Project Search Results
Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
Fredrick St. Sidewalks (Magnolia) (TAP-15) (S) | This project consists of constructing 4,224 feet of 5-foot wide sidewalk with crosswalks and ADA ramps along the west side of Fredrick Street. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Magnolia | Columbia | $395,760 | $0 | $98,940 | $494,700 |
Pine Bluff Downtown Streetscaping (TAP-15) (S) | This project consists of the reconstruction of the pedestrian corridor at the western gateway into downtown connecting Lake Saracen Trail via the Martha Mitchell Expresswar crosswalk. Construction will consist of installing sidewalks, curb and gutter, pedestrian lighting, landscaping, and other enhancements along W. Barraque Street, Main Street, S. Walnut Street and S. Pine Street. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Pine Bluff | Jefferson | $996,000 | $0 | $249,000 | $1,245,000 |
Pride of Springdale Trail (TAP-15) (S) | This project consists of the construction of approximately 5,200 LF of multi-use trail along Brush Creek between N. Gutensohn Road and Interestate 49. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Springdale | Washington | $500,000 | $0 | $125,000 | $625,000 |
Green Forest Square Streetscaping (TAP-15) (S) | This project consists of constructing sidewalks, traffic calming islands and strategically placing signs closing to the traveling lanes in the City Square. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Green Forest | Carroll | $54,464 | $0 | $42,087 | $96,551 |
N. Main St. & Hwy. 64 Sidewalks (Mulberry) (TAP-15) (S) | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Mulberry | Crawford | $249,145 | $0 | $62,286 | $311,431 | |
N. 1st St. Sidewalk (Jacksonville) (TAP-15) (S) | This project consists of the construction of approximately 2,900 LF of sidewalk along N. 1st Street that will connect existing sidewalks north of Dales Drive to John Harden Drive. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Jacksonville | Pulaski | $80,000 | $0 | $20,000 | $100,000 |
Plum St. - Cedar St. Sidewalks (Bearden) (TAP-15) (S) | This project consists of reconstructing 310 feet of 10-foot wide sidewalk with ADA ramps along the north side of 1st Street. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bearden | Ouachita | $51,200 | $0 | $12,800 | $64,000 |
Walton Blvd. Multi-Use Trail (Bentonville) (S) | Bicycle/pedestrian trial construction | Arkansas | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bentonville | Benton | $254,199 | $0 | $571,071 | $825,270 |
Dartmoor Rd. Ped. Crossing (Bella Vista) (TAP-15) (S) | This project consists of the installation of a High intensity Activated crossWalK(HAWK) at the intersection of Dartmoor Road and NW Lighting Lane. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bella Vista | Benton | $50,000 | $0 | $12,500 | $62,500 |
Hwy. 5 Sidewalk Impvts. (Norfork) (TAP-15) (S) | This project consists of the construction of approximately 2,000 LF of concrete sidewalk with crosswalks along Highway 5. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Norfork | Baxter | $102,405 | $0 | $25,601 | $128,006 |
Quitman Sidewalks (TAP-15) (S) | This project consists of the construction of approximately 5,800 LF of 5-ft wide sidewalks along 4th Street, Walnut Street, Mulberry Street and Highway 25. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Quitman | Cleburne | $188,239 | $0 | $47,060 | $235,299 |
West Memphis Tilden Rodgers Trail Reconstruction (S) | Reconstruct heavily used pedestrian trail that is over 20 years old. | Arkansas | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | West Memphis | Crittenden | $58,618 | $0 | $14,654 | $73,272 |
N. Oak St. Sidewalks (Brookland) (TAP-15) (S) | This project consists of the construction of approximately 1,600 LF of 4-ft wide sidewalk along North Oak Street. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Brookland | Craighead | $101,660 | $0 | $25,415 | $127,075 |
Hwy. 65 Sidewalks (Marshall) (TAP-15) (S) | This project consists of the construction of approximately 11,700 LF of 5-ft wide sidewalk along Highway 65. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Marshall | Searcy | $466,940 | $0 | $116,735 | $583,675 |
Front St. Streetscaping (Dardanelle) (TAP-15) (S) | This project consists of reconstructing sidewalks along Front Street including ADA accessible ramps, curb and gutters, and streetscaping. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Dardanelle | Yell | $163,216 | $0 | $40,804 | $204,020 |
N.College Ave. Sidewalks (Huntsville) (TAP-15) (S) | This project consists of the construction of approximately 3,600 LF of concrete sidewalk with ADA ramps and a 12-ft long pedestrian bridge along N. College Avenue. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Huntsville | Madison | $363,250 | $0 | $90,813 | $454,063 |
Hwy. 89 Streetscaping (Ph. 2) (Cabot) (TAP-15) (S) | This project consists of the construction of approximately 1,100 LF of sidewalks, pedestrian lighting, curb and gutter, drainage improvements, landscaping, and brick crosswalks along Highway 89. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Cabot | Lonoke | $362,248 | $0 | $90,562 | $452,810 |
Hwy. 71 Sidewalk (Mountainburg) (TAP-15) (S) | This project consists of the construction of approximately 1,600 LF of sidewalks along Highway 71 including a pedestrian bridge at the park, a set of flashing beacons, bicycle racks, and crosswalk markings. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Mountainburg | Crawford | $135,940 | $0 | $33,985 | $169,925 |
NLR Shilcott Bayou Multi-Use Bridge (S) | Replacing a pedestrian/bicycle bridge and realigning the section of trail for a safer, more inviting path that reflects current bicycle/pedestrian design standards. | Arkansas | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | North Little Rock | Pulaski | $544,000 | $0 | $199,985 | $743,985 |
Craighead Forest Park Trail (Ph. 2) (Jonesboro) (TAP-15) (S) | This project is the second phase of constructing a multi-use trail within the boundaries of Craighead Forest Park. The new bike/pedestrian trail will consist of a 12-foot wide asphalt trail paralleling inside the existing road loop around Craighead Lake. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $302,036 | $0 | $75,509 | $377,545 |
Little Rock Bike Connector (Phase 2) (S) | A bicycle path connection to be constructed that runs along the Little Rock side of the Arkansas River to join a long network of existing bike trails. | Arkansas | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Little Rock | Pulaski | $590,000 | $0 | $147,500 | $737,500 |
Rogers Mercy Hospital Trailhead (Ph. II) (S) | Building restroom facilities with amenities for pedestrians, bicyclists & pet owners at a trailhead on a heavily utilized trail that is of great importance to the region and is increasing quickly from year to year. | Arkansas | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rogers | Benton | $113,200 | $0 | $84,273 | $197,473 |
City Lake Wildlife Trail (Siloam Springs) (TAP-15) (S) | This project consists of the construction of approximately 5,600 LF of soft-gravel multi-use trail and approximately 350 LF of ADA-accessible sidewalk within the Siloam Springs City Lake Park. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Siloam Springs | Benton | $67,705 | $0 | $16,926 | $84,631 |
Shorter College Streetscape (TAP-15) (S) | This project consists of the construction of sidewalks, landscaping, and pedestrian lighting in and around the campus. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | North Little Rock | Pulaski | $432,472 | $0 | $108,118 | $540,590 |
Elm St. Sidewalks (Bryant) (TAP-15) (S) | This project consists of the construction of approximately 6,000 LF of 4-ft wide sidewalks along Boswell Road with a possible pedestrian bridge. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bryant | Saline | $172,000 | $0 | $43,000 | $215,000 |
Hwy. 7 Sidewalks (Caddo Valley) (TAP-15) (S) | This project consists of the construction of approximately 5,000 LF of sidewalks with curb and gutter along Highway 7, Highway 67, and Frost Road . | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Caddo Valley | Clark | $399,640 | $0 | $99,910 | $499,550 |
Knoxville Ave. & 19th St. Sidewalks (Russellville) (TAP-15) (S) | This project consists of constructing sidewalks that will connect Ashbrook Estates on the South to E 16th Street to the North and along E 19th Street from Hwy. 7T west to S Detroit Ave. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Russellville | Pope | $180,740 | $0 | $45,185 | $225,925 |
Main to Main Trailhead (West Memphis) (S) | Construct a trailhead at the SE corner of Broadway Ave./U.S. Hwy. 70 & the South Loop Intersection. This provides access to the Harahan Bridge Trail between Memphis and West Memphis. | Arkansas | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | West Memphis | Crittenden | $61,632 | $0 | $15,408 | $77,040 |
Main St. & Speedway St. Sidewalks (Dermott) (TAP-15) (S) | This project consists of the construction or rehabilitation of approximately 3,700 LF of sidewalk along Main Street and Speekway Street along with a pedestrian railroad crossing. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Dermott | Chicot | $229,191 | $0 | $57,298 | $286,489 |
Hwy. 102 & Stadium Ave. Sidewalks (Decatur) (TAP-15) (S) | This project consists of constructing a sidewalk along Highway 102. Approximately 1,350 linear feet of a 5-foot wide sidewalk will be constructed. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Decatur | Benton | $130,144 | $0 | $32,536 | $162,680 |
Shannon Hills Recreational Trails (Ph. 1) (TAP-15) (S) | This project consists of the construction of approximately 13,660 LF of 5-ft wide sidewalk connecting the city park to N. Sardis Rd., Branchdell Dr., N. Brechen Dr., E. High Rd., and Shamrock Dr. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Shannon Hills | Saline | $397,664 | $0 | $99,416 | $497,080 |
Fayetteville Ave. Streetscape (Alma) (TAP-15) (S) | This project consists of the construction of approximately 1,000 LF of ADA accessible sidewalk, pedestrian crosswalks, pedestrian lighting, and landscaping along Fayetteville Avenue. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Fayetteville | Crawford | $213,728 | $0 | $53,432 | $267,160 |
S. Lions Club Park Trail (El Dorado) (TAP-15) (S) | This project consists of constructing 12,193 feet of 5-foot to 10-foot wide multi-use trail (asphalt and chip seal pavement) with crosswalks and ADA ramps. Additional proposed improvements include a double 8’x10’x15’ reinforced concrete box culvert that will be constructed crossing an unnamed tributary to Flat Creek and the construction of 600 feet of curb and gutter. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | El Dorado | Union | $272,220 | $0 | $68,055 | $340,275 |
Stamps Downtown Sidewalks (TAP-15) (S) | This project consists of constructing 1,020 feet of 5’-9.5’ wide sidewalks with crosswalks and ADA ramps along Main Street, Church Street, and Thomas Street. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Stamps | Lafayette | $132,800 | $0 | $33,200 | $166,000 |
Gordon Long Park Trailhead Impvts. (Fayetteville) (S) | Construct restroom facilities and expand current parking lot that provides access to the Razorback Regional Greenway and the Scull Creek Trails. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Fayetteville | Washington | $260,000 | $0 | $65,000 | $325,000 |
AR River Trail Riverfront Dr. (Little Rock) (TAP-15) (S) | The scope of this project is to provide safety improvements and better access on Riverfront Drive. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Little Rock | Pulaski | $325,000 | $0 | $81,250 | $406,250 |
Hot Springs Creek Greenway Trail (Ph. 5) (TAP-15) (S) | This phase of the Hot Springs Creek Greenway Trail will construct parts of the sections known as the Utility Service Center Trail and the Southern Trail. The proposed section of trail to be constructed is nearly 1500 feet long and runs along the west side of Hot Springs Creek. This section consists of a 12-foot wide multi-modal trail with surfaces varying between asphalt pavement, a concrete path under the Golf Links Road bridge, and precast concrete boardwalk surfaces where the trail is on the bank of Hot Springs Creek. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hot Springs | Garland | $363,800 | $0 | $90,950 | $454,750 |
Lockesburg Sidewalks (TAP-15) (S) | Construct 3,760 feet of 5’- 8’ wide sidewalks with crosswalks and ADA ramps. Additional proposed improvements include a 6’ x 100’ pedestrian bridge crossing the De Queen Eastern Rail Road. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Lockesburg | Sevier | $353,560 | $0 | $88,390 | $441,950 |
New Hope Bicycle/Pedestrian Bridge (Rogers) (S) | This project consists of constructing three pedestrian bridges over Blossom Way Creek to connect the Razorback Regional Greenway Trail with the Turtle Creek Trail. The 10’-12’ wide concrete trail will have a length of 761 feet. Each new structure will be a steel truss bridge with a 10-feet wide concrete deck. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rogers | Benton | $934,361 | $0 | $233,590 | $1,167,951 |
UAPB Pedestrian Crossing (TAP-15) (S) | This project consists of the installation of sidewalks, a pedestrian crossing signal, textured pavement and curb cuts. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Pine Bluff | Jefferson | $383,186 | $0 | $95,797 | $478,983 |
Lake Springdale Trailhead (Springdale) (S) | Construct a trailhead to connect Lake Springdale to the Razorback Regional Greenway Trail. | Arkansas | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Springdale | Benton | $226,000 | $0 | $253,596 | $479,596 |
Donaldson Sidewalks (Ph. 1) (TAP-15) (S) | This project consists of the construction of approximately 4,800 LF of concrete sidewalks along N. Front Street, N. Hall Street, Roberts Street, Burkhart Street and Cox Street. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Donaldson | Hot Spring | $154,272 | $0 | $38,568 | $192,840 |
Hwy. 270B & Military Rd. Sidewalks (Rockport) (TAP-15) (S) | This project consists of the construction of approximately 7,000 LF of sidewalk along Highway 270 and Military Road. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rockport | Hot Spring | $203,240 | $0 | $50,810 | $254,050 |
Washington St. Streetscape (Ph. 2) (Camden) (TAP-15) (S) | This project consists of reconstructing sidewalks along Washington Street from Adams Street to Harrison Street including ADA accesible ramps, curb and gutter, and landscaping. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Camden | Ouachita | $318,208 | $0 | $79,552 | $397,760 |
AR River Trail Pinnacle Valley Rd. (Pulaski Co.) (TAP-15) (S) | This project consists of the construction of approximately 4,700 LF of 10-ft wide multi-use trail along Pinnacle Valley Road, with a 2-ft wide green buffer. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Little Rock | Pulaski | $282,236 | $0 | $70,559 | $352,795 |
Raywood - Autumnbrook Sidewalks (Sherwood) (TAP-15) (S) | This project consists of constructing sidewalks that will connect a series of existing sidewalks to the local elementary school and various City facilities along Woodruff Avenue, Raywood Drive, Auutumnbrook Circle, Holly Drive and Oakbrook Drive. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Sherwood | Pulaski | $106,380 | $0 | $26,595 | $132,975 |
42nd St., 50th St. & Pinson Dr. Sidewalks (Texarkana) (TAP-15) (S) | This project consists of 3,400 linear feet of 10' wide multi-use trail and sidewalks with a 75' pedestrian bridge over Nix Creek. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Texarkana | Miller | $215,752 | $0 | $61,661 | $277,413 |
Lisbon St. Sidewalks (Smackover) (TAP-15) (S) | This project consists of constructing 900 feet of 5-foot wide sidewalks with crosswalks and ADA ramps along the west side of Lisbon Street, crossing over to the east side at Tennyson Park. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Smackover | Union | $40,920 | $0 | $10,230 | $51,150 |
Arkadelphia Streetscape (Ph. 4) (TAP-15) (S) | This project is a continuation of a recovery plan done in 1999 establishing a strategic direction for the recovery of downtown Arkadelphia. The project includes new sidewalks, handicapped accessible pedestrian crosswalks, lighting, irrigation, and some landscape features on Highway 67 (6th Street) between Highway 51 (Caddo Street) and Clay Street. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Arkadelphia | Clark | $349,930 | $0 | $87,483 | $437,413 |
Poor Farm Rd. Sidewalks (Morrilton) (TAP-15) (S) | This project consists of constructing 2,700 feet of 5-foot wide sidewalks with ADA compliant ramps along Poor Farm Road and one pedestrian crossing over an unnamed tributary of Caney Creek. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Morrilton | Conway | $117,240 | $0 | $29,310 | $146,550 |
Rena Road Sidewalks (Van Buren) (TAP-15) (S) | This project consists of constructing new sidewalks along the recently widened Rena Road including ADA accesible ramps, curb and gutter, and crosswalks. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Van Buren | Crawford | $294,016 | $0 | $73,504 | $367,520 |
Larimer Park Trail (Green Forest) (TAP-15) (S) | This project consists of constructing a walking trail at the new Cherry Street Park. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Green Forest | Carroll | $83,527 | $0 | $20,882 | $104,409 |
4th St. Sidewalks (Nashville) (TAP-15) (S) | Construct 5' Sidewalks & Pedestrian Bridge along 4th Street between Pope Street & Leslie Street. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Nashville | Howard | $190,240 | $0 | $47,560 | $237,800 |
Race St. Sidewalks and RR Ped. Crossing (Jonesboro) (TAP-15) (S) | The purpose of this project is to improve the existing pedestrian crossing at Race Street and the UP Railroad. Approximately 829 feet of 4-foot to 6-foot wide sidewalks will be built west of the intersection. Existing sidewalks on Race Street will also be improved. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $72,678 | $0 | $18,170 | $90,848 |
College St. Sidewalks (Bono) (TAP-15) (S) | This project consists of the construction of approximately 2,800 LF of 4-ft wide sidewalk along College Street. | Arkansas | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bono | Craighead | $375,410 | $0 | $93,853 | $469,263 |
Perryville Elementary School Sidewalks (TAP-15) (S) | This project consists of the construction of approximately 3,255 LF of 4-ft wide sidewalk along Scenic Drive. | Arkansas | 2015 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Perryville | Perry | $86,120 | $0 | $21,530 | $107,650 |
Amboy/Boone School Sidewalks (N. Little Rock) (TAP-15) (S) | This project consists of constructing sidewalks that will connect neighborhoods in North Little Rock to Amboy and Boone Park Elementary Schools. | Arkansas | 2015 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | North Little Rock | Pulaski | $150,508 | $0 | $37,627 | $188,135 |
Southwood Elementary Sidewalks (Pine Bluff) (TAP-15) (S) | This project consists of the construction of approximately 350 LF of concrete sidewalk with crosswalks along Peggy Ann Drive and West 42nd Avenue and 2 flashing crosswalk devices. | Arkansas | 2015 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Pine Bluff | Jefferson | $80,377 | $0 | $20,094 | $100,471 |
Hardin Elementary Sidewalks (Redfield) (TAP-15) (S) | This project consists of the construction of approximately 2,500 LF of sidewalks along Huck Finn Boulevard, Mark Twain Boulevard, River Road, Suzanne Drive and Schoolwood Drive. | Arkansas | 2015 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Redfield | Jefferson | $87,120 | $0 | $21,780 | $108,900 |
Camden Rail to Trails (Ph. 1) (TAP-15) (S) | This project consists of constructing 10,787 feet of 12-foot wide multi-use trail with crosswalks and ADA ramps along the abandoned Missouri Pacific Rail line. Additional proposed improvements include the benches, trash receptacles, kiosk, post and rail fence, bollards, signs, and landscape vegetation. | Arkansas | 2015 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Camden | Ouachita | $847,000 | $0 | $211,750 | $1,058,750 |
Old River Bridge Rehab. (Saline Co.) (TAP-15) (S) | This project is to rehabilitate the Old River Bridge over the Saline River which is on the historic Southwest Trail and to build the bicycle/pedestrian approaches to the Bridge. This will eventually be an integral part of the Future Southwest Regional Trail that will connect Downtown Little Rock to Hot Springs National Park. | Arkansas | 2015 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Benton | Saline | $1,776,000 | $0 | $444,000 | $2,220,000 |
War Eagle Bridge Rehab. (Benton Co.) (TAP-15) (S) | This project consists of rehabilitating the steel truss bridge over War Eagle Creek on County Road 98. The single-lane bridge is 304 feet long and 15 feet wide, and the approach roadway is 19 feet wide. The bridge consists of one main span of 183 feet with four approach spans. Two piers (one stone and one concrete) support a concrete substructure and timber deck. | Arkansas | 2015 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | War Eagle | Benton | $500,000 | $0 | $125,000 | $625,000 |
Riverside Park Trail (Benton) (RTP-15) (S) | This project consists of constructing a walking trail at Riverside Park. The project will consist of a 10-foot wide paved asphalt trail approximately one mile long around Riverside Park and Holland Park facilities and connecting to Fairfield Road, Airlane Drive, and Holland Park Road. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Benton | Saline | $150,000 | $0 | $37,500 | $187,500 |
Ouachita Trail Shelter Project (RTP-15) (S) | This project consists of constructing four trail shelters along the Ouachita National Recreation Trail. The shelters will be constructed at Turner Gap, Brushy Creek Mountain, Suck Mountain and Story Creek. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Pencil Bluff | Montgomery, Polk | $35,230 | $0 | $8,808 | $44,038 |
City Park Trail (Dewitt) (RTP-15) (S) | The purpose of this project is to widen and overlay the existing City Park Trail. The existing trail will be widened from six feet to eight feet and the entire length of the 5,400 feet of trail will have an asphalt overlay. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Dewitt | Arkansas | $75,000 | $0 | $18,750 | $93,750 |
Greenway Trail (Ph. III, Sec. II) (Batesville) (RTP-15) (S) | This project consists of the construction of approximately 760 LF of 10-ft wide asphalt trail completing Batesville's Greenway Trail. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Batesville | Independence | $50,000 | $0 | $12,500 | $62,500 |
Walking Trail Rehab. (Greers Ferry) (RTP-15) (S) | This project consists of paving the existing loose gravel trail in the city park and making it ADA accessible. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Greers Ferry | Cleburne | $35,000 | $0 | $8,750 | $43,750 |
Cane Creek Boardwalk & Trail (RTP-15) (S) | This project consists of the construction of approximately 500 LF of 6-ft wide trail and a 400 LF boardwalk connecting Pavilion #1, the boat ramp, Pavilion #2 and the campground within Cane Creek State Park. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Star City | Lincoln | $157,266 | $0 | $90,572 | $247,838 |
City Park Walking Trail (Murfreesboro) (RTP-15) (S) | This project consists of overlaying and widening the existing trail around the City Park. The asphalt trail will be 8 feet wide and will have a length of 3200 feet. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Murfreesboro | Pike | $40,000 | $0 | $10,000 | $50,000 |
Cecil Cove Equestrian Trail Rehab. (RTP-15) (S) | This project consists of the rehabilitation of approximately 6 miles of the Buffalo River equestrian and pedestrian trail (natural surface) near Erbie. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Erbie | Newton | $29,332 | $0 | $7,333 | $36,665 |
Community Center Fitness Trail (Bentonville) (RTP-15) (S) | This project consists of the construction of approximately 5,300 LF of 10-ft wide concrete trail around the new Bentonville Community Center. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Bentonville | Benton | $75,000 | $0 | $173,910 | $248,910 |
Delta Heritage Trail: Rohwer-Watson (RTP-15) (S) | This project consists of the construction of approximately 50,000 LF of varying-width asphalt trail along an abandoned rail corridor adjacent to Highway 1. This project will help connect this trail from Helena-West Helena to Arkansas City. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Watson | Desha | $500,000 | $0 | $4,688,895 | $5,188,895 |
S. Broadway Trail Ext. (Heber Springs) (RTP-15) (S) | This project consists of the construction of approximately 500 LF of 10-ft wide asphalt trail and a bridge across Sulphur Creek. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Heber Springs | Cleburne | $45,000 | $0 | $11,250 | $56,250 |
Wetland Trail (Maumelle) (RTP-15) (S) | This project consists of the construction of approximately 3,000 LF of 8-ft wide trail with a gravel surface and a pier. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Maumelle | Pulaski | $32,000 | $0 | $8,000 | $40,000 |
Riverfront Parks Connector (Camden) (RTP-15) (S) | This project consists of the construction of approximately 5,800 LF of soft surface trail that will connect Sandy Beach Park to Riverfront Park. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Camden | Ouachita | $56,600 | $0 | $14,150 | $70,750 |
Levy Trail (Ph. 3) (North Little Rock) (RTP-15) (S) | This project consists of converting 1 mile of abandoned railroad bed into a 14-ft wide asphalt paved pedestrian/bicycle trail from 56th Street to Kierre Road including drainage improvements and a street crossing at 47th Street. | Arkansas | 2015 | 201 | (TAP) 201. Trails | North Little Rock | Pulaski | $271,696 | $0 | $67,924 | $339,620 |
Greenway Ped. Bridge (Jonesboro) (RTP-15) (S) | This project consists of constructing trail and a pedestrian bridge that will provide a link to the existing Greenway and the Turtle Creek Mall along Matthews Avenue. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Jonesboro | Craighead | $79,996 | $0 | $19,999 | $99,995 |
Park Trail Rehab. (Osceola) (RTP-15) (S) | This project consists of repaving the existing park trail. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Osceola | Mississippi | $50,000 | $0 | $12,500 | $62,500 |
Mt. Magazine Cabin/ Lodge Trail (RTP-15) (S) | This project consists of the construction of approximately 2,500 LF of 8-ft wide concrete trail with seating and night lighting. This provides connection to ADA restrooms and cabin within Mount Magazine State Park. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Mountain Township | Logan | $103,962 | $0 | $274,138 | $378,100 |
Lake Saracen Trail (Ph. 8) (Pine Bluff) (RTP-15) (S) | This project consists of the construction of approximately 4,000 LF of 8-ft wide trail along West Pullen Avenue and North Linden Street. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Pine Bluff | Jefferson | $30,000 | $0 | $253,350 | $283,350 |
Rice Carden Walking Trail (Fort Smith) (RTP-15) (S) | This project consists of the construction of approximately 17,700 LF of 10-ft wide asphalt trail adjacent Riverfront Drive. | Arkansas | 2015 | 201 | (TAP) 201. Trails | Fort Smith | Sebastian | $224,000 | $0 | $56,000 | $280,000 |
Jackson St. Trail Connection (Texarkana) (RTP-15) (S) | This project consists of constructing an asphalt trail from Jackson Street to the Union Pacific Railroad tracks and install a 125' bridge over Nix Creek, | Arkansas | 2015 | 201 | (TAP) 201. Trails | Texarkana | Miller | $76,500 | $0 | $19,125 | $95,625 |
Hot Springs Schools Ped. Connectors (SRTS-15) (S) | This project consists of the construction of approximately 2,000 LF of 5-ft wide sidewalk along Main Street and Patterson Street, and a 12' Multi-Use trail approximately 500 LF from Patterson Street to Lester Street. | Arkansas | 2015 | 301 | (TAP) 301. Safe routes to school infrastructure | Hot Springs | Garland | $149,500 | $0 | $37,375 | $186,875 |
McKnight St. Sidewalk (West Fork) (SRTS-15) (S) | This project consists of the construction of approximately 400 LF of 5-ft wide sidewalk along McKnight Avenue. | Arkansas | 2015 | 301 | (TAP) 301. Safe routes to school infrastructure | West Fork | Washington | $94,995 | $0 | $23,749 | $118,744 |
Cherry St. & Milan St. Sidewalks (Hamburg) (SRTS-15) (S) | This project consists of the construction of approximately 2,100 LF of 6-ft wide sidewalk along Cherry Street and Milan Street. | Arkansas | 2015 | 301 | (TAP) 301. Safe routes to school infrastructure | Hamburg | Ashley | $266,250 | $0 | $66,563 | $332,813 |
Joan Dr. Sidewalks (Shannon Hills) (SRTS-15) (S) | This project consists of the construction of approximately 3,500 LF of 5-ft wide sidewalk along Joan Drive. | Arkansas | 2015 | 301 | (TAP) 301. Safe routes to school infrastructure | Shannon Hills | Saline | $120,000 | $0 | $30,000 | $150,000 |
MacPark Connections (Little Rock) (SRTS-15) (S) | This project consists of reparing sidewalks, installing sharrows, and building new bikeways. | Arkansas | 2015 | 301 | (TAP) 301. Safe routes to school infrastructure | Little Rock | Pulaski | $96,329 | $0 | $24,082 | $120,411 |
Arkansas SRTS Outreach (Green Forest) (SRTS-15) (S) | This project consists of educational material and outreach. | Arkansas | 2015 | 302 | (TAP) 302. Safe routes to school programs | Green Forest | Carroll | $182,800 | $0 | $45,700 | $228,500 |
Magnolia Pearce St. Sidewalks (TAP-16) (S) | Construct a sidewalk along Pearce Street between E. Green and E. University | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Magnolia | Columbia | $197,000 | $0 | $49,250 | $246,250 |
ASU Campus Loop Trail (TAP-16) (S) | This project consists of constructing 5,322' of an asphalt multi-use trail. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $500,000 | $0 | $125,000 | $625,000 |
Hot Springs Creek Greenway Trail Ph. 6B (TAP-18) (S) | Continues the existing trail project by adding 1,300' long 12-foot wide multi-use trail consisting of concrete trail, timber boardwalk, security lighting, and 80' long bicycle/pedestrian bridge over Hot Springs Creek. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Hot Springs | Garland | $500,000 | $125,000 | $625,000 | |
Marion Military Rd. Streetscape (TAP-19) (S) | Construct approximately 1,900 linear feet of streetscape improvements on Military Road (Hwy. 64) and bicycle and pedestrian improvements around Carter Magnet School connecting to Military Road. These improvements will include native landscaping, pedestrian lighting, crosswalk improvements, sidewalks, benches, and porous pavers. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Marion | Crittenden | $250,000 | $62,500 | $312,500 | |
Greenland A.J. Allen Park Trail (TAP-16) (S) | Construct 2,095 feet of 8 foot wide trail connecting existing sidewalk to the Community Center. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Greenland | Washington | $147,000 | $0 | $36,750 | $183,750 |
Monticello Hwys. 278 & 425 Sidewalks (TAP-19) (S) | Construct sidewalks along Hwy. 425 and Hwy. 278 and install pedestrian signalization and a crosswalk. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Monticello | Drew | $150,000 | $37,500 | $187,500 | |
Mtn. View Hwy. 66 Sidewalks & Lighting (TAP-18) (S) | Reconstructing non-ADA compliant sidewalks along Hwy. 66, including pedestrian lighting. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Mountain View | Stone | $159,000 | $0 | $40,390 | $199,390 |
ASU Loop Trail Ph. 2 (TAP-18) (S) | This project will complete a 1.97 mile bicycle/pedestrian loop around campus by adding sharrows to Cherokee Street, converting Driver Street to bike/pedestrian only from University Loop West to Cherokee Street, and constructing a 12' wide multi-use trail on the western side of University Loop East from U. Loop West to Aggie Road and on the south side of Aggie Road from U. Loop East to Red Wolf Blvd. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $450,000 | $0 | $178,735 | $628,735 |
ADPT Delta Heritage Trail: Elaine - Mellwood (TAP-19) (S) | Construct 9 mile by 8' wide barrier-free, multi-use, pedestrian and bicycle trail segment that continues development of the Delta Heritage Trail (DHT). | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Elaine | Phillips | $250,000 | $62,500 | $312,500 | |
Prescott Hwy. 67 Sidewalks (TAP-19) (S) | Construct approximately 2,500 linear feet of 5' wide sidewalks along West First Street (Hwy. 67) along with ADA ramps. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Prescott | Nevada | $129,000 | $32,250 | $161,250 | |
Flippin Main St. Sidewalks (TAP-16) (S) | Remove and replae existing sidewalks along both sides of Main Street between 3rd Street and Hwy. 178 | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Flippin | Marion | $205,000 | $0 | $51,250 | $256,250 |
Perryville North Cedar St. Sidewalks (TAP-17) (S) | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Perryville | Perry | $100,000 | $0 | $38,780 | $138,780 | |
Eureka Springs W. Van Buren St. Sidewalk Impvts. (TAP-18) (S) | This project will construct approximately 1,520' of 5-foot wide sidewalks along the east side of Hwy.62 | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Eureka Springs | Carroll | $200,000 | $0 | $50,260 | $250,260 |
Lamar Sidewalk Impvts. (TAP-18) (S) | Consists of constructing approximately 2,830 linear feet of 5-foot wide sidewalks on various City Streets. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Lamar | Johnson | $200,000 | $0 | $50,735 | $250,735 |
Dean's Trail Ph. 1 (Springdale) (S) | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Springdale | Washington | $506,745 | $0 | $1,465,619 | $2,918,473 | |
Hackett Greenwood St. Sidewalks (TAP-18) (S) | Constructing sidewalks on Greenwood Street. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Hackett | Sebastian | $50,000 | $12,630 | $62,630 | |
Hot Springs Emory & Seventh St. Sidewalks (TAP-19) (S) | Construct sidewalks along 7th and Emory Streets. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Hot Springs | Garland | $240,000 | $60,000 | $300,000 | |
Gravette Trails (TAP-16) (S) | This project consists of constructing 15,600 linear feet of trail. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Gravette | Benton | $500,000 | $0 | $125,000 | $625,000 |
Jonesboro Downtown to ASU Connection (TAP-17) (S) | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $399,000 | $0 | $99,750 | $498,750 | |
Murfreesboro City Park Trail Lighting (TAP-16) (S) | Install pedestrian lighting along the existing walking trail north of Hwy. 29 (Razorback Rd.) and east of Worrell Street. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Murfreesboro | Pike | $80,000 | $0 | $20,000 | $100,000 |
Jonesboro Thorn St. Sidewalks (TAP-16) (S) | This project consists of removing and replacing 705' of concrete sidewalks, wheelchair ramps, and drainage improvements. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $46,000 | $0 | $11,814 | $57,814 |
Hope Downtown Streetscaping (TAP-19) (S) | Construct sidewalks with streetscape improvements including pedestrian lighting connecting downtown Hope to the William Jefferson Clinton Birthplace National Historic Site. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Hope | Hempstead | $460,000 | $115,000 | $575,000 | |
Hot Springs Creek Greenway Trail Ph. 6 (TAP-16) (S) | Construct 3,900 linear feet of 12 foot wide multi-use trail connecting the end of the 2015 ongoing project and ending at TV Hill Road. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Hot Springs | Garland | $500,000 | $0 | $125,000 | $625,000 |
Wilmot Downtown Sidewalk (TAP-17) (S) | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Wilmot | Ashley | $178,000 | $0 | $44,500 | $222,500 | |
Fort Smith Chaffee Crossing Trail (Segment 1) (TAP-16) (S) | This trail is a T shaped configuration totaling 1.6 miles of 10 foot wide trail. The east to northeast leg is from Roberts Blvd at Chad Colley extending northwestward to existing trail at Forest Wood Way. The second segment extends from Roberts Blvd down Wells Lake Road and doglegs to the west before turning southward to the end of McClure Dr. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Fort Smith | Sebastian | $500,000 | $0 | $125,000 | $625,000 |
Rogers Hwy. 94 Sidewalks (TAP-18) (S) | The purpose of this project is to construct sidewalks and sidepath to fill in the gaps along 8th Street between Poplar Street and New Hope Road. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Rogers | Benton | $250,000 | $0 | $125,343 | $375,343 |
Earle Hwys. 64 & 64B Ped. Impvts. (TAP-18) (S) | The purpose of this project is to reconstruct the sidewalk on Second Street at the elementary campus and repair the flashing school zone sign on Highway 64 by the High School. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Earle | Crittenden | $20,000 | $0 | $5,000 | $25,000 |
Jonesboro Craighead Forest Greenway Trail Ph. 4 (TAP-18) (S) | This project will add on to the existing Craighead Forest Greenway Trail by adding approximately 4,370 linear feet of 10-foot wide asphalt paved trail on the southwest side of Harrisburg Road. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $399,000 | $0 | $100,415 | $499,415 |
Warren Sidewalks (TAP-16) (S) | This project consists of constructing approximately 2,750' of concrete sidewalks, drainage improvements, crosswalks, wheelchair ramps, and landscaping. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Warren | Bradley | $177,000 | $0 | $44,250 | $221,250 |
Beebe Center St. Sidewalk Ext. (TAP-18) (S) | Constructing approximately 1,656 linear feet of sidewalk on West Center Street and Commerce Drive. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Beebe | White | $36,000 | $0 | $9,644 | $45,644 |
Gravette Trails Ph. 2 (TAP-18) (S) | Construct approximately 1.73 miles of 8-foot wide trails/sidewalks to connect to the existing trail network. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Gravette | Benton | $400,000 | $0 | $298,200 | $698,200 |
Trumann Sidewalks (TAP-18) (S) | This project will construct approximately 1,890 linear feet of 5-foot wide sidewalks on various City streets to connect to Cedar Park Elementary. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Trumann | Poinsett | $36,000 | $0 | $9,001 | $45,001 |
Southwest Trail Design | This funding along with funding from the Federal Lands Access Program is being used to design the Southwest Trail from Hot Springs National Park to Little Rock High School National Historic Site. The trail will use abandoned rail beds as well as Saline County's rehabilitated Old River Bridge. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Benton | Pulaski, Garland, & Saline | $1,170,000 | $0 | $292,500 | $1,462,500 |
Trumann Sidewalks (TAP-18) (S) | This project will construct approximately 1,890 linear feet of 5-foot wide sidewalks on various City streets to connect to Cedar Park Elementary. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Trumann | Poinsett | $36,000 | $9,001 | $45,001 | |
Fayetteville Cato Springs Trail Lighting (S) | The purpose of this project is to install lighting on the recently constructed Cato Springs Trail. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Fayetteville | Washington | $320,000 | $0 | $158,256 | $478,256 |
SAU Ped. Impvts. (TAP-16) (S) | This project consists of constructing 1,250 linear feet of concrete sidewalks and crosswalks. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Magnolia | Columbia | $110,000 | $0 | $27,500 | $137,500 |
Main St. & Roosevelt Rd. Sidewalks (LR) (S) | The purpose of this project is to construct 2,450 feet of 5-foot wide sidewalks with crosswalks and ADA ramps along Main Street and Roosevelt Road. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Little Rock | Pulaski | $160,000 | $0 | $40,000 | $200,000 |
Springdale Dean's Trail Ph. 3 (TAP-19) (S) | Construct 3 blocks of streetscape improvements including sidewalk and curb reconstruction, irrigation, crosswalk striping, benches, and landscaping in downtown Van Buren on Main Street. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Springdale | Washington | $500,000 | $125,000 | $625,000 | |
Alma Sidewalks (TAP-16) (S) | This project consists of constructing 1,335' of concrete sidewalks. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Alma | Crawford | $350,000 | $0 | $87,500 | $437,500 |
Madison Jackson St. Sidewalks (TAP-19) (S) | Construct approximately 1,700 feet of 5' wide sidewalk beginning a the intersection of Hadley Drive and Jackson Street and stop at the intersection of 5th Street and Jackson Street. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Madison | St. Francis | $60,000 | $15,000 | $75,000 | |
Osceola Sports Complex Trail (TAP-16) (S) | This project consists of constructing 0.5 mile of trail around community ball fields. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Osceola | Mississippi | $138,000 | $0 | $34,500 | $172,500 |
Wynne Merriman Ave. Streetscape & Drainage Impvts. (TAP-16) (S) | Bicycle lanes between Front Street and the local road to the east of the Cross Country Public Library with 1,750 liner feet of curb and gutter. Construction of sidewalks and ADA improvements Implement rain chain stormwater mitigation to filter water polution from the Languille River watershed. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Wynne | Cross | $351,000 | $0 | $87,750 | $438,750 |
ACHE Wellness Lake Trail (TAP-19) (S) | Construct approximately 1,300 linear feet of 10-foot wide walking trail including a pedestrian bridge. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Barling | Sebastian | $216,000 | $54,000 | $270,000 | |
Magnolia Columbia St. Sidewalks (TAP-18) (S) | Constructing sidewalks, curb and gutter, and crosswalks along Columbia Street. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Magnolia | Columbia | $373,000 | $0 | $94,075 | $467,075 |
Kelso Rd. & Burns Trail Sidewalks (Sherwood) (S) | The purpose of this project is to construct 4,093 linear feet of 5-foot wide concrete sidewalks in two phases with crosswalks and ADA compliant ramps along Kelso Road and Burns Trail beginning at Highway 107 and ending at Valley Drive. | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Sherwood | Pulaski | $125,000 | $0 | $66,212 | $191,212 |
First St. Sidewalks (Cabot) (S) | The proposed project would construct curb-and-gutter and 6-foot wide sidewalks along approximately 750 feet of First Street between the two ends of Pheasant Run Drive. | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Cabot | Lonoke | $125,000 | $0 | $34,185 | $159,185 |
Jacksonville Military Rd. Sidewalks (TAP-16) (S) | This project consists of constructing 4,300' of concrete sidewalk with drainage improvements and wheelchair ramps. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Jacksonville | Pulaski | $375,000 | $0 | $93,750 | $468,750 |
Ozark Sidewalks (TAP-16) (S) | This project consists of constructing approximately 8,300' of concrete sidewalks with wheelchair ramps. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Ozark | Franklin | $234,000 | $0 | $58,500 | $292,500 |
Greenwood Hwy. 10S Sidewalks (TAP-18) (S) | Constructing sidewalks on the North side of Hwy. 10S between Ulmer Street and Denver Street and on the South side of Hwy. 10S from Denver to the vacant Riverside Factory. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Greenwood | Sebastian | $394,000 | $99,090 | $493,090 | |
Edgewood Dr. Sidewalks (Maumelle) (S) | This project will construct 2,865 linear feet of 5-foot wide concrete sidewalks with crosswalks and ADA compliant ramps along Edgewood Drive. | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Maumelle | Pulaski | $125,000 | $0 | $93,100 | $218,100 |
White Hall City Park (TAP-16) (S) | This project consists of reconstruction of existing asphalt trail, sidewalk construction, and landscaping. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | White Hall | Jefferson | $306,000 | $0 | $89,479 | $395,479 |
Berryville Park Ped. Impvts. (TAP-16) (S) | This project consists of constructing 7,150 linear feet of concrete trail around a soccer park. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Berryville | Carroll | $231,000 | $0 | $57,750 | $288,750 |
Van Buren Downtown Streetscape (TAP-19) (S) | Construct 3 blocks of streetscape improvements including sidewalk and curb reconstruction, irrigation, crosswalk striping, benches, and landscaping in downtown Van Buren on Main Street. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Van Buren | Crawford | $492,000 | $123,000 | $615,000 | |
Little Rock Zoo Trails (TAP-16) (S) | Remove and constuct 3,700 linear feet of sidewalks and install 8 interactive trail markers throughout the Zoo. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Little Rock | Pulaski | $384,000 | $0 | $96,000 | $480,000 |
DeQueen School Connector Sidewalks (TAP-17) (S) | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | DeQueen | Sevier | $222,000 | $0 | $55,500 | $277,500 | |
Quitman Sidewalks Ph. 2 (TAP-16) (S) | Along with Phase 1 from their 2015 project, construct 5,766 linear feet of sidewalk. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Quitman | Cleburne | $234,209 | $0 | $58,552 | $292,761 |
Benton Riverside Trail Ph. 2 (TAP-16) (S) | This project consists of constructing 12,000 linear feet of concrete walking trail and rehabilitation of an existing trail at Riverside Park. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Benton | Saline | $315,000 | $0 | $78,750 | $393,750 |
Jonesboro Rains St. Sidewalks (TAP-16) (S) | This project consists of constructing 1,144' of concrete sidewalks, wheelchair ramps, and drainage improvements. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $63,000 | $0 | $16,975 | $79,975 |
Greenwood Hwy. 10S Sidewalks (TAP-18) (S) | Constructing sidewalks on the North side of Hwy. 10S between Ulmer Street and Denver Street and on the South side of Hwy. 10S from Denver to the vacant Riverside Factory. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Greenwood | Sebastian | $394,000 | $0 | $99,090 | $493,090 |
Riordan Rd. Trailhead (Bella Vista) (S) | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Bella Vista | Benton | $237,000 | $0 | $59,250 | $296,250 | |
North Little Rock 14th St. Ped. Bridge (TAP-19) (S) | Construct a 10 feet wide pedestrian bridge over the Union Pacific Railroad tracks along 14th Street between Maple Street and Willow Street.The pedestrian bridge would replace the vehicular bridge allowing a pedestriancrossing if a train was stopped on the tracks. The proposed bridge would span a distance of 140 feet and be 10 feet wide. The ends of the bridge will be ADA accessible with the use of ramps or sufficient regrading of the approaches at each end. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | North Little Rock | Pulaski | $470,000 | $117,500 | $587,500 | |
Bryant Mills Park Trail (TAP-16) (S) | Construct 2,112 linear feet of trail with markers, informational signs. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Bryant | Saline | $36,000 | $0 | $9,000 | $45,000 |
Dyer Sidewalks (TAP-16) (S) | Construct a sidewalk along N. Mail Street from Holcomb Street to Highway 64. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Dyer | Crawford | $53,000 | $0 | $13,250 | $66,250 |
Magnolia High School Dr. Sidewalks (TAP-19) (S) | Construct sidewalks to the High School along with crosswalks and curb and gutter. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Magnolia | Columbia | $102,000 | $25,500 | $127,500 | |
Hackett Greenwood St. Sidewalks (TAP-18) (S) | Constructing sidewalks on Greenwood Street. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Hackett | Sebastian | $50,000 | $0 | $12,630 | $62,630 |
Brookland Hwy. 49B Sidewalks (TAP-16) (S) | This project consists of constructing 2,905 linear feet of concrete sidewalks. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Brookland | Craighead | $106,000 | $0 | $26,500 | $132,500 |
Siloam Springs Main St. Trail Impvts. (S) | To construct a 10-foot wide ADA compliant concrete trail along Main Street between Hwy. 264 and Country Club Drive. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Siloam Springs | Benton | $118,000 | $0 | $29,500 | $147,500 |
Jackman St. & River St. Sidewalks (Benton) (S) | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Benton | Saline | $125,000 | $0 | $31,250 | $156,250 | |
McCrory Hwy. 145 Sidewalks (TAP-18) (S) | The purpose of this project is to reconstruct approximately 1,600 linear feet of 11-foot side sidewalks, install safety islands, curb and gutter, and to restripe parking to accommodate for longer vehicles and handicapped parking. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | McCrory | Woodruff | $89,000 | $22,250 | $111,250 | |
Greenwood Bell Park Promenade Ph. 2 (TAP-16) (S) | Construct phase 2 of the Bell Park loop. The trail will connect the three pavillions to the North end of the existing trail to the West. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Greenwood | Sebastian | $126,000 | $0 | $31,500 | $157,500 |
ASU Loop Trail Ph. 2 (TAP-18) (S) | This project will complete a 1.97 mile bicycle/pedestrian loop around campus by adding sharrows to Cherokee Street, converting Driver Street to bike/pedestrian only from University Loop West to Cherokee Street, and constructing a 12' wide multi-use trail on the western side of University Loop East from U. Loop West to Aggie Road and on the south side of Aggie Road from U. Loop East to Red Wolf Blvd. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $450,000 | $178,735 | $628,735 | |
Nashville 4th St. Sidewalks Ph. 2 (TAP-16) (S) | This project consists of constructing 2,200 linear feet of ADA accessible sidewalks, ramps, pavement markings for pedestrian crosswalks, and drainage improvements. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Nashville | Howard | $131,000 | $0 | $32,750 | $163,750 |
Eureka Springs W. Van Buren St. Sidewalk Impvts. (TAP-18) (S) | This project will construct approximately 1,520' of 5-foot wide sidewalks along the east side of Hwy.62 | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Eureka Springs | Carroll | $200,000 | $50,260 | $250,260 | |
Siloam Springs N. Hico St. Ped. Impvts. (TAP-18) (S) | This project will extend the existing trail by constructing approximately 1,500' of 10-foot wide multi-use trail including a pedestrian bridge. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Siloam Springs | Benton | $155,000 | $352,000 | $507,000 | |
Pangburn Sidewalk Impvts. (TAP-17) (S) | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Pangburn | White | $100,000 | $0 | $25,000 | $125,000 | |
Mtn. View Hwy. 66 Sidewalks & Lighting (TAP-18) (S) | Reconstructing non-ADA compliant sidewalks along Hwy. 66, including pedestrian lighting. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Mountain View | Stone | $159,000 | $40,390 | $199,390 | |
Prairie Grove Muddy Fork Park Walking Trail (TAP-17) (S) | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Prairie Grove | Washington | $140,000 | $0 | $35,000 | $175,000 | |
Bentonville McCollum Rd. Sidepath (TAP-16) (S) | Construction of a 10' wide trail on the west side of McCollum Road between E. Central Ave. and Tiger Blvd. The project will connect to existing trail on both E. Central Ave. and Tiger Blvd. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Bentonville | Benton | $480,000 | $0 | $120,000 | $600,000 |
Earle Hwys. 64 & 64B Ped. Impvts. (TAP-18) (S) | The purpose of this project is to reconstruct the sidewalk on Second Street at the elementary campus and repair the flashing school zone sign on Highway 64 by the High School. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Earle | Crittenden | $20,000 | $5,000 | $25,000 | |
Morrilton Sidewalks (TAP-16) (S) | This project consists of constructing 10,200 linear feet of concrete sidewalks and landscaping. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Morrilton | Conway | $498,000 | $0 | $124,500 | $622,500 |
SAU Campus Sidewalks (TAP-19) (S) | Construct ADA accessible sidewalks and crosswalks throughout campus. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Magnolia | Columbia | $93,000 | $23,250 | $116,250 | |
Rogers Hwy. 94 Sidewalks (TAP-18) (S) | The purpose of this project is to construct sidewalks and sidepath to fill in the gaps along 8th Street between Poplar Street and New Hope Road. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Rogers | Benton | $250,000 | $125,343 | $375,343 | |
Pine Bluff Grant St. Multi-use Trail (TAP-19) (S) | Construct sidewalks and drainage improvements along Grant Street between Hwy. 190 and 13th Avenue. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Pine Bluff | Jefferson | $384,000 | $96,000 | $480,000 | |
Mount Vernon Downtown Sidewalk Impvts. (TAP-17) (S) | Arkansas | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Mount Vernon | Faulkner | $168,000 | $0 | $42,000 | $210,000 | |
McRae Sidewalks (TAP-18) (S) | Constructing approximately 4,000 feet of 5' wide sidewalks on various City Streets. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | McRae | White | $84,000 | $21,350 | $105,350 | |
Glenwood Park St. and Hwy. 8 Sidewalks (TAP-18) (S) | Constructing sidewalks along Park Street and Hwy. 8. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Glenwood | Pike | $499,000 | $0 | $125,950 | $624,950 |
Gravette Trails Ph. 2 (TAP-18) (S) | Construct approximately 1.73 miles of 8-foot wide trails/sidewalks to connect to the existing trail network. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Gravette | Benton | $400,000 | $298,200 | $698,200 | |
Beebe Center St. Sidewalk Ext. (TAP-18) (S) | Constructing approximately 1,656 linear feet of sidewalk on West Center Street and Commerce Drive. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Beebe | White | $36,000 | $9,644 | $45,644 | |
Shannon Hills Sidewalks (TAP-16) (S) | This project consists of constructing 3,248 linear feet of concrete sidewalks. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Shannon Hills | Saline | $96,000 | $0 | $24,000 | $120,000 |
Vilonia Sidewalks & Hwy. 64B Ped. Lighting (TAP-19) (S) | Construct sidewalks and curb and gutter on the west side of South Church Street between Hwy. 64B and Barnard Lane. The project will also include pedestrian lighting along Hwy. 64B from South Church Street to Hwy. 107. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Vilonia | Faulkner | $500,000 | $125,000 | $625,000 | |
Lake Monticello Trail (TAP-16) (S) | This project consists of clearing and grading 4 miles of a nature trail with pedestrian bridges, including geosynthetic fabric and B-stone for stream crossings. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Monticello | Drew | $92,000 | $0 | $23,000 | $115,000 |
Clinton Sidewalk Impvts. (TAP-18) (S) | Construction of approximately 1,580' of 5-foot wide sidewalks between schools and residential neighborhoods. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Clinton | Van Buren | $54,000 | $0 | $14,000 | $68,000 |
Pulaski Co. Two Rivers Park Safety Impvts. (TAP-19) (S) | Constructing safety improvements to separate pedestrians and bicyclists and separate more experiences cyclists from recreational riders. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Little Rock | Pulaski | $330,000 | $82,500 | $412,500 | |
Paragould 8 Mile Creek Trail Ph. 1 (TAP-16) (S) | This project consists of constructing 5,100 linear feet of trail including 2 pedestrian bridges. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Paragould | Greene | $403,000 | $0 | $100,750 | $503,750 |
Forrest City Stuart Park Nature Trail (TAP-16) (S) | Construct 1,450 Lf of sidewalk along Arkansas Avenue connecting to Stuart Park and 1,300 Lf of natural surface trail in Stuart Park. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Forrest City | St. Francis | $73,000 | $0 | $18,250 | $91,250 |
Lafayette County Courthouse Square Sidewalks (TAP-16) (S) | This project consists of removal and replacement of 750' of concrete sidewalks. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Lewisville | Lafayette | $75,000 | $0 | $18,750 | $93,750 |
Lowell Greenway Connector Trail (TAP-16) (S) | Construct a 1,540 linear feet of trail connecting the Lakewood trail in Lowell to the City Limits line of Cave Springs. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Lowell | Benton | $302,000 | $0 | $75,500 | $377,500 |
Dover Elementary School Walking Trail (TAP-18) (S) | Constructing approximately 4,600' 5-foot wide walking trail that will go around the perimeter of campus. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Dover | Pope | $78,000 | $0 | $42,591 | $120,591 |
Lepanto Miles St. Sidewalks (TAP-18) (S) | This project will construct approximately 2,100 linear feet of 5-foot wide sidewalks on the south side of Miles Street. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Lepanto | Poinsett | $94,000 | $23,500 | $117,500 | |
Arkadelphia Sidewalks (TAP-16) (S) | Remove and construct sidewalks along 10th Street connecting Barkman and Haddock Street. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Arkadelphia | Clark | $80,000 | $0 | $20,000 | $100,000 |
Jonesboro Craighead Forest Greenway Trail Ph. 4 (TAP-18) (S) | This project will add on to the existing Craighead Forest Greenway Trail by adding approximately 4,370 linear feet of 10-foot wide asphalt paved trail on the southwest side of Harrisburg Road. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Jonesboro | Craighead | $399,000 | $100,415 | $499,415 | |
McRae Sidewalks (TAP-18) (S) | Constructing approximately 4,000 feet of 5' wide sidewalks on various City Streets. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | McRae | White | $84,000 | $0 | $21,350 | $105,350 |
UAPB Pedestrian Mall Ph. 1 (TAP-16) (S) | Contruction of a pedestrian mall with removal and disposal of an existing driveways and parking lot and installation of sidewalks, lighting, landscapin,g site furnishings and improved drainage. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Pine Bluff | Jefferson | $407,000 | $0 | $101,750 | $508,750 |
Helena-West Helena Big River Trail Ext. (TAP-19) (S) | Construct trail connecting the Big River Trail along the Mississippi to the Delta Heritage Trail. | Arkansas | 2019 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Helena-West Helena | Phillips | $250,000 | $62,500 | $312,500 | |
Batesville Greenway Trail Ph. 4 (TAP-16) (S) | This project consists of constructing 3,248 linear feet of concrete sidewalks. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Batesville | Independence | $87,000 | $0 | $21,750 | $108,750 |
UA Research & Technology Park Ped. Impvts. (TAP-16) (S) | Construct two trails connecting the existing Town Branch Trail to the existing Cato Springs Road Trail. | Arkansas | 2016 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Fayetteville | Washington | $374,000 | $0 | $152,125 | $526,125 |
Springdale Dean's Trail Ph. 2 (TAP-18) (S) | Construct a 12' wide concrete surface trail including a grade separated crossing under Hwy. 412. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | Springdale | Washington | $500,000 | $541,887 | $1,041,887 | |
McCrory Hwy. 145 Sidewalks (TAP-18) (S) | The purpose of this project is to reconstruct approximately 1,600 linear feet of 11-foot side sidewalks, install safety islands, curb and gutter, and to restripe parking to accommodate for longer vehicles and handicapped parking. | Arkansas | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | McCrory | Woodruff | $89,000 | $0 | $22,250 | $111,250 |
Centerton SRTS (TAP-16) (S) | This project consists of constructing approximately 3,900 linear feet of sidewalk on Seba Road. | Arkansas | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Centerton | Benton | $263,000 | $0 | $65,750 | $328,750 |
ADPT Devil's Den Trail Impvts. (TAP-18) (S) | Construct an 8-foot wide multi-use trail with a pre-fabricated bridge over Lee Creek. | Arkansas | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Fayetteville | Washington | $255,000 | $64,450 | $319,450 | |
West Fork Safe Routes Connection (TAP-17) (S) | Arkansas | 2017 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | West Fork | Washington | $181,000 | $0 | $45,250 | $226,250 | |
ADPT Devil's Den Trail Impvts. (TAP-18) (S) | Construct an 8-foot wide multi-use trail with a pre-fabricated bridge over Lee Creek. | Arkansas | 2018 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Fayetteville | Washington | $255,000 | $0 | $64,450 | $319,450 |
LR Port Authority Transit Shelter (S) | The purpose of this project is to install a transit hub shelter, bicycle parking pavilion, a bus pullout lane, and sidewalks. | Arkansas | 2019 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Little Rock | Pulaski | $50,000 | $12,500 | $62,500 | |
Newark SRTS (TAP-16) (S) | Construct a trail connecting the high school to the elementary school. | Arkansas | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Newark | Independence | $138,000 | $0 | $34,500 | $172,500 |
Hot Springs SRTS (TAP-16) (S) | This project extends the 2015 SHPO approved project locations an approximately 750 feet per location. The Main Street leg will bridge ongoning project location to existing sidewalk. The other three legs will continue from current onging project locations. | Arkansas | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Hot Springs | Garland | $120,000 | $0 | $30,000 | $150,000 |
Cabot Central Elementary SRTS Sidewalks (S) | The purpose of this project is to construct 1,500 linear feet of 5-foot wide sidewalks with crosswalks and ADA ramps along the north side of Pond Street. | Arkansas | 2019 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Cabot | Lonoke | $100,000 | $25,000 | $125,000 | |
ADPT Delta Woodlands Trail Impvts. (TAP-19) (S) | Construct a 10' wide barrier-free, paved trail for the existing Delta Woodlands Trail (0.77 mile) for a total of 4066 linear feet with several drainage culverts | Arkansas | 2019 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Lake Village | Chicot | $195,000 | $48,750 | $243,750 | |
West Side Schools Hwy. 92 Flashing Beacons (TAP-19) (S) | This project will install 3 sets of rapid flashing beacon crosswalk signs on Hwy. 92 to improve pedestrian safety. | Arkansas | 2019 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Greers Ferry | Cleburne | $20,000 | $5,000 | $25,000 | |
Wynne SRTS Ph. 2 (TAP-16) (S) | Construct 4,730 Lf of ADA accessible sidewalk and bike lanes from Turtle Creek Drive along the west side of Killough Road to Bridges and connecting to existing sidewalk at the corner of Bridges and Lemmons. | Arkansas | 2016 | 102 | (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | Wynne | Cross | $208,000 | $0 | $52,000 | $260,000 |
ADPT Delta Heritage Trail: Watson - Arkansas River (TAP-18) (S) | To provide an 8' wide barrier-free, multi-use, pedestrian and bicycle trail segment that continues the development of the Delta Heritage Trail. | Arkansas | 2018 | 103 | (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Watson | Desha | $500,000 | $2,406,521 | $2,906,521 | |
ADPT Delta Heritage Trail: Watson - Arkansas River (TAP-18) (S) | To provide an 8' wide barrier-free, multi-use, pedestrian and bicycle trail segment that continues the development of the Delta Heritage Trail. | Arkansas | 2018 | 103 | (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Watson | Desha | $500,000 | $0 | $2,406,521 | $2,906,521 |
McCallie Access Overlook (TAP-16) (S) | Construct a scenic overlook 75 feet long with a concrete barrier wall with a high water Mississippi River accessible boat ramp. | Arkansas | 2016 | 104 | (TASA) 104. Construction of turnouts, overlooks, and viewing areas | Arkansas City | Desha | $87,000 | $0 | $21,750 | $108,750 |
Saline County Old River Bridge Ph. 2 (TAP) (S) | The purpose of this project is to continue the rehabilitation of the Old River Bridge and construct the approaches to the historic bridge. | Arkansas | 2018 | 106 | (TASA) 106. Historic preservation and rehabilitation of historic transportation facilities | Benton | Saline | $500,000 | $125,000 | $625,000 | |
Mtn. Home McCabe Park Trails (RTP-18) (S) | The purpose of this project will be to construct approximately 3,000' of paved asphalt trail and 3,000' of loose gravel trail at the City's McCabe Park for various uses. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Mountain Home | Baxter | $83,000 | $0 | $21,140 | $104,140 |
Conway Stone Dam Creek Trail Ph. 2 (RTP-19) (S) | Extend Stone Dam Creek Trail in Conway with additional length, trailheads, and a pedestrian bridge. | Arkansas | 2019 | 201 | (TASA) 201. Trails | Conway | Faulkner | $125,000 | $31,250 | $156,250 | |
Taylor Tiger Track (RTP-18) (S) | This project will utilize the abandoned L&A Railroad corridor and construct a 10-foot wide trail along the eastern side of North Hays Avenue. It will cross Powell and connect the existing Children's park to a proposed new park to the City's North. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Taylor | Columbia | $81,000 | $0 | $36,852 | $117,852 |
ASU-Mtn. Home Walking & Biking Trail (RTP-18) (S) | The purpose of this project is to construct approximately 6,000 linear feet of a 10-foot wide asphalt multi-use trail on campus. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Mountain Home | Baxter | $76,000 | $0 | $20,000 | $96,000 |
USFS Moccasin Gap Vault Toilet (Motorized) (RTP-17) (S) | Arkansas | 2017 | 201 | (TASA) 201. Trails | Dover | Pope | $16,000 | $0 | $4,000 | $20,000 | |
USFS Richland Creek Vault Toilet | Arkansas | 2017 | 201 | (TASA) 201. Trails | Witt Springs | Searcy | $21,000 | $0 | $5,250 | $26,250 | |
FoOT Trail Shelter Modifications (RTP-18) (S) | This project is adding amenities to existing trail shelters in Yell, Montgomery, Garland, Saline, & Perry Counties. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Hot Springs | Garland | $21,000 | $0 | $5,500 | $26,500 |
Pottsville City Park Trail Ext. (RTP-18) (S) | This project will pave an existing loose gravel trail and make an ADA accessible 10-foot wide trail. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Pottsville | Pope | $25,000 | $0 | $7,485 | $32,485 |
Sherwood Indianhead Walking Trail (RTP-16) (S) | This project consists of constructing 1,200' of 8' wide asphalt trail including drainage improvements. | Arkansas | 2016 | 201 | (TASA) 201. Trails | Sherwood | Pulaski | $27,000 | $0 | $6,750 | $33,750 |
Dewitt Jackson St. Trail (RTP-16) (S) | Arkansas | 2016 | 201 | (TASA) 201. Trails | Dewitt | Arkansas | $35,000 | $0 | $8,750 | $43,750 | |
Hamburg Norman Park Trail Impvts. (RTP-18) (S) | This project will construct additional trail length to make a complete mile of trail around Norman Park. This project includes a creek crossing. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Hamburg | Ashley | $96,000 | $24,000 | $120,000 | |
Hot Springs Northwood Trails Ph. 2 (RTP-16) (S) | Arkansas | 2016 | 201 | (TASA) 201. Trails | Hot Springs | Garland | $48,000 | $0 | $12,000 | $60,000 | |
Greenbrier Trails (RTP-16) (S) | This project consists of constructing 3,900' of asphalt trail and 4 small pedestrian bridges. | Arkansas | 2016 | 201 | (TASA) 201. Trails | Greenbrier | Faulkner | $61,000 | $0 | $15,250 | $76,250 |
Lawrence Co. Rail-Trail Ph. 6 (RTP-16) (S) | This project consists of constructing 5,000' of asphalt trail and an at grade crossing on Hwy. 67. | Arkansas | 2016 | 201 | (TASA) 201. Trails | Walnut Ridge | Lawrence | $71,000 | $0 | $17,750 | $88,750 |
Marked Tree Carver Park Accessible Trail (RTP-18) (S) | The purpose of this project is to construct approximately 1,000 linear feet of porous pavement material that will suitthe area known to flooding and resist cracking. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Marked Tree | Poinsett | $63,000 | $0 | $17,000 | $80,000 |
Little Rock Ottenheimer Accessibility Trail (RTP-17) (S) | Arkansas | 2017 | 201 | (TASA) 201. Trails | Little Rock | Pulaski | $64,000 | $0 | $16,000 | $80,000 | |
Lonoke Rail-Trail (RTP-17) (S) | Arkansas | 2017 | 201 | (TASA) 201. Trails | Lonoke | Lonoke | $65,000 | $0 | $32,917 | $97,917 | |
Jonesboro Craighead Forest Park Trail Ph. 3 (RTP-16) (S) | Arkansas | 2016 | 201 | (TASA) 201. Trails | Jonesboro | Craighead | $359,000 | $0 | $89,750 | $448,750 | |
Crittenden Co. Delta Regional River Park Trail Connection (RTP-17) (S) | Arkansas | 2017 | 201 | (TASA) 201. Trails | West Memphis | Crittenden | $75,000 | $0 | $18,750 | $93,750 | |
Benton Southwest Trail Loop Connector (RTP-17) (S) | Arkansas | 2017 | 201 | (TASA) 201. Trails | Benton | Saline | $80,000 | $0 | $20,000 | $100,000 | |
Conway Stone Dam Creek Trail (RTP-18) (S) | This phase of the Stone Dam Creek Trail will construct approximately 1,100' of paved 12-foot wide trail. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Conway | Faulkner | $178,000 | $0 | $44,764 | $222,764 |
ATU-Ozark Rec. Trail Rehab. (RTP-18) (S) | This project will rehabilitate existing gravel trail with concrete for approximately 2,200 linear feet. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Ozark | Franklin | $143,000 | $40,260 | $183,260 | |
FoOT Trail Shelter Modifications (RTP-18) (S) | This project is adding amenities to existing trail shelters in Yell, Montgomery, Garland, Saline, & Perry Counties. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Hot Springs | Garland | $21,000 | $5,500 | $26,500 | |
ADPT Pinnacle Mtn. Park - Ouachita Trail Rehab. (RTP-18) (S) | This project will rehabilitate the existing historic steel truss bridge and build trail approaches to separate trail users and vehicular traffic on Highway 300. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Little Rock | Pulaski | $188,000 | $47,424 | $235,424 | |
Marked Tree Carver Park Accessible Trail (RTP-18) (S) | The purpose of this project is to construct approximately 1,000 linear feet of porous pavement material that will suitthe area known to flooding and resist cracking. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Marked Tree | Poinsett | $63,000 | $17,000 | $80,000 | |
Bluffton Preserve Multi-Use Trails Ph. 1 (RTP-17) (S) | Arkansas | 2017 | 201 | (TASA) 201. Trails | Clinton | Van Buren | $154,000 | $0 | $38,500 | $192,500 | |
Sebastian Co. Torraine Lake Trail Enhancement (RTP-16) (S) | This project consists of constructing 0.35 miles of 9' wide asphalt concrete trail with a 80' bridge and drainage improvements. | Arkansas | 2016 | 201 | (TASA) 201. Trails | Chaffee Crossing | Sebastian | $143,000 | $0 | $124,651 | $267,651 |
Arkansas City Delta Heritage Trail Trailhead Impvts. (RTP-19) (S) | Construct additional trailhead accomodations including ADA accessible features. | Arkansas | 2019 | 201 | (TASA) 201. Trails | Arkansas City | Desha | $188,000 | $47,000 | $235,000 | |
Little Rock Boyle Park Bike Trails (RTP-19) (S) | Major improvements to the mountainbike park including pump tracks, gateway trails, and skills features. New trails will connect to exisiting trails and new features will be added to existing trail including new signage. | Arkansas | 2019 | 201 | (TASA) 201. Trails | Little Rock | Pulaski | $200,000 | $50,000 | $250,000 | |
Holiday Island Bobcat Hiking Trail (RTP-16) (S) | This project consists of constructing a 4 mile natural surface hiking/mountain biking trail. | Arkansas | 2016 | 201 | (TASA) 201. Trails | Holiday Island | Carroll | $24,000 | $0 | $6,000 | $30,000 |
Decatur Veteran's Park Trail Impvts. (RTP-18) (S) | The purpose of this project is to construct a 10-foot wide concrete trail at Decatur's Veteran's Park. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Decatur | Benton | $250,000 | $62,500 | $312,500 | |
UALR Coleman Creek Greenway Ext. (RTP-17) (S) | Arkansas | 2017 | 201 | (TASA) 201. Trails | Little Rock | Pulaski | $42,000 | $0 | $18,000 | $60,000 | |
Taylor Tiger Track (RTP-18) (S) | This project will utilize the abandoned L&A Railroad corridor and construct a 10-foot wide trail along the eastern side of North Hays Avenue. It will cross Powell and connect the existing Children's park to a proposed new park to the City's North. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Taylor | Columbia | $81,000 | $36,852 | $117,852 | |
Gentry Flint Creek Bridge & Trail Impvts. (RTP-18) (S) | The purpose of this project is to construct a 255' long 10-foot wide trail that includes a 75-foot long pedestrian bridge over Pipe Springs in the Flint Creek Nature Area. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Gentry | Benton | $121,000 | $31,000 | $152,000 | |
Booneville Parks Connecting Trails (RTP-17) (S) | Arkansas | 2017 | 201 | (TASA) 201. Trails | Booneville | Logan | $144,000 | $0 | $36,000 | $180,000 | |
Malvern City Park Walking Trail (RTP-19) (S) | Construct approximately 3,497 feet of 6 feet wide asphalt trail with concrete accessible ramps. one new pedestrian bridge across the creek, two low water bridges will be replaced with concrete bridges, site lighting, landscaped resting areas with benches and information boards, bollards to close off portions of roads and additional trail parking. | Arkansas | 2019 | 201 | (TASA) 201. Trails | Malvern | Hot Spring | $80,000 | $20,000 | $100,000 | |
Clark Co. Iron Mt. Trail Extension (RTP-16) (S) | Arkansas | 2016 | 201 | (TASA) 201. Trails | Arkadelphia | Clark | $114,000 | $0 | $28,500 | $142,500 | |
Fayetteville Razorback Regional Greenway Rehab. (RTP-16) (S) | Arkansas | 2016 | 201 | (TASA) 201. Trails | Fayetteville | Washington | $56,000 | $0 | $90,825 | $146,825 | |
Fayetteville Razorback Greenway Tunnel Impvts. (RTP-18) (S) | This project will retrofit the existing drainage tunnel with an elevated concrete floor to keep the trail dry and safer for trail users. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Fayetteville | Washington | $88,000 | $22,000 | $110,000 | |
Lake Alma Trails Ph. 1 (Alma) (RTP-19) (S) | Construct approximately 4 miles of soft surface multi-use trails including 2 boardwalk walks, erosion control, and stone armoring. | Arkansas | 2019 | 201 | (TASA) 201. Trails | Alma | Crawford | $158,000 | $39,500 | $197,500 | |
Sulphur Springs Park Trail (RTP-19) (S) | Construct approximately 1,320 linear feet of 6-foot wide walking trail within Sulphur Springs Park. | Arkansas | 2019 | 201 | (TASA) 201. Trails | Sulphur Springs | Benton | $21,000 | $5,250 | $26,250 | |
Fairfield Bay Indian Rock House Cave Trail (RTP-18) (S) | The purpose of this project is to allow the elderly and persons with disabilities to be able to access the Indian Rock House Cave. The Cave is listed on the National Historic Register and is currently not accessible to those with disabilities. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Fairfield Bay | Van Buren | $100,000 | $108,075 | $208,075 | |
Fairfield Bay ATV/UTV Trailheads (RTP-19) (S) | Construct 2 trailheads to connect to their existing ATV/UTV trail system. | Arkansas | 2019 | 201 | (TASA) 201. Trails | Fairfield Bay | Van Buren | $270,000 | $67,500 | $337,500 | |
Mtn. Home McCabe Park Trails Ph. 2 (RTP-19) (S) | Construct multi-use trail to connect McCabe Park Trail System to ASU-Mountain Home. | Arkansas | 2019 | 201 | (TASA) 201. Trails | Mountain Home | Baxter | $164,000 | $41,000 | $205,000 | |
Conway Stone Dam Creek Trail (RTP-18) (S) | This phase of the Stone Dam Creek Trail will construct approximately 1,100' of paved 12-foot wide trail. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Conway | Faulkner | $178,000 | $44,764 | $222,764 | |
ATU-Ozark Rec. Trail Rehab. (RTP-18) (S) | This project will rehabilitate existing gravel trail with concrete for approximately 2,200 linear feet. | Arkansas | 2018 | 201 | (TASA) 201. Trails | Ozark | Franklin | $143,000 | $0 | $40,260 | $183,260 |
North Little Rock Recycle Bikes for Kids NI (TAP-17) (S) | Arkansas | 2017 | 302 | (TASA) 302. Safe routes to school programs | North Little Rock | Pulaski | $16,000 | $0 | $4,000 | $20,000 | |
Arkadelphia Feaster Trail Extension (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Arkadelphia | Clark | $17,645 | $0 | $4,410 | $22,055 | |
District 9 Sidewalk Enhancements (Phase I) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $456,853 | $0 | $114,213 | $571,066 | |
Lake Village Sidewalks (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lake Village | Chicot | $127,928 | $0 | $31,982 | $159,910 | |
De Queen Historic Downtown Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | De Queen | Sevier | $459,408 | $0 | $114,851 | $574,260 | |
District 1 Sidewalk Enhancements (Phase III) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $560,227 | $0 | $153,817 | $714,044 | |
Oil and Brine Museum Trail (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Smackover | Union | $19,473 | $0 | $20,293 | $39,766 | |
Warren Downtown Sidewalks and Landscaping (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Warren | Bradley | $392,000 | $0 | $110,010 | $502,010 | |
Decatur Hwy. 102 Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Decatur | Benton | $68,513 | $0 | $17,127 | $85,640 |
Ashdown Hwy. 71 Sidewalk Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ashdown | Little River | $160,135 | $0 | $40,033 | $200,168 | |
Magnolia Sidewalk Enhancements (Ph. III) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Magnolia | Columbia | $126,982 | $0 | $59,965 | $186,947 | |
Morrilton Childress Street Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Morrilton | Conway | $63,360 | $0 | $25,815 | $89,175 | |
Eureka Springs Hwy. 62 Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Eureka Springs | Carroll | $126,500 | $0 | $25,300 | $151,800 |
Prescott Martin St. & Moore St. Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott | Nevada | $100,000 | $0 | $28,750 | $128,750 |
Hot Spring Co. Ouachita River Trail (Ph. I) (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Malvern | Hot Spring | $45,245 | $0 | $49,178 | $94,423 | |
Osceola Hwy. 119 Bikeway (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Osceola | Mississippi | $161,447 | $0 | $40,362 | $201,809 | |
Bentonville McKissic Creek Pedestrian Trail (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bentonville | Benton | $391,458 | $0 | $97,865 | $489,323 | |
Jonesboro Phillips Dr. Streetscaping (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Jonesboro | Craighead | $300,000 | $0 | $93,793 | $393,793 |
Jonesboro Downtown Enhancements Ph. II (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Jonesboro | Craighead | $88,680 | $0 | $50,910 | $139,590 | |
Van Buren River Walkway (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Van Buren | Crawford | $150,000 | $0 | $121,445 | $271,445 | |
School Complex Sidewalks (Benton) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Benton | Saline | $72,349 | $0 | $18,087 | $90,436 | |
Shirley Hwy. 9 Ped. Overpass Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shirley | Van Buren | $72,454 | $0 | $18,114 | $90,568 | |
Mountain View Main Street Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mountain View | Stone | $117,504 | $0 | $29,376 | $146,880 | |
Pulaski Co. Pedestrian/Bicycle Bridge (Murray Lock & Dam) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Little Rock | Pulaski | $300,000 | $0 | $11,131,772 | $11,431,772 | |
Waldron Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Waldron | Scott | $38,967 | $0 | $9,741 | $48,708 |
Texarkana Downtown Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Texarkana | Miller | $300,000 | $0 | $85,519 | $385,519 | |
Malvern Hwy. 270 Sidewalk Enhancements (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Malvern | Hot Spring | $348,618 | $0 | $87,154 | $435,772 | |
Mansfield Downtown Enhancements (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mansfield | Sebastian | $89,416 | $0 | $22,353 | $111,769 | |
Alpena Denver St. Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Alpena | Boone | $42,435 | $0 | $10,608 | $53,043 | |
Prairie Grove Hwy. 62 Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prairie Grove | Washington | $102,354 | $0 | $25,588 | $127,942 | |
Dumas Main Street Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dumas | Desha | $380,000 | $0 | $125,776 | $505,776 | |
Mountain Home Hwy. 62/412 Sidewalks (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mountain Home | Baxter | $176,000 | $0 | $45,969 | $221,969 | |
Harrison Main St. & Ridge St. Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Harrison | Boone | $66,048 | $0 | $16,511 | $82,559 |
Siloam Springs Multi-Use Trail (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Siloam Springs | Benton | $320,840 | $0 | $87,269 | $408,109 | |
Little Rock Scott Hamilton Road Sidewalk (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Little Rock | Pulaski | $92,255 | $0 | $23,063 | $115,318 | |
Maumelle Millwood Circle Sidewalk (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Maumelle | Pulaski | $12,144 | $0 | $6,554 | $18,698 | |
Ashdown Downtown Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ashdown | Little River | $110,046 | $0 | $27,511 | $137,557 |
Walnut Ridge Main Street Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Walnut Ridge | Lawrence | $98,957 | $0 | $24,739 | $123,696 | |
AHTD Bikeway & Pedestrian Program (FFY 2006) | Arkansas | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $54,000 | $0 | $13,500 | $67,500 | |
Star City Bradley Avenue Sidewalks (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Star City | Lincoln | $64,681 | $0 | $16,170 | $80,851 | |
Mansfield Downtown Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mansfield | Sebastian | $177,191 | $0 | $44,618 | $221,809 | |
District 8 Sidewalk Enhancements (Phase I) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $177,130 | $0 | $44,282 | $221,412 | |
Springdale Emma Avenue Enhancements (Ph. III) (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Springdale | Washington | $150,000 | $0 | $111,170 | $261,170 | |
Pulaski County Civic Center Sidewalks & Landscaping (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | North Little Rock | Pulaski | $296,000 | $0 | $268,131 | $564,131 | |
Dierks Sidewalk Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dierks | Howard | $37,760 | $0 | $13,420 | $51,180 | |
Hot Springs Creek Greenway (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hot Springs | Garland | $438,646 | $0 | $109,661 | $548,307 | |
North Little Rock Arkansas River Walkway (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | North Little Rock | Pulaski | $440,000 | $0 | $221,600 | $661,600 | |
Siloam Springs Hwy. 204 Sidewalks (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Siloam Springs | Benton | $27,720 | $0 | $32,057 | $59,777 | |
District 9 Sidewalk Enhancements (Phase III) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $297,736 | $0 | $74,434 | $372,170 | |
Bentonville Moberly Lane Bikeway (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bentonville | Benton | $64,152 | $0 | $16,489 | $80,641 | |
Little Rock Baseline Road Sidewalks (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Little Rock | Pulaski | $177,048 | $0 | $44,262 | $221,310 | |
Lowell McClure Avenue Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lowell | Benton | $74,003 | $0 | $18,500 | $92,503 | |
Beebe Sidewalk Enhancements (Ph. III) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Beebe | White | $23,036 | $0 | $5,759 | $28,795 | |
Nashville Main St. Enhancements (Ph. II) (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nashville | Howard | $150,000 | $0 | $66,937 | $216,937 | |
Transporation Enhancement Youth Corps (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $62,300 | $0 | $0 | $62,300 | |
Gentry South Collins Ave. Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gentry | Benton | $42,876 | $0 | $10,719 | $53,595 |
North Little Rock Pike Ave./Riverfront Drive Bike Trail (S) | Arkansas | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | North Little Rock | Pulaski | $70,400 | $0 | $29,350 | $99,750 | |
Hwy. 183 Widening (Sel. Secs.) (Bryant) (S) (Sidewalks) | Arkansas | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bryant | Saline | $47,395 | $0 | $11,848 | $59,243 | |
Hot Springs Hwy. 7 Crosswalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hot Springs | Garland | $26,080 | $0 | $7,648 | $33,728 | |
District 1 Sidewalk Enhancements (Phase I) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $572,185 | $0 | $143,047 | $715,232 | |
Dover Hwy. 7 Sidewalks (ATEP-11) (S) | Reconstructing broken, non-ADA compliant sidewalks through the main corridor in Dover | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dover | Pope | $39,731 | $0 | $9,933 | $49,664 |
AHTD Bikeway & Pedestrian Program (FY 1997) | Arkansas | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $61,905 | $0 | $15,476 | $77,381 | |
District 6 Sidewalk Enhancements (Phase I) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $654,135 | $0 | $163,534 | $817,669 | |
Heber Springs Downtown Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Heber Springs | Cleburne | $101,260 | $0 | $38,464 | $139,724 | |
Greenwood Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Greenwood | Sebastian | $162,885 | $0 | $40,721 | $203,606 | |
AHTD Bikeway & Pedestrian Program (FY 1999) | Arkansas | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $55,200 | $0 | $13,800 | $69,000 | |
Hardy Spring River Pedestrain Trail (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hardy | Sharp | $149,906 | $0 | $40,681 | $190,587 | |
Danville Main Street Enhancements (Ph. II) (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Danville | Yell | $116,663 | $0 | $29,165 | $145,828 | |
Harrison Downtown Enhancements (Ph. III) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Harrison | Boone | $101,462 | $0 | $25,365 | $126,827 | |
England Downtown Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | England | Lonoke | $24,317 | $0 | $6,079 | $30,396 | |
UCA Stone Dam Creek Trail (ATEP-11) (S) | Walking path for students along Stone Dam Creek at UCA campus connecting one side of town to the University Center | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Conway | Faulkner | $165,947 | $0 | $41,486 | $207,433 |
Glenwood Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glenwood | Pike | $549,732 | $0 | $286,847 | $836,579 | |
Sebastian Co. Ben Geren Park Bicycle Trail (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fort Smith | Sebastian | $99,169 | $0 | $24,792 | $123,961 | |
Batesville Downtown Sidewalks (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Batesville | Independence | $116,532 | $0 | $29,133 | $145,665 | |
Yellville Crooked Creek Pedestrian Bridge (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yellville | Marion | $442,506 | $0 | $110,626 | $553,132 | |
Atkins School and Downtown Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Atkins | Pope | $72,066 | $0 | $18,017 | $90,083 | |
Camden Ouachita River Walkway & Overlooks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Camden | Ouachita | $175,000 | $0 | $208,277 | $383,277 | |
Glenwood Mt. View Rd. Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glenwood | Pike | $198,382 | $0 | $49,596 | $247,978 |
Howard Co. Courthouse Landscaping & Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nashville | Howard | $39,360 | $0 | $27,194 | $66,554 | |
Paragould Rector Rd. Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Paragould | Greene | $244,973 | $0 | $61,243 | $306,216 |
Chidester Barham Creek Nature Trail (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chidester | Ouachita | $61,642 | $0 | $15,411 | $77,053 | |
Greenland Scott Ave. & Circle Dr. Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Greenland | Washington | $24,310 | $0 | $8,190 | $32,500 | |
District 10 Sidewalk Enhancements (Phase II) (S) | Arkansas | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $596,906 | $0 | $149,226 | $746,132 | |
Transportation Enhancement Program Administration (FFY 01-02) | Arkansas | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $170,200 | $0 | $42,550 | $212,750 | |
Brookland Bernis St. & School St. Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Brookland | Craighead | $71,746 | $0 | $17,936 | $89,682 | |
Osceola Hale Avenue Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Osceola | Mississippi | $150,000 | $0 | $55,719 | $205,719 | |
AHTD Bikeway & Pedestrian Program (FY 2000) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $55,600 | $0 | $13,900 | $69,500 | |
Jimerson Creek Pedestrian/Bicycle Bridge (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Little Rock | Pulaski | $424,853 | $0 | $106,212 | $531,065 | |
Helena Cherry Street Enhancements (Ph. II) (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Phillips | $155,494 | $0 | $38,873 | $194,367 | |
Booneville Downtown Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Booneville | Logan | $358,571 | $0 | $89,643 | $448,214 | |
SAU Campus Sidewalks (ATEP-11) (S) | Sidewalk construction for campus pedestrians and bicyclists | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Magnolia | Columbia | $271,335 | $0 | $67,833 | $339,168 |
Springdale Sidewalk Enhancements (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Springdale | Washington | $252,563 | $0 | $63,140 | $315,703 | |
Greenbrier Hwy. 65 Sidewalks (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Greenbrier | Faulkner | $59,213 | $0 | $14,803 | $74,016 | |
Helena Levee Trail Phase II (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Phillips | $59,212 | $0 | $20,322 | $79,534 | |
Arkadelphia Downtown Streetscaping (Phase III) (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Arkadelphia | Clark | $270,304 | $0 | $67,575 | $337,879 |
DeWitt Courthouse Square Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dewitt | Arkansas | $91,284 | $0 | $22,820 | $114,104 | |
Springdale Shiloh Trail (ATEP-11) (S) | Bicycle/pedestrian trial construction | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Springdale | Washington | $270,000 | $0 | $299,584 | $569,584 |
Hampton Hwy. 278 & 2nd St. Sidewalks & Lighting (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hampton | Calhoun | $30,000 | $0 | $8,200 | $38,200 |
Nashville Main St. Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nashville | Howard | $200,000 | $0 | $53,080 | $253,080 | |
Paragould Carroll Road Sidewalks (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Paragould | Greene | $86,656 | $0 | $21,664 | $108,320 | |
Huntsville Hwy. 23 (Harris St.) Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Huntsville | Madison | $115,000 | $0 | $174,475 | $289,475 | |
Conway Tucker Creek Bike Trail (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Conway | Faulkner | $254,239 | $0 | $194,037 | $448,276 | |
Atkins Fourth St. Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Atkins | Pope | $31,799 | $0 | $7,949 | $39,748 | |
Greenwood Sidewalks (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Greenwood | Sebastian | $115,000 | $0 | $38,500 | $153,500 | |
McCain Blvd. Ped. Enh. (NLR) (Walk & Ped. Sigs.) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | North Little Rock | Pulaski | $232,646 | $0 | $68,572 | $301,218 | |
District 6 Sidewalk Enhancements (Phase II) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $408,243 | $0 | $102,061 | $510,304 | |
Booneville Downtown Enhancements (Ph. III) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Booneville | Logan | $115,000 | $0 | $29,670 | $144,670 | |
Paragould Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Paragould | Greene | $356,646 | $0 | $89,161 | $445,807 | |
Fort Smith Levee Trail (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fort Smith | Sebastian | $78,266 | $0 | $19,566 | $97,832 | |
Magnolia Sidewalk Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Magnolia | Columbia | $78,164 | $0 | $19,540 | $97,704 | |
Stuttgart Main Street Streetscaping (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Stuttgart | Arkansas | $231,463 | $0 | $57,865 | $289,328 | |
Danville Hwy. 10 (8th Street) Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Danville | Yell | $185,856 | $0 | $46,463 | $232,319 | |
Hot Springs Creek Greenway Trail (Phase III) (ATEP-11) (S) | Bicycle/pedestrian trial construction | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hot Springs | Garland | $151,981 | $0 | $37,995 | $189,976 |
Branch Williams Street Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Branch | Franklin | $35,904 | $0 | $13,152 | $49,056 | |
District 2 Sidewalk Enhancements (Phase III) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $745,557 | $0 | $186,389 | $931,946 | |
Malvern Hwy. 270 Sidewalk Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Malvern | Hot Spring | $193,106 | $0 | $48,276 | $241,382 | |
Dardanelle 5th Street Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dardanelle | Yell | $107,170 | $0 | $26,792 | $133,962 | |
Fairfield Bay Dave Creek Parkway Sidewalks (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairfield Bay | Van Buren | $77,374 | $0 | $19,344 | $96,718 | |
Jacksonville Municipal/Redmond Rd. Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Jacksonville | Pulaski | $56,266 | $0 | $16,049 | $72,315 | |
Crossett Sidewalks and Landscaping (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Crossett | Ashley | $77,568 | $0 | $47,617 | $125,185 | |
Nashville Main St. Enhancements (Ph. III) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nashville | Howard | $521,174 | $0 | $185,665 | $706,839 | |
Hwy 71 - Dixieland Rd (Rogers) (S) (Sidewalks) | Arkansas | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rogers | Benton | $77,735 | $0 | $19,433 | $97,168 | |
Yellville Hwy. 14 Sidewalk Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yellville | Marion | $85,954 | $0 | $21,489 | $107,443 | |
Marmaduke Downtown Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Marmaduke | Greene | $95,958 | $0 | $35,871 | $131,829 | |
Helena-West Helena Hwy. 49B Streetscaping (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Phillips | $250,000 | $0 | $423,800 | $673,800 |
Newport Downtown Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Newport | Jackson | $250,000 | $0 | $259,343 | $509,343 |
District 4 Sidewalk Enhancements (Phase II) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $985,153 | $0 | $246,287 | $1,231,440 | |
Clinton Hwy. 65 Sidewalk Lighting (ATEP-11) (S) | Extending Sidewalks and installing pedestrian lighting | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Clinton | Van Buren | $250,000 | $0 | $373,000 | $623,000 |
ASU Driver St. Sidewalks (ATEP-11) (S) | To construct and re-construct sidewalks for pedestrians and bicyclists on campus. | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Jonesboro | Craighead | $250,000 | $0 | $170,000 | $420,000 |
District 4 Sidewalk Enhancements (Phase I) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $231,338 | $0 | $168,391 | $399,730 | |
Waldron Downtown Enhancements (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Waldron | Scott | $187,514 | $0 | $46,878 | $234,392 | |
Piggott T.I.C. and Hwy. 62 Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Piggott | Clay | $232,687 | $0 | $58,171 | $290,858 | |
Cave Springs Pedestrian Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cave Springs | Benton | $31,321 | $0 | $7,829 | $39,150 | |
Parkin Archeological State Park Trail (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Parkin | Cross | $83,600 | $0 | $69,193 | $152,793 | |
Prescott Downtown Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Prescott | Nevada | $405,780 | $0 | $133,043 | $538,823 | |
Hamburg Downtown Square Streetscaping (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hamburg | Ashley | $265,010 | $0 | $84,526 | $349,536 | |
Forrest City Downtown Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Forrest City | St. Francis | $156,940 | $0 | $39,235 | $196,175 | |
Fayetteville Raven and Gulley Park Trails (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fayetteville | Washington | $142,224 | $0 | $45,717 | $187,941 | |
Pocahontas Town Square Landscaping (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pocahontas | Randolph | $212,630 | $0 | $53,157 | $265,787 | |
Texarkana Historic Beech St. Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Texarkana | Miller | $141,060 | $0 | $35,265 | $176,325 | |
District 8 Sidewalk Enhancements (Phase II) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $141,388 | $0 | $35,346 | $176,734 | |
Fayetteville Western Mud Creek Trail (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fayetteville | Washington | $404,129 | $0 | $101,032 | $505,161 | |
Dierks Sidewalk Enhancements (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dierks | Howard | $55,130 | $0 | $13,783 | $68,913 | |
Yellville Sidewalk Enhancement (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Yellville | Marion | $52,909 | $0 | $13,227 | $66,136 | |
Sidewalk Enhancement (P.E.) (S) | Arkansas | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $68,800 | $0 | $17,200 | $86,000 | |
Springdale Emma Avenue Enhancements (Ph. IV) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Springdale | Washington | $195,000 | $0 | $142,864 | $337,864 | |
Morrilton Downtown Sidewalks (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Morrilton | Conway | $403,397 | $0 | $160,343 | $563,740 | |
Perryville Hwy. 60 Sidewalks (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Perryville | Perry | $236,392 | $0 | $59,097 | $295,489 | |
Flippin Hwy. 62 (Main St.) Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Flippin | Marion | $108,457 | $0 | $27,114 | $135,571 | |
Conway Tucker Creek Trail (Phase II) (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Conway | Faulkner | $189,938 | $0 | $47,484 | $237,422 | |
Harrison Downtown Square Enhancements (S) | Arkansas | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Harrison | Boone | $402,878 | $0 | $100,719 | $503,597 | |
Friendship Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Friendship | Hot Spring | $16,769 | $0 | $6,364 | $23,133 | |
District 10 Sidewalk Enhancements (Phase III) (S) | Arkansas | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Craighead | $402,724 | $0 | $100,681 | $503,405 | ||
Mammoth Spring Sidewalks and Landscaping (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mammoth Spring | Fulton | $84,084 | $0 | $21,021 | $105,105 | |
Sherwood Pedestrian Overpass (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Sherwood | Pulaski | $231,258 | $0 | $86,375 | $317,633 | |
Mena Hwy. 88 Streetscaping (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mena | Scott | $150,000 | $0 | $203,490 | $353,490 |
Helena Levee Walking Trail (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Helena | Phillips | $80,000 | $0 | $20,000 | $100,000 | |
Charleston Hwy. 22 Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Charleston | Franklin | $91,226 | $0 | $22,806 | $114,032 |
Russellville W. Main St. Streetscaping (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Russellville | Pope | $210,000 | $0 | $116,153 | $326,153 |
West Memphis Broadway Revitalization Phase II (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | West Memphis | Crittenden | $233,610 | $0 | $58,402 | $292,012 | |
Pocahontas Hwy. 67 Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pocahontas | Randolph | $187,968 | $0 | $46,992 | $234,960 | |
UACCM University Blvd. Sidewalks (ATEP-11) (S) | Sidewalk construction for campus pedestrians and bicyclists | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Morrilton | Conway | $210,000 | $0 | $134,464 | $344,464 |
District 2 Sidewalk Enhancements (Phase II) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $722,888 | $0 | $180,722 | $903,610 | |
Norphlet Pedestrian Trail (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Norphlet | Union | $210,428 | $0 | $52,606 | $263,034 | |
Rogers Mercy Hospital Trailhead (ATEP-11) (S) | Parking and trailhead construction for a connection to the regional Razorback Greenway trail and Rogers Mercy Hospital | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rogers | Benton | $267,531 | $0 | $66,883 | $334,414 |
Jonesboro Main St. Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Jonesboro | Craighead | $783,984 | $0 | $230,427 | $1,014,411 | |
Holly Grove Hwy. 86 Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Holly Grove | Monroe | $56,892 | $0 | $14,223 | $71,115 |
Fordyce Downtown Sidewalk Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fordyce | Dallas | $84,292 | $0 | $21,073 | $105,365 | |
Independence Co.-Batesville Riverwalk Ext. (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Batesville | Independence | $190,896 | $0 | $47,724 | $238,620 | |
District 3 Sidewalk Enhancements (Phase I) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $256,167 | $0 | $64,042 | $320,209 | |
Bentonville Downtown Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bentonville | Benton | $200,000 | $0 | $490,666 | $690,666 | |
Arkansas City Ped. Lighting & Landscaping (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Arkansas City | Desha | $30,676 | $0 | $7,669 | $38,345 | |
Walnut Ridge Downtown Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Walnut Ridge | Lawrence | $104,615 | $0 | $26,153 | $130,768 | |
Monticello City Square Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Monticello | Drew | $150,086 | $0 | $37,522 | $187,608 | |
Brinkley Downtown Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Brinkley | Monroe | $188,771 | $0 | $47,161 | $235,932 |
Walnut Ridge Main St. Enhancements (Ph. II) (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Walnut Ridge | Lawrence | $140,657 | $0 | $35,164 | $175,821 | |
Morrilton Downtown Streetscaping (Phase III) (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Morrilton | Conway | $190,161 | $0 | $47,540 | $237,701 |
Lake Village Main St. Streetscaping (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lake Village | Chicot | $115,000 | $0 | $29,110 | $144,110 |
Harrison Main Street Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Harrison | Boone | $82,902 | $0 | $20,725 | $103,627 | |
Pine Bluff Lake Saracen Walking Trail (ATEP-11) (S) | Walking trail to pedestrian paths across park | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pine Bluff | Jefferson | $55,809 | $0 | $13,952 | $69,761 |
Maumelle Club Manor Dr. Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Maumelle | Pulaski | $62,000 | $0 | $16,740 | $78,740 |
White Hall Hwy. 365 Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | White Hall | Jefferson | $282,529 | $0 | $70,632 | $353,161 | |
Otter Creek Road - I-430 (F) (Bike Lanes) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Little Rock | Pulaski | $238,153 | $0 | $59,537 | $297,690 | |
AHTD Bikeway & Pedestrian Program (FY 1998) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $11,258 | $0 | $2,814 | $14,072 | |
Glenwood Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Glenwood | Pike | $227,782 | $0 | $56,946 | $284,728 |
Warren Downtown Enhancements (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Warren | Bradley | $223,287 | $0 | $55,821 | $279,108 | |
Berryville School Area Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Berryville | Carroll | $84,768 | $0 | $21,191 | $105,959 | |
Siloam Springs Multi-Use Trail (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Siloam Springs | Benton | $250,000 | $0 | $69,856 | $319,856 | |
State Capitol Complex Sidewalks (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Little Rock | Pulaski | $76,441 | $0 | $19,111 | $95,552 | |
Altus Downtown Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Altus | Franklin | $90,000 | $0 | $52,407 | $142,407 | |
Forrest City Division Street Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Forrest City | St. Francis | $55,000 | $0 | $16,017 | $71,017 |
Murfreesboro Downtown Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Murfreesboro | Pike | $145,099 | $0 | $36,274 | $181,373 |
Jonesboro Downtown Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Jonesboro | Craighead | $514,918 | $0 | $128,729 | $643,647 | |
Hot Spring Co. Ouachita River Trail (Ph. II) (ATEP-2000) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Malvern | Hot Spring | $229,075 | $0 | $57,580 | $286,655 | |
Dumas Main Street Enhancements (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dumas | Desha | $200,000 | $0 | $58,759 | $258,759 | |
Lonoke Downtown Enhancements (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lonoke | Lonoke | $55,761 | $0 | $13,940 | $69,701 | |
Arkadelphia Downtown Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Arkadelphia | Clark | $281,080 | $0 | $475,815 | $756,895 | |
Eudora Main Street Streetscaping Ph. II (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Eudora | Chicot | $152,870 | $0 | $38,218 | $191,088 | |
Manila Hwy. 18B Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Manila | Mississippi | $34,632 | $0 | $8,657 | $43,289 | |
Lake Village Lakefront Enhancements (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lake Village | Chicot | $145,712 | $0 | $36,428 | $182,140 | |
Urban Youth Corp's Program | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $34,701 | $0 | $8,675 | $43,376 | |
Ouachita National Forest Enhancements - Ph. 2 (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Perry | $242,898 | $0 | $60,724 | $303,622 | ||
Van Buren Old Frisco Depot Plaza Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Van Buren | Crawford | $80,000 | $0 | $42,960 | $122,960 | |
Hwy 64 - Hwy 247 Reconstruction (S) (Morrilton Sidewalks) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Morrilton | Conway | $59,715 | $0 | $21,470 | $81,185 | |
Batesville Riverwalk Ped. and Bicycle Trails (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Batesville | Independence | $280,230 | $0 | $70,058 | $350,288 | |
Benton School Area Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Benton | Saline | $199,239 | $0 | $49,810 | $249,049 | |
Benton South St. Streetscaping (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Benton | Saline | $194,000 | $0 | $154,870 | $348,870 |
Dermott Hwy. 35, Main St. & Hardy St. Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Dermott | Chicot | $113,295 | $0 | $28,324 | $141,619 | |
District 9 Sidewalk Enhancements (Phase II) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $280,339 | $0 | $70,084 | $350,423 | |
Decatur Branch Pedestrian Br. & Apprs. (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Decatur | Benton | $52,000 | $0 | $28,700 | $80,700 | |
ASU Bicycle and Pedestrian Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Jonesboro | Craighead | $145,332 | $0 | $36,332 | $181,664 | |
Pine & Cedar Wheelchair Ramps (LR) (S) | Arkansas | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | Little Rock | Pulaski | $17,296 | $0 | $23,104 | $40,400 | |
District 7 Sidewalk Enhancements (Phase III) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $362,305 | $0 | $90,577 | $452,882 | |
1995 Local ATEP (AHTD Administration) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $953,299 | $0 | $238,325 | $1,191,624 | |
Foreman Shuman St. Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Foreman | Little River | $199,000 | $0 | $68,097 | $267,097 |
Charleston Hwy. 22 Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Charleston | Franklin | $155,000 | $0 | $57,452 | $212,452 | |
Russellville Downtown Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Russellville | Pope | $75,396 | $0 | $18,848 | $94,244 | |
Fort Smith Bicycle Lanes (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fort Smith | Sebastian | $52,286 | $0 | $13,071 | $65,357 | |
Camden Streetscaping (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Camden | Ouachita | $231,169 | $0 | $57,792 | $288,961 |
Gentry Main Street Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Gentry | Benton | $155,000 | $0 | $57,978 | $212,978 | |
Jacksonville Redmond Road Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Jacksonville | Pulaski | $182,163 | $0 | $154,389 | $336,552 | |
Bentonville Ped./Bikeway Facility (ATEP-95) (S) | Arkansas | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bentonville | Benton | $279,628 | $0 | $69,332 | $348,960 | |
Green Forest Hwy. 62 (Main St.) Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Green Forest | Carroll | $155,211 | $0 | $38,803 | $194,014 | |
District 4 Sidewalk Enhancements (Phase III) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $422,702 | $0 | $105,676 | $528,378 | |
Mountain Home Downtown Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mountain Home | Baxter | $250,000 | $0 | $96,127 | $346,127 | |
Searcy Trail System (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Searcy | White | $416,826 | $0 | $142,647 | $559,473 | |
District 3 Sidewalk Enhancements (Phase III) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $198,754 | $0 | $49,688 | $248,442 | |
District 6 Sidewalk Enhancements (Phase III) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Multiple | Multiple | $193,396 | $0 | $48,348 | $241,744 | |
Des Arc Sidewalk Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Des Arc | Prairie | $95,426 | $0 | $23,856 | $119,282 | |
Pea Ridge Sidewalks (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pea Ridge | Benton | $55,000 | $0 | $43,612 | $98,612 |
Pulaski Co. College Station Enhancements (ATEP-98) (S) | Arkansas | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Little Rock | Pulaski | $414,110 | $0 | $0 | $414,110 | |
Wheatley Sidewalk Enhancements (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wheatley | St. Francis | $55,148 | $0 | $18,407 | $73,555 | |
Fayetteville Town Branch Trail (ATEP-11) (S) | Bicycle/pedestrian trial construction | Arkansas | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fayetteville | Washington | $622,368 | $0 | $167,147 | $789,515 |
Cabot Hwy. 89 Sidewalks (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cabot | Lonoke | $250,000 | $0 | $97,758 | $347,758 | |
Hot Springs Hwy. 7/Bath St. Crosswalk (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hot Springs | Garland | $33,920 | $0 | $8,480 | $42,400 | |
1994 Local Transportation Enhancement Program | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $11,450 | $0 | $2,861 | $14,311 | |
Forrest City Hwy. 1 Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Forrest City | St. Francis | $84,800 | $0 | $24,058 | $108,858 | |
Altus Hwy. 179 Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Altus | Franklin | $55,200 | $0 | $19,031 | $74,231 | |
Transportation Enhancement Design Review (S) | Arkansas | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $57,166 | $0 | $14,291 | $71,457 | |
Mammoth Spring Hwy. 9 Enhancements (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Mammoth Spring | Fulton | $32,000 | $0 | $10,998 | $42,998 | |
Ozark Courthouse Square Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ozark | Franklin | $80,000 | $0 | $55,183 | $135,183 | |
Hwy. 16-Hwy. 45 (S) (Sidewalks) | Arkansas | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fayetteville | Washington | $224,349 | $0 | $56,087 | $280,436 | |
Monticello Hwy. 425 Sidewalks (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Monticello | Drew | $224,372 | $0 | $56,093 | $280,465 | |
Nashville Toland Heights Enhancement (ATEP-94) (S) | Arkansas | 1994 | 1 | (TE) 1. Pedestrian and bicycle facilities | Nashville | Howard | $34,373 | $0 | $8,593 | $42,966 | |
Waldron Hwy. 71 Enhancements (ATEP-2000) (S) | Arkansas | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Waldron | Scott | $225,000 | $0 | $60,279 | $285,279 | |
Eudora Main Street Streetscaping (ATEP-02) (S) | Arkansas | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Eudora | Chicot | $230,665 | $0 | $57,666 | $288,331 | |
Prairie Grove Land Acquisition (ATEP-94) (S) | Arkansas | 1994 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Prairie Grove | Washington | $66,000 | $0 | $40,194 | $106,194 | |
Rotary Ann Scenic Wayside (Ozark National Forest) (S) | Arkansas | 1996 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Pope | $314,901 | $0 | $177,099 | $492,000 | ||
Arkansas Welcome Center (El Dorado) (S) | Arkansas | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | El Dorado | Union | $2,435,689 | $0 | $608,922 | $3,044,611 | |
Texarkana Tourist Information Center (S) | Arkansas | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Texarkana | Miller | $3,129,769 | $0 | $782,442 | $3,912,211 | |
Twin Groves Community Enhancements (ATEP-98) (S) | Arkansas | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Twin Groves | Faulkner | $26,352 | $0 | $6,588 | $32,940 | |
Arkansas Welcome Center (West Memphis) (S) | Arkansas | 2006 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | West Memphis | Crittenden | $452,368 | $3,830,174 | $113,093 | $4,395,635 | |
Arkansas Welcome Center (Van Buren) (S) | Arkansas | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Van Buren | Crawford | $2,266,170 | $0 | $566,542 | $2,832,712 | |
Arkansas Welcome Center (Lake Village) (S) | Arkansas | 2006 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Lake Village | Chicot | $2,284,327 | $0 | $571,082 | $2,855,409 | |
Clarendon Tourist/Welcome Center (ATEP-2000) (S) | Arkansas | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Clarendon | Monroe | $100,000 | $0 | $64,910 | $164,910 | |
Perry Co. Camp Ouachita Tourist Info. Center (ATEP-2000) (S) | Arkansas | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Perryville | Perry | $400,000 | $0 | $161,359 | $561,359 | |
Rest Areas & Info. Ctrs. Ped. Safety Sys.-Ph. 2 (Vid. Surv.) (S) | Arkansas | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Statewide | Statewide | $89,846 | $0 | $22,461 | $112,307 | |
Ouachita National Forest Enhancements (S) | Arkansas | 1997 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Perry | $300,864 | $0 | $75,216 | $376,080 | ||
Hwy. 62 Scenic Overlook (Cotter) (S) | Arkansas | 1994 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Cotter | Marion | $76,867 | $0 | $73,993 | $150,860 | |
Texarkana T.I.C. (Ramps & Drives) (S) | Arkansas | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Texarkana | Miller | $2,428,239 | $0 | $607,059 | $3,035,298 | |
Clarendon Tourist/Welcome Center (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Clarendon | Monroe | $129,283 | $0 | $32,321 | $161,604 | |
Boxley Valley Scenic Overlook (ATEP-11) (S) | Building safe pullouts for citizens to watch and take pictures of the grazing elk that cover the Valley during parts of the year. | Arkansas | 2011 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Ponca | Newton | $60,000 | $0 | $76,700 | $136,700 |
Great River Road Scenic Byway Signing (S) | Arkansas | 2008 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Multiple | Multiple | $2,360 | $0 | $1,590 | $3,950 | |
I-40 Ramp Relocations (West Memphis) (S) | Arkansas | 2009 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | West Memphis | Crittenden | $926,441 | $6,716,160 | $231,612 | $7,874,213 | |
Interstate-55 Landscaping (Blytheville)(S) | Arkansas | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Blytheville | Mississippi | $317,682 | $0 | $79,421 | $397,103 | |
Operation Wildflower Program (S) | Arkansas | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | Statewide | Statewide | $63,656 | $0 | $15,913 | $79,569 | |
Junction City Landscape Enhancement (S) | Arkansas | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Junction City | Union | $1,895 | $0 | $473 | $2,368 | |
Harrison Tourist Info Ctr Landscaping (S) | Arkansas | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Harrison | Boone | $1,599 | $0 | $400 | $1,999 | |
I-630 Landscape Enhancement (Crepe Myrtles) | Arkansas | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Little Rock | Pulaski | $4,073 | $0 | $1,018 | $5,091 | |
Hwy. 167 Rest Area Landscaping (S) | Arkansas | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Independence | $925 | $0 | $231 | $1,156 | ||
Interstate 30 Landscaping (Texarkana) (S) | Arkansas | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Texarkana | Miller | $347,219 | $0 | $95,305 | $442,524 | |
I-40 Landscaping (White River Rest Area) (S) | Arkansas | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Prairie | $136,000 | $0 | $34,000 | $170,000 | ||
I-630 Slope Landscaping (S) | Arkansas | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Little Rock | Pulaski | $1,656,736 | $0 | $414,183 | $2,070,919 | |
Marked Tree Hwy. 63 Landscaping (S) | Arkansas | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Marked Tree | Poinsett | $4,202 | $0 | $1,050 | $5,252 | |
Fayetteville Entrance Corridor Landscaping (ATEP-94) (S) | Arkansas | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Fayetteville | Washington | $4,217 | $0 | $1,053 | $5,270 | |
District 4 Landscaping Enhancement | Arkansas | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Multiple | Multiple | $6,397 | $0 | $1,599 | $7,996 | |
Eureka Springs Planer Hill Enhancements (Ph. II) (ATEP-02) (S) | Arkansas | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Eureka Springs | Carroll | $100,676 | $0 | $25,169 | $125,845 | |
Pulaski County Interstate Reforestation (Seedlings) (S) | Arkansas | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Pulaski | $18,445 | $0 | $4,611 | $23,056 | ||
AHTD Bikeway & Pedestrian Program (FY 1993) | Arkansas | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Statewide | Statewide | $36,606 | $0 | $9,151 | $45,757 | |
Springdale Landscape Enhancement (S) | Arkansas | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | Springdale | Washington | $98,800 | $0 | $24,700 | $123,500 | |
I-30 Landscaping (Social Hill Rest Area) (S) | Arkansas | 1997 | 5 | (TE) 5. Landscaping and scenic beautification | Social Hill | Hot Spring | $306,400 | $0 | $76,600 | $383,000 | |
I-40 Landscaping (Conway) (S) | Arkansas | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Conway | Faulkner | $35,974 | $0 | $8,994 | $44,968 | |
Jonesboro Stadium Blvd. Enhancements (S) | Arkansas | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Jonesboro | Craighead | $23,914 | $0 | $5,977 | $29,891 | |
District 1 Landscaping Enhancement | Arkansas | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Multiple | Multiple | $12,611 | $0 | $3,152 | $15,763 | |
M.L. King, Jr. Freeway Landscaping (Hot Springs) (S) | Arkansas | 1994 | 5 | (TE) 5. Landscaping and scenic beautification | Hot Springs | Garland | $51,920 | $0 | $12,980 | $64,900 | |
Corning Tourist Info Ctr Landscaping (S) | Arkansas | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Corning | Clay | $7,427 | $0 | $1,856 | $9,283 | |
Hwy. 49B Retaining Wall Reconst. (Helena) (S) | Arkansas | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Helena | Phillips | $76,310 | $0 | $2,361 | $78,671 | |
I-630 Decorative Planting (S) | Arkansas | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Little Rock | Pulaski | $7,456 | $0 | $1,863 | $9,319 | |
Green Forest Phillips St. Landscaping (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Green Forest | Carroll | $81,476 | $0 | $130,584 | $212,060 |
Pocahontas Black River Scenic Overlook (ATEP-95) (S) | Arkansas | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Pocahontas | Randolph | $544,725 | $0 | $449,426 | $994,151 | |
Wildflower Brochure | Arkansas | 1997 | 5 | (TE) 5. Landscaping and scenic beautification | Statewide | Statewide | $8,000 | $0 | $2,000 | $10,000 | |
I-40/I-55 Landscaping (West Memphis) (S) | Arkansas | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | West Memphis | Crittenden | $180,000 | $0 | $45,000 | $225,000 | |
Pike County Courthouse/Square Beautification (ATEP-95) (S) | Arkansas | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Murfreesboro | Pike | $180,059 | $0 | $51,620 | $231,679 | |
Amity City Circle Enhancements (ATEP-02) (S) | Arkansas | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Amity | Clark | $120,440 | $0 | $96,929 | $217,369 | |
Ft. Smith Towson Ave. Streetscaping (ATEP-11) (S) | Downtown Sidewalks/Streetscapes | Arkansas | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | Fort Smith | Sebastian | $270,000 | $0 | $379,485 | $649,485 |
Pulaski County Interstate Reforestation (Ornamental Trees)(S) | Arkansas | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Pulaski | $22,846 | $0 | $5,711 | $28,557 | ||
Mid-South CC Airport Road Decorative Fencing (ATEP-02) (S) | Arkansas | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | West Memphis | Crittenden | $327,459 | $0 | $159,646 | $487,105 | |
Hwy 150-Blytheville Tourist Info Center (Wildflower Seeds) | Arkansas | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Blytheville | Mississippi | $5,903 | $0 | $1,475 | $7,378 | |
AHTD Bikeway & Pedestrian Program (FY 1992) | Arkansas | 1992 | 5 | (TE) 5. Landscaping and scenic beautification | Statewide | Statewide | $12,282 | $0 | $3,070 | $15,352 | |
Hwy. 65 Bypass (Wetland Enhancement) | Arkansas | 1992 | 5 | (TE) 5. Landscaping and scenic beautification | Pine Bluff | Jefferson | $18,400 | $0 | $4,600 | $23,000 | |
I-40 & I-540 Landscaping (Ft. Smith/Van Buren) (S) | Arkansas | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Multiple | Multiple | $160,000 | $0 | $40,000 | $200,000 | |
Batesville Hwy. 167 Enhancements (S) | Arkansas | 1997 | 5 | (TE) 5. Landscaping and scenic beautification | Batesville | Independence | $114,400 | $0 | $34,882 | $149,282 | |
District 6 Landscaping Enhancement (Bulb Planting) | Arkansas | 1993 | 5 | (TE) 5. Landscaping and scenic beautification | Multiple | Multiple | $32,914 | $0 | $8,227 | $41,141 | |
Monroe County Courthouse Restoration (ATEP-95) (S) | Arkansas | 1995 | 6 | (TE) 6. Historic preservation | Clarendon | Monroe | $132,336 | $0 | $33,084 | $165,420 | |
Old Washington Abraham Block House (ATEP-95) (S) | Arkansas | 1995 | 6 | (TE) 6. Historic preservation | Washington | Hempstead | $133,307 | $0 | $33,327 | $166,634 | |
Old Washington Sanders Farm Restoration (ATEP-94) (S) | Arkansas | 1994 | 6 | (TE) 6. Historic preservation | Washington | Hempstead | $61,260 | $0 | $15,315 | $76,575 | |
Greene County Courthouse Renovation (ATEP-94) (S) | Arkansas | 1994 | 6 | (TE) 6. Historic preservation | Paragould | Greene | $154,000 | $0 | $42,183 | $196,183 | |
Hope Amtrak Passenger Loading Platform (ATEP-11) (S) | Pedestrian platform/beautification | Arkansas | 2011 | 6 | (TE) 6. Historic preservation | Hope | Hempstead | $65,000 | $0 | $159,594 | $224,594 |
Perry Co. Wallace Bridge Restoration (ATEP-11) (S) | Converting a historic bridge into a bicycle/pedestrian bridge | Arkansas | 2011 | 6 | (TE) 6. Historic preservation | Perryville | Perry | $61,508 | $0 | $15,377 | $76,885 |
Judsonia Truss Bridge Restoration (ATEP-11) (S) | Converting a historic bridge into a bicycle/pedestrian bridge | Arkansas | 2011 | 6 | (TE) 6. Historic preservation | Judsonia | White | $240,000 | $0 | $657,637 | $897,637 |
Old State House Preservation (ATEP-95) (S) | Arkansas | 1995 | 6 | (TE) 6. Historic preservation | Little Rock | Pulaski | $154,919 | $0 | $38,729 | $193,648 | |
Marion Co. Courthouse Restoration (ATEP-95) (S) | Arkansas | 1995 | 6 | (TE) 6. Historic preservation | Yellville | Marion | $233,200 | $0 | $252,602 | $485,802 | |
Walnut Ridge Depot Restoration (ATEP) (S) | Arkansas | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Walnut Ridge | Lawrence | $272,553 | $0 | $68,138 | $340,691 | |
Blytheville Historic Bus Station Restoration (ATEP-02) (S) | Arkansas | 2002 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Blytheville | Mississippi | $284,123 | $0 | $240,066 | $524,189 | |
Hazen Depot Renovation (ATEP-98) (S) | Arkansas | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Hazen | Prairie | $69,777 | $0 | $17,444 | $87,221 | |
White River Bridge Repair (Cotter) (S) | Arkansas | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Cotter | Baxter | $4,859,486 | $0 | $1,214,871 | $6,074,357 | |
Hope Cairo-Fulton Depot Restoration (ATEP-2000) (S) | Arkansas | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Hope | Hempstead | $347,920 | $0 | $86,980 | $434,900 | |
Historic Bridge Inventory (Enhancement Publication) (Phase III) (S) | Arkansas | 2002 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Statewide | Statewide | $360,000 | $0 | $90,000 | $450,000 | |
Moro Bay Ferry Exhibit (Barge Relocation) | Arkansas | 1993 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Moro Bay | Bradley | $34,155 | $0 | $8,539 | $42,694 | |
Moro Bay Ferry Exhibit (Barge Clean & Paint) | Arkansas | 1993 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Moro Bay | Bradley | $21,057 | $0 | $0 | $21,057 | |
Newport Depot Restoration (ATEP-95) (S) | Arkansas | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Newport | Jackson | $327,800 | $0 | $81,950 | $409,750 | |
Russellville Depot Restoration (Ph. III) (ATEP-02) (S) | Arkansas | 2002 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Russellville | Pope | $51,586 | $0 | $16,284 | $67,870 | |
Van Buren Frisco Depot & King Opera House Renov. (ATEP-95) (S) | Arkansas | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Van Buren | Crawford | $147,682 | $0 | $36,920 | $184,602 | |
Moro Bay Ferry Exhibit (Parking & Pedestal) | Arkansas | 1993 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Moro Bay | Bradley | $54,198 | $0 | $22,290 | $76,488 | |
Hope Railroad Depot Renovation (ATEP) (S) | Arkansas | 1994 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Hope | Hempstead | $411,982 | $0 | $102,995 | $514,977 | |
Lexa - Cypress Bend R.R. Corridor Study | Arkansas | 1992 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Lexa | Desha | $154,321 | $0 | $38,579 | $192,900 | |
Rogers Frisco Transportation Enhancement (ATEP-95) (S) | Arkansas | 1995 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Rogers | Benton | $265,882 | $0 | $77,539 | $343,421 | |
Snow Lake-Cypress Bend Rail Purchase | Arkansas | 1994 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Snow Lake | Desha | $600,000 | $0 | $150,000 | $750,000 | |
Statewide Illegal Sign Removal | Arkansas | 1992 | 9 | (TE) 9. Inventory, control, and removal of outdoor advertising | Statewide | Statewide | $81,017 | $0 | $20,253 | $101,270 | |
Archeological Artifacts Curation | Arkansas | 1996 | 10 | (TE) 10. Archaeological planning & research | Statewide | Statewide | $3,999 | $0 | $999 | $4,998 | |
Arkansas Archeological Survey Internet Accessible Site (S) | Arkansas | 2002 | 10 | (TE) 10. Archaeological planning & research | Statewide | Statewide | $88,218 | $0 | $159,152 | $247,370 | |
Arkansas Archeological Survey Database (S) | Arkansas | 2006 | 10 | (TE) 10. Archaeological planning & research | Statewide | Statewide | $340,365 | $0 | $85,091 | $425,456 | |
GIS Database Management System (ATEP) | Arkansas | 1998 | 10 | (TE) 10. Archaeological planning & research | Statewide | Statewide | $1,115,200 | $0 | $278,800 | $1,394,000 | |
Dept. of Ark. Heritage GIS (ATEP) (S) | Arkansas | 1994 | 10 | (TE) 10. Archaeological planning & research | Statewide | Statewide | $80,000 | $0 | $20,000 | $100,000 | |
Pine Bluff Bypass Mitigation Booklet (S) | Arkansas | 1997 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Pine Bluff | Jefferson | $11,601 | $0 | $2,900 | $14,501 | |
Cass - Ozark (P.E.) | Arkansas | 2000 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Cass | Franklin | $38,835 | $0 | $9,708 | $48,543 | |
SHPO Supportive Services | Arkansas | 2008 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Statewide | Statewide | $338,901 | $0 | $84,725 | $423,626 | |
Lower Delta Wetland Mitigation Area (S) | Arkansas | 1996 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Ashley | $168,000 | $0 | $42,000 | $210,000 | ||
Water Quality Enhancement Project (S) | Arkansas | 2001 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Statewide | Statewide | $13,270 | $0 | $3,317 | $16,587 | |
Hwy. 71 Bypass - Hwy. 94 (Rogers - Searles Prairie) | Arkansas | 1993 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Rogers | Benton | $671,426 | $0 | $167,856 | $839,282 | |
I-30 Frontage Road Slide Repair (Benton) (S) | Arkansas | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Benton | Saline | $406,057 | $0 | $101,514 | $507,571 | |
Independence Co. Transportation Museum (ATEP-02) (S) | Arkansas | 2002 | 12 | (TE) 12. Establishment of transportation museums | Batesville | Independence | $73,780 | $0 | $333,768 | $407,548 |