Project Search Results

Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Back to Search Page
Project Name Description State Year Activity Activity Type City County Federal Funds ARRA Funds Local Funds Total
Fredrick St. Sidewalks (Magnolia) (TAP-15) (S) This project consists of constructing 4,224 feet of 5-foot wide sidewalk with crosswalks and ADA ramps along the west side of Fredrick Street. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Magnolia Columbia $395,760 $0 $98,940 $494,700
Pine Bluff Downtown Streetscaping (TAP-15) (S) This project consists of the reconstruction of the pedestrian corridor at the western gateway into downtown connecting Lake Saracen Trail via the Martha Mitchell Expresswar crosswalk. Construction will consist of installing sidewalks, curb and gutter, pedestrian lighting, landscaping, and other enhancements along W. Barraque Street, Main Street, S. Walnut Street and S. Pine Street. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Pine Bluff Jefferson $996,000 $0 $249,000 $1,245,000
Pride of Springdale Trail (TAP-15) (S) This project consists of the construction of approximately 5,200 LF of multi-use trail along Brush Creek between N. Gutensohn Road and Interestate 49. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Springdale Washington $500,000 $0 $125,000 $625,000
Green Forest Square Streetscaping (TAP-15) (S) This project consists of constructing sidewalks, traffic calming islands and strategically placing signs closing to the traveling lanes in the City Square. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Green Forest Carroll $54,464 $0 $42,087 $96,551
N. Main St. & Hwy. 64 Sidewalks (Mulberry) (TAP-15) (S) Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Mulberry Crawford $249,145 $0 $62,286 $311,431
N. 1st St. Sidewalk (Jacksonville) (TAP-15) (S) This project consists of the construction of approximately 2,900 LF of sidewalk along N. 1st Street that will connect existing sidewalks north of Dales Drive to John Harden Drive. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Jacksonville Pulaski $80,000 $0 $20,000 $100,000
Plum St. - Cedar St. Sidewalks (Bearden) (TAP-15) (S) This project consists of reconstructing 310 feet of 10-foot wide sidewalk with ADA ramps along the north side of 1st Street. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Bearden Ouachita $51,200 $0 $12,800 $64,000
Walton Blvd. Multi-Use Trail (Bentonville) (S) Bicycle/pedestrian trial construction Arkansas 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Bentonville Benton $254,199 $0 $571,071 $825,270
Dartmoor Rd. Ped. Crossing (Bella Vista) (TAP-15) (S) This project consists of the installation of a High intensity Activated crossWalK(HAWK) at the intersection of Dartmoor Road and NW Lighting Lane. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Bella Vista Benton $50,000 $0 $12,500 $62,500
Hwy. 5 Sidewalk Impvts. (Norfork) (TAP-15) (S) This project consists of the construction of approximately 2,000 LF of concrete sidewalk with crosswalks along Highway 5. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Norfork Baxter $102,405 $0 $25,601 $128,006
Quitman Sidewalks (TAP-15) (S) This project consists of the construction of approximately 5,800 LF of 5-ft wide sidewalks along 4th Street, Walnut Street, Mulberry Street and Highway 25. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Quitman Cleburne $188,239 $0 $47,060 $235,299
West Memphis Tilden Rodgers Trail Reconstruction (S) Reconstruct heavily used pedestrian trail that is over 20 years old. Arkansas 2013 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities West Memphis Crittenden $58,618 $0 $14,654 $73,272
N. Oak St. Sidewalks (Brookland) (TAP-15) (S) This project consists of the construction of approximately 1,600 LF of 4-ft wide sidewalk along North Oak Street. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Brookland Craighead $101,660 $0 $25,415 $127,075
Hwy. 65 Sidewalks (Marshall) (TAP-15) (S) This project consists of the construction of approximately 11,700 LF of 5-ft wide sidewalk along Highway 65. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Marshall Searcy $466,940 $0 $116,735 $583,675
Front St. Streetscaping (Dardanelle) (TAP-15) (S) This project consists of reconstructing sidewalks along Front Street including ADA accessible ramps, curb and gutters, and streetscaping. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Dardanelle Yell $163,216 $0 $40,804 $204,020
N.College Ave. Sidewalks (Huntsville) (TAP-15) (S) This project consists of the construction of approximately 3,600 LF of concrete sidewalk with ADA ramps and a 12-ft long pedestrian bridge along N. College Avenue. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Huntsville Madison $363,250 $0 $90,813 $454,063
Hwy. 89 Streetscaping (Ph. 2) (Cabot) (TAP-15) (S) This project consists of the construction of approximately 1,100 LF of sidewalks, pedestrian lighting, curb and gutter, drainage improvements, landscaping, and brick crosswalks along Highway 89. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Cabot Lonoke $362,248 $0 $90,562 $452,810
Hwy. 71 Sidewalk (Mountainburg) (TAP-15) (S) This project consists of the construction of approximately 1,600 LF of sidewalks along Highway 71 including a pedestrian bridge at the park, a set of flashing beacons, bicycle racks, and crosswalk markings. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Mountainburg Crawford $135,940 $0 $33,985 $169,925
NLR Shilcott Bayou Multi-Use Bridge (S) Replacing a pedestrian/bicycle bridge and realigning the section of trail for a safer, more inviting path that reflects current bicycle/pedestrian design standards. Arkansas 2013 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities North Little Rock Pulaski $544,000 $0 $199,985 $743,985
Craighead Forest Park Trail (Ph. 2) (Jonesboro) (TAP-15) (S) This project is the second phase of constructing a multi-use trail within the boundaries of Craighead Forest Park. The new bike/pedestrian trail will consist of a 12-foot wide asphalt trail paralleling inside the existing road loop around Craighead Lake. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $302,036 $0 $75,509 $377,545
Little Rock Bike Connector (Phase 2) (S) A bicycle path connection to be constructed that runs along the Little Rock side of the Arkansas River to join a long network of existing bike trails. Arkansas 2013 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Little Rock Pulaski $590,000 $0 $147,500 $737,500
Rogers Mercy Hospital Trailhead (Ph. II) (S) Building restroom facilities with amenities for pedestrians, bicyclists & pet owners at a trailhead on a heavily utilized trail that is of great importance to the region and is increasing quickly from year to year. Arkansas 2013 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Rogers Benton $113,200 $0 $84,273 $197,473
City Lake Wildlife Trail (Siloam Springs) (TAP-15) (S) This project consists of the construction of approximately 5,600 LF of soft-gravel multi-use trail and approximately 350 LF of ADA-accessible sidewalk within the Siloam Springs City Lake Park. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Siloam Springs Benton $67,705 $0 $16,926 $84,631
Shorter College Streetscape (TAP-15) (S) This project consists of the construction of sidewalks, landscaping, and pedestrian lighting in and around the campus. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities North Little Rock Pulaski $432,472 $0 $108,118 $540,590
Elm St. Sidewalks (Bryant) (TAP-15) (S) This project consists of the construction of approximately 6,000 LF of 4-ft wide sidewalks along Boswell Road with a possible pedestrian bridge. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Bryant Saline $172,000 $0 $43,000 $215,000
Hwy. 7 Sidewalks (Caddo Valley) (TAP-15) (S) This project consists of the construction of approximately 5,000 LF of sidewalks with curb and gutter along Highway 7, Highway 67, and Frost Road . Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Caddo Valley Clark $399,640 $0 $99,910 $499,550
Knoxville Ave. & 19th St. Sidewalks (Russellville) (TAP-15) (S) This project consists of constructing sidewalks that will connect Ashbrook Estates on the South to E 16th Street to the North and along E 19th Street from Hwy. 7T west to S Detroit Ave. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Russellville Pope $180,740 $0 $45,185 $225,925
Main to Main Trailhead (West Memphis) (S) Construct a trailhead at the SE corner of Broadway Ave./U.S. Hwy. 70 & the South Loop Intersection. This provides access to the Harahan Bridge Trail between Memphis and West Memphis. Arkansas 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities West Memphis Crittenden $61,632 $0 $15,408 $77,040
Main St. & Speedway St. Sidewalks (Dermott) (TAP-15) (S) This project consists of the construction or rehabilitation of approximately 3,700 LF of sidewalk along Main Street and Speekway Street along with a pedestrian railroad crossing. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Dermott Chicot $229,191 $0 $57,298 $286,489
Hwy. 102 & Stadium Ave. Sidewalks (Decatur) (TAP-15) (S) This project consists of constructing a sidewalk along Highway 102. Approximately 1,350 linear feet of a 5-foot wide sidewalk will be constructed. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Decatur Benton $130,144 $0 $32,536 $162,680
Shannon Hills Recreational Trails (Ph. 1) (TAP-15) (S) This project consists of the construction of approximately 13,660 LF of 5-ft wide sidewalk connecting the city park to N. Sardis Rd., Branchdell Dr., N. Brechen Dr., E. High Rd., and Shamrock Dr. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Shannon Hills Saline $397,664 $0 $99,416 $497,080
Fayetteville Ave. Streetscape (Alma) (TAP-15) (S) This project consists of the construction of approximately 1,000 LF of ADA accessible sidewalk, pedestrian crosswalks, pedestrian lighting, and landscaping along Fayetteville Avenue. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Fayetteville Crawford $213,728 $0 $53,432 $267,160
S. Lions Club Park Trail (El Dorado) (TAP-15) (S) This project consists of constructing 12,193 feet of 5-foot to 10-foot wide multi-use trail (asphalt and chip seal pavement) with crosswalks and ADA ramps. Additional proposed improvements include a double 8’x10’x15’ reinforced concrete box culvert that will be constructed crossing an unnamed tributary to Flat Creek and the construction of 600 feet of curb and gutter. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities El Dorado Union $272,220 $0 $68,055 $340,275
Stamps Downtown Sidewalks (TAP-15) (S) This project consists of constructing 1,020 feet of 5’-9.5’ wide sidewalks with crosswalks and ADA ramps along Main Street, Church Street, and Thomas Street. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Stamps Lafayette $132,800 $0 $33,200 $166,000
Gordon Long Park Trailhead Impvts. (Fayetteville) (S) Construct restroom facilities and expand current parking lot that provides access to the Razorback Regional Greenway and the Scull Creek Trails. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Fayetteville Washington $260,000 $0 $65,000 $325,000
AR River Trail Riverfront Dr. (Little Rock) (TAP-15) (S) The scope of this project is to provide safety improvements and better access on Riverfront Drive. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Little Rock Pulaski $325,000 $0 $81,250 $406,250
Hot Springs Creek Greenway Trail (Ph. 5) (TAP-15) (S) This phase of the Hot Springs Creek Greenway Trail will construct parts of the sections known as the Utility Service Center Trail and the Southern Trail. The proposed section of trail to be constructed is nearly 1500 feet long and runs along the west side of Hot Springs Creek. This section consists of a 12-foot wide multi-modal trail with surfaces varying between asphalt pavement, a concrete path under the Golf Links Road bridge, and precast concrete boardwalk surfaces where the trail is on the bank of Hot Springs Creek. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Hot Springs Garland $363,800 $0 $90,950 $454,750
Lockesburg Sidewalks (TAP-15) (S) Construct 3,760 feet of 5’- 8’ wide sidewalks with crosswalks and ADA ramps. Additional proposed improvements include a 6’ x 100’ pedestrian bridge crossing the De Queen Eastern Rail Road. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Lockesburg Sevier $353,560 $0 $88,390 $441,950
New Hope Bicycle/Pedestrian Bridge (Rogers) (S) This project consists of constructing three pedestrian bridges over Blossom Way Creek to connect the Razorback Regional Greenway Trail with the Turtle Creek Trail. The 10’-12’ wide concrete trail will have a length of 761 feet. Each new structure will be a steel truss bridge with a 10-feet wide concrete deck. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Rogers Benton $934,361 $0 $233,590 $1,167,951
UAPB Pedestrian Crossing (TAP-15) (S) This project consists of the installation of sidewalks, a pedestrian crossing signal, textured pavement and curb cuts. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Pine Bluff Jefferson $383,186 $0 $95,797 $478,983
Lake Springdale Trailhead (Springdale) (S) Construct a trailhead to connect Lake Springdale to the Razorback Regional Greenway Trail. Arkansas 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Springdale Benton $226,000 $0 $253,596 $479,596
Donaldson Sidewalks (Ph. 1) (TAP-15) (S) This project consists of the construction of approximately 4,800 LF of concrete sidewalks along N. Front Street, N. Hall Street, Roberts Street, Burkhart Street and Cox Street. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Donaldson Hot Spring $154,272 $0 $38,568 $192,840
Hwy. 270B & Military Rd. Sidewalks (Rockport) (TAP-15) (S) This project consists of the construction of approximately 7,000 LF of sidewalk along Highway 270 and Military Road. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Rockport Hot Spring $203,240 $0 $50,810 $254,050
Washington St. Streetscape (Ph. 2) (Camden) (TAP-15) (S) This project consists of reconstructing sidewalks along Washington Street from Adams Street to Harrison Street including ADA accesible ramps, curb and gutter, and landscaping. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Camden Ouachita $318,208 $0 $79,552 $397,760
AR River Trail Pinnacle Valley Rd. (Pulaski Co.) (TAP-15) (S) This project consists of the construction of approximately 4,700 LF of 10-ft wide multi-use trail along Pinnacle Valley Road, with a 2-ft wide green buffer. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Little Rock Pulaski $282,236 $0 $70,559 $352,795
Raywood - Autumnbrook Sidewalks (Sherwood) (TAP-15) (S) This project consists of constructing sidewalks that will connect a series of existing sidewalks to the local elementary school and various City facilities along Woodruff Avenue, Raywood Drive, Auutumnbrook Circle, Holly Drive and Oakbrook Drive. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Sherwood Pulaski $106,380 $0 $26,595 $132,975
42nd St., 50th St. & Pinson Dr. Sidewalks (Texarkana) (TAP-15) (S) This project consists of 3,400 linear feet of 10' wide multi-use trail and sidewalks with a 75' pedestrian bridge over Nix Creek. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Texarkana Miller $215,752 $0 $61,661 $277,413
Lisbon St. Sidewalks (Smackover) (TAP-15) (S) This project consists of constructing 900 feet of 5-foot wide sidewalks with crosswalks and ADA ramps along the west side of Lisbon Street, crossing over to the east side at Tennyson Park. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Smackover Union $40,920 $0 $10,230 $51,150
Arkadelphia Streetscape (Ph. 4) (TAP-15) (S) This project is a continuation of a recovery plan done in 1999 establishing a strategic direction for the recovery of downtown Arkadelphia. The project includes new sidewalks, handicapped accessible pedestrian crosswalks, lighting, irrigation, and some landscape features on Highway 67 (6th Street) between Highway 51 (Caddo Street) and Clay Street. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Arkadelphia Clark $349,930 $0 $87,483 $437,413
Poor Farm Rd. Sidewalks (Morrilton) (TAP-15) (S) This project consists of constructing 2,700 feet of 5-foot wide sidewalks with ADA compliant ramps along Poor Farm Road and one pedestrian crossing over an unnamed tributary of Caney Creek. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Morrilton Conway $117,240 $0 $29,310 $146,550
Rena Road Sidewalks (Van Buren) (TAP-15) (S) This project consists of constructing new sidewalks along the recently widened Rena Road including ADA accesible ramps, curb and gutter, and crosswalks. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Van Buren Crawford $294,016 $0 $73,504 $367,520
Larimer Park Trail (Green Forest) (TAP-15) (S) This project consists of constructing a walking trail at the new Cherry Street Park. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Green Forest Carroll $83,527 $0 $20,882 $104,409
4th St. Sidewalks (Nashville) (TAP-15) (S) Construct 5' Sidewalks & Pedestrian Bridge along 4th Street between Pope Street & Leslie Street. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Nashville Howard $190,240 $0 $47,560 $237,800
Race St. Sidewalks and RR Ped. Crossing (Jonesboro) (TAP-15) (S) The purpose of this project is to improve the existing pedestrian crossing at Race Street and the UP Railroad. Approximately 829 feet of 4-foot to 6-foot wide sidewalks will be built west of the intersection. Existing sidewalks on Race Street will also be improved. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $72,678 $0 $18,170 $90,848
College St. Sidewalks (Bono) (TAP-15) (S) This project consists of the construction of approximately 2,800 LF of 4-ft wide sidewalk along College Street. Arkansas 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Bono Craighead $375,410 $0 $93,853 $469,263
Perryville Elementary School Sidewalks (TAP-15) (S) This project consists of the construction of approximately 3,255 LF of 4-ft wide sidewalk along Scenic Drive. Arkansas 2015 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Perryville Perry $86,120 $0 $21,530 $107,650
Amboy/Boone School Sidewalks (N. Little Rock) (TAP-15) (S) This project consists of constructing sidewalks that will connect neighborhoods in North Little Rock to Amboy and Boone Park Elementary Schools. Arkansas 2015 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers North Little Rock Pulaski $150,508 $0 $37,627 $188,135
Southwood Elementary Sidewalks (Pine Bluff) (TAP-15) (S) This project consists of the construction of approximately 350 LF of concrete sidewalk with crosswalks along Peggy Ann Drive and West 42nd Avenue and 2 flashing crosswalk devices. Arkansas 2015 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Pine Bluff Jefferson $80,377 $0 $20,094 $100,471
Hardin Elementary Sidewalks (Redfield) (TAP-15) (S) This project consists of the construction of approximately 2,500 LF of sidewalks along Huck Finn Boulevard, Mark Twain Boulevard, River Road, Suzanne Drive and Schoolwood Drive. Arkansas 2015 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Redfield Jefferson $87,120 $0 $21,780 $108,900
Camden Rail to Trails (Ph. 1) (TAP-15) (S) This project consists of constructing 10,787 feet of 12-foot wide multi-use trail with crosswalks and ADA ramps along the abandoned Missouri Pacific Rail line. Additional proposed improvements include the benches, trash receptacles, kiosk, post and rail fence, bollards, signs, and landscape vegetation. Arkansas 2015 103 (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users Camden Ouachita $847,000 $0 $211,750 $1,058,750
Old River Bridge Rehab. (Saline Co.) (TAP-15) (S) This project is to rehabilitate the Old River Bridge over the Saline River which is on the historic Southwest Trail and to build the bicycle/pedestrian approaches to the Bridge. This will eventually be an integral part of the Future Southwest Regional Trail that will connect Downtown Little Rock to Hot Springs National Park. Arkansas 2015 106 (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities Benton Saline $1,776,000 $0 $444,000 $2,220,000
War Eagle Bridge Rehab. (Benton Co.) (TAP-15) (S) This project consists of rehabilitating the steel truss bridge over War Eagle Creek on County Road 98. The single-lane bridge is 304 feet long and 15 feet wide, and the approach roadway is 19 feet wide. The bridge consists of one main span of 183 feet with four approach spans. Two piers (one stone and one concrete) support a concrete substructure and timber deck. Arkansas 2015 106 (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities War Eagle Benton $500,000 $0 $125,000 $625,000
Riverside Park Trail (Benton) (RTP-15) (S) This project consists of constructing a walking trail at Riverside Park. The project will consist of a 10-foot wide paved asphalt trail approximately one mile long around Riverside Park and Holland Park facilities and connecting to Fairfield Road, Airlane Drive, and Holland Park Road. Arkansas 2015 201 (TAP) 201. Trails Benton Saline $150,000 $0 $37,500 $187,500
Ouachita Trail Shelter Project (RTP-15) (S) This project consists of constructing four trail shelters along the Ouachita National Recreation Trail. The shelters will be constructed at Turner Gap, Brushy Creek Mountain, Suck Mountain and Story Creek. Arkansas 2015 201 (TAP) 201. Trails Pencil Bluff Montgomery, Polk $35,230 $0 $8,808 $44,038
City Park Trail (Dewitt) (RTP-15) (S) The purpose of this project is to widen and overlay the existing City Park Trail. The existing trail will be widened from six feet to eight feet and the entire length of the 5,400 feet of trail will have an asphalt overlay. Arkansas 2015 201 (TAP) 201. Trails Dewitt Arkansas $75,000 $0 $18,750 $93,750
Greenway Trail (Ph. III, Sec. II) (Batesville) (RTP-15) (S) This project consists of the construction of approximately 760 LF of 10-ft wide asphalt trail completing Batesville's Greenway Trail. Arkansas 2015 201 (TAP) 201. Trails Batesville Independence $50,000 $0 $12,500 $62,500
Walking Trail Rehab. (Greers Ferry) (RTP-15) (S) This project consists of paving the existing loose gravel trail in the city park and making it ADA accessible. Arkansas 2015 201 (TAP) 201. Trails Greers Ferry Cleburne $35,000 $0 $8,750 $43,750
Cane Creek Boardwalk & Trail (RTP-15) (S) This project consists of the construction of approximately 500 LF of 6-ft wide trail and a 400 LF boardwalk connecting Pavilion #1, the boat ramp, Pavilion #2 and the campground within Cane Creek State Park. Arkansas 2015 201 (TAP) 201. Trails Star City Lincoln $157,266 $0 $90,572 $247,838
City Park Walking Trail (Murfreesboro) (RTP-15) (S) This project consists of overlaying and widening the existing trail around the City Park. The asphalt trail will be 8 feet wide and will have a length of 3200 feet. Arkansas 2015 201 (TAP) 201. Trails Murfreesboro Pike $40,000 $0 $10,000 $50,000
Cecil Cove Equestrian Trail Rehab. (RTP-15) (S) This project consists of the rehabilitation of approximately 6 miles of the Buffalo River equestrian and pedestrian trail (natural surface) near Erbie. Arkansas 2015 201 (TAP) 201. Trails Erbie Newton $29,332 $0 $7,333 $36,665
Community Center Fitness Trail (Bentonville) (RTP-15) (S) This project consists of the construction of approximately 5,300 LF of 10-ft wide concrete trail around the new Bentonville Community Center. Arkansas 2015 201 (TAP) 201. Trails Bentonville Benton $75,000 $0 $173,910 $248,910
Delta Heritage Trail: Rohwer-Watson (RTP-15) (S) This project consists of the construction of approximately 50,000 LF of varying-width asphalt trail along an abandoned rail corridor adjacent to Highway 1. This project will help connect this trail from Helena-West Helena to Arkansas City. Arkansas 2015 201 (TAP) 201. Trails Watson Desha $500,000 $0 $4,688,895 $5,188,895
S. Broadway Trail Ext. (Heber Springs) (RTP-15) (S) This project consists of the construction of approximately 500 LF of 10-ft wide asphalt trail and a bridge across Sulphur Creek. Arkansas 2015 201 (TAP) 201. Trails Heber Springs Cleburne $45,000 $0 $11,250 $56,250
Wetland Trail (Maumelle) (RTP-15) (S) This project consists of the construction of approximately 3,000 LF of 8-ft wide trail with a gravel surface and a pier. Arkansas 2015 201 (TAP) 201. Trails Maumelle Pulaski $32,000 $0 $8,000 $40,000
Riverfront Parks Connector (Camden) (RTP-15) (S) This project consists of the construction of approximately 5,800 LF of soft surface trail that will connect Sandy Beach Park to Riverfront Park. Arkansas 2015 201 (TAP) 201. Trails Camden Ouachita $56,600 $0 $14,150 $70,750
Levy Trail (Ph. 3) (North Little Rock) (RTP-15) (S) This project consists of converting 1 mile of abandoned railroad bed into a 14-ft wide asphalt paved pedestrian/bicycle trail from 56th Street to Kierre Road including drainage improvements and a street crossing at 47th Street. Arkansas 2015 201 (TAP) 201. Trails North Little Rock Pulaski $271,696 $0 $67,924 $339,620
Greenway Ped. Bridge (Jonesboro) (RTP-15) (S) This project consists of constructing trail and a pedestrian bridge that will provide a link to the existing Greenway and the Turtle Creek Mall along Matthews Avenue. Arkansas 2015 201 (TAP) 201. Trails Jonesboro Craighead $79,996 $0 $19,999 $99,995
Park Trail Rehab. (Osceola) (RTP-15) (S) This project consists of repaving the existing park trail. Arkansas 2015 201 (TAP) 201. Trails Osceola Mississippi $50,000 $0 $12,500 $62,500
Mt. Magazine Cabin/ Lodge Trail (RTP-15) (S) This project consists of the construction of approximately 2,500 LF of 8-ft wide concrete trail with seating and night lighting. This provides connection to ADA restrooms and cabin within Mount Magazine State Park. Arkansas 2015 201 (TAP) 201. Trails Mountain Township Logan $103,962 $0 $274,138 $378,100
Lake Saracen Trail (Ph. 8) (Pine Bluff) (RTP-15) (S) This project consists of the construction of approximately 4,000 LF of 8-ft wide trail along West Pullen Avenue and North Linden Street. Arkansas 2015 201 (TAP) 201. Trails Pine Bluff Jefferson $30,000 $0 $253,350 $283,350
Rice Carden Walking Trail (Fort Smith) (RTP-15) (S) This project consists of the construction of approximately 17,700 LF of 10-ft wide asphalt trail adjacent Riverfront Drive. Arkansas 2015 201 (TAP) 201. Trails Fort Smith Sebastian $224,000 $0 $56,000 $280,000
Jackson St. Trail Connection (Texarkana) (RTP-15) (S) This project consists of constructing an asphalt trail from Jackson Street to the Union Pacific Railroad tracks and install a 125' bridge over Nix Creek, Arkansas 2015 201 (TAP) 201. Trails Texarkana Miller $76,500 $0 $19,125 $95,625
Hot Springs Schools Ped. Connectors (SRTS-15) (S) This project consists of the construction of approximately 2,000 LF of 5-ft wide sidewalk along Main Street and Patterson Street, and a 12' Multi-Use trail approximately 500 LF from Patterson Street to Lester Street. Arkansas 2015 301 (TAP) 301. Safe routes to school infrastructure Hot Springs Garland $149,500 $0 $37,375 $186,875
McKnight St. Sidewalk (West Fork) (SRTS-15) (S) This project consists of the construction of approximately 400 LF of 5-ft wide sidewalk along McKnight Avenue. Arkansas 2015 301 (TAP) 301. Safe routes to school infrastructure West Fork Washington $94,995 $0 $23,749 $118,744
Cherry St. & Milan St. Sidewalks (Hamburg) (SRTS-15) (S) This project consists of the construction of approximately 2,100 LF of 6-ft wide sidewalk along Cherry Street and Milan Street. Arkansas 2015 301 (TAP) 301. Safe routes to school infrastructure Hamburg Ashley $266,250 $0 $66,563 $332,813
Joan Dr. Sidewalks (Shannon Hills) (SRTS-15) (S) This project consists of the construction of approximately 3,500 LF of 5-ft wide sidewalk along Joan Drive. Arkansas 2015 301 (TAP) 301. Safe routes to school infrastructure Shannon Hills Saline $120,000 $0 $30,000 $150,000
MacPark Connections (Little Rock) (SRTS-15) (S) This project consists of reparing sidewalks, installing sharrows, and building new bikeways. Arkansas 2015 301 (TAP) 301. Safe routes to school infrastructure Little Rock Pulaski $96,329 $0 $24,082 $120,411
Arkansas SRTS Outreach (Green Forest) (SRTS-15) (S) This project consists of educational material and outreach. Arkansas 2015 302 (TAP) 302. Safe routes to school programs Green Forest Carroll $182,800 $0 $45,700 $228,500
Magnolia Pearce St. Sidewalks (TAP-16) (S) Construct a sidewalk along Pearce Street between E. Green and E. University Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Magnolia Columbia $197,000 $0 $49,250 $246,250
ASU Campus Loop Trail (TAP-16) (S) This project consists of constructing 5,322' of an asphalt multi-use trail. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $500,000 $0 $125,000 $625,000
Hot Springs Creek Greenway Trail Ph. 6B (TAP-18) (S) Continues the existing trail project by adding 1,300' long 12-foot wide multi-use trail consisting of concrete trail, timber boardwalk, security lighting, and 80' long bicycle/pedestrian bridge over Hot Springs Creek. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Hot Springs Garland $500,000 $125,000 $625,000
Marion Military Rd. Streetscape (TAP-19) (S) Construct approximately 1,900 linear feet of streetscape improvements on Military Road (Hwy. 64) and bicycle and pedestrian improvements around Carter Magnet School connecting to Military Road. These improvements will include native landscaping, pedestrian lighting, crosswalk improvements, sidewalks, benches, and porous pavers. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Marion Crittenden $250,000 $62,500 $312,500
Greenland A.J. Allen Park Trail (TAP-16) (S) Construct 2,095 feet of 8 foot wide trail connecting existing sidewalk to the Community Center. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Greenland Washington $147,000 $0 $36,750 $183,750
Monticello Hwys. 278 & 425 Sidewalks (TAP-19) (S) Construct sidewalks along Hwy. 425 and Hwy. 278 and install pedestrian signalization and a crosswalk. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Monticello Drew $150,000 $37,500 $187,500
Mtn. View Hwy. 66 Sidewalks & Lighting (TAP-18) (S) Reconstructing non-ADA compliant sidewalks along Hwy. 66, including pedestrian lighting. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Mountain View Stone $159,000 $0 $40,390 $199,390
ASU Loop Trail Ph. 2 (TAP-18) (S) This project will complete a 1.97 mile bicycle/pedestrian loop around campus by adding sharrows to Cherokee Street, converting Driver Street to bike/pedestrian only from University Loop West to Cherokee Street, and constructing a 12' wide multi-use trail on the western side of University Loop East from U. Loop West to Aggie Road and on the south side of Aggie Road from U. Loop East to Red Wolf Blvd. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $450,000 $0 $178,735 $628,735
ADPT Delta Heritage Trail: Elaine - Mellwood (TAP-19) (S) Construct 9 mile by 8' wide barrier-free, multi-use, pedestrian and bicycle trail segment that continues development of the Delta Heritage Trail (DHT). Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Elaine Phillips $250,000 $62,500 $312,500
Prescott Hwy. 67 Sidewalks (TAP-19) (S) Construct approximately 2,500 linear feet of 5' wide sidewalks along West First Street (Hwy. 67) along with ADA ramps. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Prescott Nevada $129,000 $32,250 $161,250
Flippin Main St. Sidewalks (TAP-16) (S) Remove and replae existing sidewalks along both sides of Main Street between 3rd Street and Hwy. 178 Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Flippin Marion $205,000 $0 $51,250 $256,250
Perryville North Cedar St. Sidewalks (TAP-17) (S) Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Perryville Perry $100,000 $0 $38,780 $138,780
Eureka Springs W. Van Buren St. Sidewalk Impvts. (TAP-18) (S) This project will construct approximately 1,520' of 5-foot wide sidewalks along the east side of Hwy.62 Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Eureka Springs Carroll $200,000 $0 $50,260 $250,260
Lamar Sidewalk Impvts. (TAP-18) (S) Consists of constructing approximately 2,830 linear feet of 5-foot wide sidewalks on various City Streets. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Lamar Johnson $200,000 $0 $50,735 $250,735
Dean's Trail Ph. 1 (Springdale) (S) Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Springdale Washington $506,745 $0 $1,465,619 $2,918,473
Hackett Greenwood St. Sidewalks (TAP-18) (S) Constructing sidewalks on Greenwood Street. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Hackett Sebastian $50,000 $12,630 $62,630
Hot Springs Emory & Seventh St. Sidewalks (TAP-19) (S) Construct sidewalks along 7th and Emory Streets. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Hot Springs Garland $240,000 $60,000 $300,000
Gravette Trails (TAP-16) (S) This project consists of constructing 15,600 linear feet of trail. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Gravette Benton $500,000 $0 $125,000 $625,000
Jonesboro Downtown to ASU Connection (TAP-17) (S) Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $399,000 $0 $99,750 $498,750
Murfreesboro City Park Trail Lighting (TAP-16) (S) Install pedestrian lighting along the existing walking trail north of Hwy. 29 (Razorback Rd.) and east of Worrell Street. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Murfreesboro Pike $80,000 $0 $20,000 $100,000
Jonesboro Thorn St. Sidewalks (TAP-16) (S) This project consists of removing and replacing 705' of concrete sidewalks, wheelchair ramps, and drainage improvements. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $46,000 $0 $11,814 $57,814
Hope Downtown Streetscaping (TAP-19) (S) Construct sidewalks with streetscape improvements including pedestrian lighting connecting downtown Hope to the William Jefferson Clinton Birthplace National Historic Site. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Hope Hempstead $460,000 $115,000 $575,000
Hot Springs Creek Greenway Trail Ph. 6 (TAP-16) (S) Construct 3,900 linear feet of 12 foot wide multi-use trail connecting the end of the 2015 ongoing project and ending at TV Hill Road. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Hot Springs Garland $500,000 $0 $125,000 $625,000
Wilmot Downtown Sidewalk (TAP-17) (S) Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Wilmot Ashley $178,000 $0 $44,500 $222,500
Fort Smith Chaffee Crossing Trail (Segment 1) (TAP-16) (S) This trail is a T shaped configuration totaling 1.6 miles of 10 foot wide trail. The east to northeast leg is from Roberts Blvd at Chad Colley extending northwestward to existing trail at Forest Wood Way. The second segment extends from Roberts Blvd down Wells Lake Road and doglegs to the west before turning southward to the end of McClure Dr. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Fort Smith Sebastian $500,000 $0 $125,000 $625,000
Rogers Hwy. 94 Sidewalks (TAP-18) (S) The purpose of this project is to construct sidewalks and sidepath to fill in the gaps along 8th Street between Poplar Street and New Hope Road. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Rogers Benton $250,000 $0 $125,343 $375,343
Earle Hwys. 64 & 64B Ped. Impvts. (TAP-18) (S) The purpose of this project is to reconstruct the sidewalk on Second Street at the elementary campus and repair the flashing school zone sign on Highway 64 by the High School. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Earle Crittenden $20,000 $0 $5,000 $25,000
Jonesboro Craighead Forest Greenway Trail Ph. 4 (TAP-18) (S) This project will add on to the existing Craighead Forest Greenway Trail by adding approximately 4,370 linear feet of 10-foot wide asphalt paved trail on the southwest side of Harrisburg Road. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $399,000 $0 $100,415 $499,415
Warren Sidewalks (TAP-16) (S) This project consists of constructing approximately 2,750' of concrete sidewalks, drainage improvements, crosswalks, wheelchair ramps, and landscaping. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Warren Bradley $177,000 $0 $44,250 $221,250
Beebe Center St. Sidewalk Ext. (TAP-18) (S) Constructing approximately 1,656 linear feet of sidewalk on West Center Street and Commerce Drive. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Beebe White $36,000 $0 $9,644 $45,644
Gravette Trails Ph. 2 (TAP-18) (S) Construct approximately 1.73 miles of 8-foot wide trails/sidewalks to connect to the existing trail network. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Gravette Benton $400,000 $0 $298,200 $698,200
Trumann Sidewalks (TAP-18) (S) This project will construct approximately 1,890 linear feet of 5-foot wide sidewalks on various City streets to connect to Cedar Park Elementary. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Trumann Poinsett $36,000 $0 $9,001 $45,001
Southwest Trail Design This funding along with funding from the Federal Lands Access Program is being used to design the Southwest Trail from Hot Springs National Park to Little Rock High School National Historic Site. The trail will use abandoned rail beds as well as Saline County's rehabilitated Old River Bridge. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Benton Pulaski, Garland, & Saline $1,170,000 $0 $292,500 $1,462,500
Trumann Sidewalks (TAP-18) (S) This project will construct approximately 1,890 linear feet of 5-foot wide sidewalks on various City streets to connect to Cedar Park Elementary. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Trumann Poinsett $36,000 $9,001 $45,001
Fayetteville Cato Springs Trail Lighting (S) The purpose of this project is to install lighting on the recently constructed Cato Springs Trail. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Fayetteville Washington $320,000 $0 $158,256 $478,256
SAU Ped. Impvts. (TAP-16) (S) This project consists of constructing 1,250 linear feet of concrete sidewalks and crosswalks. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Magnolia Columbia $110,000 $0 $27,500 $137,500
Main St. & Roosevelt Rd. Sidewalks (LR) (S) The purpose of this project is to construct 2,450 feet of 5-foot wide sidewalks with crosswalks and ADA ramps along Main Street and Roosevelt Road. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Little Rock Pulaski $160,000 $0 $40,000 $200,000
Springdale Dean's Trail Ph. 3 (TAP-19) (S) Construct 3 blocks of streetscape improvements including sidewalk and curb reconstruction, irrigation, crosswalk striping, benches, and landscaping in downtown Van Buren on Main Street. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Springdale Washington $500,000 $125,000 $625,000
Alma Sidewalks (TAP-16) (S) This project consists of constructing 1,335' of concrete sidewalks. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Alma Crawford $350,000 $0 $87,500 $437,500
Madison Jackson St. Sidewalks (TAP-19) (S) Construct approximately 1,700 feet of 5' wide sidewalk beginning a the intersection of Hadley Drive and Jackson Street and stop at the intersection of 5th Street and Jackson Street. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Madison St. Francis $60,000 $15,000 $75,000
Osceola Sports Complex Trail (TAP-16) (S) This project consists of constructing 0.5 mile of trail around community ball fields. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Osceola Mississippi $138,000 $0 $34,500 $172,500
Wynne Merriman Ave. Streetscape & Drainage Impvts. (TAP-16) (S) Bicycle lanes between Front Street and the local road to the east of the Cross Country Public Library with 1,750 liner feet of curb and gutter. Construction of sidewalks and ADA improvements Implement rain chain stormwater mitigation to filter water polution from the Languille River watershed. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Wynne Cross $351,000 $0 $87,750 $438,750
ACHE Wellness Lake Trail (TAP-19) (S) Construct approximately 1,300 linear feet of 10-foot wide walking trail including a pedestrian bridge. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Barling Sebastian $216,000 $54,000 $270,000
Magnolia Columbia St. Sidewalks (TAP-18) (S) Constructing sidewalks, curb and gutter, and crosswalks along Columbia Street. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Magnolia Columbia $373,000 $0 $94,075 $467,075
Kelso Rd. & Burns Trail Sidewalks (Sherwood) (S) The purpose of this project is to construct 4,093 linear feet of 5-foot wide concrete sidewalks in two phases with crosswalks and ADA compliant ramps along Kelso Road and Burns Trail beginning at Highway 107 and ending at Valley Drive. Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Sherwood Pulaski $125,000 $0 $66,212 $191,212
First St. Sidewalks (Cabot) (S) The proposed project would construct curb-and-gutter and 6-foot wide sidewalks along approximately 750 feet of First Street between the two ends of Pheasant Run Drive. Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Cabot Lonoke $125,000 $0 $34,185 $159,185
Jacksonville Military Rd. Sidewalks (TAP-16) (S) This project consists of constructing 4,300' of concrete sidewalk with drainage improvements and wheelchair ramps. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Jacksonville Pulaski $375,000 $0 $93,750 $468,750
Ozark Sidewalks (TAP-16) (S) This project consists of constructing approximately 8,300' of concrete sidewalks with wheelchair ramps. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Ozark Franklin $234,000 $0 $58,500 $292,500
Greenwood Hwy. 10S Sidewalks (TAP-18) (S) Constructing sidewalks on the North side of Hwy. 10S between Ulmer Street and Denver Street and on the South side of Hwy. 10S from Denver to the vacant Riverside Factory. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Greenwood Sebastian $394,000 $99,090 $493,090
Edgewood Dr. Sidewalks (Maumelle) (S) This project will construct 2,865 linear feet of 5-foot wide concrete sidewalks with crosswalks and ADA compliant ramps along Edgewood Drive. Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Maumelle Pulaski $125,000 $0 $93,100 $218,100
White Hall City Park (TAP-16) (S) This project consists of reconstruction of existing asphalt trail, sidewalk construction, and landscaping. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities White Hall Jefferson $306,000 $0 $89,479 $395,479
Berryville Park Ped. Impvts. (TAP-16) (S) This project consists of constructing 7,150 linear feet of concrete trail around a soccer park. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Berryville Carroll $231,000 $0 $57,750 $288,750
Van Buren Downtown Streetscape (TAP-19) (S) Construct 3 blocks of streetscape improvements including sidewalk and curb reconstruction, irrigation, crosswalk striping, benches, and landscaping in downtown Van Buren on Main Street. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Van Buren Crawford $492,000 $123,000 $615,000
Little Rock Zoo Trails (TAP-16) (S) Remove and constuct 3,700 linear feet of sidewalks and install 8 interactive trail markers throughout the Zoo. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Little Rock Pulaski $384,000 $0 $96,000 $480,000
DeQueen School Connector Sidewalks (TAP-17) (S) Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities DeQueen Sevier $222,000 $0 $55,500 $277,500
Quitman Sidewalks Ph. 2 (TAP-16) (S) Along with Phase 1 from their 2015 project, construct 5,766 linear feet of sidewalk. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Quitman Cleburne $234,209 $0 $58,552 $292,761
Benton Riverside Trail Ph. 2 (TAP-16) (S) This project consists of constructing 12,000 linear feet of concrete walking trail and rehabilitation of an existing trail at Riverside Park. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Benton Saline $315,000 $0 $78,750 $393,750
Jonesboro Rains St. Sidewalks (TAP-16) (S) This project consists of constructing 1,144' of concrete sidewalks, wheelchair ramps, and drainage improvements. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $63,000 $0 $16,975 $79,975
Greenwood Hwy. 10S Sidewalks (TAP-18) (S) Constructing sidewalks on the North side of Hwy. 10S between Ulmer Street and Denver Street and on the South side of Hwy. 10S from Denver to the vacant Riverside Factory. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Greenwood Sebastian $394,000 $0 $99,090 $493,090
Riordan Rd. Trailhead (Bella Vista) (S) Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Bella Vista Benton $237,000 $0 $59,250 $296,250
North Little Rock 14th St. Ped. Bridge (TAP-19) (S) Construct a 10 feet wide pedestrian bridge over the Union Pacific Railroad tracks along 14th Street between Maple Street and Willow Street.The pedestrian bridge would replace the vehicular bridge allowing a pedestriancrossing if a train was stopped on the tracks. The proposed bridge would span a distance of 140 feet and be 10 feet wide. The ends of the bridge will be ADA accessible with the use of ramps or sufficient regrading of the approaches at each end. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities North Little Rock Pulaski $470,000 $117,500 $587,500
Bryant Mills Park Trail (TAP-16) (S) Construct 2,112 linear feet of trail with markers, informational signs. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Bryant Saline $36,000 $0 $9,000 $45,000
Dyer Sidewalks (TAP-16) (S) Construct a sidewalk along N. Mail Street from Holcomb Street to Highway 64. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Dyer Crawford $53,000 $0 $13,250 $66,250
Magnolia High School Dr. Sidewalks (TAP-19) (S) Construct sidewalks to the High School along with crosswalks and curb and gutter. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Magnolia Columbia $102,000 $25,500 $127,500
Hackett Greenwood St. Sidewalks (TAP-18) (S) Constructing sidewalks on Greenwood Street. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Hackett Sebastian $50,000 $0 $12,630 $62,630
Brookland Hwy. 49B Sidewalks (TAP-16) (S) This project consists of constructing 2,905 linear feet of concrete sidewalks. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Brookland Craighead $106,000 $0 $26,500 $132,500
Siloam Springs Main St. Trail Impvts. (S) To construct a 10-foot wide ADA compliant concrete trail along Main Street between Hwy. 264 and Country Club Drive. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Siloam Springs Benton $118,000 $0 $29,500 $147,500
Jackman St. & River St. Sidewalks (Benton) (S) Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Benton Saline $125,000 $0 $31,250 $156,250
McCrory Hwy. 145 Sidewalks (TAP-18) (S) The purpose of this project is to reconstruct approximately 1,600 linear feet of 11-foot side sidewalks, install safety islands, curb and gutter, and to restripe parking to accommodate for longer vehicles and handicapped parking. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities McCrory Woodruff $89,000 $22,250 $111,250
Greenwood Bell Park Promenade Ph. 2 (TAP-16) (S) Construct phase 2 of the Bell Park loop. The trail will connect the three pavillions to the North end of the existing trail to the West. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Greenwood Sebastian $126,000 $0 $31,500 $157,500
ASU Loop Trail Ph. 2 (TAP-18) (S) This project will complete a 1.97 mile bicycle/pedestrian loop around campus by adding sharrows to Cherokee Street, converting Driver Street to bike/pedestrian only from University Loop West to Cherokee Street, and constructing a 12' wide multi-use trail on the western side of University Loop East from U. Loop West to Aggie Road and on the south side of Aggie Road from U. Loop East to Red Wolf Blvd. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $450,000 $178,735 $628,735
Nashville 4th St. Sidewalks Ph. 2 (TAP-16) (S) This project consists of constructing 2,200 linear feet of ADA accessible sidewalks, ramps, pavement markings for pedestrian crosswalks, and drainage improvements. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Nashville Howard $131,000 $0 $32,750 $163,750
Eureka Springs W. Van Buren St. Sidewalk Impvts. (TAP-18) (S) This project will construct approximately 1,520' of 5-foot wide sidewalks along the east side of Hwy.62 Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Eureka Springs Carroll $200,000 $50,260 $250,260
Siloam Springs N. Hico St. Ped. Impvts. (TAP-18) (S) This project will extend the existing trail by constructing approximately 1,500' of 10-foot wide multi-use trail including a pedestrian bridge. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Siloam Springs Benton $155,000 $352,000 $507,000
Pangburn Sidewalk Impvts. (TAP-17) (S) Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Pangburn White $100,000 $0 $25,000 $125,000
Mtn. View Hwy. 66 Sidewalks & Lighting (TAP-18) (S) Reconstructing non-ADA compliant sidewalks along Hwy. 66, including pedestrian lighting. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Mountain View Stone $159,000 $40,390 $199,390
Prairie Grove Muddy Fork Park Walking Trail (TAP-17) (S) Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Prairie Grove Washington $140,000 $0 $35,000 $175,000
Bentonville McCollum Rd. Sidepath (TAP-16) (S) Construction of a 10' wide trail on the west side of McCollum Road between E. Central Ave. and Tiger Blvd. The project will connect to existing trail on both E. Central Ave. and Tiger Blvd. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Bentonville Benton $480,000 $0 $120,000 $600,000
Earle Hwys. 64 & 64B Ped. Impvts. (TAP-18) (S) The purpose of this project is to reconstruct the sidewalk on Second Street at the elementary campus and repair the flashing school zone sign on Highway 64 by the High School. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Earle Crittenden $20,000 $5,000 $25,000
Morrilton Sidewalks (TAP-16) (S) This project consists of constructing 10,200 linear feet of concrete sidewalks and landscaping. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Morrilton Conway $498,000 $0 $124,500 $622,500
SAU Campus Sidewalks (TAP-19) (S) Construct ADA accessible sidewalks and crosswalks throughout campus. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Magnolia Columbia $93,000 $23,250 $116,250
Rogers Hwy. 94 Sidewalks (TAP-18) (S) The purpose of this project is to construct sidewalks and sidepath to fill in the gaps along 8th Street between Poplar Street and New Hope Road. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Rogers Benton $250,000 $125,343 $375,343
Pine Bluff Grant St. Multi-use Trail (TAP-19) (S) Construct sidewalks and drainage improvements along Grant Street between Hwy. 190 and 13th Avenue. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Pine Bluff Jefferson $384,000 $96,000 $480,000
Mount Vernon Downtown Sidewalk Impvts. (TAP-17) (S) Arkansas 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Mount Vernon Faulkner $168,000 $0 $42,000 $210,000
McRae Sidewalks (TAP-18) (S) Constructing approximately 4,000 feet of 5' wide sidewalks on various City Streets. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities McRae White $84,000 $21,350 $105,350
Glenwood Park St. and Hwy. 8 Sidewalks (TAP-18) (S) Constructing sidewalks along Park Street and Hwy. 8. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Glenwood Pike $499,000 $0 $125,950 $624,950
Gravette Trails Ph. 2 (TAP-18) (S) Construct approximately 1.73 miles of 8-foot wide trails/sidewalks to connect to the existing trail network. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Gravette Benton $400,000 $298,200 $698,200
Beebe Center St. Sidewalk Ext. (TAP-18) (S) Constructing approximately 1,656 linear feet of sidewalk on West Center Street and Commerce Drive. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Beebe White $36,000 $9,644 $45,644
Shannon Hills Sidewalks (TAP-16) (S) This project consists of constructing 3,248 linear feet of concrete sidewalks. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Shannon Hills Saline $96,000 $0 $24,000 $120,000
Vilonia Sidewalks & Hwy. 64B Ped. Lighting (TAP-19) (S) Construct sidewalks and curb and gutter on the west side of South Church Street between Hwy. 64B and Barnard Lane. The project will also include pedestrian lighting along Hwy. 64B from South Church Street to Hwy. 107. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Vilonia Faulkner $500,000 $125,000 $625,000
Lake Monticello Trail (TAP-16) (S) This project consists of clearing and grading 4 miles of a nature trail with pedestrian bridges, including geosynthetic fabric and B-stone for stream crossings. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Monticello Drew $92,000 $0 $23,000 $115,000
Clinton Sidewalk Impvts. (TAP-18) (S) Construction of approximately 1,580' of 5-foot wide sidewalks between schools and residential neighborhoods. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Clinton Van Buren $54,000 $0 $14,000 $68,000
Pulaski Co. Two Rivers Park Safety Impvts. (TAP-19) (S) Constructing safety improvements to separate pedestrians and bicyclists and separate more experiences cyclists from recreational riders. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Little Rock Pulaski $330,000 $82,500 $412,500
Paragould 8 Mile Creek Trail Ph. 1 (TAP-16) (S) This project consists of constructing 5,100 linear feet of trail including 2 pedestrian bridges. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Paragould Greene $403,000 $0 $100,750 $503,750
Forrest City Stuart Park Nature Trail (TAP-16) (S) Construct 1,450 Lf of sidewalk along Arkansas Avenue connecting to Stuart Park and 1,300 Lf of natural surface trail in Stuart Park. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Forrest City St. Francis $73,000 $0 $18,250 $91,250
Lafayette County Courthouse Square Sidewalks (TAP-16) (S) This project consists of removal and replacement of 750' of concrete sidewalks. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Lewisville Lafayette $75,000 $0 $18,750 $93,750
Lowell Greenway Connector Trail (TAP-16) (S) Construct a 1,540 linear feet of trail connecting the Lakewood trail in Lowell to the City Limits line of Cave Springs. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Lowell Benton $302,000 $0 $75,500 $377,500
Dover Elementary School Walking Trail (TAP-18) (S) Constructing approximately 4,600' 5-foot wide walking trail that will go around the perimeter of campus. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Dover Pope $78,000 $0 $42,591 $120,591
Lepanto Miles St. Sidewalks (TAP-18) (S) This project will construct approximately 2,100 linear feet of 5-foot wide sidewalks on the south side of Miles Street. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Lepanto Poinsett $94,000 $23,500 $117,500
Arkadelphia Sidewalks (TAP-16) (S) Remove and construct sidewalks along 10th Street connecting Barkman and Haddock Street. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Arkadelphia Clark $80,000 $0 $20,000 $100,000
Jonesboro Craighead Forest Greenway Trail Ph. 4 (TAP-18) (S) This project will add on to the existing Craighead Forest Greenway Trail by adding approximately 4,370 linear feet of 10-foot wide asphalt paved trail on the southwest side of Harrisburg Road. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Jonesboro Craighead $399,000 $100,415 $499,415
McRae Sidewalks (TAP-18) (S) Constructing approximately 4,000 feet of 5' wide sidewalks on various City Streets. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities McRae White $84,000 $0 $21,350 $105,350
UAPB Pedestrian Mall Ph. 1 (TAP-16) (S) Contruction of a pedestrian mall with removal and disposal of an existing driveways and parking lot and installation of sidewalks, lighting, landscapin,g site furnishings and improved drainage. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Pine Bluff Jefferson $407,000 $0 $101,750 $508,750
Helena-West Helena Big River Trail Ext. (TAP-19) (S) Construct trail connecting the Big River Trail along the Mississippi to the Delta Heritage Trail. Arkansas 2019 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Helena-West Helena Phillips $250,000 $62,500 $312,500
Batesville Greenway Trail Ph. 4 (TAP-16) (S) This project consists of constructing 3,248 linear feet of concrete sidewalks. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Batesville Independence $87,000 $0 $21,750 $108,750
UA Research & Technology Park Ped. Impvts. (TAP-16) (S) Construct two trails connecting the existing Town Branch Trail to the existing Cato Springs Road Trail. Arkansas 2016 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Fayetteville Washington $374,000 $0 $152,125 $526,125
Springdale Dean's Trail Ph. 2 (TAP-18) (S) Construct a 12' wide concrete surface trail including a grade separated crossing under Hwy. 412. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities Springdale Washington $500,000 $541,887 $1,041,887
McCrory Hwy. 145 Sidewalks (TAP-18) (S) The purpose of this project is to reconstruct approximately 1,600 linear feet of 11-foot side sidewalks, install safety islands, curb and gutter, and to restripe parking to accommodate for longer vehicles and handicapped parking. Arkansas 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities McCrory Woodruff $89,000 $0 $22,250 $111,250
Centerton SRTS (TAP-16) (S) This project consists of constructing approximately 3,900 linear feet of sidewalk on Seba Road. Arkansas 2016 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Centerton Benton $263,000 $0 $65,750 $328,750
ADPT Devil's Den Trail Impvts. (TAP-18) (S) Construct an 8-foot wide multi-use trail with a pre-fabricated bridge over Lee Creek. Arkansas 2018 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Fayetteville Washington $255,000 $64,450 $319,450
West Fork Safe Routes Connection (TAP-17) (S) Arkansas 2017 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers West Fork Washington $181,000 $0 $45,250 $226,250
ADPT Devil's Den Trail Impvts. (TAP-18) (S) Construct an 8-foot wide multi-use trail with a pre-fabricated bridge over Lee Creek. Arkansas 2018 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Fayetteville Washington $255,000 $0 $64,450 $319,450
LR Port Authority Transit Shelter (S) The purpose of this project is to install a transit hub shelter, bicycle parking pavilion, a bus pullout lane, and sidewalks. Arkansas 2019 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Little Rock Pulaski $50,000 $12,500 $62,500
Newark SRTS (TAP-16) (S) Construct a trail connecting the high school to the elementary school. Arkansas 2016 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Newark Independence $138,000 $0 $34,500 $172,500
Hot Springs SRTS (TAP-16) (S) This project extends the 2015 SHPO approved project locations an approximately 750 feet per location. The Main Street leg will bridge ongoning project location to existing sidewalk. The other three legs will continue from current onging project locations. Arkansas 2016 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Hot Springs Garland $120,000 $0 $30,000 $150,000
Cabot Central Elementary SRTS Sidewalks (S) The purpose of this project is to construct 1,500 linear feet of 5-foot wide sidewalks with crosswalks and ADA ramps along the north side of Pond Street. Arkansas 2019 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Cabot Lonoke $100,000 $25,000 $125,000
ADPT Delta Woodlands Trail Impvts. (TAP-19) (S) Construct a 10' wide barrier-free, paved trail for the existing Delta Woodlands Trail (0.77 mile) for a total of 4066 linear feet with several drainage culverts Arkansas 2019 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Lake Village Chicot $195,000 $48,750 $243,750
West Side Schools Hwy. 92 Flashing Beacons (TAP-19) (S) This project will install 3 sets of rapid flashing beacon crosswalk signs on Hwy. 92 to improve pedestrian safety. Arkansas 2019 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Greers Ferry Cleburne $20,000 $5,000 $25,000
Wynne SRTS Ph. 2 (TAP-16) (S) Construct 4,730 Lf of ADA accessible sidewalk and bike lanes from Turtle Creek Drive along the west side of Killough Road to Bridges and connecting to existing sidewalk at the corner of Bridges and Lemmons. Arkansas 2016 102 (TASA) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers Wynne Cross $208,000 $0 $52,000 $260,000
ADPT Delta Heritage Trail: Watson - Arkansas River (TAP-18) (S) To provide an 8' wide barrier-free, multi-use, pedestrian and bicycle trail segment that continues the development of the Delta Heritage Trail. Arkansas 2018 103 (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users Watson Desha $500,000 $2,406,521 $2,906,521
ADPT Delta Heritage Trail: Watson - Arkansas River (TAP-18) (S) To provide an 8' wide barrier-free, multi-use, pedestrian and bicycle trail segment that continues the development of the Delta Heritage Trail. Arkansas 2018 103 (TASA) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users Watson Desha $500,000 $0 $2,406,521 $2,906,521
McCallie Access Overlook (TAP-16) (S) Construct a scenic overlook 75 feet long with a concrete barrier wall with a high water Mississippi River accessible boat ramp. Arkansas 2016 104 (TASA) 104. Construction of turnouts, overlooks, and viewing areas Arkansas City Desha $87,000 $0 $21,750 $108,750
Saline County Old River Bridge Ph. 2 (TAP) (S) The purpose of this project is to continue the rehabilitation of the Old River Bridge and construct the approaches to the historic bridge. Arkansas 2018 106 (TASA) 106. Historic preservation and rehabilitation of historic transportation facilities Benton Saline $500,000 $125,000 $625,000
Mtn. Home McCabe Park Trails (RTP-18) (S) The purpose of this project will be to construct approximately 3,000' of paved asphalt trail and 3,000' of loose gravel trail at the City's McCabe Park for various uses. Arkansas 2018 201 (TASA) 201. Trails Mountain Home Baxter $83,000 $0 $21,140 $104,140
Conway Stone Dam Creek Trail Ph. 2 (RTP-19) (S) Extend Stone Dam Creek Trail in Conway with additional length, trailheads, and a pedestrian bridge. Arkansas 2019 201 (TASA) 201. Trails Conway Faulkner $125,000 $31,250 $156,250
Taylor Tiger Track (RTP-18) (S) This project will utilize the abandoned L&A Railroad corridor and construct a 10-foot wide trail along the eastern side of North Hays Avenue. It will cross Powell and connect the existing Children's park to a proposed new park to the City's North. Arkansas 2018 201 (TASA) 201. Trails Taylor Columbia $81,000 $0 $36,852 $117,852
ASU-Mtn. Home Walking & Biking Trail (RTP-18) (S) The purpose of this project is to construct approximately 6,000 linear feet of a 10-foot wide asphalt multi-use trail on campus. Arkansas 2018 201 (TASA) 201. Trails Mountain Home Baxter $76,000 $0 $20,000 $96,000
USFS Moccasin Gap Vault Toilet (Motorized) (RTP-17) (S) Arkansas 2017 201 (TASA) 201. Trails Dover Pope $16,000 $0 $4,000 $20,000
USFS Richland Creek Vault Toilet Arkansas 2017 201 (TASA) 201. Trails Witt Springs Searcy $21,000 $0 $5,250 $26,250
FoOT Trail Shelter Modifications (RTP-18) (S) This project is adding amenities to existing trail shelters in Yell, Montgomery, Garland, Saline, & Perry Counties. Arkansas 2018 201 (TASA) 201. Trails Hot Springs Garland $21,000 $0 $5,500 $26,500
Pottsville City Park Trail Ext. (RTP-18) (S) This project will pave an existing loose gravel trail and make an ADA accessible 10-foot wide trail. Arkansas 2018 201 (TASA) 201. Trails Pottsville Pope $25,000 $0 $7,485 $32,485
Sherwood Indianhead Walking Trail (RTP-16) (S) This project consists of constructing 1,200' of 8' wide asphalt trail including drainage improvements. Arkansas 2016 201 (TASA) 201. Trails Sherwood Pulaski $27,000 $0 $6,750 $33,750
Dewitt Jackson St. Trail (RTP-16) (S) Arkansas 2016 201 (TASA) 201. Trails Dewitt Arkansas $35,000 $0 $8,750 $43,750
Hamburg Norman Park Trail Impvts. (RTP-18) (S) This project will construct additional trail length to make a complete mile of trail around Norman Park. This project includes a creek crossing. Arkansas 2018 201 (TASA) 201. Trails Hamburg Ashley $96,000 $24,000 $120,000
Hot Springs Northwood Trails Ph. 2 (RTP-16) (S) Arkansas 2016 201 (TASA) 201. Trails Hot Springs Garland $48,000 $0 $12,000 $60,000
Greenbrier Trails (RTP-16) (S) This project consists of constructing 3,900' of asphalt trail and 4 small pedestrian bridges. Arkansas 2016 201 (TASA) 201. Trails Greenbrier Faulkner $61,000 $0 $15,250 $76,250
Lawrence Co. Rail-Trail Ph. 6 (RTP-16) (S) This project consists of constructing 5,000' of asphalt trail and an at grade crossing on Hwy. 67. Arkansas 2016 201 (TASA) 201. Trails Walnut Ridge Lawrence $71,000 $0 $17,750 $88,750
Marked Tree Carver Park Accessible Trail (RTP-18) (S) The purpose of this project is to construct approximately 1,000 linear feet of porous pavement material that will suitthe area known to flooding and resist cracking. Arkansas 2018 201 (TASA) 201. Trails Marked Tree Poinsett $63,000 $0 $17,000 $80,000
Little Rock Ottenheimer Accessibility Trail (RTP-17) (S) Arkansas 2017 201 (TASA) 201. Trails Little Rock Pulaski $64,000 $0 $16,000 $80,000
Lonoke Rail-Trail (RTP-17) (S) Arkansas 2017 201 (TASA) 201. Trails Lonoke Lonoke $65,000 $0 $32,917 $97,917
Jonesboro Craighead Forest Park Trail Ph. 3 (RTP-16) (S) Arkansas 2016 201 (TASA) 201. Trails Jonesboro Craighead $359,000 $0 $89,750 $448,750
Crittenden Co. Delta Regional River Park Trail Connection (RTP-17) (S) Arkansas 2017 201 (TASA) 201. Trails West Memphis Crittenden $75,000 $0 $18,750 $93,750
Benton Southwest Trail Loop Connector (RTP-17) (S) Arkansas 2017 201 (TASA) 201. Trails Benton Saline $80,000 $0 $20,000 $100,000
Conway Stone Dam Creek Trail (RTP-18) (S) This phase of the Stone Dam Creek Trail will construct approximately 1,100' of paved 12-foot wide trail. Arkansas 2018 201 (TASA) 201. Trails Conway Faulkner $178,000 $0 $44,764 $222,764
ATU-Ozark Rec. Trail Rehab. (RTP-18) (S) This project will rehabilitate existing gravel trail with concrete for approximately 2,200 linear feet. Arkansas 2018 201 (TASA) 201. Trails Ozark Franklin $143,000 $40,260 $183,260
FoOT Trail Shelter Modifications (RTP-18) (S) This project is adding amenities to existing trail shelters in Yell, Montgomery, Garland, Saline, & Perry Counties. Arkansas 2018 201 (TASA) 201. Trails Hot Springs Garland $21,000 $5,500 $26,500
ADPT Pinnacle Mtn. Park - Ouachita Trail Rehab. (RTP-18) (S) This project will rehabilitate the existing historic steel truss bridge and build trail approaches to separate trail users and vehicular traffic on Highway 300. Arkansas 2018 201 (TASA) 201. Trails Little Rock Pulaski $188,000 $47,424 $235,424
Marked Tree Carver Park Accessible Trail (RTP-18) (S) The purpose of this project is to construct approximately 1,000 linear feet of porous pavement material that will suitthe area known to flooding and resist cracking. Arkansas 2018 201 (TASA) 201. Trails Marked Tree Poinsett $63,000 $17,000 $80,000
Bluffton Preserve Multi-Use Trails Ph. 1 (RTP-17) (S) Arkansas 2017 201 (TASA) 201. Trails Clinton Van Buren $154,000 $0 $38,500 $192,500
Sebastian Co. Torraine Lake Trail Enhancement (RTP-16) (S) This project consists of constructing 0.35 miles of 9' wide asphalt concrete trail with a 80' bridge and drainage improvements. Arkansas 2016 201 (TASA) 201. Trails Chaffee Crossing Sebastian $143,000 $0 $124,651 $267,651
Arkansas City Delta Heritage Trail Trailhead Impvts. (RTP-19) (S) Construct additional trailhead accomodations including ADA accessible features. Arkansas 2019 201 (TASA) 201. Trails Arkansas City Desha $188,000 $47,000 $235,000
Little Rock Boyle Park Bike Trails (RTP-19) (S) Major improvements to the mountainbike park including pump tracks, gateway trails, and skills features. New trails will connect to exisiting trails and new features will be added to existing trail including new signage. Arkansas 2019 201 (TASA) 201. Trails Little Rock Pulaski $200,000 $50,000 $250,000
Holiday Island Bobcat Hiking Trail (RTP-16) (S) This project consists of constructing a 4 mile natural surface hiking/mountain biking trail. Arkansas 2016 201 (TASA) 201. Trails Holiday Island Carroll $24,000 $0 $6,000 $30,000
Decatur Veteran's Park Trail Impvts. (RTP-18) (S) The purpose of this project is to construct a 10-foot wide concrete trail at Decatur's Veteran's Park. Arkansas 2018 201 (TASA) 201. Trails Decatur Benton $250,000 $62,500 $312,500
UALR Coleman Creek Greenway Ext. (RTP-17) (S) Arkansas 2017 201 (TASA) 201. Trails Little Rock Pulaski $42,000 $0 $18,000 $60,000
Taylor Tiger Track (RTP-18) (S) This project will utilize the abandoned L&A Railroad corridor and construct a 10-foot wide trail along the eastern side of North Hays Avenue. It will cross Powell and connect the existing Children's park to a proposed new park to the City's North. Arkansas 2018 201 (TASA) 201. Trails Taylor Columbia $81,000 $36,852 $117,852
Gentry Flint Creek Bridge & Trail Impvts. (RTP-18) (S) The purpose of this project is to construct a 255' long 10-foot wide trail that includes a 75-foot long pedestrian bridge over Pipe Springs in the Flint Creek Nature Area. Arkansas 2018 201 (TASA) 201. Trails Gentry Benton $121,000 $31,000 $152,000
Booneville Parks Connecting Trails (RTP-17) (S) Arkansas 2017 201 (TASA) 201. Trails Booneville Logan $144,000 $0 $36,000 $180,000
Malvern City Park Walking Trail (RTP-19) (S) Construct approximately 3,497 feet of 6 feet wide asphalt trail with concrete accessible ramps. one new pedestrian bridge across the creek, two low water bridges will be replaced with concrete bridges, site lighting, landscaped resting areas with benches and information boards, bollards to close off portions of roads and additional trail parking. Arkansas 2019 201 (TASA) 201. Trails Malvern Hot Spring $80,000 $20,000 $100,000
Clark Co. Iron Mt. Trail Extension (RTP-16) (S) Arkansas 2016 201 (TASA) 201. Trails Arkadelphia Clark $114,000 $0 $28,500 $142,500
Fayetteville Razorback Regional Greenway Rehab. (RTP-16) (S) Arkansas 2016 201 (TASA) 201. Trails Fayetteville Washington $56,000 $0 $90,825 $146,825
Fayetteville Razorback Greenway Tunnel Impvts. (RTP-18) (S) This project will retrofit the existing drainage tunnel with an elevated concrete floor to keep the trail dry and safer for trail users. Arkansas 2018 201 (TASA) 201. Trails Fayetteville Washington $88,000 $22,000 $110,000
Lake Alma Trails Ph. 1 (Alma) (RTP-19) (S) Construct approximately 4 miles of soft surface multi-use trails including 2 boardwalk walks, erosion control, and stone armoring. Arkansas 2019 201 (TASA) 201. Trails Alma Crawford $158,000 $39,500 $197,500
Sulphur Springs Park Trail (RTP-19) (S) Construct approximately 1,320 linear feet of 6-foot wide walking trail within Sulphur Springs Park. Arkansas 2019 201 (TASA) 201. Trails Sulphur Springs Benton $21,000 $5,250 $26,250
Fairfield Bay Indian Rock House Cave Trail (RTP-18) (S) The purpose of this project is to allow the elderly and persons with disabilities to be able to access the Indian Rock House Cave. The Cave is listed on the National Historic Register and is currently not accessible to those with disabilities. Arkansas 2018 201 (TASA) 201. Trails Fairfield Bay Van Buren $100,000 $108,075 $208,075
Fairfield Bay ATV/UTV Trailheads (RTP-19) (S) Construct 2 trailheads to connect to their existing ATV/UTV trail system. Arkansas 2019 201 (TASA) 201. Trails Fairfield Bay Van Buren $270,000 $67,500 $337,500
Mtn. Home McCabe Park Trails Ph. 2 (RTP-19) (S) Construct multi-use trail to connect McCabe Park Trail System to ASU-Mountain Home. Arkansas 2019 201 (TASA) 201. Trails Mountain Home Baxter $164,000 $41,000 $205,000
Conway Stone Dam Creek Trail (RTP-18) (S) This phase of the Stone Dam Creek Trail will construct approximately 1,100' of paved 12-foot wide trail. Arkansas 2018 201 (TASA) 201. Trails Conway Faulkner $178,000 $44,764 $222,764
ATU-Ozark Rec. Trail Rehab. (RTP-18) (S) This project will rehabilitate existing gravel trail with concrete for approximately 2,200 linear feet. Arkansas 2018 201 (TASA) 201. Trails Ozark Franklin $143,000 $0 $40,260 $183,260
North Little Rock Recycle Bikes for Kids NI (TAP-17) (S) Arkansas 2017 302 (TASA) 302. Safe routes to school programs North Little Rock Pulaski $16,000 $0 $4,000 $20,000
Arkadelphia Feaster Trail Extension (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Arkadelphia Clark $17,645 $0 $4,410 $22,055
District 9 Sidewalk Enhancements (Phase I) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $456,853 $0 $114,213 $571,066
Lake Village Sidewalks (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Lake Village Chicot $127,928 $0 $31,982 $159,910
De Queen Historic Downtown Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities De Queen Sevier $459,408 $0 $114,851 $574,260
District 1 Sidewalk Enhancements (Phase III) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $560,227 $0 $153,817 $714,044
Oil and Brine Museum Trail (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Smackover Union $19,473 $0 $20,293 $39,766
Warren Downtown Sidewalks and Landscaping (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Warren Bradley $392,000 $0 $110,010 $502,010
Decatur Hwy. 102 Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Decatur Benton $68,513 $0 $17,127 $85,640
Ashdown Hwy. 71 Sidewalk Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Ashdown Little River $160,135 $0 $40,033 $200,168
Magnolia Sidewalk Enhancements (Ph. III) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Magnolia Columbia $126,982 $0 $59,965 $186,947
Morrilton Childress Street Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Morrilton Conway $63,360 $0 $25,815 $89,175
Eureka Springs Hwy. 62 Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Eureka Springs Carroll $126,500 $0 $25,300 $151,800
Prescott Martin St. & Moore St. Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Prescott Nevada $100,000 $0 $28,750 $128,750
Hot Spring Co. Ouachita River Trail (Ph. I) (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Malvern Hot Spring $45,245 $0 $49,178 $94,423
Osceola Hwy. 119 Bikeway (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Osceola Mississippi $161,447 $0 $40,362 $201,809
Bentonville McKissic Creek Pedestrian Trail (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Bentonville Benton $391,458 $0 $97,865 $489,323
Jonesboro Phillips Dr. Streetscaping (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Jonesboro Craighead $300,000 $0 $93,793 $393,793
Jonesboro Downtown Enhancements Ph. II (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Jonesboro Craighead $88,680 $0 $50,910 $139,590
Van Buren River Walkway (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Van Buren Crawford $150,000 $0 $121,445 $271,445
School Complex Sidewalks (Benton) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Benton Saline $72,349 $0 $18,087 $90,436
Shirley Hwy. 9 Ped. Overpass Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Shirley Van Buren $72,454 $0 $18,114 $90,568
Mountain View Main Street Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Mountain View Stone $117,504 $0 $29,376 $146,880
Pulaski Co. Pedestrian/Bicycle Bridge (Murray Lock & Dam) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Little Rock Pulaski $300,000 $0 $11,131,772 $11,431,772
Waldron Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Waldron Scott $38,967 $0 $9,741 $48,708
Texarkana Downtown Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Texarkana Miller $300,000 $0 $85,519 $385,519
Malvern Hwy. 270 Sidewalk Enhancements (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Malvern Hot Spring $348,618 $0 $87,154 $435,772
Mansfield Downtown Enhancements (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Mansfield Sebastian $89,416 $0 $22,353 $111,769
Alpena Denver St. Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Alpena Boone $42,435 $0 $10,608 $53,043
Prairie Grove Hwy. 62 Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Prairie Grove Washington $102,354 $0 $25,588 $127,942
Dumas Main Street Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Dumas Desha $380,000 $0 $125,776 $505,776
Mountain Home Hwy. 62/412 Sidewalks (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Mountain Home Baxter $176,000 $0 $45,969 $221,969
Harrison Main St. & Ridge St. Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Harrison Boone $66,048 $0 $16,511 $82,559
Siloam Springs Multi-Use Trail (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Siloam Springs Benton $320,840 $0 $87,269 $408,109
Little Rock Scott Hamilton Road Sidewalk (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Little Rock Pulaski $92,255 $0 $23,063 $115,318
Maumelle Millwood Circle Sidewalk (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Maumelle Pulaski $12,144 $0 $6,554 $18,698
Ashdown Downtown Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Ashdown Little River $110,046 $0 $27,511 $137,557
Walnut Ridge Main Street Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Walnut Ridge Lawrence $98,957 $0 $24,739 $123,696
AHTD Bikeway & Pedestrian Program (FFY 2006) Arkansas 2006 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $54,000 $0 $13,500 $67,500
Star City Bradley Avenue Sidewalks (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Star City Lincoln $64,681 $0 $16,170 $80,851
Mansfield Downtown Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Mansfield Sebastian $177,191 $0 $44,618 $221,809
District 8 Sidewalk Enhancements (Phase I) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $177,130 $0 $44,282 $221,412
Springdale Emma Avenue Enhancements (Ph. III) (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Springdale Washington $150,000 $0 $111,170 $261,170
Pulaski County Civic Center Sidewalks & Landscaping (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities North Little Rock Pulaski $296,000 $0 $268,131 $564,131
Dierks Sidewalk Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Dierks Howard $37,760 $0 $13,420 $51,180
Hot Springs Creek Greenway (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Hot Springs Garland $438,646 $0 $109,661 $548,307
North Little Rock Arkansas River Walkway (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities North Little Rock Pulaski $440,000 $0 $221,600 $661,600
Siloam Springs Hwy. 204 Sidewalks (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Siloam Springs Benton $27,720 $0 $32,057 $59,777
District 9 Sidewalk Enhancements (Phase III) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $297,736 $0 $74,434 $372,170
Bentonville Moberly Lane Bikeway (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Bentonville Benton $64,152 $0 $16,489 $80,641
Little Rock Baseline Road Sidewalks (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Little Rock Pulaski $177,048 $0 $44,262 $221,310
Lowell McClure Avenue Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Lowell Benton $74,003 $0 $18,500 $92,503
Beebe Sidewalk Enhancements (Ph. III) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Beebe White $23,036 $0 $5,759 $28,795
Nashville Main St. Enhancements (Ph. II) (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Nashville Howard $150,000 $0 $66,937 $216,937
Transporation Enhancement Youth Corps (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $62,300 $0 $0 $62,300
Gentry South Collins Ave. Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Gentry Benton $42,876 $0 $10,719 $53,595
North Little Rock Pike Ave./Riverfront Drive Bike Trail (S) Arkansas 1997 1 (TE) 1. Pedestrian and bicycle facilities North Little Rock Pulaski $70,400 $0 $29,350 $99,750
Hwy. 183 Widening (Sel. Secs.) (Bryant) (S) (Sidewalks) Arkansas 1999 1 (TE) 1. Pedestrian and bicycle facilities Bryant Saline $47,395 $0 $11,848 $59,243
Hot Springs Hwy. 7 Crosswalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Hot Springs Garland $26,080 $0 $7,648 $33,728
District 1 Sidewalk Enhancements (Phase I) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $572,185 $0 $143,047 $715,232
Dover Hwy. 7 Sidewalks (ATEP-11) (S) Reconstructing broken, non-ADA compliant sidewalks through the main corridor in Dover Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Dover Pope $39,731 $0 $9,933 $49,664
AHTD Bikeway & Pedestrian Program (FY 1997) Arkansas 1997 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $61,905 $0 $15,476 $77,381
District 6 Sidewalk Enhancements (Phase I) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $654,135 $0 $163,534 $817,669
Heber Springs Downtown Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Heber Springs Cleburne $101,260 $0 $38,464 $139,724
Greenwood Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Greenwood Sebastian $162,885 $0 $40,721 $203,606
AHTD Bikeway & Pedestrian Program (FY 1999) Arkansas 1999 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $55,200 $0 $13,800 $69,000
Hardy Spring River Pedestrain Trail (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Hardy Sharp $149,906 $0 $40,681 $190,587
Danville Main Street Enhancements (Ph. II) (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Danville Yell $116,663 $0 $29,165 $145,828
Harrison Downtown Enhancements (Ph. III) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Harrison Boone $101,462 $0 $25,365 $126,827
England Downtown Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities England Lonoke $24,317 $0 $6,079 $30,396
UCA Stone Dam Creek Trail (ATEP-11) (S) Walking path for students along Stone Dam Creek at UCA campus connecting one side of town to the University Center Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Conway Faulkner $165,947 $0 $41,486 $207,433
Glenwood Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Glenwood Pike $549,732 $0 $286,847 $836,579
Sebastian Co. Ben Geren Park Bicycle Trail (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Fort Smith Sebastian $99,169 $0 $24,792 $123,961
Batesville Downtown Sidewalks (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Batesville Independence $116,532 $0 $29,133 $145,665
Yellville Crooked Creek Pedestrian Bridge (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Yellville Marion $442,506 $0 $110,626 $553,132
Atkins School and Downtown Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Atkins Pope $72,066 $0 $18,017 $90,083
Camden Ouachita River Walkway & Overlooks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Camden Ouachita $175,000 $0 $208,277 $383,277
Glenwood Mt. View Rd. Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Glenwood Pike $198,382 $0 $49,596 $247,978
Howard Co. Courthouse Landscaping & Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Nashville Howard $39,360 $0 $27,194 $66,554
Paragould Rector Rd. Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Paragould Greene $244,973 $0 $61,243 $306,216
Chidester Barham Creek Nature Trail (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Chidester Ouachita $61,642 $0 $15,411 $77,053
Greenland Scott Ave. & Circle Dr. Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Greenland Washington $24,310 $0 $8,190 $32,500
District 10 Sidewalk Enhancements (Phase II) (S) Arkansas 1999 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $596,906 $0 $149,226 $746,132
Transportation Enhancement Program Administration (FFY 01-02) Arkansas 2001 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $170,200 $0 $42,550 $212,750
Brookland Bernis St. & School St. Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Brookland Craighead $71,746 $0 $17,936 $89,682
Osceola Hale Avenue Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Osceola Mississippi $150,000 $0 $55,719 $205,719
AHTD Bikeway & Pedestrian Program (FY 2000) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $55,600 $0 $13,900 $69,500
Jimerson Creek Pedestrian/Bicycle Bridge (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Little Rock Pulaski $424,853 $0 $106,212 $531,065
Helena Cherry Street Enhancements (Ph. II) (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Helena Phillips $155,494 $0 $38,873 $194,367
Booneville Downtown Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Booneville Logan $358,571 $0 $89,643 $448,214
SAU Campus Sidewalks (ATEP-11) (S) Sidewalk construction for campus pedestrians and bicyclists Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Magnolia Columbia $271,335 $0 $67,833 $339,168
Springdale Sidewalk Enhancements (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Springdale Washington $252,563 $0 $63,140 $315,703
Greenbrier Hwy. 65 Sidewalks (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Greenbrier Faulkner $59,213 $0 $14,803 $74,016
Helena Levee Trail Phase II (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Helena Phillips $59,212 $0 $20,322 $79,534
Arkadelphia Downtown Streetscaping (Phase III) (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Arkadelphia Clark $270,304 $0 $67,575 $337,879
DeWitt Courthouse Square Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Dewitt Arkansas $91,284 $0 $22,820 $114,104
Springdale Shiloh Trail (ATEP-11) (S) Bicycle/pedestrian trial construction Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Springdale Washington $270,000 $0 $299,584 $569,584
Hampton Hwy. 278 & 2nd St. Sidewalks & Lighting (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Hampton Calhoun $30,000 $0 $8,200 $38,200
Nashville Main St. Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Nashville Howard $200,000 $0 $53,080 $253,080
Paragould Carroll Road Sidewalks (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Paragould Greene $86,656 $0 $21,664 $108,320
Huntsville Hwy. 23 (Harris St.) Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Huntsville Madison $115,000 $0 $174,475 $289,475
Conway Tucker Creek Bike Trail (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Conway Faulkner $254,239 $0 $194,037 $448,276
Atkins Fourth St. Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Atkins Pope $31,799 $0 $7,949 $39,748
Greenwood Sidewalks (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Greenwood Sebastian $115,000 $0 $38,500 $153,500
McCain Blvd. Ped. Enh. (NLR) (Walk & Ped. Sigs.) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities North Little Rock Pulaski $232,646 $0 $68,572 $301,218
District 6 Sidewalk Enhancements (Phase II) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $408,243 $0 $102,061 $510,304
Booneville Downtown Enhancements (Ph. III) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Booneville Logan $115,000 $0 $29,670 $144,670
Paragould Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Paragould Greene $356,646 $0 $89,161 $445,807
Fort Smith Levee Trail (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Fort Smith Sebastian $78,266 $0 $19,566 $97,832
Magnolia Sidewalk Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Magnolia Columbia $78,164 $0 $19,540 $97,704
Stuttgart Main Street Streetscaping (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Stuttgart Arkansas $231,463 $0 $57,865 $289,328
Danville Hwy. 10 (8th Street) Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Danville Yell $185,856 $0 $46,463 $232,319
Hot Springs Creek Greenway Trail (Phase III) (ATEP-11) (S) Bicycle/pedestrian trial construction Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Hot Springs Garland $151,981 $0 $37,995 $189,976
Branch Williams Street Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Branch Franklin $35,904 $0 $13,152 $49,056
District 2 Sidewalk Enhancements (Phase III) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $745,557 $0 $186,389 $931,946
Malvern Hwy. 270 Sidewalk Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Malvern Hot Spring $193,106 $0 $48,276 $241,382
Dardanelle 5th Street Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Dardanelle Yell $107,170 $0 $26,792 $133,962
Fairfield Bay Dave Creek Parkway Sidewalks (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Fairfield Bay Van Buren $77,374 $0 $19,344 $96,718
Jacksonville Municipal/Redmond Rd. Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Jacksonville Pulaski $56,266 $0 $16,049 $72,315
Crossett Sidewalks and Landscaping (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Crossett Ashley $77,568 $0 $47,617 $125,185
Nashville Main St. Enhancements (Ph. III) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Nashville Howard $521,174 $0 $185,665 $706,839
Hwy 71 - Dixieland Rd (Rogers) (S) (Sidewalks) Arkansas 1997 1 (TE) 1. Pedestrian and bicycle facilities Rogers Benton $77,735 $0 $19,433 $97,168
Yellville Hwy. 14 Sidewalk Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Yellville Marion $85,954 $0 $21,489 $107,443
Marmaduke Downtown Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Marmaduke Greene $95,958 $0 $35,871 $131,829
Helena-West Helena Hwy. 49B Streetscaping (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Helena Phillips $250,000 $0 $423,800 $673,800
Newport Downtown Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Newport Jackson $250,000 $0 $259,343 $509,343
District 4 Sidewalk Enhancements (Phase II) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $985,153 $0 $246,287 $1,231,440
Clinton Hwy. 65 Sidewalk Lighting (ATEP-11) (S) Extending Sidewalks and installing pedestrian lighting Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Clinton Van Buren $250,000 $0 $373,000 $623,000
ASU Driver St. Sidewalks (ATEP-11) (S) To construct and re-construct sidewalks for pedestrians and bicyclists on campus. Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Jonesboro Craighead $250,000 $0 $170,000 $420,000
District 4 Sidewalk Enhancements (Phase I) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $231,338 $0 $168,391 $399,730
Waldron Downtown Enhancements (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Waldron Scott $187,514 $0 $46,878 $234,392
Piggott T.I.C. and Hwy. 62 Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Piggott Clay $232,687 $0 $58,171 $290,858
Cave Springs Pedestrian Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Cave Springs Benton $31,321 $0 $7,829 $39,150
Parkin Archeological State Park Trail (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Parkin Cross $83,600 $0 $69,193 $152,793
Prescott Downtown Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Prescott Nevada $405,780 $0 $133,043 $538,823
Hamburg Downtown Square Streetscaping (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Hamburg Ashley $265,010 $0 $84,526 $349,536
Forrest City Downtown Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Forrest City St. Francis $156,940 $0 $39,235 $196,175
Fayetteville Raven and Gulley Park Trails (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Fayetteville Washington $142,224 $0 $45,717 $187,941
Pocahontas Town Square Landscaping (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Pocahontas Randolph $212,630 $0 $53,157 $265,787
Texarkana Historic Beech St. Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Texarkana Miller $141,060 $0 $35,265 $176,325
District 8 Sidewalk Enhancements (Phase II) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $141,388 $0 $35,346 $176,734
Fayetteville Western Mud Creek Trail (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Fayetteville Washington $404,129 $0 $101,032 $505,161
Dierks Sidewalk Enhancements (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Dierks Howard $55,130 $0 $13,783 $68,913
Yellville Sidewalk Enhancement (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Yellville Marion $52,909 $0 $13,227 $66,136
Sidewalk Enhancement (P.E.) (S) Arkansas 1999 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $68,800 $0 $17,200 $86,000
Springdale Emma Avenue Enhancements (Ph. IV) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Springdale Washington $195,000 $0 $142,864 $337,864
Morrilton Downtown Sidewalks (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Morrilton Conway $403,397 $0 $160,343 $563,740
Perryville Hwy. 60 Sidewalks (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Perryville Perry $236,392 $0 $59,097 $295,489
Flippin Hwy. 62 (Main St.) Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Flippin Marion $108,457 $0 $27,114 $135,571
Conway Tucker Creek Trail (Phase II) (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Conway Faulkner $189,938 $0 $47,484 $237,422
Harrison Downtown Square Enhancements (S) Arkansas 1997 1 (TE) 1. Pedestrian and bicycle facilities Harrison Boone $402,878 $0 $100,719 $503,597
Friendship Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Friendship Hot Spring $16,769 $0 $6,364 $23,133
District 10 Sidewalk Enhancements (Phase III) (S) Arkansas 1999 1 (TE) 1. Pedestrian and bicycle facilities Craighead $402,724 $0 $100,681 $503,405
Mammoth Spring Sidewalks and Landscaping (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Mammoth Spring Fulton $84,084 $0 $21,021 $105,105
Sherwood Pedestrian Overpass (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Sherwood Pulaski $231,258 $0 $86,375 $317,633
Mena Hwy. 88 Streetscaping (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Mena Scott $150,000 $0 $203,490 $353,490
Helena Levee Walking Trail (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Helena Phillips $80,000 $0 $20,000 $100,000
Charleston Hwy. 22 Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Charleston Franklin $91,226 $0 $22,806 $114,032
Russellville W. Main St. Streetscaping (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Russellville Pope $210,000 $0 $116,153 $326,153
West Memphis Broadway Revitalization Phase II (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities West Memphis Crittenden $233,610 $0 $58,402 $292,012
Pocahontas Hwy. 67 Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Pocahontas Randolph $187,968 $0 $46,992 $234,960
UACCM University Blvd. Sidewalks (ATEP-11) (S) Sidewalk construction for campus pedestrians and bicyclists Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Morrilton Conway $210,000 $0 $134,464 $344,464
District 2 Sidewalk Enhancements (Phase II) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $722,888 $0 $180,722 $903,610
Norphlet Pedestrian Trail (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Norphlet Union $210,428 $0 $52,606 $263,034
Rogers Mercy Hospital Trailhead (ATEP-11) (S) Parking and trailhead construction for a connection to the regional Razorback Greenway trail and Rogers Mercy Hospital Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Rogers Benton $267,531 $0 $66,883 $334,414
Jonesboro Main St. Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Jonesboro Craighead $783,984 $0 $230,427 $1,014,411
Holly Grove Hwy. 86 Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Holly Grove Monroe $56,892 $0 $14,223 $71,115
Fordyce Downtown Sidewalk Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Fordyce Dallas $84,292 $0 $21,073 $105,365
Independence Co.-Batesville Riverwalk Ext. (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Batesville Independence $190,896 $0 $47,724 $238,620
District 3 Sidewalk Enhancements (Phase I) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $256,167 $0 $64,042 $320,209
Bentonville Downtown Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Bentonville Benton $200,000 $0 $490,666 $690,666
Arkansas City Ped. Lighting & Landscaping (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Arkansas City Desha $30,676 $0 $7,669 $38,345
Walnut Ridge Downtown Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Walnut Ridge Lawrence $104,615 $0 $26,153 $130,768
Monticello City Square Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Monticello Drew $150,086 $0 $37,522 $187,608
Brinkley Downtown Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Brinkley Monroe $188,771 $0 $47,161 $235,932
Walnut Ridge Main St. Enhancements (Ph. II) (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Walnut Ridge Lawrence $140,657 $0 $35,164 $175,821
Morrilton Downtown Streetscaping (Phase III) (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Morrilton Conway $190,161 $0 $47,540 $237,701
Lake Village Main St. Streetscaping (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Lake Village Chicot $115,000 $0 $29,110 $144,110
Harrison Main Street Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Harrison Boone $82,902 $0 $20,725 $103,627
Pine Bluff Lake Saracen Walking Trail (ATEP-11) (S) Walking trail to pedestrian paths across park Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Pine Bluff Jefferson $55,809 $0 $13,952 $69,761
Maumelle Club Manor Dr. Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Maumelle Pulaski $62,000 $0 $16,740 $78,740
White Hall Hwy. 365 Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities White Hall Jefferson $282,529 $0 $70,632 $353,161
Otter Creek Road - I-430 (F) (Bike Lanes) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Little Rock Pulaski $238,153 $0 $59,537 $297,690
AHTD Bikeway & Pedestrian Program (FY 1998) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $11,258 $0 $2,814 $14,072
Glenwood Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Glenwood Pike $227,782 $0 $56,946 $284,728
Warren Downtown Enhancements (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Warren Bradley $223,287 $0 $55,821 $279,108
Berryville School Area Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Berryville Carroll $84,768 $0 $21,191 $105,959
Siloam Springs Multi-Use Trail (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Siloam Springs Benton $250,000 $0 $69,856 $319,856
State Capitol Complex Sidewalks (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Little Rock Pulaski $76,441 $0 $19,111 $95,552
Altus Downtown Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Altus Franklin $90,000 $0 $52,407 $142,407
Forrest City Division Street Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Forrest City St. Francis $55,000 $0 $16,017 $71,017
Murfreesboro Downtown Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Murfreesboro Pike $145,099 $0 $36,274 $181,373
Jonesboro Downtown Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Jonesboro Craighead $514,918 $0 $128,729 $643,647
Hot Spring Co. Ouachita River Trail (Ph. II) (ATEP-2000) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Malvern Hot Spring $229,075 $0 $57,580 $286,655
Dumas Main Street Enhancements (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Dumas Desha $200,000 $0 $58,759 $258,759
Lonoke Downtown Enhancements (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Lonoke Lonoke $55,761 $0 $13,940 $69,701
Arkadelphia Downtown Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Arkadelphia Clark $281,080 $0 $475,815 $756,895
Eudora Main Street Streetscaping Ph. II (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Eudora Chicot $152,870 $0 $38,218 $191,088
Manila Hwy. 18B Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Manila Mississippi $34,632 $0 $8,657 $43,289
Lake Village Lakefront Enhancements (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Lake Village Chicot $145,712 $0 $36,428 $182,140
Urban Youth Corp's Program Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $34,701 $0 $8,675 $43,376
Ouachita National Forest Enhancements - Ph. 2 (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Perry $242,898 $0 $60,724 $303,622
Van Buren Old Frisco Depot Plaza Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Van Buren Crawford $80,000 $0 $42,960 $122,960
Hwy 64 - Hwy 247 Reconstruction (S) (Morrilton Sidewalks) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Morrilton Conway $59,715 $0 $21,470 $81,185
Batesville Riverwalk Ped. and Bicycle Trails (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Batesville Independence $280,230 $0 $70,058 $350,288
Benton School Area Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Benton Saline $199,239 $0 $49,810 $249,049
Benton South St. Streetscaping (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Benton Saline $194,000 $0 $154,870 $348,870
Dermott Hwy. 35, Main St. & Hardy St. Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Dermott Chicot $113,295 $0 $28,324 $141,619
District 9 Sidewalk Enhancements (Phase II) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $280,339 $0 $70,084 $350,423
Decatur Branch Pedestrian Br. & Apprs. (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Decatur Benton $52,000 $0 $28,700 $80,700
ASU Bicycle and Pedestrian Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Jonesboro Craighead $145,332 $0 $36,332 $181,664
Pine & Cedar Wheelchair Ramps (LR) (S) Arkansas 2003 1 (TE) 1. Pedestrian and bicycle facilities Little Rock Pulaski $17,296 $0 $23,104 $40,400
District 7 Sidewalk Enhancements (Phase III) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $362,305 $0 $90,577 $452,882
1995 Local ATEP (AHTD Administration) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $953,299 $0 $238,325 $1,191,624
Foreman Shuman St. Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Foreman Little River $199,000 $0 $68,097 $267,097
Charleston Hwy. 22 Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Charleston Franklin $155,000 $0 $57,452 $212,452
Russellville Downtown Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Russellville Pope $75,396 $0 $18,848 $94,244
Fort Smith Bicycle Lanes (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Fort Smith Sebastian $52,286 $0 $13,071 $65,357
Camden Streetscaping (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Camden Ouachita $231,169 $0 $57,792 $288,961
Gentry Main Street Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Gentry Benton $155,000 $0 $57,978 $212,978
Jacksonville Redmond Road Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Jacksonville Pulaski $182,163 $0 $154,389 $336,552
Bentonville Ped./Bikeway Facility (ATEP-95) (S) Arkansas 1995 1 (TE) 1. Pedestrian and bicycle facilities Bentonville Benton $279,628 $0 $69,332 $348,960
Green Forest Hwy. 62 (Main St.) Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Green Forest Carroll $155,211 $0 $38,803 $194,014
District 4 Sidewalk Enhancements (Phase III) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $422,702 $0 $105,676 $528,378
Mountain Home Downtown Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Mountain Home Baxter $250,000 $0 $96,127 $346,127
Searcy Trail System (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Searcy White $416,826 $0 $142,647 $559,473
District 3 Sidewalk Enhancements (Phase III) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $198,754 $0 $49,688 $248,442
District 6 Sidewalk Enhancements (Phase III) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Multiple Multiple $193,396 $0 $48,348 $241,744
Des Arc Sidewalk Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Des Arc Prairie $95,426 $0 $23,856 $119,282
Pea Ridge Sidewalks (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Pea Ridge Benton $55,000 $0 $43,612 $98,612
Pulaski Co. College Station Enhancements (ATEP-98) (S) Arkansas 1998 1 (TE) 1. Pedestrian and bicycle facilities Little Rock Pulaski $414,110 $0 $0 $414,110
Wheatley Sidewalk Enhancements (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Wheatley St. Francis $55,148 $0 $18,407 $73,555
Fayetteville Town Branch Trail (ATEP-11) (S) Bicycle/pedestrian trial construction Arkansas 2011 1 (TE) 1. Pedestrian and bicycle facilities Fayetteville Washington $622,368 $0 $167,147 $789,515
Cabot Hwy. 89 Sidewalks (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Cabot Lonoke $250,000 $0 $97,758 $347,758
Hot Springs Hwy. 7/Bath St. Crosswalk (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Hot Springs Garland $33,920 $0 $8,480 $42,400
1994 Local Transportation Enhancement Program Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $11,450 $0 $2,861 $14,311
Forrest City Hwy. 1 Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Forrest City St. Francis $84,800 $0 $24,058 $108,858
Altus Hwy. 179 Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Altus Franklin $55,200 $0 $19,031 $74,231
Transportation Enhancement Design Review (S) Arkansas 1996 1 (TE) 1. Pedestrian and bicycle facilities Statewide Statewide $57,166 $0 $14,291 $71,457
Mammoth Spring Hwy. 9 Enhancements (Ph. II) (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Mammoth Spring Fulton $32,000 $0 $10,998 $42,998
Ozark Courthouse Square Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Ozark Franklin $80,000 $0 $55,183 $135,183
Hwy. 16-Hwy. 45 (S) (Sidewalks) Arkansas 1999 1 (TE) 1. Pedestrian and bicycle facilities Fayetteville Washington $224,349 $0 $56,087 $280,436
Monticello Hwy. 425 Sidewalks (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Monticello Drew $224,372 $0 $56,093 $280,465
Nashville Toland Heights Enhancement (ATEP-94) (S) Arkansas 1994 1 (TE) 1. Pedestrian and bicycle facilities Nashville Howard $34,373 $0 $8,593 $42,966
Waldron Hwy. 71 Enhancements (ATEP-2000) (S) Arkansas 2000 1 (TE) 1. Pedestrian and bicycle facilities Waldron Scott $225,000 $0 $60,279 $285,279
Eudora Main Street Streetscaping (ATEP-02) (S) Arkansas 2002 1 (TE) 1. Pedestrian and bicycle facilities Eudora Chicot $230,665 $0 $57,666 $288,331
Prairie Grove Land Acquisition (ATEP-94) (S) Arkansas 1994 3 (TE) 3. Acquisition of scenic or historic easements and sites Prairie Grove Washington $66,000 $0 $40,194 $106,194
Rotary Ann Scenic Wayside (Ozark National Forest) (S) Arkansas 1996 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Pope $314,901 $0 $177,099 $492,000
Arkansas Welcome Center (El Dorado) (S) Arkansas 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers El Dorado Union $2,435,689 $0 $608,922 $3,044,611
Texarkana Tourist Information Center (S) Arkansas 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Texarkana Miller $3,129,769 $0 $782,442 $3,912,211
Twin Groves Community Enhancements (ATEP-98) (S) Arkansas 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Twin Groves Faulkner $26,352 $0 $6,588 $32,940
Arkansas Welcome Center (West Memphis) (S) Arkansas 2006 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers West Memphis Crittenden $452,368 $3,830,174 $113,093 $4,395,635
Arkansas Welcome Center (Van Buren) (S) Arkansas 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Van Buren Crawford $2,266,170 $0 $566,542 $2,832,712
Arkansas Welcome Center (Lake Village) (S) Arkansas 2006 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Lake Village Chicot $2,284,327 $0 $571,082 $2,855,409
Clarendon Tourist/Welcome Center (ATEP-2000) (S) Arkansas 2000 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Clarendon Monroe $100,000 $0 $64,910 $164,910
Perry Co. Camp Ouachita Tourist Info. Center (ATEP-2000) (S) Arkansas 2000 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Perryville Perry $400,000 $0 $161,359 $561,359
Rest Areas & Info. Ctrs. Ped. Safety Sys.-Ph. 2 (Vid. Surv.) (S) Arkansas 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Statewide Statewide $89,846 $0 $22,461 $112,307
Ouachita National Forest Enhancements (S) Arkansas 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Perry $300,864 $0 $75,216 $376,080
Hwy. 62 Scenic Overlook (Cotter) (S) Arkansas 1994 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Cotter Marion $76,867 $0 $73,993 $150,860
Texarkana T.I.C. (Ramps & Drives) (S) Arkansas 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Texarkana Miller $2,428,239 $0 $607,059 $3,035,298
Clarendon Tourist/Welcome Center (Ph. II) (ATEP-02) (S) Arkansas 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Clarendon Monroe $129,283 $0 $32,321 $161,604
Boxley Valley Scenic Overlook (ATEP-11) (S) Building safe pullouts for citizens to watch and take pictures of the grazing elk that cover the Valley during parts of the year. Arkansas 2011 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Ponca Newton $60,000 $0 $76,700 $136,700
Great River Road Scenic Byway Signing (S) Arkansas 2008 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Multiple Multiple $2,360 $0 $1,590 $3,950
I-40 Ramp Relocations (West Memphis) (S) Arkansas 2009 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers West Memphis Crittenden $926,441 $6,716,160 $231,612 $7,874,213
Interstate-55 Landscaping (Blytheville)(S) Arkansas 1996 5 (TE) 5. Landscaping and scenic beautification Blytheville Mississippi $317,682 $0 $79,421 $397,103
Operation Wildflower Program (S) Arkansas 2004 5 (TE) 5. Landscaping and scenic beautification Statewide Statewide $63,656 $0 $15,913 $79,569
Junction City Landscape Enhancement (S) Arkansas 1994 5 (TE) 5. Landscaping and scenic beautification Junction City Union $1,895 $0 $473 $2,368
Harrison Tourist Info Ctr Landscaping (S) Arkansas 1993 5 (TE) 5. Landscaping and scenic beautification Harrison Boone $1,599 $0 $400 $1,999
I-630 Landscape Enhancement (Crepe Myrtles) Arkansas 1994 5 (TE) 5. Landscaping and scenic beautification Little Rock Pulaski $4,073 $0 $1,018 $5,091
Hwy. 167 Rest Area Landscaping (S) Arkansas 1993 5 (TE) 5. Landscaping and scenic beautification Independence $925 $0 $231 $1,156
Interstate 30 Landscaping (Texarkana) (S) Arkansas 1996 5 (TE) 5. Landscaping and scenic beautification Texarkana Miller $347,219 $0 $95,305 $442,524
I-40 Landscaping (White River Rest Area) (S) Arkansas 1998 5 (TE) 5. Landscaping and scenic beautification Prairie $136,000 $0 $34,000 $170,000
I-630 Slope Landscaping (S) Arkansas 1996 5 (TE) 5. Landscaping and scenic beautification Little Rock Pulaski $1,656,736 $0 $414,183 $2,070,919
Marked Tree Hwy. 63 Landscaping (S) Arkansas 1994 5 (TE) 5. Landscaping and scenic beautification Marked Tree Poinsett $4,202 $0 $1,050 $5,252
Fayetteville Entrance Corridor Landscaping (ATEP-94) (S) Arkansas 1994 5 (TE) 5. Landscaping and scenic beautification Fayetteville Washington $4,217 $0 $1,053 $5,270
District 4 Landscaping Enhancement Arkansas 1993 5 (TE) 5. Landscaping and scenic beautification Multiple Multiple $6,397 $0 $1,599 $7,996
Eureka Springs Planer Hill Enhancements (Ph. II) (ATEP-02) (S) Arkansas 2002 5 (TE) 5. Landscaping and scenic beautification Eureka Springs Carroll $100,676 $0 $25,169 $125,845
Pulaski County Interstate Reforestation (Seedlings) (S) Arkansas 1995 5 (TE) 5. Landscaping and scenic beautification Pulaski $18,445 $0 $4,611 $23,056
AHTD Bikeway & Pedestrian Program (FY 1993) Arkansas 1993 5 (TE) 5. Landscaping and scenic beautification Statewide Statewide $36,606 $0 $9,151 $45,757
Springdale Landscape Enhancement (S) Arkansas 1996 5 (TE) 5. Landscaping and scenic beautification Springdale Washington $98,800 $0 $24,700 $123,500
I-30 Landscaping (Social Hill Rest Area) (S) Arkansas 1997 5 (TE) 5. Landscaping and scenic beautification Social Hill Hot Spring $306,400 $0 $76,600 $383,000
I-40 Landscaping (Conway) (S) Arkansas 1993 5 (TE) 5. Landscaping and scenic beautification Conway Faulkner $35,974 $0 $8,994 $44,968
Jonesboro Stadium Blvd. Enhancements (S) Arkansas 1995 5 (TE) 5. Landscaping and scenic beautification Jonesboro Craighead $23,914 $0 $5,977 $29,891
District 1 Landscaping Enhancement Arkansas 1993 5 (TE) 5. Landscaping and scenic beautification Multiple Multiple $12,611 $0 $3,152 $15,763
M.L. King, Jr. Freeway Landscaping (Hot Springs) (S) Arkansas 1994 5 (TE) 5. Landscaping and scenic beautification Hot Springs Garland $51,920 $0 $12,980 $64,900
Corning Tourist Info Ctr Landscaping (S) Arkansas 1993 5 (TE) 5. Landscaping and scenic beautification Corning Clay $7,427 $0 $1,856 $9,283
Hwy. 49B Retaining Wall Reconst. (Helena) (S) Arkansas 1998 5 (TE) 5. Landscaping and scenic beautification Helena Phillips $76,310 $0 $2,361 $78,671
I-630 Decorative Planting (S) Arkansas 1995 5 (TE) 5. Landscaping and scenic beautification Little Rock Pulaski $7,456 $0 $1,863 $9,319
Green Forest Phillips St. Landscaping (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 5 (TE) 5. Landscaping and scenic beautification Green Forest Carroll $81,476 $0 $130,584 $212,060
Pocahontas Black River Scenic Overlook (ATEP-95) (S) Arkansas 1995 5 (TE) 5. Landscaping and scenic beautification Pocahontas Randolph $544,725 $0 $449,426 $994,151
Wildflower Brochure Arkansas 1997 5 (TE) 5. Landscaping and scenic beautification Statewide Statewide $8,000 $0 $2,000 $10,000
I-40/I-55 Landscaping (West Memphis) (S) Arkansas 1995 5 (TE) 5. Landscaping and scenic beautification West Memphis Crittenden $180,000 $0 $45,000 $225,000
Pike County Courthouse/Square Beautification (ATEP-95) (S) Arkansas 1995 5 (TE) 5. Landscaping and scenic beautification Murfreesboro Pike $180,059 $0 $51,620 $231,679
Amity City Circle Enhancements (ATEP-02) (S) Arkansas 2002 5 (TE) 5. Landscaping and scenic beautification Amity Clark $120,440 $0 $96,929 $217,369
Ft. Smith Towson Ave. Streetscaping (ATEP-11) (S) Downtown Sidewalks/Streetscapes Arkansas 2011 5 (TE) 5. Landscaping and scenic beautification Fort Smith Sebastian $270,000 $0 $379,485 $649,485
Pulaski County Interstate Reforestation (Ornamental Trees)(S) Arkansas 1995 5 (TE) 5. Landscaping and scenic beautification Pulaski $22,846 $0 $5,711 $28,557
Mid-South CC Airport Road Decorative Fencing (ATEP-02) (S) Arkansas 2002 5 (TE) 5. Landscaping and scenic beautification West Memphis Crittenden $327,459 $0 $159,646 $487,105
Hwy 150-Blytheville Tourist Info Center (Wildflower Seeds) Arkansas 1993 5 (TE) 5. Landscaping and scenic beautification Blytheville Mississippi $5,903 $0 $1,475 $7,378
AHTD Bikeway & Pedestrian Program (FY 1992) Arkansas 1992 5 (TE) 5. Landscaping and scenic beautification Statewide Statewide $12,282 $0 $3,070 $15,352
Hwy. 65 Bypass (Wetland Enhancement) Arkansas 1992 5 (TE) 5. Landscaping and scenic beautification Pine Bluff Jefferson $18,400 $0 $4,600 $23,000
I-40 & I-540 Landscaping (Ft. Smith/Van Buren) (S) Arkansas 1995 5 (TE) 5. Landscaping and scenic beautification Multiple Multiple $160,000 $0 $40,000 $200,000
Batesville Hwy. 167 Enhancements (S) Arkansas 1997 5 (TE) 5. Landscaping and scenic beautification Batesville Independence $114,400 $0 $34,882 $149,282
District 6 Landscaping Enhancement (Bulb Planting) Arkansas 1993 5 (TE) 5. Landscaping and scenic beautification Multiple Multiple $32,914 $0 $8,227 $41,141
Monroe County Courthouse Restoration (ATEP-95) (S) Arkansas 1995 6 (TE) 6. Historic preservation Clarendon Monroe $132,336 $0 $33,084 $165,420
Old Washington Abraham Block House (ATEP-95) (S) Arkansas 1995 6 (TE) 6. Historic preservation Washington Hempstead $133,307 $0 $33,327 $166,634
Old Washington Sanders Farm Restoration (ATEP-94) (S) Arkansas 1994 6 (TE) 6. Historic preservation Washington Hempstead $61,260 $0 $15,315 $76,575
Greene County Courthouse Renovation (ATEP-94) (S) Arkansas 1994 6 (TE) 6. Historic preservation Paragould Greene $154,000 $0 $42,183 $196,183
Hope Amtrak Passenger Loading Platform (ATEP-11) (S) Pedestrian platform/beautification Arkansas 2011 6 (TE) 6. Historic preservation Hope Hempstead $65,000 $0 $159,594 $224,594
Perry Co. Wallace Bridge Restoration (ATEP-11) (S) Converting a historic bridge into a bicycle/pedestrian bridge Arkansas 2011 6 (TE) 6. Historic preservation Perryville Perry $61,508 $0 $15,377 $76,885
Judsonia Truss Bridge Restoration (ATEP-11) (S) Converting a historic bridge into a bicycle/pedestrian bridge Arkansas 2011 6 (TE) 6. Historic preservation Judsonia White $240,000 $0 $657,637 $897,637
Old State House Preservation (ATEP-95) (S) Arkansas 1995 6 (TE) 6. Historic preservation Little Rock Pulaski $154,919 $0 $38,729 $193,648
Marion Co. Courthouse Restoration (ATEP-95) (S) Arkansas 1995 6 (TE) 6. Historic preservation Yellville Marion $233,200 $0 $252,602 $485,802
Walnut Ridge Depot Restoration (ATEP) (S) Arkansas 1994 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Walnut Ridge Lawrence $272,553 $0 $68,138 $340,691
Blytheville Historic Bus Station Restoration (ATEP-02) (S) Arkansas 2002 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Blytheville Mississippi $284,123 $0 $240,066 $524,189
Hazen Depot Renovation (ATEP-98) (S) Arkansas 1998 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Hazen Prairie $69,777 $0 $17,444 $87,221
White River Bridge Repair (Cotter) (S) Arkansas 2000 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Cotter Baxter $4,859,486 $0 $1,214,871 $6,074,357
Hope Cairo-Fulton Depot Restoration (ATEP-2000) (S) Arkansas 2000 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Hope Hempstead $347,920 $0 $86,980 $434,900
Historic Bridge Inventory (Enhancement Publication) (Phase III) (S) Arkansas 2002 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Statewide Statewide $360,000 $0 $90,000 $450,000
Moro Bay Ferry Exhibit (Barge Relocation) Arkansas 1993 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Moro Bay Bradley $34,155 $0 $8,539 $42,694
Moro Bay Ferry Exhibit (Barge Clean & Paint) Arkansas 1993 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Moro Bay Bradley $21,057 $0 $0 $21,057
Newport Depot Restoration (ATEP-95) (S) Arkansas 1995 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Newport Jackson $327,800 $0 $81,950 $409,750
Russellville Depot Restoration (Ph. III) (ATEP-02) (S) Arkansas 2002 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Russellville Pope $51,586 $0 $16,284 $67,870
Van Buren Frisco Depot & King Opera House Renov. (ATEP-95) (S) Arkansas 1995 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Van Buren Crawford $147,682 $0 $36,920 $184,602
Moro Bay Ferry Exhibit (Parking & Pedestal) Arkansas 1993 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Moro Bay Bradley $54,198 $0 $22,290 $76,488
Hope Railroad Depot Renovation (ATEP) (S) Arkansas 1994 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Hope Hempstead $411,982 $0 $102,995 $514,977
Lexa - Cypress Bend R.R. Corridor Study Arkansas 1992 8 (TE) 8. Conversion of abandoned railway corridors to trails Lexa Desha $154,321 $0 $38,579 $192,900
Rogers Frisco Transportation Enhancement (ATEP-95) (S) Arkansas 1995 8 (TE) 8. Conversion of abandoned railway corridors to trails Rogers Benton $265,882 $0 $77,539 $343,421
Snow Lake-Cypress Bend Rail Purchase Arkansas 1994 8 (TE) 8. Conversion of abandoned railway corridors to trails Snow Lake Desha $600,000 $0 $150,000 $750,000
Statewide Illegal Sign Removal Arkansas 1992 9 (TE) 9. Inventory, control, and removal of outdoor advertising Statewide Statewide $81,017 $0 $20,253 $101,270
Archeological Artifacts Curation Arkansas 1996 10 (TE) 10. Archaeological planning & research Statewide Statewide $3,999 $0 $999 $4,998
Arkansas Archeological Survey Internet Accessible Site (S) Arkansas 2002 10 (TE) 10. Archaeological planning & research Statewide Statewide $88,218 $0 $159,152 $247,370
Arkansas Archeological Survey Database (S) Arkansas 2006 10 (TE) 10. Archaeological planning & research Statewide Statewide $340,365 $0 $85,091 $425,456
GIS Database Management System (ATEP) Arkansas 1998 10 (TE) 10. Archaeological planning & research Statewide Statewide $1,115,200 $0 $278,800 $1,394,000
Dept. of Ark. Heritage GIS (ATEP) (S) Arkansas 1994 10 (TE) 10. Archaeological planning & research Statewide Statewide $80,000 $0 $20,000 $100,000
Pine Bluff Bypass Mitigation Booklet (S) Arkansas 1997 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Pine Bluff Jefferson $11,601 $0 $2,900 $14,501
Cass - Ozark (P.E.) Arkansas 2000 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Cass Franklin $38,835 $0 $9,708 $48,543
SHPO Supportive Services Arkansas 2008 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Statewide Statewide $338,901 $0 $84,725 $423,626
Lower Delta Wetland Mitigation Area (S) Arkansas 1996 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Ashley $168,000 $0 $42,000 $210,000
Water Quality Enhancement Project (S) Arkansas 2001 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Statewide Statewide $13,270 $0 $3,317 $16,587
Hwy. 71 Bypass - Hwy. 94 (Rogers - Searles Prairie) Arkansas 1993 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Rogers Benton $671,426 $0 $167,856 $839,282
I-30 Frontage Road Slide Repair (Benton) (S) Arkansas 1999 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Benton Saline $406,057 $0 $101,514 $507,571
Independence Co. Transportation Museum (ATEP-02) (S) Arkansas 2002 12 (TE) 12. Establishment of transportation museums Batesville Independence $73,780 $0 $333,768 $407,548