Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
Chavanelle Trail | In the City of Dubuque from Radford Road to Seipple Road | Iowa | 2019 | 1 | (DEMO) 1. Pedestrian and bicycle facilities | DUBUQUE | DUBUQUE | $657,000 | $2,618 | $659,618 | |
Red Rock Prairie Trail | Red Rock Prairie Trail: Neal Smith Entrance to S 80th Ave; Red Rock park to Business 163/IA 163 | Iowa | 2019 | 1 | (FLAP) 1. Pedestrian and bicycle facilities | RURAL | JASPER | $500,000 | $758,500 | $1,258,500 | |
Raccoon River Valley Trail Bridges Rehab (G-R) | Rehab bridges G through R | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | DALLAS | $459,000 | $120,460 | $579,460 | ||
Jones Pasture Trail | Jones Pasture Trail: Extension of Dickinson County Spine Trail 5,440 feet through Jone's Pasture to Angler's Bay Wildlife Management Area. | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | FAYETTE | $250,000 | $316,000 | $566,000 | ||
North Park Cadet Trail Phase 2: Trail from the intersection of Main & North St to Vernon Dr | North Park Cadet Trail Phase 2: trail from the intersection of Main & North St to Vernon Dr | Iowa | 2018 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | IOWA FALLS | HARDIN | $200,000 | $50,000 | $250,000 | |
Urban Youth Corps 2019 - Hawkeye Community College | Cedar Valley Arboretum and Botanicals • Build a boardwalk over a swale on a trail that connects Hawkeye Community College to the Arboretum. • Apply a stabilizer solution to a 100-foot section of path by the Welcome Center that is well traveled. • Turn a 1/3-mile-long mulch path into a gravel path. • Trim back vegetation encroaching on the trails and identify/remove non-native, invasive species. | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | BLACK HAWK | $34,054 | $8,513 | $42,567 | ||
Urban Youth Corps 2019 - Black Hawk County Conservation | • Repair/re-chip the Willow 2 Trail from the picnic shelter by the nature center to the bridge that goes to River Hills School. • Place ties alongside sections of the trail. • Replace railroad ties along the the path from the nature center to the top of the stairs on the edge cliff. • Clear brush, remove invasive species and re-chip trail that goes from the upper parking lot down behind the Buckles program building. • Repair and re-chip trail around the pond. • Re-stripe the parking lots (top and bottom parking lots). • Clear brush along the edges of the Cedar Valley Nature Trail from south of Evansdale to Gilbertville. | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | BLACK HAWK | $10,092 | $2,523 | $12,615 | ||
Urban Youth Corps 2019 - Dubuque County Conservation | • Remove all vegetation encroaching on the Heritage Trail from Rupp Hollow Rd to Cedar Ridge Rd. • Remove 8’x10’ bridge and install new bridge with railings on Woodland Ecology Trail at Swiss Valley Nature Preserve. • Remove all vegetation encroaching on the Heritage Trail from Cedar Ridge Rd to Twin Springs Rd. • Replace existing culvert railings at 3 locations along Heritage Trail. • Install five new interpretive signs at multiple sites along the Heritage Trail. • Replace decking on 40’x7’ bridge and add railing on Early Settlers Trail at New Wine Park. | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | DUBUQUE | $10,992 | $2,748 | $13,740 | ||
Iowa 100 Trail | 42nd St North along Preserve Lane to Rock Island Preserve along abandonde rail approx 250' east of Cedar River | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | LINN | $726,000 | $182,000 | $908,000 | ||
Des Moines River Valley Trail South Extension Phase 1 | Construct approximately 9,990 ft of trail that connects the existing 20 mile trail system to Oleson Park | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | FORT DODGE | WEBSTER | $700,000 | $516,000 | $1,216,000 | |
Prairie Rivers Trail - 170th St. Connection | On 170th street from end of existing trail west 1.25 miles to Nelson Avenue/N 15th St. | Iowa | 2020 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | FORT DODGE | WEBSTER | $350,000 | $227,860 | $577,860 | |
SW Greenbelt Trail from Beedle Dr to Intermodal Facility | Trail connection from Beedle Dr east .94 miles to Intermodal Facility | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | AMES | STORY | $159,000 | $241,000 | $400,000 | |
First Street Trail | On former Canadian Pacific RR Line from Blackhawk Trail Road to E. Iowa Street | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | ELDRIDGE | SCOTT | $994,618 | $457,382 | $1,452,000 | |
Wapsi Great Western Line Trail | From 500th Street to Minnesota State line | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | MITCHELL | $289,000 | $73,000 | $362,000 | ||
Heritage Trail Bridge 21 Replacement | Demolish and replace existing Heritage Trail Bridge 21. The new bridge will be 10 ft. wide and 197 ft. long with two piers. | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | DUBUQUE | $400,000 | $157,470 | $557,470 | |
Cherokee Trail - Phase 3 | From Midway Dr. along Vinton Ditch to E. Avenue along E Avenue to Vinton Ditch to & along F Avenue until 13th Street | Iowa | 2019 | 101 | (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities | CEDAR RAPIDS | LINN | $1,634,000 | $6,866,000 | $8,500,000 | |
Wabash Depot Renovation | Renovation of Wabash Depot | Iowa | 2019 | 106 | (STBG) 106. Historic preservation and rehabilitation of historic transportation facilities | SHENANDOAH | PAGE | $88,085 | $29,915 | $118,000 | |
Grant Wood Trail Extension | From Highway 13 to 35th Street. | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | MARION | LINN | $524,769 | $0 | $131,192 | $655,961 |
Highland Park Streetscape, Phase 2 | Highland Park Streetscape, Phase 2 | Iowa | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | DES MOINES | POLK | $528,000 | $0 | $1,372,000 | $1,900,000 |
6th Ave Streetscape Phase 1: College Ave to Hickman Rd | Provide wider sidewalks and crosswalk improvements, new street and pedestian lights, pedestrain amenities, shared-use road with bicycle sharrows and signage, bicycle parking, and landscaping and street trees where appropriate. | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | DES MOINES | POLK | $600,000 | $0 | $800,000 | $1,400,000 |
Flint River Trail - Phase 1A | From Irish Ridge Road west approx 1.3 miles through Starr's Cave Park to US Hwy 61 ROW line. | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | DES MOINES | $634,000 | $0 | $159,000 | $793,000 |
Rodeo Park 350 ft | Rehabilitate approximately 350 feet of Rodeo Park Trail | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | FORT MADISON | LEE | $82,035 | $0 | $20,509 | $102,544 |
Road for East Dunreath access, gravel parking lot, boat ramp | Road for the new East Dunreath access, provide a gravel parking lot for 6-8 cars with small boat trailers and construct a small concrete boat ramp to provide public access to the Lake Red Rock Project for recreation. | Iowa | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | MARION | $69,130 | $0 | $17,283 | $86,413 |
High Trestle Trail: Southwest Ordnance Rd Connection | West 1st St southbound to the intersection of Southwest Cherry St and Ordinance Rd. | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | ANKENY | POLK | $150,000 | $0 | $175,000 | $325,000 |
Clear Creek Trail--Phases 6 and 7 | Design and construction--Phases 6-7, combined w/NRT-1557(643)--9G-52 for $493,305 | Iowa | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | CORALVILLE | JOHNSON | $619,295 | $0 | $123,859 | $743,154 |
Turkey River Trail and Pedestrian Bridge | On B64, from Elgin Easterly 1.2 Miles to Clayton County Line, includes a bridge over Turkey River | Iowa | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | FAYETTE | $1,084,000 | $0 | $52,000 | $1,136,000 |
Hoover Nature Trail Phase 2 | Construct Phase 2 of the missing link to connect the Hoover Trail, the Cedar River Trail, and the Cedar Valley Nature Trail in eastern Iowa. | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | JOHNSON | $1,120,000 | $0 | $1,966,747 | $3,086,747 |
West Marion Street Trail | In the City of Manchester, West Marion St Trail: from S 9th St to S 12th St. | Iowa | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | MANCHESTER | DELAWARE | $155,000 | $0 | $39,000 | $194,000 |
Lake Path Trail - JewEllsworth Trail Segment | From the Jubilee Trail in Jewell, on-street through town to north of RR, east across Drainage Ditch #71 to former RR ROW, along ROW to Delphi Street then on-street through Ellswroth to Dearborn Street Federal Funds will be used from Saratoga Avenue to De | Iowa | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | HAMILTON | $331,808 | $0 | $515,807 | $847,615 |
Sac & Fox Trail Extension | From Indian Creek to Trailridge Road SE [West side of E Post Road SE from Indian Creek to Trailridge Road SE, including sidewalks along Trailridge Rod from Ashland Ct & Bever Avenue] | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | CEDAR RAPIDS | LINN | $164,000 | $0 | $56,000 | $220,000 |
Edgewood Road NW Multiuse Pathway from O Avenue to Ellis Road | Along eastern side of Edgewood Road from O Avenue to Ellis Road. | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | CEDAR RAPIDS | LINN | $321,000 | $0 | $80,000 | $401,000 |
Monroe to Prairie City - Phase 2 | Loacted in former railroad ROW, extending from Monroe toward Prairie City. Phase 1 developed the first 5.7 miles with temporary limestone chip surface. Phase 2 will place final limestone chip surface on that same 5.7 miles. | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | JASPER | $137,769 | $0 | $34,442 | $172,211 |
East Blue Creek Bridge Replacement, Cedar Valley Nature Trail | Replace an existing wood bridge structure on the Cedar Valley Nature Trail | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | LINN | $168,000 | $0 | $432,000 | $600,000 |
IA-15 Enterprise Drive Trail | From 3 Elms Park Road south to Enterprise Drive then west to Enterprise Court | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | INDEPENDENCE | BUCHANAN | $180,000 | $0 | $45,000 | $225,000 |
Sweet Water Creek Recreational Trail | Traverses town between 1st Ave. SW/SE and 1st Ave. NW/NE and runs along Sweet Water Creek and Wapsipinicon Greenbelt to Sweet march Wildlife Area. Proposed design is a 10' wide, 3" thikc HMA trail with 2' shoulders. | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | TRIPOLI | BREMER | $186,000 | $0 | $288,000 | $474,000 |
Black Hawk Lake Trail Phase 2 | In the city of Lake View, Black Hawk Lake Trail Phase II: From Ice House Point to South State Road. | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | LAKE VIEW | SAC | $200,000 | $0 | $175,000 | $375,000 |
Easter Lake Trail Phase 3 | Easter Lake Trail Phase 3 | Iowa | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | POLK | $200,000 | $0 | $1,925,600 | $2,125,600 |
Grant Wood Trail from Highway 13 to Oxley Road | Construction of a 12 ft. wide, compacted limestone screenings surface trail. | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | LINN | $220,000 | $0 | $55,000 | $275,000 |
Riverfront Trail Connection: Connecting Lewis and Clark trail | Connecting the existing Lewis and Clark Trails along Missouri River from just south of RR bridge under east side Bacon Creek Channel Bridge and Pedestrian bridge over Bacon Creek Channel Bridge to Lafayette Street, Pedestrian Bridge over Floyd Channel and under west side of Floyd Channel Bridge connecting to existing trail at Chris Larson Park. 5,000' of 10' wide trail and two 500' ped bridges. | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | SIOUX CITY | WOODBURY | $127,000 | $0 | $2,613,000 | $2,740,000 |
Mason Road Shared Use Path | 10' wide shared use path within the north right-of-way of Mason Road, between Sequoia Drive at Ed Stone Middle School and Haskell Street. | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | BURLINGTON | DES MOINES | $233,668 | $0 | $58,418 | $292,086 |
Bellevue Rivervue Trail-Phase II | Trail construction 1.5 miles from Jefferson Avenue northerly on the W side of US 52 to 395th Street | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | BELLEVUE | JACKSON | $250,000 | $0 | $62,500 | $312,500 |
Hoover Nature Trail/Fairgrounds Trailhead and Trail | On Hoover Nature Trail along Collins Road and near 4-H Center at Louisa County Fairgrounds in Columbus Junction, Iowa | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | COLUMBUS JUNCTION | LOUISA | $126,161 | $0 | $129,139 | $255,300 |
City of Dyersville 3rd St Southwest Bridge Trail Crossing | Replace approximately 250 ft of sidewalk with 10 ft wide concrete multi-use trail; replace an existing narrow pedestian walkway less than 4 ft wide on the 3rd St SW bridge with a 10 ft wide aluminum walkway; and upgrade the east side bridge rail to current standards | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | DYERSVILLE | DUBUQUE | $250,000 | $0 | $63,000 | $313,000 |
Babcock Woods Trail Extension | From Soccer Complex to Babcock Woods. | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | WAVERLY | BREMER | $125,000 | $0 | $35,000 | $160,000 |
Center Street Trail Improvements | 10' trail along Center Street from the Cedar River to Lone Tree Road | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | CEDAR FALLS | BLACK HAWK | $258,551 | $0 | $141,449 | $400,000 |
Iowa Great Lakes Trail Phase 2 | From intersection at 4th Ave W and W 18th St in the City of Spencer north to 300th St in Clay County, approximately 4 miles. | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | SPENCER | CLAY | $272,000 | $0 | $107,400 | $379,400 |
Walnut Creek Trail | From 156th Street to Waterford Road | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | URBANDALE | POLK | $274,961 | $0 | $278,839 | $553,800 |
Wapsipinicon Trail | On Shaw Road, from Hale Bridge to west side of GWSB/highway 64/E 3rd Street | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | ANAMOSA | JONES | $280,000 | $0 | $720,000 | $1,000,000 |
Heart of Iowa Nature Trail - Highway 69 to Trailridge Park | Paving one mile of limestone trail from the intersection of Highway 69 and E First Street in Huxley to Trailridge park located on 560th Avenue | Iowa | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | HUXLEY | STORY | $186,223 | $0 | $95,000 | $281,223 |
River Forest Road Trail | River Forest Rd Trail: On top of Cedar River levee in Evansdale. | Iowa | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | EVANSDALE | BLACK HAWK | $308,000 | $0 | $78,000 | $386,000 |
Big Sioux/Highway 12 Trail | Pave 10' wide trail from Big Sioux River to Sioux River Rd/Highway 12 | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | SIOUX CITY | WOODBURY | $400,000 | $0 | $200,000 | $600,000 |
Algona Recreational Trail, Phase 2 | Algona Recreational Trail, Phase 2 - from drainage ditch to Bishop Garrigan High School | Iowa | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | ALGONA | KOSSUTH | $286,000 | $0 | $123,000 | $409,000 |
Statweide Bike Map | Statewide Bike Map printing - misc. | Iowa | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | Statewide | $40,000 | $0 | $40,000 | |
I-VIEW (Iowa Visulization, Index and Evaluation of Walkability) - Enhances previous I-Walk project. | The project is a statwide GIS mapping and tool development project. It builds upon the Enhancing I-WALK project previously funded in 2013. | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | Statewide | $64,617 | $0 | $16,154 | $80,771 |
Edgewood Trail | Ellis Blvd NW to Glass Rd NE | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | CEDAR RAPIDS | LINN | $985,000 | $0 | $248,000 | $1,233,000 |
Kewash Nature Trail Enhancement & Paving | From Hwy 1 to Crooked Creek and 1900 ft spur | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | RURAL | WASHINGTON | $342,537 | $0 | $880,810 | $1,223,347 |
Lindale Trail Extension | Lindale Trail extension on the former RR ROW from 51st Street and Center Point Road NE to the existing trail just east o C Avenue NE. | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | CEDAR RAPIDS | LINN | $932,000 | $0 | $233,000 | $1,165,000 |
CeMar Trail - Phase 1A | From Cedar Lake Loop Trail across Shaver Road, under I-380 and along H Avenue NE to Oakand Road | Iowa | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | CEDAR RAPIDS | LINN | $1,036,000 | $0 | $379,000 | $1,415,000 |
Estherville Recreational Trail | Along abandoned RR ROW from trailhead at 6th Avenue S to 2nd Avenue S, then north from 2nd Avenue N to 14th Avenue N | Iowa | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | ESTHERVILLE | EMMET | $163,000 | $237,000 | $400,000 | |
Cherokee Trail - Phase 1 | In the City of Cedar Rapids, from Stoney Point Road NW, through Cherry Hill Park, to Sharon Lane at Eastview Drive NW | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | CEDAR RAPIDS | LINN | $840,000 | $0 | $0 | $0 |
Des Moines River Trail, Phase 2 | SE 22nd Street to Easter Lake, generally along Hartford Avenue | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | DES MOINES | POLK | $800,000 | $0 | $600,000 | $1,400,000 |
Indian Creek Trail | 10th Street over Indain Creek, from Tower Terrace Road south 2.1 M to Boyson Trail north of 8th Avenue | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | MARION | LINN | $2,293,000 | $0 | $574,000 | $2,867,000 |
CeMar Lindale Connector | CeMar Cedar Rapids Phase 4 - Lindale Connector, Marion City Limit N to Hwy 100 and Lindale Mall Shopping Centers | Iowa | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | CEDAR RAPIDS | LINN | $1,457,000 | $0 | $263,000 | $1,720,000 |
42nd Street Streetscape | From I-235 to Crocker Street including lighting, traffic calming, safety-related infrastructure, and pedestrian facility improvements | Iowa | 2018 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | DES MOINES | POLK | $480,000 | $0 | $1,420,000 | $1,900,000 |
Gear Avenue Trail | On S. Gear Avenue from Division Street north to north entrance to SECC | Iowa | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | WEST BURLINGTON | DES MOINES | $280,000 | $70,000 | $350,000 | |
Removal of RR bridge over Marion Blvd. | Demolishion of railroad bridge over Marion Blvd. | Iowa | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | MARION | LINN | $242,000 | $0 | $61,000 | $303,000 |
AMU Well Field North Trail Paving Project | In AMU Well Field, pave from trailhead west 1,900 ft to the SE corner of the softball/baseball field complex | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | ATLANTIC | CASS | $100,000 | $0 | $25,000 | $125,000 |
City-County Connector Trail | In the City of Council Bluffs, on Railraod Avenue, from Kanesville Blvd north 1.3 miles to Council Bluffs Corporate Limits | Iowa | 2019 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | COUNCIL BLUFFS | POTTAWATTAMIE | $461,000 | $115,000 | $576,000 | |
Sidewalk Extension on Main St between Ash Ave and Cherry Ave | Project is a 900 ft (0.17 mi) long sidewalk extension to fill a gap between existing sidewalks across from Center Point Urbana Intermediate School (on south side of Main St). Project will also reconstruct intersection pavements at crosswalks for ADA compliance. | Iowa | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | URBANA | BENTON | $50,000 | $0 | $99,000 | $149,000 |
CeMar Trail | CeMar Trail - Marion | Iowa | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | MARION | LINN | $4,644,000 | $0 | $1,161,000 | $5,805,000 |
Riverside SRTS Project | 8' wide sidewalk beginning at Blackberry Ave and running northeasterly along the east side of Ash St/Tupelo Blvd and then east to the Riverside Elementary School. | Iowa | 2017 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | RIVERSIDE | WASHINGTON | $96,000 | $0 | $224,000 | $320,000 |
School Zone Flashing Beacons | School Zone Flashing Beacons (5 locations) | Iowa | 2015 | 102 | (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers | ANKENY | POLK | $80,000 | $0 | $30,000 | $110,000 |
Lower Bee Branch; Overlook at 16th Street Detention Basin | Trail Overlook in the City of Dubuque, Lower Bee Branch: Overlook at 16th Street Detention Basin | Iowa | 2016 | 104 | (TAP) 104. Construction of turnouts, overlooks, and viewing areas | DUBUQUE | DUBUQUE | $940,000 | $0 | $480,509 | $1,420,509 |
Urban Youth Corps 2014 | Urban Youth Corps 2014 | Iowa | 2014 | 107 | (TAP) 107. Vegetation management practices in transportation rights-of-way to improve roadway safety, prevent against invasive species, and provide erosion control | RURAL | Statewide | $100,000 | $0 | $25,000 | $125,000 |
UYC 2015 | Urban Youth Corps - FFY 2015 Funds | Iowa | 2015 | 107 | (TAP) 107. Vegetation management practices in transportation rights-of-way to improve roadway safety, prevent against invasive species, and provide erosion control | RURAL | Statewide | $75,000 | $0 | $33,000 | $108,000 |
Iowa's Living Roadways Project Program | Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Trails Visioning - Planning Activities | Iowa | 2014 | 107 | (TAP) 107. Vegetation management practices in transportation rights-of-way to improve roadway safety, prevent against invasive species, and provide erosion control | RURAL | Statewide | $88,680 | $0 | $25,047 | $113,727 |
Winterset Safe Routes to School | Winterset Safe Routes to School | Iowa | 2014 | 301 | (TAP) 301. Safe routes to school infrastructure | WINTERSET | MADISON | $164,000 | $0 | $41,000 | $205,000 |
Iowa Safe Routes to School Partnership | Conduct SRTS education and encouragement activities across the state to encourage more children to walk or ride bicycles to and from school. | Iowa | 2014 | 302 | (TAP) 302. Safe routes to school programs | RURAL | Statewide | $60,000 | $0 | $15,000 | $75,000 |
Iowa Safe Routes to School Partnership | Conduct SRTS education and encouragement activities across the state to encourage more children to walk or ride bicycles to and from school. | Iowa | 2016 | 302 | (TAP) 302. Safe routes to school programs | RURAL | Statewide | $157,893 | $0 | $39,473 | $197,366 |
Iowa Safe Routes to School Partnership | Conduct SRTS education and encouragement activities across the state to encourage more children to walk or ride bicycles to and from school. | Iowa | 2015 | 302 | (TAP) 302. Safe routes to school programs | RURAL | Statewide | $123,504 | $0 | $30,876 | $154,380 |
North Park Trail Extension | On old rail bed from W 10th Street to W 18th Street and on 18th Street from Highway Boulevard to 4th Avenue W | Iowa | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | SPENCER | CLAY | $136,000 | $0 | $184,000 | $320,000 |
Urban Youth Corps 2018 - Hartman Reserve | • Repair and/or replace existing trail stairway. • All trails will have vegetation trimmed back, any dead snags within 10 feet of the trail will be removed, and all downed trees will be removed. | Iowa | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | BLACK HAWK | $6,910 | $1,728 | $8,638 | ||
Reconstruction of N Mississippi St/Y40 | Along N. Mississippi St. (Y40) from Mayne St. 0.5 miles to Lauretta St. in Scott county and the city of Blue Grass | Iowa | 2018 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | BLUE GRASS | SCOTT | $900,000 | $0 | $702,000 | $1,602,000 |
Goose Creek Trail | On Goose Creek Trail, from Goose Creek and 53rd Street NW to 59th Street NW and Scott Street | Iowa | 2017 | 101 | (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities | DAVENPORT | SCOTT | $1,138,000 | $0 | $962,000 | $2,100,000 |
SRTS Partnership | Non-construction project: The partnership will work with schools and communities in Iowa to host education and encouragement activities for elementary aged children. | Iowa | 2018 | 302 | (TASA) 302. Safe routes to school programs | RURAL | Statewide | $180,971 | $0 | $45,242 | $226,213 |
Locust Street Trail--Between ECL and 9th Street | City of Carter Lake: Locust Street Trail--Between ECL and 9th Street | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | CARTER LAKE | HARRISON | $90,000 | $0 | $30,072 | $120,072 |
North Liberty Trail - 12th Avenue Extension from Penn Street to Coyote Court | North Trail Extension from Penn Street to Coyote Court. Final Voucher sent- 9/25/08 | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | NORTH LIBERTY | JOHNSON | $175,000 | $0 | $43,750 | $218,750 |
Carlisle Gateway Project - Co Line Rd / Hwy 5 Intersection; Co Line Rd & 155th Ave Street Improvements; Scotch Ridge Ctr to North Park Trail | Co Line Rd & 155th Ave Street Improvements; Scotch Ridge Ctr to North Park Trail | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | CARLISLE | POLK | $1,011,492 | $0 | $252,873 | $1,264,366 |
Along W Platt St. from W 43rd St. to Western Ave. | West platt St Trail-W 43rd St- Western Avenue PCC Trail | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | MAQUOKETA | JACKSON | $174,690 | $0 | $41,713 | $216,404 |
In Pine Lake State Prk (Phase 2) | South End of Pine Lake State Park to the Northern boundary.PCC Trail | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HARDIN | $174,000 | $0 | $43,500 | $217,500 |
Sheldon Recreational Trail - 3 Sections: Community College, Village Northwest and Hills Park | the project is at three different locations 1. Intersection of US 18 to existing trail through Village Northwest. 2. Intersections of 19th Ave/East 4 St to 23rd Ave/East 6th. 3. Western Avehue to Northwest Iowa Community College along the abandoned Illinois RR right of way. | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | SHELDON | O'BRIEN | $173,000 | $0 | $66,876 | $239,876 |
Hudson Road Recreational Trail, Phase II | Recreational Trail - Hudson Road Trail from W 12th Street to W 31st Street | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR FALLS | BLACK HAWK | $172,113 | $0 | $43,029 | $215,142 |
Oelwein NE Recreation Trail | NE Recreational Trail - BIKE/PED | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | OELWEIN | FAYETTE | $172,000 | $0 | $62,300 | $234,300 |
Nishnabotna River Pedestrian Bridge | Pedesrtrian Bridge across the Nishnabotna River in Edgington Park | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | AVOCA | POTTAWATTAMIE | $171,792 | $0 | $208,208 | $380,000 |
Gilbert to Ames Trail | From Ames north 2.5 miles to SCL of Gilbert (west of UP Railroad ROW). Will connect the existing trail system (Bloomington Heights Subdivision) in Ames to the existing trail at the Gilbert Elementary School system in Gilbert on new ROW approximately 2.5 miles long x 50 feet wide. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | STORY | $62,000 | $0 | $883,000 | $945,000 |
Blue Grass Trail, Phase I/Segments #1 and #4 | Begins in the Black Bear Crossing Subdivision, just east of the City and travels north to N. Mississippi Street | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | BLUE GRASS | SCOTT | $170,925 | $0 | $333,400 | $504,325 |
Mississippi Riverwalk (PE only) | Mississippi Riverwalk | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | DUBUQUE | DUBUQUE | $170,400 | $0 | $42,600 | $213,000 |
US 63 South Trail Underpass | On the southside of Oskaloosa city limits. PE, CE Construction. Under US 63/Market St in Oskaloosa Trail Crossing. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | OSKALOOSA | MAHASKA | $169,135 | $0 | $42,284 | $211,419 |
Heart of Iowa Nature Trail (Phase IV) from Maxwell ECL to 0.75 mi. W. of Collins | To develop 3.75 miles of trail from east of town of Maxwell to 0.75 mile west of the town of Collins | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | STORY | $166,073 | $0 | $42,646 | $208,719 |
Epworth East Gate Trail | From 600 ft W of Bierman Rd E on Jacoby to 2100 Ft N along Bierman Rd, PCC Trail | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | EPWORTH | DUBUQUE | $166,055 | $0 | $77,545 | $243,600 |
Kingsley Community Biking/Walking Trail Phase II | PCC Sidewalk /Trail - Kingsley Rec Trail from Brandon Street to Clarendon St. in Kingsley | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | KINGSLEY | PLYMOUTH | $166,000 | $0 | $41,500 | $207,500 |
Johnston Greenbelt Trail from Beaver Dr. to Crown Point | Johnston Greenbelt Trail- 1.6 miles of ACC trail | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | JOHNSTON | POLK | $165,800 | $0 | $95,715 | $261,515 |
Chavanelle Trail | Chavanelle Trail - from IA-32 (NW Arterial to Seippel Road | Iowa | 2016 | 1 | (TE) 1. Pedestrian and bicycle facilities | DUBUQUE | DUBUQUE | $906,139 | $0 | $226,534 | $1,132,673 |
Rodeo Park Trailway | Rodeo Park Trail- HMA Trail | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | FORT MADISON | LEE | $165,600 | $0 | $41,400 | $207,000 |
Tiffin Trail, Phase 4 | Jasper Ave to I-380. Continue trail from existing end on the west side of Jasper Avenue thence Southerly along the west side of Jasper Avenue to the North side of Clear Creek Bridge thence easterly to a point on the east side of Jasper Avenue thence southerly and easterly along the North side of Clear Creek to the I-380 right of way where the city of Coralville will tie to the project. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | TIFFIN | JOHNSON | $161,844 | $0 | $77,135 | $238,979 |
NIACC Trail from Birch Dr. to NIACC dormitories | NIACC Trail from Birch Dr. to NIACC dormitoriesin Mason City. ACC Trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | MASON CITY | CERRO GORDO | $161,600 | $0 | $111,769 | $273,369 |
9th Street Recreational Trail | PCC Trail along the north side of 9th Street, from US 67 to 19th Avenue | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | CAMANCHE | CLINTON | $160,010 | $0 | $39,990 | $200,000 |
IA 3 West Trail: from East Floyd River to 16th Ave NW | 2000 ft of 8ft wide recreational trail along ROW Iowa Hwy3 from existing trail on east side of Floyd to 16th Ave NW on west side of Floyd River which will include one 125ft Rec Trail Bridge. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | LE MARS | WOODBURY | $160,000 | $0 | $40,000 | $200,000 |
Big Lake Trail from Lewis and Clark Monument to Missouri River Levy | ACC Trail at the Big Lake Rec Area in Council Bluffs | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | COUNCIL BLUFFS | POTTAWATTAMIE | $160,000 | $0 | $17,519 | $177,519 |
Four Mile Creek Trail | Greenway Trail in Pleasant Hill. Trail construction. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | PLEASANT HILL | POLK | $160,000 | $0 | $70,325 | $230,325 |
Gay Lea Wilson Trail East Extension | The Gay Lea Wilson Trail East Extension through Altoona is 2 miles of 10' wide recreational trail that connects to the Gay Lea Wilson Trail and continues northerly under I-80. | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | ALTOONA | POLK | $700,000 | $0 | $817,900 | $1,517,900 |
Trail - Ochee Yahola Co. Park to Mitchell Co. Line | Trail - Ochee Yahola Co. Park to Mitchell Co. Line. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | WORTH | $160,000 | $0 | $40,000 | $200,000 |
Cedar Valley Nature Trail Hard Surfacing - 1995 | For asphalt surfacing the north 5 miles of the Cedar Valley Nature Trail from Evansdale to Gilbertville | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | BLACK HAWK | $160,000 | $0 | $40,500 | $200,500 |
Pedestrian bridge - Kimberly Road over Duck Creek | Ped. Over pass | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | BETTENDORF | SCOTT | $160,000 | $0 | $98,432 | $258,432 |
Welcome Home Soldier--Historical Pathway | Proposal for the trail portion of the project. A historic pathway. 8 acre site located just west of Albis and directly north of Highway 34. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MONROE | $175,000 | $0 | $110,000 | $285,000 |
North Lake Trail Extension: From 10th St to 590th St | Construct 8' trail form 10th St north to County Road C-49. Actual length is approx 3975 ft and could be in west ROW from 10th st to 12th st and cross Lake Ave on south side of intersection. Remaining in east ROW from 12th st to C-49. Some areas may require existing ditch to be built up and or temp construction easement. | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | STORM LAKE | BUENA VISTA | $193,000 | $0 | $120,655 | $313,655 |
Downtown Skywalk | Over Pedestrian Walkway - On 3rd Street SE & 1st Avenue E. Skywalk extends from existing on 1st to existing on 3rd St. | Iowa | 2016 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $1,440,000 | $0 | $360,000 | $1,800,000 |
Cedar Valley Nature Trail Hard Surfacing - 1997 | Cedar Valley Nature Trail Hard Surfacing - 1997 | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | BLACK HAWK | $181,807 | $0 | $77,917 | $259,724 |
North Dodge Street (Iowa 1) Trail and Bridge over I-80 | North Dodge Street (Iowa 1) Trail and Bridge over I-80 | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | IOWA CITY | JOHNSON | $753,884 | $753,884 | $1,046,115 | $1,800,000 |
Walnut Creek Trail Connection - Phase 1 Part A | Walnut Creek Trail Connection Phase 1, Part A. Associated projects are STP-ES-1945(665)--8I-77 and NRT-NT00(2)--9G-77. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $192,200 | $0 | $250,000 | $442,200 |
Raccoon River Valley Trail Rehabilitation | PCC Sidewalk/Trail. Trail Rehabilitation from Panora to Yale. 100% prorate | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | GUTHRIE | $782,454 | $778,247 | $167,657 | $950,112 |
Wahpeton Trail 2004 | PCC Rec.Trail - East side of State Highway 86 on west side of West Lake Okoboji | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | WAHPETON | DICKINSON | $192,100 | $0 | $169,900 | $362,000 |
The Missing Link Trail | Along the east side of North Walnut Creek between University and College Ave. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | WINDSOR HEIGHTS | POLK | $190,880 | $0 | $156,431 | $347,311 |
Iowa Riverfront Trail (Phase 1) from the Western Historic Trails Center to Playland Park | For construction of 2.5 miles of trail along the Missouri River in Council Bluffs | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | COUNCIL BLUFFS | POTTAWATTAMIE | $190,600 | $0 | $432,997 | $623,597 |
Linking Bicycle Trail on the Great River Road: Study | Study the possibility of connecting the Great River Road and Mississippi River Trail (MRT) in Louisa County to a bike route in Muscatine County in eastern Iowa. | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LOUISA | $110,000 | $0 | $28,775 | $138,775 |
Rathbun Lake Multi-Use Trail - Phase 1 | Rathbun Lake Multi-Use Trail - Phase 1 . Earth/Granular Surface Trail | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RATHBUN | APPANOOSE | $1,291,589 | $1,157,993 | $34,634 | $1,326,223 |
Leech Park Trailhead | Recreational trail to the city of Spencer. In-kind contribution. PCC Trai, parking lot, lighting, Leach Park, Grand Ave and 4th St southwest. Trail construction and Lighting | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | SPENCER | CLAY | $188,434 | $0 | $47,066 | $235,500 |
Sauk Rail Trail Paving - Maple River to Carnarvon | PCC Sidewalk/Trail from Maple River in Carroll County to Carnarvon, in Sac County. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CARROLL | $1,200,000 | $1,200,000 | $131,617 | $1,331,617 |
South Loop Trail, Highway 34 Bridge to Mary Street | Complete 6300lf of Segment 1 and 6300 lf of Segment 4. Located in Ottumwa along south levee of Des Moines River, from Highway 34 bridge to Williams St, then continueing south along DOT ROW, under Hwy 63 via a former rail underpass, then north along the former Wabash railroad bed to Williams St. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | OTTUMWA | WAPELLO | $231,000 | $0 | $24,468 | $255,468 |
Principal Riverwalk - Walnut/Grand Avenue West | HMA Sidewalk/Trail. Principal Riverwalk west side of Des Moines River from walnut street to Grand Avenue. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $2,849,000 | $2,317,776 | $67,654 | $2,916,654 |
Lewis & Clark Trail Study | Lewis & Clark Multi-Use Trail Study. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | Statewide | $213,549 | $0 | $53,387 | $266,936 |
Enhancement project in Coralville | Trail construction | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | CORALVILLE | JOHNSON | $187,441 | $0 | $56,826 | $244,267 |
T-Bone Trail Phase 4 | T Bone Rec. Trail Phase 4-Audubon County Road (260th St.) North to Hamilin (IOWA 44) | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | AUDUBON | $186,800 | $0 | $80,100 | $266,900 |
Jordan Creek Trail on 86th St. | Greenbelt trail ext. (1.1 mile). Rec. Trail in Clive 86th to Jordan. Grade and three bridges. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | CLIVE | POLK | $186,790 | $0 | $121,008 | $307,798 |
Jerry Kelley Trail Phase 2: PE Work Only | PE work from Memorial Park to Wilder Elementary School. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | INDIANOLA | WARREN | $26,600 | $0 | $6,650 | $33,250 |
Sioux Center Recreation Trail | Sioux Center Recreational Trail - Kinsley Elementary to 10 16th St SE/SE 1st St to Middle School | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CENTER | SIOUX | $186,750 | $0 | $186,750 | $373,500 |
Heritage Trail Riverfront (PE only) | Engineering Study by BRW inc | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | DUBUQUE | DUBUQUE | $28,000 | $0 | $7,000 | $35,000 |
T-Bone Trail Extension Engineering | Design the portion of the T-Bone Trail that would connect Schildberg Park with the Atlantic sports complex and the Atlantic Municipal Utilities wellhead trail system, including the design of a bridge over Troublesome Creek. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | ATLANTIC | CASS | $46,743 | $0 | $11,730 | $58,473 |
Westview / Pedersen Park Trail projects | Involved two trail segments. West project - from 11th Ave. near INM RR crossing to intersection of Grand Ave. and W. Park St. East project - along 10th Ave. E from Oneota Park entrance to E. 9th St. at Pedersen Pk. Also around the Pete's Pond area.PCC Trail | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | SPENCER | CLAY | $186,000 | $0 | $68,755 | $254,755 |
Greenbelt Pedestrian/Bike Trail System (Island Park Trail) | PCC trail. For the Island Park Recreational Trail area. . | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | ROCK RAPIDS | LYON | $184,600 | $0 | $46,200 | $230,800 |
Long Grove, Eldridge, Cody Multipurpose Trail Design Engineering | Long Grove, Eldridge, Cody Multipurpose Trail Design Engineering | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | LONG GROVE | SCOTT | $90,152 | $90,152 | $69,847 | $160,000 |
Vintage Street Lighting on Main St. in Hampton CBD | Historic Lighting in the city of Hampton. The city provided 6 detectable pedestrain ramps for the project. | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | HAMPTON | FRANKLIN | $184,000 | $0 | $46,000 | $230,000 |
Mississippi River Trail - Bettendorf to Princeton - Planning/Engineering | Mississippi River Trail - Bettendorf to Princeton - Planning/Engineering | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | LE CLAIRE | SCOTT | $211,912 | $211,912 | $0 | $211,912 |
Developing Iowa Byways Through GIS Technology | Developing Iowa Byways Through GIS Technology | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | Statewide | $251,752 | $0 | $62,938 | $314,690 |
E. LeClaire Rd from 9th Ave to N 16th Ave | E Leclaire Rd Trail - 9th to N 16th in Eldridge, Trail Construction. | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | ELDRIDGE | SCOTT | $183,000 | $0 | $57,821 | $240,821 |
Ia 58 Recreation/Pedestrian Trail Study | IA 58 58 Recreation/Pedestrian Trail Study The study has been completed. Trail development has been initiated. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR FALLS | BLACK HAWK | $2,640,339 | $0 | $747,660 | $3,388,000 |
South Duff Trail ( Phase 1 ) Airport Rd to Chestnut St. | ACC trail. South Duff on Airport Road to Chestnut | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $181,958 | $0 | $138,041 | $320,000 |
Gay Lea Wilson Trail Extension - Ankeny Segment - Phase 1 | From SE 54th Street south 1.0 mile then east 0.5 mile to SE Delaware Avenue. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | ANKENY | POLK | $175,000 | $0 | $425,000 | $600,000 |
Linn Creek Trail Extension to Iowa 330 Trail | PCC Trail 3.10 mi in length from existing HMA trail at Marsh Avenue/Highway S75 north to Highway 30, east along Highway 30 and Iowa Ave/Bus 30, and then north along Highland Acres Road to Grimes Farm and Conservation Center. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MARSHALL | $231,000 | $0 | $1,245,000 | $1,476,000 |
T-Bone Trail on IAIS RRHMA Trail | For the segment that extends from Audubon Co. line south 5 mi. to Atlantic. Grade and Pave | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CASS | $234,400 | $0 | $46,136 | $280,536 |
Heritage Trail Riverfront Extension to connect Heron Pond Wetlands trail with Dubuque Jaycees Trail | Dub. Heritage Trail Ext. Heron Pond to Jaycees Trail via 16th St. Bridge | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | DUBUQUE | $233,000 | $0 | $155,154 | $388,154 |
Riverwalk Loop Trail | PCC Trail - Riverwalk Loop Trail - Cedar Bend Park to Mullen Avenue Commission approved as: Cedar Valley River Renaissance Trail | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $454,625 | $0 | $194,840 | $649,465 |
Fayette County Trail -- Elgin to Nims Bridge | Paved multipurpose trail along W51 (Canoe Road) and B40 from Elgin to Clermont to Nims Bridge approximately 4.8 miles in length. Canoe & Great River Elgin to Clearmont to NIMS Bridge Part of ECN Trail - multi purpose | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | FAYETTE | $455,000 | $0 | $310,299 | $765,299 |
Chichaqua Valley Trail: Approx 800' W of Grant St along RR bed; Blair St NW spur; 2nd St NE to NE 88th St | Trail will extend west from existing CVT trailhead at NE 88th st on segment of abandoned rail ilne approx 1,700ft. Then north along west fence line of Top Farms property approx 700ft. Trail is 1,900ft in length and 10' paved surface. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | BONDURANT | POLK | $460,000 | $0 | $390,000 | $850,000 |
Riverwalk Loop Trail - From 6th St. to 18th St.(Vinton St.) | Riverwalk Loop Trail P.C.C. Trail From 6th St. to 18th St.(Vinton St.) | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $468,000 | $0 | $486,558 | $954,558 |
Hoover Nature Trail / Wright Brothers Blvd to County Line | $400,000 Earmark will be let under (91). HMA sidewalk/trail. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LINN | $476,056 | $0 | $232,444 | $708,500 |
Grant Wood Trail Underpass | Development of the Grant Wood Trail Underpass at the intersection of Highway 13 and Grant Wood Trail, 0.5 mile north of Highway 100. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LINN | $480,000 | $0 | $370,000 | $850,000 |
Loras College Parkway | Loras parkway from Loras Boulevard to 17th St. Replace existing street with pedestrian parkway. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | DUBUQUE | DUBUQUE | $489,150 | $0 | $168,975 | $658,125 |
Neal Smith Connector Trail | Trail along Oralabor Rd from SW State Street to South Ankeny Boulevard PCC Trail | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | ANKENY | POLK | $495,000 | $0 | $155,000 | $650,000 |
Fairfax Trail along east side of unnamed tributary to Prairie Creek | 10' wide trail along Highway 151 from Prairie Avenue to East Cemetery Road in Fairfax. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | FAIRFAX | LINN | $502,000 | $0 | $362,500 | $864,500 |
Central Iowa Trail Loop - Altoona Segment Phase 1 & 2 | From 15th Ave SW Easterly to 8th Ave NE. Trail construction. | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | ALTOONA | POLK | $506,400 | $0 | $126,550 | $632,950 |
Fairfield Loop Trail--NW Quadrant | Trail from Grimes Avenue, 1,300ft east of County Road H33 (Brookville Road) to Gear Avenue and 8th Street in Fairfield. Loop Trail NW Quadrant; Grimes Ave to Gear Ave | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | FAIRFIELD | JEFFERSON | $515,000 | $0 | $135,000 | $650,000 |
Clear Creek Greenbelt Trail Extensions and RR Underpass Phase 4 Part 2 | Clear Creek Greenbelt Trail Phase 4, Part 2, Tunnel under Iowa Interstate RR&Trail Const. to 2nd Ave. in /Coralville- PCC Trail. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | CORALVILLE | JOHNSON | $519,451 | $0 | $129,862 | $649,314 |
West Big Spirit Trail | Construction of bike lanes along 240th Ave. in Dickinson County-from City of Orleans to the Minnesota State Line. HMA Trail | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | ORLEANS | DICKINSON | $523,980 | $0 | $130,995 | $654,975 |
Mississippi River Trail: At Credit Island | Credit Island Park and over the backwater slough to approximately 2620 South Concord Street, Davenport. Construct pre-engineerred MRT/ADT Bridge and access trail from Credit Island Park to S. Concord St. Federal limit based on available IA156 demo funding for all authorized work typ es. Credit Island Ped Bridge NOTE: $439,000 TE funds were made available for this project; however, if these funds are not used, they go back into the pot for redistribution by the MPO. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | DAVENPORT | SCOTT | $2,251,402 | $0 | $839,001 | $3,090,403 |
Lewis and Clark Rivers Edge Trail (Phase 2) | Phase 2 portion of a recreational trail from Riverside park to Chris Larson Park in Sioux City. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CITY | WOODBURY | $533,935 | $0 | $406,679 | $940,614 |
Great Western Bike Trail | Great western trail in polk and warren county. ACC Trail 11.4 Miles | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $538,040 | $0 | $283,960 | $822,000 |
CEMAR Trail - Phase 2 | Phases 1 and 2: Beginning at the Shaver Road trail head along H Ave, past Daniels Park, then along old railroad to 29th St. Phase 2 only: From 20th Street NE to 29th Street NE. This project has both TE and Demo funding. Earmark funding is $328,300; State Recreational Trails SRT-1187(751)--9H-57 funds of $150,000 | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $542,500 | $0 | $232,500 | $775,000 |
Cedar Valley River Renaissance Trail Enhamcement | PCC Trail. Cedar Valley River, 6th St. to Park Ave. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $453,376 | $0 | $1,086,571 | $1,539,947 |
Rock Creek Trail from Rock Creek State Park east to Poweshiek Co. Line-Segment 2 - HMA Trail | To extend the trail 4.2 miles along county roadway to the entrance of Rock Creek State Park. Grade and Pave | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | JASPER | $549,400 | $0 | $137,400 | $686,800 |
Chautauqua Park Trail - Chris Larson Park to Chautauqua Park | The "Chautauqua park Trail" from the end of the developed Chatauqua Park then extending northerly along the Missouri River(West of Interstate no 29) to just south of the BN Railroad bridge(missouri river). | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CITY | WOODBURY | $445,183 | $0 | $587,885 | $1,033,068 |
Center Street Bridge - Des Moines | New pedestrain bridge over the Des Moines River at approximately Center St. **THIS PROJECT IS LOCATED UNDER PROJECT NUMBER EDP-1945(709)--7Y-77** | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $3,599,601 | $0 | $2,256,038 | $5,855,639 |
Oneota River Trail (Dug Road Multi-use Recreational Corridor) | Located along the south side of the Upper Iowa River | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | DECORAH | WINNESHIEK | $393,000 | $0 | $199,647 | $592,647 |
Flint River Recreational Trail: Phases II-A, IV-A, & IV-B | Trail Phase II-A, IV-A and IV-B | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | BURLINGTON | DES MOINES | $394,745 | $0 | $413,261 | $808,006 |
Ankeny to Woodward Trail Corridor | Trail - Des Moines River Bridge -U Ave to QF La NE in Dallas/Boone Counties. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $3,855,000 | $0 | $963,750 | $4,818,750 |
Melrose Avenue Wide Sidewalk | Melrose Ave: Intersection of Melrose Ave & Sunset St. Will replace existing 4ft wide sidewalk with 8ft sidewalk on North side of Melrose ave. Total project length is approx 3,000lf. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | UNIVERSITY HEIGHTS | JOHNSON | $396,800 | $0 | $143,200 | $540,000 |
East 14th St. Pedestrian Overpass | Span east 14th street just north of Grandview Avenue. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $399,932 | $0 | $1,520,224 | $1,920,156 |
Prairie Farmer Trail Hard Surfacing | HMA-Recreational Trail from Calmar to Cresco. | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $400,000 | $0 | $911,000 | $1,311,000 |
River Renaissance North Downtown Trail | Along Cedar River from E Mullan Ave to Cedar River Dam | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $400,000 | $0 | $600,000 | $1,000,000 |
Near Canoe Road (W51) Bridge at Turkey River - Construction Portion | Next to existing Canoe Road (W51) bridge to accommodate paved trail as part of overall Elgin to Nims Bridge trail project. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | FAYETTE | $400,000 | $0 | $130,899 | $530,899 |
Canoe Road (W51) Bridge Widening at Turkey River - PE PORTION | Widening of existing Canoe Road (W51) bridge to accommodate paved trail as part of overall Elgin to Nims Bridge trail project. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | FAYETTE | $400,000 | $0 | $115,500 | $515,500 |
Cedar Lake Trail extension to 32nd St. | In Cedar Rapids- Cedar Lake Trail. Grade and Surface. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $400,100 | $0 | $93,179 | $493,279 |
Wapsi Great Western Trail, Phase I | Howard County, From the City of Elma North to 150th Street. . | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $405,000 | $0 | $101,250 | $506,250 |
US 218 / Cedar Valley Lakes Trail (Phase 2) - Mullan Ave. to West 18th St. | US 218 / Cedar Valley Lakes Trail (Phase 2) - Mullan Ave. to West 18th St. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $416,131 | $0 | $23,125 | $439,257 |
Donald Street Trail from US Hwy 63 to Tibbits Park | Donald Street Trail, US 63 to Tibbits Park-from East Lake to the Gates Park Trail at Highway 63 (Logan Avenue). Project awarded to Vieth Construction Corp. PCc Trail | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $421,952 | $0 | $73,850 | $495,802 |
Central Iowa Trail Loop-Ankeny to Woodward Extension | Central Iowa Trail Loop - PE,CE& Construction. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $422,156 | $0 | $577,845 | $1,000,001 |
Flint River Trail Phase III: From the levee and along Cash St to Bluff Rd | PCC trail descending from the levee, across a short trail bridge over a drainage way, then following easements along Cash Street to Bluff Road. Connecting Phase II (STP-ES-0977(633)--8I-29) to the Mississippi River Trail. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | BURLINGTON | DES MOINES | $424,157 | $0 | $106,842 | $531,000 |
Four-Mile Greenway Trail (Gay Lea Wilson to Ankeny) | From NE 29th St/NE 54th Ave. to Four-Mile Creek, then south along the Creek to near Aurora Avenue. PCC Trail | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $431,715 | $0 | $754,285 | $1,186,000 |
Beaver Avenue Streetscape - Beaver Crest Drive to Fagen Drive | Beaver Avenue Streetscape - Beaver Crest Drive to Fagan Drive: Beaver Ave. from Beaver Crest Dr. to 250' north of Fagen Dr. & along Urbandale Ave. approx. 300' east and west of Beaver Ave. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $439,000 | $0 | $861,000 | $1,300,000 |
Cedar Valley / Hoover Trail Connector (Phase 1) from Czech Village (16th Ave.) to Tait Cummins Park | Original statewide grant of $442,000 was for Czech Village to S. of US 30. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $442,400 | $0 | $91,420 | $533,820 |
Cedar View Trail from Fairfield to Libertyville (includes trail bridge over Cedar Creek) | 376 feet bridge over the Cedar Creek, in the Sec 4-71-10 2.3 miles west of Fairfield. Project Federally closed on 1/14/2010. Participating Cost=$483,250, Non Participating=$9,111.99. Federal Funds=$386,600 Prorate Share. | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | JEFFERSON | $386,600 | $0 | $96,650 | $483,250 |
Easter Lake Trail Phase 2 | Easter Lake Trail Phase 2 | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $560,000 | $0 | $264,000 | $824,000 |
Div. I: Cedar Valley Lakes Trail - Phase 1 | Phase 1 (revised) from Greenhill Rd. to Westfield Ave. and Div. II:Trolley Car Trail- Ansborough connection | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $571,300 | $0 | $469,700 | $1,041,000 |
American Discovery Trail - Grand Ave. at 63rd St. to Fleur Drive | For the last 3 segments of the American Discovery Trail through Des Moines .8 miles. Associated projects are STP-E-1945(667)--8V-77 and NRT-NT00(2)--9G-77. | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $773,000 | $0 | $417,000 | $1,190,000 |
Union Railway Bridge Renovation | For the renovation of the Union Railway Bridge over the river in Des Moines near Court Avenue. Also part of the Principal Riverwalk project. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $1,668,420 | $0 | $1,532,160 | $3,200,580 |
Trail Planning in Des Moines MPO Area | Trail Planning in Des Moines | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $125,000 | $0 | $31,250 | $156,250 |
Eldridge to Long Grove, Cody Recreational Trail | Trail along Scott Co Y64 from Sheridan Meadows Park in Eldridge to E Sapphire Lane in Long Grove. Related to project ESL-2290(610)--7S-82. PCC Trail | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | ELDRIDGE | SCOTT | $825,682 | $0 | $206,420 | $1,032,102 |
Boone River Recreational Trail Bridge | Rec. Trail over Boone River. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | WEBSTER CITY | HAMILTON | $863,131 | $0 | $481,305 | $1,344,436 |
Decorah Trout Run Trail - Bridging Hwy 9 | Constructing a bicycle/ped bridge over Highway 9. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | DECORAH | ALLAMAKEE | $895,746 | $0 | $619,228 | $1,514,975 |
Central Iowa Trail Loop from Violet Ave to NW 158th Ave-PCC-Trail | Central IA Trail Loop from Violet Ave to NW 158th Ave - PCC Trail. Project shares an optional contract with STP-ES-E-C0008(49)--8T-08 | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | BOONE | $917,937 | $0 | $138,562 | $1,056,500 |
Rolling Prairie Trail, US63 to Readlyn | Hard surfacing of 5 miles of the Rolling Prairie Trail between U.S. 63 and Readlyn in Bremer County, including construction of 5 pedestrian/trail bridges. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | BREMER | $939,436 | $0 | $402,616 | $1,342,052 |
Raccoon River Valley Trail Addition, Phase II | PCC Sidewalk/Trail - Dawson to Perry Trail from West 1ST Street in Dawson to .5 mile SE of Perry. Stip $942,000 | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | DAWSON | DALLAS | $941,921 | $0 | $274,555 | $1,216,476 |
Boone River Recreational Trail | Boone River Recreational Trail to Briggs Woods Lake Spillway near Webster City, PE, CE, and Construction.. Rec Trail - Letting - 2/20/07 - $151,131. Withholding 5% ($34,147.46)l11/4/09 - Entered Final Voucher for $34,147.46. Final Audit waived per letter from External Audits dtd 6/26/13 Project Completed, Federally Closed on 6/26/13 Total Project Costs: $1,401,289.03 Part Costs: $1,177,663.75+NP Costs: $223,625.28 Federal Funds: $942,131.00 | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | WEBSTER CITY | HAMILTON | $942,131 | $0 | $591,219 | $1,533,350 |
Raccoon River Valley Trail Addition, Extension #3 | From the SE side of Dallas Center (at Vine St) to the NW side of Waukee (Deming Ave & 10th St). | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | DALLAS | $969,516 | $0 | $242,379 | $1,211,895 |
Heart of Iowa Nature Trail Phase 7 - Bridge Project | Construction of two bridges on the Heart of Iowa Nature Trail, over the Union Pacific Railroad and the Skunk River in Cambridge. Phase 7 and Phase 8 (STPES-SEB12) are combined. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | STORY | $1,633,800 | $0 | $106,516 | $1,740,316 |
Cedar Valley / Hoover Trail Connector (Segment C) from McLeod Place to Blairs Ferry Rd. | To construct 1.9 miles of trail in Cedar Rapids from McCloud Place NE to Blairs Ferry Road NE. Segment 'C' of Cedar Valley/Hoover Trail(Blairsferry Ext) DISTRICT PROJECT | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $974,400 | $0 | $360,457 | $1,334,857 |
Central IA Trail Loop-QF Lane to Violet Ave-PCC Trail | Central IA Trail Loop - QF Lane to Violet Ave - PCC Trail. Project shares an optional contract with STP-ES-E-C008(50)--8T-08 | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $1,023,379 | $0 | $141,245 | $1,164,625 |
Allamakee Co. trail from New Albin to Lansing along Hwy 26 | For the beginning of the county trail system; consists of 11.2 miles of paved 4-foot shoulders along county roads | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | ALLAMAKEE | $1,092,000 | $0 | $698,500 | $1,790,500 |
MRT- Heritage Trail & Pedestrian Overpass | MRT/Heritage Trail Rupp Hollow Rd to South John Deer Rd Rupp Hollow Road Pedestrian Bridge over US 52 | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | DUBUQUE | $1,522,313 | $0 | $30,811 | $1,553,125 |
Cedar Valley Nature Trail, Phases 2 and 3 | From County Home Road to Lafayette and from Fishel Road to Schultz Road for a total distance of 6.8 miles. HMA Trail | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LINN | $1,106,000 | $0 | $838,250 | $1,944,250 |
Wapsi Great Western Trail SAFETEA-LU Earmark | 2 mile section near Pinicon Alders Wildlife Area - HMA Trail | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MITCHELL | $772,335 | $0 | $295,665 | $1,068,000 |
Briggs Woods Golf Course Clubhouse to Briggs Woods Park | Trail construction from Briggs Wood Golf Course to Briggs Woods Park.Trail shortened to avoid rail road. Trail construction/PE/Ce | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HAMILTON | $571,100 | $0 | $142,900 | $714,000 |
Lewis and Clark Rivers Edge Trail (Phase 1) from Riverside Park to Chris Larsen Park | Along the route of the proposed "Rivers Edge Trail" in the corridor between the Missouri river and Interstate route No 29 from the south edge of Hamilton Boulevard thence appr. 3.3 miles to Riverside park. PCC Trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CITY | WOODBURY | $765,800 | $0 | $241,914 | $1,007,714 |
Chichaqua Valley Trail (SW Connector of the Central Iowa Trail Loop) | HMA Trail. From Bondurant to Des Moines along abandoned RR Corridor. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $750,000 | $0 | $1,808,000 | $2,558,000 |
American Discovery Trail, | For the installation of a tunnel under Fleur Drive between Waterworks Park and Grays Lake in Des Moines. Project was let; bids were rejected. Project was re-concepted into the American Discovery Trail, Segment 4, which extends from the Bill Riley Trail to the American Discovery Trail, Riverpoint Segment, with a proposed letting date of 4/15/2008. Retained 5% TE Portion of construction=$7,825.75. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $573,090 | $0 | $245,610 | $818,700 |
US 218 / Cedar Valley Lakes Trail (Phase 3) | For construction of 4.01 miles of trail from the US 218/West 18th Street intersection along the Cedar River levee to the Evansdale city limits, through downtown Evansdale to connect with an abandoned railroad corridor and a city street system to the terminus of the Cedar Valley Nature Trail. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $579,520 | $0 | $144,880 | $724,400 |
Scotch Ridge Nature Trail: Summerset Trail to Scotch Ridge Nature Center | Connection of Summerset Trail: Connection of Summerset Trail with Des Moines River, Carlisle to Des Moines Ped/Bike Grade & Pave | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | CARLISLE | WARREN | $584,935 | $0 | $146,233 | $731,169 |
Gay Lea Wilson Trail Extension - Ankeny Phase 2 | This 3.0 mile segment will run from NE Delaware Avenue east and south to County NE 54th Avenue. The trail will be a 10 foot wide PCC multi-use trail. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | ANKENY | POLK | $585,250 | $0 | $727,150 | $1,312,400 |
Mississippi River Trail Leach Park to Riverdale | Development of the Mississippi River Trail from Leach Park in Bettendorf to Duck Creek in Riverdale. | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | BETTENDORF | SCOTT | $2,165,000 | $0 | $541,250 | $2,706,250 |
Decorah Cut Trail--Segment 11 of Trout Run Trail | Trail on the east side of US 52 North of IA 9 to Oneota Drive | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | DECORAH | WINNESHIEK | $605,117 | $0 | $635,702 | $1,240,820 |
Linn Creek / Grimes Farm Trail from Grimes Conservation Farm NE 2.3 miles to Morris Park | For a 2.3-mile trail linking the Grimes Conservation Farm with Morris Park. Linn Creek/Grimes Farm Trail in Marshalltown Preliminary Engineering, ROW & Trail construction. Project completed. Federally closed - 7/20/09. $756,625.00 Participating +$15,387.09 Non- Participating). Federal Funds $605,300. | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | MARSHALLTOWN | MARSHALL | $605,300 | $0 | $151,325 | $756,625 |
Motor Mill Trail | Construct 10 foot wide lime path trail along the Turkey River from the Motor Mill Bridge and Park to the Pony Hollow Trail. 4.1 Miles. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CLAYTON | $605,576 | $0 | $175,000 | $780,576 |
Trail of Two Cities Legacy Initiative | Construct 16 miles of multi-use trail along the Mississippi River connecting Pikes Peak State Park to Effigy Mounds national Monument, via the cities of Marquette and McGregor. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | MCGREGOR | CLAYTON | $611,900 | $0 | $688,100 | $1,300,000 |
US 34 from, Adams County Line East to Creston | New HMA Paved Shoulder on US 34 from Adams Co. Line E. to Creston. Project included in approved HSIP-JLR 5/9/07 | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | CRESTON | UNION | $618,514 | $0 | $69,310 | $687,823 |
Trestle-to-Trestle Trail | To connect Johnston trails with Neal Smith Trail - (from DM Rivertrestle Bridge S of Euclid N. to existing trail N. of Beaver CR Bridge. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $636,750 | $0 | $763,250 | $1,400,000 |
American Discovery Trail - Riverpoint Segment - Grays Lake to Court Avenue | For design and construction of a 2-mile segment of the American Discovery Trail (ADT) from Gray's Lake to downtown Des Moines following the south bank of the Raccoon River near Gray's Lake, crossing the river to its north bank at the 5th Street bridge, continuing east to Sec Taylor Staduim and north to Court Avenue, then crossing the Des Moines River on a city owned railroad trestle to connect with the Pat Dorrian Trail. | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $645,000 | $0 | $295,023 | $940,023 |
Central IA Trail Loop from NW 118th Ave. to NE 18th St in the City of Ankeny | Central IA Trail from NW 118th Ave to NE 18th St in the city of Ankeny-HMA Trail. STIP $562,597, IN-Kind=$132,141 donated RR ROW, DEMO IA 177. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | ANKENY | POLK | $658,209 | $0 | $2,494 | $660,704 |
Flint River Trail: Flint Bottom Road to Big Hollow Rec Area - Phase II and III | Off road from Des Moines County Highway 99 to Starr's Cave Preserve, Thye Wood Habitat Area, and Big Hollow Rec Area; roughly 15 miles. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | DES MOINES | $718,198 | $0 | $542,745 | $1,260,943 |
Heart of Iowa Nature Tail Phase 8 | This project number was authorized as an amendment to STP-ES-E-C085(90)--8T-85. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | STORY | $725,000 | $0 | $312,000 | $1,037,000 |
Rolling Prairie Trail - Coulter to Hampton (Segment A) | Multipurpose trail from Coulter to Hampton east city limits approximately 9.6 miles. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | FRANKLIN | $735,000 | $0 | $268,000 | $1,003,000 |
Bettendorf Middle Road Trail | Recreational Trail along Middle Road from Duck Creek to Devils Glen Road. PCC Trail | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | BETTENDORF | SCOTT | $741,876 | $0 | $970,092 | $1,711,968 |
MRT - South Urban Section, Phase 1 (Clinton to Camanche Trail) | From the US 67/Washington Blvd intersection in Camanche; extending NE along Washington Blvd, 3rd St, and local roads adjacent to the Mississippi River to the 4th Ave/Washington Blvd intersection; then N along Washington Blvd and US 67 to US 30; then E along US 30 to S 14th St in Clinton. HMA and PCC Trail/Bridge | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | CLINTON | CLINTON | $1,902,892 | $0 | $722,108 | $2,625,000 |
Weed Park to Wildcat Den Trail | HMA Trail Weed Park to Wildcat Den Trail | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | MUSCATINE | MUSCATINE | $381,726 | $0 | $116,632 | $498,358 |
American Discovery Trail Segment 3 | From North Valley Drive to Bill Riley Trail along Walnut Creek | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $376,000 | $0 | $824,000 | $1,200,000 |
Mississippi River Trail Through Allamakee County | Mississippi RiverTrail Through Allamakee County | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | ALLAMAKEE | $4,900,000 | $0 | $650,101 | $5,550,101 |
1st Avenue Trail | Along 1st Avenue (in the ROW) from Monroe Street to Nixon Street | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | CASCADE | DUBUQUE | $250,000 | $0 | $92,000 | $342,000 |
South Troy Trail Park | Construct trail from CVNT near Robins Road to S Troy Road at Robins Park | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | ROBINS | LINN | $250,000 | $0 | $236,354 | $486,354 |
Skunk River Trail - South River Valley Park to Carr Pool | HMA Sidewalk/trail - Skunk River Rec Trail - RiverValley Park to Carr Pool | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $175,728 | $175,728 | $5,431 | $181,159 |
Pinicon Ridge Park to Central City Trail Connection | Construct 7,000' of trail to connect the campgrounds in Pinicon Ridge Park in northeastern Linn County to Central City. A crossing will be constructed under the south side of the Iowa Highway 13 Wapsipinicon River bridge. It will be 12' wide with a crushed limestone surface. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LINN | $250,400 | $0 | $62,600 | $313,000 |
Newton North Hike/Bike Trail | Newton North Hike/Bike Trail: 1.1 mile, 8' wide concrete trail from Woodland park, along N 15th Avenue E to E 12th Street N | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | NEWTON | JASPER | $254,000 | $0 | $63,339 | $317,339 |
Trail Muddy Cr. & CRANDIC RR., Penn St to SCL | Trail from Penn St to South Corp. Limits. In North Liberty. ACC trail | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | NORTH LIBERTY | JOHNSON | $259,400 | $0 | $43,173 | $302,573 |
Rolling Prairie Trail - Beed's Lake Spur | Beed's Lake park south on Nettle Ave to Main. Rolling Prairie Trail Segment: Nettle Ave from existing Rail Corridor to 165th St | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | FRANKLIN | $259,600 | $0 | $90,143 | $349,743 |
Outer Drive/Floyd Blvd to Floyd River Trail | Hoeven Valley Corridor - Outer Drive Project, Sioux City | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CITY | WOODBURY | $201,473 | $0 | $50,368 | $251,841 |
Loess Hills Arboretum Trail | For design and construction of a 1.7 mile trail on the Sioux City campus of the Western Iowa Tech Community College. Also to obtain the necessary resources to gain "conservation easements" to land for future trail linkages to the Bacon Creek Recreational Area and the Milwaukee Road Trail. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CITY | WOODBURY | $263,782 | $0 | $90,218 | $354,000 |
Wapsi Great Western Line Trail, Mitchell County | Route (E911): Trail : From the intersection of 450th and Walnut --west 1/2 mile--north1.75 miles to the southeast edge of McIntire. Then from 502 Munson St. on the northwest edge of McIntire 1/2 mile west and north to 470th st.. The project is to install concrete surface on 2.75 miles of trail Type work: 9509 Ped/Bike Grade & Pave | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MITCHELL | $267,288 | $0 | $26,212 | $293,500 |
IA 58 Recreation / Pedestrian Trail | Recreational Trail in the City of Cedar Falls from N of Viking Rd to N of Greenhill Rd | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR FALLS | BLACK HAWK | $269,939 | $0 | $68,061 | $338,000 |
Ellis Blvd Trail Extension: Boat ramps to Edgewood Rd NW | Extension of existing pedestrian and bike path approximately 3,000 feet from boat harbor to Edgewood Rd NW. Extension of existing storm sewer outlets and minor grading will be required to complete the project. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $270,000 | $0 | $68,000 | $338,000 |
Union Road Trail | Trail Along Union Road from W. 1st Street to W. 12th Street | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR FALLS | BLACK HAWK | $272,000 | $0 | $68,000 | $340,000 |
Indian Creek Trail - Council Bluffs | 10' concrete trail on the west bank of the Indian Creek levee between Hwy. 92/275 & 16th Ave. Trail to go under I-80/29 bridges and 23rd Ave. bridge inside levee. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | COUNCIL BLUFFS | POTTAWATTAMIE | $280,000 | $0 | $156,000 | $436,000 |
Rathbun Lake Multi-Use Trail - Culvert Extension at Highway J18 and Ham Creek | J18 Rathbun Lake Multi-Use Trail-Culvert Ext Ension at Highway J18 and Ham Creek $20,358.93 is regular TE funds - will not be billing (DC 1/20/12) | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | APPANOOSE | $170,358 | $150,000 | $5,090 | $175,449 |
Hoover Nature Trail, Connect to Ely (American Discovery Trail) | Hoover Nature Trail, Connect to Ely (American Discovery Trail | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LINN | $280,228 | $0 | $54,915 | $335,143 |
Ventura Grade Recreational Trail Improvement Project | Constructing an HMA recreational trail along the east side of South Main Street (S14) on the south edge of the City of Ventura. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CERRO GORDO | $282,000 | $0 | $70,500 | $352,500 |
Resurfacing and Renovation of the Original Spine Trail and Poyzer Trail | HMA Sidewalk/Trail. Multiple Trails - Stylecraft, Okoboji Slough, Spine and Poyzer Trails. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | DICKINSON | $186,365 | $186,365 | $47,567 | $233,932 |
Loop Trail Bridge over BNSF Railroad- Chautauqua Park | BRIDGE NEW- PPCB. Chautauqua Park to Walton Lake Trail over BNSF RR at east end of Fairfield. | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | FAIRFIELD | JEFFERSON | $282,951 | $0 | $121,049 | $404,000 |
Mid City Trail - Avenue A to Avenue H | PCC Sidewalk/Trail - Mid-City Trail along North 13th St. from Ave. A to Avenue H. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | COUNCIL BLUFFS | POTTAWATTAMIE | $200,000 | $200,000 | $92,741 | $292,741 |
Lyons Multiple Use Recreational Trail | North end elementary School Ped and Bicycle Trail, North 3rd St to 27th Ave North. PCC Trail | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | CLINTON | CLINTON | $250,000 | $0 | $300,000 | $550,000 |
Grinnell Arbor Lake Trail Improvements | From SE corner of Arbor Lake East to IA 146, then South to Industrial Avenue. PCC Sidewalk/Trail | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | GRINNELL | POWESHIEK | $234,000 | $0 | $302,257 | $536,257 |
Central Iowa Trail Loop - NW 158th Ave to NW 118th Ave - HMA Trail | Central IA Trail Loop-NW 158th Ave to Nw 118th Ave - HMA Trail. STIP $1,356,398, In-Kind=$277,344 donated RR ROW. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $1,364,414 | $0 | $341,102 | $1,705,517 |
Chichaqua Trail - Polk Co. line west | chicihaqua-Bondurant-Jasper Co Line Bike Trail. 4.5 mile ACC Trail | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $236,000 | $0 | $55,911 | $291,911 |
Mount Pleasant Trail, Phase 4 | Rec Trail - from US 218 overpass south & east around East Lake and the City Park | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | MOUNT PLEASANT | HENRY | $236,000 | $0 | $87,686 | $323,686 |
Westside Recreation Trail | PCC -Trail ,from school along South St. to Eby to West Main | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | LISBON | LINN | $236,800 | $0 | $59,200 | $296,000 |
Mississippi River Trail (MRT) development along Washington Blvd from 3rd Street to 2nd Ave | Mississippi River Trail (MRT) development along Washington Blvd from 3rd Street to 2nd Ave. | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | CAMANCHE | CLINTON | $237,000 | $0 | $60,000 | $297,000 |
Mount Pleasant Trail, Phase 3 | Link trail. Along old US 218 and new US 218 in SE Mount Pleasant. Preliminary and Construction Engineering and Trail Construction. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | MOUNT PLEASANT | HENRY | $238,600 | $0 | $156,967 | $395,567 |
North and South Riverside Trail | HMA Resurfacing. North Riverside Trail along Cedar River. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR FALLS | BLACK HAWK | $207,500 | $207,500 | $13,863 | $221,363 |
Rolling Prairie Trail-Shell Rock to Clarksville | HMA Trail - Shell Rock Trail - 1 mile East of Clarksville to Co. Rd. T63. | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | BUTLER | $239,413 | $0 | $204,587 | $444,000 |
Trail | 12th St. Recreational Trail from Hudson Rd. to Union Road. PCC Trail | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR FALLS | BLACK HAWK | $240,000 | $0 | $142,900 | $382,900 |
Keosauqua Riverfront Trail | Connect with existing Loop Trail at Hwy 1 and continue down to and along the Des Moines River. Continue southeast along the Des Moines River to the new Des Moines River Hwy 1 parking. Continue across the new bridge via the walking lane and connect there with Lacey-Keosauqua State Park. | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | KEOSAUQUA | VAN BUREN | $240,000 | $0 | $127,000 | $367,000 |
Perry Creek Greenway Trail (Phase 1) | The Phase One recreational trail beginning at an existing trail near the intersection of 3rd and Douglas St thence along the RR right of way and thence along Perry Creek conduit to Green Space are southwest of 3rd & Water St. Intersection. | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CITY | WOODBURY | $242,200 | $0 | $121,817 | $364,017 |
Interurban Trail - various locations from SE 54th St to 1st St | Trail construction | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | ANKENY | POLK | $242,400 | $0 | $60,600 | $303,000 |
Wolf Creek Trail- Phase II | From Phase 1 terminus of Wolf Creek trail to Comet trail | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | TAMA | $244,720 | $0 | $61,180 | $305,900 |
Main Street Enhancements Phase IV | Replacement of sidewalk, historic lighting- 2nd Street to 4th Street. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | KEOKUK | LEE | $245,742 | $0 | $43,665 | $289,408 |
East University Ave. Gateway Project | E.University beautification project. Improvements north of fairgrounds. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $249,000 | $0 | $35,770 | $284,770 |
Lisbon Trail System | Lisbon Trail System | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | LISBON | LINN | $249,603 | $0 | $80,397 | $330,000 |
Westside Park Bike/Walking Trail Project | Installation of 10' wide PCC multi-use trail parallel to and on the east sife of 3rd st SW from existing parking lot within the park to 3rd st SW and parallel to and on the south side of 3rd ave SW from 5th st SW to 1st st SW for a total length of .5 miles. 10/10/12 added from 3rd Ave SW to drainage ditch. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | DYERSVILLE | DUBUQUE | $250,000 | $0 | $82,750 | $332,750 |
Wapsi Great Western Line Trail, Howard County | WGWL Trail: Acme to Riceville Ped/Bike Grade & Pave. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $285,000 | $0 | $2,000 | $287,000 |
Grinnell Area Rec Trail underpass extension from U.S 6 to 4th Ave | Grinnell Area Rec Trail underpass (culvert)from U.S. 6 to 4th Ave in the city of Grinnell $225,000 STIP amount managed by the district | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | GRINNELL | POWESHIEK | $285,000 | $0 | $335,000 | $620,000 |
Duck Creek Trail from Hollowview Park to Devils Glen Rd. | Duck Creek Trail from Hollowview Park to Devils Glen Rd in Bettendorf. Trail Grade and Pave | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | BETTENDORF | SCOTT | $159,000 | $0 | $394,094 | $553,094 |
Douglas Avenue Trail Project | Douglas Ave from 100th to 109th St and Douglas parkway from 128th to 134th St | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | URBANDALE | POLK | $325,000 | $0 | $379,000 | $704,000 |
Forest City Trail - along IA Hwy 9, connected to Pilot Knob State Park (phase 1) | Forest City Trail - along IA Hwy 9, connected to Pilot Knob State Park (phase 1) | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | FOREST CITY | WINNEBAGO | $327,790 | $0 | $91,032 | $418,822 |
N. side of Webster City to US Hwy 20 four lane bridge | Boone River Trail in Webster City. PCC Trail. Two multi purpose trail segments (5 miles) | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | WEBSTER CITY | HAMILTON | $328,530 | $0 | $187,568 | $516,098 |
Unknown project Title | This project found in the OPFIN Accounting program. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $328,719 | $0 | $82,179 | $410,899 |
Pine Lake St Park into Steamboat Rock | Pine Lake State Park to Steamboat Rock. PCC Trail. Federally closed - 12/18/08.Total Project Cost $405,745.51, Participating Cost=$397,726.92, Federal Funds=$318,181.54, Non Participating=$8,018.59. STIP=$329,600 | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HARDIN | $329,500 | $0 | $103,200 | $432,700 |
Walcott Recreational Trail and Park | Walcott recreational trail and nature park: along mud creek in walcott, north of park view drive, west of main st, east of bridge lane | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | WALCOTT | SCOTT | $330,773 | $0 | $193,950 | $524,723 |
West Liberty RR Depot Restoratiion (Phases 1, 2, 3 & 4) | For the restoration of a 98-year-old depot as a trailhead / rest area and historic transportation museum. Between Elm St and C.L. Railroad in West Liberty. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | WEST LIBERTY | MUSCATINE | $338,006 | $0 | $256,217 | $594,223 |
North Liberty Dubuque Street Connector Trail | 10-foot trail extending generally north-south approximately 8,600 feet through the eastern portion of North Liberty. The trail will connect the proposed Johnson County trail along Dubuque Street at the south corporate limits to the proposed Mehaffey Bridge Road trail at the north corporate limits. Dubuque Street Trail in the City of North Liberty, South City Limit to North City Limit | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | NORTH LIBERTY | JOHNSON | $342,163 | $0 | $455,413 | $797,576 |
Cedar Valley / Hoover Trail Connector - Downtown Corridor | For development of a 1.6-mile bike/ped trail from the Czech Village through the central business district to the south end of Cedar Lake | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $347,000 | $0 | $149,000 | $496,000 |
Manchester Trail Segments | For 2 trail segments in the city of Manchester - the Bailey Drive/South Brewer Walkway (along Bailey Drive from East Main Street south to South Brewer Street and South Brewer Street northwesterly to Vine Street) and the River Trail Walkway (along the Maquoketa River from River Front Park westerly to West Main Street). | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | MANCHESTER | DELAWARE | $347,638 | $0 | $86,862 | $434,500 |
Iowa Riverfront Trail (Phase 2) from Playland Park to N 25th St. | Iowa Riverfront Trail-Playland Park-North 25th St PCC Trail in Council Bluffs | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | COUNCIL BLUFFS | POTTAWATTAMIE | $350,000 | $0 | $47,807 | $397,807 |
Whiterock Sustainable Trail | Located in Whiterock Conservancy Lands, Gutherie County, Orange townships, Sections 3, 11, 13, 14, 23 and 24. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | GUTHRIE | $355,680 | $0 | $226,000 | $581,680 |
Skunk River Trail Extension, Phase 2, Lincoln Way to South River Valley Park | grading and paving of PCC trail from Lincoln Way along the Skunk River, north to South River Valley Park. Approx. 0.9 miles. Land acqsition for future project phases will be included with the project. Permanent and temporary easement will be acquired along the Skunk River from the confluence of Squaw Creek, north to South River Valley Park. | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $360,000 | $0 | $430,000 | $790,000 |
Soldier Creek Nature Trail | Project is located from 2007 N. 15th Street to Street between Harlan Rogers Sports Complex. PCC Trail | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | FORT DODGE | WEBSTER | $361,000 | $0 | $1,808,951 | $2,169,951 |
Mississippi Riverfront Trail Extension Phase V | Build a new .45 mile trail from the IA 92 river bridge north to Spillway Lane. HMA Trail | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | MUSCATINE | MUSCATINE | $366,000 | $0 | $579,000 | $945,000 |
Center Street Bridge | Pedestrain Bridge over the Des Moines River at approximately Center St. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $5,100,000 | $0 | $1,400,000 | $6,500,000 |
Chichaqua Trail from Jasper-Polk Co. line to Baxter | Project also included $191,624 of State Rec Trail funds. ACC Overlay 15.3 miles | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | JASPER | $369,600 | $0 | $295,346 | $664,946 |
Multi-Modal Ground Transportation Center Streetscape | To streetscape the new multi-modal ground transportation center, which will serve all ground transportation modes | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CITY | WOODBURY | $322,979 | $0 | $105,306 | $428,285 |
Dubuque Street Trail, Phase 2 | Paving trail from 275th Street to Juniper Street. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | JOHNSON | $322,958 | $0 | $87,042 | $410,000 |
Dubuque Heritage Trail - 22nd Street to the Mines of Spain | For final design, engineering and construction of the Dubuque Heritage Trail, 10.6 miles along the Mississippi Riverfront | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | DUBUQUE | DUBUQUE | $322,800 | $0 | $138,286 | $461,086 |
Grundy County Lake Connection Trail | For a trail that extends from the Grundy County Lake north along the west side of a stream to Co Rd D19, along D19 to the 7th Street Trail in Dike. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | DIKE | GRUNDY | $320,000 | $0 | $139,000 | $459,000 |
Cedar Valley / Hoover Trail Connector - Blairs Ferry Rd. to CNRR Jct. in Hiawatha | PCC TRAIL FROM BLAIRSFERRY TO BOYSON ROAD | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | HIAWATHA | LINN | $287,800 | $0 | $174,400 | $462,200 |
US 71/Ia. 175 at Co. Rd. N-20/D-59 Intersection 4 Miles W. of Auburn HMA Paved Shoulders | HMA Paved Shoulders on US 71/Ia 175 at County Road North-20/D-59 intersection 4 miles west of Auburn | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | SAC | $296,467 | $0 | $10,661 | $307,129 |
Wapsi Great Western Trail Bridge over Watson's Creek in Hendricks Park - Bridge-New. | Wapsi Great Western Trail Bridge over Watson's Creek in Hendricks Park - Bridge Replacement -CCS | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $296,579 | $0 | $74,144 | $370,723 |
5th Avenue Entry Streetscape--Phase 1 | Recreational Trail - 5th Avenue from 400 LF North of IA 141 to RR Tracks. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | COON RAPIDS | CARROLL | $300,000 | $0 | $200,000 | $500,000 |
Wapsi Great Western Trail Bridges 2 & 3 | Wapsi Great W. Trail - 2 bridges over branch of Little Wapsi River and Little Wapsi River -HMA Trail | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $300,000 | $0 | $75,000 | $375,000 |
Wapsi Trail Bridge 3 & 4 | Wapsi Trail Bridges 3 & 4 | Iowa | 2016 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $302,712 | $0 | $0 | $302,712 |
Multipurpose TraiL from Postville to Gilbert Park in Elgin | Multi-purpose trail from Postville to Clermont North. In-kind, | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | FAYETTE | $303,500 | $0 | $774,500 | $1,078,000 |
On Dubuque St (W-66) from Butler Bridge over the Iowa River to W Overlook Rd. | Dubuque St TRail IA R N to Overlook Road-PCC Trail | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | IOWA CITY | JOHNSON | $304,000 | $0 | $76,000 | $380,000 |
T-Bone Trail, Exira to 260th Street | Project will construct 2.9 miles of hard-surfaced recreational trail from Exira north to 260th Street. Will complete the final phase of the T-Bone Trail and would create a trail from Audubon to Atlantic. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | AUDUBON | $232,175 | $0 | $145,323 | $377,498 |
South First Street Improvements and Resurfacing | Construction of .3 miles of PCC recreatinal trail along South First Street in from Hwy 5 to School Street in Carlisle. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | CARLISLE | WARREN | $65,466 | $65,466 | $463,036 | $528,502 |
Cedar River Portion of the American Discovery Trail Cedar Lake Loop Trail | To develop a trailhead at Cedar Lake and reconstruct a gravel trail to an asphalt trail around Cedar Lake and to the Cedar River.Along the north and east sides of Cedar Lake | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $305,025 | $0 | $105,139 | $410,164 |
Court Hill Trail | Construct approximately 1 mile of 10-foot wide paved pedestrian trail from Court Hill Park to Creekside Park along the South Branch of Ralston Creek including the removal and replacement of an existing pedestrian bridge in Iowa City | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | IOWA CITY | JOHNSON | $305,676 | $0 | $446,258 | $751,934 |
River's Edge Trail (Lewis & Clark Trail) in Sioux City | For a 0.58-mile trail following the Lewis & Clark Expedition route along the Missouri River that will link two existing segments - Chris Larsen Park and Chautauqua Park. Trail Construction | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CITY | WOODBURY | $308,009 | $0 | $728,561 | $1,036,571 |
Soldier Creek Nature Trail Phase II | 10 Foot PCC Trail form Harlan Rogers Sports Complex north entrance to Kennedy Park along 160th Street, Oates Avenue, 150th Street and Nelson Avenue in Webster County. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | WEBSTER | $308,887 | $0 | $580,593 | $889,480 |
Cedar River Trail from 6th St. to 18th St. | Cedar River Trail from from 6th to 18th St. | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $317,677 | $0 | $323,647 | $641,324 |
Amana Trail, Phase II | Develop a 1.11 mile trail route from Main Amana through to the west end of Middle Amana. HMA Trail 10-foot wide. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | IOWA | $318,483 | $0 | $84,816 | $403,299 |
Central Iowa Trail Loop-Ankeny to Woodward | Central Iowa Trail Loop from Ankeny to Woodward. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $7,220,529 | $0 | $2,279,471 | $9,500,000 |
8th St. Bicycle / Pedestrian Overpass | 8th St. in Altoona- 15th Ave. to RR. Pedestrian bridge.TRAIL BRIDGE OVER 8TH ST SW & TRAIL CONSTR. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | ALTOONA | POLK | $319,000 | $0 | $61,906 | $380,906 |
Center Street Bridge | Pedestrain Bridge over the Des Moines River at approximately Center St. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $7,306,710 | $0 | $1,826,677 | $9,133,387 |
Duck Creek Bike Path from Devils Glen to State St. | Bettendorf-Devils Glen Park, Trail paving | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | BETTENDORF | SCOTT | $159,000 | $0 | $171,000 | $330,000 |
Trail - Jacoby Drive (Bierman Road to 5th Avenue | Along Jacoby Drive from Fifth Ave SW to 600 feet west of Biermann Rd. trail Grade and Pave.1.1 miles | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | EPWORTH | DUBUQUE | $160,000 | $0 | $40,398 | $200,398 |
Wapsi Great Western Trail, Phase 3 - Walnut Avenue to N of 430th Street | Wapsi Great Western Trail from Walnut Avenue to north of 430th Street (north of Riceville). HMA Trail | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MITCHELL | $157,000 | $0 | $118,082 | $275,082 |
Goose Creek Recreational Trail Phase 2 | 59th and Scott St. to Prairie Height Park. Design work | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | DAVENPORT | SCOTT | $70,000 | $0 | $1,030,000 | $1,100,000 |
Afton Community Trail | HMA Trail along Filmore St. in Afton from Temple St. East to high School Drive and North to Afton Rec. Complex. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | AFTON | UNION | $70,125 | $0 | $29,500 | $99,625 |
East Park Lake Trail Loop | East Park multi-purpose trail in Rudd, ACC trail | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | RUDD | FLOYD | $70,400 | $0 | $18,561 | $88,961 |
Monroe to Prairie City Corridor Trail - Phase I | Granular trail on abandoned railroad right-of-way along Highway 163 beginning at the west edge of Monroe extending to Highway F62 (Phase I) a distance of 6.06 miles. Jasper County Trail Prairie City to Monroe | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | JASPER | $70,938 | $0 | $30,402 | $101,340 |
U.S. 65 From NCL Mason City North to IA 9 in Manly | New HMA Paved Shoulders on U.S. 65 from NCL Mason City N. to Ia 9 in Manly, 5.68 miles. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | MASON CITY | CERRO GORDO | $71,066 | $0 | $17,766 | $88,832 |
Hyland Ave. from West St. to Ontario St. | In Ames, Hyland to Oakland and Ontario | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $72,000 | $0 | $230,034 | $302,034 |
Oakdale Boulevard Trail - from Wickam School to 1st Ave. | Oakdale Blvd Trail in Coralville.PCC Trail. Project closed | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | CORALVILLE | JOHNSON | $72,000 | $0 | $55,600 | $127,600 |
W. SIDE OF US 75 FROM GROVER ST TO ORBIT RD. | Recreational trail on the west side of US75 to grover street. .55 miles. Marrland hts trail in Hinton from Titan to Grover St | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | HINTON | PLYMOUTH | $72,700 | $0 | $18,175 | $90,875 |
Hanging Rock Park to Raccoon River Valley Trail | Recreational trail.Hanging Rock Park to Raccoon River Valley Trail..83 miles. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | DALLAS | $73,140 | $0 | $4,846 | $77,986 |
Trail Head Park at 5th St. & RR St. Intersection | 5th Street-Hudson RR Street Trail Head Park Construction | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | HUDSON | BLACK HAWK | $73,600 | $0 | $18,400 | $92,000 |
Red Oak Trail, Paving Phase 1 | Paving a 8ft wide, 0.5 mile long trail from 8th Street to Eastern Ave parallel to Hwy 34 on south side of Hwy 34 ROW. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RED OAK | MONTGOMERY | $74,240 | $0 | $34,560 | $108,800 |
Nature Discovery Trail | County Environmental Discovery Center, ACC Bike Trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MUSCATINE | $74,800 | $0 | $11,939 | $86,739 |
Lincoln Way / Skunk River Bike/Ped Bridge | Trail Bridge - Pedestrian bridge at Skunk River in the City of Ames. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $75,000 | $0 | $236,100 | $311,100 |
North Raccoon Valley Trail Pedestrian Bridge | Bridge overWalnut Creek and the connection on both sides of the bridge. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | URBANDALE | POLK | $75,000 | $0 | $74,039 | $149,039 |
South 50th St. - pedestrian bridge over IA Hwy 5 | Adding sidewalks to brdiges built in conjunction with the IA 5 Beltway project. Funding was included in the structure project. | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | WEST DES MOINES | POLK | $75,400 | $0 | $113,600 | $189,000 |
Red Oak Trail, Phase I Grading | Grading of the Red Oak trail system, phase 1. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | RED OAK | MONTGOMERY | $69,203 | $0 | $31,984 | $101,187 |
Plum Creek Trail (Phase 2) | Pre-engineered truss bridge over E Fork of Wapsipinicon River | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | FREDERICKSBURG | CHICKASAW | $75,720 | $0 | $64,697 | $140,417 |
Red Oak Trail - Section 2 paving | This project will pave approximately 2000ft of recreational trail in Red Oak. Section 2 includes the trail from near Eastern Ave in US Hwy 34 right of way to an existing Evergreen Cemetary road approx 500ft north of Inman Dr. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | RED OAK | MONTGOMERY | $68,800 | $0 | $30,200 | $99,000 |
In Havens Acres Park from State St (Hwy 67) to S Kensington St | Duck Creek Recreation trail in Riverdale, PCC Trail | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | RIVERDALE | SCOTT | $68,624 | $0 | $37,375 | $106,000 |
Indian Creek Streambank Stabilization on Chichaqua Valley Trail | Indian Creek Streambank Stabilization on the Chichaqua Valley. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | JASPER | $61,579 | $0 | $30,921 | $92,500 |
Milford Bike Trail | The Milford Bike Trail along County Road A-34(13th St) and surface marking for bike routes on various streets. ACC Trail | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | MILFORD | DICKINSON | $63,000 | $0 | $33,755 | $96,755 |
Grinnell Trail Head | End of Gart Trail to Trail head along sunset avenue.. | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | GRINNELL | POWESHIEK | $63,000 | $0 | $16,520 | $79,520 |
3 Rivers Trail from 2.6 mi. west of Eagle Grove into Eagle Grove | Recreational trail | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | WRIGHT | $64,400 | $0 | $16,100 | $80,500 |
13th Str. 10th Ave from 6th Ave to Ball Prk in Vinton | Walkway Along 13th Str. & 10th Avenue from 6th Ave to Ball Park | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | VINTON | BENTON | $64,600 | $0 | $16,150 | $80,750 |
Oneota River Trail - Phase 2 | Oneota River Trail in Decorah. Grading. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | DECORAH | WINNESHIEK | $64,700 | $0 | $715 | $65,415 |
Burlington RecPlex Trail-Phase I | Rec Plex Trail - PCC Trail from school east to Battle Creek Nature&Recreation area. Final voucher done on 9/24/08. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | BURLINGTON | DES MOINES | $64,800 | $0 | $16,200 | $81,000 |
Hinton Recreational Trail | Grover St: Trail along Grover Street and second Ave. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | HINTON | PLYMOUTH | $65,000 | $0 | $33,000 | $98,000 |
Cable Car Square Historic Lighting/Sidewalk | HISTORIC LIGHTING-CABLE CAR SQUARE | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | DUBUQUE | DUBUQUE | $65,600 | $0 | $16,400 | $82,000 |
Forest City Trail - along IA Hwy 9 connected to Pilot Knob State Park (phase 2) | Trail Forest City 180th Street to Pilot Knob State Park | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | FOREST CITY | WINNESHIEK | $65,692 | $0 | $16,423 | $82,115 |
Heritage Trail | Surface and landscape the Dyersville-heritage Trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | DYERSVILLE | DUBUQUE | $66,000 | $0 | $17,357 | $83,357 |
Walking trails and viaduct remodeling | Delmar Park project. Viaduct removal and trail landscaoe | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | DELMAR | CLINTON | $66,900 | $0 | $13,359 | $80,259 |
Prairie Bridge Park - bridge over creek to connect two exsting trails | This project also listed under IA96101 WITH A MAX OF 8800 | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | ACKLEY | HARDIN | $67,530 | $0 | $13,607 | $81,137 |
Prairie Du Chien Trail | FROM I-80 NE TO Newport Rd. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | JOHNSON | $68,000 | $0 | $215,631 | $283,631 |
Along US Hwy 59 from Hillcrest Drive to Victory Dr. | Multi-purpose trail which will parallel US 59 from Hillcrest Dr to Victory Dr on the north side of Cherokee | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | CHEROKEE | CHEROKEE | $68,100 | $0 | $22,169 | $90,269 |
Ottumwa Prk. Lagoon Trail - Retaining Walls | Retaining Walls on the Lagoone Park Trail in Ottumwa. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | OTTUMWA | WAPELLO | $68,800 | $0 | $6,200 | $75,000 |
Clay County - Pederson Park Trail Extension | Along 10th Avenue East from East 9th St to E 14th Street. Federally closed - 10/29/09. Total Project cost=$123,608.16, Participating Cost = $116,500, Federal Funds = $93,200, Non Participating = $7,108.16 (Local Eligible Unclaimed funds due to STIP amount). STIP Amended to $93,200, FY03 STIP $66,100. | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | SPENCER | CLAY | $76,740 | $0 | $5,860 | $82,600 |
Pedestrain Trail Phase 2 - along 2nd, 3rd and Grant Streets | Tiffin Pedestrain Trail. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | TIFFIN | JOHNSON | $76,832 | $0 | $11,880 | $88,712 |
T-Bone Trail Extension | Trail - Atlantic to Audubon County Line. Located on T-Bone trail in Cass County, from north County Line just east of US 71 southwesterly to a point in Section 22, T-77N, R-36W. | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CASS | $76,880 | $0 | $19,220 | $96,100 |
Linn Creek Trail in Marshalltown | .9 mile Trail | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | MARSHALLTOWN | MARSHALL | $86,800 | $0 | $66,380 | $153,180 |
Dysart to Vinton Trail (Dysart Segment) | C.R. Roberts Memorial Pkway, trailhead 1.0 miles | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | DYSART | TAMA | $86,900 | $0 | $18,818 | $105,718 |
Deer Prk. in Eldora along Ia 175 to S-56 | From the Eldora Corp line to Pine Lake State park, PCC trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | ELDORA | HARDIN | $88,000 | $0 | $27,452 | $115,452 |
Gilbert Drive- River Forest Rd to Evansdale Trail | PCC Trail. Gilbert Drive from River Froest Road to just east of Grand Blvd in city. | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | EVANSDALE | BLACK HAWK | $88,000 | $0 | $22,000 | $110,000 |
Recreational Trail along East Lakeshore Drive from Circle Park to Hudson Street | PCC Trail along Lakeshore Drive from Grand Ave to Hudson St in Storm Lake | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | STORM LAKE | BUENA VISTA | $88,000 | $0 | $15,283 | $103,283 |
Diamond Lake Trail - HMA Trail | HMA Trail from 480th Ave. south into Diamond Lake Park. Trail Construction. | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POWESHIEK | $89,000 | $0 | $22,250 | $111,250 |
City Park Trail Phase 3 | PCC Sidewalk/Trail, Tiffin City Park to Jasper Ave-Phase 3 | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | TIFFIN | JOHNSON | $89,000 | $0 | $17,800 | $106,800 |
Local Trail - Bedstead Truss Bridge on Clayton Ave. to Trail | Mud Creek Park- Relocate bridge on Clayton Ave in Section 28-71-7- to Mud Creek Park/312th St in Section 22-70-5. | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HENRY | $89,500 | $0 | $22,375 | $111,875 |
Local Trail - Bedstead Truss Bridge on Hickory Ave. to Trail | Relocate bridge on Hickory Ave in Section 20-70-6 to Oakland Mills Park/253rd St in section 24-71-7. | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HENRY | $89,500 | $0 | $22,375 | $111,875 |
Oelwein Municipal Trail (Phase I) from Redgate Park to Levin Park | Trail construction from Redgate to Platt's to Platt's Park | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | OELWEIN | FAYETTE | $89,500 | $0 | $29,250 | $118,750 |
Jacobson Park Trail - from the west end of the existing trail on the south side of Prairie Dr. south | From the west terminus of the existing trail on the south side of Prairie Dr S to Parkview Dr, along NE Bank of the skunk River and looping back to Parkview Dr. .9 Mile | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | STORY CITY | STORY | $89,600 | $0 | $22,500 | $112,100 |
Waukee: Sugar Creek Trail Bridge | Trail bridge over Sugar Creek | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | WAUKEE | DALLAS | $90,000 | $0 | $190,000 | $280,000 |
Meyers Lake Trail Extension | Tom Meyers Lake Trail from Meyers Lake to Cedar Valley Nature Trail | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | EVANSDALE | BLACK HAWK | $90,400 | $0 | $33,600 | $124,000 |
Grundy County Lake Trail | For development of a 0.87 mile trail around the north and west side of the Grundy County Lake and connecting to the trail along county road T55. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | GRUNDY | $92,000 | $0 | $367,000 | $459,000 |
Mount Pleasant Trail, Phase 2 | Unnamed trail from Linden heights, east to east lake park in the city of Mt pleasant. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | MOUNT PLEASANT | HENRY | $92,800 | $0 | $23,200 | $116,000 |
Skunk River Trail Extension | Grading and paving of a PCC Trail from the Hunziker Youth Sports Complex north along the Skunk River to SE 16th Street. | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $86,000 | $0 | $350,000 | $436,000 |
Lake Trail (Phases 2 & 3) | PCC Trail Lakeshore Drive in Storm Lake. Let amount was $78,741.86(Phase 2) | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | STORM LAKE | BUENA VISTA | $85,550 | $0 | $15,449 | $101,000 |
Pin Oak Marsh Trails - 1 mile south of Chariton on IA Hwy 14 | 1 mile south of Chariton on IA Hwy 14. Trail Construction | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LUCAS | $84,500 | $0 | $22,130 | $106,630 |
East Park Multi Purpose trail - ACC Trail | Centennial Park/Riverfront Trail in Davenport, ACC. Aka Riverfront trail extension. | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | DAVENPORT | SCOTT | $83,745 | $0 | $20,936 | $104,682 |
Cedar Creek Bridge | Cedar Creek Bridge | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MADISON | $77,400 | $0 | $49,965 | $127,365 |
Greenbelt Park along Chippewa Creek | ACC Trail construction south of Gothic House site. In the city of Eldon, along Railroad St from Walnut St northeasterly .337 miles along Chippewa Creek. | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | ELDON | WAPELLO | $78,000 | $0 | $102,000 | $180,000 |
Kenue Trail - Kenue Environmental Management Area (phase 2) | CONSTRUCTION OF A RECREATIONAL TRAIL FROM THE LAKES ART CENTER PROPERTY TO THE ENTRANCE OF KENUE PARK ON 170TH ST. ACC Trail | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | DICKINSON | $78,000 | $0 | $19,500 | $97,500 |
Gillette Park and Aquatic Center Project | PCC Trail- Gillette Park Trail | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | CHEROKEE | CHEROKEE | $78,000 | $0 | $26,000 | $104,000 |
Trout Run Trail | PCC Trail - in Winneshiek Co. from intersection of Trout Run Rd.& Siewers Spring Rd. South. | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | DECORAH | WINNESHIEK | $78,000 | $0 | $597,500 | $675,500 |
East Newton Hike and Bike Trail Phase 2 | North-E 20th St S, east-S 3rd Ave E, north-E 23rd St, east-N 4th Ave E HMA Trail | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | NEWTON | JASPER | $78,000 | $0 | $40,000 | $118,000 |
Coralville to North Liberty | Along 12 th Avenue from Maplewood Drive in Coralville to Front Street in North Liberty. PCC Trail. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | CORALVILLE | JOHNSON | $78,791 | $0 | $19,698 | $98,489 |
Clarke County Fine Arts and Recreation Center Trail | Project Completed, Federally Closed on 3/15/2010 | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | OSCEOLA | CLARKE | $61,300 | $0 | $25,143 | $86,443 |
Valley View Trail - (Valley View Park) pedestrian bridge | Valley View Trail in Council Bluffs- Pedestrain Bridge. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | COUNCIL BLUFFS | POTTAWATTAMIE | $79,000 | $0 | $168,536 | $247,536 |
Municipal Park Rec. Trail 4th Ave. N. to Park Lane | Le Mars municipal park recreation trail that runs through the park for approximately .85 miles from 4th ave ne to Park lane/4th avenue NE intersection. | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | LE MARS | PLYMOUTH | $80,000 | $0 | $67,406 | $147,406 |
Rockford Bridge | Adding a biketrail to a bridge under construction in Rockford. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | ROCKFORD | FLOYD | $157,978 | $0 | $1,276,598 | $1,434,576 |
Cedar River Trail - Segment G Phase 2 Along Subdivision | Cedar River Trail from HWY 30 - 76th Avenue. - Pavement Resurfacing | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $80,000 | $0 | $175,300 | $255,300 |
Dubuque Heritage Trail Extension - Grade & Pave | Ped/Bike Grade and Pave. 32nd extension from Sageville(Dubuque heritage trail extension) | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | DUBUQUE | DUBUQUE | $80,400 | $0 | $78,471 | $158,871 |
South Tama Trail, Phase 3 | Recreational Trail - West along Fee St&Deer Creek, Under US 30, to West Ross St. Earth or Granular Surface Trail | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | TOLEDO | TAMA | $82,000 | $0 | $57,480 | $139,480 |
Ottumwa Prk. Lagoon Trail - continuous path around Ottumwa Park | ACC Trail from an existing parking lot, easterly .706 miles in Ottumwa Park in Ottumwa, Ia | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | OTTUMWA | WAPELLO | $82,900 | $0 | $16,339 | $99,239 |
IA. 1 at Union Pacific RR X-ing | Bike\Ped Trail RR crossing- Union Pacific at Hwy 1. Facilities for Pedestrians and Bicycles. | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | MOUNT VERNON | LINN | $83,000 | $0 | $20,796 | $103,796 |
Comet Trail Extension | Comet Trail Extension in Conrad, PE/Ce/trail, 1 mile | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | CONRAD | GRUNDY | $79,200 | $0 | $19,800 | $99,000 |
Recreational Complex Trail | Recreational trail within the limits of the Sergeant Bluff Recreational complex, bounded by South Lewis Blvd and Warrior road. PCC Trail | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | SERGEANT BLUFF | WOODBURY | $96,100 | $0 | $24,100 | $120,200 |
Creston Park to Park Trail | HMA Trail. For construction of a 1.3 mile asphalt surfaced trail for walking and bicycling. Will connect Creston's hard surfaced trail (1.28 miles) at the Southern Prairie YMCA and extend to Mitchel Marsh. The DNR will continue the trail to Green Valley State Park. Final Voucher done 11/4/09. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | CRESTON | UNION | $61,000 | $0 | $67,100 | $128,100 |
Paving of Section 3 of Red Oak Trail Systems | Pave approx 1860 ft of rec trail. Section 3 includes trail from 4th st to 8th st in US Hwy 34 ROW and approx 500 ft of trail along SE corner of Evergreen Cemetary which will connect end of trail paved under Section 2 to Inman Drive. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | RED OAK | MONTGOMERY | $59,680 | $0 | $30,320 | $90,000 |
Bibbins / Reservoir Park multi-purpose trail | This project is on the acct reports with project number STP-E-0874(1)--8V-87. Believe it is transposed as there is no city with the number 874 | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | BEDFORD | TAYLOR | $22,400 | $0 | $7,844 | $30,244 |
Great Western Trail Improvements | Great Western Trail Improvements | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | WARREN | $22,497 | $0 | $5,624 | $28,122 |
Hwy 65 Trail and Gateway | Part of a larger roadway improvement project on US 20/65. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | IOWA FALLS | HARDIN | $23,000 | $0 | $691,000 | $714,000 |
Trail extension to Wilder Park | Wilder Park in Allison | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | ALLISON | BUTLER | $23,769 | $0 | $5,942 | $29,711 |
Charles City Recreation Trail Extension-Phase III 2006 Bike Trail Improvements | Charles City Recreational Trail Extension-Phase II(Charley Western Bike Trail) | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | CHARLES CITY | FLOYD | $24,250 | $0 | $24,250 | $48,500 |
Westbrook Park Pedestrian Bridge over Silver Creek | Pedestrian Bridge. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | DE WITT | CLINTON | $25,140 | $0 | $70,816 | $95,956 |
Greenfield Square Improvements | City of Greenfield Square Improvements. Final Voucher sent to Deb Coles on 1/27/10. | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | GREENFIELD | ADAIR | $26,000 | $0 | $61,000 | $87,000 |
Althaus Park Pedestrian Trail | Althaus Park Pedestrian Trail | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | ASBURY | DUBUQUE | $27,600 | $0 | $26,602 | $54,202 |
Elwood Dr. Trail from Mortensen Rd. to South 16th St. | Elwood Drive Bike Path- Phase 1 .4 Mile ACC bike path. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $28,000 | $0 | $19,246 | $47,246 |
Stone State Park Nature Center Pedestrian trails - (Phase 2) | Complete | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | WOODBURY | $28,800 | $0 | $23,600 | $52,400 |
Walnut Wetlands Trail | Walnut Wetlands Trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | WALNUT | POTTAWATTAMIE | $29,300 | $0 | $7,325 | $36,625 |
Lucas County Town Square (pedestrian walkway) | Side walk around the town square in the city of Chariton. | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | CHARITON | LUCAS | $30,000 | $0 | $8,100 | $38,100 |
Wapsi Great Western Trail Extension(Prairie Farmer Trail) | Trail surfacing - Northwestern RR ROW in Afton TWP (Acme toward Riceville) | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $30,000 | $0 | $7,500 | $37,500 |
Stanton Greenbelt Trail Extension | Greenbelt Trail Extension, from Prospect Street then under Holland Avenue Bridge to extisting trail. 770 feet. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | STANTON | MONTGOMERY | $30,920 | $0 | $7,730 | $38,650 |
East River Trail - lighting installations | In Des Moines-Saylorville Bike Trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $32,000 | $0 | $12,926 | $44,926 |
Sally's Alley | City of Corning-Alleny between Benton and Davis Avenues between seventh and eight streets | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | CORNING | ADAMS | $21,920 | $0 | $5,474 | $27,394 |
Four Corners Park Trail | Construction of HMA Trail at Four Corners recreational area near Manning. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CARROLL | $32,000 | $0 | $8,000 | $40,000 |
Tiffin City Park Trail, Phase 2 - Bridge | Ped. Bridge New - Other | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | TIFFIN | JOHNSON | $19,000 | $0 | $6,000 | $25,000 |
Trail Wayfinding signs in Urbanized Johnson County | Purchase of signs. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | CORALVILLE | JOHNSON | $15,600 | $0 | $3,900 | $19,500 |
Interurban Trail - ROW Acquisition | IN Ankeny-NE58- Oralabor Road- Bike Trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | ANKENY | POLK | $20,000 | $0 | $5,000 | $25,000 |
Wapsi Great Western Trail Acquisition | L22E TE Funding $200,000 LY30 IA152 Funding $43,000 | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $243,000 | $0 | $60,750 | $303,750 |
Wapsi Great Western Trail, ROW purchase from Walnut Ave to Pinicon Alders Wildlife Area | Wapsi Great Western Trail, ROW purchase from Walnut Ave to Pinicon Alders Wildlife Area | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MITCHELL | $299,000 | $0 | $74,000 | $373,000 |
Little Sioux River Trail | Trail and bridge located between Grand Avenue to 355th Street in southwest Spencer, immediately west of West Leach Park . | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | SPENCER | CLAY | $365,000 | $0 | $232,068 | $597,068 |
Dry Run Trail Segment #1: Construction Box culvert crossing US 52 and trail connection to Trout Run Trail; ROW acquisition | This project will construct a box culvert crossing US 52 and provide a connection to the Trout Run Trail. This project is also a ROW acquisition north and west of the proposed US 52 box culvert to Windridge Implement Drive. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | DECORAH | WINNESHIEK | $543,833 | $0 | $233,072 | $776,905 |
Farragut Railroad Park | Trail plan and design along Dupont Street. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | FARRAGUT | FREMONT | $4,400 | $0 | $1,600 | $6,000 |
Jerry Kelley Trail Phase 2: Memorial Park to Wilder Elementary School | Jerry Kelley Trail Phase 2:Memorial Park to Wilder Elementary School | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | INDIANOLA | WARREN | $282,920 | $0 | $164,680 | $447,600 |
Marking the Mormon Trail across Southern Iowa | Members of the Iowa Mormon Trail Assoc. has researched the exact location of the trail across iowa, and documented its location. | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MONROE | $16,032 | $0 | $22,380 | $38,412 |
Clear Creek Trail - study | Pedestrian Walkway | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | TIFFIN | JOHNSON | $26,400 | $0 | $11,100 | $37,500 |
Cedar Valley Nature Trail--Evaluation Study of Two Bridges | Two Cedar Valley Nature Trail bridges cross the Cedar River and both are in need of either repair or replacement. One is in McFarland Park near La Porte city and one is in Evansdale. This project will provide funding to hire a consultant to inspect the bridges and to provide alternatives for repair/replacement. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR FALLS | BLACK HAWK | $50,000 | $0 | $12,500 | $62,500 |
MRT Feasibility Study - Allamakee County | MRT Feasibility Study in Allamakee County | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | ALLAMAKEE | $66,400 | $0 | $16,600 | $83,000 |
Lenox RR Depot with multi-purpose trail | Bibbons Park Trail in Lenox | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | LENOX | TAYLOR | $12,000 | $0 | $12,783 | $24,783 |
Fogle Recreation Trail | Fogle rec area in Sec 31-70-30 N of Diagonal. Trail surfacing. | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | RINGGOLD | $12,720 | $0 | $3,180 | $15,900 |
Sands Timber multi-purpose trail | Trail construction on Sands Timber Trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | TAYLOR | $12,800 | $0 | $12,593 | $25,393 |
Trailhead Park at beginning of Volksweg Trail | (RTC rail-trail database) Volksweg Trail head Park, Sidewalks etc | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | PELLA | MARION | $15,000 | $0 | $5,085 | $20,085 |
Strawberry Point - Backbone Trail (Phase 1& 2) | PE/PC portion of the trail. | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | STRAWBERRY POINT | CLAYTON | $18,575 | $0 | $104,724 | $123,300 |
Pedestrian / Bike path from IA Hwy 1 / Cass Str. to Davis Prk. | Hwy 1 Pedestrian/Bike path from Davis Park to Murphy's Addition. PCC TRAIL | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | MOUNT VERNON | LINN | $34,900 | $0 | $39,974 | $74,874 |
Ringgold Co. Trail | E. from US 169 at Mt Ayr ECL,ACC Trail | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | RINGGOLD | $36,000 | $0 | $9,273 | $45,273 |
Wabash Trace Nature Trail - Sportsmen Park to Nishnabotna River | Wabash Trace Nature Trail - Sportsmen Park to Nishnabotna River | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | SHENANDOAH | PAGE | $36,865 | $0 | $15,239 | $52,104 |
Lakes Bike / Hike Trail | Pedestrian Trail in Greenfield. PCC Pave. | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | GREENFIELD | ADAIR | $52,000 | $0 | $10,868 | $62,868 |
West Main St. Trail - Anton Addition along US Hwy 218 from Palmer Dr. to Bluff St. | Anton Addition along US Hwy 218 from Palmer Dr. to Bluff St. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | LA PORTE CITY | BLACK HAWK | $52,200 | $0 | $35,301 | $87,501 |
Pleasant Valley Trail from East 2nd St. to Montgomery Drive | Recreational trail from Barnes St SE to the Battle Creek-Ida Grove High School. Phase "B" of the Pleasant Valley Trail from the county club and routed adjacent to the City Swimming pool, public library, Hospital and completes the loop back to the highschool. | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | IDA GROVE | IDA | $52,436 | $0 | $46,863 | $99,299 |
Manchester Trail - Alg Acers and Stiles Streets | NE Bikeway Trail/Sidewalk | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | MANCHESTER | DELAWARE | $53,700 | $0 | $25,887 | $79,587 |
US 6 in Iowa City from Hawkins Drive to Intersection of Newton Road | SideWalk Extension. Along US 6 from Hawkings Drive to intersection of Newton RD. PCC Trail 0.27 mile. Project Engineer is Shoemaker & Haaland P.E. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | IOWA CITY | JOHNSON | $55,000 | $0 | $102,822 | $157,822 |
North Ridge Trail - Oakdale Research Park to NCL | North Liberty trail to north Ridge Trail.PCC Trail | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | CORALVILLE | JOHNSON | $55,200 | $0 | $23,800 | $79,000 |
Red Oak Trail Section 4 | Red Oak Trail - Section 4 From 4th Street to 9th Street $55,840 Federal Aid | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | RED OAK | MONTGOMERY | $55,840 | $0 | $30,960 | $86,800 |
Cedar Valley Trail - Depot Rehabilitation | Rehabilitation of railroad depot in center point | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | CENTER POINT | LINN | $56,000 | $0 | $48,342 | $104,342 |
Forest City Recreational Trail Extension | Bike trail along IA 9 South in Forest City.Revision to this project was made by RPA 2 Planner in March 2003. Trail will be heading south for 400 to 600 ft from the same point on J Street. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | FOREST CITY | WINNEBAGO | $56,000 | $0 | $15,900 | $71,900 |
Ottumwanoc Tribal Trail (Market Street to Vine Street) | NOC Tribal Trail - on the north side levee from Market St. to Vine St. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | OTTUMWA | WAPELLO | $56,623 | $0 | $14,155 | $70,778 |
Oakland Mills Bridge Restoration | Pedestrian Bridge over the Skunk River in Oakland Mills State Park near the junction fo W55 and H46. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HENRY | $57,000 | $0 | $2,535 | $59,535 |
North Manning Safe Route to School | North Manning Safe Route to School | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | MANNING | CARROLL | $57,000 | $0 | $322,000 | $379,000 |
Schildberg Quarry Lake 1 Trail | Construct approximately 0.5 miles of pedestrian/bicycle hard surfaced trail near the city/county line and eventually connecting to a trail being developed by Cass County to connect the Schildberg Recreation Area to the T-Bone Trail that runs north through part of Cass County to Audubon. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | ATLANTIC | CASS | $57,199 | $0 | $32,801 | $90,000 |
Main Street Improvement Project | Curb and gutter, 8' sidewalks, & street lights along both sides of Main Street between Franklin Street and Washington Street. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RYAN | DELAWARE | $57,843 | $0 | $14,460 | $72,303 |
Ringgold County Courthouse Square | Construct a sidewalk and retaining wall along all four sides of the Ringgold County Courthouse square in Mount Ayr. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | MOUNT AYR | RINGGOLD | $58,876 | $0 | $14,719 | $73,595 |
Sunrise Park Trail | Recreational trail construction along Lincoln St from Roosevelt St to Sunrise Park. Then East to Jefferseon St, then along Jefferson St from 3rd St to the existing sidewalk/trail near Remsen Union High School. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | REMSEN | PLYMOUTH | $51,000 | $0 | $32,600 | $83,600 |
King/Idaho Recreational Trail Head | For the development of a trail head at the northeast corner of the intersection of ML King Jr Drive and Idaho Street. | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $50,000 | $0 | $31,080 | $81,080 |
Schildberg Quarry Recreation Area, Phase 1 | Schildberg Trail on outskirts of Atlantic. HMA TRAIL | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | ATLANTIC | CASS | $50,000 | $0 | $76,930 | $126,930 |
Sandy Hollow Trail - From 4TH Ave SE in Sioux Center, East Along B40 to just east of the ECL of Sioux Center | Sandy Hollow Recrdation Trail beginning at the intersectio nof 4th Ave and County Road B-4 in Sioux Center, thence east and south approx. 3 miles to Sandy Hollow Recreation Area. | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | SIOUX CENTER | SIOUX | $50,000 | $0 | $30,711 | $80,711 |
Clear Creek Trail (Phase 1) - from City Park to Kimberlite St. | PCC Trail - Clear Creek trail in Tiffin.Pedestrian Trail Phase 1-City park to near Kimberlite St .2 mile | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | TIFFIN | JOHNSON | $37,291 | $0 | $31,708 | $69,000 |
Recreational Trail- Indian St Trail | Recreational trail along east Indian Dr from US 59 to North Roosevelt Ave (.39 mile). | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | CHEROKEE | CHEROKEE | $37,300 | $0 | $12,161 | $49,461 |
Wabash Trace Tr. from .5 mi S. of Ia 2 S. to Missouri state line | from .5 mi S. of Ia 2 S. to Missouri state line (RTC rail-trail database). Granular surface, BR Dk | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | PAGE | $38,935 | $0 | $9,863 | $48,798 |
Trail bridge over Walnut Creek and 240 feet of trail construction | trail bridge and 240 feet of trail construction | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | URBANDALE | POLK | $39,100 | $0 | $4,502 | $43,602 |
Clay Recreational Trail | To be located from Main St. bridge to IA Hwy 57 | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR FALLS | BLACK HAWK | $39,200 | $0 | $11,411 | $50,611 |
IA Hwy 2 - 1st & Main St. City Entrance | Sidewalk and Landscaping,IA 2, 1st & Main St City Entrance | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | LEON | DECATUR | $39,848 | $0 | $9,962 | $49,810 |
Motor Mill site on Galaxy road over turkey river. | Motor Mill site on Galaxy road over turkey river. Trail bridge. Bike/pedestrian | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CLAYTON | $39,920 | $0 | $9,980 | $49,900 |
Kenue Trail - Kenue Environmental Management Area (phase 1) | The construction of hard and Limestone surfaced trail from existing Spine trail to Kenue Environmental management area(KEMA) plus associated trail amenities. | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | DICKINSON | $60,000 | $0 | $37,182 | $97,182 |
Kewash Trail - N. D Ave to IA 92/1 (W 5th St) | ACC Trail Project (RTC rail-trail database) | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | WASHINGTON | WASHINGTON | $40,000 | $0 | $4,919 | $44,919 |
Elwood Dr. Trail (Phase 2) Airport Rd. to Green Hills Drive | Acc Trail - Elwood Dr from Greenhill Dr to Airport Rd. | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $45,927 | $0 | $3,273 | $49,200 |
Butler Street from Anderson Street east to Stiles Street then north to Prospect Street | PCC TRAIL, along Stiles St & Butler St in Manchesterl. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | MANCHESTER | DELAWARE | $46,000 | $0 | $38,095 | $84,095 |
West Main Street from 9th Street to 12th Street | PCC TRAIL,along Main St in Manchester from 9th to 12th. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | MANCHESTER | DELAWARE | $47,200 | $0 | $23,244 | $70,444 |
Wapsi Great Western Line - develop state border entrance | BIKE TRAIL-McEntire NW to Minn. Line | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MITCHELL | $48,000 | $0 | $9,181 | $57,181 |
Stone State Park Nature Center Pedestrian trails (Phase 1) | Construction of 2 miles of new hiking and interpretive trails in the Loess Hills Nature center in the se portion of Stone State Park. No letting - done in cooperation with Woodbury County Conservation | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | WOODBURY | $48,000 | $0 | $12,000 | $60,000 |
Pilot Grove Park - historic preservation and bicycle facilities | Pilot Grove Park Bike Path | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | MONTGOMERY | $48,100 | $0 | $56,245 | $104,345 |
West Overlook Trail | Overlook Rd 1.5 min of Iowa City NE, ACC Trail. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | JOHNSON | $49,000 | $0 | $21,000 | $70,000 |
Living Memory Park Trail | Paving the existing trail in Living Memory Park in the city of Kiron.PCC Trail | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | KIRON | CRAWFORD | $44,000 | $0 | $11,000 | $55,000 |
Waterwork Park in Iowa City, Butler House/Amphitheatre | Grade and Pave .71 mile of trail at Iowa City Waterworks Plant Site, NW of Dubuque St & I-80, Butler House Area | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | IOWA CITY | JOHNSON | $96,537 | $0 | $28,754 | $125,292 |
Turkey River Bridge | Bridge over Turkey River (loaced between B64 and Clayton County Line | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | FAYETTE | $334,000 | $0 | $293,000 | $627,000 |
Along E Platt St. from Jacobsen Dr. to Dearborn St. | I64/East Platt St in maquoketa from Jacobsen drive to Dearborn st. Grade and Pave PCC Trail | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | MAQUOKETA | JACKSON | $138,009 | $0 | $42,799 | $180,809 |
Mount Pleasant Trail, Phase 5 | Mount Pleasant Trail Phase V | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | MOUNT PLEASANT | HENRY | $120,000 | $0 | $30,000 | $150,000 |
Burlington RecPlex Trail-Phase II | In Burlington from existing trail to Division St - Phase 2 | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | BURLINGTON | DES MOINES | $120,000 | $0 | $30,300 | $150,300 |
Unnamed Trail - In the City of Spencer along 10th Avenue East from East 4th to Pedersen Park. | Pederson Park Trail 2000- Along 10th avenue from E 4th st to E 9th St east to Pedersen park. Project Federally closed - 10/29/09. Participating Cost=$91,250, Federal Funds = $73,000. Non Participating Cost=$13,830.92.(Local Eligible Unclaimed Funds). | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | SPENCER | CLAY | $120,000 | $0 | $5,100 | $125,100 |
Plum Creek Trail - Phase 1 & 2 | Plum Creek Trail in Fredericksburg. ACC Trail through NCL east-west | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | FREDERICKSBURG | CHICKASAW | $120,000 | $0 | $30,000 | $150,000 |
Twin Lakes Recreational Trail (Phase 2) | Trail is proposed to be located on west side and part of south end of Twin Lake | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CALHOUN | $150,000 | $0 | $255,100 | $405,100 |
Twin Lakes Trai l - Phase 3 | PCC Trail.Twin Lakes Rec Trail connect to Twin Lakes to State Park. Photos Available. Project completed. Federally closed on 12/11/09. Total Project Cost = $111,375.03 Constr.Part. Cost=$108,033.78, 80%=Federal Funds=$86,427.02. Non-Part. Cost = $3,341.25 (Construction costs with no supporting documentation submitted for reimbursement) | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CALHOUN | $141,400 | $0 | $35,350 | $176,750 |
Grey Eagle Trail Extension-Iowa Avenue to East City Limits | 1.25 mile segment of trail along the north levee of the Des Moines River from the intersection of Hwy 34 and 77th Avenue to the city limits. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | OTTUMWA | WAPELLO | $136,969 | $0 | $64,381 | $201,350 |
Trail- West Broadway St Trail Implementation Project | Enhancement lighting trail, West Broadway St/Trail Enhancement, West Broadway street between Hwy 71 Lake Street Dam Road. Bike/Ped Trail | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | ARNOLDS PARK | DICKINSON | $140,400 | $0 | $140,300 | $280,700 |
Waveland Trail Project | Walnut Creek Trail to I235 following Cummins Creek | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $150,000 | $0 | $350,000 | $500,000 |
Bettendorf Riverfront Trail - Along the Mississippi River from Greenwood Ave. to 10th St. | Riverfront Trail -HMA Trail in Bettendorf from Greenwood Ave to 10th St. | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | BETTENDORF | SCOTT | $119,800 | $0 | $29,900 | $149,700 |
FLAP Neal Smith Trail | Resurface and widen 1 mile of the Neal Smith Trail beginning at the Riverview Park and heading north on the trail. | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $300,000 | $0 | $150,000 | $450,000 |
Wapsi Great Western Trail, Phase II | For hard surfacing the trail between 140th Street and 150th Street in Howard County. HMA Trail | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $150,000 | $0 | $37,500 | $187,500 |
Marr Park to Ainsworth Shared Use Pathway | Design and construction of 0.89 mile shared use path from within Marr Park to Ainsworth via existing highway ROW of Highway 92. | Iowa | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | WASHINGTON | $140,000 | $0 | $150,000 | $290,000 |
Little Walnut Creek Trail | Trail Connection along Little Walnut Creek from 156th Street west to Urbandale/Clive boundary. PCC Paving | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | URBANDALE | DALLAS | $150,000 | $0 | $185,000 | $335,000 |
Hudson: US 63 Sergeant Rd Trail Extension | Hudson: US 63 Sergeant Rd Trail Extension | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | HUDSON | BLACK HAWK | $993,000 | $0 | $248,000 | $1,241,000 |
Spring Lake Park Trail Extension | Recreational Trail in the City of Cherokeee along Spring Lake Drive | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | CHEROKEE | CHEROKEE | $140,000 | $0 | $70,600 | $210,600 |
NW Beaver Drive Trail | Project on hold for a while | Iowa | 2017 | 1 | (TE) 1. Pedestrian and bicycle facilities | JOHNSTON | POLK | $304,320 | $0 | $2,636,111 | $2,940,431 |
Des Moines River Greenbelt Scenic Overlook on the HTT | Located in Boone county but Polk county is the sponsor. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POLK | $140,000 | $0 | $60,000 | $200,000 |
Meredith Drive Trail | PCC Sidewalk/Trail - Meredith Drive to Grimes. Final Voucher sent to Finance on 5/14/10 | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | URBANDALE | POLK | $118,250 | $0 | $29,563 | $147,813 |
6th Avenue West Recreational Trail | PCC Sidewalk/Trail - 6th Ave West Rec Trail - west on 12th St SW then north on 6th Avenue Sw. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | LE MARS | WOODBURY | $117,000 | $0 | $94,100 | $211,100 |
Jewell to Ellsworth Trail Bridge Construction | Jewell to Ellsworth Trail Bridge construction | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HAMILTON | $140,000 | $0 | $38,000 | $178,000 |
Howard Co Trails - Elma to 150th & Prairie Farmer to Cresco | Elma to 150th & Prairie Farmer to Cresco; Let in two phases - one locally and one at the DOT. (RTC rail-trail database). Trail construction | Iowa | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | HOWARD | $138,000 | $0 | $34,500 | $172,500 |
Summit St. Trail - Jacobson Dr. from Wstrn Ave. to Ia. 64 | Pedestrain Trail Western Ave to Hwy 64. acc & pcc Trail along Summit ST | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | MAQUOKETA | JACKSON | $151,398 | $0 | $37,159 | $188,557 |
Starr's Cave Bridge | Pedestrian Bridge Over Flint Creek in Starr's Cave Park- Foot bridge | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | DES MOINES | $151,740 | $0 | $173,260 | $325,000 |
Trail Development from Wright Bros Blvd to Ely Corporate Limits | Trail Development from Wright Bros Blvd to Ely Corporate Limits. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LINN | $113,600 | $0 | $594,900 | $708,500 |
Fair View Park/10th Avenue East Trail Extension | PCC Trail - Fairview Park Trail - East 14th St. to East 18th in Spencer. | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | SPENCER | CLAY | $134,300 | $0 | $38,425 | $172,725 |
Sheldon Recreational Trails | Sheldon Recreational Trail - Two Segments. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | SHELDON | O'BRIEN | $113,000 | $0 | $135,000 | $248,000 |
Bob Layton Trail | The Bob Layton Trail from north of Douglas Parkway to just south of Meredith Drive in the Walnut Creek Regional Park. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | URBANDALE | DALLAS | $120,000 | $0 | $615,000 | $735,000 |
Along IA Hwy 965 from Zeller to Westwood | PCC Pave. Recreational trail from zeller st to westwood st | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | NORTH LIBERTY | JOHNSON | $150,000 | $0 | $191,800 | $341,800 |
Sauk Rail Trail | Bike Trail-The construction of two miles of the Sauk Rail Trail and associate appurtenances from Swan lake state park to Main street in Carroll, Iowa. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | CARROLL | CARROLL | $150,000 | $0 | $46,335 | $196,335 |
Eldridge Bike Path | First St Bike Trail - along First St from Davies St to Iowa St. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | ELDRIDGE | SCOTT | $120,826 | $0 | $10,771 | $131,597 |
Skunk River Trail - Phase 3: Bloomington Rd to Ada Hayden | In the city of Ames, Skunk River Trail: From Bloomington Road to Ada Hayden Park | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $250,000 | $0 | $225,000 | $475,000 |
McVay Rec. Trail Staging Area | PCC Trail - staging area to the McVay Trail in Indianola, near the intersection of N 15th and Iowa 92. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | INDIANOLA | WARREN | $134,000 | $0 | $39,447 | $173,447 |
Cedar Valley Trail Hard Surfacing - 1996 | For hard surfacing a 4-mile segment of the Cedar Valley Nature Trail between LaPorte City and McFarlane Park.(from 1 mi. W. of LaPorte City to McFarlane park) | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | BLACK HAWK | $133,456 | $0 | $134,872 | $268,328 |
Cottonwood Trail Enhancement | Recreational Trail - Cottonwood Trail Expansion | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | HUMBOLDT | HUMBOLDT | $143,943 | $0 | $71,970 | $215,913 |
Kingsley Community Biking/Walking Trail | Along Quest Ave throughout town in the city of Kingsley. PCC Trail. Final voucher sent to Deb on 9/25/08. | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | KINGSLEY | PLYMOUTH | $131,100 | $0 | $28,900 | $160,000 |
Sidewalk Improvements Program - Phase II | Construct sidewalks along Pella Avenue, Santa Clara Street, D Avenue, and North 3rd Street | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | OSKALOOSA | MAHASKA | $185,600 | $0 | $46,400 | $232,000 |
Indianola Trail Head - McVay and Indianola-Carlisle Trail Connection | Summerset & McVay Trails on 5th St in Indianola. Restrooms, Info Center,Trailhead and parking lot in Indianola | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | INDIANOLA | WARREN | $129,500 | $0 | $85,619 | $215,119 |
Trail from 69th & Deerview Dr. to Beaver Creek | 69th & Deerview Dr to Beaver Cr in Urbandale, Preliminary/Construction Engr.Urbandale-johnston trail connection | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | URBANDALE | POLK | $128,600 | $0 | $157,723 | $286,323 |
City of Tiffin - bike/walk trail from City Park to Ireland Avenue | In the City of Tiffin: Clear Creek Trail from City Park to Ireland Avenue | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | TIFFIN | JOHNSON | $148,992 | $0 | $232,859 | $381,851 |
Country Club Road Bike Lane | Add 5 foot bike lanes on both sides of County Club Road from 260th Street north 1.71 miles to South G Avenue | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | NEVADA | STORY | $127,231 | $0 | $361,769 | $489,000 |
North Park Cadet Trail: From North St through North Park to Cadet Field | 3000' LF, 10' wide hard surfaced trail from North Park to Cadet Field. | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | IOWA FALLS | HARDIN | $270,000 | $0 | $276,400 | $546,400 |
Frank Starr Park in Storm Lake- Phase 3 | Installation of Pedestrian Lighting at Frank Starr Park. Let amount for this phase 3 was $129,750 | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | STORM LAKE | BUENA VISTA | $127,200 | $0 | $31,800 | $159,000 |
Local Trail - Bike / Pedestrian path extension (0.22 miles) Phase 1 | PCC Recreational trail along First St. and Eastwood lane to F-41. | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | LONG GROVE | SCOTT | $125,600 | $0 | $31,400 | $157,000 |
Kauffman Trail | Kauffman Trail from US 30 north 1,400 feet to the existing Rose Garden between 2nd & 4th. PCC Trail - begin 2200ft N of US 30, along W edge of Timber Cr., N 750ft to 3rd St. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | STATE CENTER | MARSHALL | $112,000 | $0 | $28,000 | $140,000 |
Southeast Connector Trail System - SE 9th to SE 15th ST | Trail along Southest Connector from SE 9th Street to SE 15th Street. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | DES MOINES | POLK | $125,000 | $0 | $5,975,000 | $6,100,000 |
North Ridge Trail - I-80 underpass connection from Northridge Park to 25th Ave. | PCC Pave-Coralville - North Ridge Trail. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | CORALVILLE | JOHNSON | $96,600 | $0 | $121,035 | $217,635 |
Lake Pahoja Recreational Trail--Phase II | Lake Pahoja Recreational Trail - Phase II | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LYON | $145,314 | $0 | $94,686 | $240,000 |
Twin Lakes Recreational Trail (Phase 1) | This is a PCC Trail on the west side of North Twin Lakes, Phase I. Keith Roos of the Calhoun County Conservation Board is the project manager. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | CALHOUN | $147,440 | $0 | $36,860 | $184,300 |
72nd St. Bicycle / Pedestrian Underpass | 72nd Street Bike/Pedestrian underpass, Urbandale, Preliminary & Construction Engr. ACC Trail | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | URBANDALE | POLK | $123,808 | $0 | $83,120 | $206,928 |
Holstein Community Walking/Bike Trail | From north end of existing trail (Mueller street estended) north and west to the east end of sidewalk on Second Street. Also, from the existing trail south of the Lohff Schuman Community Center to South Kiel Street. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | HOLSTEIN | IDA | $123,750 | $0 | $41,250 | $165,000 |
Indianola Memorial Trail Connection--Phase I | Memorial Trail - PCC Sidewalk/Trail, connecting Summerset County Trail & Memorial City Park. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | INDIANOLA | WARREN | $147,570 | $0 | $76,727 | $224,297 |
Main Street Reconstruction | Main Street Reconstruction | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | KEOKUK | LEE | $142,515 | $0 | $257,485 | $400,000 |
Barrick Road Bicycle/Pedestrian Bridge | Replace bicycle/pedestrian bridge on Barrick Road over the Cedar River in Janesville. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | JANESVILLE | BLACK HAWK | $123,166 | $0 | $576,803 | $699,969 |
Downtown Riverfront Trail | from 2nd St to Waterloo Rd (Cedar R Levy). | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR FALLS | BLACK HAWK | $148,000 | $0 | $52,000 | $200,000 |
D-59 in Carnarvon north along M-68 to D-59 | The construction of 3.1 miles of the Sauk Rail Trail from Carnarvon north to the intersection fo county road M68 known as "Quinns Corner". | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | SAC | $150,000 | $0 | $100,000 | $250,000 |
Lake Mills Recreational Trail | Located in eastern Lake Mills, connecting South 10th Ave E to North 3 Ave E | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | LAKE MILLS | WINNEBAGO | $123,000 | $0 | $80,941 | $203,941 |
Pedestrian & Bike Trail | Pedestrian & Bike Trail along West Ave\Broadway Ave and throughout Sports Complex. HMA Trail | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | BURLINGTON | DES MOINES | $122,300 | $0 | $66,700 | $189,000 |
Clay County Trail (Phase 2) - in East Leach Park from South Grand Ave. to 10th Ave. East. | Phase II of the Clay county trail in East Leavh Park for a pedestrian/bicycle bridge to span the Little Sioux River and for a portion of the trail. | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | SPENCER | CLAY | $121,000 | $0 | $125,113 | $246,113 |
CeMar Trail - Phase 1C | Along north side of H Avenue and 16th Street NE from Maplewood Drive to F Avenue NE, and along the west side of Maplewood Drive from J Avenue to K Avenue | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $274,000 | $0 | $68,000 | $342,000 |
Clinton Great Places Bridge Arches | Project is being administered by the district office. | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | CLINTON | CLINTON | $112,000 | $0 | $28,000 | $140,000 |
10th Ave. Pedestrian Bridge - Lincoln Highway at 1st Str. | In Mt Vernon- 10th Ave. Pedestrian Bridge, Walk, Lights, Bridge Repair. | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | MOUNT VERNON | LINN | $113,408 | $0 | $37,473 | $150,881 |
Fontana Bike Trail | For development of a 1.5 mile trail connecting Fontana Park to the city of Hazelton and the regional trail system. Project awarded to Howrey Construction Inc of Rockwell City Iowa. Admin Eng: Buchanan County Engineer | Iowa | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | HAZELTON | BUCHANAN | $112,000 | $0 | $28,000 | $140,000 |
Greenbelt Trail - Phase 2 | Greenbelt trail in Stanton- Phase 2 Grade and Pave | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | STANTON | MONTGOMERY | $152,200 | $0 | $69,334 | $221,534 |
Elwood Dr. Trail (Phase 1) from Lincoln Way to S. 16th St. and from Mortensen Rd. to Green Hills Dri | For construction of a 1.5 mile hard surfaced trail along Elwood Drive from Lincoln Way to Airport Road in Ames | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | AMES | STORY | $105,000 | $0 | $153,000 | $258,000 |
Cedar Lake/McLeod Run Trail Bridges | Bridges over Cedar Lake and Mcleod Run trails | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $104,500 | $0 | $125,509 | $230,009 |
Phase VI - Heart of Iowa Nature Trail | For development of 1.5 miles of trail from one mile west of Collins into the Collins Trailside Park | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | STORY | $104,119 | $0 | $26,052 | $130,171 |
Ottumwanoc Tribal Trail along the Des Moines River levee from Market Street to Quincy Avenue | Trail from Quincy Ave along the river to Market Street. | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | OTTUMWA | WAPELLO | $103,400 | $0 | $51,850 | $155,250 |
Moville Pedestrian Trail (Phase 2) | Recreation trail constructed along 150th st and Humbolt ave and Fairview Dr from Arlington Cemetary South and West to Woodbury county Fairgrounds.- Grading, RCB Culvert extension. | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | MOVILLE | WOODBURY | $153,800 | $0 | $63,400 | $217,200 |
South 8th St. Pedestrian Trail under IA Hwy 5 | South 8th St. Pedestrian Trail under IA Hwy 5 | Iowa | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | WEST DES MOINES | POLK | $102,700 | $0 | $154,700 | $257,400 |
Stolley Park & Oxbow Wildlife Area Trail ( 2 locations ) | The recreational trail at the two locations of Oxbow Park(Wildlife area) and Stolley Park. | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | SPENCER | CLAY | $102,114 | $0 | $52,085 | $154,200 |
Diamond Lake Trail | PCC trail from Montezuma to Diamond Lake approximately 0.59 mile. | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | POWESHIEK | $138,000 | $0 | $48,697 | $186,697 |
Rolling Hills Bike Path | The "Rolling Hills Bike Path" along the west side of County Route no. K52 from the east quarter corner of Sec. 27 thence northerly to an entrance with the Rolling Hills golf course. Grade/ACC Pave | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | HULL | SIOUX | $101,000 | $0 | $25,250 | $126,250 |
Galva Trail Project | On Galva to Holstein School District Property. Bonded by Noll Street on the West. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | GALVA | IDA | $105,000 | $0 | $32,000 | $137,000 |
Clark Street Recreational Trail | Trail along Clark Street from Salisbury Avenue to Terrace Road. HMA trail. | Iowa | 2013 | 1 | (TE) 1. Pedestrian and bicycle facilities | CHARLES CITY | FLOYD | $100,000 | $0 | $75,000 | $175,000 |
River Front Walkway/Pedestrian Walkway | River Front Walkway/Pedestrian Walkway. | Iowa | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | MANCHESTER | DELAWARE | $100,000 | $0 | $27,173 | $127,173 |
Muscatine Riverfront Trail (Pearl City Trail) | Construct 1,000 feet of trail between Chestnut Street and Cedar Street along the Mississippi Riverfront in downtown Muscatine. Local Letting | Iowa | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | MUSCATINE | MUSCATINE | $100,000 | $0 | $140,000 | $240,000 |
Muscatine Bridge Lighting Project | Highway 92 Bridge Lighting | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | MUSCATINE | MUSCATINE | $100,000 | $0 | $200,000 | $300,000 |
North Newton Bike & Hike Trail | PCC trail construction. Along N 11th Ave. E. from Patterson Park to E. 10th St. N. - Under construction. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | NEWTON | JASPER | $100,000 | $0 | $139,799 | $239,799 |
City Park Rec Trail in Lemars, PCC Trail | City Park Rec Trail in Lemars, PCC Trail | Iowa | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | LE MARS | PLYMOUTH | $100,000 | $0 | $43,559 | $143,559 |
Sheldon Recreational Trail (Phase 2) from Floyd River to Hills Park | Construct a recreational trail from e Floyd tiver to Hills park in sheldon. ACC trail | Iowa | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | SHELDON | O'BRIEN | $157,000 | $0 | $39,250 | $196,250 |
Trail | Riverview Prk. Dr. from 9th Ave to 6th Ave. S PCC Trail | Iowa | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | CLINTON | CLINTON | $100,000 | $0 | $216,594 | $316,594 |
Hoover Nature Trail, Connect to Ely (ADT) | $99,000 TE funds processed under EDP-0006(092)--7Y-57. Final voucher sent to Finance on 4/19/12. | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | LINN | $99,000 | $0 | $181,228 | $280,228 |
US 63 Sergeant Road Trail Surfacing | Westfield Avenue to Dale Drive. | Iowa | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | WATERLOO | BLACK HAWK | $157,000 | $0 | $203,245 | $360,245 |
Heart of Iowa Trail - from city park at Rock Creek to city limits | City of Maxwell near Rock Creek East to ECL of Maxwell. Bridge Rehabilitation. .4 miles | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | MAXWELL | STORY | $97,500 | $0 | $32,500 | $130,000 |
Brookwood Park to Soccer Complex Connector Trail | Constrct a 10-ft wide, 0.8 mile long HMA trail from the existing path in Brookwood Park southward along 8th Street SE to near the Waverly Soccer Complex. | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | WAVERLY | BREMER | $100,000 | $0 | $25,000 | $125,000 |
Wolf Creek Trail from N. end of Gladbrook Trail NW 1.5 mi. | Far North end of Gladbrook trail in Gladbrook. From Gladbrook trail to Comet Trail. | Iowa | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | TAMA | $152,100 | $0 | $37,900 | $190,000 |
CeMar Trail - Phase 1B | Daniels park Trail from Oakland Road and H Avenue intersectioN along the south side of Daniels Park and a spur trail along the east side of Daniels park from H Avenue to J Avenue | Iowa | 2015 | 1 | (TE) 1. Pedestrian and bicycle facilities | CEDAR RAPIDS | LINN | $255,596 | $0 | $51,119 | $306,715 |
Lincoln Walk Trail (Phase 1) from Lincoln Prairie Park at the jct. Of 216th and 219th St., northeast | from Lincoln Prairie Park at the jct. Of 216th and 219th St., northeast; Boone Co. is doing engineering for the project. HMA Trail | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | OGDEN | BOONE | $105,100 | $0 | $26,300 | $131,400 |
Three Elms Park Road - 4th Ave SE to Three Elms Park | HMA Pave Shoulders from 4th Ave SE to Three Elms Park. | Iowa | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | BUCHANAN | $107,000 | $0 | $322,000 | $429,000 |
Prairie Pathways Masterplan for interpretive signing and information | Cedar Valley Trail - Prairie Pathways master plan. CONTRACT 05739 WAS SET UP FOR 65,122.20. | Iowa | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | BLACK HAWK | $80,000 | $0 | $20,000 | $100,000 |
HMA Bike lanes along County Road R38 from NCL of Slater to County Road E57 | Grade & pave 4.5 miles of bike lanes along Co. Rd. R38 from NCL of Slater to Co Rd. E57 | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | SLATER | STORY | $106,000 | $0 | $26,500 | $132,500 |
Black Hawk Lake Trail - Phase I | Phase I includes 0.51 miles of PCC trail 10' in width at Ice House Point along Black Hawk Lake | Iowa | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | LAKE VIEW | SAC | $110,000 | $0 | $108,000 | $218,000 |
Butler House Trail | pcc Sidewalk- Iowa City-Iowa River Trail | Iowa | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | IOWA CITY | JOHNSON | $111,700 | $0 | $27,925 | $139,625 |
Stanton Bridge Relocation and Trail Development | Stanton Bridge relocation and trail development. | Iowa | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | STANTON | MONTGOMERY | $110,500 | $0 | $27,625 | $138,125 |
Rolling Prairie Trail, Hampton to Hansel | 4.5 mile extension of Rolling Prairie Trail in Franklin County with a granular surface and retro-fit bridge decks for two bridges being 100' and 200'. | Iowa | 2014 | 1 | (TE) 1. Pedestrian and bicycle facilities | RURAL | FRANKLIN | $151,977 | $0 | $100,023 | $252,000 |
Green Valley Trail - along south side of Hwy 25 from Country Club Drive to Lincoln St. (HMA Trail) | along south side of Hwy 25 from Country Club Drive to Lincoln St In-kind contribution.Grade and Pave | Iowa | 2003 | 1 | (TE) 1. Pedestrian and bicycle facilities | CRESTON | UNION | $112,000 | $0 | $38,440 | $150,440 |
Guttenberg Riverfront Trail | From Marina Road south to Cincinatti Street, 0.39 mile. Riverfront Trail from Marina Rd South to Cincinnati St in the City of Guttenberg | Iowa | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | GUTTENBERG | CLAYTON | $109,000 | $0 | $27,250 | $136,250 |
Enhancing I-WALK: Iowa Participatory Evaluation and Documentation of Sidewalks (I-PEDS) | Develop automated I-WALK tools, develop participatory crowd-sourced sidewalk evaluation tool, and develop walking school bus portal to manage walking school bus programs. | Iowa | 2014 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | RURAL | Statewide | $92,602 | $0 | $23,154 | $115,756 |
INHF Project Level Planning for 5 Trail Systems. | Project level planning for Central Iowa Trails, American Discovery Trail, Mississippi River Trail/Eastern Iowa Trail System, Lewis & Clark Multi-Use Trail/Western Iowa Trail System and Iowa Great Lakes Trail System. | Iowa | 2013 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | RURAL | Statewide | $75,000 | $0 | $32,143 | $107,143 |
Iowa DOT Statewide Bicycle Map Printing | Iowa | 2018 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | RURAL | Statewide | $30,780 | $0 | $0 | $30,780 | |
Iowa Mormon Wagon Trails and Handcart Trail Historic Resource Inventory and Plan | Iowa Mormon Wagon Trails and Handcart Trail Historic Resource Inventory and Plan | Iowa | 2013 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | RURAL | Statewide | $86,000 | $0 | $39,000 | $125,000 |
Vincent Bluffs Acquisition | For acquisition of a prominent bluff in the Loess Hills near the I-80/I-29 interchange in Council Bluffs | Iowa | 2001 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | COUNCIL BLUFFS | POTTAWATTAMIE | $290,500 | $0 | $124,500 | $415,000 |
Great River Road and Loess Hills Scenic Byway Protection Project for conservation easements and fee titles. | Protect land through fee title acquisition and conservation easements. Primary focus to preserve scenic byway viewshed, increase public land, permanetly protect critical wildlife habitat and low mangement of natural resources. Secondary focus of outreach to communities, counties and landowners for protection of future sites and corridors including Scenic Byways and to preserve rail-trails. | Iowa | 2013 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | RURAL | Statewide | $455,000 | $0 | $195,000 | $650,000 |
Yellow River Property Acquisition - Ferguson Tract | Acquisition of a 1,054 acre scenic and historic archaeological site along the Great River Road between Effigy Mounds National Monument and Yellow River State Forest. | Iowa | 1999 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | RURAL | ALLAMAKEE | $330,000 | $0 | $630,000 | $960,000 |
Dry Run Trail ROW Acquisition | West and south Windridge Implements Drive linking Trout Run Trail and Prairie Farmer Trail | Iowa | 2013 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | RURAL | WINNESHIEK | $206,167 | $0 | $134,833 | $341,000 |
Herndon to Coon Rapids Segment of the American Discovery Trail: ROW purchase | Acquisition of ROW for a 17 mile segment of the American Discovery Trail that will join Raccoon River Valley network west of Des Moines with the major Whiterock Conservancy rural tourism area. | Iowa | 2011 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | COON RAPIDS | CARROLL | $365,000 | $0 | $531,500 | $896,500 |
US 20 Sac & Fox Overlook | US 20 Sac and Fox Overlook - project awarded to Manatt's Inc.-8/15/08. Letting - 2/17/09 =$203,042.02, Wicks Construction, Inc. Admin Eng: Craig Ritland Landscape. | Iowa | 2005 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | RURAL | HARDIN | $300,900 | $0 | $133,000 | $433,900 |
Loess Hills Scenic Byways Interpretive Panels and Route Signage | Locally let for sign materials. County provided installation as in-kind contribution. | Iowa | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | HARRISON | $25,321 | $0 | $6,330 | $31,651 |
Iowa's Living Roadway Scenic & Natural Resources Fund - FY2002 | For continuation of the visioning and landscaping program for communities w/populations under 10,000 | Iowa | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | Statewide | $400,000 | $0 | $512,221 | $912,221 |
Balltown Scenic Overlook Phase 2 | Ridge road /C9Y scenic overlook North of Balltown. | Iowa | 2003 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | DUBUQUE | $131,060 | $0 | $4,969 | $136,029 |
Ia 2 Southern Loess Hills Welcome Center to Center Parking & Landscaping | Welcome Center along IA 2; 1/2 mile west of I-29, parking lot. | Iowa | 2005 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | FREMONT | $80,000 | $0 | $20,000 | $100,000 |
Cody Sesquicentenial Trail Signs and Historic Markers - along designated routes in Scott Co. | Historical signs and markers on Cody Trail. | Iowa | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | SCOTT | $18,839 | $0 | $4,710 | $23,549 |
Milwaukee Railroad Shops Historic District - Alternative Transportation Project | 1 mile segment of Big Sioux River/Riverside Trail; 1 1/2 mile interpretive walking trail; 70-100 slot parking lot; entrance drive | Iowa | 2011 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | SIOUX CITY | WOODBURY | $750,000 | $0 | $963,610 | $1,713,610 |
US 30/IA 136 in Clinton(Gateway Signs) Signing | US 30/IA 136 in Clinton(Gateway Signs) Signing | Iowa | 2007 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | CLINTON | CLINTON | $112,000 | $0 | $63,234 | $175,234 |
Lincoln Highway Interpretive Center | For development of interpretive ctr at existing state welcome center re the development of the auto, highways and Lincoln Hwy attractions | Iowa | 1999 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | HARRISON | $336,000 | $0 | $144,000 | $480,000 |
Hurstville Interpretive Center along US Hwy. 61 one mi. north of Maquoketa | For the construction of a 9,440 sq ft interpretive tourist center along US 61 one mile n of Maquoketa within the Hurstville Marsh Complex. Sec 13-84-2E (intersection at US61 and Rockdale Road) | Iowa | 2003 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | JACKSON | $490,898 | $0 | $446,486 | $937,384 |
Iowa's Living Roadways ISTEA (FY1999) | For community visioning and landscaping projects in communities with populations of under 10,000 | Iowa | 1999 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | Statewide | $783,804 | $0 | $441,196 | $1,225,000 |
Historic Hills: Destination Corridor Signage | Nine county Historic Hills Region | Iowa | 2005 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | APPANOOSE | $368,300 | $0 | $157,900 | $526,200 |
Iowa Byways Photo Database Development | Iowa Byways Photo Database Development | Iowa | 2009 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | Statewide | $102,802 | $0 | $25,701 | $128,503 |
Great River Road Scenic Byway & Loess Hills Scenic Byway Protection Project | Protect land within Iowa's two national scenic byways vie sheds. Protect land through title fee acquisition and conservation easement. This project will increase public land, permanently protect critical wildlife habitat, preserve valuable scenic byway view sheds and allow management of natural resources. | Iowa | 2011 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | Statewide | $750,000 | $0 | $838,850 | $1,588,850 |
Loess Hills National Scenic Byway Guidebook-Revisions/Reprinting | Update and reprint Loess Hills National Scenic Byway Guidebook. | Iowa | 2008 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | FREMONT | $27,000 | $0 | $46,000 | $73,000 |
Valley Junction Streetscape - Wayfinding, Identity & Directory Signage | Local letting - letting date 9/19/2007. | Iowa | 2007 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | DES MOINES | POLK | $125,149 | $0 | $41,716 | $166,865 |
Marking the Mormon Trail Across Iowa | For wood and metal signs where a road intersects with the actual Mormon Trail, maps for the entire route across the state, kiosks at historic sites and informational brochures. | Iowa | 1995 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | Statewide | $112,710 | $0 | $30,850 | $143,560 |
Lewis and Clark Educational and Interpretive Visitor Center | Displays and exhibits for Lewis and Clark Visitor's center. Phase 3 | Iowa | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | MONONA | $400,000 | $0 | $2,600,000 | $3,000,000 |
Keokuk Gateway (Phases 2 & 3) - Information Center at the intersection of Lucas St. and N. 1st Street | Information Center at the intersection of Lucas St. and N. 1st St. Scenic over look in Keokuk | Iowa | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | KEOKUK | LEE | $118,600 | $0 | $20,219 | $138,819 |
Interpreting Iowa's Byways: Develop and Implement Interpretive Master Plans | Interpreting Iowa's Byways: Develop and Implement Interpretive Master Plans | Iowa | 2013 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | Statewide | $554,000 | $0 | $238,000 | $792,000 |
Lions Club Tree Park Lincoln Highway Interpretive Site | For a regional interpretive center located at jct of E53 and US 30 east of Grand Junction to depict the Lincoln Highway and its role in our nation's history | Iowa | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | GREENE | $212,135 | $0 | $90,965 | $303,100 |
Scenic Overlook and Pedestrian Trail in Balltown on Co. Rd. C9Y | Scenic overlook and Bus parking.Just East of Balltown, Sec.5-90-18 | Iowa | 2001 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | DUBUQUE | $156,700 | $0 | $39,100 | $195,800 |
Historic Hills Destination Corridor Signage Design | Signage Design for entrance signage to 20 communities in 8 counties in southern iowa. | Iowa | 2004 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | Statewide | $93,520 | $0 | $23,380 | $116,900 |
Milwaukee Railroad shops Historic District Phase 5 | Engineering; rehab for carpenter shop, sand drying house, water closet and engineer tool shed; purchase/install minature railroad to move people from parking area to various station shops. | Iowa | 2010 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | SIOUX CITY | WOODBURY | $477,142 | $0 | $119,286 | $596,428 |
Mile Hill Lake Scenic Overlook Connecting Trails along Scenic Byway | Overlook connecting Trails along byway, | Iowa | 1998 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | RURAL | MILLS | $81,600 | $0 | $15,320 | $96,920 |
Urban Youth Corps Training and Landscaping-2008 | 5 sponsors. Trees Forever, MYEP, Mahaska CCB, INHF, Dubuque CCB. | Iowa | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $114,317 | $0 | $52,272 | $166,589 |
Urban Youth Corps Program 2011 | 2011 Urban Youth Corps Program - 6 sponsors. City of Dubuque, Dubuque CCB, Iowa CCB, INHF, Mahaska CCB, Optimae/ARMY Corps. | Iowa | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $100,000 | $0 | $25,000 | $125,000 |
I-29 from US 34 N. to IA 370 Landscaping(Revegetation) | I-29 from US 34 N. to IA 370 Landscaping(Revegetation) | Iowa | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | MILLS | $87,277 | $0 | $21,819 | $109,096 |
The Surf District - North Shore Drive Streetscape Improvement Project | Project is on North Shore Drive from Midpoint North Driving lane to North ROW line. It includes new brick paver sidewalks, concrete driveway approaches, decorative lighting and minor storm sewer improvements. | Iowa | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | CLEAR LAKE | CERRO GORDO | $87,138 | $0 | $107,100 | $194,238 |
Urban Youth Corps 2012 | Project sponsors (6) are City of Dubuque Leisure Services Department ($23,478), Dubuque County Conservation Board ($8,919), Friends of Hartman Reserve ($5,018), Iowa County Conservation Board ($18,972), Optimae LifeServices/Army Corps of Engineers ($8,754), Siouxland Historical Railroad Association ($15,989) | Iowa | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $100,000 | $0 | $42,857 | $142,857 |
Fairfield Downtown Streetscape | Court Street - Downtown area Streets. | Iowa | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | FAIRFIELD | JEFFERSON | $282,100 | $0 | $120,900 | $403,000 |
Main Street Scenic Beautification in Mediapolis | Along Main St., from Hwy 61 to Curve St. in the city of Mediapolis. PCC Pvement - replace. | Iowa | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | MEDIAPOLIS | DES MOINES | $101,000 | $0 | $3,747 | $104,747 |
Urban Youth Corps Training and Landscaping - FY2001 | Urban Youth Corps Training and Landscaping - FY2001 | Iowa | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $85,000 | $0 | $85,000 | $170,000 |
IA 210 (Main St.) Streetscaping from 2nd St. to Broad Street | Downtown streetscape improvements: Sidewalk,planters and lighting. | Iowa | 1997 | 5 | (TE) 5. Landscaping and scenic beautification | MAXWELL | STORY | $84,700 | $0 | $65,410 | $150,110 |
Diagonal Downtown Beautification Project - Phase 1 | Broadway street from 2nd street to 4th street. | Iowa | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | DIAGONAL | RINGGOLD | $100,000 | $0 | $25,000 | $125,000 |
Bloomfield lamp posts | Purchase and install 36 amp posts and fixtures for Davis County Courthouse Square. | Iowa | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | BLOOMFIELD | DAVIS | $39,600 | $0 | $9,900 | $49,500 |
Vintage St Lighting | Main St from Gilbert to Lane in Charles City, Vintage Lighting | Iowa | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | CHARLES CITY | FLOYD | $117,000 | $0 | $29,250 | $146,250 |
City Square enhancements - phase 2 | Centerville Townscape-for materials purchase. Town square in the city of centerville, landscaping. | Iowa | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | CENTERVILLE | APPANOOSE | $70,000 | $0 | $17,500 | $87,500 |
Iowa's Living Roadways (FY1996) | For community visioning and landscaping projects in communities with populations of under 10,000 | Iowa | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $493,000 | $0 | $123,000 | $616,000 |
Keokuk Gateway (Phase 1) at 2nd & Main St (US Hwy 136 ) | IA 136/2nd st main st in keokuk-landscaping | Iowa | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | KEOKUK | LEE | $124,000 | $0 | $31,000 | $155,000 |
Grinnell Downtown Street Scaping | Historic Block of 4th Ave. from Main St. to Broad St ; Broad St. from 4th Ave. to 5th Ave. .2 miles. lighting, pavers, landscape, etc. | Iowa | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | GRINNELL | POWESHIEK | $504,000 | $0 | $126,000 | $630,000 |
Urban Youth Corps Program 2009 | 2009 Urban Youth Corps Program-- 6 sponsors. Trees Forever, ResCare (Army corps of engineers), Mahaska CCB, INHF, Dubuque CCB, Black Hawk CCB. | Iowa | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $125,000 | $0 | $53,571 | $178,571 |
Business 218 Landscaping (Phase 2) from Brantingham St. to Glenwood Rd. | Brantingham St. to Glenwood Rd | Iowa | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | CHARLES CITY | FLOYD | $192,500 | $0 | $82,500 | $275,000 |
Roadside Beautification/Maintenance Reduction: County Highways | UNI will purchase prairie grass and wildflower seed for count road rights of way to distribute to the 77 counties with Integrated Roadside Vegetation Management Plans on file with the Iowa DOT. | Iowa | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $188,947 | $0 | $694,915 | $883,862 |
Bringing Prairie and People Together | HMA Trail. For PE, CE and Construction | Iowa | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | PRAIRIE CITY | JASPER | $593,454 | $0 | $183,528 | $776,982 |
Window on Waterloo, Phase 5; US 218 Gateway Development | For tree plantings, antique lighting, decorative brick pavers, and the Leo P. Roof recognition area adjacent to the northbound service road and the relocated US 218 viaduct between West Park Avenue and West 6th Street. | Iowa | 1997 | 5 | (TE) 5. Landscaping and scenic beautification | WATERLOO | BLACK HAWK | $638,885 | $0 | $159,721 | $798,606 |
Landscaping from US 34 North to Iowa 137 in Albia | Contract with Ogle's Greenhouse to landscape the Albia Highway 5 Corridor. | Iowa | 1996 | 5 | (TE) 5. Landscaping and scenic beautification | ALBIA | MONROE | $47,600 | $0 | $38,974 | $86,574 |
Ames Southeast Entryway | US 30 in the City of Ames from S. Dayton Ave to I-35 Interchange. Lighting and landscaping. | Iowa | 2010 | 5 | (TE) 5. Landscaping and scenic beautification | AMES | STORY | $683,000 | $0 | $400,310 | $1,083,310 |
Urban Youth Corps Training and Landscaping - FY99? | Urban Youth Corps Training and Landscaping - FY99? | Iowa | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $47,460 | $0 | $58,278 | $105,739 |
Urban Youth Corps Training and Landscaping -2007 | Urban Youth Corps Training and Landscaping -2007 | Iowa | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $46,695 | $0 | $33,304 | $80,000 |
Iowa's Living Roadways / Trees Forever (FY1998) | For community visioning and landscaping projects in communities with populations of under 10,000. | Iowa | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $744,723 | $0 | $319,167 | $1,063,890 |
Highland Park Streetscaping at 6th Ave. and Euclid Ave. in Des moines. | 6th Avenue in Des moines from Euclid to Clinton. HMA Resurfacing with Milling. | Iowa | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | DES MOINES | POLK | $185,300 | $0 | $679,554 | $864,854 |
Fairfield Entrance Sign | Fairfield entrance side on the south part of town. NE Quadrant of interchage Hwy 1 and Hwy 34. | Iowa | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | FAIRFIELD | JEFFERSON | $40,800 | $0 | $10,200 | $51,000 |
US 63 Streetscape | For 0.5 mile of streetscape to the one-way pair of Mullan Ave and 1st St between US 218 and the riverwalk, and to Commercial St and Jefferson St. | Iowa | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | WATERLOO | BLACK HAWK | $476,938 | $0 | $119,235 | $596,173 |
Urban Youth Corps Training and Landscaping - FY2000 | Urban Youth Corps Training and Landscaping - FY2000 | Iowa | 2000 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $60,000 | $0 | $48,015 | $108,015 |
Roadside Beautification / Maint. Reduction - FY 2002 | For prairie grass and wildflower seed purchase for county rights of way in Iowa | Iowa | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | CEDAR FALLS | BLACK HAWK | $461,223 | $0 | $197,634 | $658,857 |
Roadside Beautification / Maint. Reduction - FY 2001 | For purchase of seed only | Iowa | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $461,200 | $0 | $472,500 | $933,700 |
Roadside Beautification/Maintenance Reduction FY 2009 | UNI will purchase prairie grass and wildflower seed for county road rights of way to distribute to the counties with Integrated Roadside Vegetation Management Plans on file with the Iowa DOT. | Iowa | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $200,000 | $0 | $50,000 | $250,000 |
Roadside Beautification/Maintenance Reduction: County Highways 2008 | Roadside Beautification/Maintenance Reduction: County Highways 2008 | Iowa | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $200,000 | $0 | $85,714 | $285,714 |
Iowa's Living Roadways | Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping (PE, CE and Construction) | Iowa | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | MARION | LINN | $200,000 | $0 | $103,818 | $303,818 |
Iowa's Living Roadways Scenic and Natural Resources Fund (Trees Forever) | To assist small communities to re-establish the native landscape along their transportation corridors. Typical participating communities are motivated by a desire to keep their small towns viable by improving them both physically and visually. | Iowa | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $400,000 | $0 | $180,714 | $580,714 |
Iowa's Living Roadway Scenic & Natural Resources Fund - FY2003 | For continuation of the visioning and landscaping program for communities w/populations under 10,000 | Iowa | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $400,000 | $0 | $176,000 | $576,000 |
Iowa's Living Roadways 2005 | Iowa's Living Roadway Scenic and Natural Resources - Landscaping, PE and Construction | Iowa | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | MARION | LINN | $200,000 | $0 | $436,000 | $636,000 |
Roadside Beautification/Maintenance Reduction 2007 | FY 2007 | Iowa | 2007 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $200,000 | $0 | $100,000 | $300,000 |
Iowa's Living Roadways | Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction | Iowa | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | MARION | LINN | $200,000 | $0 | $133,998 | $333,998 |
Iowa's Living Roadways Project Program | Assist small communities and counties throughout Iowa for roadside and trail enhancements, landscape projects. (Trees Forever) | Iowa | 2013 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $400,000 | $0 | $171,428 | $571,428 |
Iowa's Living Roadways 2004 | Iowa Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping | Iowa | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | MARION | LINN | $200,000 | $0 | $50,000 | $250,000 |
Iowa's Living Roadways 2004 | For landscaping in cities with populations under 10,000. | Iowa | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $200,000 | $0 | $85,714 | $285,714 |
Roadside Beautification/Maiintenance Reduction 2004 | For purchase and distribution of prairie grass and weldflower seed to the 81 counties with Integrated Roadside Vegetation Management Plans on file with the Iowa DOT. | Iowa | 2006 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $200,000 | $0 | $100,000 | $300,000 |
Roadside Beautification/Maintenance Reduction 2002 | For purchase of prairie grass and wildflower seed to be made available to the 79 counties with Integrated Roadside Vegetation Management Plans on file with the Iowa Department of Transportation. The prairie grass and seed is to be used in county road rights-of-way. | Iowa | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $200,000 | $0 | $810,216 | $1,010,216 |
Along US 69 (Ankeny Blvd.) from 1st St. to just north of NE 18th St. | Landscaping Along US 69 (Ankeny Blvd.) from 1st St. to just north of NE 18th St. | Iowa | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | ANKENY | POLK | $200,000 | $0 | $267,418 | $467,418 |
Arnolds Park: US 71 Corridor Enhancements | Scenic beautification of the US 71 corridor in the Iowa Great Lakes region. Trail, lighting | Iowa | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | ARNOLDS PARK | DICKINSON | $450,000 | $0 | $667,000 | $1,117,000 |
Valley Junction Streetscape - 4th to 6th Street | Valley Junction Streetscape - 4th to 6th Street | Iowa | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | WEST DES MOINES | POLK | $450,407 | $0 | $243,330 | $693,737 |
Urban Youth Corps Training and Landscaping - FY2002 | Urban Youth Corps Training and Landscaping - FY2002 | Iowa | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $67,802 | $0 | $52,197 | $120,000 |
URBAN YOUTH CORPS- Statewide | URBAN YOUTH CORPS- Statewide | Iowa | 2004 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $80,000 | $0 | $80,000 | $160,000 |
Enhancement project in Black Hawk County | At native roadside vegetation enhancement center at the UNI campus. | Iowa | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | BLACK HAWK | $760,000 | $0 | $190,000 | $950,000 |
Iowa's Living Roadway Project Program - Trail Visioning | Trails Visioning - Provide Iowa communities and trail groups professional plan and implement trail safety and overall trail improvement projects. | Iowa | 2017 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $82,000 | $0 | $20,500 | $102,500 |
Iowa's Living Roadway Projects Program - Trails Visioning | Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction | Iowa | 2016 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $60,000 | $0 | $140,000 | $200,000 |
Iowa's Living Roadway Projects Program - Projects | Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction | Iowa | 2016 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $140,000 | $0 | $60,000 | $200,000 |
Iowa's Living Roadways | Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction | Iowa | 2009 | 5 | (TE) 5. Landscaping and scenic beautification | MARION | LINN | $400,000 | $0 | $293,302 | $693,302 |
Parkersburg Iowa Highway 14/57 Corridor Improvements | Encompassing 1.44 miles, the project termini are the east junction of IA 14/57 to the west juction of IA 14/57 in Parkersburg. In addition to the proposed roadway improvements (Agreement No HDP-014-7(036)--7I-12), proposed enahncements include aesthetic improvements, bicycle and pedestrian accomodation, lighting, and pavement treatments. The exact scope of the enhancements will be deteremined as part of the final design of the corridor. | Iowa | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | PARKERSBURG | BLACK HAWK | $2,851,770 | $0 | $230 | $2,852,000 |
U.S. Highway 63 Streetscape Enhancements - Donald Street to Newell Street | Encompassing one miles, streetscape enahncements will include brick pavers at median ends and intersection corners, shade trees and evergreen trees, pedestrian lighting, decorative roadway lighting, benches, trash recepticles, neighborhood monuments and a recreational trail. | Iowa | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | WATERLOO | BLACK HAWK | $861,000 | $0 | $277,780 | $1,138,780 |
Iowa's Living Roadway Project Program | Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Trails Visioning - Planning Activities | Iowa | 2014 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $84,000 | $0 | $21,000 | $105,000 |
Iowa's Living Roadways Projects Program | Iowa's Living Roadways Projects Program - Community Improvement Projects | Iowa | 2017 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $167,562 | $0 | $42,000 | $209,562 |
Iowa's Living Roadways Project Program | Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction | Iowa | 2014 | 5 | (TE) 5. Landscaping and scenic beautification | RURAL | Statewide | $354,496 | $0 | $0 | $354,496 |
Iowa's Living Roadways | Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction | Iowa | 2011 | 5 | (TE) 5. Landscaping and scenic beautification | MARION | LINN | $400,000 | $0 | $21,126 | $421,126 |
Iowa's Living Roadways | Iowa's Living Roadway: Trees Forever outside services engineering, landscaping | Iowa | 2012 | 5 | (TE) 5. Landscaping and scenic beautification | MARION | LINN | $400,000 | $0 | $171,428 | $571,428 |
Fleur Drive Gateway Scenic Beautification Project | To landscape the medians along the entire length of Fleur Drive in order to create a scenic gateway and calm traffic flow. | Iowa | 2003 | 5 | (TE) 5. Landscaping and scenic beautification | DES MOINES | POLK | $400,000 | $0 | $1,342,039 | $1,742,039 |
Signing Iowa's National Heritage Area | For signing Iowa's National Heritage Area: Site id signs at Silos and Smokestacks designated sites. | Iowa | 2005 | 6 | (TE) 6. Historic preservation | RURAL | BLACK HAWK | $109,250 | $0 | $27,313 | $136,563 |
Development and Access to Cultural Resource Data in Iowa through GIS | To link the database of historic site information to a GIS system to be shared by SHPO and OSA | Iowa | 1999 | 6 | (TE) 6. Historic preservation | RURAL | Statewide | $434,412 | $0 | $186,177 | $620,589 |
Conoco Station Restoration | Conoco Station Restoration | Iowa | 2000 | 6 | (TE) 6. Historic preservation | BEDFORD | TAYLOR | $50,000 | $0 | $13,800 | $63,800 |
Chautauqua Recreational Park (Phase 1) wetland and water quality mitigation for runoff from US 59. | wetland and water quality mitigation for runoff from US 59. Project completed. Federally closed - 12/28/09. Total Project Cost =$144,212.45. Participating Cost $91,625, Non- Part Cost $52,587.45(Local eligible unclaimed funds due to STIP amount) Federal Funds=$73,300 | Iowa | 2001 | 6 | (TE) 6. Historic preservation | OAKLAND | POTTAWATTAMIE | $73,300 | $0 | $18,300 | $91,600 |
Renovating Old Fort Madison in Lee County | Renovating Old Fort Madison in Lee County. | Iowa | 2006 | 6 | (TE) 6. Historic preservation | FORT MADISON | LEE | $33,929 | $0 | $12,876 | $46,806 |
Swedish Heritage Husker Restoration Project | Restoration of Swedish Huckster barn in Swedesburg | Iowa | 1995 | 6 | (TE) 6. Historic preservation | RURAL | HENRY | $27,000 | $0 | $52,806 | $79,806 |
Grand Army of the Republics Building | Grand Army of the Republics Building | Iowa | 1995 | 6 | (TE) 6. Historic preservation | RURAL | DALLAS | $22,600 | $0 | $7,025 | $29,625 |
Home Oil Restoration | Rehabilitate the historic Lincoln Highway Home Oil Service Station, while modernizing the interior of the facility to house the City?¢‚Ä¢‚Äôs Department of Public Safety. | Iowa | 2012 | 6 | (TE) 6. Historic preservation | STATE CENTER | MARSHALL | $112,262 | $0 | $48,112 | $160,374 |
Historical Restoration of Grand Army of the Republic Building in Redfield | For restoration of the Grand Army of the Republic bldg, a historic building tied to the GAR Highway (US 6). This phase includes constructing the storefront, repairing the walls, windows and doors, painting, mechanicals and electrical installation. | Iowa | 2002 | 6 | (TE) 6. Historic preservation | REDFIELD | DALLAS | $60,000 | $0 | $30,000 | $90,000 |
Steam Locomotive Restoration | Restoration of steam locomotive no 1355, located in Sioux City and the Sioux city Historic roundhouse railway complex. | Iowa | 1997 | 6 | (TE) 6. Historic preservation | SIOUX CITY | WOODBURY | $64,280 | $0 | $9,320 | $73,600 |
Exploring Iowa's Past: An Archaeological Guide to Iowa | For development of a book to make Iowa DOT archaeology projects understandable to the general public | Iowa | 1996 | 6 | (TE) 6. Historic preservation | IOWA CITY | LINN | $55,400 | $0 | $36,011 | $91,411 |
American Gothic House Visitor Center & Trailhead | Building Restoration of the American Gothic House. | Iowa | 2004 | 6 | (TE) 6. Historic preservation | OTTUMWA | WAPELLO | $75,000 | $0 | $277,173 | $352,173 |
Restoration of the Germania Haus / Miller Hotel as the German American Heritage Center | For a museum, library, archives, records repository, and research center related to the German immigrants in the state's development | Iowa | 2000 | 6 | (TE) 6. Historic preservation | DAVENPORT | SCOTT | $97,972 | $0 | $24,528 | $122,500 |
Dayton House (Stagecoach Inn) Restoration | Complete restoration of the 1868 Dayton House (Stagecoach Inn). Will be used as a historical site for tours, retreats, and reenactments. | Iowa | 2008 | 6 | (TE) 6. Historic preservation | BOUTON | DALLAS | $105,000 | $0 | $45,000 | $150,000 |
Dayton House Restoration Phase II | Complete the restoration of the 1868 Dayton House Stagecoach Inn). | Iowa | 2012 | 6 | (TE) 6. Historic preservation | RURAL | DALLAS | $105,000 | $0 | $45,000 | $150,000 |
Klondike Hotel Rehabilitation - Arhitectural study services only | Architect consultant investigation and study report for the Historic Klondike hotel. No letting for consultant service, consultant agreement signed by DOT 9/9/98. | Iowa | 1998 | 6 | (TE) 6. Historic preservation | MANILLA | CRAWFORD | $6,000 | $0 | $1,500 | $7,500 |
Rolling Prairie Trail Bridge Repair | Repair of Rolling Prairie Trail Bridge over Shell Rock River west of Clarksville following arson. Will include new wood decking and railings. | Iowa | 2011 | 6 | (TE) 6. Historic preservation | RURAL | BUTLER | $210,000 | $0 | $90,000 | $300,000 |
Wapsi Great Western Trail Welcome Center in Riceville - purchase and rennovate an historic building | Purchase and rennovate an historic building; project progressing as of Aug 2002.SHPO'S historical architect approved the building renovation plans on 10/3/00. | Iowa | 1996 | 6 | (TE) 6. Historic preservation | RURAL | MITCHELL | $304,400 | $0 | $76,100 | $380,500 |
Klondike Railroad Hotel - Exterior Restoration | Phases A,B,C of the exterior restoration of the Klondike Railroad Hotel. | Iowa | 2001 | 6 | (TE) 6. Historic preservation | MANILLA | CRAWFORD | $114,200 | $0 | $28,300 | $142,500 |
Phase 4: Milwaukee Railroad Shops Historic District Rehabilitation Project | Phase 4 Milwaukee Railroad Shop Historic District Rehabilitration Paroject. | Iowa | 2007 | 6 | (TE) 6. Historic preservation | SIOUX CITY | WOODBURY | $606,856 | $0 | $310,394 | $917,250 |
Lincoln Highway Rehabilitation & Restoration | Storm sewer/Intake. - 8th St. to Bus Brown Drive in Woodbine. Also has $175,000 in TE Funding from Region 18 (MAPA). The TE funds should be used first | Iowa | 2006 | 6 | (TE) 6. Historic preservation | WOODBINE | HARRISON | $359,735 | $0 | $42,228 | $401,963 |
Keystone Bridge Rehabilitation over Turkey River | Keystone Bridge Rehabilitation - Bridge Street over Turkey River - Tuck pointing, pillar repair. Storm sewer repair and water line relocation for Keystone Bridge Rehabiliation project. | Iowa | 2005 | 6 | (TE) 6. Historic preservation | ELKADER | CLAYTON | $261,352 | $0 | $112,008 | $373,360 |
Historic Main Street Rehabilitation AMANA Phase 1 - 47th Avenue (1st St.) from 46th Avenue to 48th Avenue | Design development and construction documents for the entire project area and the restoration of 47th Avenue | Iowa | 2001 | 6 | (TE) 6. Historic preservation | RURAL | IOWA | $477,000 | $0 | $208,240 | $685,240 |
Historic Main Street in Amana Phase 2 | Reconstruction of Main St in Amana 220th Trail (IA 220) 43rd Ave to 47th Ave Phase 2 | Iowa | 2003 | 6 | (TE) 6. Historic preservation | RURAL | IOWA | $637,223 | $0 | $667,776 | $1,305,000 |
Iowa State Fair Grandstand Rehabilitation | For the rehabilitation of the historic Iowa State Fair Grandstand to its original 1927 condition | Iowa | 1996 | 6 | (TE) 6. Historic preservation | DES MOINES | POLK | $1,250,000 | $0 | $3,067,930 | $4,317,930 |
Historic Preservation | Building Restoration | Iowa | 1994 | 6 | (TE) 6. Historic preservation | DAVENPORT | SCOTT | $483,000 | $0 | $800,681 | $1,283,681 |
Amtrak Station Platform Improvements | For improvements to AMTRAK platforms to bring them up to ADA compliance. Facilities for pedestrians.Jasper Construction Services and City of West Des Moines. Project Engineer Shive-Hattery Engr&Arch | Iowa | 2006 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | FORT MADISON | LEE | $750,000 | $0 | $250,000 | $1,000,000 |
Milwaukee RR Roundhouse Acquisition and Stabilization | For the acquisition of the former Milwaukee Railroad Roundhouse Complex and stabilization of the current deterioration of the roundhouse AKA Siouxland Historical Railroad Bldg | Iowa | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | SIOUX CITY | WOODBURY | $540,000 | $0 | $135,000 | $675,000 |
Carroll Depot Courtyard Development | To develop the courtyard around the restored historic C & NW depot along US 30 & the Lincoln Highway | Iowa | 2002 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | RURAL | CARROLL | $278,930 | $0 | $211,497 | $490,427 |
Transportation Improvements to the Boone & Scenic Valley Railroad | To purchase 23.6 acres of historic railroad right ofway and electrify 1.6 miles of track, other associated rehabilitation activities. SEE NOTE: SAYS FUNDS WERE ADDED FROM ANOTHER PROJECT | Iowa | 1996 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | BOONE | BOONE | $516,000 | $0 | $118,370 | $634,370 |
Burlington Northern Depot Renovation #2 | Renovation of historic depot located at Hwy 69 (Main St) and main rail in Osceola. Restoration to reflect the early 1900's. | Iowa | 2013 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | OSCEOLA | CLARKE | $811,924 | $0 | $618,076 | $1,430,000 |
Relocation / Restoration of Illinois Central RR Depot | Building restoration | Iowa | 1996 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | INDEPENDENCE | BUCHANAN | $192,000 | $0 | $48,001 | $240,001 |
Dawson Depot Acquisition and Restoration | Dawson Depot Acquisition and Restoration | Iowa | 2007 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | DAWSON | DALLAS | $157,500 | $0 | $48,750 | $206,250 |
Heritage Zone - the Milwaukee Railroad Shops Historic District | Building Renovation.The project will purchase 8+ acres of former railroad property, and will rehabilitate the wood sand tower, sand drying house, interior of car shops, and interior of roundhouse bay 1. | Iowa | 2005 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | SIOUX CITY | WOODBURY | $263,782 | $0 | $113,050 | $376,832 |
Phase 2 Humeston Union Depot Interior Renovation | The Union RR depot restoration. This is part of the Mormon Trail program as the depot is owned by the Mormon Trail Chamber and Development Corporation. | Iowa | 1999 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | HUMESTON | WAYNE | $48,200 | $0 | $12,100 | $60,300 |
Santa Fe Depot & Freight Complex Restoration | Initiate the restoration and reuse of the historic 1909 Santa Fe Depot, 1926 Railway Expressway Agency Building adjacent to the depot and the 1930 Santa Fe Freight Office building. These buildings, known as the Atcheson, Topeka and Santa Fe Passenger and Freight Complex, are listed as a complex on the National Register of Historic Places. The project will encompass Phase I of the complex restoration and reuse project, which will rehabilitate part of the depot for use as an Amtrak station and the first floor of the Freight Office for use as an interpretive center for the North Lee County Historical Society, which possesses many artifacts relevant to the area's history, especially related to rail transportation. | Iowa | 2008 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | FORT MADISON | LEE | $280,000 | $0 | $120,000 | $400,000 |
Window Rennovation / Preservation | To replace window frames and install new windows in a historic Creston railroad depot. | Iowa | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | CRESTON | UNION | $180,000 | $0 | $45,000 | $225,000 |
Rehabilitation and Retrofit of Historic Boone County Wagon Bridge | Rehabilitation and Retrofit of Historic Boone County Wagon Bridge | Iowa | 2006 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | RURAL | BOONE | $800,000 | $0 | $160,000 | $960,000 |
Historic Transportation Depot Rehabilitation - Cedar Valley Nature Trail | Cedar Valley Nature Trail Depot Rehabilitation | Iowa | 2009 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | RURAL | LINN | $192,500 | $0 | $92,500 | $285,000 |
Marsh Arch Bridge Rehabilitation | For the rehabilitation and restoration of an existing Marsh Rainbow Arch concrete bridge constructed in 1916 | Iowa | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | RURAL | BOONE | $112,000 | $0 | $28,000 | $140,000 |
Cedar Covered Bridge in Madison County | To restore the fire-damaged Cedar Covered Bridge and landscape the immediate vicinity. The bridge was extensively damaged by fire on September 3, 2002. This bridge was immortamized by the Robert Waller novel, "The Bridges of Madison County". | Iowa | 2003 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | RURAL | MADISON | $700,000 | $0 | $300,000 | $1,000,000 |
Phase 2 Lincoln Way Restoration from 3rd St. to 7th St. | Rehabilitation / restoration of Lincoln Way from 3rd Street to 7th Street - grading, drainage, paving, walls, lights, interpretive signs, etc. Brick paver restoration | Iowa | 2003 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | WOODBINE | HARRISON | $1,107,000 | $0 | $375,820 | $1,482,820 |
Pine Ave pedestrian bridge over I-35 | Adding sidewalks to brdiges built in conjunction with the IA 5 Beltway project. Funding was included in the structure project. | Iowa | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | WEST DES MOINES | POLK | $139,700 | $0 | $210,300 | $350,000 |
Hale Bridge Restoration and Renovation | For the restoration and relocation of a three-span bowstring truss bridge known as the Hale Bridge in Jones County. The 296-foot bridge is listed on the National Register of Historic Places and is scheduled for replacement by a new structure. Over the Wapsipinicon River | Iowa | 2002 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | RURAL | JONES | $205,874 | $0 | $196,450 | $402,324 |
Mills Tower Complex and ICRR Depot Restoration | Architectural and construction costs. | Iowa | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | IOWA FALLS | HARDIN | $185,948 | $0 | $25,986 | $211,935 |
Reed/Niland Corner - Phase 3 | Reed/Niland Corner - Phase 3 | Iowa | 2007 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | COLO | STORY | $131,363 | $0 | $56,300 | $187,663 |
Leon Depot Renovation, Phase 2 | Leon Depot Renovation, Phase 2 | Iowa | 2005 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | LEON | DECATUR | $135,000 | $0 | $58,800 | $193,800 |
Lincoln Way Restoration from 2nd St. to 3rd St. | Project includes design of improvements from 2nd to 11th St., but only includes construction from 2nd to 3rd St. NOTE:Expanded to 7th st. Brick paver restoration | Iowa | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | WOODBINE | HARRISON | $1,107,000 | $0 | $1,117,000 | $2,224,000 |
Osceola Burlington Northern Railroad Depot | Building Renovation. Amtrak Depot - Osceola Burlington Northern Depot. | Iowa | 2003 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | OSCEOLA | CLARKE | $301,186 | $0 | $71,590 | $372,776 |
Leon Depot Restoration, Phase III | Location at 1306 S Main Street, Leon, IA. Goal of this phase of the restoration of the historic BNSF rail depot is to replace the current single pane windows (many already damaged or deteriorated) with modern windows that also preserve the historic look and function of the existing windows. | Iowa | 2013 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | LEON | DECATUR | $130,000 | $0 | $53,700 | $183,700 |
Iowa River Trail - Burlington St. to Napoleon Park | Iowa Rail Trail-Burlington-Napoleon Pk. ACC/PCC Trail | Iowa | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | IOWA CITY | JOHNSON | $715,000 | $0 | $597,306 | $1,312,306 |
Raccoon River Valley Trail (Phase 3) from Herndon S. to Yale (from N. termini of RRVT in Yale to E-5 | Raccoon River Valley Trail (Phase 3) from Herndon S. to Yale (from N. termini of RRVT in Yale to E-5 (RTC rail-trail database) ACC trail. | Iowa | 1999 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | GREENE | $123,700 | $0 | $236,067 | $359,767 |
Correctionville to Little Sioux Park | Rail Trail (.70 miles) From IA 31 (Correctionville) along abandoned RR to Little Sioux Pk Recreational Trail south of Correctionville and Iowa 31 continuing along abandoned Chicago, Central and Pacific Right of way and terminating in Little Sioux Park | Iowa | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | WOODBURY | $90,000 | $0 | $22,500 | $112,500 |
From 5th St. to F St. on Charles City Western RR ROW | On Charles City Western RR ROW. Charles City Engineer trail designer. Bike/Pedestrian trail | Iowa | 2001 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | CHARLES CITY | FLOYD | $82,400 | $0 | $25,135 | $107,535 |
Raccoon River Valley Trail Overlay (extension) | This is an extension of the previously funded overaly project STP-E-C025(54)--8V-25. Raccoon Valley Trail from P58 E. to 0.6 miles west of R22 in Waukee. | Iowa | 2005 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | DALLAS | $306,410 | $0 | $111,682 | $418,093 |
Postville Trail | Rail Trail along I&M RR in Postville. Co-op Drive from Lybrand St to Ogden St. | Iowa | 2004 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | POSTVILLE | ALLAMAKEE | $72,600 | $0 | $30,298 | $102,898 |
Raccoon Valley Trail from Beuna Vista Drive to Rocklyn Drive | HMA Trail - Raccoon Valley Trail from Buena Vista Dr. & Oakbrook Dr. Jct. SE to Rocklyn Dr. in City of Urbandale. | Iowa | 2007 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | URBANDALE | POLK | $145,000 | $0 | $70,186 | $215,186 |
Keosauqua Two-Mile Loop Trail | Along old rr bed, Mulberry St, fairgrounds, & shared use streets. 2 miles | Iowa | 2004 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | KEOSAUQUA | VAN BUREN | $148,000 | $0 | $53,500 | $201,500 |
Cedar Valley / Hoover Trail Connector (Phase 2) from Tait Cummins Park to Ely Road SW | For 4.61 miles of trail along the riverfront, city streets, and railroad right of way to connect the CVNT to downtown Cedar Rapids. Prairie Creek to Ely Rd Sw. | Iowa | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | CEDAR RAPIDS | LINN | $601,125 | $0 | $104,033 | $705,158 |
Old Stone Arch Trail - trail construction on abandoned RR ROW in Shelby and Pottawattamie counties | trail construction on abandoned RR ROW in Shelby and Pottawattamie counties. ACC trail | Iowa | 1996 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | SHELBY | SHELBY | $334,410 | $0 | $83,635 | $418,045 |
Correctionville - Little Sioux Park Trail | RR ROW between Little Sioux County Park and the town of Correctionville. 1.7 miles | Iowa | 2004 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | WOODBURY | $270,000 | $0 | $545,413 | $815,413 |
Rolling Prairie Trail-Clarksville Connection | 1.00 mile of Rail trail connecting east of Clarksville to rail trail west of Clarksville. | Iowa | 2006 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | BUTLER | $160,000 | $0 | $40,000 | $200,000 |
Raccoon River Valley Trail | Located in Cooper from N St. to Booth St. (RTC rail-trail database) | Iowa | 1997 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | GREENE | $181,900 | $0 | $190,145 | $372,045 |
Raccoon River Valley Trail Addition | Commission again 1/8/2008 for increase; Raccoon River Valley Trail-Addition-Former RR ROW from Herndon in Guthrie Cty. to Waukee in Dallas Cty. | Iowa | 2008 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | DALLAS | $1,979,056 | $0 | $2,346,584 | $4,325,640 |
Boone & Scenic Valley Rail | To rehabilitate 2.5 miles of railroad track and six interpretive sites, refurbish freight train and funds for purchase of FDDMS right of way. Mainline Rehabilitation and interpretive Sites | Iowa | 2003 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | BOONE | BOONE | $497,000 | $0 | $213,000 | $710,000 |
Railbanking of IANW RR, Section 2 & 3 | Purchase of Sections 2 & 3 of the IANW RR | Iowa | 2012 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | DICKINSON | $595,511 | $0 | $255,219 | $850,730 |
Rail Trail Extension - Trains unlimited corridor US 63 to Readlyn | Acquire right of way for rail trail extension.SW cor sec 7-91-12 E 6 mi. to SE cor sec 11-91-11 | Iowa | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | WAVERLY | BREMER | $52,000 | $0 | $48,200 | $100,200 |
Ringgold Co. Trail - Phase 2 (on abandoned RR ROW in W 1/4 Cor. Of Section 4-68-29) | Mp Trail on abandoned RR ROW in W 1/4 Cor. Of section 4-68-29 | Iowa | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | RINGGOLD | $32,897 | $0 | $8,224 | $41,122 |
Clearfield Trail | Walking and biking trail 0.6 miles long on abandoned rail line. The trail begins on the west edge of the City of Clearfield and continues west. It will be surfaced with gravel/mulch and will be landscaped. | Iowa | 2007 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | CLEARFIELD | TAYLOR | $21,500 | $0 | $11,500 | $33,000 |
Waverly / Bremer Co. Rail-Trail | To develop a trail extending from US 63 to 1st St. in Waverly along an abandoned railroad corridor. (ROW Acquistion) | Iowa | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | WAVERLY | BREMER | $70,600 | $0 | $17,700 | $88,300 |
Four rail to trail corridors: Sheffield to Chapin, Belmond to Thornton, Thornton to Mason City, Eddyville to Maxon | ROW- Four Rail to Trail Corridors: Sheffield to Chapin, Belmond to Thornton, Thornton to Mason City, Eddyville to Maxon. | Iowa | 2006 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | CERRO GORDO | $600,000 | $0 | $300,210 | $900,210 |
Railbanking of IANW RR, Section 1 in Dickinson County and a rail segment in Osceola. County. | Acquisition of the a segment of the IANW RR in Dickinson County and a segment in Osceola County. | Iowa | 2013 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | DICKINSON | $750,000 | $0 | $753,566 | $1,503,566 |
Waukee to Dawson Trail Right of Way | Waukee to Dawson Trail Right of Way, Rural railroad ROW between Waukee and Dawson PE, ROW | Iowa | 2006 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | DALLAS | $836,000 | $0 | $209,000 | $1,045,000 |
Rolling Prairie Trail Acquisition- Allison to Coulter | Rolling Prairie Trail. Union Pacific Railroad corridor from East of Allison to just East of Coulter. PE, Right of way acquisition. | Iowa | 2005 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | BUTLER | $620,377 | $0 | $246,497 | $866,875 |
Raccoon River Valley Trail Extension - connecting existing Raccoon River Valley trail to Clive Green | For a six-mile trail project connecting the Raccoon River Valley Trail to the Des Moines metro area along US 6 | Iowa | 2000 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | RURAL | DALLAS | $17,500 | $0 | $503,682 | $521,182 |
Sand Road Heritage architectural survey | Sand Road Heritage - achitectural survey. | Iowa | 1996 | 10 | (TE) 10. Archaeological planning & research | RURAL | JOHNSON | $65,800 | $0 | $29,052 | $94,852 |
Archaeological Survey of the Glenwood Resource Center | Archaeological Survey of the Glenwood Resource Center | Iowa | 2011 | 10 | (TE) 10. Archaeological planning & research | GLENWOOD | POTTAWATTAMIE | $292,402 | $0 | $125,598 | $418,000 |
Historic Preservation | Historic preservation activities done by a consultant and temporary Iowa DOT staff. Document the location and condition and preserve the Iowa Dot's historic materials. | Iowa | 2006 | 10 | (TE) 10. Archaeological planning & research | RURAL | STORY | $220,000 | $0 | $220,000 | $440,000 |
Provide On-line Access to History, Architecture, Archaeology Documents | To provide on-line computer access to history, architecture and archaeology documents contained in Iowa's statewide site inventory with scanned, searchable text in Portable Digital File (PDF) format. | Iowa | 2006 | 10 | (TE) 10. Archaeological planning & research | RURAL | Statewide | $220,275 | $0 | $94,404 | $314,679 |
LANDMASS - GIS Landscape Model for Archaeological Site Suitability in Iowa | For the creation of LANDMASS, a decision support model for archaeological survey planning and cultural resource management in Iowa. The model will include a relational database and Geographical Information System (GIS) that combines and synthesizes multiple layers of archaeological and environmental data. | Iowa | 2004 | 10 | (TE) 10. Archaeological planning & research | DES MOINES | POLK | $221,406 | $0 | $101,190 | $322,596 |
Bringing the Glenwood Culture to Iowan's: Research Publication & Engagement on Archaeological Sites Excavated by IDOT | This project proposes archaeological research culminating in the publication of a scientific report and activities associated with outreach programs on the 800-year-old Glenwood culture of Mills County, Iowa. The project involves Glenwood archaeological sites excavated as part of Iowa DOT?¢‚Ä¢‚Äôs 1970 construction of U.S. Route 34, now part of the Loess Hills Scenic Byway. | Iowa | 2011 | 10 | (TE) 10. Archaeological planning & research | RURAL | Statewide | $398,986 | $0 | $340,747 | $739,733 |
Historic Document Archiving, Phase IV | For the consultant to continue to develop a plan for cataloging and preserving, as well as digitizing and making available the Iowa DOT's hhistoric photo collections. | Iowa | 2009 | 10 | (TE) 10. Archaeological planning & research | RURAL | Statewide | $120,000 | $0 | $51,429 | $171,429 |
Cultural Resources Study in the Loess Hills | Cultural Resources Study in the Loess Hills | Iowa | 2008 | 10 | (TE) 10. Archaeological planning & research | RURAL | Statewide | $119,710 | $0 | $51,305 | $171,015 |
Various County Roads - Roadside Vegetation | EROSIAN CONTROL AT VARIOUS LOCATIONS IN THE COUNTY. DELAY WAITING FOR FINAL PAPER WORK AND AUDIT | Iowa | 1999 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | RURAL | LINN | $80,000 | $0 | $20,000 | $100,000 |
Enhancement of Education about 20th & 21st Centuries Rail Transportation | This project allows the museum to expand exhibits about passenger and freight transportation in the 20th and 21st century railroading. | Iowa | 2008 | 12 | (TE) 12. Establishment of transportation museums | COUNCIL BLUFFS | POTTAWATTAMIE | $265,000 | $0 | $238,500 | $503,500 |
Territorial Transportation and Railroad Museum | Territorial Transportation and Railroad Museum | Iowa | 1995 | 12 | (TE) 12. Establishment of transportation museums | MARQUETTE | CLAYTON | $76,300 | $0 | $19,100 | $95,400 |
Four Mile Creek Greenway Trail from Ankeny to Neal Smith Trail | (RTC rail-trail database). Neal Smith Saylorville DM River to NW 2nd Ave. PCC Trail | Iowa | 2004 | 12 | (TE) 12. Establishment of transportation museums | RURAL | POLK | $319,800 | $0 | $446,800 | $766,600 |
National Mississippi River Museum & Aquarium Rivers Center, Phase III | Project was Locally Let. Contractor J.P. Cullen & Sons, Inc | Iowa | 2007 | 12 | (TE) 12. Establishment of transportation museums | DUBUQUE | DUBUQUE | $4,530,695 | $0 | $1,719,305 | $6,250,000 |
Laura Ingalls Wilder Museum in Burr Oak | For the installation of a new roof on the hotel and heat/AC/insulation to lengthen the tourism season | Iowa | 2000 | 12 | (TE) 12. Establishment of transportation museums | RURAL | WINNESHIEK | $17,870 | $0 | $4,926 | $22,796 |
Mid America Transportation Museum Wing | Airport - Construction of the Mid American Transportation to Air Museum Building | Iowa | 2005 | 12 | (TE) 12. Establishment of transportation museums | SIOUX CITY | WOODBURY | $1,078,428 | $0 | $1,283,372 | $2,361,800 |
Lewis and Clark Keelboat Exhibit - Phase 1 & 2 | Lewis & Clark Keelboat Exhibit, Phase 1-construction of a facility to house the boat for educational display purposes. | Iowa | 2003 | 12 | (TE) 12. Establishment of transportation museums | RURAL | WOODBURY | $850,000 | $0 | $1,041,175 | $1,891,175 |
Grinnell Transportation Museum -Spaulding Historic Site Acquisition and Stabilization Project | For purchase, stabilization, and engineering work for the Spaulding Buggy Works & Automobile Factory Complex | Iowa | 2002 | 12 | (TE) 12. Establishment of transportation museums | GRINNELL | POWESHIEK | $978,000 | $0 | $7,022,000 | $8,000,000 |
Iowa Transportation Museum-Phase One Buildings | IA Transportation Museum-Rehabilitation of the Adinistratiion Building and Link Building (aka Phase One Buildings) | Iowa | 2008 | 12 | (TE) 12. Establishment of transportation museums | GRINNELL | POWESHIEK | $750,000 | $0 | $187,500 | $937,500 |
Iowa Transportation Museum, Emergency Repairs | Iowa Transportation Museum, Emergency Repairs | Iowa | 2007 | 12 | (TE) 12. Establishment of transportation museums | GRINNELL | POWESHIEK | $4,098,790 | $0 | $1,578,972 | $5,677,763 |
Iowa Transportation Museum, National Transportation Heroes Center | Nat'l Transportation Heroes Center&Regional Transp. Library. | Iowa | 2006 | 12 | (TE) 12. Establishment of transportation museums | GRINNELL | POWESHIEK | $4,098,790 | $0 | $1,024,697 | $5,123,487 |
Iowa Transportation Museum, Phase 2 | For continued development of the museum, research library, restoration lab, and conference center. | Iowa | 2006 | 12 | (TE) 12. Establishment of transportation museums | GRINNELL | POWESHIEK | $500,000 | $0 | $2,985,000 | $3,485,000 |
Carnegie Library Cultural Museum Restoration (Phase 1) | To transform the 1904 Carnegie Library into a transportation and cultural museum . Interactive electronic and video displays | Iowa | 2001 | 12 | (TE) 12. Establishment of transportation museums | COUNCIL BLUFFS | POTTAWATTAMIE | $200,000 | $0 | $650,000 | $850,000 |
Restoration/Preservation of BN Depot WW II Museum | For Phase II and III of the project - includes restoring interior infrastructure, heating/cooling; plumbing; electricity, museum installation | Iowa | 2000 | 12 | (TE) 12. Establishment of transportation museums | RED OAK | MONTGOMERY | $119,937 | $0 | $54,475 | $174,412 |
Centerville Safe Routes to School - Phase I | Centerville Safe Routes to School - Phase I | Iowa | 2010 | 301 | (TE) 301. Safe routes to school infrastructure | CENTERVILLE | APPANOOSE | $10,000 | $0 | $249,595 | $259,595 |