Project Search Results

Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Back to Search Page
Project Name Description State Year Activity Activity Type City County Federal Funds ARRA Funds Local Funds Total
SAFE SIDEWALKS-CONRAD Sidewalk work on 2nd Ave South between Maryland St and Michigan St. Speed signs near the intersection of Wisconsin St and 1st Ave South. Crosswalk signs near the intersection of Main Street and 3rd Ave South. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Conrad Pondera $97,181 $0 $15,062 $112,243
N 7th Ave Sidewalks-Bozeman Design and construction of ADA compliant sidewalks. Along North 7th Avenue connecting to the sidewalk north of Griffin Drive southward to connect to the sidewalk south of Nikles Drive in Bozeman. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Bozeman Gallatin $172,094 $0 $26,675 $198,769
Overlook Dr Path-GTF Design and construction of approximately 1,330 lineal feet of bicycle and pedestrian path. In Great Falls along the south side of Overlook Drive between the Broadwater Overlook Park and 10th Avenue South. Montana 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Great Falls Cascade $491,766 $0 $72,903 $564,669
SIDEWALKS-CASCADE Installation of ADA compliant sidewalks, curb and gutter along 4th Ave N between 4th St N and 2nd St N, along 3rd St S between 2nd Ave S and Central Ave, and along Central Ave (S-330) between 1st St and the Missouri River Bridge. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Cascade Cascade $163,883 $0 $24,174 $188,057
Hwy 135 Path - St. Regis Design and construction of 3,345 lineal feet of 10' wide sidewalk and 1,612 lineal feet of 8' wide asphalt trail. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities St. Regis Mineral $465,013 $0 $72,077 $537,090
Fairgrounds Sidewalks - Glasgow Design and construction of sidewalks and 3 ADA compliant parking spaces. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Glasgow Valley $234,321 $0 $36,320 $270,641
Highway 89 Path - S of Livingston Design and construction of a bicycle and pedestrian path. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Livingston Park $1,574,721 $0 $191,090 $1,765,811
Makawasha Ave Walks-Crw Agency Design and construction of approximately 1,690 lineal feet of concrete sidewalk. Located in Crow Agency along the south side of Makawasha Avenue between Bala Street and Mapata Avenue. Montana 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Crow Agency Big Horn $400,982 $0 $0 $400,982
SIDEWALK CONNECTIONS-BUTTE Installation of ADA compliant sidewalks on Stuart Ave (L-47-1390) between George St and the west entrance to the East Middle School. Anticipated Project Let Date = June of 2018. Estimated PE Phase End Date = December of 2020. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Butte Silver Bow $113,675 $0 $17,619 $131,294
Sidewalks-Fairfield Design and construction of sidewalks, crosswalks, curb and gutter. The Project is located in Fairfield along 2nd Avenue North between 6th and 7th Streets North, along 1st Avenue North from mid-block eastward to 7th Street North, along 5th Street North from 1st Avenue North southward approximately 100 feet, along 6th Street North between 1st Avenue North and Central Avenue, along Division Lane from Central Avenue West southward approximately 450 feet, and along Central Avenue West from Division Lane to Parkway. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Fairfield Teton $269,117 $0 $41,713 $310,830
Bitterroot Trail Safety-Msla Design and construction of bike/ped safety improvements to eight street crossings along the Bitterroot Branch Trail. In Missoula along the Bitterroot Branch Trail between North Avenue and 1st Street. Montana 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Missoula Missoula $285,580 $0 $29,563 $315,143
O St-Bennett St Connector-Liv Design and construction of a shared-use path (widened shoulder) and sidewalks. Along Park St between O St and Bennett St (widened shoulder), and along O St between Callender St and Park St (sidewalk) in Livingston. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Livingston Park $245,704 $0 $38,048 $283,752
Hwy 2 Ped Bridge - Malta Design and construction of a bicycle and pedestrian bridge. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Malta Phillips $1,750,223 $0 $263,247 $2,013,470
Nyhagen Rd Path-Cut Bank Design and construction of an 8-ft wide asphalt multi-use path. Project begins at the terminus of the sidewalk along S-213, just west of Central Avenue. The path extends east, crosses Central Avenue and continues east along the south side of Nyhagen Road for approximately 0.9 miles. The path then turns south along the western edge of City of Cut Bank property, School District property, and Glacier County Historical Society property for 0.5 miles and ending at Old Kevin Highway in Cut Bank. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Cut Bank Glacier $536,934 $0 $83,225 $620,159
Round Butte Rd Path-Ronan Design and construction of sidewalks and/or asphalt path. From the Ronan Middle School along Round Butte Road westward to the existing path west of the RR tracks in Ronan. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Ronan Lake $788,946 $0 $0 $788,946
Path Pavement Preservation-Boz Design and construction of pavement preservation consisting of patching, fog sealing, and ADA upgrades at the intersections. The Project shall be located in Bozeman on: the Highland Boulevard Path along the west side of Highland Boulevard between Main Street and Kagy Boulevard; the South 19th Avenue Path along the east side of South 19th Avenue between College Street and the FWP office north of Lincoln Street; the Library Path (Gallagator Trail) from the east side of the Bozeman Public Library to South Church Avenue; the College Street Path on the south side of College Street between South 11th Avenue and South 29th Avenue; and the Oak Street Path along the south side of Oak Street between Rouse Avenue and the 5th Avenue corridor. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Bozeman Gallatin $159,669 $0 $24,749 $184,418
Sidewalks-Twin Bridges Design and construction of ADA compliant sidewalk, crosswalks, curb and gutter. The Project is located in Twin Bridges along West 6th Avenue between Wray and Main Streets, along North Bridge between West 5th and 6th Avenues, along West 5th Avenue between North Bridge and Main Streets, along Wray Street between West 8th and West 6th Avenues, and along West 8th Avenue from Wray Street eastward to mid-block. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Twin Bridges Madison $288,188 $0 $43,588 $331,776
MULTI-USE PATH-LAME DEER Multi-Use path along Lame Deer School Access Road to BIA Route 4 (approximately 0.48 miles). Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Lame Deer Rosebud $568,942 $0 $0 $568,942
Three Mile Drive Path - Kalispell Design and construction of approximately 3,152 lineal feet of hard-surfaced bicycle and pedestrian path. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Kalispell Flathead $499,248 $0 $74,236 $573,484
PARK DR 4TH AVE N PED XING-GTF Transportation Alternatives (TA) project in Great Falls at the intersection of Park Drive (U-5208) and 4th Ave North. Bike/ped crossing extending across Park Drive (from 4th Ave N) to the Gibson Park Entrance. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Great Falls Cascade $193,810 $0 $30,038 $223,848
S-373 Ped Bridge-Woodside Design and construction of a bicycle and pedestrian bridge. Located in Ravalli County adjacent to S-373 (Woodside Cutoff Rd) between Woodside and Corvallis. The bridge will cross the Bitterroot River. Montana 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Woodside Ravalli $2,185,384 $0 $332,034 $2,517,418
Hwy 78 Path & Walks-Columbus Design and construction of multi-use paths, sidewalks, roadway crossing improvements (rectangular rapid flashing beacon, crosswalk markings & signage). The Project is located in Columbus along East Pike Avenue (S-306) between Quarry Street and North 3rd Street, along Highway 78 (P-78) between Ich-Ke-Pe Park and East 1st Avenue South, along East Pike Avenue (P-78) between Diamond Street and North 9th Street, and along North 9th Street (P-78) between East Pike Avenue and Granite Peak Park. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Columbus Stillwater $807,857 $0 $125,219 $933,076
Downtown ADA Ramps - Helena Design and construction of approximately 170 ADA ramps. Located in the greater Last Chance Gulch Area, also, along, Helena Avenue from Last Chance Gulch to just east of Montana Avenue, and along Last Chance Gulch (the street) as far north as Lyndale Avenue. Montana 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Helena Lewis & Clark $593,082 $0 $91,928 $685,010
Hwy 287 Sidewalks - Ennis Design and construction of ADA compliant concrete sidewalks. Montana 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Ennis Madison $430,408 $0 $57,625 $488,033
Sidewalks Phase II-Cascade Design and construction of sidewalks and ADA curb ramps. Along 3rd Street between 4th and 5th Avenues S, along 2nd Street between 4th Avenue S and Central Avenue, and along 3rd Avenue S between 1st and 3rd Streets in Cascade. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Cascade Cascade $298,752 $0 $46,307 $345,059
Benton Avenue Path-Helena Design and construction of a 0.73 mile long multi-use path. The project includes railroad crossing improvements, landscaping, chain link fence, curb & gutter and ADA upgrades. Along the east side of Benton Avenue from the intersection with the Centennial trail just north of the access road to the City of Helena Transfer Station, north across the railroad tracks and continuing north to the terminus of the existing paved multi-use path near the intersection of Benton Avenue and Elmwood Lane in Helena. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Helena Lewis & Clark $988,173 $0 $153,168 $1,141,341
Bike/Ped Path II Hwy 93-Kalispell Design and construction of a bicycle and pedestrian path approximately 892 feet in length. Along the west side of US 93 adjacent to the Kalispell Youth Complex (opposite Flathead Community College) in Kalispell. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Kalispell Flathead $195,970 $0 $30,375 $226,345
PEDESTRIAN CROSSINGS-CORVALLIS Rectangular rapid-flashing beacons (RRFBs) to be installed at the following locations: At the intersection of the Woodside Cutoff Rd (S-373) and Old Corvallis Rd, On the East Side Highway (S-269) at the primary school crosswalk, and On the East Side Highway (S-269) between the Edna Thomas School and the athletic field. Vehicle speed signs to be installed on the East Side Highway north of Edna Thomas School/athletic field crossing and just north of the intersection with 2nd Street. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Corvallis Ravalli $115,186 $0 $17,854 $133,040
West Bank Trail Imprvts-GTF Design and construction of a hard-surfaced bicycle and pedestrian path. In Great Falls along the east side of West Bank Park. Montana 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Great Falls Cascade $213,786 $0 $33,137 $246,923
W SIDE TRAIL XINGS-BOZEMAN Roadway crossing improvements (including widened sidewalks, curb ramps, refuge island, rectangular rapid flashing beacons and crosswalk markings) at three locations in Bozeman: On Babcock Street at the intersection with Fowler Ave, on Durston Road between Hunters Way and Greenway Ave, and on Oak Street at the intersection with Hunters Way. Anticipated Project Let Date = June of 2018. Estimated PE Phase End Date = December of 2020. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Bozeman Gallatin $141,813 $0 $21,981 $163,794
Hwy 93 Path - Kalispll Design and construction of approximately 3,840 lineal feet of hard-surface bicycle and pedestrian path. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Kalispell Flathead $185,737 $0 $25,447 $211,184
MULTI-USE PATH-HEART BUTTE Multi-Use path extending approximately 0.3 miles from Heart Butte School to Heart Butte Road. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Heart Butte Pondera $387,787 $0 $0 $387,787
BECRAFT LANE SIDEWALK-LOCKWOOD Installation of ADA compliant sidewalks, curb and gutter along Becraft Lane (L-56-1528) between Old Hardin Road and Noblewood Drive. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Lockwood Yellowstone $498,252 $0 $300,867 $799,119
Uptown ADA Ramps - Butte Design and construction of approximately 31,000 square feet concrete sidewalks, ADA ramps and corners. Montana 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Butte Silver Bow $165,688 $0 $25,682 $191,370
5th & E Street Walks - Livingston Design and construction of ADA compliant sidewalks and ADA curb ramps. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Livingston Park $255,490 $0 $39,601 $295,091
7th Ave NW Sidewalks-Choteau Design and construction of sidewalks, curb ramps, driveway and alley approaches. Along the west side of 7th Avenue NW between the high school and 7th Street NW in Choteau. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Choteau Teton $191,568 $0 $29,693 $221,261
7th Ave ADA Ramps - Lewistown Design and construction of ADA ramps. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Lewistown Fergus $421,226 $0 $65,291 $486,517
City Loop Path - Lewistown Design and construction of a paved surface on approximately 1.69 miles of existing gravel bicycle and pedestrian trail. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Lewistown Fergus $150,533 $0 $23,333 $173,866
Main Street ADA-Deer Lodge Design and construction of ADA compliant sidewalk and corners. Along Main Street between Texas and California Streets in Deer Lodge. Montana 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Deer Lodge Powell $791,387 $0 $122,666 $914,053
Main Street ADA Ramps - Shelby Design and construction of 10,280 square feet of concrete sidewalk and 11 ADA compliant curb ramps. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Shelby Toole $644,491 $0 $99,286 $743,777
MULTI-USE PATH-SE PABLO Multi-Use path on the east side of US-93 from Division Street to the existing path (near the pedestrian bridge). Some sidewalk along Big Knife Lane to tie the new path to the existing sidewalk. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Pablo Lake $45,497 $0 $0 $45,497
14TH ST SE 9TH AVE SE PATH-SID Transportation Alternatives (TA) project in Sidney along 14th St SE (U-10402) and 9th Ave SE (U-10407). Shared Use Path begins at intersection of 4th Ave SE & 14th St SE, extends along 14th St SE to 9th Ave SE, then up 9th Ave SE to 10th Street SE. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Sidney Richland $765,702 $0 $118,683 $884,385
Broadwater Ave Path - Billings Design and construction of approximately one-quarter mile of bicycle and pedestrian path. Montana 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Billings Yellowstone $450,156 $0 $69,839 $519,995
Durston Road Sidewalks - Bozeman Design and construction of ADA compliant sidewalks. Montana 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Bozeman Gallatin $100,895 $0 $15,639 $116,534
FAIRGROUNDS RD PATH-HAMILTON Transportation Alternatives (TA) project in Hamilton along Fairgrounds Road (from Old Corvallis Road to Daly Avenue). Shared use path to include lighting, retaining wall and fencing. Montana 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Hamilton Ravalli $530,375 $0 $82,208 $612,583
School Sidewalks - Arlee Design and construction of approximately 1,450 lineal feet of ADA compliant concrete sidewalks, Montana 2014 301 (TAP) 301. Safe routes to school infrastructure Arlee Lake $187,766 $0 $0 $187,766
Balsam St Sidewalk - Libby Design and construction of ADA compliant concrete sidewalk. Montana 2014 301 (TAP) 301. Safe routes to school infrastructure Libby Lincoln $225,081 $0 $34,888 $259,969
4th Ave East Walks - Polson Design and construction of sidewalks, curb, and ADA compliant crosswalks. Montana 2014 301 (TAP) 301. Safe routes to school infrastructure Polson Lake $275,664 $0 $0 $275,664
Lewis & King St Walks-E Helena Design and construction of ADA compliant sidewalks. Along the north side of East Lewis St between Lake Helena Dr and Oak Ave and along the south side of East King St and west side of North Montana Ave between the Radley School and East Clinton St in East Helena. Montana 2017 301 (TAP) 301. Safe routes to school infrastructure East Helena Lewis & Clark $338,261 $0 $52,432 $390,693
S-228 Path - Highwood Design and construction of 760' of bicycle and pedestrian path. Montana 2014 301 (TAP) 301. Safe routes to school infrastructure Highwood Chouteau $210,128 $0 $32,570 $242,698
Elem School Bike Ped - Bozeman Design and construction of sidewalks, shared use path, bike racks, and bike rack pads. Montana 2015 301 (TAP) 301. Safe routes to school infrastructure Bozeman Gallatin $418,486 $0 $61,981 $480,467
Gerald Ave Sidewalk Impvt-Msla Design and construction of ADA ramps, bulb-outs, rectangular rapid flashing beacons, signing, striping, and storm drain modifications at the intersections of 5th Street/Gerald Avenue and 6th Street/Gerald Avenue. Also, design and construction of a raised crosswalk across Gerald Avenue between Eddy Avenue and Connell Avenue in front of the main entrance to Hellgate High School. Montana 2018 301 (TAP) 301. Safe routes to school infrastructure Missoula Missoula $378,863 $0 $58,724 $437,587
City Park Walking Paths-Baker The local agency will construct concrete sidewalks, ramps, picnic areas and concrete bridge; install sprinkler system, picnic tables and landscaping. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Baker Fallon $20,537 $0 $5,134 $25,671
Sidewalks-Forsyth This project primarily involves the removal and replacement of approximately 503 meters (1650 ft.) concrete sidewalk and the rehabilitation of about 30 meters (100 ft.) of underground vaults. Work will also include the placement of crushed base course, Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Forsyth Rosebud $74,612 $0 $74,612 $149,224
River Trail-Deer Lodge Design and construction of approx. 3.75 miles x 10 ft wide trail system utilizing existing trails where possible in and around Deer Lodge. Montana 2006 1 (TE) 1. Pedestrian and bicycle facilities Deer Lodge Powell $246,598 $0 $37,223 $283,821
Aronson Bypass Trl - Billings Design and construction of a 10 foot-wide X 1,500 foot-long hard surfaced bicycle and pedestrian trail. Construction date is estimated to be 7/2013. Montana 2012 1 (TE) 1. Pedestrian and bicycle facilities Billings Yellowstone $130,289 $0 $20,194 $150,483
Crooked Falls Trl-Gtf Design and construction of a 6' to 8' wide pedestrain/bicycle trail to extend River's Edge Trail from the Lewis and Clark Overlook to Cochrane Dam. The first segment of trail will be paved, with the remainder being graveled. A 10-foot wide asphalt trail Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Great Falls Cascade $237,270 $0 $269,318 $506,588
Sidewalk Ramps-Missoula Installation of accessible curb ramps on existing public sidewalks within the City of Missoula. The following on system routes: Scott Street (U8109) between Toole and Phillips Streets. South 5th Street (U8114/P117) between Russell and Arthur Avenues. Sout Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $0 $350,000 $47,275 $397,275
Jensen Lane Path-Polson Design and construction for a pedestrian path that includes: Approximately 1,020-feet of concrete path that is 6-foot wide in accordance with current design standards and ADA requirements. Montana 1997 1 (TE) 1. Pedestrian and bicycle facilities Polson Lake $32,307 $0 $0 $32,307
U.S.2-Saco Construction only for a sidewalk project that is approximately 1,455 feet in length and 10-feet wide. Montana 1999 1 (TE) 1. Pedestrian and bicycle facilities Saco Phillips $61,991 $0 $6,000 $67,991
School Sidewalks - Florence Design and construction of approximately 2,490 LF of hard-surfaced sidewalks and paths. Project includes signs and striping of crosswalks near the Florence Elementary School. Near the Florence Elementary School along Old Highway 93 between Tie Chute Lane Montana 2008 1 (TE) 1. Pedestrian and bicycle facilities Hamilton Ravalli $283,143 $0 $43,887 $327,030
Sidewalks-Columbus This project is described as the removal of 399.5 square meters [4300 sq. ft.] of old sidewalk and the construction of 589.9 square meters [6350 sq. ft.] of new sidewalk. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Columbus Stillwater $39,935 $0 $9,984 $49,919
Blacktail Creek Project-Butte This project primarily involves the construction of a 3 meter (10-ft.) wide, 2,225 meter (7,300-ft.) long asphalt pavement pathway, two parking areas, two pedestrian footbridges over Blacktail Creek, earthen embankment stormwater sedimentation basins, st Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Butte Butte Silver Bow $899,627 $0 $220,142 $1,119,769
Continental Drive Path-Butte Design and construction for a pedestrian path that includes: grading, fill material, drainage culverts, sub-grade preparation, asphalt paving, striping, appropriate signs, planting native vegetation, pedestrian benches and as needed installation of safet Montana 1999 1 (TE) 1. Pedestrian and bicycle facilities Butte Butte Silver Bow $126,548 $0 $19,615 $146,163
County Museum Walkway-Hardin The design and construction of approximately 2,800 lineal feet 6-foot wide walkways using pressure treated lumber. Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Hardin Big Horn $91,543 $0 $0 $91,543
Bike/Ped Path - Troy Design and construction of 1 mile hard surfaced bike/ped path. Project includes storm drainage improvements. The project is located in Troy near the abandoned BNSF spur line between the intersection of Highway 2 and Haul Road extending north to Roosevelt Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Libby Lincoln $313,463 $0 $48,588 $362,051
Courthouse Sidewalks - Broadus Design and construction of approximately 880 lineal feet ADA compliant concrete sidewalks. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Broadus Powder River $139,901 $0 $22,685 $162,586
Gallatin River Tr - E Manhattan Design and construct bicycle/pedestrian trail. Montana 2003 1 (TE) 1. Pedestrian and bicycle facilities Manhattan Gallatin $414,233 $0 $7,372 $421,605
Highland Dr Sidewalk-Glasgow The project includes design and construction of a concrete drain structure, six foot sidewalk and an eight foot bike path. Total length of the project is approximately 2,862 linear feet. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Glasgow Valley $139,803 $0 $40,537 $180,340
Sierra Road Path asphalt path about 10-feet wide and approximately 3600 feet in length Montana 2002 1 (TE) 1. Pedestrian and bicycle facilities Helena Lewis & Clark $187,738 $0 $33,252 $220,990
Sidewalks & Landscaping - Msla Construction only to install approximately 9600 SF of 5' wide sidewalk and renovate disturbed landscaping. Montana 2005 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $27,849 $0 $40,000 $67,849
Clements Rd/North Av Path-Msla Design and construction for a pedestrian walkway that includes: gravel base and asphalt surfacing for a walkway approximately 1.5 miles in length and topsoil and seeding for about 2.3 acres to replant disturbed land in accordance with current design stan Montana 1998 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $212,172 $0 $26,683 $238,855
Sidewalks II - Laurel Design and construction of ADA compliant sidewalks, ADA crossings, a retaining wall, curb and gutter. Montana 2015 1 (TE) 1. Pedestrian and bicycle facilities Laurel Yellowstone $91,653 $0 $14,207 $105,860
Sidewalk II - Ft. Benton Design and construction of approximately 3,500 square feet of concrete sidewalk. Project includes the removal of the existing deteriorated sidewalk. In Fort Benton on the west side of Front Street between 12th and 13th Streets. Montana 2011 1 (TE) 1. Pedestrian and bicycle facilities Fort Benton Chouteau $37,890 $0 $5,873 $43,763
Roman Crk Rd Path Design and construction of a 1.25 mile X 8-10 ft wide pathway along north along Roman Creek Road beginning at the Frenchtown Frontage Road Walkway. Including top soil and seeding of all disturbed areas. The local agency will engage a project engineer fo Montana 2007 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $154,572 $0 $24,102 $178,674
Fairgrounds Sidewalks-Havre Design and construction for a sidewalk project that includes: Placing about 225 lineal feet, 6-foot wide concrete in one area, placing about 45 lineal feet of 12-foot wide concrete sidewalk and constructing five handicapped parking spaces. in accordance Montana 2000 1 (TE) 1. Pedestrian and bicycle facilities Havre Hill $19,344 $0 $2,997 $22,341
City Hall Sidewalks-Wolf Point Design and construction for a sidewalk project that includes: Removal of deteriorated sidewalk and replace with about 700 lineal feet of five foot wide concrete sidewalk, curb and gutter and adjustment of existing sprinkler heads. All construction will Montana 2000 1 (TE) 1. Pedestrian and bicycle facilities Wolf Point Roosevelt $54,715 $0 $8,601 $63,316
Sidewalks-Absarokee Design and construction for a sidewalk project that includes: Removal of deteriorated concrete sidewalk, sub grade preparation and installation of new concrete sidewalk that is about six-feet wide and approximately 3565 feet in length in accordance with Montana 2000 1 (TE) 1. Pedestrian and bicycle facilities Absarokee Stillwater $100,541 $0 $11,183 $111,724
Sidewalks-Chester The design and construction for approximately 2,537 lineal feet of 6 to 8 foot wide concrete sidewalk in accordance with current design standards and ada requirements. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Chester Liberty $76,912 $0 $23,216 $100,128
23rd Street South Walks - Great Falls Design and construction of 11,705 square feet of concrete sidewalk, two bus loading/unloading pads, 420 linear feet of curb and gutter, and ADA compliant curb ramps. The project includes irrigation system upgrades. In Great Falls along 23rd St S twixt 1 Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Great Falls Cascade $263,995 $0 $40,919 $304,914
Sidewalks-Colstrip 300 linear feet of sidewalk removal and replacement plus another 720 linear feet of new sidewalk construction Montana 2003 1 (TE) 1. Pedestrian and bicycle facilities Colstrip Rosebud $25,270 $0 $3,884 $29,154
Civic Center Ped Trail Design and construction of bike/ped path Montana 2003 1 (TE) 1. Pedestrian and bicycle facilities Butte Butte Silver Bow $239,109 $0 $37,063 $276,172
Sidewalks - Crow Agency Design and construction of sidewalks, landscaping and signage. Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Crow Agency Big Horn $433,052 $0 $67,124 $500,176
City Trail Sys Phase 1 - Helena Design and construction of a bicycle/pedestrian bridge and hard-surfaced shared use paths. Project includes striping bike lanes, sidewalk replacement, benches, lighting, and signs. Montana 2010 1 (TE) 1. Pedestrian and bicycle facilities Helena Lewis & Clark $1,132,455 $0 $175,531 $1,307,986
3 Park Sidewalks -Helena Design and construction of approximately 1575 linear feet of sidewalks at 3 Helena Park locations, to include ADA requirements. Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Helena Lewis & Clark $76,723 $0 $11,892 $88,615
Sw Park Sidewalks-Hardin Design and construction of concrete sidewalks to include ADA features. In Hardin around the periphery and across the interior of Southwest (South?) Park adjacent to Lewis Avenue, 1st Street, Miles Avenue and Division Street. Montana 2010 1 (TE) 1. Pedestrian and bicycle facilities Hardin Big Horn $66,216 $0 $10,264 $76,480
1996 School Sidewalks-Blgs The design and construction of concrete sidewalks, curb and gutter, street widening on 17th Street West and Colton Boulevard, and curb bulbing at the intersections of 32nd Street West with Colton Boulevard and Boulder Avenue. Associated work such as new Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Billings Yellowstone $121,708 $0 $256,665 $378,373
Sidewalks-Malta The design and construction for the removal of old sidewalk and installation of new concrete sidewalks and curbs along eight blocks and near the high school. Construction will occur on right-of-way owned by the Montana Department of Transportation and t Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Malta Phillips $123,551 $0 $31,455 $155,006
Farm To Market Road Path asphalt path about 10-feet wide and about 5,940-feet long Montana 2002 1 (TE) 1. Pedestrian and bicycle facilities Kalispell Flathead $143,015 $0 $23,149 $166,164
Bike/Ped Fac-Sherian County The design and construction of sidewalks in the County and a bike/pedestrian path in Plentywood. The County portion is for removal and replacement of deteriorated sidewalks in Medicine Lake, Westby, Reserve and Antelope. The City portion is for an 8-10 Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Plentywood Sheridan $158,583 $0 $51,280 $209,863
Greenough Drive Sidewalks-Msla Design and construction of sidewalks, bike lanes, and curb and gutter. In Missoula along both sides of Greenough Drive between Madison Avenue and the Water Works Hill Trailhead. Proposed construction date is September 17, 2010. Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $221,066 $221,066 $0 $221,066
College & Huffine Path-Bozeman Design and construction of a 10' wide shared use path. Project will include signage, three bridges (or other type water crossings), and protected crosswalks. Montana 2005 1 (TE) 1. Pedestrian and bicycle facilities Bozeman Gallatin $491,420 $0 $76,171 $567,591
19th St W Walks - Billings Design and construction of hard-surfaced ADA compliant sidewalks, curb extensions, beacons, and a ladder style crosswalk. Montana 2015 1 (TE) 1. Pedestrian and bicycle facilities Billings Yellowstone $136,392 $0 $21,142 $157,534
Montana St Ped Bridge 80 foot pedestrian bridge over Montana Street Montana 2001 1 (TE) 1. Pedestrian and bicycle facilities Butte Butte Silver Bow $135,498 $0 $42,944 $178,442
Clark Fork-Missoula Design and construction of bike/ped path Montana 1999 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $220,130 $0 $714,029 $934,159
Laknar Ln Path - Dillon Design and construction of approx 1.12 miles of paved path, striping, rumble strips and easement aquisition. The majority of the project will utilize the existing ROW. ROW involvement is anticipated to require obtaining easements from two property owners. Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Dillon Beaverhead $208,676 $0 $19,898 $228,574
1996 Sidewalks-Park City This project primarily involves the removal of approximately 175 sq. meters (1,875 sq. feet) of existing concrete sidewalk and the construction of 772 sq. meters (8,300 sq. feet) of new concrete sidewalk. Work will also include subgrade preparation, ere Montana 1996 1 (TE) 1. Pedestrian and bicycle facilities Park City Stillwater $37,724 $0 $5,847 $43,571
Gardiner North - Sidewalks Design and construction of approximately 2,000 feet of sidewalk. Montana 2014 1 (TE) 1. Pedestrian and bicycle facilities Gardiner Park $76,582 $0 $11,870 $88,452
Sidewalks - Froid Removal of old sidewalks, design and installation of 336 sq yds of concrete sidewalks, 300 sq yds of concrete curb and gutter, and ADA ramps. In Froid along the south side of Main Street (S-405) between 1st and 2nd Avenues South, and along the west side o Montana 2008 1 (TE) 1. Pedestrian and bicycle facilities Wolf Point Roosevelt $80,779 $0 $12,520 $93,299
Fairgounds Bike/Ped - Hamilton Design and construction of sidewalks, bike racks, concrete pads, sheltered benches, a drinking fountain, ADA compliant restroom, and ADA access ramps to public buildings. Montana 2014 1 (TE) 1. Pedestrian and bicycle facilities Hamilton Ravalli $180,184 $0 $27,929 $208,113
SRTS Sidewalks - Scobey Design and construction of approximately 1,950 lineal feet of concrete sidewalk to include ADA features. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Scobey Daniels $80,609 $0 $12,494 $93,103
Benton Ave Sidewalks-Helena Reconstruction of sidewalks and pedestrian crossings to include 3400 sq ft of sidewalk, curb and gutter, signage, and mailbox relocations as needed. In Helena on the east side of Benton Avenue between Clarke Street and Lawrence Street. Montana 2010 1 (TE) 1. Pedestrian and bicycle facilities Helena Lewis & Clark $73,683 $0 $11,421 $85,104
Homesteader Park-Huntley This project is the design and construction of a pedestrian trail with an asphalt surface. An existing barbed wire fence will be removed. Montana 1996 1 (TE) 1. Pedestrian and bicycle facilities Huntley Yellowstone $76,918 $0 $19,229 $96,147
Fairgrounds L'Scape/S'Walk-Gtf The design and installation of landscaping and an irrigation system, as well as approximately 2,700 lineal feet of sidewalk, in accordance with current design standards and ADA requirements, adjoining and within the Montana ExpoPark. Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Great Falls Cascade $157,415 $0 $24,692 $182,107
Ponderosa School Path - Billings Design and construction of approximately 2,000 lineal feet of hard surfaced bicycle and pedestrian path. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Billings Yellowstone $217,114 $0 $33,652 $250,766
2nd St Ne/Nw Walks - Cut Bank Design and construction of approximately 1,400 lineal feet of ADA compliant concrete sidewalks to include street crossings. Project includes the installation of 2-4 radar speed signs near the elementary schools. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Cut Bank Glacier $98,510 $0 $573 $99,083
Joslyn St Path - Helena Design and construction of a bicycle and pedestrian path approximately 3,400 feet in length. Montana 2015 1 (TE) 1. Pedestrian and bicycle facilities Helena Lewis & Clark $433,496 $0 $67,193 $500,689
Lolo Trail - Missoula Design and construction of approximately 4,300 lineal feet of hard-surfaced bicycle and pedestrian path. Montana 2014 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $433,922 $0 $67,258 $501,180
2001 Sidewalks-East Helena 630-lineal feet of new five to six foot wide concrete sidewalk Montana 2001 1 (TE) 1. Pedestrian and bicycle facilities East Helena Lewis & Clark $19,320 $0 $2,994 $22,314
S Central Bike/Ped Trl-Sidney Design and construct bike/ped path Montana 2004 1 (TE) 1. Pedestrian and bicycle facilities Sidney Richland $122,559 $0 $11,875 $134,434
Sidewalks Design and construction of sidewalks Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Sweetgrass Toole $6,007 $0 $931 $6,938
East Main St Sidewalks - Laurel (Dist Managed) Replacement of deteriorated sidewalk at spot locations along East Main Street (P-4). Anticipated letting of Spring 2012. In Laurel on both sides of East Main Street (P-4) between 1st Avenue and Ohio Avenue. Montana 2011 1 (TE) 1. Pedestrian and bicycle facilities Laurel Yellowstone $199,266 $0 $30,887 $230,153
9th-10th Connector Retaining wall to reduce right of way acquisition associated with alignment of River's Edge Trail. Montana 1993 1 (TE) 1. Pedestrian and bicycle facilities Great Falls Cascade $50,750 $0 $7,866 $58,616
K Williams Expansion Trl - Msla Design and construction of a 1,320 foot long hard-surfaced bicycle and pedestrian path. Montana 2015 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $434,124 $0 $67,291 $501,415
Sidewalks-Manhattan Design and construction of sidewalks and possible repairs of existing sidewalks if funds allow. In Manhattan along the east side of South Broadway Street between Main Street and Lexington Avenue and, along the south side of Main Street between 7th Street Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Bozeman Gallatin $73,773 $0 $11,435 $85,208
Smith School Sidewalks - Helena Install approximately 250 LN FT of 5' wide sidewalks, curb bulbs on California Street, and ADA ramps. Montana 2005 1 (TE) 1. Pedestrian and bicycle facilities Helena Lewis & Clark $37,235 $0 $5,395 $42,630
Bike/Ped Trail-Whitefish The design and construction of a 10 foot wide bike/pedestrian trail system through Whitefish that includes widening of shoulders, pavement markings, signing and planting of trees in accordance with current design standards and ADA requirements. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Whitefish Flathead $122,948 $0 $30,737 $153,685
Oddfellows Park-Great Falls The design and construction of park improvements to include landscaping, river landing, trailhead parking area, and other amenities for hiker/bikers. An irrigation system will be installed as will information signs. Montana 1993 1 (TE) 1. Pedestrian and bicycle facilities Great Falls Cascade $50,893 $0 $9,287 $60,180
North Higgins Bike/Ped-Msla Design and construction of sidewalks, bike lanes, and period lighting. The project includes street funiture, landscaping and bulbouts at the intersections. In Missoula along both sides of Higgins Avenue (U-8119) between Broadway and Railroad Streets. Anti Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $0 $1,250,000 $338,777 $1,588,777
Ped Bridge - W of Opportunity Design and construction of a bicycle and pedestrian bridge. Montana 2015 1 (TE) 1. Pedestrian and bicycle facilities Anaconda Deer Lodge $66,041 $0 $10,236 $76,277
Bike/Ped Path - Sheperd The design, construction and right-of-way easement acquisition for a bike/pedestrian path approximately 2.6 miles in length, ten-foot wide with an asphalt surface in accordance with current design standards and ADA requirements. Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Shepherd Yellowstone $8,906 $0 $1,381 $10,287
Bike/Ped Path Hwy 93 - Kalispell Design and construction of approximately one mile of hard-surfaced bicycle and pedestrian path 8 to 10 feet-wide to include ADA features, benches, trees, signing and landscaping. On the east side of Highway 93 (N-5) between East Wyoming Street and Meridi Montana 2012 1 (TE) 1. Pedestrian and bicycle facilities Kalispell Flathead $184,238 $0 $212,795 $397,033
Black Eagle Falls Trail-Gtf Design and construction for a paved bicycle pedestrian project about 2,950' in length that includes: earthwork, gravel sub-base, paving; topsoil and seeding adjacent to the trail; a paved trailhead parking area with a path connecting to trail; a very sho Montana 2000 1 (TE) 1. Pedestrian and bicycle facilities Great Falls Cascade $123,101 $0 $19,260 $142,361
Florence-North Design and construction of bike/ped path Montana 1999 1 (TE) 1. Pedestrian and bicycle facilities Florence Ravalli $93,500 $0 $14,493 $107,993
School District Sidewalks 2 - Shelby Design and construction of sidewalks, alley aprons and ADA features. Montana 2010 1 (TE) 1. Pedestrian and bicycle facilities Shelby Toole $8,931 $0 $1,384 $10,315
Gabel Rd Bike/Ped Path-Blgs Design and construction of bike/ped path Montana 2004 1 (TE) 1. Pedestrian and bicycle facilities Billings Yellowstone $95,431 $0 $4,827 $100,258
Copper Sands Rd Path - Anaconda Design and construction of bicycle and pedestrian paths at two locations in Anaconda. Montana 2015 1 (TE) 1. Pedestrian and bicycle facilities Anaconda Deer Lodge $43,222 $0 $6,698 $49,920
Bike Ped Path - Box Elder Construction of an approximately one mile long hard-surfaced path to include protective barriers where the path crosses Box Elder Creek. Parallels Laredo Road east and south of the town of Box Elder. Montana 2007 1 (TE) 1. Pedestrian and bicycle facilities Box Elder Hill $158,318 $0 $24,540 $182,858
Main Street Enhancement new concrete sidewalk about 12-feet wide and about 570-feet long, curb and gutter, tree grates, trees, irrigation system, pedestrian benches, trash receptacles and conduit for future lighting Montana 2002 1 (TE) 1. Pedestrian and bicycle facilities Victor Ravalli $121,926 $0 $11,674 $133,600
South Helena Interchange Design and construction bike/ped paths Montana 2006 1 (TE) 1. Pedestrian and bicycle facilities Helena Lewis & Clark $435,000 $0 $67,426 $502,426
Frontage Road Walkway-Frenchtown Design and construction of bike/ped path Montana 2002 1 (TE) 1. Pedestrian and bicycle facilities Frenchtown Missoula $263,703 $0 $40,875 $304,578
Jackson St Sidewalks-Billings Design and construct sidewalks Montana 2004 1 (TE) 1. Pedestrian and bicycle facilities Billings Yellowstone $81,385 $0 $117,998 $199,383
Upgrade Sidewalks (Ada Req.), 3 Locs. Design and construction of sidewalks Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Butte Butte Silver Bow $134,286 $0 $33,574 $167,860
1997 Woodland Park Path-Kal Design and construction for a pedestrian path project that includes: Sub-base preparation and construction of an 8-foot wide asphalt path that is approximately 4,500-feet long in an existing city park. All path construction will be in accordance with c Montana 1997 1 (TE) 1. Pedestrian and bicycle facilities Kalispell Flathead $76,612 $0 $11,875 $88,487
North Reserve St-Msla Construction only that includes complete reconstruction of the existing roadway to a 4 lane PCCP surfacing limited access facility with dedicated left turn lanes at major intersections. Bicycle paths and sidewalks on the east and west side of the roadwa Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $277,220 $0 $42,984 $320,204
Three Forks - Urban Design and construction of concrete sidewalks and asphalt bike/ped trail. Montana 2011 1 (TE) 1. Pedestrian and bicycle facilities Three Forks Gallatin $43,470 $0 $6,738 $50,208
Sidewalks - Manhattan Design and construction of 360 lineal feet of sidewalk to connect to an existing path. Montana 2012 1 (TE) 1. Pedestrian and bicycle facilities Manhattan Gallatin $48,102 $0 $48,102 $96,204
Madison St Bridge Trail - Msla Design and construction of an 8-foot wide, 520 foot long gravel surfaced connector trail. Montana 2006 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $4,013 $0 $6,603 $10,616
Arrowhead School Path - Billings Design and construction of approximately 1200 lineal feet of hard-surfaced bicycle and pedestrian path. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Billings Yellowstone $80,166 $0 $12,425 $92,591
Sidewalks 4 - Big Timber Construction of approximately 1000 lineal feet of ADA compliant concrete sidewalk. Three sites in Big Timber: an ADA corner on the southeast corner of 3rd Ave and Hooper St, sidewalk on the south side of 5th Ave twixt Hooper and Poplar Sts, sidewalk on t Montana 2014 1 (TE) 1. Pedestrian and bicycle facilities Big Timber Sweet Grass $78,439 $0 $12,158 $90,597
Sidewalk Replacement-Stanford The design and construction for a sidewalk project at three locations. 1) Judith Basin County Courthouse, 2) Senior Citizens Center and 3) along Main Street. This includes removal of old concrete replacing it with new. New steps to the courthouse and Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Stanford Judith Basin $37,752 $0 $9,438 $47,190
Bike/Ped Path-Chinook The design and construction of a Bike/Pedestrian Facility from U.S. 2 to the fairgrounds in Chinook. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Chinook Blaine $25,321 $0 $6,330 $31,651
Mt 16 - Culbertson Design and construction of sidewalks and ADA featues in the Town of Culbertson. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Culbertson Roosevelt $158,770 $0 $24,610 $183,380
Sidewalks-Hot Springs Design and construction for a sidewalk/landscaping project that includes: Removal of about 1,230-LF of deteriorated concrete sidewalk and installation of approximately 4,040-LF of new concrete sidewalk, installation of about six pedestrian benches and tw Montana 1997 1 (TE) 1. Pedestrian and bicycle facilities Hot Springs Sanders $133,022 $0 $0 $133,022
Bike/Ped - Bozeman Design and construction of hard-surfaced bicycle and pedestrian path, ADA accessible curbs, signage, striping, curb and gutter. Montana 2015 1 (TE) 1. Pedestrian and bicycle facilities Bozeman Gallatin $240,934 $0 $37,345 $278,279
US 93 Path - Arlee Design and construction of a hard-surfaced bicycle and pedestrian path approximately .85 miles in length. Montana 2012 1 (TE) 1. Pedestrian and bicycle facilities Arlee Lake $185,026 $0 $28,679 $213,705
17th Ave Sidewalks - Forsyth Design and construction of approximately 600 linear feet of 5 foot-wide concrete sidewalks and curb. The project includes an underground sprinkler system and sidewalk lighting. Montana 2008 1 (TE) 1. Pedestrian and bicycle facilities Forsyth Rosebud $185,056 $0 $28,684 $213,740
Custer Park Sidewalks-Hardin Design and construction/reconstruction of new sidewalks to replace existing damaged sidewalks on two sides and in the middle of Custer Park, to include ADA ramps at all intersections The project is located in Hardin on the south side of 4th Street West be Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Hardin Big Horn $78,946 $0 $12,236 $91,182
Sidewalks II - Butte Design and construction of approximately 52,000 square feet of ADA compliant sidewalk. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Butte Silver Bow $680,969 $0 $105,551 $786,520
Sidewalks-Savage/Lambert Design and construction for a sidewalk project in Savage and Lambert that includes: removal of about 515-feet of deteriorated concrete sidewalk, new sidewalk and curb and gutter approximately 1,120-feet in length at various locations within both towns in Montana 1999 1 (TE) 1. Pedestrian and bicycle facilities Savage Richland $77,915 $0 $7,380 $85,295
Sidewalk 1st Ave S-Gtf Design and installation of 500 linear feet of concrete sidewalk & curb, two bulbout corners, 4 ADA ramps, trees, period lights, bicycle rack and other minor landscape features. In Great Falls on the south side of 1st Avenue South (U-5234) between 2nd and Montana 2010 1 (TE) 1. Pedestrian and bicycle facilities Great Falls Cascade $997,367 $0 $154,593 $1,151,960
Sidewalks Design and construction of sidewalks Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Stevensville Ravalli $54,887 $0 $13,722 $68,609
Heights Bike Trail-Billings The design and construction of a two mile, ten foot wide, hard surfaced pedestrian/bike facility. The project will include appropriate signing and will be constructed along an existing utility right-of-way in Billings Heights. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Billings Yellowstone $209,284 $0 $52,321 $261,605
Bike/Ped Paths - Gallatin Co. Design and construction of approximately 8,605 lineal feet of hard-surface bicycle and pedestrian path to include ADA features. Montana 2012 1 (TE) 1. Pedestrian and bicycle facilities Belgrade Gallatin $430,425 $0 $59,045 $489,470
Rocky Pt/Hillcrest Path-Polson Design and construction to include widening along Rocky Point Road and Hillcrest Drive. The project is approximately 16,500 feet long with widening to be 8-10 feet. The project also includes stripping and signing. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Polson Lake $245,467 $0 $0 $245,467
US 93 Path II - Arlee Construction of a hard-surfaced bicycle and pedestrian path approximately 1.5 miles in length. Montana 2014 1 (TE) 1. Pedestrian and bicycle facilities Arlee Lake $138,208 $0 $7,146 $149,145
Sidewalks Design and construction of sidewalks Montana 1995 1 (TE) 1. Pedestrian and bicycle facilities Judith Gap Wheatland $249,827 $0 $59,238 $309,065
Kim Williams Expansion Trail - Missoula Design and construction of a 1,320 foot long hard-surfaced bicycle and pedestrian path. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $434,124 $0 $67,291 $501,415
Cote Lane Walkway-Msla Design and construction for a pedestrian walkway that includes: Sub-base preparation, grading and placing asphalt surfacing on a walkway that is about 10-feet wide, adjacent to the roadway for an approximate distance of 1.0 miles. All work will be in ac Montana 2000 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $66,769 $0 $36,692 $103,461
Sidewalks - Medicine Lk & Westby Medicine Lake-approximately 60 lineal feet of concrete sidewalks, curb and gutter. Westby-approximately 350 lineal feet of concrete sidewalks, curb and gutter, and ADA ramps. Montana 2009 1 (TE) 1. Pedestrian and bicycle facilities Westby Sheridan $47,503 $0 $5,363 $52,867
Bike/Ped Trail-Silver Park Design and construction of 10' wide hard surfaced bike/ped trails including excavation, installation of irrigation, lighting, benches, trash receptacles and landscaping. In Missoula at Silver Park, creating a connection to the Riverfront Trail System and Montana 2008 1 (TE) 1. Pedestrian and bicycle facilities Missoula Missoula $564,340 $0 $87,473 $651,813
Mullan Rd Walkway-Frenchtown Construct a 4-foot widening of Mullan Road from the Frenchtown school east, for a distance of 2,100 feet on both sides of the road. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Frenchtown Missoula $33,603 $0 $8,401 $42,004
Missouri River Footbridge The Design and Construction work to include re-decking of the second span of the existing bridge; install chainlink barrier fence and reconstruction of the bridge approach. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Fort Benton Chouteau $50,325 $0 $12,581 $62,906
Riverview Rd Path - Seeley Lake Design and construction of a 10' wide shared use path approximately .75 miles in length. Montana 2005 1 (TE) 1. Pedestrian and bicycle facilities Seeley Lake Missoula $122,265 $0 $18,951 $141,216
Bike/Ped Path - Darby Construction of a hard surface ped/bike path in Darby Memorial Park and Library. Includes landscaping and street furniture. Montana 2005 1 (TE) 1. Pedestrian and bicycle facilities Darby Ravalli $93,711 $0 $12,881 $106,592
Churchill Rd Sidewalk Design and construction of approximately 1,900 lineal feet of concrete sidewalk and street crossings at Bethal Drive, Pleasant Street, and the east end of the project. Montana 2012 1 (TE) 1. Pedestrian and bicycle facilities Churchill Gallatin $123,940 $0 $19,211 $143,151
Baltrusch Trail - Havre Paving of a 5100 ' x 6 ' wide paved multiuse, ADA accessible path. The trail begins near the intersection of 17th Street and 12th Avenue and travels to the east until it reaches the the dike and then travels along the dike to the northeast to intersect wi Montana 2008 1 (TE) 1. Pedestrian and bicycle facilities Havre Hill $59,513 $0 $9,225 $68,738
City Hall Sidewalks - Plentywood Construction of approximately 72 lineal feet of 11.25 foot-wide concrete sidewalk. Project includes the removal of the existing deteriorated sidewalk. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Plentywood Sheridan $51,837 $0 $8,035 $59,872
1996 Lawrence Park Tr-Kal Design and construction for an asphalt surfaced pedestrian/bicycle trail approximately 1,600 feet long and 10-foot wide including two bike racks, four pedestrian benches, one pedestrian bridge and appropriate signing in accordance with current design sta Montana 1996 1 (TE) 1. Pedestrian and bicycle facilities Kalispell Flathead $327,280 $0 $50,775 $378,055
Bike/Ped Walkway-Wpt The Local Agency will design and construct a walkway that meets ADA requirements. Construction includes excavation, curb and gutter and new walkway along the east edge of 6th Avenue within the existing City of Wolf Point right of way. Montana 1994 1 (TE) 1. Pedestrian and bicycle facilities Wolf Point Roosevelt $183,946 $0 $190,453 $374,399
5th St South Streetscape - Gtf Install 294 lineal feet of concrete sidewalk, curb & gutter, ramps, plant 12 trees, install 4 period lights, and 8 granite benches. Montana 2006 1 (TE) 1. Pedestrian and bicycle facilities Great Falls Cascade $143,441 $0 $20,483 $163,924
Courthouse Walks - Deer Lodge Design and construction of 305 square yards of concrete sidewalks and 273 linear feet of curb and gutter. Installation of an irrigation system, planting of trees and shrubs, and the restoration of the statue of Lieutenant John Mullan. Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Deer Lodge Powell $91,050 $0 $14,113 $105,163
Richland County Sidewalks Design and construction for a sidewalk project that includes: Removal of deteriorated sidewalk about 830-SY, installation of about 1,040-SY of new concrete sidewalk approximately 8-feet wide and installation of curb and gutter and asphalt patching at ne Montana 1997 1 (TE) 1. Pedestrian and bicycle facilities Richland $76,247 $0 $11,818 $88,065
Sidewalks-E.Helena Design and construction of approximately 673 lineal feet of concrete sidewalks. Work includes valley gutter and ADA features. In East Helena: 1) On the north side of Main Street between 2nd and 1st Streets. 2) On the north side of Main Street west of Montana 2011 1 (TE) 1. Pedestrian and bicycle facilities East Helena Lewis & Clark $51,948 $0 $8,052 $60,000
City Sidewalks - Livingston Construction of approximately 3,950 lineal feet of concrete sidewalks and 32 ADA curb ramps. 625 lineal feet of sidewalk and 4 ADA curb ramps are on-system (U-routes). Montana 2013 1 (TE) 1. Pedestrian and bicycle facilities Livingston Park $158,584 $0 $24,581 $183,165
Old Hwy 200 Trail - Milltown Design and construction of a hard-surfaced bicycle and pedestrian trail approximately 3,250 feet in length. Montana 2014 1 (TE) 1. Pedestrian and bicycle facilities Milltown Missoula $137,796 $0 $21,358 $159,154
Bike/Ped Path-Cascade Design and construct bike/ped path Montana 2004 1 (TE) 1. Pedestrian and bicycle facilities Cascade Cascade $100,001 $0 $32,734 $132,735
Bike/Ped Safety Campaign - Blgs Design and production of a safety campaign aimed at educating bicyclists, pedestrians, and motorists on how to travel safely. The campaign will include, television ads, print advertisements, billboards, radio ads, and other print media to be released in Montana 2012 2 (TE) 2. Pedestrian and bicycle safety and educational activities Billings Yellowstone $92,165 $0 $14,286 $106,451
Historic Building Acq-Havre Property acquisition only for the purchase of the Old Main Post Office building in accordance with current right-of-way property acquisition procedures. Montana 1996 3 (TE) 3. Acquisition of scenic or historic easements and sites Havre Hill $89,610 $0 $13,890 $103,500
Interpretive Sites-Choteau Co Construction to include the fabrication overlook railings with sign mounts, the manufacture of 15 overlook signs and 20 levee signs, the fabrication of levee sign supports. A small structure will be constructed at each location to provide a viewing platf Montana 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Chouteau $58,440 $0 $9,058 $67,498
Visitor Center - Cooke City Installation of interpretive displays in the Cooke City Visitor Center. The project includes lighting, fencing, and the establishment of a ground cover on the Visiitor Center property. Located at 206 Main Street in Cooke City. Montana 2013 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Cooke City Park $70,152 $0 $10,874 $81,026
Transportation Exhibit-Billings This project involves the development and construction of an indoor exhibit. Work will include research, oral interviews, and the construction of building displays. Montana 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Billings Yellowstone $19,703 $0 $3,054 $22,757
White Arm Park-Lodge Grass Installation of landscape features to include native ground covers, benches, trash receptacles and fencing. In Lodge Grass at White Arm Park adjacent to Main Street. White Arm Park in Lodge Grass adjacent to Main Street (S-463). Montana 2010 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Lodge Grass Big Horn $25,703 $0 $3,984 $29,687
Sprinkler System - Black Eagle Installation of a sprinkler system. On the grounds of the Black Eagle Community Center at 2332 Smelter Ave, Black Eagle Montana 2010 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Great Falls Cascade $19,182 $0 $3,081 $22,263
Lscape Central Park-Cut Bank Design and installation of wall panels, brick pillars, steel fencing, planters, river rock borders, trees and canopies. The project is located on City property in Cut Bank east of the intersection of Main Street and Central Avenue. East of the intersectio Montana 2010 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Cut Bank Glacier $155,481 $0 $24,100 $179,581
Buffalo Road Signs Purchase and installation of an informational sign system consisting of approximately 20 aluminum signs on treated wood posts. The signs will denote the "Road to the Buffalo", a network of historic trails used by the native peoples to travel to and from Montana 2013 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Thompson Falls Sanders $5,243 $0 $813 $6,056
Museum Landscape-Hardin Installation of plants, benches, signage and a 6 foot-wide boardwalk approximately 1250 feet in length. East of Hardin along the south boundary of the Big Horn County Historical Museum property adjacent to Montana 47. Montana 2010 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Hardin Big Horn $82,181 $0 $12,738 $94,919
Welcome Signs - Butte Design, construction and placement of welcome signs and landscaping near the four Butte Interchanges. Montana 2005 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Butte Butte Silver Bow $69,991 $0 $10,292 $80,283
Park Landscape-Lima Landscaping project to include trees, fencing, and an irrigation system. In Lima southeast of the intersection of Peat and Harrison Streets. Proposed construction date July 30, 2008. Montana 2008 5 (TE) 5. Landscaping and scenic beautification Dillon Beaverhead $22,355 $0 $3,430 $25,785
Community Hall Preserv-Lincoln Removal and replacement of sill logs and damaged footings, flooring and floor joists as needed, filling and - or staining exterior cracks in logs, installation of drain system. Lincoln Community Hall at 404 Main Street (MT 200) in Lincoln. anticipated c Montana 2008 5 (TE) 5. Landscaping and scenic beautification Lincoln Lewis & Clark $164,472 $0 $25,493 $189,965
Library Landscaping - Gtf Removal of brick wall and fountain, fill in low areas, creation of pool area, construct bridge/ramp over pool into the main entrance of the library, plant trees and shrubs, and place benches. Montana 2006 5 (TE) 5. Landscaping and scenic beautification Great Falls Cascade $155,818 $0 $14,081 $169,899
Landscaping - Colstrip Purchase and installation of two "Welcome to Colstrip" signs. Project includes landscaping around the signs. Montana 2015 5 (TE) 5. Landscaping and scenic beautification Colstrip Rosebud $10,913 $0 $1,692 $12,605
Entryway Landscaping plasma cut welcome signs, landscape timbers, decorative rocks and shrubs at three locations Montana 2002 5 (TE) 5. Landscaping and scenic beautification Ennis Madison $11,296 $0 $1,234 $12,530
Loma Hill Overlook-Chouteau Co Design and construction for a landscaping project that includes: Construction of a concrete and wood open-air structure and interpretative signs at a scenic overlook. All construction will be in accordance with current design standards and ADA requireme Montana 2001 5 (TE) 5. Landscaping and scenic beautification Fort Benton Chouteau $34,141 $0 $3,100 $37,241
Courthouse Windows-Ft Benton Hire a consultant to perform a condition assessment and design drawings for the replacement of windows in the historic Chouteau County Courthouse. Chouteau County Courthouse, 1308 Franklin Street, in Fort Benton. Montana 2007 5 (TE) 5. Landscaping and scenic beautification Fort Benton Chouteau $100,631 $0 $15,598 $116,229
Art Center-Colstrip This project primarily involves the installation of landscaping features including an underground irrigation system, trees and shrubs, fencing, security lighting and an ADA accessible ramp at the rear entrance to the building. The project will also incl Montana 1994 5 (TE) 5. Landscaping and scenic beautification Colstrip Rosebud $61,817 $0 $18,450 $80,267
Fort Assinniboine-Sw Of Havre Stabilization, repair of exterior walls, repoint sections of brick on the Double Guard Cavalry Stable/Shop Building. Project is located at Fort Assinniboine south west of Havre on US 87 Montana 2007 5 (TE) 5. Landscaping and scenic beautification Havre Hill $11,394 $0 $1,719 $13,113
Landscaping - Scobey Purchase and installation of an irrigation system. Montana 2015 5 (TE) 5. Landscaping and scenic beautification Scobey Daniels $11,116 $0 $1,723 $12,839
Fairgrounds Lscaping - Forsyth underground irrigation system, asphalt surfaced handicapped parking and ADA path Montana 2002 5 (TE) 5. Landscaping and scenic beautification Forsyth Rosebud $89,897 $0 $11,131 $101,028
Courthouse Sq Rehab - Helena Replace roof, gutters, venting and downspouts, upgrade and stabilize foundation, replace windows, doors, renovation of the front porch, installation of ADA features, and entrance and facade improvements to the 222 Broadway Building. Replacement of the det Montana 2010 5 (TE) 5. Landscaping and scenic beautification Helena Lewis & Clark $256,244 $0 $39,718 $295,962
2nd Av N-Malm Afb-Great Falls Construction for a landscaping project described as installation of colored and textured concrete in sections of four medians on 2nd Avenue North between 57th Street and the Main Gate of Malmstrom Air Force Base. Montana 1993 5 (TE) 5. Landscaping and scenic beautification Great Falls Cascade $17,465 $0 $2,707 $20,172
High Plains Landscaping -Gtf Remove sidewalk on 2nd St S and replace with tree, sod and sprinkler system, install 150' of new sidewalk on Park Ave with Historic lighting and landscaping Montana 2006 5 (TE) 5. Landscaping and scenic beautification Great Falls Cascade $85,423 $0 $12,887 $98,310
Landscaping-Stanford Design and construction for a landscaping project that includes: installation for under ground sprinkler system at three different locations. Two locations are in Stanford at the county courthouse and a city park. The other location is in Hobson along Montana 1998 5 (TE) 5. Landscaping and scenic beautification Stanford Judith Basin $10,871 $0 $1,685 $12,556
2001 Landscaping-Forsyth Design and construction for a landscaping project that includes: Installation of an underground sprinkler system, automatic controls and extension of existing sprinkler water lines in a 6.8 acre county owned cemetery adjacent to Interstate 94. All const Montana 2000 5 (TE) 5. Landscaping and scenic beautification Forsyth Rosebud $52,984 $0 $8,211 $61,195
Landscaping - W Yellowstone Lighting at the three entrances to town to illuminate the existing welcome signs. Design and construction of an events sign near the visitor center. In West Yellowstone on US 191 and 287. Montana 2012 5 (TE) 5. Landscaping and scenic beautification West Yellowstone Gallatin $10,913 $0 $1,692 $12,605
Landscaping - Baker & Plevna Design and installation of approximately 22 period light poles and lamps. The installation of approximately 700 lineal feet of fencing. The installation of a pedestrian activated signal. Montana 2014 5 (TE) 5. Landscaping and scenic beautification Baker Fallon $126,562 $0 $19,617 $146,179
Filtration Plant Lscape-Havre Landscaping Montana 2004 5 (TE) 5. Landscaping and scenic beautification Havre Hill $35,254 $0 $22,612 $57,866
Trailhead Landscape - Lewistown Establishment of a trailhead for the Lewistown bicycle and pedestrian trail system. Construction of brick piers and entry sign at the trailhead entrance, an irrigation system, plantings, a water feature, benches, and trash receptacles. The project inclu Montana 2013 5 (TE) 5. Landscaping and scenic beautification Lewistown Fergus $94,739 $0 $14,685 $109,424
Library Landscaping placement of sod, planting of trees and bushes, and installing sidewalk and curb & gutter with handicapped access Montana 2003 5 (TE) 5. Landscaping and scenic beautification Dutton Teton $23,799 $0 $3,351 $27,150
Courthouse/Museum-Virginia Ci Leveling of existing land at the courthouse and museum, terracing the land and planting new lawn area. The creation of new flower beds and planting of trees. Montana 1994 5 (TE) 5. Landscaping and scenic beautification Virginia City Madison $10,816 $0 $1,676 $12,492
Mccarthy Park-Townsend The Construction to include landscaping, trees and planting grass, drip irrigation system, sprinkler system and some picnic tables. Montana 1994 5 (TE) 5. Landscaping and scenic beautification Townsend Broadwater $47,879 $0 $7,421 $55,300
River Drive Landscaping Design and construction for a landscaping project that includes: Planting about 18 shrubs and 14 trees and sod, topsoil, minor grading, installation of an irrigation system for approximately 1.7 acres, and reconstruction of a historic sandstone retainin Montana 1997 5 (TE) 5. Landscaping and scenic beautification Great Falls Cascade $65,909 $0 $9,842 $75,751
Park Landscaping-Twin Bridges Construction for a landscaping project that includes: Installation of trees, shrubs, sod, pedestrian benches, electrical power, pipe, sprinkler heads, valves and control box for an under ground sprinkler system in a seven acre city park. Montana 2000 5 (TE) 5. Landscaping and scenic beautification Twin Bridges Madison $26,303 $0 $5,302 $31,605
Courthouse L'Scaping-Columbus This project is the design and construction of bermed flower beds delineated by brick on the east and west elevations and the south facade, the waterproofing of the structure's brick walls below the granite water table, the installation of a drip-type ir Montana 1994 5 (TE) 5. Landscaping and scenic beautification Columbus Stillwater $13,268 $0 $2,057 $15,325
Park Landscaping-Clyde Park The design and construction for a landscaping project that includes: Installation of an underground sprinkler system, one bike rack and approximately 880 lineal feet five foot wide concrete sidewalk in accordance with current design standards and ADA re Montana 1996 5 (TE) 5. Landscaping and scenic beautification Clyde Park Park $40,383 $0 $6,259 $46,642
Landscaping-Roundup The design and construction for building a retaining wall at one location and installation of underground sprinkler system, planting grass, shrubs at two locations. Also includes minor curb and gutter work at one location on right-of-way owned by the Mo Montana 1994 5 (TE) 5. Landscaping and scenic beautification Roundup Musselshell $43,632 $0 $6,763 $50,395
Streetscape-Lewistown Installation of streetscape amenities to include: bike stands, trash receptacles and benches. In Lewistown on Main Street (N-57) between 8th Avenue and 1st Avenue (P43/U7111). Montana 2008 5 (TE) 5. Landscaping and scenic beautification Lewistown Fergus $36,896 $0 $5,718 $42,614
Park Landscaping underground sprinkler system and planting about 15 trees in a town park Montana 2001 5 (TE) 5. Landscaping and scenic beautification Rudyard Hill $23,832 $0 $7,750 $31,582
Robbers Roost - Madison Co Restoration of Robber's Roost an historic stage coach stop 5 miles S of Sheridan on US Hwy 287 (aka Vigilante Trail). To include repairs or replacement of roof, trim, porch, flooring, windows, doors, masonry, fence and construction and installation of int Montana 2007 5 (TE) 5. Landscaping and scenic beautification Virginia City Madison $28,051 $0 $4,348 $32,399
Landscaping - Butte Design, construction and installation of street trees, benches, period lighting, a monument sign, and sidewalks. Montana 2015 5 (TE) 5. Landscaping and scenic beautification Butte Silver Bow $140,513 $0 $21,780 $162,293
Highway Landscaping-Drummond The design and construction for a landscaping project that includes: Underground sprinkler system, planting grass, bushes, shrubs and installation of two pedestrian benches. Montana 1996 5 (TE) 5. Landscaping and scenic beautification Drummond Granite $9,245 $0 $1,319 $10,564
3 Locations-Phillips County The design and construction for a landscaping project to include trees, shrubs, topsoil, sod, watering systems, well, park benches, wooden planters and some sidewalk. Montana 1995 5 (TE) 5. Landscaping and scenic beautification Phillips $36,408 $0 $6,157 $42,565
Historic Lighting-Bozeman Design and construction for a scenic beautification project that includes: The preparation of the casting models, 140 base castings and pole caps for the installation of 46 - 2 bracket light fixtures along Main Street from Rouse Avenue to Grand Avenue. Montana 1999 5 (TE) 5. Landscaping and scenic beautification Bozeman Gallatin $73,707 $0 $14,085 $87,792
Arts Guild-Red Lodge Construction for the restoration of a historic railroad depot that includes: Removal and replacement of the old inadequate heating system and replacing it with a new hot water heating system, constructing a fire wall to contain the boiler, repairing wal Montana 1993 6 (TE) 6. Historic preservation Red Lodge Carbon $25,166 $0 $3,901 $29,067
Courthouse-Helena The design and construction for the repair of a historic retaining wall, landscaping, underground irrigation system and installation of historic lighting. Montana 1994 6 (TE) 6. Historic preservation Helena Lewis & Clark $25,014 $0 $3,877 $28,891
Visitor Center - Havre Hire a consultant to conduct and environmental study, facilitate project planning and develop preliminary design drawings for a visitor center. Montana 2006 6 (TE) 6. Historic preservation Havre Hill $25,000 $0 $3,875 $28,875
City/County Building-Helena The design and construction for the repair of damage to mortar joints by repointing and water damage through sealing. Montana 1994 6 (TE) 6. Historic preservation Helena Lewis & Clark $58,495 $0 $101,804 $160,299
Sanders Community Hall Exterior restoration Montana 2004 6 (TE) 6. Historic preservation Sanders Treasure $7,812 $0 $1,277 $9,089
Traveler Info Station - Chinook Installation of a 10-watt AM radio transmitter to provide recorded messages to travelers about the Bear Paw Battlefield and other Chinook area attractions. Transmission range of 3-5 miles. Montana 2006 6 (TE) 6. Historic preservation Chinook Blaine $7,656 $0 $6,000 $13,656
Courthouse Rehab-Virginia City Replace the existing roof on the county courthouse. Montana 1994 6 (TE) 6. Historic preservation Virginia City Madison $40,563 $0 $6,287 $46,850
Fort Assinniboine Rehab The construction for historic preservation at Fort Assinnibione that includes: Roofing repair, roof tile replacement, some structural repair, porch work, door and window frame and covers, some ceiling and wall repair, applying paint and sealant, gutter Montana 1996 6 (TE) 6. Historic preservation Havre Hill $67,743 $0 $10,499 $78,242
Yankee Jim Canyon Trail-Lvgs Design and construction of a gravel parking area, trail clearing, installation of benches, information sign. five area description signs and a unisex bathroom. Construction of an ADA accessable trail in accordance with current design standards and ADA r Montana 1994 6 (TE) 6. Historic preservation Livingston Park $96,678 $0 $9,236 $105,914
Mmrh Rehab - Cascade Co Design and installation of HVAC system, insulation and replacement of 2 doors. The Montana Museum of Railroad History in Great Falls on the Cascade County Fairgrounds. Montana 2010 6 (TE) 6. Historic preservation Great Falls Cascade $104,802 $0 $16,245 $121,047
1996 Paris Gibson Square-Gtf The design and construction for a historic preservation project that includes: The replacement of approximately 45 windows on the south side of the building. Montana 1998 6 (TE) 6. Historic preservation Great Falls Cascade $98,875 $0 $15,325 $114,200
Heritage Center Pres-Havre Design and construction for a historic preservation project that includes: Replacement of about 26 first floor windows with architecturally correct replacements in accordance with the Department of Interior's standards for rehabilitating historic buildi Montana 1998 6 (TE) 6. Historic preservation Havre Hill $85,075 $0 $13,185 $98,260
Courthouse Restoration - Havre Restoration and repair of the exterior architectual terra cotta on the Hill County Courthouse. The Courthouse is listed on the National Register of Historic Places and is located in Havre on the corner of 4th Street and 3rd Avenue in Havre. Montana 2014 6 (TE) 6. Historic preservation Havre Hill $231,714 $0 $35,916 $267,630
Schoolhouse-Deborgia The design and construction for a historic preservation project that includes: Replacing the building heater, replacement of broken windows, refinishing the vestibule and staircase area, refinish the first and second levels wood floors, clean/paint the Montana 1995 6 (TE) 6. Historic preservation Deborgia Mineral $26,229 $0 $4,066 $30,295
Courthouse Windows - Stanford Design, construction and installation of east side main windows and east side main entrance door and windows. Montana 2006 6 (TE) 6. Historic preservation Stanford Judith Basin $40,438 $0 $4,159 $44,597
Horse Barn Preserv - Lewiston Stabilization and restoration of a 1917 draft horse barn. CTEP funds will be used to construct 10 replacement windows. The building is eligible for listing on the National Register of Historic Places. Located on the Central Montana Fairgrounds north of Montana 2012 6 (TE) 6. Historic preservation Lewistown Fergus $31,156 $0 $4,830 $35,986
Camp Needmore Rehab-Carter Co Reconstruction of the mess hall building which will include: Lifting the structure, pouring new concrete foundations and new supports, enclosing the foundation, some electrical work, make the entrance ADA accessible and install a sign near the structure Montana 1996 6 (TE) 6. Historic preservation Ekalaka Carter $52,793 $0 $8,183 $60,976
Courthouse-Stanford Design and construction for a historic preservation project that includes: removal and installation of approximately fifty-five (55) windows on the second and third floors that conform to the Secretary of the Interior's standards regarding historic struc Montana 1998 6 (TE) 6. Historic preservation Stanford Judith Basin $82,343 $0 $12,764 $95,107
Treasure County Museum - Hysham Revise front entrance and replace windows and doors in the Treasure County Museum. This building is eligible for listing on the National Register of Historic Places. Montana 2013 6 (TE) 6. Historic preservation Hysham Treasure $17,429 $0 $2,701 $20,130
Civic Center Restoration - Gtf Assessment and first phase of repair to the exterior of the Civic Center, to include repair, repointing, and resetting of the concrete caps. Montana 2006 6 (TE) 6. Historic preservation Great Falls Cascade $72,890 $0 $10,065 $82,955
Cascade County Courthouse The Local Agency will replace existing single pane windows with retrofit double insulated glass windows. Montana 1993 6 (TE) 6. Historic preservation Great Falls Cascade $71,188 $0 $11,034 $82,222
1999-Historic Light-Anaconda Design and construction for a historic lighting project that includes: retrofit of street lights in a 36-block area by installing new underground service, weather tight outdoor enclosures, conduit, trenching and asphalt/concrete cutting and patching. The Montana 1999 6 (TE) 6. Historic preservation Anaconda Deer Lodge $180,000 $0 $612,292 $792,292
Labor Temple-Red Lodge repair and replace damaged windows; tuck point damaged brick mortar; repair and caulk around sandstone window sills; wash building and apply waterproof protection. Montana 1993 6 (TE) 6. Historic preservation Red Lodge Carbon $44,935 $0 $6,965 $51,900
Rialto Preservation-Deer Lodge Installation of new lights, windows, entrance doors and flooring, power wash facade and paint as needed. Rialto Theatre - 418 Main Street in Deer Lodge. Montana 2008 6 (TE) 6. Historic preservation Deer Lodge Powell $145,651 $0 $22,576 $168,227
Courthouse Rehab-Bozeman The design and construction for a historic preservation project that includes: Restoring the south facade revolving door, cleaning the exterior, tuck pointing the stone and brick surfaces, landscaping, underground sprinkler system, sidewalks to and arou Montana 1997 6 (TE) 6. Historic preservation Bozeman Gallatin $331,075 $0 $66,729 $397,804
Yucca Theatre Rehab-Hysham This project is preserving and renovating the exterior of the Yucca Theater in the town of Hysham. This work is described as the replacement of vegas, vestibule doors, and glass block windows; the preparation and painting of the building exterior; and r Montana 1994 6 (TE) 6. Historic preservation Hysham Treasure $29,275 $0 $6,238 $35,513
Millstone And Markers-Msla Design and construction that involves the installation of historic markers and a millstone display along two trails in Missoula. Also included will be the publishing of a historic walking tour/teaching guide with the information related to the historic Montana 1994 6 (TE) 6. Historic preservation Missoula Missoula $31,118 $0 $9,630 $40,748
Townhall Preservation-Boulder Design and construction for a historic preservation project that includes: Replacement of two doors and installation of approximately 30-foot long by 8-foot wide sidewalk in accordance with current design standards and ADA requirements. Montana 1997 6 (TE) 6. Historic preservation Boulder Jefferson $18,696 $0 $6,596 $25,292
Civic Center-Helena The design and construction for the repair of the mural on the outside above the main entrance to the Civil Center. Montana 1994 6 (TE) 6. Historic preservation Helena Lewis & Clark $43,607 $0 $6,759 $50,366
County Courthouse Rehab-Helena Design and construction for a historic preservation project that includes: Remove/replace about 320 lineal feet of retaining wall, re-point stone siding, restore granite and sandstone walls, restore fascia, seal vents, renovate granite steps, replace ent Montana 2000 6 (TE) 6. Historic preservation Helena Lewis & Clark $375,981 $0 $38,514 $414,495
Pioneer Cabin Restoration-Helena The local agency will develop a CTEP project described as the design and construction to restore a historical structure. This includes work on the roof, exterior walls, foundation, interior floor, and wall supports. Montana 1994 6 (TE) 6. Historic preservation Helena Lewis & Clark $33,293 $0 $5,160 $38,453
Townhall-Wibaux The design and construction for historic preservation for repair of the roof. Montana 1994 6 (TE) 6. Historic preservation Wibaux Wibaux $13,931 $0 $2,173 $16,104
Stable Pres-Fort Assinniboine Stabilization and preservation work on the calvary stable at Fort Assinniboine. Work to include masonry and roof repairs, rebuild doors, replace windows and painting. Southeast of US Hwy 87 on MSU-Northern Ag Experimental Station, six miles SW of Havre a Montana 2008 6 (TE) 6. Historic preservation Havre Hill $32,841 $0 $4,936 $37,777
4-H Building Rehab-Gtf Design and construction for the replacement/restoration of the roof on the historic 4-H building at the fairgrounds. Montana 1996 6 (TE) 6. Historic preservation Great Falls Cascade $85,167 $0 $13,201 $98,368
Orpheum Marquee-Conrad Replace the existing Orpheum Theatre marquee with a reproduction of the original. Marquee dimensions are approximately 36' wide x 7' high x 7' deep. On the northeast corner of Main (I-15 Business Loop) and 4th Ave in Conrad. Montana 2008 6 (TE) 6. Historic preservation Conrad Pondera $51,975 $0 $8,056 $60,031
Courthouse-Fort Benton Design and construction for a historic preservation that includes: Construction for the replacement of an historic metal roof to resemble the original roof of the county courthouse in accordance with the Secretary of the Interior's guidelines for the pre Montana 1999 6 (TE) 6. Historic preservation Fort Benton Chouteau $105,330 $0 $8,383 $113,713
2001 City County Bldg roofing of historic building Montana 2001 6 (TE) 6. Historic preservation Helena Lewis & Clark $121,327 $0 $16,222 $137,549
Paris Gibson Square-Gtf The repair, replacement and restoration of Paris Gibson Square's roof, windows and stained exterior stone. Montana 1993 6 (TE) 6. Historic preservation Great Falls Cascade $239,233 $0 $80,795 $320,028
Historic School Rehab-Bozeman Design and construction for a historic preservation project that includes: Demolition of the deteriorated roof sections, demolition of all fascia and soffits, repair of roof structure, new roof decking, new roof and construction of new trim in accordanc Montana 2000 6 (TE) 6. Historic preservation Bozeman Gallatin $131,463 $0 $18,251 $149,714
Savenac Historic Site-Haugan Design and construction of approximately 6 historic transportation related displays about the Savenac Historic Site from 1907 to the present. Montana 1995 6 (TE) 6. Historic preservation Haugan Mineral $15,585 $0 $3,320 $18,905
Rialto Theater-Deer Lodge Design and construction for a historic preservation project that includes: Rewiring the marquis, new fixtures, fiberglass roof, painting and replacement lights and globes on building exterior. Montana 1997 6 (TE) 6. Historic preservation Deer Lodge Powell $28,709 $0 $2,039 $30,748
1996 Labor Temple-Red Lodge The design and construction for historic preservation of a building that includes: Installation of three wood doors and frames, fill opening in foundation wall, restore electrical service, restore fire escape, install roof gutters, remove/replace sidewa Montana 1996 6 (TE) 6. Historic preservation Red Lodge Carbon $32,740 $0 $299,375 $332,115
Community Hall-Lodge Pole Design and construction for a historic preservation project that includes: Replacing deteriorated logs, filling joints between logs, roof, replacing windows and exterior doors in accordance with the Department of the Interiors Guidelines for the Rehabili Montana 2001 6 (TE) 6. Historic preservation Lodge Pole Blaine $220,625 $0 $34,197 $254,822
Courthouse Preserv - Stanford Repair and reinforcement of the brick exterior on the west side of the Judith Basin County Courthouse. Montana 2014 6 (TE) 6. Historic preservation Stanford Judith Basin $40,913 $0 $6,343 $47,256
Historic Lighting-Eureka Design and Construction for a landscaping project that includes: Installation of about 35 period-type street lights, landscaping approximately 7,500 square foot area with plants, shrubs and irrigation system, installation of a pedestrian path within the Montana 1996 6 (TE) 6. Historic preservation Eureka Lincoln $94,244 $0 $14,608 $108,852
Depot Rehab-Dillon Design and construction for a depot rehabilitation project that includes: Electrical work to bring the building up to operational standards. Work to be done is new electrical service, new wiring, outlets, switches and light fixtures. All work will con Montana 2001 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Dillon Beaverhead $11,855 $0 $10,236 $22,091
Railroad Depot-Harlowton The Local Agency will rewire existing fixtures, rewire the structure, prepare and paint portions of the structures exterior, complete fencing and complete landscaping. Montana 1993 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Harlowton Wheatland $8,619 $0 $1,336 $9,955
Depot Restoration-Livingston Design for the construction of a historic preservation project that includes: Evaluating the roof structure, new roof members as needed, replace roof, repoint existing brink in chimneys, minor plaster repair and install rain gutters in accordance with th Montana 2001 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Livingston Park $205,692 $0 $460,511 $666,203
Depot Preservation-Kevin The design and construction for restoring the depot by replacing the roof system, repainting the exterior siding and remodel the restrooms for ADA compliance. Montana 1995 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Kevin Toole $25,579 $0 $3,964 $29,543
Bell Street Br Rehab-Glendive The improvement contemplated consists of the design and repair/rehabilitation of a historic bridge. Montana 1994 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Glendive Dawson $256,276 $0 $279,723 $535,999
Uprr Depot Rehab-West Y'Stone Design and construction to repair the existing UPRR Dining Hall Building. This will include repair of a roof truss, log and frame rafter tails, fir slab siding and reset some of the stonework on the building. Montana 1994 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities West Yellowstone Gallatin $34,840 $0 $7,487 $42,327
Depot Preservation-Billings This project involves the rehabilitation of a historic railroad depot. Work will include removing the existing deteriorated roofing, repairing the underlying roofing structure, repairing the canopy and installing a new interior roof in the main depot bu Montana 1994 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Billings Yellowstone $175,531 $0 $29,769 $205,300
Rr Corridor Preserv-Lewistown Purchase of 16.87 miles of abandoned BNSF railroad right-of-way (approximately 200 acres) for use as a bicycle and pedestrian path. The project will include appraisal and survey costs. Begins 1.5 miles east of the town of Moore, extends east for 16.87 Montana 2007 8 (TE) 8. Conversion of abandoned railway corridors to trails Lewistown Fergus $236,859 $0 $37,820 $274,679
BA&P Historic Railtrail-Butte Design and construction for a railtrail that includes: Sub grade preparation, asphalt paving, storm drainage, interpretive signs, pedestrian shelters and benches, trash containers and drinking fountain for a trail about 10-feet wide and about 2.186 mile Montana 2001 8 (TE) 8. Conversion of abandoned railway corridors to trails Butte Butte Silver Bow $264,877 $0 $339,211 $604,088
Milwaukee Rr Trail-Msla Design and construction for a pedestrian trail about 2,900 feet in length that includes: Grading, sub-base preparation, asphalt surface on a portion of the trail that is approximately 12-feet wide in accordance with current design standards and ADA requ Montana 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Missoula Missoula $197,213 $0 $49,303 $246,516
Railtrail-Centerville Design and construction for a bicycle trail, pedestrian path and improvements to a rural park, that include: a paved pedestrian trial approximately 1,100 ft in length, landscaping, irrigation system and four ADA parking spaces; and a gravel bicycle trail Montana 1995 8 (TE) 8. Conversion of abandoned railway corridors to trails Centerville Cascade $184,885 $0 $28,212 $213,097
Great Northern Railtrail-Kal Design and construction for a bicycle/pedestrian path that includes: Sub-grade preparation and asphalt surfacing for a path about 2.2 miles in length and ten-foot wide. All construction will be in accordance with current design standards and ADA require Montana 2001 8 (TE) 8. Conversion of abandoned railway corridors to trails Kalispell Flathead $430,674 $0 $26,767 $457,441
Rail Trail-Somers The design, right-of-way acquisition and construction of an approximately 1.2 mile long, 10-foot wide asphalt path on an abandoned railroad bed in accordance with current design standards, State right-of-way acquisition procedures and ADA requirements. Montana 1994 8 (TE) 8. Conversion of abandoned railway corridors to trails Somers Flathead $105,659 $0 $16,377 $122,036
Rail Trail Meridian-Kalispell Design and construction for a pedestrian facility that is about 4,000 foot long, 10 foot wide asphalt paved trail. A 400' sidewalk will be constructed south of Meridian road leading to the trail. A two-strand barb wire fence will parallel each side of th Montana 1994 8 (TE) 8. Conversion of abandoned railway corridors to trails Kalispell Flathead $153,138 $0 $37,888 $191,026
Milwaukee Rr Row-Msla The local agency will comply with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 as amended (49 CFR 24) in the acquisition process, however the local agency agrees not to acquire any property or easement subject to t Montana 1993 8 (TE) 8. Conversion of abandoned railway corridors to trails Missoula Missoula $67,146 $0 $16,787 $83,933
Control Of Outdoor Advertising Control of outdoor advertising Montana 1996 9 (TE) 9. Inventory, control, and removal of outdoor advertising Statewide Statewide $809,691 $0 $125,962 $935,653
Chief Plenty Coups State Park To perform historical and cultural research of Chief Plenty Coups State Park. This will produce documentation and a final report. Montana 1994 10 (TE) 10. Archaeological planning & research Billings Big Horn $14,964 $0 $0 $14,964
Archeological Site Archeological investigation Montana 1995 10 (TE) 10. Archaeological planning & research Shawmut Wheatland $2,597 $0 $403 $3,000
Ft Ellis Archaeological Survey Conducting a magnetic survey and archaeological field test of the Fort Ellis site. The project will generate a detailed map of the subsurface archaeological deposits within approximately a 1.5 acre area at the fort site. Montana 1995 10 (TE) 10. Archaeological planning & research Bozeman Gallatin $18,398 $0 $2,852 $21,250
Fort Assinniboine Construction only; The project includes two phases: A) Archaeological survey of the fort cultural sources on the property; B) fencing around the historic buildings to preserve them. Montana 1994 10 (TE) 10. Archaeological planning & research Havre Hill $23,791 $0 $3,688 $27,479
Charlie Russell Trail Brochure The local agency will design, procure art, perform historical research and write text for brochure, and print brochure. Montana 1994 10 (TE) 10. Archaeological planning & research Judith Basin $9,957 $0 $1,543 $11,500
Erosion Control, I-94, East of Hathwy. Erosion mitigation Montana 1996 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Custer $63,635 $0 $9,864 $73,499
Erosion Control, US 212 Erosion mitigation Montana 1997 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Big Horn $79,196 $0 $0 $79,196
Runoff Mitigation, 2 Locations Erosion mitigation Montana 1995 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Billings Yellowstone $84,300 $0 $13,070 $97,370
Lolo Pass Runoff Mitigation Erosion mitigation Montana 1995 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Missoula $337,135 $0 $52,256 $389,391
Pave Skalkoho Rd. (MT 38) to stop erosion Erosion mitigation Montana 1993 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Philipsburg Granite $61,139 $0 $9,477 $70,616
Transport Museum Transportation museum project that includes exterior repair and painting, repair of windows, upgrade interior lighting, stairs, interior doors, heating and insulation, procure museum artifacts and mount displays Montana 2002 12 (TE) 12. Establishment of transportation museums Virginia City Madison $20,401 $0 $10,294 $30,695