Skip to content

Focus Term: Facts and FIgures


Blog
Bright Horizons: Florida’s Miami LOOP
January 12, 2018
Approximately 54 percent complete to date, the Miami LOOP is a 225-mile trail vision to expand transportation options, make biking and walking safer and more equitable.
The Atlantic Greenway in South Beach is part of Florida’s 225-mile developing Miami LOOP. | Photo by Lee Smith
resource
D&H Rail-Trail: User Survey and Economic Impact Analysis (
December 31, 2017
RTC conducted this study of the users of the 38-mile D&H Rail-Trail under a grant from the Pennsylvania Department of Conservation and Natural Resources.
Blog
Colorado’s Animas River Trail
November 08, 2017
For walkers and bicyclists along the town’s scenic Animas River Trail, the white-and-gray plumes of steam rising from the old locomotives and the echo of train whistles are common sights and sounds.
Animas River Trail | Photo by Cindy BarksAnimas River Trail | Photo by Cindy Barks
resource
Erie to Pittsburgh Trail User Survey and Economic Impact Analysis (2013)
January 01, 2014
This study of six connected trails make up the central leg of the developing 270-mile Erie to Pittsburgh Trail.