum signs on treated wood posts. The signs will denote the "Road to the Buffalo", a network of historic trails used by the native peoples to travel to and from | Montana | 2013 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Thompson Falls | Sanders | $5,243 | $0 | $813 | $6,056 |
Museum Landscape-Hardin | Installation of plants, benches, signage and a 6 foot-wide boardwalk approximately 1250 feet in length. East of Hardin along the south boundary of the Big Horn County Historical Museum property adjacent to Montana 47. | Montana | 2010 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Hardin | Big Horn | $82,181 | $0 | $12,738 | $94,919 |
Welcome Signs - Butte | Design, construction and placement of welcome signs and landscaping near the four Butte Interchanges. | Montana | 2005 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Butte | Butte Silver Bow | $69,991 | $0 | $10,292 | $80,283 |
Park Landscape-Lima | Landscaping project to include trees, fencing, and an irrigation system. In Lima southeast of the intersection of Peat and Harrison Streets. Proposed construction date July 30, 2008. | Montana | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Dillon | Beaverhead | $22,355 | $0 | $3,430 | $25,785 |
Community Hall Preserv-Lincoln | Removal and replacement of sill logs and damaged footings, flooring and floor joists as needed, filling and - or staining exterior cracks in logs, installation of drain system. Lincoln Community Hall at 404 Main Street (MT 200) in Lincoln. anticipated c | Montana | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Lincoln | Lewis & Clark | $164,472 | $0 | $25,493 | $189,965 |
Library Landscaping - Gtf | Removal of brick wall and fountain, fill in low areas, creation of pool area, construct bridge/ramp over pool into the main entrance of the library, plant trees and shrubs, and place benches. | Montana | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Great Falls | Cascade | $155,818 | $0 | $14,081 | $169,899 |
Landscaping - Colstrip | Purchase and installation of two "Welcome to Colstrip" signs. Project includes landscaping around the signs. | Montana | 2015 | 5 | (TE) 5. Landscaping and scenic beautification | Colstrip | Rosebud | $10,913 | $0 | $1,692 | $12,605 |
Entryway Landscaping | plasma cut welcome signs, landscape timbers, decorative rocks and shrubs at three locations | Montana | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Ennis | Madison | $11,296 | $0 | $1,234 | $12,530 |
Loma Hill Overlook-Chouteau Co | Design and construction for a landscaping project that includes: Construction of a concrete and wood open-air structure and interpretative signs at a scenic overlook. All construction will be in accordance with current design standards and ADA requireme | Montana | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Fort Benton | Chouteau | $34,141 | $0 | $3,100 | $37,241 |
Courthouse Windows-Ft Benton | Hire a consultant to perform a condition assessment and design drawings for the replacement of windows in the historic Chouteau County Courthouse. Chouteau County Courthouse, 1308 Franklin Street, in Fort Benton. | Montana | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Fort Benton | Chouteau | $100,631 | $0 | $15,598 | $116,229 |
Art Center-Colstrip | This project primarily involves the installation of landscaping features including an underground irrigation system, trees and shrubs, fencing, security lighting and an ADA accessible ramp at the rear entrance to the building. The project will also incl | Montana | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Colstrip | Rosebud | $61,817 | $0 | $18,450 | $80,267 |
Fort Assinniboine-Sw Of Havre | Stabilization, repair of exterior walls, repoint sections of brick on the Double Guard Cavalry Stable/Shop Building. Project is located at Fort Assinniboine south west of Havre on US 87 | Montana | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Havre | Hill | $11,394 | $0 | $1,719 | $13,113 |
Landscaping - Scobey | Purchase and installation of an irrigation system. | Montana | 2015 | 5 | (TE) 5. Landscaping and scenic beautification | Scobey | Daniels | $11,116 | $0 | $1,723 | $12,839 |
Fairgrounds Lscaping - Forsyth | underground irrigation system, asphalt surfaced handicapped parking and ADA path | Montana | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Forsyth | Rosebud | $89,897 | $0 | $11,131 | $101,028 |
Courthouse Sq Rehab - Helena | Replace roof, gutters, venting and downspouts, upgrade and stabilize foundation, replace windows, doors, renovation of the front porch, installation of ADA features, and entrance and facade improvements to the 222 Broadway Building. Replacement of the det | Montana | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | Helena | Lewis & Clark | $256,244 | $0 | $39,718 | $295,962 |
2nd Av N-Malm Afb-Great Falls | Construction for a landscaping project described as installation of colored and textured concrete in sections of four medians on 2nd Avenue North between 57th Street and the Main Gate of Malmstrom Air Force Base. | Montana | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Great Falls | Cascade | $17,465 | $0 | $2,707 | $20,172 |
High Plains Landscaping -Gtf | Remove sidewalk on 2nd St S and replace with tree, sod and sprinkler system, install 150' of new sidewalk on Park Ave with Historic lighting and landscaping | Montana | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | Great Falls | Cascade | $85,423 | $0 | $12,887 | $98,310 |
Landscaping-Stanford | Design and construction for a landscaping project that includes: installation for under ground sprinkler system at three different locations. Two locations are in Stanford at the county courthouse and a city park. The other location is in Hobson along | Montana | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Stanford | Judith Basin | $10,871 | $0 | $1,685 | $12,556 |
2001 Landscaping-Forsyth | Design and construction for a landscaping project that includes: Installation of an underground sprinkler system, automatic controls and extension of existing sprinkler water lines in a 6.8 acre county owned cemetery adjacent to Interstate 94. All const | Montana | 2000 | 5 | (TE) 5. Landscaping and scenic beautification | Forsyth | Rosebud | $52,984 | $0 | $8,211 | $61,195 |
Landscaping - W Yellowstone | Lighting at the three entrances to town to illuminate the existing welcome signs. Design and construction of an events sign near the visitor center. In West Yellowstone on US 191 and 287. | Montana | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | West Yellowstone | Gallatin | $10,913 | $0 | $1,692 | $12,605 |
Landscaping - Baker & Plevna | Design and installation of approximately 22 period light poles and lamps. The installation of approximately 700 lineal feet of fencing. The installation of a pedestrian activated signal. | Montana | 2014 | 5 | (TE) 5. Landscaping and scenic beautification | Baker | Fallon | $126,562 | $0 | $19,617 | $146,179 |
Filtration Plant Lscape-Havre | Landscaping | Montana | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Havre | Hill | $35,254 | $0 | $22,612 | $57,866 |
Trailhead Landscape - Lewistown | Establishment of a trailhead for the Lewistown bicycle and pedestrian trail system. Construction of brick piers and entry sign at the trailhead entrance, an irrigation system, plantings, a water feature, benches, and trash receptacles. The project inclu | Montana | 2013 | 5 | (TE) 5. Landscaping and scenic beautification | Lewistown | Fergus | $94,739 | $0 | $14,685 | $109,424 |
Library Landscaping | placement of sod, planting of trees and bushes, and installing sidewalk and curb & gutter with handicapped access | Montana | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | Dutton | Teton | $23,799 | $0 | $3,351 | $27,150 |
Courthouse/Museum-Virginia Ci | Leveling of existing land at the courthouse and museum, terracing the land and planting new lawn area. The creation of new flower beds and planting of trees. | Montana | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Virginia City | Madison | $10,816 | $0 | $1,676 | $12,492 |
Mccarthy Park-Townsend | The Construction to include landscaping, trees and planting grass, drip irrigation system, sprinkler system and some picnic tables. | Montana | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Townsend | Broadwater | $47,879 | $0 | $7,421 | $55,300 |
River Drive Landscaping | Design and construction for a landscaping project that includes: Planting about 18 shrubs and 14 trees and sod, topsoil, minor grading, installation of an irrigation system for approximately 1.7 acres, and reconstruction of a historic sandstone retainin | Montana | 1997 | 5 | (TE) 5. Landscaping and scenic beautification | Great Falls | Cascade | $65,909 | $0 | $9,842 | $75,751 |
Park Landscaping-Twin Bridges | Construction for a landscaping project that includes: Installation of trees, shrubs, sod, pedestrian benches, electrical power, pipe, sprinkler heads, valves and control box for an under ground sprinkler system in a seven acre city park. | Montana | 2000 | 5 | (TE) 5. Landscaping and scenic beautification | Twin Bridges | Madison | $26,303 | $0 | $5,302 | $31,605 |
Courthouse L'Scaping-Columbus | This project is the design and construction of bermed flower beds delineated by brick on the east and west elevations and the south facade, the waterproofing of the structure's brick walls below the granite water table, the installation of a drip-type ir | Montana | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Columbus | Stillwater | $13,268 | $0 | $2,057 | $15,325 |
Park Landscaping-Clyde Park | The design and construction for a landscaping project that includes: Installation of an underground sprinkler system, one bike rack and approximately 880 lineal feet five foot wide concrete sidewalk in accordance with current design standards and ADA re | Montana | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Clyde Park | Park | $40,383 | $0 | $6,259 | $46,642 |
Landscaping-Roundup | The design and construction for building a retaining wall at one location and installation of underground sprinkler system, planting grass, shrubs at two locations. Also includes minor curb and gutter work at one location on right-of-way owned by the Mo | Montana | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Roundup | Musselshell | $43,632 | $0 | $6,763 | $50,395 |
Streetscape-Lewistown | Installation of streetscape amenities to include: bike stands, trash receptacles and benches. In Lewistown on Main Street (N-57) between 8th Avenue and 1st Avenue (P43/U7111). | Montana | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Lewistown | Fergus | $36,896 | $0 | $5,718 | $42,614 |
Park Landscaping | underground sprinkler system and planting about 15 trees in a town park | Montana | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Rudyard | Hill | $23,832 | $0 | $7,750 | $31,582 |
Robbers Roost - Madison Co | Restoration of Robber's Roost an historic stage coach stop 5 miles S of Sheridan on US Hwy 287 (aka Vigilante Trail). To include repairs or replacement of roof, trim, porch, flooring, windows, doors, masonry, fence and construction and installation of int | Montana | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | Virginia City | Madison | $28,051 | $0 | $4,348 | $32,399 |
Landscaping - Butte | Design, construction and installation of street trees, benches, period lighting, a monument sign, and sidewalks. | Montana | 2015 | 5 | (TE) 5. Landscaping and scenic beautification | Butte | Silver Bow | $140,513 | $0 | $21,780 | $162,293 |
Highway Landscaping-Drummond | The design and construction for a landscaping project that includes: Underground sprinkler system, planting grass, bushes, shrubs and installation of two pedestrian benches. | Montana | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Drummond | Granite | $9,245 | $0 | $1,319 | $10,564 |
3 Locations-Phillips County | The design and construction for a landscaping project to include trees, shrubs, topsoil, sod, watering systems, well, park benches, wooden planters and some sidewalk. | Montana | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Phillips | $36,408 | $0 | $6,157 | $42,565 | |
Historic Lighting-Bozeman | Design and construction for a scenic beautification project that includes: The preparation of the casting models, 140 base castings and pole caps for the installation of 46 - 2 bracket light fixtures along Main Street from Rouse Avenue to Grand Avenue. | Montana | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Bozeman | Gallatin | $73,707 | $0 | $14,085 | $87,792 |
Arts Guild-Red Lodge | Construction for the restoration of a historic railroad depot that includes: Removal and replacement of the old inadequate heating system and replacing it with a new hot water heating system, constructing a fire wall to contain the boiler, repairing wal | Montana | 1993 | 6 | (TE) 6. Historic preservation | Red Lodge | Carbon | $25,166 | $0 | $3,901 | $29,067 |
Courthouse-Helena | The design and construction for the repair of a historic retaining wall, landscaping, underground irrigation system and installation of historic lighting. | Montana | 1994 | 6 | (TE) 6. Historic preservation | Helena | Lewis & Clark | $25,014 | $0 | $3,877 | $28,891 |
Visitor Center - Havre | Hire a consultant to conduct and environmental study, facilitate project planning and develop preliminary design drawings for a visitor center. | Montana | 2006 | 6 | (TE) 6. Historic preservation | Havre | Hill | $25,000 | $0 | $3,875 | $28,875 |
City/County Building-Helena | The design and construction for the repair of damage to mortar joints by repointing and water damage through sealing. | Montana | 1994 | 6 | (TE) 6. Historic preservation | Helena | Lewis & Clark | $58,495 | $0 | $101,804 | $160,299 |
Sanders Community Hall | Exterior restoration | Montana | 2004 | 6 | (TE) 6. Historic preservation | Sanders | Treasure | $7,812 | $0 | $1,277 | $9,089 |
Traveler Info Station - Chinook | Installation of a 10-watt AM radio transmitter to provide recorded messages to travelers about the Bear Paw Battlefield and other Chinook area attractions. Transmission range of 3-5 miles. | Montana | 2006 | 6 | (TE) 6. Historic preservation | Chinook | Blaine | $7,656 | $0 | $6,000 | $13,656 |
Courthouse Rehab-Virginia City | Replace the existing roof on the county courthouse. | Montana | 1994 | 6 | (TE) 6. Historic preservation | Virginia City | Madison | $40,563 | $0 | $6,287 | $46,850 |
Fort Assinniboine Rehab | The construction for historic preservation at Fort Assinnibione that includes: Roofing repair, roof tile replacement, some structural repair, porch work, door and window frame and covers, some ceiling and wall repair, applying paint and sealant, gutter | Montana | 1996 | 6 | (TE) 6. Historic preservation | Havre | Hill | $67,743 | $0 | $10,499 | $78,242 |
Yankee Jim Canyon Trail-Lvgs | Design and construction of a gravel parking area, trail clearing, installation of benches, information sign. five area description signs and a unisex bathroom. Construction of an ADA accessable trail in accordance with current design standards and ADA r | Montana | 1994 | 6 | (TE) 6. Historic preservation | Livingston | Park | $96,678 | $0 | $9,236 | $105,914 |
Mmrh Rehab - Cascade Co | Design and installation of HVAC system, insulation and replacement of 2 doors. The Montana Museum of Railroad History in Great Falls on the Cascade County Fairgrounds. | Montana | 2010 | 6 | (TE) 6. Historic preservation | Great Falls | Cascade | $104,802 | $0 | $16,245 | $121,047 |
1996 Paris Gibson Square-Gtf | The design and construction for a historic preservation project that includes: The replacement of approximately 45 windows on the south side of the building. | Montana | 1998 | 6 | (TE) 6. Historic preservation | Great Falls | Cascade | $98,875 | $0 | $15,325 | $114,200 |
Heritage Center Pres-Havre | Design and construction for a historic preservation project that includes: Replacement of about 26 first floor windows with architecturally correct replacements in accordance with the Department of Interior's standards for rehabilitating historic buildi | Montana | 1998 | 6 | (TE) 6. Historic preservation | Havre | Hill | $85,075 | $0 | $13,185 | $98,260 |
Courthouse Restoration - Havre | Restoration and repair of the exterior architectual terra cotta on the Hill County Courthouse. The Courthouse is listed on the National Register of Historic Places and is located in Havre on the corner of 4th Street and 3rd Avenue in Havre. | Montana | 2014 | 6 | (TE) 6. Historic preservation | Havre | Hill | $231,714 | $0 | $35,916 | $267,630 |
Schoolhouse-Deborgia | The design and construction for a historic preservation project that includes: Replacing the building heater, replacement of broken windows, refinishing the vestibule and staircase area, refinish the first and second levels wood floors, clean/paint the | Montana | 1995 | 6 | (TE) 6. Historic preservation | Deborgia | Mineral | $26,229 | $0 | $4,066 | $30,295 |
Courthouse Windows - Stanford | Design, construction and installation of east side main windows and east side main entrance door and windows. | Montana | 2006 | 6 | (TE) 6. Historic preservation | Stanford | Judith Basin | $40,438 | $0 | $4,159 | $44,597 |
Horse Barn Preserv - Lewiston | Stabilization and restoration of a 1917 draft horse barn. CTEP funds will be used to construct 10 replacement windows. The building is eligible for listing on the National Register of Historic Places. Located on the Central Montana Fairgrounds north of | Montana | 2012 | 6 | (TE) 6. Historic preservation | Lewistown | Fergus | $31,156 | $0 | $4,830 | $35,986 |
Camp Needmore Rehab-Carter Co | Reconstruction of the mess hall building which will include: Lifting the structure, pouring new concrete foundations and new supports, enclosing the foundation, some electrical work, make the entrance ADA accessible and install a sign near the structure | Montana | 1996 | 6 | (TE) 6. Historic preservation | Ekalaka | Carter | $52,793 | $0 | $8,183 | $60,976 |
Courthouse-Stanford | Design and construction for a historic preservation project that includes: removal and installation of approximately fifty-five (55) windows on the second and third floors that conform to the Secretary of the Interior's standards regarding historic struc | Montana | 1998 | 6 | (TE) 6. Historic preservation | Stanford | Judith Basin | $82,343 | $0 | $12,764 | $95,107 |
Treasure County Museum - Hysham | Revise front entrance and replace windows and doors in the Treasure County Museum. This building is eligible for listing on the National Register of Historic Places. | Montana | 2013 | 6 | (TE) 6. Historic preservation | Hysham | Treasure | $17,429 | $0 | $2,701 | $20,130 |
Civic Center Restoration - Gtf | Assessment and first phase of repair to the exterior of the Civic Center, to include repair, repointing, and resetting of the concrete caps. | Montana | 2006 | 6 | (TE) 6. Historic preservation | Great Falls | Cascade | $72,890 | $0 | $10,065 | $82,955 |
Cascade County Courthouse | The Local Agency will replace existing single pane windows with retrofit double insulated glass windows. | Montana | 1993 | 6 | (TE) 6. Historic preservation | Great Falls | Cascade | $71,188 | $0 | $11,034 | $82,222 |
1999-Historic Light-Anaconda | Design and construction for a historic lighting project that includes: retrofit of street lights in a 36-block area by installing new underground service, weather tight outdoor enclosures, conduit, trenching and asphalt/concrete cutting and patching. The | Montana | 1999 | 6 | (TE) 6. Historic preservation | Anaconda | Deer Lodge | $180,000 | $0 | $612,292 | $792,292 |
Labor Temple-Red Lodge | repair and replace damaged windows; tuck point damaged brick mortar; repair and caulk around sandstone window sills; wash building and apply waterproof protection. | Montana | 1993 | 6 | (TE) 6. Historic preservation | Red Lodge | Carbon | $44,935 | $0 | $6,965 | $51,900 |
Rialto Preservation-Deer Lodge | Installation of new lights, windows, entrance doors and flooring, power wash facade and paint as needed. Rialto Theatre - 418 Main Street in Deer Lodge. | Montana | 2008 | 6 | (TE) 6. Historic preservation | Deer Lodge | Powell | $145,651 | $0 | $22,576 | $168,227 |
Courthouse Rehab-Bozeman | The design and construction for a historic preservation project that includes: Restoring the south facade revolving door, cleaning the exterior, tuck pointing the stone and brick surfaces, landscaping, underground sprinkler system, sidewalks to and arou | Montana | 1997 | 6 | (TE) 6. Historic preservation | Bozeman | Gallatin | $331,075 | $0 | $66,729 | $397,804 |
Yucca Theatre Rehab-Hysham | This project is preserving and renovating the exterior of the Yucca Theater in the town of Hysham. This work is described as the replacement of vegas, vestibule doors, and glass block windows; the preparation and painting of the building exterior; and r | Montana | 1994 | 6 | (TE) 6. Historic preservation | Hysham | Treasure | $29,275 | $0 | $6,238 | $35,513 |
Millstone And Markers-Msla | Design and construction that involves the installation of historic markers and a millstone display along two trails in Missoula. Also included will be the publishing of a historic walking tour/teaching guide with the information related to the historic | Montana | 1994 | 6 | (TE) 6. Historic preservation | Missoula | Missoula | $31,118 | $0 | $9,630 | $40,748 |
Townhall Preservation-Boulder | Design and construction for a historic preservation project that includes: Replacement of two doors and installation of approximately 30-foot long by 8-foot wide sidewalk in accordance with current design standards and ADA requirements. | Montana | 1997 | 6 | (TE) 6. Historic preservation | Boulder | Jefferson | $18,696 | $0 | $6,596 | $25,292 |
Civic Center-Helena | The design and construction for the repair of the mural on the outside above the main entrance to the Civil Center. | Montana | 1994 | 6 | (TE) 6. Historic preservation | Helena | Lewis & Clark | $43,607 | $0 | $6,759 | $50,366 |
County Courthouse Rehab-Helena | Design and construction for a historic preservation project that includes: Remove/replace about 320 lineal feet of retaining wall, re-point stone siding, restore granite and sandstone walls, restore fascia, seal vents, renovate granite steps, replace ent | Montana | 2000 | 6 | (TE) 6. Historic preservation | Helena | Lewis & Clark | $375,981 | $0 | $38,514 | $414,495 |
Pioneer Cabin Restoration-Helena | The local agency will develop a CTEP project described as the design and construction to restore a historical structure. This includes work on the roof, exterior walls, foundation, interior floor, and wall supports. | Montana | 1994 | 6 | (TE) 6. Historic preservation | Helena | Lewis & Clark | $33,293 | $0 | $5,160 | $38,453 |
Townhall-Wibaux | The design and construction for historic preservation for repair of the roof. | Montana | 1994 | 6 | (TE) 6. Historic preservation | Wibaux | Wibaux | $13,931 | $0 | $2,173 | $16,104 |
Stable Pres-Fort Assinniboine | Stabilization and preservation work on the calvary stable at Fort Assinniboine. Work to include masonry and roof repairs, rebuild doors, replace windows and painting. Southeast of US Hwy 87 on MSU-Northern Ag Experimental Station, six miles SW of Havre a | Montana | 2008 | 6 | (TE) 6. Historic preservation | Havre | Hill | $32,841 | $0 | $4,936 | $37,777 |
4-H Building Rehab-Gtf | Design and construction for the replacement/restoration of the roof on the historic 4-H building at the fairgrounds. | Montana | 1996 | 6 | (TE) 6. Historic preservation | Great Falls | Cascade | $85,167 | $0 | $13,201 | $98,368 |
Orpheum Marquee-Conrad | Replace the existing Orpheum Theatre marquee with a reproduction of the original. Marquee dimensions are approximately 36' wide x 7' high x 7' deep. On the northeast corner of Main (I-15 Business Loop) and 4th Ave in Conrad. | Montana | 2008 | 6 | (TE) 6. Historic preservation | Conrad | Pondera | $51,975 | $0 | $8,056 | $60,031 |
Courthouse-Fort Benton | Design and construction for a historic preservation that includes: Construction for the replacement of an historic metal roof to resemble the original roof of the county courthouse in accordance with the Secretary of the Interior's guidelines for the pre | Montana | 1999 | 6 | (TE) 6. Historic preservation | Fort Benton | Chouteau | $105,330 | $0 | $8,383 | $113,713 |
2001 City County Bldg | roofing of historic building | Montana | 2001 | 6 | (TE) 6. Historic preservation | Helena | Lewis & Clark | $121,327 | $0 | $16,222 | $137,549 |
Paris Gibson Square-Gtf | The repair, replacement and restoration of Paris Gibson Square's roof, windows and stained exterior stone. | Montana | 1993 | 6 | (TE) 6. Historic preservation | Great Falls | Cascade | $239,233 | $0 | $80,795 | $320,028 |
Historic School Rehab-Bozeman | Design and construction for a historic preservation project that includes: Demolition of the deteriorated roof sections, demolition of all fascia and soffits, repair of roof structure, new roof decking, new roof and construction of new trim in accordanc | Montana | 2000 | 6 | (TE) 6. Historic preservation | Bozeman | Gallatin | $131,463 | $0 | $18,251 | $149,714 |
Savenac Historic Site-Haugan | Design and construction of approximately 6 historic transportation related displays about the Savenac Historic Site from 1907 to the present. | Montana | 1995 | 6 | (TE) 6. Historic preservation | Haugan | Mineral | $15,585 | $0 | $3,320 | $18,905 |
Rialto Theater-Deer Lodge | Design and construction for a historic preservation project that includes: Rewiring the marquis, new fixtures, fiberglass roof, painting and replacement lights and globes on building exterior. | Montana | 1997 | 6 | (TE) 6. Historic preservation | Deer Lodge | Powell | $28,709 | $0 | $2,039 | $30,748 |
1996 Labor Temple-Red Lodge | The design and construction for historic preservation of a building that includes: Installation of three wood doors and frames, fill opening in foundation wall, restore electrical service, restore fire escape, install roof gutters, remove/replace sidewa | Montana | 1996 | 6 | (TE) 6. Historic preservation | Red Lodge | Carbon | $32,740 | $0 | $299,375 | $332,115 |
Community Hall-Lodge Pole | Design and construction for a historic preservation project that includes: Replacing deteriorated logs, filling joints between logs, roof, replacing windows and exterior doors in accordance with the Department of the Interiors Guidelines for the Rehabili | Montana | 2001 | 6 | (TE) 6. Historic preservation | Lodge Pole | Blaine | $220,625 | $0 | $34,197 | $254,822 |
Courthouse Preserv - Stanford | Repair and reinforcement of the brick exterior on the west side of the Judith Basin County Courthouse. | Montana | 2014 | 6 | (TE) 6. Historic preservation | Stanford | Judith Basin | $40,913 | $0 | $6,343 | $47,256 |
Historic Lighting-Eureka | Design and Construction for a landscaping project that includes: Installation of about 35 period-type street lights, landscaping approximately 7,500 square foot area with plants, shrubs and irrigation system, installation of a pedestrian path within the | Montana | 1996 | 6 | (TE) 6. Historic preservation | Eureka | Lincoln | $94,244 | $0 | $14,608 | $108,852 |
Depot Rehab-Dillon | Design and construction for a depot rehabilitation project that includes: Electrical work to bring the building up to operational standards. Work to be done is new electrical service, new wiring, outlets, switches and light fixtures. All work will con | Montana | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Dillon | Beaverhead | $11,855 | $0 | $10,236 | $22,091 |
Railroad Depot-Harlowton | The Local Agency will rewire existing fixtures, rewire the structure, prepare and paint portions of the structures exterior, complete fencing and complete landscaping. | Montana | 1993 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Harlowton | Wheatland | $8,619 | $0 | $1,336 | $9,955 |
Depot Restoration-Livingston | Design for the construction of a historic preservation project that includes: Evaluating the roof structure, new roof members as needed, replace roof, repoint existing brink in chimneys, minor plaster repair and install rain gutters in accordance with th | Montana | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Livingston | Park | $205,692 | $0 | $460,511 | $666,203 |
Depot Preservation-Kevin | The design and construction for restoring the depot by replacing the roof system, repainting the exterior siding and remodel the restrooms for ADA compliance. | Montana | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Kevin | Toole | $25,579 | $0 | $3,964 | $29,543 |
Bell Street Br Rehab-Glendive | The improvement contemplated consists of the design and repair/rehabilitation of a historic bridge. | Montana | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Glendive | Dawson | $256,276 | $0 | $279,723 | $535,999 |
Uprr Depot Rehab-West Y'Stone | Design and construction to repair the existing UPRR Dining Hall Building. This will include repair of a roof truss, log and frame rafter tails, fir slab siding and reset some of the stonework on the building. | Montana | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | West Yellowstone | Gallatin | $34,840 | $0 | $7,487 | $42,327 |
Depot Preservation-Billings | This project involves the rehabilitation of a historic railroad depot. Work will include removing the existing deteriorated roofing, repairing the underlying roofing structure, repairing the canopy and installing a new interior roof in the main depot bu | Montana | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Billings | Yellowstone | $175,531 | $0 | $29,769 | $205,300 |
Rr Corridor Preserv-Lewistown | Purchase of 16.87 miles of abandoned BNSF railroad right-of-way (approximately 200 acres) for use as a bicycle and pedestrian path. The project will include appraisal and survey costs. Begins 1.5 miles east of the town of Moore, extends east for 16.87 | Montana | 2007 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Lewistown | Fergus | $236,859 | $0 | $37,820 | $274,679 |
BA&P Historic Railtrail-Butte | Design and construction for a railtrail that includes: Sub grade preparation, asphalt paving, storm drainage, interpretive signs, pedestrian shelters and benches, trash containers and drinking fountain for a trail about 10-feet wide and about 2.186 mile | Montana | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Butte | Butte Silver Bow | $264,877 | $0 | $339,211 | $604,088 |
Milwaukee Rr Trail-Msla | Design and construction for a pedestrian trail about 2,900 feet in length that includes: Grading, sub-base preparation, asphalt surface on a portion of the trail that is approximately 12-feet wide in accordance with current design standards and ADA requ | Montana | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Missoula | Missoula | $197,213 | $0 | $49,303 | $246,516 |
Railtrail-Centerville | Design and construction for a bicycle trail, pedestrian path and improvements to a rural park, that include: a paved pedestrian trial approximately 1,100 ft in length, landscaping, irrigation system and four ADA parking spaces; and a gravel bicycle trail | Montana | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Centerville | Cascade | $184,885 | $0 | $28,212 | $213,097 |
Great Northern Railtrail-Kal | Design and construction for a bicycle/pedestrian path that includes: Sub-grade preparation and asphalt surfacing for a path about 2.2 miles in length and ten-foot wide. All construction will be in accordance with current design standards and ADA require | Montana | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Kalispell | Flathead | $430,674 | $0 | $26,767 | $457,441 |
Rail Trail-Somers | The design, right-of-way acquisition and construction of an approximately 1.2 mile long, 10-foot wide asphalt path on an abandoned railroad bed in accordance with current design standards, State right-of-way acquisition procedures and ADA requirements. | Montana | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Somers | Flathead | $105,659 | $0 | $16,377 | $122,036 |
Rail Trail Meridian-Kalispell | Design and construction for a pedestrian facility that is about 4,000 foot long, 10 foot wide asphalt paved trail. A 400' sidewalk will be constructed south of Meridian road leading to the trail. A two-strand barb wire fence will parallel each side of th | Montana | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Kalispell | Flathead | $153,138 | $0 | $37,888 | $191,026 |
Milwaukee Rr Row-Msla | The local agency will comply with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 as amended (49 CFR 24) in the acquisition process, however the local agency agrees not to acquire any property or easement subject to t | Montana | 1993 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Missoula | Missoula | $67,146 | $0 | $16,787 | $83,933 |
Control Of Outdoor Advertising | Control of outdoor advertising | Montana | 1996 | 9 | (TE) 9. Inventory, control, and removal of outdoor advertising | Statewide | Statewide | $809,691 | $0 | $125,962 | $935,653 |
Chief Plenty Coups State Park | To perform historical and cultural research of Chief Plenty Coups State Park. This will produce documentation and a final report. | Montana | 1994 | 10 | (TE) 10. Archaeological planning & research | Billings | Big Horn | $14,964 | $0 | $0 | $14,964 |
Archeological Site | Archeological investigation | Montana | 1995 | 10 | (TE) 10. Archaeological planning & research | Shawmut | Wheatland | $2,597 | $0 | $403 | $3,000 |
Ft Ellis Archaeological Survey | Conducting a magnetic survey and archaeological field test of the Fort Ellis site. The project will generate a detailed map of the subsurface archaeological deposits within approximately a 1.5 acre area at the fort site. | Montana | 1995 | 10 | (TE) 10. Archaeological planning & research | Bozeman | Gallatin | $18,398 | $0 | $2,852 | $21,250 |
Fort Assinniboine | Construction only; The project includes two phases: A) Archaeological survey of the fort cultural sources on the property; B) fencing around the historic buildings to preserve them. | Montana | 1994 | 10 | (TE) 10. Archaeological planning & research | Havre | Hill | $23,791 | $0 | $3,688 | $27,479 |
Charlie Russell Trail Brochure | The local agency will design, procure art, perform historical research and write text for brochure, and print brochure. | Montana | 1994 | 10 | (TE) 10. Archaeological planning & research | Judith Basin | $9,957 | $0 | $1,543 | $11,500 | |
Erosion Control, I-94, East of Hathwy. | Erosion mitigation | Montana | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Custer | $63,635 | $0 | $9,864 | $73,499 | |
Erosion Control, US 212 | Erosion mitigation | Montana | 1997 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Big Horn | $79,196 | $0 | $0 | $79,196 | |
Runoff Mitigation, 2 Locations | Erosion mitigation | Montana | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Billings | Yellowstone | $84,300 | $0 | $13,070 | $97,370 |
Lolo Pass Runoff Mitigation | Erosion mitigation | Montana | 1995 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Missoula | $337,135 | $0 | $52,256 | $389,391 | |
Pave Skalkoho Rd. (MT 38) to stop erosion | Erosion mitigation | Montana | 1993 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Philipsburg | Granite | $61,139 | $0 | $9,477 | $70,616 |
Transport Museum | Transportation museum project that includes exterior repair and painting, repair of windows, upgrade interior lighting, stairs, interior doors, heating and insulation, procure museum artifacts and mount displays | Montana | 2002 | 12 | (TE) 12. Establishment of transportation museums | Virginia City | Madison | $20,401 | $0 | $10,294 | $30,695 |