Project Search Results

Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Back to Search Page
Project Name Description State Year Activity Activity Type City County Federal Funds ARRA Funds Local Funds Total
Chavanelle Trail In the City of Dubuque from Radford Road to Seipple Road Iowa 2019 1 (DEMO) 1. Pedestrian and bicycle facilities DUBUQUE DUBUQUE $657,000 $2,618 $659,618
Red Rock Prairie Trail Red Rock Prairie Trail: Neal Smith Entrance to S 80th Ave; Red Rock park to Business 163/IA 163 Iowa 2019 1 (FLAP) 1. Pedestrian and bicycle facilities RURAL JASPER $500,000 $758,500 $1,258,500
Raccoon River Valley Trail Bridges Rehab (G-R) Rehab bridges G through R Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities DALLAS $459,000 $120,460 $579,460
Jones Pasture Trail Jones Pasture Trail: Extension of Dickinson County Spine Trail 5,440 feet through Jone's Pasture to Angler's Bay Wildlife Management Area. Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities FAYETTE $250,000 $316,000 $566,000
North Park Cadet Trail Phase 2: Trail from the intersection of Main & North St to Vernon Dr North Park Cadet Trail Phase 2: trail from the intersection of Main & North St to Vernon Dr Iowa 2018 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities IOWA FALLS HARDIN $200,000 $50,000 $250,000
Urban Youth Corps 2019 - Hawkeye Community College Cedar Valley Arboretum and Botanicals • Build a boardwalk over a swale on a trail that connects Hawkeye Community College to the Arboretum. • Apply a stabilizer solution to a 100-foot section of path by the Welcome Center that is well traveled. • Turn a 1/3-mile-long mulch path into a gravel path. • Trim back vegetation encroaching on the trails and identify/remove non-native, invasive species. Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities BLACK HAWK $34,054 $8,513 $42,567
Urban Youth Corps 2019 - Black Hawk County Conservation • Repair/re-chip the Willow 2 Trail from the picnic shelter by the nature center to the bridge that goes to River Hills School. • Place ties alongside sections of the trail. • Replace railroad ties along the the path from the nature center to the top of the stairs on the edge cliff. • Clear brush, remove invasive species and re-chip trail that goes from the upper parking lot down behind the Buckles program building. • Repair and re-chip trail around the pond. • Re-stripe the parking lots (top and bottom parking lots). • Clear brush along the edges of the Cedar Valley Nature Trail from south of Evansdale to Gilbertville. Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities BLACK HAWK $10,092 $2,523 $12,615
Urban Youth Corps 2019 - Dubuque County Conservation • Remove all vegetation encroaching on the Heritage Trail from Rupp Hollow Rd to Cedar Ridge Rd. • Remove 8’x10’ bridge and install new bridge with railings on Woodland Ecology Trail at Swiss Valley Nature Preserve. • Remove all vegetation encroaching on the Heritage Trail from Cedar Ridge Rd to Twin Springs Rd. • Replace existing culvert railings at 3 locations along Heritage Trail. • Install five new interpretive signs at multiple sites along the Heritage Trail. • Replace decking on 40’x7’ bridge and add railing on Early Settlers Trail at New Wine Park. Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities DUBUQUE $10,992 $2,748 $13,740
Iowa 100 Trail 42nd St North along Preserve Lane to Rock Island Preserve along abandonde rail approx 250' east of Cedar River Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities LINN $726,000 $182,000 $908,000
Des Moines River Valley Trail South Extension Phase 1 Construct approximately 9,990 ft of trail that connects the existing 20 mile trail system to Oleson Park Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities FORT DODGE WEBSTER $700,000 $516,000 $1,216,000
Prairie Rivers Trail - 170th St. Connection On 170th street from end of existing trail west 1.25 miles to Nelson Avenue/N 15th St. Iowa 2020 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities FORT DODGE WEBSTER $350,000 $227,860 $577,860
SW Greenbelt Trail from Beedle Dr to Intermodal Facility Trail connection from Beedle Dr east .94 miles to Intermodal Facility Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities AMES STORY $159,000 $241,000 $400,000
First Street Trail On former Canadian Pacific RR Line from Blackhawk Trail Road to E. Iowa Street Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities ELDRIDGE SCOTT $994,618 $457,382 $1,452,000
Wapsi Great Western Line Trail From 500th Street to Minnesota State line Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities MITCHELL $289,000 $73,000 $362,000
Heritage Trail Bridge 21 Replacement Demolish and replace existing Heritage Trail Bridge 21. The new bridge will be 10 ft. wide and 197 ft. long with two piers. Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL DUBUQUE $400,000 $157,470 $557,470
Cherokee Trail - Phase 3 From Midway Dr. along Vinton Ditch to E. Avenue along E Avenue to Vinton Ditch to & along F Avenue until 13th Street Iowa 2019 101 (STBG) 101. Construction, planning, and design of on-road and off-road trail facilities CEDAR RAPIDS LINN $1,634,000 $6,866,000 $8,500,000
Wabash Depot Renovation Renovation of Wabash Depot Iowa 2019 106 (STBG) 106. Historic preservation and rehabilitation of historic transportation facilities SHENANDOAH PAGE $88,085 $29,915 $118,000
Grant Wood Trail Extension From Highway 13 to 35th Street. Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities MARION LINN $524,769 $0 $131,192 $655,961
Highland Park Streetscape, Phase 2 Highland Park Streetscape, Phase 2 Iowa 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities DES MOINES POLK $528,000 $0 $1,372,000 $1,900,000
6th Ave Streetscape Phase 1: College Ave to Hickman Rd Provide wider sidewalks and crosswalk improvements, new street and pedestian lights, pedestrain amenities, shared-use road with bicycle sharrows and signage, bicycle parking, and landscaping and street trees where appropriate. Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities DES MOINES POLK $600,000 $0 $800,000 $1,400,000
Flint River Trail - Phase 1A From Irish Ridge Road west approx 1.3 miles through Starr's Cave Park to US Hwy 61 ROW line. Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL DES MOINES $634,000 $0 $159,000 $793,000
Rodeo Park 350 ft Rehabilitate approximately 350 feet of Rodeo Park Trail Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities FORT MADISON LEE $82,035 $0 $20,509 $102,544
Road for East Dunreath access, gravel parking lot, boat ramp Road for the new East Dunreath access, provide a gravel parking lot for 6-8 cars with small boat trailers and construct a small concrete boat ramp to provide public access to the Lake Red Rock Project for recreation. Iowa 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL MARION $69,130 $0 $17,283 $86,413
High Trestle Trail: Southwest Ordnance Rd Connection West 1st St southbound to the intersection of Southwest Cherry St and Ordinance Rd. Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities ANKENY POLK $150,000 $0 $175,000 $325,000
Clear Creek Trail--Phases 6 and 7 Design and construction--Phases 6-7, combined w/NRT-1557(643)--9G-52 for $493,305 Iowa 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities CORALVILLE JOHNSON $619,295 $0 $123,859 $743,154
Turkey River Trail and Pedestrian Bridge On B64, from Elgin Easterly 1.2 Miles to Clayton County Line, includes a bridge over Turkey River Iowa 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL FAYETTE $1,084,000 $0 $52,000 $1,136,000
Hoover Nature Trail Phase 2 Construct Phase 2 of the missing link to connect the Hoover Trail, the Cedar River Trail, and the Cedar Valley Nature Trail in eastern Iowa. Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL JOHNSON $1,120,000 $0 $1,966,747 $3,086,747
West Marion Street Trail In the City of Manchester, West Marion St Trail: from S 9th St to S 12th St. Iowa 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities MANCHESTER DELAWARE $155,000 $0 $39,000 $194,000
Lake Path Trail - JewEllsworth Trail Segment From the Jubilee Trail in Jewell, on-street through town to north of RR, east across Drainage Ditch #71 to former RR ROW, along ROW to Delphi Street then on-street through Ellswroth to Dearborn Street Federal Funds will be used from Saratoga Avenue to De Iowa 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL HAMILTON $331,808 $0 $515,807 $847,615
Sac & Fox Trail Extension From Indian Creek to Trailridge Road SE [West side of E Post Road SE from Indian Creek to Trailridge Road SE, including sidewalks along Trailridge Rod from Ashland Ct & Bever Avenue] Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities CEDAR RAPIDS LINN $164,000 $0 $56,000 $220,000
Edgewood Road NW Multiuse Pathway from O Avenue to Ellis Road Along eastern side of Edgewood Road from O Avenue to Ellis Road. Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities CEDAR RAPIDS LINN $321,000 $0 $80,000 $401,000
Monroe to Prairie City - Phase 2 Loacted in former railroad ROW, extending from Monroe toward Prairie City. Phase 1 developed the first 5.7 miles with temporary limestone chip surface. Phase 2 will place final limestone chip surface on that same 5.7 miles. Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL JASPER $137,769 $0 $34,442 $172,211
East Blue Creek Bridge Replacement, Cedar Valley Nature Trail Replace an existing wood bridge structure on the Cedar Valley Nature Trail Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL LINN $168,000 $0 $432,000 $600,000
IA-15 Enterprise Drive Trail From 3 Elms Park Road south to Enterprise Drive then west to Enterprise Court Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities INDEPENDENCE BUCHANAN $180,000 $0 $45,000 $225,000
Sweet Water Creek Recreational Trail Traverses town between 1st Ave. SW/SE and 1st Ave. NW/NE and runs along Sweet Water Creek and Wapsipinicon Greenbelt to Sweet march Wildlife Area. Proposed design is a 10' wide, 3" thikc HMA trail with 2' shoulders. Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities TRIPOLI BREMER $186,000 $0 $288,000 $474,000
Black Hawk Lake Trail Phase 2 In the city of Lake View, Black Hawk Lake Trail Phase II: From Ice House Point to South State Road. Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities LAKE VIEW SAC $200,000 $0 $175,000 $375,000
Easter Lake Trail Phase 3 Easter Lake Trail Phase 3 Iowa 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL POLK $200,000 $0 $1,925,600 $2,125,600
Grant Wood Trail from Highway 13 to Oxley Road Construction of a 12 ft. wide, compacted limestone screenings surface trail. Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL LINN $220,000 $0 $55,000 $275,000
Riverfront Trail Connection: Connecting Lewis and Clark trail Connecting the existing Lewis and Clark Trails along Missouri River from just south of RR bridge under east side Bacon Creek Channel Bridge and Pedestrian bridge over Bacon Creek Channel Bridge to Lafayette Street, Pedestrian Bridge over Floyd Channel and under west side of Floyd Channel Bridge connecting to existing trail at Chris Larson Park. 5,000' of 10' wide trail and two 500' ped bridges. Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities SIOUX CITY WOODBURY $127,000 $0 $2,613,000 $2,740,000
Mason Road Shared Use Path 10' wide shared use path within the north right-of-way of Mason Road, between Sequoia Drive at Ed Stone Middle School and Haskell Street. Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities BURLINGTON DES MOINES $233,668 $0 $58,418 $292,086
Bellevue Rivervue Trail-Phase II Trail construction 1.5 miles from Jefferson Avenue northerly on the W side of US 52 to 395th Street Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities BELLEVUE JACKSON $250,000 $0 $62,500 $312,500
Hoover Nature Trail/Fairgrounds Trailhead and Trail On Hoover Nature Trail along Collins Road and near 4-H Center at Louisa County Fairgrounds in Columbus Junction, Iowa Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities COLUMBUS JUNCTION LOUISA $126,161 $0 $129,139 $255,300
City of Dyersville 3rd St Southwest Bridge Trail Crossing Replace approximately 250 ft of sidewalk with 10 ft wide concrete multi-use trail; replace an existing narrow pedestian walkway less than 4 ft wide on the 3rd St SW bridge with a 10 ft wide aluminum walkway; and upgrade the east side bridge rail to current standards Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities DYERSVILLE DUBUQUE $250,000 $0 $63,000 $313,000
Babcock Woods Trail Extension From Soccer Complex to Babcock Woods. Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities WAVERLY BREMER $125,000 $0 $35,000 $160,000
Center Street Trail Improvements 10' trail along Center Street from the Cedar River to Lone Tree Road Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities CEDAR FALLS BLACK HAWK $258,551 $0 $141,449 $400,000
Iowa Great Lakes Trail Phase 2 From intersection at 4th Ave W and W 18th St in the City of Spencer north to 300th St in Clay County, approximately 4 miles. Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities SPENCER CLAY $272,000 $0 $107,400 $379,400
Walnut Creek Trail From 156th Street to Waterford Road Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities URBANDALE POLK $274,961 $0 $278,839 $553,800
Wapsipinicon Trail On Shaw Road, from Hale Bridge to west side of GWSB/highway 64/E 3rd Street Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities ANAMOSA JONES $280,000 $0 $720,000 $1,000,000
Heart of Iowa Nature Trail - Highway 69 to Trailridge Park Paving one mile of limestone trail from the intersection of Highway 69 and E First Street in Huxley to Trailridge park located on 560th Avenue Iowa 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities HUXLEY STORY $186,223 $0 $95,000 $281,223
River Forest Road Trail River Forest Rd Trail: On top of Cedar River levee in Evansdale. Iowa 2014 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities EVANSDALE BLACK HAWK $308,000 $0 $78,000 $386,000
Big Sioux/Highway 12 Trail Pave 10' wide trail from Big Sioux River to Sioux River Rd/Highway 12 Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities SIOUX CITY WOODBURY $400,000 $0 $200,000 $600,000
Algona Recreational Trail, Phase 2 Algona Recreational Trail, Phase 2 - from drainage ditch to Bishop Garrigan High School Iowa 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities ALGONA KOSSUTH $286,000 $0 $123,000 $409,000
Statweide Bike Map Statewide Bike Map printing - misc. Iowa 2019 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL Statewide $40,000 $0 $40,000
I-VIEW (Iowa Visulization, Index and Evaluation of Walkability) - Enhances previous I-Walk project. The project is a statwide GIS mapping and tool development project. It builds upon the Enhancing I-WALK project previously funded in 2013. Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL Statewide $64,617 $0 $16,154 $80,771
Edgewood Trail Ellis Blvd NW to Glass Rd NE Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities CEDAR RAPIDS LINN $985,000 $0 $248,000 $1,233,000
Kewash Nature Trail Enhancement & Paving From Hwy 1 to Crooked Creek and 1900 ft spur Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities RURAL WASHINGTON $342,537 $0 $880,810 $1,223,347
Lindale Trail Extension Lindale Trail extension on the former RR ROW from 51st Street and Center Point Road NE to the existing trail just east o C Avenue NE. Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities CEDAR RAPIDS LINN $932,000 $0 $233,000 $1,165,000
CeMar Trail - Phase 1A From Cedar Lake Loop Trail across Shaver Road, under I-380 and along H Avenue NE to Oakand Road Iowa 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities CEDAR RAPIDS LINN $1,036,000 $0 $379,000 $1,415,000
Estherville Recreational Trail Along abandoned RR ROW from trailhead at 6th Avenue S to 2nd Avenue S, then north from 2nd Avenue N to 14th Avenue N Iowa 2019 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities ESTHERVILLE EMMET $163,000 $237,000 $400,000
Cherokee Trail - Phase 1 In the City of Cedar Rapids, from Stoney Point Road NW, through Cherry Hill Park, to Sharon Lane at Eastview Drive NW Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities CEDAR RAPIDS LINN $840,000 $0 $0 $0
Des Moines River Trail, Phase 2 SE 22nd Street to Easter Lake, generally along Hartford Avenue Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities DES MOINES POLK $800,000 $0 $600,000 $1,400,000
Indian Creek Trail 10th Street over Indain Creek, from Tower Terrace Road south 2.1 M to Boyson Trail north of 8th Avenue Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities MARION LINN $2,293,000 $0 $574,000 $2,867,000
CeMar Lindale Connector CeMar Cedar Rapids Phase 4 - Lindale Connector, Marion City Limit N to Hwy 100 and Lindale Mall Shopping Centers Iowa 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities CEDAR RAPIDS LINN $1,457,000 $0 $263,000 $1,720,000
42nd Street Streetscape From I-235 to Crocker Street including lighting, traffic calming, safety-related infrastructure, and pedestrian facility improvements Iowa 2018 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities DES MOINES POLK $480,000 $0 $1,420,000 $1,900,000
Gear Avenue Trail On S. Gear Avenue from Division Street north to north entrance to SECC Iowa 2019 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities WEST BURLINGTON DES MOINES $280,000 $70,000 $350,000
Removal of RR bridge over Marion Blvd. Demolishion of railroad bridge over Marion Blvd. Iowa 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities MARION LINN $242,000 $0 $61,000 $303,000
AMU Well Field North Trail Paving Project In AMU Well Field, pave from trailhead west 1,900 ft to the SE corner of the softball/baseball field complex Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities ATLANTIC CASS $100,000 $0 $25,000 $125,000
City-County Connector Trail In the City of Council Bluffs, on Railraod Avenue, from Kanesville Blvd north 1.3 miles to Council Bluffs Corporate Limits Iowa 2019 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities COUNCIL BLUFFS POTTAWATTAMIE $461,000 $115,000 $576,000
Sidewalk Extension on Main St between Ash Ave and Cherry Ave Project is a 900 ft (0.17 mi) long sidewalk extension to fill a gap between existing sidewalks across from Center Point Urbana Intermediate School (on south side of Main St). Project will also reconstruct intersection pavements at crosswalks for ADA compliance. Iowa 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities URBANA BENTON $50,000 $0 $99,000 $149,000
CeMar Trail CeMar Trail - Marion Iowa 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities MARION LINN $4,644,000 $0 $1,161,000 $5,805,000
Riverside SRTS Project 8' wide sidewalk beginning at Blackberry Ave and running northeasterly along the east side of Ash St/Tupelo Blvd and then east to the Riverside Elementary School. Iowa 2017 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers RIVERSIDE WASHINGTON $96,000 $0 $224,000 $320,000
School Zone Flashing Beacons School Zone Flashing Beacons (5 locations) Iowa 2015 102 (TAP) 102. Construction, planning, and design of infrastructure-related projects and systems that will provide safe routes for non-drivers ANKENY POLK $80,000 $0 $30,000 $110,000
Lower Bee Branch; Overlook at 16th Street Detention Basin Trail Overlook in the City of Dubuque, Lower Bee Branch: Overlook at 16th Street Detention Basin Iowa 2016 104 (TAP) 104. Construction of turnouts, overlooks, and viewing areas DUBUQUE DUBUQUE $940,000 $0 $480,509 $1,420,509
Urban Youth Corps 2014 Urban Youth Corps 2014 Iowa 2014 107 (TAP) 107. Vegetation management practices in transportation rights-of-way to improve roadway safety, prevent against invasive species, and provide erosion control RURAL Statewide $100,000 $0 $25,000 $125,000
UYC 2015 Urban Youth Corps - FFY 2015 Funds Iowa 2015 107 (TAP) 107. Vegetation management practices in transportation rights-of-way to improve roadway safety, prevent against invasive species, and provide erosion control RURAL Statewide $75,000 $0 $33,000 $108,000
Iowa's Living Roadways Project Program Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Trails Visioning - Planning Activities Iowa 2014 107 (TAP) 107. Vegetation management practices in transportation rights-of-way to improve roadway safety, prevent against invasive species, and provide erosion control RURAL Statewide $88,680 $0 $25,047 $113,727
Winterset Safe Routes to School Winterset Safe Routes to School Iowa 2014 301 (TAP) 301. Safe routes to school infrastructure WINTERSET MADISON $164,000 $0 $41,000 $205,000
Iowa Safe Routes to School Partnership Conduct SRTS education and encouragement activities across the state to encourage more children to walk or ride bicycles to and from school. Iowa 2014 302 (TAP) 302. Safe routes to school programs RURAL Statewide $60,000 $0 $15,000 $75,000
Iowa Safe Routes to School Partnership Conduct SRTS education and encouragement activities across the state to encourage more children to walk or ride bicycles to and from school. Iowa 2016 302 (TAP) 302. Safe routes to school programs RURAL Statewide $157,893 $0 $39,473 $197,366
Iowa Safe Routes to School Partnership Conduct SRTS education and encouragement activities across the state to encourage more children to walk or ride bicycles to and from school. Iowa 2015 302 (TAP) 302. Safe routes to school programs RURAL Statewide $123,504 $0 $30,876 $154,380
North Park Trail Extension On old rail bed from W 10th Street to W 18th Street and on 18th Street from Highway Boulevard to 4th Avenue W Iowa 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities SPENCER CLAY $136,000 $0 $184,000 $320,000
Urban Youth Corps 2018 - Hartman Reserve • Repair and/or replace existing trail stairway. • All trails will have vegetation trimmed back, any dead snags within 10 feet of the trail will be removed, and all downed trees will be removed. Iowa 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities BLACK HAWK $6,910 $1,728 $8,638
Reconstruction of N Mississippi St/Y40 Along N. Mississippi St. (Y40) from Mayne St. 0.5 miles to Lauretta St. in Scott county and the city of Blue Grass Iowa 2018 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities BLUE GRASS SCOTT $900,000 $0 $702,000 $1,602,000
Goose Creek Trail On Goose Creek Trail, from Goose Creek and 53rd Street NW to 59th Street NW and Scott Street Iowa 2017 101 (TASA) 101. Construction, planning, and design of on-road and off-road trail facilities DAVENPORT SCOTT $1,138,000 $0 $962,000 $2,100,000
SRTS Partnership Non-construction project: The partnership will work with schools and communities in Iowa to host education and encouragement activities for elementary aged children. Iowa 2018 302 (TASA) 302. Safe routes to school programs RURAL Statewide $180,971 $0 $45,242 $226,213
Locust Street Trail--Between ECL and 9th Street City of Carter Lake: Locust Street Trail--Between ECL and 9th Street Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities CARTER LAKE HARRISON $90,000 $0 $30,072 $120,072
North Liberty Trail - 12th Avenue Extension from Penn Street to Coyote Court North Trail Extension from Penn Street to Coyote Court. Final Voucher sent- 9/25/08 Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities NORTH LIBERTY JOHNSON $175,000 $0 $43,750 $218,750
Carlisle Gateway Project - Co Line Rd / Hwy 5 Intersection; Co Line Rd & 155th Ave Street Improvements; Scotch Ridge Ctr to North Park Trail Co Line Rd & 155th Ave Street Improvements; Scotch Ridge Ctr to North Park Trail Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities CARLISLE POLK $1,011,492 $0 $252,873 $1,264,366
Along W Platt St. from W 43rd St. to Western Ave. West platt St Trail-W 43rd St- Western Avenue PCC Trail Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities MAQUOKETA JACKSON $174,690 $0 $41,713 $216,404
In Pine Lake State Prk (Phase 2) South End of Pine Lake State Park to the Northern boundary.PCC Trail Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities RURAL HARDIN $174,000 $0 $43,500 $217,500
Sheldon Recreational Trail - 3 Sections: Community College, Village Northwest and Hills Park the project is at three different locations 1. Intersection of US 18 to existing trail through Village Northwest. 2. Intersections of 19th Ave/East 4 St to 23rd Ave/East 6th. 3. Western Avehue to Northwest Iowa Community College along the abandoned Illinois RR right of way. Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities SHELDON O'BRIEN $173,000 $0 $66,876 $239,876
Hudson Road Recreational Trail, Phase II Recreational Trail - Hudson Road Trail from W 12th Street to W 31st Street Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities CEDAR FALLS BLACK HAWK $172,113 $0 $43,029 $215,142
Oelwein NE Recreation Trail NE Recreational Trail - BIKE/PED Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities OELWEIN FAYETTE $172,000 $0 $62,300 $234,300
Nishnabotna River Pedestrian Bridge Pedesrtrian Bridge across the Nishnabotna River in Edgington Park Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities AVOCA POTTAWATTAMIE $171,792 $0 $208,208 $380,000
Gilbert to Ames Trail From Ames north 2.5 miles to SCL of Gilbert (west of UP Railroad ROW). Will connect the existing trail system (Bloomington Heights Subdivision) in Ames to the existing trail at the Gilbert Elementary School system in Gilbert on new ROW approximately 2.5 miles long x 50 feet wide. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL STORY $62,000 $0 $883,000 $945,000
Blue Grass Trail, Phase I/Segments #1 and #4 Begins in the Black Bear Crossing Subdivision, just east of the City and travels north to N. Mississippi Street Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities BLUE GRASS SCOTT $170,925 $0 $333,400 $504,325
Mississippi Riverwalk (PE only) Mississippi Riverwalk Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities DUBUQUE DUBUQUE $170,400 $0 $42,600 $213,000
US 63 South Trail Underpass On the southside of Oskaloosa city limits. PE, CE Construction. Under US 63/Market St in Oskaloosa Trail Crossing. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities OSKALOOSA MAHASKA $169,135 $0 $42,284 $211,419
Heart of Iowa Nature Trail (Phase IV) from Maxwell ECL to 0.75 mi. W. of Collins To develop 3.75 miles of trail from east of town of Maxwell to 0.75 mile west of the town of Collins Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities RURAL STORY $166,073 $0 $42,646 $208,719
Epworth East Gate Trail From 600 ft W of Bierman Rd E on Jacoby to 2100 Ft N along Bierman Rd, PCC Trail Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities EPWORTH DUBUQUE $166,055 $0 $77,545 $243,600
Kingsley Community Biking/Walking Trail Phase II PCC Sidewalk /Trail - Kingsley Rec Trail from Brandon Street to Clarendon St. in Kingsley Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities KINGSLEY PLYMOUTH $166,000 $0 $41,500 $207,500
Johnston Greenbelt Trail from Beaver Dr. to Crown Point Johnston Greenbelt Trail- 1.6 miles of ACC trail Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities JOHNSTON POLK $165,800 $0 $95,715 $261,515
Chavanelle Trail Chavanelle Trail - from IA-32 (NW Arterial to Seippel Road Iowa 2016 1 (TE) 1. Pedestrian and bicycle facilities DUBUQUE DUBUQUE $906,139 $0 $226,534 $1,132,673
Rodeo Park Trailway Rodeo Park Trail- HMA Trail Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities FORT MADISON LEE $165,600 $0 $41,400 $207,000
Tiffin Trail, Phase 4 Jasper Ave to I-380. Continue trail from existing end on the west side of Jasper Avenue thence Southerly along the west side of Jasper Avenue to the North side of Clear Creek Bridge thence easterly to a point on the east side of Jasper Avenue thence southerly and easterly along the North side of Clear Creek to the I-380 right of way where the city of Coralville will tie to the project. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities TIFFIN JOHNSON $161,844 $0 $77,135 $238,979
NIACC Trail from Birch Dr. to NIACC dormitories NIACC Trail from Birch Dr. to NIACC dormitoriesin Mason City. ACC Trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities MASON CITY CERRO GORDO $161,600 $0 $111,769 $273,369
9th Street Recreational Trail PCC Trail along the north side of 9th Street, from US 67 to 19th Avenue Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities CAMANCHE CLINTON $160,010 $0 $39,990 $200,000
IA 3 West Trail: from East Floyd River to 16th Ave NW 2000 ft of 8ft wide recreational trail along ROW Iowa Hwy3 from existing trail on east side of Floyd to 16th Ave NW on west side of Floyd River which will include one 125ft Rec Trail Bridge. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities LE MARS WOODBURY $160,000 $0 $40,000 $200,000
Big Lake Trail from Lewis and Clark Monument to Missouri River Levy ACC Trail at the Big Lake Rec Area in Council Bluffs Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities COUNCIL BLUFFS POTTAWATTAMIE $160,000 $0 $17,519 $177,519
Four Mile Creek Trail Greenway Trail in Pleasant Hill. Trail construction. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities PLEASANT HILL POLK $160,000 $0 $70,325 $230,325
Gay Lea Wilson Trail East Extension The Gay Lea Wilson Trail East Extension through Altoona is 2 miles of 10' wide recreational trail that connects to the Gay Lea Wilson Trail and continues northerly under I-80. Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities ALTOONA POLK $700,000 $0 $817,900 $1,517,900
Trail - Ochee Yahola Co. Park to Mitchell Co. Line Trail - Ochee Yahola Co. Park to Mitchell Co. Line. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL WORTH $160,000 $0 $40,000 $200,000
Cedar Valley Nature Trail Hard Surfacing - 1995 For asphalt surfacing the north 5 miles of the Cedar Valley Nature Trail from Evansdale to Gilbertville Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL BLACK HAWK $160,000 $0 $40,500 $200,500
Pedestrian bridge - Kimberly Road over Duck Creek Ped. Over pass Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities BETTENDORF SCOTT $160,000 $0 $98,432 $258,432
Welcome Home Soldier--Historical Pathway Proposal for the trail portion of the project. A historic pathway. 8 acre site located just west of Albis and directly north of Highway 34. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL MONROE $175,000 $0 $110,000 $285,000
North Lake Trail Extension: From 10th St to 590th St Construct 8' trail form 10th St north to County Road C-49. Actual length is approx 3975 ft and could be in west ROW from 10th st to 12th st and cross Lake Ave on south side of intersection. Remaining in east ROW from 12th st to C-49. Some areas may require existing ditch to be built up and or temp construction easement. Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities STORM LAKE BUENA VISTA $193,000 $0 $120,655 $313,655
Downtown Skywalk Over Pedestrian Walkway - On 3rd Street SE & 1st Avenue E. Skywalk extends from existing on 1st to existing on 3rd St. Iowa 2016 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $1,440,000 $0 $360,000 $1,800,000
Cedar Valley Nature Trail Hard Surfacing - 1997 Cedar Valley Nature Trail Hard Surfacing - 1997 Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities RURAL BLACK HAWK $181,807 $0 $77,917 $259,724
North Dodge Street (Iowa 1) Trail and Bridge over I-80 North Dodge Street (Iowa 1) Trail and Bridge over I-80 Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities IOWA CITY JOHNSON $753,884 $753,884 $1,046,115 $1,800,000
Walnut Creek Trail Connection - Phase 1 Part A Walnut Creek Trail Connection Phase 1, Part A. Associated projects are STP-ES-1945(665)--8I-77 and NRT-NT00(2)--9G-77. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $192,200 $0 $250,000 $442,200
Raccoon River Valley Trail Rehabilitation PCC Sidewalk/Trail. Trail Rehabilitation from Panora to Yale. 100% prorate Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL GUTHRIE $782,454 $778,247 $167,657 $950,112
Wahpeton Trail 2004 PCC Rec.Trail - East side of State Highway 86 on west side of West Lake Okoboji Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities WAHPETON DICKINSON $192,100 $0 $169,900 $362,000
The Missing Link Trail Along the east side of North Walnut Creek between University and College Ave. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities WINDSOR HEIGHTS POLK $190,880 $0 $156,431 $347,311
Iowa Riverfront Trail (Phase 1) from the Western Historic Trails Center to Playland Park For construction of 2.5 miles of trail along the Missouri River in Council Bluffs Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities COUNCIL BLUFFS POTTAWATTAMIE $190,600 $0 $432,997 $623,597
Linking Bicycle Trail on the Great River Road: Study Study the possibility of connecting the Great River Road and Mississippi River Trail (MRT) in Louisa County to a bike route in Muscatine County in eastern Iowa. Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities RURAL LOUISA $110,000 $0 $28,775 $138,775
Rathbun Lake Multi-Use Trail - Phase 1 Rathbun Lake Multi-Use Trail - Phase 1 . Earth/Granular Surface Trail Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RATHBUN APPANOOSE $1,291,589 $1,157,993 $34,634 $1,326,223
Leech Park Trailhead Recreational trail to the city of Spencer. In-kind contribution. PCC Trai, parking lot, lighting, Leach Park, Grand Ave and 4th St southwest. Trail construction and Lighting Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities SPENCER CLAY $188,434 $0 $47,066 $235,500
Sauk Rail Trail Paving - Maple River to Carnarvon PCC Sidewalk/Trail from Maple River in Carroll County to Carnarvon, in Sac County. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL CARROLL $1,200,000 $1,200,000 $131,617 $1,331,617
South Loop Trail, Highway 34 Bridge to Mary Street Complete 6300lf of Segment 1 and 6300 lf of Segment 4. Located in Ottumwa along south levee of Des Moines River, from Highway 34 bridge to Williams St, then continueing south along DOT ROW, under Hwy 63 via a former rail underpass, then north along the former Wabash railroad bed to Williams St. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities OTTUMWA WAPELLO $231,000 $0 $24,468 $255,468
Principal Riverwalk - Walnut/Grand Avenue West HMA Sidewalk/Trail. Principal Riverwalk west side of Des Moines River from walnut street to Grand Avenue. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $2,849,000 $2,317,776 $67,654 $2,916,654
Lewis & Clark Trail Study Lewis & Clark Multi-Use Trail Study. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL Statewide $213,549 $0 $53,387 $266,936
Enhancement project in Coralville Trail construction Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities CORALVILLE JOHNSON $187,441 $0 $56,826 $244,267
T-Bone Trail Phase 4 T Bone Rec. Trail Phase 4-Audubon County Road (260th St.) North to Hamilin (IOWA 44) Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities RURAL AUDUBON $186,800 $0 $80,100 $266,900
Jordan Creek Trail on 86th St. Greenbelt trail ext. (1.1 mile). Rec. Trail in Clive 86th to Jordan. Grade and three bridges. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities CLIVE POLK $186,790 $0 $121,008 $307,798
Jerry Kelley Trail Phase 2: PE Work Only PE work from Memorial Park to Wilder Elementary School. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities INDIANOLA WARREN $26,600 $0 $6,650 $33,250
Sioux Center Recreation Trail Sioux Center Recreational Trail - Kinsley Elementary to 10 16th St SE/SE 1st St to Middle School Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CENTER SIOUX $186,750 $0 $186,750 $373,500
Heritage Trail Riverfront (PE only) Engineering Study by BRW inc Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities DUBUQUE DUBUQUE $28,000 $0 $7,000 $35,000
T-Bone Trail Extension Engineering Design the portion of the T-Bone Trail that would connect Schildberg Park with the Atlantic sports complex and the Atlantic Municipal Utilities wellhead trail system, including the design of a bridge over Troublesome Creek. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities ATLANTIC CASS $46,743 $0 $11,730 $58,473
Westview / Pedersen Park Trail projects Involved two trail segments. West project - from 11th Ave. near INM RR crossing to intersection of Grand Ave. and W. Park St. East project - along 10th Ave. E from Oneota Park entrance to E. 9th St. at Pedersen Pk. Also around the Pete's Pond area.PCC Trail Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities SPENCER CLAY $186,000 $0 $68,755 $254,755
Greenbelt Pedestrian/Bike Trail System (Island Park Trail) PCC trail. For the Island Park Recreational Trail area. . Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities ROCK RAPIDS LYON $184,600 $0 $46,200 $230,800
Long Grove, Eldridge, Cody Multipurpose Trail Design Engineering Long Grove, Eldridge, Cody Multipurpose Trail Design Engineering Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities LONG GROVE SCOTT $90,152 $90,152 $69,847 $160,000
Vintage Street Lighting on Main St. in Hampton CBD Historic Lighting in the city of Hampton. The city provided 6 detectable pedestrain ramps for the project. Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities HAMPTON FRANKLIN $184,000 $0 $46,000 $230,000
Mississippi River Trail - Bettendorf to Princeton - Planning/Engineering Mississippi River Trail - Bettendorf to Princeton - Planning/Engineering Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities LE CLAIRE SCOTT $211,912 $211,912 $0 $211,912
Developing Iowa Byways Through GIS Technology Developing Iowa Byways Through GIS Technology Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL Statewide $251,752 $0 $62,938 $314,690
E. LeClaire Rd from 9th Ave to N 16th Ave E Leclaire Rd Trail - 9th to N 16th in Eldridge, Trail Construction. Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities ELDRIDGE SCOTT $183,000 $0 $57,821 $240,821
Ia 58 Recreation/Pedestrian Trail Study IA 58 58 Recreation/Pedestrian Trail Study The study has been completed. Trail development has been initiated. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities CEDAR FALLS BLACK HAWK $2,640,339 $0 $747,660 $3,388,000
South Duff Trail ( Phase 1 ) Airport Rd to Chestnut St. ACC trail. South Duff on Airport Road to Chestnut Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $181,958 $0 $138,041 $320,000
Gay Lea Wilson Trail Extension - Ankeny Segment - Phase 1 From SE 54th Street south 1.0 mile then east 0.5 mile to SE Delaware Avenue. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities ANKENY POLK $175,000 $0 $425,000 $600,000
Linn Creek Trail Extension to Iowa 330 Trail PCC Trail 3.10 mi in length from existing HMA trail at Marsh Avenue/Highway S75 north to Highway 30, east along Highway 30 and Iowa Ave/Bus 30, and then north along Highland Acres Road to Grimes Farm and Conservation Center. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL MARSHALL $231,000 $0 $1,245,000 $1,476,000
T-Bone Trail on IAIS RRHMA Trail For the segment that extends from Audubon Co. line south 5 mi. to Atlantic. Grade and Pave Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities RURAL CASS $234,400 $0 $46,136 $280,536
Heritage Trail Riverfront Extension to connect Heron Pond Wetlands trail with Dubuque Jaycees Trail Dub. Heritage Trail Ext. Heron Pond to Jaycees Trail via 16th St. Bridge Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities RURAL DUBUQUE $233,000 $0 $155,154 $388,154
Riverwalk Loop Trail PCC Trail - Riverwalk Loop Trail - Cedar Bend Park to Mullen Avenue Commission approved as: Cedar Valley River Renaissance Trail Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $454,625 $0 $194,840 $649,465
Fayette County Trail -- Elgin to Nims Bridge Paved multipurpose trail along W51 (Canoe Road) and B40 from Elgin to Clermont to Nims Bridge approximately 4.8 miles in length. Canoe & Great River Elgin to Clearmont to NIMS Bridge Part of ECN Trail - multi purpose Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL FAYETTE $455,000 $0 $310,299 $765,299
Chichaqua Valley Trail: Approx 800' W of Grant St along RR bed; Blair St NW spur; 2nd St NE to NE 88th St Trail will extend west from existing CVT trailhead at NE 88th st on segment of abandoned rail ilne approx 1,700ft. Then north along west fence line of Top Farms property approx 700ft. Trail is 1,900ft in length and 10' paved surface. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities BONDURANT POLK $460,000 $0 $390,000 $850,000
Riverwalk Loop Trail - From 6th St. to 18th St.(Vinton St.) Riverwalk Loop Trail P.C.C. Trail From 6th St. to 18th St.(Vinton St.) Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $468,000 $0 $486,558 $954,558
Hoover Nature Trail / Wright Brothers Blvd to County Line $400,000 Earmark will be let under (91). HMA sidewalk/trail. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL LINN $476,056 $0 $232,444 $708,500
Grant Wood Trail Underpass Development of the Grant Wood Trail Underpass at the intersection of Highway 13 and Grant Wood Trail, 0.5 mile north of Highway 100. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL LINN $480,000 $0 $370,000 $850,000
Loras College Parkway Loras parkway from Loras Boulevard to 17th St. Replace existing street with pedestrian parkway. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities DUBUQUE DUBUQUE $489,150 $0 $168,975 $658,125
Neal Smith Connector Trail Trail along Oralabor Rd from SW State Street to South Ankeny Boulevard PCC Trail Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities ANKENY POLK $495,000 $0 $155,000 $650,000
Fairfax Trail along east side of unnamed tributary to Prairie Creek 10' wide trail along Highway 151 from Prairie Avenue to East Cemetery Road in Fairfax. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities FAIRFAX LINN $502,000 $0 $362,500 $864,500
Central Iowa Trail Loop - Altoona Segment Phase 1 & 2 From 15th Ave SW Easterly to 8th Ave NE. Trail construction. Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities ALTOONA POLK $506,400 $0 $126,550 $632,950
Fairfield Loop Trail--NW Quadrant Trail from Grimes Avenue, 1,300ft east of County Road H33 (Brookville Road) to Gear Avenue and 8th Street in Fairfield. Loop Trail NW Quadrant; Grimes Ave to Gear Ave Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities FAIRFIELD JEFFERSON $515,000 $0 $135,000 $650,000
Clear Creek Greenbelt Trail Extensions and RR Underpass Phase 4 Part 2 Clear Creek Greenbelt Trail Phase 4, Part 2, Tunnel under Iowa Interstate RR&Trail Const. to 2nd Ave. in /Coralville- PCC Trail. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities CORALVILLE JOHNSON $519,451 $0 $129,862 $649,314
West Big Spirit Trail Construction of bike lanes along 240th Ave. in Dickinson County-from City of Orleans to the Minnesota State Line. HMA Trail Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities ORLEANS DICKINSON $523,980 $0 $130,995 $654,975
Mississippi River Trail: At Credit Island Credit Island Park and over the backwater slough to approximately 2620 South Concord Street, Davenport. Construct pre-engineerred MRT/ADT Bridge and access trail from Credit Island Park to S. Concord St. Federal limit based on available IA156 demo funding for all authorized work typ es. Credit Island Ped Bridge NOTE: $439,000 TE funds were made available for this project; however, if these funds are not used, they go back into the pot for redistribution by the MPO. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities DAVENPORT SCOTT $2,251,402 $0 $839,001 $3,090,403
Lewis and Clark Rivers Edge Trail (Phase 2) Phase 2 portion of a recreational trail from Riverside park to Chris Larson Park in Sioux City. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CITY WOODBURY $533,935 $0 $406,679 $940,614
Great Western Bike Trail Great western trail in polk and warren county. ACC Trail 11.4 Miles Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $538,040 $0 $283,960 $822,000
CEMAR Trail - Phase 2 Phases 1 and 2: Beginning at the Shaver Road trail head along H Ave, past Daniels Park, then along old railroad to 29th St. Phase 2 only: From 20th Street NE to 29th Street NE. This project has both TE and Demo funding. Earmark funding is $328,300; State Recreational Trails SRT-1187(751)--9H-57 funds of $150,000 Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $542,500 $0 $232,500 $775,000
Cedar Valley River Renaissance Trail Enhamcement PCC Trail. Cedar Valley River, 6th St. to Park Ave. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $453,376 $0 $1,086,571 $1,539,947
Rock Creek Trail from Rock Creek State Park east to Poweshiek Co. Line-Segment 2 - HMA Trail To extend the trail 4.2 miles along county roadway to the entrance of Rock Creek State Park. Grade and Pave Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities RURAL JASPER $549,400 $0 $137,400 $686,800
Chautauqua Park Trail - Chris Larson Park to Chautauqua Park The "Chautauqua park Trail" from the end of the developed Chatauqua Park then extending northerly along the Missouri River(West of Interstate no 29) to just south of the BN Railroad bridge(missouri river). Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CITY WOODBURY $445,183 $0 $587,885 $1,033,068
Center Street Bridge - Des Moines New pedestrain bridge over the Des Moines River at approximately Center St. **THIS PROJECT IS LOCATED UNDER PROJECT NUMBER EDP-1945(709)--7Y-77** Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $3,599,601 $0 $2,256,038 $5,855,639
Oneota River Trail (Dug Road Multi-use Recreational Corridor) Located along the south side of the Upper Iowa River Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities DECORAH WINNESHIEK $393,000 $0 $199,647 $592,647
Flint River Recreational Trail: Phases II-A, IV-A, & IV-B Trail Phase II-A, IV-A and IV-B Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities BURLINGTON DES MOINES $394,745 $0 $413,261 $808,006
Ankeny to Woodward Trail Corridor Trail - Des Moines River Bridge -U Ave to QF La NE in Dallas/Boone Counties. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $3,855,000 $0 $963,750 $4,818,750
Melrose Avenue Wide Sidewalk Melrose Ave: Intersection of Melrose Ave & Sunset St. Will replace existing 4ft wide sidewalk with 8ft sidewalk on North side of Melrose ave. Total project length is approx 3,000lf. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities UNIVERSITY HEIGHTS JOHNSON $396,800 $0 $143,200 $540,000
East 14th St. Pedestrian Overpass Span east 14th street just north of Grandview Avenue. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $399,932 $0 $1,520,224 $1,920,156
Prairie Farmer Trail Hard Surfacing HMA-Recreational Trail from Calmar to Cresco. Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $400,000 $0 $911,000 $1,311,000
River Renaissance North Downtown Trail Along Cedar River from E Mullan Ave to Cedar River Dam Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $400,000 $0 $600,000 $1,000,000
Near Canoe Road (W51) Bridge at Turkey River - Construction Portion Next to existing Canoe Road (W51) bridge to accommodate paved trail as part of overall Elgin to Nims Bridge trail project. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL FAYETTE $400,000 $0 $130,899 $530,899
Canoe Road (W51) Bridge Widening at Turkey River - PE PORTION Widening of existing Canoe Road (W51) bridge to accommodate paved trail as part of overall Elgin to Nims Bridge trail project. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL FAYETTE $400,000 $0 $115,500 $515,500
Cedar Lake Trail extension to 32nd St. In Cedar Rapids- Cedar Lake Trail. Grade and Surface. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $400,100 $0 $93,179 $493,279
Wapsi Great Western Trail, Phase I Howard County, From the City of Elma North to 150th Street. . Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $405,000 $0 $101,250 $506,250
US 218 / Cedar Valley Lakes Trail (Phase 2) - Mullan Ave. to West 18th St. US 218 / Cedar Valley Lakes Trail (Phase 2) - Mullan Ave. to West 18th St. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $416,131 $0 $23,125 $439,257
Donald Street Trail from US Hwy 63 to Tibbits Park Donald Street Trail, US 63 to Tibbits Park-from East Lake to the Gates Park Trail at Highway 63 (Logan Avenue). Project awarded to Vieth Construction Corp. PCc Trail Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $421,952 $0 $73,850 $495,802
Central Iowa Trail Loop-Ankeny to Woodward Extension Central Iowa Trail Loop - PE,CE& Construction. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $422,156 $0 $577,845 $1,000,001
Flint River Trail Phase III: From the levee and along Cash St to Bluff Rd PCC trail descending from the levee, across a short trail bridge over a drainage way, then following easements along Cash Street to Bluff Road. Connecting Phase II (STP-ES-0977(633)--8I-29) to the Mississippi River Trail. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities BURLINGTON DES MOINES $424,157 $0 $106,842 $531,000
Four-Mile Greenway Trail (Gay Lea Wilson to Ankeny) From NE 29th St/NE 54th Ave. to Four-Mile Creek, then south along the Creek to near Aurora Avenue. PCC Trail Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $431,715 $0 $754,285 $1,186,000
Beaver Avenue Streetscape - Beaver Crest Drive to Fagen Drive Beaver Avenue Streetscape - Beaver Crest Drive to Fagan Drive: Beaver Ave. from Beaver Crest Dr. to 250' north of Fagen Dr. & along Urbandale Ave. approx. 300' east and west of Beaver Ave. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $439,000 $0 $861,000 $1,300,000
Cedar Valley / Hoover Trail Connector (Phase 1) from Czech Village (16th Ave.) to Tait Cummins Park Original statewide grant of $442,000 was for Czech Village to S. of US 30. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $442,400 $0 $91,420 $533,820
Cedar View Trail from Fairfield to Libertyville (includes trail bridge over Cedar Creek) 376 feet bridge over the Cedar Creek, in the Sec 4-71-10 2.3 miles west of Fairfield. Project Federally closed on 1/14/2010. Participating Cost=$483,250, Non Participating=$9,111.99. Federal Funds=$386,600 Prorate Share. Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities RURAL JEFFERSON $386,600 $0 $96,650 $483,250
Easter Lake Trail Phase 2 Easter Lake Trail Phase 2 Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $560,000 $0 $264,000 $824,000
Div. I: Cedar Valley Lakes Trail - Phase 1 Phase 1 (revised) from Greenhill Rd. to Westfield Ave. and Div. II:Trolley Car Trail- Ansborough connection Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $571,300 $0 $469,700 $1,041,000
American Discovery Trail - Grand Ave. at 63rd St. to Fleur Drive For the last 3 segments of the American Discovery Trail through Des Moines .8 miles. Associated projects are STP-E-1945(667)--8V-77 and NRT-NT00(2)--9G-77. Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $773,000 $0 $417,000 $1,190,000
Union Railway Bridge Renovation For the renovation of the Union Railway Bridge over the river in Des Moines near Court Avenue. Also part of the Principal Riverwalk project. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $1,668,420 $0 $1,532,160 $3,200,580
Trail Planning in Des Moines MPO Area Trail Planning in Des Moines Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $125,000 $0 $31,250 $156,250
Eldridge to Long Grove, Cody Recreational Trail Trail along Scott Co Y64 from Sheridan Meadows Park in Eldridge to E Sapphire Lane in Long Grove. Related to project ESL-2290(610)--7S-82. PCC Trail Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities ELDRIDGE SCOTT $825,682 $0 $206,420 $1,032,102
Boone River Recreational Trail Bridge Rec. Trail over Boone River. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities WEBSTER CITY HAMILTON $863,131 $0 $481,305 $1,344,436
Decorah Trout Run Trail - Bridging Hwy 9 Constructing a bicycle/ped bridge over Highway 9. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities DECORAH ALLAMAKEE $895,746 $0 $619,228 $1,514,975
Central Iowa Trail Loop from Violet Ave to NW 158th Ave-PCC-Trail Central IA Trail Loop from Violet Ave to NW 158th Ave - PCC Trail. Project shares an optional contract with STP-ES-E-C0008(49)--8T-08 Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL BOONE $917,937 $0 $138,562 $1,056,500
Rolling Prairie Trail, US63 to Readlyn Hard surfacing of 5 miles of the Rolling Prairie Trail between U.S. 63 and Readlyn in Bremer County, including construction of 5 pedestrian/trail bridges. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL BREMER $939,436 $0 $402,616 $1,342,052
Raccoon River Valley Trail Addition, Phase II PCC Sidewalk/Trail - Dawson to Perry Trail from West 1ST Street in Dawson to .5 mile SE of Perry. Stip $942,000 Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities DAWSON DALLAS $941,921 $0 $274,555 $1,216,476
Boone River Recreational Trail Boone River Recreational Trail to Briggs Woods Lake Spillway near Webster City, PE, CE, and Construction.. Rec Trail - Letting - 2/20/07 - $151,131. Withholding 5% ($34,147.46)l11/4/09 - Entered Final Voucher for $34,147.46. Final Audit waived per letter from External Audits dtd 6/26/13 Project Completed, Federally Closed on 6/26/13 Total Project Costs: $1,401,289.03 Part Costs: $1,177,663.75+NP Costs: $223,625.28 Federal Funds: $942,131.00 Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities WEBSTER CITY HAMILTON $942,131 $0 $591,219 $1,533,350
Raccoon River Valley Trail Addition, Extension #3 From the SE side of Dallas Center (at Vine St) to the NW side of Waukee (Deming Ave & 10th St). Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL DALLAS $969,516 $0 $242,379 $1,211,895
Heart of Iowa Nature Trail Phase 7 - Bridge Project Construction of two bridges on the Heart of Iowa Nature Trail, over the Union Pacific Railroad and the Skunk River in Cambridge. Phase 7 and Phase 8 (STPES-SEB12) are combined. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities RURAL STORY $1,633,800 $0 $106,516 $1,740,316
Cedar Valley / Hoover Trail Connector (Segment C) from McLeod Place to Blairs Ferry Rd. To construct 1.9 miles of trail in Cedar Rapids from McCloud Place NE to Blairs Ferry Road NE. Segment 'C' of Cedar Valley/Hoover Trail(Blairsferry Ext) DISTRICT PROJECT Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $974,400 $0 $360,457 $1,334,857
Central IA Trail Loop-QF Lane to Violet Ave-PCC Trail Central IA Trail Loop - QF Lane to Violet Ave - PCC Trail. Project shares an optional contract with STP-ES-E-C008(50)--8T-08 Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $1,023,379 $0 $141,245 $1,164,625
Allamakee Co. trail from New Albin to Lansing along Hwy 26 For the beginning of the county trail system; consists of 11.2 miles of paved 4-foot shoulders along county roads Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities RURAL ALLAMAKEE $1,092,000 $0 $698,500 $1,790,500
MRT- Heritage Trail & Pedestrian Overpass MRT/Heritage Trail Rupp Hollow Rd to South John Deer Rd Rupp Hollow Road Pedestrian Bridge over US 52 Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities RURAL DUBUQUE $1,522,313 $0 $30,811 $1,553,125
Cedar Valley Nature Trail, Phases 2 and 3 From County Home Road to Lafayette and from Fishel Road to Schultz Road for a total distance of 6.8 miles. HMA Trail Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL LINN $1,106,000 $0 $838,250 $1,944,250
Wapsi Great Western Trail SAFETEA-LU Earmark 2 mile section near Pinicon Alders Wildlife Area - HMA Trail Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities RURAL MITCHELL $772,335 $0 $295,665 $1,068,000
Briggs Woods Golf Course Clubhouse to Briggs Woods Park Trail construction from Briggs Wood Golf Course to Briggs Woods Park.Trail shortened to avoid rail road. Trail construction/PE/Ce Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities RURAL HAMILTON $571,100 $0 $142,900 $714,000
Lewis and Clark Rivers Edge Trail (Phase 1) from Riverside Park to Chris Larsen Park Along the route of the proposed "Rivers Edge Trail" in the corridor between the Missouri river and Interstate route No 29 from the south edge of Hamilton Boulevard thence appr. 3.3 miles to Riverside park. PCC Trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CITY WOODBURY $765,800 $0 $241,914 $1,007,714
Chichaqua Valley Trail (SW Connector of the Central Iowa Trail Loop) HMA Trail. From Bondurant to Des Moines along abandoned RR Corridor. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $750,000 $0 $1,808,000 $2,558,000
American Discovery Trail, For the installation of a tunnel under Fleur Drive between Waterworks Park and Grays Lake in Des Moines. Project was let; bids were rejected. Project was re-concepted into the American Discovery Trail, Segment 4, which extends from the Bill Riley Trail to the American Discovery Trail, Riverpoint Segment, with a proposed letting date of 4/15/2008. Retained 5% TE Portion of construction=$7,825.75. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $573,090 $0 $245,610 $818,700
US 218 / Cedar Valley Lakes Trail (Phase 3) For construction of 4.01 miles of trail from the US 218/West 18th Street intersection along the Cedar River levee to the Evansdale city limits, through downtown Evansdale to connect with an abandoned railroad corridor and a city street system to the terminus of the Cedar Valley Nature Trail. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $579,520 $0 $144,880 $724,400
Scotch Ridge Nature Trail: Summerset Trail to Scotch Ridge Nature Center Connection of Summerset Trail: Connection of Summerset Trail with Des Moines River, Carlisle to Des Moines Ped/Bike Grade & Pave Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities CARLISLE WARREN $584,935 $0 $146,233 $731,169
Gay Lea Wilson Trail Extension - Ankeny Phase 2 This 3.0 mile segment will run from NE Delaware Avenue east and south to County NE 54th Avenue. The trail will be a 10 foot wide PCC multi-use trail. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities ANKENY POLK $585,250 $0 $727,150 $1,312,400
Mississippi River Trail Leach Park to Riverdale Development of the Mississippi River Trail from Leach Park in Bettendorf to Duck Creek in Riverdale. Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities BETTENDORF SCOTT $2,165,000 $0 $541,250 $2,706,250
Decorah Cut Trail--Segment 11 of Trout Run Trail Trail on the east side of US 52 North of IA 9 to Oneota Drive Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities DECORAH WINNESHIEK $605,117 $0 $635,702 $1,240,820
Linn Creek / Grimes Farm Trail from Grimes Conservation Farm NE 2.3 miles to Morris Park For a 2.3-mile trail linking the Grimes Conservation Farm with Morris Park. Linn Creek/Grimes Farm Trail in Marshalltown Preliminary Engineering, ROW & Trail construction. Project completed. Federally closed - 7/20/09. $756,625.00 Participating +$15,387.09 Non- Participating). Federal Funds $605,300. Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities MARSHALLTOWN MARSHALL $605,300 $0 $151,325 $756,625
Motor Mill Trail Construct 10 foot wide lime path trail along the Turkey River from the Motor Mill Bridge and Park to the Pony Hollow Trail. 4.1 Miles. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities RURAL CLAYTON $605,576 $0 $175,000 $780,576
Trail of Two Cities Legacy Initiative Construct 16 miles of multi-use trail along the Mississippi River connecting Pikes Peak State Park to Effigy Mounds national Monument, via the cities of Marquette and McGregor. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities MCGREGOR CLAYTON $611,900 $0 $688,100 $1,300,000
US 34 from, Adams County Line East to Creston New HMA Paved Shoulder on US 34 from Adams Co. Line E. to Creston. Project included in approved HSIP-JLR 5/9/07 Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities CRESTON UNION $618,514 $0 $69,310 $687,823
Trestle-to-Trestle Trail To connect Johnston trails with Neal Smith Trail - (from DM Rivertrestle Bridge S of Euclid N. to existing trail N. of Beaver CR Bridge. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $636,750 $0 $763,250 $1,400,000
American Discovery Trail - Riverpoint Segment - Grays Lake to Court Avenue For design and construction of a 2-mile segment of the American Discovery Trail (ADT) from Gray's Lake to downtown Des Moines following the south bank of the Raccoon River near Gray's Lake, crossing the river to its north bank at the 5th Street bridge, continuing east to Sec Taylor Staduim and north to Court Avenue, then crossing the Des Moines River on a city owned railroad trestle to connect with the Pat Dorrian Trail. Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $645,000 $0 $295,023 $940,023
Central IA Trail Loop from NW 118th Ave. to NE 18th St in the City of Ankeny Central IA Trail from NW 118th Ave to NE 18th St in the city of Ankeny-HMA Trail. STIP $562,597, IN-Kind=$132,141 donated RR ROW, DEMO IA 177. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities ANKENY POLK $658,209 $0 $2,494 $660,704
Flint River Trail: Flint Bottom Road to Big Hollow Rec Area - Phase II and III Off road from Des Moines County Highway 99 to Starr's Cave Preserve, Thye Wood Habitat Area, and Big Hollow Rec Area; roughly 15 miles. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL DES MOINES $718,198 $0 $542,745 $1,260,943
Heart of Iowa Nature Tail Phase 8 This project number was authorized as an amendment to STP-ES-E-C085(90)--8T-85. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL STORY $725,000 $0 $312,000 $1,037,000
Rolling Prairie Trail - Coulter to Hampton (Segment A) Multipurpose trail from Coulter to Hampton east city limits approximately 9.6 miles. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL FRANKLIN $735,000 $0 $268,000 $1,003,000
Bettendorf Middle Road Trail Recreational Trail along Middle Road from Duck Creek to Devils Glen Road. PCC Trail Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities BETTENDORF SCOTT $741,876 $0 $970,092 $1,711,968
MRT - South Urban Section, Phase 1 (Clinton to Camanche Trail) From the US 67/Washington Blvd intersection in Camanche; extending NE along Washington Blvd, 3rd St, and local roads adjacent to the Mississippi River to the 4th Ave/Washington Blvd intersection; then N along Washington Blvd and US 67 to US 30; then E along US 30 to S 14th St in Clinton. HMA and PCC Trail/Bridge Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities CLINTON CLINTON $1,902,892 $0 $722,108 $2,625,000
Weed Park to Wildcat Den Trail HMA Trail Weed Park to Wildcat Den Trail Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities MUSCATINE MUSCATINE $381,726 $0 $116,632 $498,358
American Discovery Trail Segment 3 From North Valley Drive to Bill Riley Trail along Walnut Creek Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $376,000 $0 $824,000 $1,200,000
Mississippi River Trail Through Allamakee County Mississippi RiverTrail Through Allamakee County Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL ALLAMAKEE $4,900,000 $0 $650,101 $5,550,101
1st Avenue Trail Along 1st Avenue (in the ROW) from Monroe Street to Nixon Street Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities CASCADE DUBUQUE $250,000 $0 $92,000 $342,000
South Troy Trail Park Construct trail from CVNT near Robins Road to S Troy Road at Robins Park Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities ROBINS LINN $250,000 $0 $236,354 $486,354
Skunk River Trail - South River Valley Park to Carr Pool HMA Sidewalk/trail - Skunk River Rec Trail - RiverValley Park to Carr Pool Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $175,728 $175,728 $5,431 $181,159
Pinicon Ridge Park to Central City Trail Connection Construct 7,000' of trail to connect the campgrounds in Pinicon Ridge Park in northeastern Linn County to Central City. A crossing will be constructed under the south side of the Iowa Highway 13 Wapsipinicon River bridge. It will be 12' wide with a crushed limestone surface. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL LINN $250,400 $0 $62,600 $313,000
Newton North Hike/Bike Trail Newton North Hike/Bike Trail: 1.1 mile, 8' wide concrete trail from Woodland park, along N 15th Avenue E to E 12th Street N Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities NEWTON JASPER $254,000 $0 $63,339 $317,339
Trail Muddy Cr. & CRANDIC RR., Penn St to SCL Trail from Penn St to South Corp. Limits. In North Liberty. ACC trail Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities NORTH LIBERTY JOHNSON $259,400 $0 $43,173 $302,573
Rolling Prairie Trail - Beed's Lake Spur Beed's Lake park south on Nettle Ave to Main. Rolling Prairie Trail Segment: Nettle Ave from existing Rail Corridor to 165th St Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities RURAL FRANKLIN $259,600 $0 $90,143 $349,743
Outer Drive/Floyd Blvd to Floyd River Trail Hoeven Valley Corridor - Outer Drive Project, Sioux City Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CITY WOODBURY $201,473 $0 $50,368 $251,841
Loess Hills Arboretum Trail For design and construction of a 1.7 mile trail on the Sioux City campus of the Western Iowa Tech Community College. Also to obtain the necessary resources to gain "conservation easements" to land for future trail linkages to the Bacon Creek Recreational Area and the Milwaukee Road Trail. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CITY WOODBURY $263,782 $0 $90,218 $354,000
Wapsi Great Western Line Trail, Mitchell County Route (E911): Trail : From the intersection of 450th and Walnut --west 1/2 mile--north1.75 miles to the southeast edge of McIntire. Then from 502 Munson St. on the northwest edge of McIntire 1/2 mile west and north to 470th st.. The project is to install concrete surface on 2.75 miles of trail Type work: 9509 Ped/Bike Grade & Pave Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities RURAL MITCHELL $267,288 $0 $26,212 $293,500
IA 58 Recreation / Pedestrian Trail Recreational Trail in the City of Cedar Falls from N of Viking Rd to N of Greenhill Rd Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities CEDAR FALLS BLACK HAWK $269,939 $0 $68,061 $338,000
Ellis Blvd Trail Extension: Boat ramps to Edgewood Rd NW Extension of existing pedestrian and bike path approximately 3,000 feet from boat harbor to Edgewood Rd NW. Extension of existing storm sewer outlets and minor grading will be required to complete the project. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $270,000 $0 $68,000 $338,000
Union Road Trail Trail Along Union Road from W. 1st Street to W. 12th Street Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities CEDAR FALLS BLACK HAWK $272,000 $0 $68,000 $340,000
Indian Creek Trail - Council Bluffs 10' concrete trail on the west bank of the Indian Creek levee between Hwy. 92/275 & 16th Ave. Trail to go under I-80/29 bridges and 23rd Ave. bridge inside levee. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities COUNCIL BLUFFS POTTAWATTAMIE $280,000 $0 $156,000 $436,000
Rathbun Lake Multi-Use Trail - Culvert Extension at Highway J18 and Ham Creek J18 Rathbun Lake Multi-Use Trail-Culvert Ext Ension at Highway J18 and Ham Creek $20,358.93 is regular TE funds - will not be billing (DC 1/20/12) Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL APPANOOSE $170,358 $150,000 $5,090 $175,449
Hoover Nature Trail, Connect to Ely (American Discovery Trail) Hoover Nature Trail, Connect to Ely (American Discovery Trail Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities RURAL LINN $280,228 $0 $54,915 $335,143
Ventura Grade Recreational Trail Improvement Project Constructing an HMA recreational trail along the east side of South Main Street (S14) on the south edge of the City of Ventura. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities RURAL CERRO GORDO $282,000 $0 $70,500 $352,500
Resurfacing and Renovation of the Original Spine Trail and Poyzer Trail HMA Sidewalk/Trail. Multiple Trails - Stylecraft, Okoboji Slough, Spine and Poyzer Trails. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL DICKINSON $186,365 $186,365 $47,567 $233,932
Loop Trail Bridge over BNSF Railroad- Chautauqua Park BRIDGE NEW- PPCB. Chautauqua Park to Walton Lake Trail over BNSF RR at east end of Fairfield. Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities FAIRFIELD JEFFERSON $282,951 $0 $121,049 $404,000
Mid City Trail - Avenue A to Avenue H PCC Sidewalk/Trail - Mid-City Trail along North 13th St. from Ave. A to Avenue H. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities COUNCIL BLUFFS POTTAWATTAMIE $200,000 $200,000 $92,741 $292,741
Lyons Multiple Use Recreational Trail North end elementary School Ped and Bicycle Trail, North 3rd St to 27th Ave North. PCC Trail Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities CLINTON CLINTON $250,000 $0 $300,000 $550,000
Grinnell Arbor Lake Trail Improvements From SE corner of Arbor Lake East to IA 146, then South to Industrial Avenue. PCC Sidewalk/Trail Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities GRINNELL POWESHIEK $234,000 $0 $302,257 $536,257
Central Iowa Trail Loop - NW 158th Ave to NW 118th Ave - HMA Trail Central IA Trail Loop-NW 158th Ave to Nw 118th Ave - HMA Trail. STIP $1,356,398, In-Kind=$277,344 donated RR ROW. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $1,364,414 $0 $341,102 $1,705,517
Chichaqua Trail - Polk Co. line west chicihaqua-Bondurant-Jasper Co Line Bike Trail. 4.5 mile ACC Trail Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $236,000 $0 $55,911 $291,911
Mount Pleasant Trail, Phase 4 Rec Trail - from US 218 overpass south & east around East Lake and the City Park Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities MOUNT PLEASANT HENRY $236,000 $0 $87,686 $323,686
Westside Recreation Trail PCC -Trail ,from school along South St. to Eby to West Main Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities LISBON LINN $236,800 $0 $59,200 $296,000
Mississippi River Trail (MRT) development along Washington Blvd from 3rd Street to 2nd Ave Mississippi River Trail (MRT) development along Washington Blvd from 3rd Street to 2nd Ave. Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities CAMANCHE CLINTON $237,000 $0 $60,000 $297,000
Mount Pleasant Trail, Phase 3 Link trail. Along old US 218 and new US 218 in SE Mount Pleasant. Preliminary and Construction Engineering and Trail Construction. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities MOUNT PLEASANT HENRY $238,600 $0 $156,967 $395,567
North and South Riverside Trail HMA Resurfacing. North Riverside Trail along Cedar River. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities CEDAR FALLS BLACK HAWK $207,500 $207,500 $13,863 $221,363
Rolling Prairie Trail-Shell Rock to Clarksville HMA Trail - Shell Rock Trail - 1 mile East of Clarksville to Co. Rd. T63. Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities RURAL BUTLER $239,413 $0 $204,587 $444,000
Trail 12th St. Recreational Trail from Hudson Rd. to Union Road. PCC Trail Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities CEDAR FALLS BLACK HAWK $240,000 $0 $142,900 $382,900
Keosauqua Riverfront Trail Connect with existing Loop Trail at Hwy 1 and continue down to and along the Des Moines River. Continue southeast along the Des Moines River to the new Des Moines River Hwy 1 parking. Continue across the new bridge via the walking lane and connect there with Lacey-Keosauqua State Park. Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities KEOSAUQUA VAN BUREN $240,000 $0 $127,000 $367,000
Perry Creek Greenway Trail (Phase 1) The Phase One recreational trail beginning at an existing trail near the intersection of 3rd and Douglas St thence along the RR right of way and thence along Perry Creek conduit to Green Space are southwest of 3rd & Water St. Intersection. Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CITY WOODBURY $242,200 $0 $121,817 $364,017
Interurban Trail - various locations from SE 54th St to 1st St Trail construction Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities ANKENY POLK $242,400 $0 $60,600 $303,000
Wolf Creek Trail- Phase II From Phase 1 terminus of Wolf Creek trail to Comet trail Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities RURAL TAMA $244,720 $0 $61,180 $305,900
Main Street Enhancements Phase IV Replacement of sidewalk, historic lighting- 2nd Street to 4th Street. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities KEOKUK LEE $245,742 $0 $43,665 $289,408
East University Ave. Gateway Project E.University beautification project. Improvements north of fairgrounds. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $249,000 $0 $35,770 $284,770
Lisbon Trail System Lisbon Trail System Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities LISBON LINN $249,603 $0 $80,397 $330,000
Westside Park Bike/Walking Trail Project Installation of 10' wide PCC multi-use trail parallel to and on the east sife of 3rd st SW from existing parking lot within the park to 3rd st SW and parallel to and on the south side of 3rd ave SW from 5th st SW to 1st st SW for a total length of .5 miles. 10/10/12 added from 3rd Ave SW to drainage ditch. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities DYERSVILLE DUBUQUE $250,000 $0 $82,750 $332,750
Wapsi Great Western Line Trail, Howard County WGWL Trail: Acme to Riceville Ped/Bike Grade & Pave. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $285,000 $0 $2,000 $287,000
Grinnell Area Rec Trail underpass extension from U.S 6 to 4th Ave Grinnell Area Rec Trail underpass (culvert)from U.S. 6 to 4th Ave in the city of Grinnell $225,000 STIP amount managed by the district Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities GRINNELL POWESHIEK $285,000 $0 $335,000 $620,000
Duck Creek Trail from Hollowview Park to Devils Glen Rd. Duck Creek Trail from Hollowview Park to Devils Glen Rd in Bettendorf. Trail Grade and Pave Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities BETTENDORF SCOTT $159,000 $0 $394,094 $553,094
Douglas Avenue Trail Project Douglas Ave from 100th to 109th St and Douglas parkway from 128th to 134th St Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities URBANDALE POLK $325,000 $0 $379,000 $704,000
Forest City Trail - along IA Hwy 9, connected to Pilot Knob State Park (phase 1) Forest City Trail - along IA Hwy 9, connected to Pilot Knob State Park (phase 1) Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities FOREST CITY WINNEBAGO $327,790 $0 $91,032 $418,822
N. side of Webster City to US Hwy 20 four lane bridge Boone River Trail in Webster City. PCC Trail. Two multi purpose trail segments (5 miles) Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities WEBSTER CITY HAMILTON $328,530 $0 $187,568 $516,098
Unknown project Title This project found in the OPFIN Accounting program. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $328,719 $0 $82,179 $410,899
Pine Lake St Park into Steamboat Rock Pine Lake State Park to Steamboat Rock. PCC Trail. Federally closed - 12/18/08.Total Project Cost $405,745.51, Participating Cost=$397,726.92, Federal Funds=$318,181.54, Non Participating=$8,018.59. STIP=$329,600 Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities RURAL HARDIN $329,500 $0 $103,200 $432,700
Walcott Recreational Trail and Park Walcott recreational trail and nature park: along mud creek in walcott, north of park view drive, west of main st, east of bridge lane Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities WALCOTT SCOTT $330,773 $0 $193,950 $524,723
West Liberty RR Depot Restoratiion (Phases 1, 2, 3 & 4) For the restoration of a 98-year-old depot as a trailhead / rest area and historic transportation museum. Between Elm St and C.L. Railroad in West Liberty. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities WEST LIBERTY MUSCATINE $338,006 $0 $256,217 $594,223
North Liberty Dubuque Street Connector Trail 10-foot trail extending generally north-south approximately 8,600 feet through the eastern portion of North Liberty. The trail will connect the proposed Johnson County trail along Dubuque Street at the south corporate limits to the proposed Mehaffey Bridge Road trail at the north corporate limits. Dubuque Street Trail in the City of North Liberty, South City Limit to North City Limit Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities NORTH LIBERTY JOHNSON $342,163 $0 $455,413 $797,576
Cedar Valley / Hoover Trail Connector - Downtown Corridor For development of a 1.6-mile bike/ped trail from the Czech Village through the central business district to the south end of Cedar Lake Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $347,000 $0 $149,000 $496,000
Manchester Trail Segments For 2 trail segments in the city of Manchester - the Bailey Drive/South Brewer Walkway (along Bailey Drive from East Main Street south to South Brewer Street and South Brewer Street northwesterly to Vine Street) and the River Trail Walkway (along the Maquoketa River from River Front Park westerly to West Main Street). Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities MANCHESTER DELAWARE $347,638 $0 $86,862 $434,500
Iowa Riverfront Trail (Phase 2) from Playland Park to N 25th St. Iowa Riverfront Trail-Playland Park-North 25th St PCC Trail in Council Bluffs Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities COUNCIL BLUFFS POTTAWATTAMIE $350,000 $0 $47,807 $397,807
Whiterock Sustainable Trail Located in Whiterock Conservancy Lands, Gutherie County, Orange townships, Sections 3, 11, 13, 14, 23 and 24. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RURAL GUTHRIE $355,680 $0 $226,000 $581,680
Skunk River Trail Extension, Phase 2, Lincoln Way to South River Valley Park grading and paving of PCC trail from Lincoln Way along the Skunk River, north to South River Valley Park. Approx. 0.9 miles. Land acqsition for future project phases will be included with the project. Permanent and temporary easement will be acquired along the Skunk River from the confluence of Squaw Creek, north to South River Valley Park. Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $360,000 $0 $430,000 $790,000
Soldier Creek Nature Trail Project is located from 2007 N. 15th Street to Street between Harlan Rogers Sports Complex. PCC Trail Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities FORT DODGE WEBSTER $361,000 $0 $1,808,951 $2,169,951
Mississippi Riverfront Trail Extension Phase V Build a new .45 mile trail from the IA 92 river bridge north to Spillway Lane. HMA Trail Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities MUSCATINE MUSCATINE $366,000 $0 $579,000 $945,000
Center Street Bridge Pedestrain Bridge over the Des Moines River at approximately Center St. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $5,100,000 $0 $1,400,000 $6,500,000
Chichaqua Trail from Jasper-Polk Co. line to Baxter Project also included $191,624 of State Rec Trail funds. ACC Overlay 15.3 miles Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities RURAL JASPER $369,600 $0 $295,346 $664,946
Multi-Modal Ground Transportation Center Streetscape To streetscape the new multi-modal ground transportation center, which will serve all ground transportation modes Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CITY WOODBURY $322,979 $0 $105,306 $428,285
Dubuque Street Trail, Phase 2 Paving trail from 275th Street to Juniper Street. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL JOHNSON $322,958 $0 $87,042 $410,000
Dubuque Heritage Trail - 22nd Street to the Mines of Spain For final design, engineering and construction of the Dubuque Heritage Trail, 10.6 miles along the Mississippi Riverfront Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities DUBUQUE DUBUQUE $322,800 $0 $138,286 $461,086
Grundy County Lake Connection Trail For a trail that extends from the Grundy County Lake north along the west side of a stream to Co Rd D19, along D19 to the 7th Street Trail in Dike. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities DIKE GRUNDY $320,000 $0 $139,000 $459,000
Cedar Valley / Hoover Trail Connector - Blairs Ferry Rd. to CNRR Jct. in Hiawatha PCC TRAIL FROM BLAIRSFERRY TO BOYSON ROAD Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities HIAWATHA LINN $287,800 $0 $174,400 $462,200
US 71/Ia. 175 at Co. Rd. N-20/D-59 Intersection 4 Miles W. of Auburn HMA Paved Shoulders HMA Paved Shoulders on US 71/Ia 175 at County Road North-20/D-59 intersection 4 miles west of Auburn Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities RURAL SAC $296,467 $0 $10,661 $307,129
Wapsi Great Western Trail Bridge over Watson's Creek in Hendricks Park - Bridge-New. Wapsi Great Western Trail Bridge over Watson's Creek in Hendricks Park - Bridge Replacement -CCS Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $296,579 $0 $74,144 $370,723
5th Avenue Entry Streetscape--Phase 1 Recreational Trail - 5th Avenue from 400 LF North of IA 141 to RR Tracks. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities COON RAPIDS CARROLL $300,000 $0 $200,000 $500,000
Wapsi Great Western Trail Bridges 2 & 3 Wapsi Great W. Trail - 2 bridges over branch of Little Wapsi River and Little Wapsi River -HMA Trail Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $300,000 $0 $75,000 $375,000
Wapsi Trail Bridge 3 & 4 Wapsi Trail Bridges 3 & 4 Iowa 2016 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $302,712 $0 $0 $302,712
Multipurpose TraiL from Postville to Gilbert Park in Elgin Multi-purpose trail from Postville to Clermont North. In-kind, Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities RURAL FAYETTE $303,500 $0 $774,500 $1,078,000
On Dubuque St (W-66) from Butler Bridge over the Iowa River to W Overlook Rd. Dubuque St TRail IA R N to Overlook Road-PCC Trail Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities IOWA CITY JOHNSON $304,000 $0 $76,000 $380,000
T-Bone Trail, Exira to 260th Street Project will construct 2.9 miles of hard-surfaced recreational trail from Exira north to 260th Street. Will complete the final phase of the T-Bone Trail and would create a trail from Audubon to Atlantic. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL AUDUBON $232,175 $0 $145,323 $377,498
South First Street Improvements and Resurfacing Construction of .3 miles of PCC recreatinal trail along South First Street in from Hwy 5 to School Street in Carlisle. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities CARLISLE WARREN $65,466 $65,466 $463,036 $528,502
Cedar River Portion of the American Discovery Trail Cedar Lake Loop Trail To develop a trailhead at Cedar Lake and reconstruct a gravel trail to an asphalt trail around Cedar Lake and to the Cedar River.Along the north and east sides of Cedar Lake Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $305,025 $0 $105,139 $410,164
Court Hill Trail Construct approximately 1 mile of 10-foot wide paved pedestrian trail from Court Hill Park to Creekside Park along the South Branch of Ralston Creek including the removal and replacement of an existing pedestrian bridge in Iowa City Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities IOWA CITY JOHNSON $305,676 $0 $446,258 $751,934
River's Edge Trail (Lewis & Clark Trail) in Sioux City For a 0.58-mile trail following the Lewis & Clark Expedition route along the Missouri River that will link two existing segments - Chris Larsen Park and Chautauqua Park. Trail Construction Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CITY WOODBURY $308,009 $0 $728,561 $1,036,571
Soldier Creek Nature Trail Phase II 10 Foot PCC Trail form Harlan Rogers Sports Complex north entrance to Kennedy Park along 160th Street, Oates Avenue, 150th Street and Nelson Avenue in Webster County. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities RURAL WEBSTER $308,887 $0 $580,593 $889,480
Cedar River Trail from 6th St. to 18th St. Cedar River Trail from from 6th to 18th St. Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $317,677 $0 $323,647 $641,324
Amana Trail, Phase II Develop a 1.11 mile trail route from Main Amana through to the west end of Middle Amana. HMA Trail 10-foot wide. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities RURAL IOWA $318,483 $0 $84,816 $403,299
Central Iowa Trail Loop-Ankeny to Woodward Central Iowa Trail Loop from Ankeny to Woodward. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $7,220,529 $0 $2,279,471 $9,500,000
8th St. Bicycle / Pedestrian Overpass 8th St. in Altoona- 15th Ave. to RR. Pedestrian bridge.TRAIL BRIDGE OVER 8TH ST SW & TRAIL CONSTR. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities ALTOONA POLK $319,000 $0 $61,906 $380,906
Center Street Bridge Pedestrain Bridge over the Des Moines River at approximately Center St. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $7,306,710 $0 $1,826,677 $9,133,387
Duck Creek Bike Path from Devils Glen to State St. Bettendorf-Devils Glen Park, Trail paving Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities BETTENDORF SCOTT $159,000 $0 $171,000 $330,000
Trail - Jacoby Drive (Bierman Road to 5th Avenue Along Jacoby Drive from Fifth Ave SW to 600 feet west of Biermann Rd. trail Grade and Pave.1.1 miles Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities EPWORTH DUBUQUE $160,000 $0 $40,398 $200,398
Wapsi Great Western Trail, Phase 3 - Walnut Avenue to N of 430th Street Wapsi Great Western Trail from Walnut Avenue to north of 430th Street (north of Riceville). HMA Trail Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL MITCHELL $157,000 $0 $118,082 $275,082
Goose Creek Recreational Trail Phase 2 59th and Scott St. to Prairie Height Park. Design work Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities DAVENPORT SCOTT $70,000 $0 $1,030,000 $1,100,000
Afton Community Trail HMA Trail along Filmore St. in Afton from Temple St. East to high School Drive and North to Afton Rec. Complex. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities AFTON UNION $70,125 $0 $29,500 $99,625
East Park Lake Trail Loop East Park multi-purpose trail in Rudd, ACC trail Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities RUDD FLOYD $70,400 $0 $18,561 $88,961
Monroe to Prairie City Corridor Trail - Phase I Granular trail on abandoned railroad right-of-way along Highway 163 beginning at the west edge of Monroe extending to Highway F62 (Phase I) a distance of 6.06 miles. Jasper County Trail Prairie City to Monroe Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL JASPER $70,938 $0 $30,402 $101,340
U.S. 65 From NCL Mason City North to IA 9 in Manly New HMA Paved Shoulders on U.S. 65 from NCL Mason City N. to Ia 9 in Manly, 5.68 miles. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities MASON CITY CERRO GORDO $71,066 $0 $17,766 $88,832
Hyland Ave. from West St. to Ontario St. In Ames, Hyland to Oakland and Ontario Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $72,000 $0 $230,034 $302,034
Oakdale Boulevard Trail - from Wickam School to 1st Ave. Oakdale Blvd Trail in Coralville.PCC Trail. Project closed Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities CORALVILLE JOHNSON $72,000 $0 $55,600 $127,600
W. SIDE OF US 75 FROM GROVER ST TO ORBIT RD. Recreational trail on the west side of US75 to grover street. .55 miles. Marrland hts trail in Hinton from Titan to Grover St Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities HINTON PLYMOUTH $72,700 $0 $18,175 $90,875
Hanging Rock Park to Raccoon River Valley Trail Recreational trail.Hanging Rock Park to Raccoon River Valley Trail..83 miles. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL DALLAS $73,140 $0 $4,846 $77,986
Trail Head Park at 5th St. & RR St. Intersection 5th Street-Hudson RR Street Trail Head Park Construction Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities HUDSON BLACK HAWK $73,600 $0 $18,400 $92,000
Red Oak Trail, Paving Phase 1 Paving a 8ft wide, 0.5 mile long trail from 8th Street to Eastern Ave parallel to Hwy 34 on south side of Hwy 34 ROW. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RED OAK MONTGOMERY $74,240 $0 $34,560 $108,800
Nature Discovery Trail County Environmental Discovery Center, ACC Bike Trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL MUSCATINE $74,800 $0 $11,939 $86,739
Lincoln Way / Skunk River Bike/Ped Bridge Trail Bridge - Pedestrian bridge at Skunk River in the City of Ames. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $75,000 $0 $236,100 $311,100
North Raccoon Valley Trail Pedestrian Bridge Bridge overWalnut Creek and the connection on both sides of the bridge. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities URBANDALE POLK $75,000 $0 $74,039 $149,039
South 50th St. - pedestrian bridge over IA Hwy 5 Adding sidewalks to brdiges built in conjunction with the IA 5 Beltway project. Funding was included in the structure project. Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities WEST DES MOINES POLK $75,400 $0 $113,600 $189,000
Red Oak Trail, Phase I Grading Grading of the Red Oak trail system, phase 1. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities RED OAK MONTGOMERY $69,203 $0 $31,984 $101,187
Plum Creek Trail (Phase 2) Pre-engineered truss bridge over E Fork of Wapsipinicon River Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities FREDERICKSBURG CHICKASAW $75,720 $0 $64,697 $140,417
Red Oak Trail - Section 2 paving This project will pave approximately 2000ft of recreational trail in Red Oak. Section 2 includes the trail from near Eastern Ave in US Hwy 34 right of way to an existing Evergreen Cemetary road approx 500ft north of Inman Dr. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities RED OAK MONTGOMERY $68,800 $0 $30,200 $99,000
In Havens Acres Park from State St (Hwy 67) to S Kensington St Duck Creek Recreation trail in Riverdale, PCC Trail Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities RIVERDALE SCOTT $68,624 $0 $37,375 $106,000
Indian Creek Streambank Stabilization on Chichaqua Valley Trail Indian Creek Streambank Stabilization on the Chichaqua Valley. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities RURAL JASPER $61,579 $0 $30,921 $92,500
Milford Bike Trail The Milford Bike Trail along County Road A-34(13th St) and surface marking for bike routes on various streets. ACC Trail Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities MILFORD DICKINSON $63,000 $0 $33,755 $96,755
Grinnell Trail Head End of Gart Trail to Trail head along sunset avenue.. Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities GRINNELL POWESHIEK $63,000 $0 $16,520 $79,520
3 Rivers Trail from 2.6 mi. west of Eagle Grove into Eagle Grove Recreational trail Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities RURAL WRIGHT $64,400 $0 $16,100 $80,500
13th Str. 10th Ave from 6th Ave to Ball Prk in Vinton Walkway Along 13th Str. & 10th Avenue from 6th Ave to Ball Park Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities VINTON BENTON $64,600 $0 $16,150 $80,750
Oneota River Trail - Phase 2 Oneota River Trail in Decorah. Grading. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities DECORAH WINNESHIEK $64,700 $0 $715 $65,415
Burlington RecPlex Trail-Phase I Rec Plex Trail - PCC Trail from school east to Battle Creek Nature&Recreation area. Final voucher done on 9/24/08. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities BURLINGTON DES MOINES $64,800 $0 $16,200 $81,000
Hinton Recreational Trail Grover St: Trail along Grover Street and second Ave. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities HINTON PLYMOUTH $65,000 $0 $33,000 $98,000
Cable Car Square Historic Lighting/Sidewalk HISTORIC LIGHTING-CABLE CAR SQUARE Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities DUBUQUE DUBUQUE $65,600 $0 $16,400 $82,000
Forest City Trail - along IA Hwy 9 connected to Pilot Knob State Park (phase 2) Trail Forest City 180th Street to Pilot Knob State Park Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities FOREST CITY WINNESHIEK $65,692 $0 $16,423 $82,115
Heritage Trail Surface and landscape the Dyersville-heritage Trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities DYERSVILLE DUBUQUE $66,000 $0 $17,357 $83,357
Walking trails and viaduct remodeling Delmar Park project. Viaduct removal and trail landscaoe Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities DELMAR CLINTON $66,900 $0 $13,359 $80,259
Prairie Bridge Park - bridge over creek to connect two exsting trails This project also listed under IA96101 WITH A MAX OF 8800 Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities ACKLEY HARDIN $67,530 $0 $13,607 $81,137
Prairie Du Chien Trail FROM I-80 NE TO Newport Rd. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL JOHNSON $68,000 $0 $215,631 $283,631
Along US Hwy 59 from Hillcrest Drive to Victory Dr. Multi-purpose trail which will parallel US 59 from Hillcrest Dr to Victory Dr on the north side of Cherokee Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities CHEROKEE CHEROKEE $68,100 $0 $22,169 $90,269
Ottumwa Prk. Lagoon Trail - Retaining Walls Retaining Walls on the Lagoone Park Trail in Ottumwa. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities OTTUMWA WAPELLO $68,800 $0 $6,200 $75,000
Clay County - Pederson Park Trail Extension Along 10th Avenue East from East 9th St to E 14th Street. Federally closed - 10/29/09. Total Project cost=$123,608.16, Participating Cost = $116,500, Federal Funds = $93,200, Non Participating = $7,108.16 (Local Eligible Unclaimed funds due to STIP amount). STIP Amended to $93,200, FY03 STIP $66,100. Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities SPENCER CLAY $76,740 $0 $5,860 $82,600
Pedestrain Trail Phase 2 - along 2nd, 3rd and Grant Streets Tiffin Pedestrain Trail. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities TIFFIN JOHNSON $76,832 $0 $11,880 $88,712
T-Bone Trail Extension Trail - Atlantic to Audubon County Line. Located on T-Bone trail in Cass County, from north County Line just east of US 71 southwesterly to a point in Section 22, T-77N, R-36W. Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities RURAL CASS $76,880 $0 $19,220 $96,100
Linn Creek Trail in Marshalltown .9 mile Trail Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities MARSHALLTOWN MARSHALL $86,800 $0 $66,380 $153,180
Dysart to Vinton Trail (Dysart Segment) C.R. Roberts Memorial Pkway, trailhead 1.0 miles Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities DYSART TAMA $86,900 $0 $18,818 $105,718
Deer Prk. in Eldora along Ia 175 to S-56 From the Eldora Corp line to Pine Lake State park, PCC trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities ELDORA HARDIN $88,000 $0 $27,452 $115,452
Gilbert Drive- River Forest Rd to Evansdale Trail PCC Trail. Gilbert Drive from River Froest Road to just east of Grand Blvd in city. Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities EVANSDALE BLACK HAWK $88,000 $0 $22,000 $110,000
Recreational Trail along East Lakeshore Drive from Circle Park to Hudson Street PCC Trail along Lakeshore Drive from Grand Ave to Hudson St in Storm Lake Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities STORM LAKE BUENA VISTA $88,000 $0 $15,283 $103,283
Diamond Lake Trail - HMA Trail HMA Trail from 480th Ave. south into Diamond Lake Park. Trail Construction. Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities RURAL POWESHIEK $89,000 $0 $22,250 $111,250
City Park Trail Phase 3 PCC Sidewalk/Trail, Tiffin City Park to Jasper Ave-Phase 3 Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities TIFFIN JOHNSON $89,000 $0 $17,800 $106,800
Local Trail - Bedstead Truss Bridge on Clayton Ave. to Trail Mud Creek Park- Relocate bridge on Clayton Ave in Section 28-71-7- to Mud Creek Park/312th St in Section 22-70-5. Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities RURAL HENRY $89,500 $0 $22,375 $111,875
Local Trail - Bedstead Truss Bridge on Hickory Ave. to Trail Relocate bridge on Hickory Ave in Section 20-70-6 to Oakland Mills Park/253rd St in section 24-71-7. Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities RURAL HENRY $89,500 $0 $22,375 $111,875
Oelwein Municipal Trail (Phase I) from Redgate Park to Levin Park Trail construction from Redgate to Platt's to Platt's Park Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities OELWEIN FAYETTE $89,500 $0 $29,250 $118,750
Jacobson Park Trail - from the west end of the existing trail on the south side of Prairie Dr. south From the west terminus of the existing trail on the south side of Prairie Dr S to Parkview Dr, along NE Bank of the skunk River and looping back to Parkview Dr. .9 Mile Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities STORY CITY STORY $89,600 $0 $22,500 $112,100
Waukee: Sugar Creek Trail Bridge Trail bridge over Sugar Creek Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities WAUKEE DALLAS $90,000 $0 $190,000 $280,000
Meyers Lake Trail Extension Tom Meyers Lake Trail from Meyers Lake to Cedar Valley Nature Trail Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities EVANSDALE BLACK HAWK $90,400 $0 $33,600 $124,000
Grundy County Lake Trail For development of a 0.87 mile trail around the north and west side of the Grundy County Lake and connecting to the trail along county road T55. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities RURAL GRUNDY $92,000 $0 $367,000 $459,000
Mount Pleasant Trail, Phase 2 Unnamed trail from Linden heights, east to east lake park in the city of Mt pleasant. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities MOUNT PLEASANT HENRY $92,800 $0 $23,200 $116,000
Skunk River Trail Extension Grading and paving of a PCC Trail from the Hunziker Youth Sports Complex north along the Skunk River to SE 16th Street. Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $86,000 $0 $350,000 $436,000
Lake Trail (Phases 2 & 3) PCC Trail Lakeshore Drive in Storm Lake. Let amount was $78,741.86(Phase 2) Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities STORM LAKE BUENA VISTA $85,550 $0 $15,449 $101,000
Pin Oak Marsh Trails - 1 mile south of Chariton on IA Hwy 14 1 mile south of Chariton on IA Hwy 14. Trail Construction Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities RURAL LUCAS $84,500 $0 $22,130 $106,630
East Park Multi Purpose trail - ACC Trail Centennial Park/Riverfront Trail in Davenport, ACC. Aka Riverfront trail extension. Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities DAVENPORT SCOTT $83,745 $0 $20,936 $104,682
Cedar Creek Bridge Cedar Creek Bridge Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities RURAL MADISON $77,400 $0 $49,965 $127,365
Greenbelt Park along Chippewa Creek ACC Trail construction south of Gothic House site. In the city of Eldon, along Railroad St from Walnut St northeasterly .337 miles along Chippewa Creek. Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities ELDON WAPELLO $78,000 $0 $102,000 $180,000
Kenue Trail - Kenue Environmental Management Area (phase 2) CONSTRUCTION OF A RECREATIONAL TRAIL FROM THE LAKES ART CENTER PROPERTY TO THE ENTRANCE OF KENUE PARK ON 170TH ST. ACC Trail Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities RURAL DICKINSON $78,000 $0 $19,500 $97,500
Gillette Park and Aquatic Center Project PCC Trail- Gillette Park Trail Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities CHEROKEE CHEROKEE $78,000 $0 $26,000 $104,000
Trout Run Trail PCC Trail - in Winneshiek Co. from intersection of Trout Run Rd.& Siewers Spring Rd. South. Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities DECORAH WINNESHIEK $78,000 $0 $597,500 $675,500
East Newton Hike and Bike Trail Phase 2 North-E 20th St S, east-S 3rd Ave E, north-E 23rd St, east-N 4th Ave E HMA Trail Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities NEWTON JASPER $78,000 $0 $40,000 $118,000
Coralville to North Liberty Along 12 th Avenue from Maplewood Drive in Coralville to Front Street in North Liberty. PCC Trail. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities CORALVILLE JOHNSON $78,791 $0 $19,698 $98,489
Clarke County Fine Arts and Recreation Center Trail Project Completed, Federally Closed on 3/15/2010 Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities OSCEOLA CLARKE $61,300 $0 $25,143 $86,443
Valley View Trail - (Valley View Park) pedestrian bridge Valley View Trail in Council Bluffs- Pedestrain Bridge. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities COUNCIL BLUFFS POTTAWATTAMIE $79,000 $0 $168,536 $247,536
Municipal Park Rec. Trail 4th Ave. N. to Park Lane Le Mars municipal park recreation trail that runs through the park for approximately .85 miles from 4th ave ne to Park lane/4th avenue NE intersection. Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities LE MARS PLYMOUTH $80,000 $0 $67,406 $147,406
Rockford Bridge Adding a biketrail to a bridge under construction in Rockford. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities ROCKFORD FLOYD $157,978 $0 $1,276,598 $1,434,576
Cedar River Trail - Segment G Phase 2 Along Subdivision Cedar River Trail from HWY 30 - 76th Avenue. - Pavement Resurfacing Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $80,000 $0 $175,300 $255,300
Dubuque Heritage Trail Extension - Grade & Pave Ped/Bike Grade and Pave. 32nd extension from Sageville(Dubuque heritage trail extension) Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities DUBUQUE DUBUQUE $80,400 $0 $78,471 $158,871
South Tama Trail, Phase 3 Recreational Trail - West along Fee St&Deer Creek, Under US 30, to West Ross St. Earth or Granular Surface Trail Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities TOLEDO TAMA $82,000 $0 $57,480 $139,480
Ottumwa Prk. Lagoon Trail - continuous path around Ottumwa Park ACC Trail from an existing parking lot, easterly .706 miles in Ottumwa Park in Ottumwa, Ia Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities OTTUMWA WAPELLO $82,900 $0 $16,339 $99,239
IA. 1 at Union Pacific RR X-ing Bike\Ped Trail RR crossing- Union Pacific at Hwy 1. Facilities for Pedestrians and Bicycles. Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities MOUNT VERNON LINN $83,000 $0 $20,796 $103,796
Comet Trail Extension Comet Trail Extension in Conrad, PE/Ce/trail, 1 mile Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities CONRAD GRUNDY $79,200 $0 $19,800 $99,000
Recreational Complex Trail Recreational trail within the limits of the Sergeant Bluff Recreational complex, bounded by South Lewis Blvd and Warrior road. PCC Trail Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities SERGEANT BLUFF WOODBURY $96,100 $0 $24,100 $120,200
Creston Park to Park Trail HMA Trail. For construction of a 1.3 mile asphalt surfaced trail for walking and bicycling. Will connect Creston's hard surfaced trail (1.28 miles) at the Southern Prairie YMCA and extend to Mitchel Marsh. The DNR will continue the trail to Green Valley State Park. Final Voucher done 11/4/09. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities CRESTON UNION $61,000 $0 $67,100 $128,100
Paving of Section 3 of Red Oak Trail Systems Pave approx 1860 ft of rec trail. Section 3 includes trail from 4th st to 8th st in US Hwy 34 ROW and approx 500 ft of trail along SE corner of Evergreen Cemetary which will connect end of trail paved under Section 2 to Inman Drive. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities RED OAK MONTGOMERY $59,680 $0 $30,320 $90,000
Bibbins / Reservoir Park multi-purpose trail This project is on the acct reports with project number STP-E-0874(1)--8V-87. Believe it is transposed as there is no city with the number 874 Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities BEDFORD TAYLOR $22,400 $0 $7,844 $30,244
Great Western Trail Improvements Great Western Trail Improvements Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL WARREN $22,497 $0 $5,624 $28,122
Hwy 65 Trail and Gateway Part of a larger roadway improvement project on US 20/65. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities IOWA FALLS HARDIN $23,000 $0 $691,000 $714,000
Trail extension to Wilder Park Wilder Park in Allison Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities ALLISON BUTLER $23,769 $0 $5,942 $29,711
Charles City Recreation Trail Extension-Phase III 2006 Bike Trail Improvements Charles City Recreational Trail Extension-Phase II(Charley Western Bike Trail) Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities CHARLES CITY FLOYD $24,250 $0 $24,250 $48,500
Westbrook Park Pedestrian Bridge over Silver Creek Pedestrian Bridge. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities DE WITT CLINTON $25,140 $0 $70,816 $95,956
Greenfield Square Improvements City of Greenfield Square Improvements. Final Voucher sent to Deb Coles on 1/27/10. Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities GREENFIELD ADAIR $26,000 $0 $61,000 $87,000
Althaus Park Pedestrian Trail Althaus Park Pedestrian Trail Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities ASBURY DUBUQUE $27,600 $0 $26,602 $54,202
Elwood Dr. Trail from Mortensen Rd. to South 16th St. Elwood Drive Bike Path- Phase 1 .4 Mile ACC bike path. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $28,000 $0 $19,246 $47,246
Stone State Park Nature Center Pedestrian trails - (Phase 2) Complete Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities RURAL WOODBURY $28,800 $0 $23,600 $52,400
Walnut Wetlands Trail Walnut Wetlands Trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities WALNUT POTTAWATTAMIE $29,300 $0 $7,325 $36,625
Lucas County Town Square (pedestrian walkway) Side walk around the town square in the city of Chariton. Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities CHARITON LUCAS $30,000 $0 $8,100 $38,100
Wapsi Great Western Trail Extension(Prairie Farmer Trail) Trail surfacing - Northwestern RR ROW in Afton TWP (Acme toward Riceville) Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $30,000 $0 $7,500 $37,500
Stanton Greenbelt Trail Extension Greenbelt Trail Extension, from Prospect Street then under Holland Avenue Bridge to extisting trail. 770 feet. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities STANTON MONTGOMERY $30,920 $0 $7,730 $38,650
East River Trail - lighting installations In Des Moines-Saylorville Bike Trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $32,000 $0 $12,926 $44,926
Sally's Alley City of Corning-Alleny between Benton and Davis Avenues between seventh and eight streets Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities CORNING ADAMS $21,920 $0 $5,474 $27,394
Four Corners Park Trail Construction of HMA Trail at Four Corners recreational area near Manning. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities RURAL CARROLL $32,000 $0 $8,000 $40,000
Tiffin City Park Trail, Phase 2 - Bridge Ped. Bridge New - Other Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities TIFFIN JOHNSON $19,000 $0 $6,000 $25,000
Trail Wayfinding signs in Urbanized Johnson County Purchase of signs. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities CORALVILLE JOHNSON $15,600 $0 $3,900 $19,500
Interurban Trail - ROW Acquisition IN Ankeny-NE58- Oralabor Road- Bike Trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities ANKENY POLK $20,000 $0 $5,000 $25,000
Wapsi Great Western Trail Acquisition L22E TE Funding $200,000 LY30 IA152 Funding $43,000 Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $243,000 $0 $60,750 $303,750
Wapsi Great Western Trail, ROW purchase from Walnut Ave to Pinicon Alders Wildlife Area Wapsi Great Western Trail, ROW purchase from Walnut Ave to Pinicon Alders Wildlife Area Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL MITCHELL $299,000 $0 $74,000 $373,000
Little Sioux River Trail Trail and bridge located between Grand Avenue to 355th Street in southwest Spencer, immediately west of West Leach Park . Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities SPENCER CLAY $365,000 $0 $232,068 $597,068
Dry Run Trail Segment #1: Construction Box culvert crossing US 52 and trail connection to Trout Run Trail; ROW acquisition This project will construct a box culvert crossing US 52 and provide a connection to the Trout Run Trail. This project is also a ROW acquisition north and west of the proposed US 52 box culvert to Windridge Implement Drive. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities DECORAH WINNESHIEK $543,833 $0 $233,072 $776,905
Farragut Railroad Park Trail plan and design along Dupont Street. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities FARRAGUT FREMONT $4,400 $0 $1,600 $6,000
Jerry Kelley Trail Phase 2: Memorial Park to Wilder Elementary School Jerry Kelley Trail Phase 2:Memorial Park to Wilder Elementary School Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities INDIANOLA WARREN $282,920 $0 $164,680 $447,600
Marking the Mormon Trail across Southern Iowa Members of the Iowa Mormon Trail Assoc. has researched the exact location of the trail across iowa, and documented its location. Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities RURAL MONROE $16,032 $0 $22,380 $38,412
Clear Creek Trail - study Pedestrian Walkway Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities TIFFIN JOHNSON $26,400 $0 $11,100 $37,500
Cedar Valley Nature Trail--Evaluation Study of Two Bridges Two Cedar Valley Nature Trail bridges cross the Cedar River and both are in need of either repair or replacement. One is in McFarland Park near La Porte city and one is in Evansdale. This project will provide funding to hire a consultant to inspect the bridges and to provide alternatives for repair/replacement. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities CEDAR FALLS BLACK HAWK $50,000 $0 $12,500 $62,500
MRT Feasibility Study - Allamakee County MRT Feasibility Study in Allamakee County Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities RURAL ALLAMAKEE $66,400 $0 $16,600 $83,000
Lenox RR Depot with multi-purpose trail Bibbons Park Trail in Lenox Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities LENOX TAYLOR $12,000 $0 $12,783 $24,783
Fogle Recreation Trail Fogle rec area in Sec 31-70-30 N of Diagonal. Trail surfacing. Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities RURAL RINGGOLD $12,720 $0 $3,180 $15,900
Sands Timber multi-purpose trail Trail construction on Sands Timber Trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL TAYLOR $12,800 $0 $12,593 $25,393
Trailhead Park at beginning of Volksweg Trail (RTC rail-trail database) Volksweg Trail head Park, Sidewalks etc Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities PELLA MARION $15,000 $0 $5,085 $20,085
Strawberry Point - Backbone Trail (Phase 1& 2) PE/PC portion of the trail. Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities STRAWBERRY POINT CLAYTON $18,575 $0 $104,724 $123,300
Pedestrian / Bike path from IA Hwy 1 / Cass Str. to Davis Prk. Hwy 1 Pedestrian/Bike path from Davis Park to Murphy's Addition. PCC TRAIL Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities MOUNT VERNON LINN $34,900 $0 $39,974 $74,874
Ringgold Co. Trail E. from US 169 at Mt Ayr ECL,ACC Trail Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities RURAL RINGGOLD $36,000 $0 $9,273 $45,273
Wabash Trace Nature Trail - Sportsmen Park to Nishnabotna River Wabash Trace Nature Trail - Sportsmen Park to Nishnabotna River Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities SHENANDOAH PAGE $36,865 $0 $15,239 $52,104
Lakes Bike / Hike Trail Pedestrian Trail in Greenfield. PCC Pave. Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities GREENFIELD ADAIR $52,000 $0 $10,868 $62,868
West Main St. Trail - Anton Addition along US Hwy 218 from Palmer Dr. to Bluff St. Anton Addition along US Hwy 218 from Palmer Dr. to Bluff St. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities LA PORTE CITY BLACK HAWK $52,200 $0 $35,301 $87,501
Pleasant Valley Trail from East 2nd St. to Montgomery Drive Recreational trail from Barnes St SE to the Battle Creek-Ida Grove High School. Phase "B" of the Pleasant Valley Trail from the county club and routed adjacent to the City Swimming pool, public library, Hospital and completes the loop back to the highschool. Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities IDA GROVE IDA $52,436 $0 $46,863 $99,299
Manchester Trail - Alg Acers and Stiles Streets NE Bikeway Trail/Sidewalk Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities MANCHESTER DELAWARE $53,700 $0 $25,887 $79,587
US 6 in Iowa City from Hawkins Drive to Intersection of Newton Road SideWalk Extension. Along US 6 from Hawkings Drive to intersection of Newton RD. PCC Trail 0.27 mile. Project Engineer is Shoemaker & Haaland P.E. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities IOWA CITY JOHNSON $55,000 $0 $102,822 $157,822
North Ridge Trail - Oakdale Research Park to NCL North Liberty trail to north Ridge Trail.PCC Trail Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities CORALVILLE JOHNSON $55,200 $0 $23,800 $79,000
Red Oak Trail Section 4 Red Oak Trail - Section 4 From 4th Street to 9th Street $55,840 Federal Aid Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities RED OAK MONTGOMERY $55,840 $0 $30,960 $86,800
Cedar Valley Trail - Depot Rehabilitation Rehabilitation of railroad depot in center point Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities CENTER POINT LINN $56,000 $0 $48,342 $104,342
Forest City Recreational Trail Extension Bike trail along IA 9 South in Forest City.Revision to this project was made by RPA 2 Planner in March 2003. Trail will be heading south for 400 to 600 ft from the same point on J Street. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities FOREST CITY WINNEBAGO $56,000 $0 $15,900 $71,900
Ottumwanoc Tribal Trail (Market Street to Vine Street) NOC Tribal Trail - on the north side levee from Market St. to Vine St. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities OTTUMWA WAPELLO $56,623 $0 $14,155 $70,778
Oakland Mills Bridge Restoration Pedestrian Bridge over the Skunk River in Oakland Mills State Park near the junction fo W55 and H46. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL HENRY $57,000 $0 $2,535 $59,535
North Manning Safe Route to School North Manning Safe Route to School Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities MANNING CARROLL $57,000 $0 $322,000 $379,000
Schildberg Quarry Lake 1 Trail Construct approximately 0.5 miles of pedestrian/bicycle hard surfaced trail near the city/county line and eventually connecting to a trail being developed by Cass County to connect the Schildberg Recreation Area to the T-Bone Trail that runs north through part of Cass County to Audubon. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities ATLANTIC CASS $57,199 $0 $32,801 $90,000
Main Street Improvement Project Curb and gutter, 8' sidewalks, & street lights along both sides of Main Street between Franklin Street and Washington Street. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RYAN DELAWARE $57,843 $0 $14,460 $72,303
Ringgold County Courthouse Square Construct a sidewalk and retaining wall along all four sides of the Ringgold County Courthouse square in Mount Ayr. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities MOUNT AYR RINGGOLD $58,876 $0 $14,719 $73,595
Sunrise Park Trail Recreational trail construction along Lincoln St from Roosevelt St to Sunrise Park. Then East to Jefferseon St, then along Jefferson St from 3rd St to the existing sidewalk/trail near Remsen Union High School. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities REMSEN PLYMOUTH $51,000 $0 $32,600 $83,600
King/Idaho Recreational Trail Head For the development of a trail head at the northeast corner of the intersection of ML King Jr Drive and Idaho Street. Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $50,000 $0 $31,080 $81,080
Schildberg Quarry Recreation Area, Phase 1 Schildberg Trail on outskirts of Atlantic. HMA TRAIL Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities ATLANTIC CASS $50,000 $0 $76,930 $126,930
Sandy Hollow Trail - From 4TH Ave SE in Sioux Center, East Along B40 to just east of the ECL of Sioux Center Sandy Hollow Recrdation Trail beginning at the intersectio nof 4th Ave and County Road B-4 in Sioux Center, thence east and south approx. 3 miles to Sandy Hollow Recreation Area. Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities SIOUX CENTER SIOUX $50,000 $0 $30,711 $80,711
Clear Creek Trail (Phase 1) - from City Park to Kimberlite St. PCC Trail - Clear Creek trail in Tiffin.Pedestrian Trail Phase 1-City park to near Kimberlite St .2 mile Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities TIFFIN JOHNSON $37,291 $0 $31,708 $69,000
Recreational Trail- Indian St Trail Recreational trail along east Indian Dr from US 59 to North Roosevelt Ave (.39 mile). Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities CHEROKEE CHEROKEE $37,300 $0 $12,161 $49,461
Wabash Trace Tr. from .5 mi S. of Ia 2 S. to Missouri state line from .5 mi S. of Ia 2 S. to Missouri state line (RTC rail-trail database). Granular surface, BR Dk Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities RURAL PAGE $38,935 $0 $9,863 $48,798
Trail bridge over Walnut Creek and 240 feet of trail construction trail bridge and 240 feet of trail construction Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities URBANDALE POLK $39,100 $0 $4,502 $43,602
Clay Recreational Trail To be located from Main St. bridge to IA Hwy 57 Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities CEDAR FALLS BLACK HAWK $39,200 $0 $11,411 $50,611
IA Hwy 2 - 1st & Main St. City Entrance Sidewalk and Landscaping,IA 2, 1st & Main St City Entrance Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities LEON DECATUR $39,848 $0 $9,962 $49,810
Motor Mill site on Galaxy road over turkey river. Motor Mill site on Galaxy road over turkey river. Trail bridge. Bike/pedestrian Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities RURAL CLAYTON $39,920 $0 $9,980 $49,900
Kenue Trail - Kenue Environmental Management Area (phase 1) The construction of hard and Limestone surfaced trail from existing Spine trail to Kenue Environmental management area(KEMA) plus associated trail amenities. Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities RURAL DICKINSON $60,000 $0 $37,182 $97,182
Kewash Trail - N. D Ave to IA 92/1 (W 5th St) ACC Trail Project (RTC rail-trail database) Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities WASHINGTON WASHINGTON $40,000 $0 $4,919 $44,919
Elwood Dr. Trail (Phase 2) Airport Rd. to Green Hills Drive Acc Trail - Elwood Dr from Greenhill Dr to Airport Rd. Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $45,927 $0 $3,273 $49,200
Butler Street from Anderson Street east to Stiles Street then north to Prospect Street PCC TRAIL, along Stiles St & Butler St in Manchesterl. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities MANCHESTER DELAWARE $46,000 $0 $38,095 $84,095
West Main Street from 9th Street to 12th Street PCC TRAIL,along Main St in Manchester from 9th to 12th. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities MANCHESTER DELAWARE $47,200 $0 $23,244 $70,444
Wapsi Great Western Line - develop state border entrance BIKE TRAIL-McEntire NW to Minn. Line Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities RURAL MITCHELL $48,000 $0 $9,181 $57,181
Stone State Park Nature Center Pedestrian trails (Phase 1) Construction of 2 miles of new hiking and interpretive trails in the Loess Hills Nature center in the se portion of Stone State Park. No letting - done in cooperation with Woodbury County Conservation Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL WOODBURY $48,000 $0 $12,000 $60,000
Pilot Grove Park - historic preservation and bicycle facilities Pilot Grove Park Bike Path Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL MONTGOMERY $48,100 $0 $56,245 $104,345
West Overlook Trail Overlook Rd 1.5 min of Iowa City NE, ACC Trail. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities RURAL JOHNSON $49,000 $0 $21,000 $70,000
Living Memory Park Trail Paving the existing trail in Living Memory Park in the city of Kiron.PCC Trail Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities KIRON CRAWFORD $44,000 $0 $11,000 $55,000
Waterwork Park in Iowa City, Butler House/Amphitheatre Grade and Pave .71 mile of trail at Iowa City Waterworks Plant Site, NW of Dubuque St & I-80, Butler House Area Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities IOWA CITY JOHNSON $96,537 $0 $28,754 $125,292
Turkey River Bridge Bridge over Turkey River (loaced between B64 and Clayton County Line Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities RURAL FAYETTE $334,000 $0 $293,000 $627,000
Along E Platt St. from Jacobsen Dr. to Dearborn St. I64/East Platt St in maquoketa from Jacobsen drive to Dearborn st. Grade and Pave PCC Trail Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities MAQUOKETA JACKSON $138,009 $0 $42,799 $180,809
Mount Pleasant Trail, Phase 5 Mount Pleasant Trail Phase V Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities MOUNT PLEASANT HENRY $120,000 $0 $30,000 $150,000
Burlington RecPlex Trail-Phase II In Burlington from existing trail to Division St - Phase 2 Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities BURLINGTON DES MOINES $120,000 $0 $30,300 $150,300
Unnamed Trail - In the City of Spencer along 10th Avenue East from East 4th to Pedersen Park. Pederson Park Trail 2000- Along 10th avenue from E 4th st to E 9th St east to Pedersen park. Project Federally closed - 10/29/09. Participating Cost=$91,250, Federal Funds = $73,000. Non Participating Cost=$13,830.92.(Local Eligible Unclaimed Funds). Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities SPENCER CLAY $120,000 $0 $5,100 $125,100
Plum Creek Trail - Phase 1 & 2 Plum Creek Trail in Fredericksburg. ACC Trail through NCL east-west Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities FREDERICKSBURG CHICKASAW $120,000 $0 $30,000 $150,000
Twin Lakes Recreational Trail (Phase 2) Trail is proposed to be located on west side and part of south end of Twin Lake Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities RURAL CALHOUN $150,000 $0 $255,100 $405,100
Twin Lakes Trai l - Phase 3 PCC Trail.Twin Lakes Rec Trail connect to Twin Lakes to State Park. Photos Available. Project completed. Federally closed on 12/11/09. Total Project Cost = $111,375.03 Constr.Part. Cost=$108,033.78, 80%=Federal Funds=$86,427.02. Non-Part. Cost = $3,341.25 (Construction costs with no supporting documentation submitted for reimbursement) Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities RURAL CALHOUN $141,400 $0 $35,350 $176,750
Grey Eagle Trail Extension-Iowa Avenue to East City Limits 1.25 mile segment of trail along the north levee of the Des Moines River from the intersection of Hwy 34 and 77th Avenue to the city limits. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities OTTUMWA WAPELLO $136,969 $0 $64,381 $201,350
Trail- West Broadway St Trail Implementation Project Enhancement lighting trail, West Broadway St/Trail Enhancement, West Broadway street between Hwy 71 Lake Street Dam Road. Bike/Ped Trail Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities ARNOLDS PARK DICKINSON $140,400 $0 $140,300 $280,700
Waveland Trail Project Walnut Creek Trail to I235 following Cummins Creek Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $150,000 $0 $350,000 $500,000
Bettendorf Riverfront Trail - Along the Mississippi River from Greenwood Ave. to 10th St. Riverfront Trail -HMA Trail in Bettendorf from Greenwood Ave to 10th St. Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities BETTENDORF SCOTT $119,800 $0 $29,900 $149,700
FLAP Neal Smith Trail Resurface and widen 1 mile of the Neal Smith Trail beginning at the Riverview Park and heading north on the trail. Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $300,000 $0 $150,000 $450,000
Wapsi Great Western Trail, Phase II For hard surfacing the trail between 140th Street and 150th Street in Howard County. HMA Trail Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $150,000 $0 $37,500 $187,500
Marr Park to Ainsworth Shared Use Pathway Design and construction of 0.89 mile shared use path from within Marr Park to Ainsworth via existing highway ROW of Highway 92. Iowa 2012 1 (TE) 1. Pedestrian and bicycle facilities RURAL WASHINGTON $140,000 $0 $150,000 $290,000
Little Walnut Creek Trail Trail Connection along Little Walnut Creek from 156th Street west to Urbandale/Clive boundary. PCC Paving Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities URBANDALE DALLAS $150,000 $0 $185,000 $335,000
Hudson: US 63 Sergeant Rd Trail Extension Hudson: US 63 Sergeant Rd Trail Extension Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities HUDSON BLACK HAWK $993,000 $0 $248,000 $1,241,000
Spring Lake Park Trail Extension Recreational Trail in the City of Cherokeee along Spring Lake Drive Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities CHEROKEE CHEROKEE $140,000 $0 $70,600 $210,600
NW Beaver Drive Trail Project on hold for a while Iowa 2017 1 (TE) 1. Pedestrian and bicycle facilities JOHNSTON POLK $304,320 $0 $2,636,111 $2,940,431
Des Moines River Greenbelt Scenic Overlook on the HTT Located in Boone county but Polk county is the sponsor. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities RURAL POLK $140,000 $0 $60,000 $200,000
Meredith Drive Trail PCC Sidewalk/Trail - Meredith Drive to Grimes. Final Voucher sent to Finance on 5/14/10 Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities URBANDALE POLK $118,250 $0 $29,563 $147,813
6th Avenue West Recreational Trail PCC Sidewalk/Trail - 6th Ave West Rec Trail - west on 12th St SW then north on 6th Avenue Sw. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities LE MARS WOODBURY $117,000 $0 $94,100 $211,100
Jewell to Ellsworth Trail Bridge Construction Jewell to Ellsworth Trail Bridge construction Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL HAMILTON $140,000 $0 $38,000 $178,000
Howard Co Trails - Elma to 150th & Prairie Farmer to Cresco Elma to 150th & Prairie Farmer to Cresco; Let in two phases - one locally and one at the DOT. (RTC rail-trail database). Trail construction Iowa 1997 1 (TE) 1. Pedestrian and bicycle facilities RURAL HOWARD $138,000 $0 $34,500 $172,500
Summit St. Trail - Jacobson Dr. from Wstrn Ave. to Ia. 64 Pedestrain Trail Western Ave to Hwy 64. acc & pcc Trail along Summit ST Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities MAQUOKETA JACKSON $151,398 $0 $37,159 $188,557
Starr's Cave Bridge Pedestrian Bridge Over Flint Creek in Starr's Cave Park- Foot bridge Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities RURAL DES MOINES $151,740 $0 $173,260 $325,000
Trail Development from Wright Bros Blvd to Ely Corporate Limits Trail Development from Wright Bros Blvd to Ely Corporate Limits. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL LINN $113,600 $0 $594,900 $708,500
Fair View Park/10th Avenue East Trail Extension PCC Trail - Fairview Park Trail - East 14th St. to East 18th in Spencer. Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities SPENCER CLAY $134,300 $0 $38,425 $172,725
Sheldon Recreational Trails Sheldon Recreational Trail - Two Segments. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities SHELDON O'BRIEN $113,000 $0 $135,000 $248,000
Bob Layton Trail The Bob Layton Trail from north of Douglas Parkway to just south of Meredith Drive in the Walnut Creek Regional Park. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities URBANDALE DALLAS $120,000 $0 $615,000 $735,000
Along IA Hwy 965 from Zeller to Westwood PCC Pave. Recreational trail from zeller st to westwood st Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities NORTH LIBERTY JOHNSON $150,000 $0 $191,800 $341,800
Sauk Rail Trail Bike Trail-The construction of two miles of the Sauk Rail Trail and associate appurtenances from Swan lake state park to Main street in Carroll, Iowa. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities CARROLL CARROLL $150,000 $0 $46,335 $196,335
Eldridge Bike Path First St Bike Trail - along First St from Davies St to Iowa St. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities ELDRIDGE SCOTT $120,826 $0 $10,771 $131,597
Skunk River Trail - Phase 3: Bloomington Rd to Ada Hayden In the city of Ames, Skunk River Trail: From Bloomington Road to Ada Hayden Park Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $250,000 $0 $225,000 $475,000
McVay Rec. Trail Staging Area PCC Trail - staging area to the McVay Trail in Indianola, near the intersection of N 15th and Iowa 92. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities INDIANOLA WARREN $134,000 $0 $39,447 $173,447
Cedar Valley Trail Hard Surfacing - 1996 For hard surfacing a 4-mile segment of the Cedar Valley Nature Trail between LaPorte City and McFarlane Park.(from 1 mi. W. of LaPorte City to McFarlane park) Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities RURAL BLACK HAWK $133,456 $0 $134,872 $268,328
Cottonwood Trail Enhancement Recreational Trail - Cottonwood Trail Expansion Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities HUMBOLDT HUMBOLDT $143,943 $0 $71,970 $215,913
Kingsley Community Biking/Walking Trail Along Quest Ave throughout town in the city of Kingsley. PCC Trail. Final voucher sent to Deb on 9/25/08. Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities KINGSLEY PLYMOUTH $131,100 $0 $28,900 $160,000
Sidewalk Improvements Program - Phase II Construct sidewalks along Pella Avenue, Santa Clara Street, D Avenue, and North 3rd Street Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities OSKALOOSA MAHASKA $185,600 $0 $46,400 $232,000
Indianola Trail Head - McVay and Indianola-Carlisle Trail Connection Summerset & McVay Trails on 5th St in Indianola. Restrooms, Info Center,Trailhead and parking lot in Indianola Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities INDIANOLA WARREN $129,500 $0 $85,619 $215,119
Trail from 69th & Deerview Dr. to Beaver Creek 69th & Deerview Dr to Beaver Cr in Urbandale, Preliminary/Construction Engr.Urbandale-johnston trail connection Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities URBANDALE POLK $128,600 $0 $157,723 $286,323
City of Tiffin - bike/walk trail from City Park to Ireland Avenue In the City of Tiffin: Clear Creek Trail from City Park to Ireland Avenue Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities TIFFIN JOHNSON $148,992 $0 $232,859 $381,851
Country Club Road Bike Lane Add 5 foot bike lanes on both sides of County Club Road from 260th Street north 1.71 miles to South G Avenue Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities NEVADA STORY $127,231 $0 $361,769 $489,000
North Park Cadet Trail: From North St through North Park to Cadet Field 3000' LF, 10' wide hard surfaced trail from North Park to Cadet Field. Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities IOWA FALLS HARDIN $270,000 $0 $276,400 $546,400
Frank Starr Park in Storm Lake- Phase 3 Installation of Pedestrian Lighting at Frank Starr Park. Let amount for this phase 3 was $129,750 Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities STORM LAKE BUENA VISTA $127,200 $0 $31,800 $159,000
Local Trail - Bike / Pedestrian path extension (0.22 miles) Phase 1 PCC Recreational trail along First St. and Eastwood lane to F-41. Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities LONG GROVE SCOTT $125,600 $0 $31,400 $157,000
Kauffman Trail Kauffman Trail from US 30 north 1,400 feet to the existing Rose Garden between 2nd & 4th. PCC Trail - begin 2200ft N of US 30, along W edge of Timber Cr., N 750ft to 3rd St. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities STATE CENTER MARSHALL $112,000 $0 $28,000 $140,000
Southeast Connector Trail System - SE 9th to SE 15th ST Trail along Southest Connector from SE 9th Street to SE 15th Street. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities DES MOINES POLK $125,000 $0 $5,975,000 $6,100,000
North Ridge Trail - I-80 underpass connection from Northridge Park to 25th Ave. PCC Pave-Coralville - North Ridge Trail. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities CORALVILLE JOHNSON $96,600 $0 $121,035 $217,635
Lake Pahoja Recreational Trail--Phase II Lake Pahoja Recreational Trail - Phase II Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL LYON $145,314 $0 $94,686 $240,000
Twin Lakes Recreational Trail (Phase 1) This is a PCC Trail on the west side of North Twin Lakes, Phase I. Keith Roos of the Calhoun County Conservation Board is the project manager. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities RURAL CALHOUN $147,440 $0 $36,860 $184,300
72nd St. Bicycle / Pedestrian Underpass 72nd Street Bike/Pedestrian underpass, Urbandale, Preliminary & Construction Engr. ACC Trail Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities URBANDALE POLK $123,808 $0 $83,120 $206,928
Holstein Community Walking/Bike Trail From north end of existing trail (Mueller street estended) north and west to the east end of sidewalk on Second Street. Also, from the existing trail south of the Lohff Schuman Community Center to South Kiel Street. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities HOLSTEIN IDA $123,750 $0 $41,250 $165,000
Indianola Memorial Trail Connection--Phase I Memorial Trail - PCC Sidewalk/Trail, connecting Summerset County Trail & Memorial City Park. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities INDIANOLA WARREN $147,570 $0 $76,727 $224,297
Main Street Reconstruction Main Street Reconstruction Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities KEOKUK LEE $142,515 $0 $257,485 $400,000
Barrick Road Bicycle/Pedestrian Bridge Replace bicycle/pedestrian bridge on Barrick Road over the Cedar River in Janesville. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities JANESVILLE BLACK HAWK $123,166 $0 $576,803 $699,969
Downtown Riverfront Trail from 2nd St to Waterloo Rd (Cedar R Levy). Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities CEDAR FALLS BLACK HAWK $148,000 $0 $52,000 $200,000
D-59 in Carnarvon north along M-68 to D-59 The construction of 3.1 miles of the Sauk Rail Trail from Carnarvon north to the intersection fo county road M68 known as "Quinns Corner". Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities RURAL SAC $150,000 $0 $100,000 $250,000
Lake Mills Recreational Trail Located in eastern Lake Mills, connecting South 10th Ave E to North 3 Ave E Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities LAKE MILLS WINNEBAGO $123,000 $0 $80,941 $203,941
Pedestrian & Bike Trail Pedestrian & Bike Trail along West Ave\Broadway Ave and throughout Sports Complex. HMA Trail Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities BURLINGTON DES MOINES $122,300 $0 $66,700 $189,000
Clay County Trail (Phase 2) - in East Leach Park from South Grand Ave. to 10th Ave. East. Phase II of the Clay county trail in East Leavh Park for a pedestrian/bicycle bridge to span the Little Sioux River and for a portion of the trail. Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities SPENCER CLAY $121,000 $0 $125,113 $246,113
CeMar Trail - Phase 1C Along north side of H Avenue and 16th Street NE from Maplewood Drive to F Avenue NE, and along the west side of Maplewood Drive from J Avenue to K Avenue Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $274,000 $0 $68,000 $342,000
Clinton Great Places Bridge Arches Project is being administered by the district office. Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities CLINTON CLINTON $112,000 $0 $28,000 $140,000
10th Ave. Pedestrian Bridge - Lincoln Highway at 1st Str. In Mt Vernon- 10th Ave. Pedestrian Bridge, Walk, Lights, Bridge Repair. Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities MOUNT VERNON LINN $113,408 $0 $37,473 $150,881
Fontana Bike Trail For development of a 1.5 mile trail connecting Fontana Park to the city of Hazelton and the regional trail system. Project awarded to Howrey Construction Inc of Rockwell City Iowa. Admin Eng: Buchanan County Engineer Iowa 2005 1 (TE) 1. Pedestrian and bicycle facilities HAZELTON BUCHANAN $112,000 $0 $28,000 $140,000
Greenbelt Trail - Phase 2 Greenbelt trail in Stanton- Phase 2 Grade and Pave Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities STANTON MONTGOMERY $152,200 $0 $69,334 $221,534
Elwood Dr. Trail (Phase 1) from Lincoln Way to S. 16th St. and from Mortensen Rd. to Green Hills Dri For construction of a 1.5 mile hard surfaced trail along Elwood Drive from Lincoln Way to Airport Road in Ames Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities AMES STORY $105,000 $0 $153,000 $258,000
Cedar Lake/McLeod Run Trail Bridges Bridges over Cedar Lake and Mcleod Run trails Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $104,500 $0 $125,509 $230,009
Phase VI - Heart of Iowa Nature Trail For development of 1.5 miles of trail from one mile west of Collins into the Collins Trailside Park Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities RURAL STORY $104,119 $0 $26,052 $130,171
Ottumwanoc Tribal Trail along the Des Moines River levee from Market Street to Quincy Avenue Trail from Quincy Ave along the river to Market Street. Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities OTTUMWA WAPELLO $103,400 $0 $51,850 $155,250
Moville Pedestrian Trail (Phase 2) Recreation trail constructed along 150th st and Humbolt ave and Fairview Dr from Arlington Cemetary South and West to Woodbury county Fairgrounds.- Grading, RCB Culvert extension. Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities MOVILLE WOODBURY $153,800 $0 $63,400 $217,200
South 8th St. Pedestrian Trail under IA Hwy 5 South 8th St. Pedestrian Trail under IA Hwy 5 Iowa 2002 1 (TE) 1. Pedestrian and bicycle facilities WEST DES MOINES POLK $102,700 $0 $154,700 $257,400
Stolley Park & Oxbow Wildlife Area Trail ( 2 locations ) The recreational trail at the two locations of Oxbow Park(Wildlife area) and Stolley Park. Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities SPENCER CLAY $102,114 $0 $52,085 $154,200
Diamond Lake Trail PCC trail from Montezuma to Diamond Lake approximately 0.59 mile. Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities RURAL POWESHIEK $138,000 $0 $48,697 $186,697
Rolling Hills Bike Path The "Rolling Hills Bike Path" along the west side of County Route no. K52 from the east quarter corner of Sec. 27 thence northerly to an entrance with the Rolling Hills golf course. Grade/ACC Pave Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities HULL SIOUX $101,000 $0 $25,250 $126,250
Galva Trail Project On Galva to Holstein School District Property. Bonded by Noll Street on the West. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities GALVA IDA $105,000 $0 $32,000 $137,000
Clark Street Recreational Trail Trail along Clark Street from Salisbury Avenue to Terrace Road. HMA trail. Iowa 2013 1 (TE) 1. Pedestrian and bicycle facilities CHARLES CITY FLOYD $100,000 $0 $75,000 $175,000
River Front Walkway/Pedestrian Walkway River Front Walkway/Pedestrian Walkway. Iowa 2009 1 (TE) 1. Pedestrian and bicycle facilities MANCHESTER DELAWARE $100,000 $0 $27,173 $127,173
Muscatine Riverfront Trail (Pearl City Trail) Construct 1,000 feet of trail between Chestnut Street and Cedar Street along the Mississippi Riverfront in downtown Muscatine. Local Letting Iowa 2007 1 (TE) 1. Pedestrian and bicycle facilities MUSCATINE MUSCATINE $100,000 $0 $140,000 $240,000
Muscatine Bridge Lighting Project Highway 92 Bridge Lighting Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities MUSCATINE MUSCATINE $100,000 $0 $200,000 $300,000
North Newton Bike & Hike Trail PCC trail construction. Along N 11th Ave. E. from Patterson Park to E. 10th St. N. - Under construction. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities NEWTON JASPER $100,000 $0 $139,799 $239,799
City Park Rec Trail in Lemars, PCC Trail City Park Rec Trail in Lemars, PCC Trail Iowa 1999 1 (TE) 1. Pedestrian and bicycle facilities LE MARS PLYMOUTH $100,000 $0 $43,559 $143,559
Sheldon Recreational Trail (Phase 2) from Floyd River to Hills Park Construct a recreational trail from e Floyd tiver to Hills park in sheldon. ACC trail Iowa 2001 1 (TE) 1. Pedestrian and bicycle facilities SHELDON O'BRIEN $157,000 $0 $39,250 $196,250
Trail Riverview Prk. Dr. from 9th Ave to 6th Ave. S PCC Trail Iowa 1996 1 (TE) 1. Pedestrian and bicycle facilities CLINTON CLINTON $100,000 $0 $216,594 $316,594
Hoover Nature Trail, Connect to Ely (ADT) $99,000 TE funds processed under EDP-0006(092)--7Y-57. Final voucher sent to Finance on 4/19/12. Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities RURAL LINN $99,000 $0 $181,228 $280,228
US 63 Sergeant Road Trail Surfacing Westfield Avenue to Dale Drive. Iowa 2004 1 (TE) 1. Pedestrian and bicycle facilities WATERLOO BLACK HAWK $157,000 $0 $203,245 $360,245
Heart of Iowa Trail - from city park at Rock Creek to city limits City of Maxwell near Rock Creek East to ECL of Maxwell. Bridge Rehabilitation. .4 miles Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities MAXWELL STORY $97,500 $0 $32,500 $130,000
Brookwood Park to Soccer Complex Connector Trail Constrct a 10-ft wide, 0.8 mile long HMA trail from the existing path in Brookwood Park southward along 8th Street SE to near the Waverly Soccer Complex. Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities WAVERLY BREMER $100,000 $0 $25,000 $125,000
Wolf Creek Trail from N. end of Gladbrook Trail NW 1.5 mi. Far North end of Gladbrook trail in Gladbrook. From Gladbrook trail to Comet Trail. Iowa 1998 1 (TE) 1. Pedestrian and bicycle facilities RURAL TAMA $152,100 $0 $37,900 $190,000
CeMar Trail - Phase 1B Daniels park Trail from Oakland Road and H Avenue intersectioN along the south side of Daniels Park and a spur trail along the east side of Daniels park from H Avenue to J Avenue Iowa 2015 1 (TE) 1. Pedestrian and bicycle facilities CEDAR RAPIDS LINN $255,596 $0 $51,119 $306,715
Lincoln Walk Trail (Phase 1) from Lincoln Prairie Park at the jct. Of 216th and 219th St., northeast from Lincoln Prairie Park at the jct. Of 216th and 219th St., northeast; Boone Co. is doing engineering for the project. HMA Trail Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities OGDEN BOONE $105,100 $0 $26,300 $131,400
Three Elms Park Road - 4th Ave SE to Three Elms Park HMA Pave Shoulders from 4th Ave SE to Three Elms Park. Iowa 2008 1 (TE) 1. Pedestrian and bicycle facilities RURAL BUCHANAN $107,000 $0 $322,000 $429,000
Prairie Pathways Masterplan for interpretive signing and information Cedar Valley Trail - Prairie Pathways master plan. CONTRACT 05739 WAS SET UP FOR 65,122.20. Iowa 2000 1 (TE) 1. Pedestrian and bicycle facilities RURAL BLACK HAWK $80,000 $0 $20,000 $100,000
HMA Bike lanes along County Road R38 from NCL of Slater to County Road E57 Grade & pave 4.5 miles of bike lanes along Co. Rd. R38 from NCL of Slater to Co Rd. E57 Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities SLATER STORY $106,000 $0 $26,500 $132,500
Black Hawk Lake Trail - Phase I Phase I includes 0.51 miles of PCC trail 10' in width at Ice House Point along Black Hawk Lake Iowa 2010 1 (TE) 1. Pedestrian and bicycle facilities LAKE VIEW SAC $110,000 $0 $108,000 $218,000
Butler House Trail pcc Sidewalk- Iowa City-Iowa River Trail Iowa 1995 1 (TE) 1. Pedestrian and bicycle facilities IOWA CITY JOHNSON $111,700 $0 $27,925 $139,625
Stanton Bridge Relocation and Trail Development Stanton Bridge relocation and trail development. Iowa 2006 1 (TE) 1. Pedestrian and bicycle facilities STANTON MONTGOMERY $110,500 $0 $27,625 $138,125
Rolling Prairie Trail, Hampton to Hansel 4.5 mile extension of Rolling Prairie Trail in Franklin County with a granular surface and retro-fit bridge decks for two bridges being 100' and 200'. Iowa 2014 1 (TE) 1. Pedestrian and bicycle facilities RURAL FRANKLIN $151,977 $0 $100,023 $252,000
Green Valley Trail - along south side of Hwy 25 from Country Club Drive to Lincoln St. (HMA Trail) along south side of Hwy 25 from Country Club Drive to Lincoln St In-kind contribution.Grade and Pave Iowa 2003 1 (TE) 1. Pedestrian and bicycle facilities CRESTON UNION $112,000 $0 $38,440 $150,440
Guttenberg Riverfront Trail From Marina Road south to Cincinatti Street, 0.39 mile. Riverfront Trail from Marina Rd South to Cincinnati St in the City of Guttenberg Iowa 2011 1 (TE) 1. Pedestrian and bicycle facilities GUTTENBERG CLAYTON $109,000 $0 $27,250 $136,250
Enhancing I-WALK: Iowa Participatory Evaluation and Documentation of Sidewalks (I-PEDS) Develop automated I-WALK tools, develop participatory crowd-sourced sidewalk evaluation tool, and develop walking school bus portal to manage walking school bus programs. Iowa 2014 2 (TE) 2. Pedestrian and bicycle safety and educational activities RURAL Statewide $92,602 $0 $23,154 $115,756
INHF Project Level Planning for 5 Trail Systems. Project level planning for Central Iowa Trails, American Discovery Trail, Mississippi River Trail/Eastern Iowa Trail System, Lewis & Clark Multi-Use Trail/Western Iowa Trail System and Iowa Great Lakes Trail System. Iowa 2013 2 (TE) 2. Pedestrian and bicycle safety and educational activities RURAL Statewide $75,000 $0 $32,143 $107,143
Iowa DOT Statewide Bicycle Map Printing Iowa 2018 2 (TE) 2. Pedestrian and bicycle safety and educational activities RURAL Statewide $30,780 $0 $0 $30,780
Iowa Mormon Wagon Trails and Handcart Trail Historic Resource Inventory and Plan Iowa Mormon Wagon Trails and Handcart Trail Historic Resource Inventory and Plan Iowa 2013 2 (TE) 2. Pedestrian and bicycle safety and educational activities RURAL Statewide $86,000 $0 $39,000 $125,000
Vincent Bluffs Acquisition For acquisition of a prominent bluff in the Loess Hills near the I-80/I-29 interchange in Council Bluffs Iowa 2001 3 (TE) 3. Acquisition of scenic or historic easements and sites COUNCIL BLUFFS POTTAWATTAMIE $290,500 $0 $124,500 $415,000
Great River Road and Loess Hills Scenic Byway Protection Project for conservation easements and fee titles. Protect land through fee title acquisition and conservation easements. Primary focus to preserve scenic byway viewshed, increase public land, permanetly protect critical wildlife habitat and low mangement of natural resources. Secondary focus of outreach to communities, counties and landowners for protection of future sites and corridors including Scenic Byways and to preserve rail-trails. Iowa 2013 3 (TE) 3. Acquisition of scenic or historic easements and sites RURAL Statewide $455,000 $0 $195,000 $650,000
Yellow River Property Acquisition - Ferguson Tract Acquisition of a 1,054 acre scenic and historic archaeological site along the Great River Road between Effigy Mounds National Monument and Yellow River State Forest. Iowa 1999 3 (TE) 3. Acquisition of scenic or historic easements and sites RURAL ALLAMAKEE $330,000 $0 $630,000 $960,000
Dry Run Trail ROW Acquisition West and south Windridge Implements Drive linking Trout Run Trail and Prairie Farmer Trail Iowa 2013 3 (TE) 3. Acquisition of scenic or historic easements and sites RURAL WINNESHIEK $206,167 $0 $134,833 $341,000
Herndon to Coon Rapids Segment of the American Discovery Trail: ROW purchase Acquisition of ROW for a 17 mile segment of the American Discovery Trail that will join Raccoon River Valley network west of Des Moines with the major Whiterock Conservancy rural tourism area. Iowa 2011 3 (TE) 3. Acquisition of scenic or historic easements and sites COON RAPIDS CARROLL $365,000 $0 $531,500 $896,500
US 20 Sac & Fox Overlook US 20 Sac and Fox Overlook - project awarded to Manatt's Inc.-8/15/08. Letting - 2/17/09 =$203,042.02, Wicks Construction, Inc. Admin Eng: Craig Ritland Landscape. Iowa 2005 3 (TE) 3. Acquisition of scenic or historic easements and sites RURAL HARDIN $300,900 $0 $133,000 $433,900
Loess Hills Scenic Byways Interpretive Panels and Route Signage Locally let for sign materials. County provided installation as in-kind contribution. Iowa 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL HARRISON $25,321 $0 $6,330 $31,651
Iowa's Living Roadway Scenic & Natural Resources Fund - FY2002 For continuation of the visioning and landscaping program for communities w/populations under 10,000 Iowa 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL Statewide $400,000 $0 $512,221 $912,221
Balltown Scenic Overlook Phase 2 Ridge road /C9Y scenic overlook North of Balltown. Iowa 2003 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL DUBUQUE $131,060 $0 $4,969 $136,029
Ia 2 Southern Loess Hills Welcome Center to Center Parking & Landscaping Welcome Center along IA 2; 1/2 mile west of I-29, parking lot. Iowa 2005 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL FREMONT $80,000 $0 $20,000 $100,000
Cody Sesquicentenial Trail Signs and Historic Markers - along designated routes in Scott Co. Historical signs and markers on Cody Trail. Iowa 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL SCOTT $18,839 $0 $4,710 $23,549
Milwaukee Railroad Shops Historic District - Alternative Transportation Project 1 mile segment of Big Sioux River/Riverside Trail; 1 1/2 mile interpretive walking trail; 70-100 slot parking lot; entrance drive Iowa 2011 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers SIOUX CITY WOODBURY $750,000 $0 $963,610 $1,713,610
US 30/IA 136 in Clinton(Gateway Signs) Signing US 30/IA 136 in Clinton(Gateway Signs) Signing Iowa 2007 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers CLINTON CLINTON $112,000 $0 $63,234 $175,234
Lincoln Highway Interpretive Center For development of interpretive ctr at existing state welcome center re the development of the auto, highways and Lincoln Hwy attractions Iowa 1999 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL HARRISON $336,000 $0 $144,000 $480,000
Hurstville Interpretive Center along US Hwy. 61 one mi. north of Maquoketa For the construction of a 9,440 sq ft interpretive tourist center along US 61 one mile n of Maquoketa within the Hurstville Marsh Complex. Sec 13-84-2E (intersection at US61 and Rockdale Road) Iowa 2003 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL JACKSON $490,898 $0 $446,486 $937,384
Iowa's Living Roadways ISTEA (FY1999) For community visioning and landscaping projects in communities with populations of under 10,000 Iowa 1999 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL Statewide $783,804 $0 $441,196 $1,225,000
Historic Hills: Destination Corridor Signage Nine county Historic Hills Region Iowa 2005 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL APPANOOSE $368,300 $0 $157,900 $526,200
Iowa Byways Photo Database Development Iowa Byways Photo Database Development Iowa 2009 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL Statewide $102,802 $0 $25,701 $128,503
Great River Road Scenic Byway & Loess Hills Scenic Byway Protection Project Protect land within Iowa's two national scenic byways vie sheds. Protect land through title fee acquisition and conservation easement. This project will increase public land, permanently protect critical wildlife habitat, preserve valuable scenic byway view sheds and allow management of natural resources. Iowa 2011 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL Statewide $750,000 $0 $838,850 $1,588,850
Loess Hills National Scenic Byway Guidebook-Revisions/Reprinting Update and reprint Loess Hills National Scenic Byway Guidebook. Iowa 2008 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL FREMONT $27,000 $0 $46,000 $73,000
Valley Junction Streetscape - Wayfinding, Identity & Directory Signage Local letting - letting date 9/19/2007. Iowa 2007 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers DES MOINES POLK $125,149 $0 $41,716 $166,865
Marking the Mormon Trail Across Iowa For wood and metal signs where a road intersects with the actual Mormon Trail, maps for the entire route across the state, kiosks at historic sites and informational brochures. Iowa 1995 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL Statewide $112,710 $0 $30,850 $143,560
Lewis and Clark Educational and Interpretive Visitor Center Displays and exhibits for Lewis and Clark Visitor's center. Phase 3 Iowa 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL MONONA $400,000 $0 $2,600,000 $3,000,000
Keokuk Gateway (Phases 2 & 3) - Information Center at the intersection of Lucas St. and N. 1st Street Information Center at the intersection of Lucas St. and N. 1st St. Scenic over look in Keokuk Iowa 2002 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers KEOKUK LEE $118,600 $0 $20,219 $138,819
Interpreting Iowa's Byways: Develop and Implement Interpretive Master Plans Interpreting Iowa's Byways: Develop and Implement Interpretive Master Plans Iowa 2013 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL Statewide $554,000 $0 $238,000 $792,000
Lions Club Tree Park Lincoln Highway Interpretive Site For a regional interpretive center located at jct of E53 and US 30 east of Grand Junction to depict the Lincoln Highway and its role in our nation's history Iowa 2000 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL GREENE $212,135 $0 $90,965 $303,100
Scenic Overlook and Pedestrian Trail in Balltown on Co. Rd. C9Y Scenic overlook and Bus parking.Just East of Balltown, Sec.5-90-18 Iowa 2001 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL DUBUQUE $156,700 $0 $39,100 $195,800
Historic Hills Destination Corridor Signage Design Signage Design for entrance signage to 20 communities in 8 counties in southern iowa. Iowa 2004 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL Statewide $93,520 $0 $23,380 $116,900
Milwaukee Railroad shops Historic District Phase 5 Engineering; rehab for carpenter shop, sand drying house, water closet and engineer tool shed; purchase/install minature railroad to move people from parking area to various station shops. Iowa 2010 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers SIOUX CITY WOODBURY $477,142 $0 $119,286 $596,428
Mile Hill Lake Scenic Overlook Connecting Trails along Scenic Byway Overlook connecting Trails along byway, Iowa 1998 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers RURAL MILLS $81,600 $0 $15,320 $96,920
Urban Youth Corps Training and Landscaping-2008 5 sponsors. Trees Forever, MYEP, Mahaska CCB, INHF, Dubuque CCB. Iowa 2008 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $114,317 $0 $52,272 $166,589
Urban Youth Corps Program 2011 2011 Urban Youth Corps Program - 6 sponsors. City of Dubuque, Dubuque CCB, Iowa CCB, INHF, Mahaska CCB, Optimae/ARMY Corps. Iowa 2011 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $100,000 $0 $25,000 $125,000
I-29 from US 34 N. to IA 370 Landscaping(Revegetation) I-29 from US 34 N. to IA 370 Landscaping(Revegetation) Iowa 2002 5 (TE) 5. Landscaping and scenic beautification RURAL MILLS $87,277 $0 $21,819 $109,096
The Surf District - North Shore Drive Streetscape Improvement Project Project is on North Shore Drive from Midpoint North Driving lane to North ROW line. It includes new brick paver sidewalks, concrete driveway approaches, decorative lighting and minor storm sewer improvements. Iowa 2012 5 (TE) 5. Landscaping and scenic beautification CLEAR LAKE CERRO GORDO $87,138 $0 $107,100 $194,238
Urban Youth Corps 2012 Project sponsors (6) are City of Dubuque Leisure Services Department ($23,478), Dubuque County Conservation Board ($8,919), Friends of Hartman Reserve ($5,018), Iowa County Conservation Board ($18,972), Optimae LifeServices/Army Corps of Engineers ($8,754), Siouxland Historical Railroad Association ($15,989) Iowa 2012 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $100,000 $0 $42,857 $142,857
Fairfield Downtown Streetscape Court Street - Downtown area Streets. Iowa 2009 5 (TE) 5. Landscaping and scenic beautification FAIRFIELD JEFFERSON $282,100 $0 $120,900 $403,000
Main Street Scenic Beautification in Mediapolis Along Main St., from Hwy 61 to Curve St. in the city of Mediapolis. PCC Pvement - replace. Iowa 2003 5 (TE) 5. Landscaping and scenic beautification MEDIAPOLIS DES MOINES $101,000 $0 $3,747 $104,747
Urban Youth Corps Training and Landscaping - FY2001 Urban Youth Corps Training and Landscaping - FY2001 Iowa 2001 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $85,000 $0 $85,000 $170,000
IA 210 (Main St.) Streetscaping from 2nd St. to Broad Street Downtown streetscape improvements: Sidewalk,planters and lighting. Iowa 1997 5 (TE) 5. Landscaping and scenic beautification MAXWELL STORY $84,700 $0 $65,410 $150,110
Diagonal Downtown Beautification Project - Phase 1 Broadway street from 2nd street to 4th street. Iowa 2012 5 (TE) 5. Landscaping and scenic beautification DIAGONAL RINGGOLD $100,000 $0 $25,000 $125,000
Bloomfield lamp posts Purchase and install 36 amp posts and fixtures for Davis County Courthouse Square. Iowa 1995 5 (TE) 5. Landscaping and scenic beautification BLOOMFIELD DAVIS $39,600 $0 $9,900 $49,500
Vintage St Lighting Main St from Gilbert to Lane in Charles City, Vintage Lighting Iowa 1999 5 (TE) 5. Landscaping and scenic beautification CHARLES CITY FLOYD $117,000 $0 $29,250 $146,250
City Square enhancements - phase 2 Centerville Townscape-for materials purchase. Town square in the city of centerville, landscaping. Iowa 1999 5 (TE) 5. Landscaping and scenic beautification CENTERVILLE APPANOOSE $70,000 $0 $17,500 $87,500
Iowa's Living Roadways (FY1996) For community visioning and landscaping projects in communities with populations of under 10,000 Iowa 1996 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $493,000 $0 $123,000 $616,000
Keokuk Gateway (Phase 1) at 2nd & Main St (US Hwy 136 ) IA 136/2nd st main st in keokuk-landscaping Iowa 1999 5 (TE) 5. Landscaping and scenic beautification KEOKUK LEE $124,000 $0 $31,000 $155,000
Grinnell Downtown Street Scaping Historic Block of 4th Ave. from Main St. to Broad St ; Broad St. from 4th Ave. to 5th Ave. .2 miles. lighting, pavers, landscape, etc. Iowa 2004 5 (TE) 5. Landscaping and scenic beautification GRINNELL POWESHIEK $504,000 $0 $126,000 $630,000
Urban Youth Corps Program 2009 2009 Urban Youth Corps Program-- 6 sponsors. Trees Forever, ResCare (Army corps of engineers), Mahaska CCB, INHF, Dubuque CCB, Black Hawk CCB. Iowa 2009 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $125,000 $0 $53,571 $178,571
Business 218 Landscaping (Phase 2) from Brantingham St. to Glenwood Rd. Brantingham St. to Glenwood Rd Iowa 2002 5 (TE) 5. Landscaping and scenic beautification CHARLES CITY FLOYD $192,500 $0 $82,500 $275,000
Roadside Beautification/Maintenance Reduction: County Highways UNI will purchase prairie grass and wildflower seed for count road rights of way to distribute to the 77 counties with Integrated Roadside Vegetation Management Plans on file with the Iowa DOT. Iowa 2003 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $188,947 $0 $694,915 $883,862
Bringing Prairie and People Together HMA Trail. For PE, CE and Construction Iowa 2006 5 (TE) 5. Landscaping and scenic beautification PRAIRIE CITY JASPER $593,454 $0 $183,528 $776,982
Window on Waterloo, Phase 5; US 218 Gateway Development For tree plantings, antique lighting, decorative brick pavers, and the Leo P. Roof recognition area adjacent to the northbound service road and the relocated US 218 viaduct between West Park Avenue and West 6th Street. Iowa 1997 5 (TE) 5. Landscaping and scenic beautification WATERLOO BLACK HAWK $638,885 $0 $159,721 $798,606
Landscaping from US 34 North to Iowa 137 in Albia Contract with Ogle's Greenhouse to landscape the Albia Highway 5 Corridor. Iowa 1996 5 (TE) 5. Landscaping and scenic beautification ALBIA MONROE $47,600 $0 $38,974 $86,574
Ames Southeast Entryway US 30 in the City of Ames from S. Dayton Ave to I-35 Interchange. Lighting and landscaping. Iowa 2010 5 (TE) 5. Landscaping and scenic beautification AMES STORY $683,000 $0 $400,310 $1,083,310
Urban Youth Corps Training and Landscaping - FY99? Urban Youth Corps Training and Landscaping - FY99? Iowa 1999 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $47,460 $0 $58,278 $105,739
Urban Youth Corps Training and Landscaping -2007 Urban Youth Corps Training and Landscaping -2007 Iowa 2007 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $46,695 $0 $33,304 $80,000
Iowa's Living Roadways / Trees Forever (FY1998) For community visioning and landscaping projects in communities with populations of under 10,000. Iowa 1998 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $744,723 $0 $319,167 $1,063,890
Highland Park Streetscaping at 6th Ave. and Euclid Ave. in Des moines. 6th Avenue in Des moines from Euclid to Clinton. HMA Resurfacing with Milling. Iowa 2004 5 (TE) 5. Landscaping and scenic beautification DES MOINES POLK $185,300 $0 $679,554 $864,854
Fairfield Entrance Sign Fairfield entrance side on the south part of town. NE Quadrant of interchage Hwy 1 and Hwy 34. Iowa 2011 5 (TE) 5. Landscaping and scenic beautification FAIRFIELD JEFFERSON $40,800 $0 $10,200 $51,000
US 63 Streetscape For 0.5 mile of streetscape to the one-way pair of Mullan Ave and 1st St between US 218 and the riverwalk, and to Commercial St and Jefferson St. Iowa 2011 5 (TE) 5. Landscaping and scenic beautification WATERLOO BLACK HAWK $476,938 $0 $119,235 $596,173
Urban Youth Corps Training and Landscaping - FY2000 Urban Youth Corps Training and Landscaping - FY2000 Iowa 2000 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $60,000 $0 $48,015 $108,015
Roadside Beautification / Maint. Reduction - FY 2002 For prairie grass and wildflower seed purchase for county rights of way in Iowa Iowa 2002 5 (TE) 5. Landscaping and scenic beautification CEDAR FALLS BLACK HAWK $461,223 $0 $197,634 $658,857
Roadside Beautification / Maint. Reduction - FY 2001 For purchase of seed only Iowa 2001 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $461,200 $0 $472,500 $933,700
Roadside Beautification/Maintenance Reduction FY 2009 UNI will purchase prairie grass and wildflower seed for county road rights of way to distribute to the counties with Integrated Roadside Vegetation Management Plans on file with the Iowa DOT. Iowa 2009 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $200,000 $0 $50,000 $250,000
Roadside Beautification/Maintenance Reduction: County Highways 2008 Roadside Beautification/Maintenance Reduction: County Highways 2008 Iowa 2009 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $200,000 $0 $85,714 $285,714
Iowa's Living Roadways Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping (PE, CE and Construction) Iowa 2008 5 (TE) 5. Landscaping and scenic beautification MARION LINN $200,000 $0 $103,818 $303,818
Iowa's Living Roadways Scenic and Natural Resources Fund (Trees Forever) To assist small communities to re-establish the native landscape along their transportation corridors. Typical participating communities are motivated by a desire to keep their small towns viable by improving them both physically and visually. Iowa 2003 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $400,000 $0 $180,714 $580,714
Iowa's Living Roadway Scenic & Natural Resources Fund - FY2003 For continuation of the visioning and landscaping program for communities w/populations under 10,000 Iowa 2003 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $400,000 $0 $176,000 $576,000
Iowa's Living Roadways 2005 Iowa's Living Roadway Scenic and Natural Resources - Landscaping, PE and Construction Iowa 2007 5 (TE) 5. Landscaping and scenic beautification MARION LINN $200,000 $0 $436,000 $636,000
Roadside Beautification/Maintenance Reduction 2007 FY 2007 Iowa 2007 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $200,000 $0 $100,000 $300,000
Iowa's Living Roadways Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction Iowa 2009 5 (TE) 5. Landscaping and scenic beautification MARION LINN $200,000 $0 $133,998 $333,998
Iowa's Living Roadways Project Program Assist small communities and counties throughout Iowa for roadside and trail enhancements, landscape projects. (Trees Forever) Iowa 2013 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $400,000 $0 $171,428 $571,428
Iowa's Living Roadways 2004 Iowa Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping Iowa 2006 5 (TE) 5. Landscaping and scenic beautification MARION LINN $200,000 $0 $50,000 $250,000
Iowa's Living Roadways 2004 For landscaping in cities with populations under 10,000. Iowa 2006 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $200,000 $0 $85,714 $285,714
Roadside Beautification/Maiintenance Reduction 2004 For purchase and distribution of prairie grass and weldflower seed to the 81 counties with Integrated Roadside Vegetation Management Plans on file with the Iowa DOT. Iowa 2006 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $200,000 $0 $100,000 $300,000
Roadside Beautification/Maintenance Reduction 2002 For purchase of prairie grass and wildflower seed to be made available to the 79 counties with Integrated Roadside Vegetation Management Plans on file with the Iowa Department of Transportation. The prairie grass and seed is to be used in county road rights-of-way. Iowa 2004 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $200,000 $0 $810,216 $1,010,216
Along US 69 (Ankeny Blvd.) from 1st St. to just north of NE 18th St. Landscaping Along US 69 (Ankeny Blvd.) from 1st St. to just north of NE 18th St. Iowa 1995 5 (TE) 5. Landscaping and scenic beautification ANKENY POLK $200,000 $0 $267,418 $467,418
Arnolds Park: US 71 Corridor Enhancements Scenic beautification of the US 71 corridor in the Iowa Great Lakes region. Trail, lighting Iowa 2002 5 (TE) 5. Landscaping and scenic beautification ARNOLDS PARK DICKINSON $450,000 $0 $667,000 $1,117,000
Valley Junction Streetscape - 4th to 6th Street Valley Junction Streetscape - 4th to 6th Street Iowa 2009 5 (TE) 5. Landscaping and scenic beautification WEST DES MOINES POLK $450,407 $0 $243,330 $693,737
Urban Youth Corps Training and Landscaping - FY2002 Urban Youth Corps Training and Landscaping - FY2002 Iowa 2002 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $67,802 $0 $52,197 $120,000
URBAN YOUTH CORPS- Statewide URBAN YOUTH CORPS- Statewide Iowa 2004 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $80,000 $0 $80,000 $160,000
Enhancement project in Black Hawk County At native roadside vegetation enhancement center at the UNI campus. Iowa 2001 5 (TE) 5. Landscaping and scenic beautification RURAL BLACK HAWK $760,000 $0 $190,000 $950,000
Iowa's Living Roadway Project Program - Trail Visioning Trails Visioning - Provide Iowa communities and trail groups professional plan and implement trail safety and overall trail improvement projects. Iowa 2017 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $82,000 $0 $20,500 $102,500
Iowa's Living Roadway Projects Program - Trails Visioning Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction Iowa 2016 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $60,000 $0 $140,000 $200,000
Iowa's Living Roadway Projects Program - Projects Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction Iowa 2016 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $140,000 $0 $60,000 $200,000
Iowa's Living Roadways Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction Iowa 2009 5 (TE) 5. Landscaping and scenic beautification MARION LINN $400,000 $0 $293,302 $693,302
Parkersburg Iowa Highway 14/57 Corridor Improvements Encompassing 1.44 miles, the project termini are the east junction of IA 14/57 to the west juction of IA 14/57 in Parkersburg. In addition to the proposed roadway improvements (Agreement No HDP-014-7(036)--7I-12), proposed enahncements include aesthetic improvements, bicycle and pedestrian accomodation, lighting, and pavement treatments. The exact scope of the enhancements will be deteremined as part of the final design of the corridor. Iowa 2012 5 (TE) 5. Landscaping and scenic beautification PARKERSBURG BLACK HAWK $2,851,770 $0 $230 $2,852,000
U.S. Highway 63 Streetscape Enhancements - Donald Street to Newell Street Encompassing one miles, streetscape enahncements will include brick pavers at median ends and intersection corners, shade trees and evergreen trees, pedestrian lighting, decorative roadway lighting, benches, trash recepticles, neighborhood monuments and a recreational trail. Iowa 2012 5 (TE) 5. Landscaping and scenic beautification WATERLOO BLACK HAWK $861,000 $0 $277,780 $1,138,780
Iowa's Living Roadway Project Program Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Trails Visioning - Planning Activities Iowa 2014 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $84,000 $0 $21,000 $105,000
Iowa's Living Roadways Projects Program Iowa's Living Roadways Projects Program - Community Improvement Projects Iowa 2017 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $167,562 $0 $42,000 $209,562
Iowa's Living Roadways Project Program Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction Iowa 2014 5 (TE) 5. Landscaping and scenic beautification RURAL Statewide $354,496 $0 $0 $354,496
Iowa's Living Roadways Iowa's Living Roadway Scenic & Natural Resource Fund (Trees Forever) Landscaping - PE/CE/Construction Iowa 2011 5 (TE) 5. Landscaping and scenic beautification MARION LINN $400,000 $0 $21,126 $421,126
Iowa's Living Roadways Iowa's Living Roadway: Trees Forever outside services engineering, landscaping Iowa 2012 5 (TE) 5. Landscaping and scenic beautification MARION LINN $400,000 $0 $171,428 $571,428
Fleur Drive Gateway Scenic Beautification Project To landscape the medians along the entire length of Fleur Drive in order to create a scenic gateway and calm traffic flow. Iowa 2003 5 (TE) 5. Landscaping and scenic beautification DES MOINES POLK $400,000 $0 $1,342,039 $1,742,039
Signing Iowa's National Heritage Area For signing Iowa's National Heritage Area: Site id signs at Silos and Smokestacks designated sites. Iowa 2005 6 (TE) 6. Historic preservation RURAL BLACK HAWK $109,250 $0 $27,313 $136,563
Development and Access to Cultural Resource Data in Iowa through GIS To link the database of historic site information to a GIS system to be shared by SHPO and OSA Iowa 1999 6 (TE) 6. Historic preservation RURAL Statewide $434,412 $0 $186,177 $620,589
Conoco Station Restoration Conoco Station Restoration Iowa 2000 6 (TE) 6. Historic preservation BEDFORD TAYLOR $50,000 $0 $13,800 $63,800
Chautauqua Recreational Park (Phase 1) wetland and water quality mitigation for runoff from US 59. wetland and water quality mitigation for runoff from US 59. Project completed. Federally closed - 12/28/09. Total Project Cost =$144,212.45. Participating Cost $91,625, Non- Part Cost $52,587.45(Local eligible unclaimed funds due to STIP amount) Federal Funds=$73,300 Iowa 2001 6 (TE) 6. Historic preservation OAKLAND POTTAWATTAMIE $73,300 $0 $18,300 $91,600
Renovating Old Fort Madison in Lee County Renovating Old Fort Madison in Lee County. Iowa 2006 6 (TE) 6. Historic preservation FORT MADISON LEE $33,929 $0 $12,876 $46,806
Swedish Heritage Husker Restoration Project Restoration of Swedish Huckster barn in Swedesburg Iowa 1995 6 (TE) 6. Historic preservation RURAL HENRY $27,000 $0 $52,806 $79,806
Grand Army of the Republics Building Grand Army of the Republics Building Iowa 1995 6 (TE) 6. Historic preservation RURAL DALLAS $22,600 $0 $7,025 $29,625
Home Oil Restoration Rehabilitate the historic Lincoln Highway Home Oil Service Station, while modernizing the interior of the facility to house the City?¢‚Ä¢‚Äôs Department of Public Safety. Iowa 2012 6 (TE) 6. Historic preservation STATE CENTER MARSHALL $112,262 $0 $48,112 $160,374
Historical Restoration of Grand Army of the Republic Building in Redfield For restoration of the Grand Army of the Republic bldg, a historic building tied to the GAR Highway (US 6). This phase includes constructing the storefront, repairing the walls, windows and doors, painting, mechanicals and electrical installation. Iowa 2002 6 (TE) 6. Historic preservation REDFIELD DALLAS $60,000 $0 $30,000 $90,000
Steam Locomotive Restoration Restoration of steam locomotive no 1355, located in Sioux City and the Sioux city Historic roundhouse railway complex. Iowa 1997 6 (TE) 6. Historic preservation SIOUX CITY WOODBURY $64,280 $0 $9,320 $73,600
Exploring Iowa's Past: An Archaeological Guide to Iowa For development of a book to make Iowa DOT archaeology projects understandable to the general public Iowa 1996 6 (TE) 6. Historic preservation IOWA CITY LINN $55,400 $0 $36,011 $91,411
American Gothic House Visitor Center & Trailhead Building Restoration of the American Gothic House. Iowa 2004 6 (TE) 6. Historic preservation OTTUMWA WAPELLO $75,000 $0 $277,173 $352,173
Restoration of the Germania Haus / Miller Hotel as the German American Heritage Center For a museum, library, archives, records repository, and research center related to the German immigrants in the state's development Iowa 2000 6 (TE) 6. Historic preservation DAVENPORT SCOTT $97,972 $0 $24,528 $122,500
Dayton House (Stagecoach Inn) Restoration Complete restoration of the 1868 Dayton House (Stagecoach Inn). Will be used as a historical site for tours, retreats, and reenactments. Iowa 2008 6 (TE) 6. Historic preservation BOUTON DALLAS $105,000 $0 $45,000 $150,000
Dayton House Restoration Phase II Complete the restoration of the 1868 Dayton House Stagecoach Inn). Iowa 2012 6 (TE) 6. Historic preservation RURAL DALLAS $105,000 $0 $45,000 $150,000
Klondike Hotel Rehabilitation - Arhitectural study services only Architect consultant investigation and study report for the Historic Klondike hotel. No letting for consultant service, consultant agreement signed by DOT 9/9/98. Iowa 1998 6 (TE) 6. Historic preservation MANILLA CRAWFORD $6,000 $0 $1,500 $7,500
Rolling Prairie Trail Bridge Repair Repair of Rolling Prairie Trail Bridge over Shell Rock River west of Clarksville following arson. Will include new wood decking and railings. Iowa 2011 6 (TE) 6. Historic preservation RURAL BUTLER $210,000 $0 $90,000 $300,000
Wapsi Great Western Trail Welcome Center in Riceville - purchase and rennovate an historic building Purchase and rennovate an historic building; project progressing as of Aug 2002.SHPO'S historical architect approved the building renovation plans on 10/3/00. Iowa 1996 6 (TE) 6. Historic preservation RURAL MITCHELL $304,400 $0 $76,100 $380,500
Klondike Railroad Hotel - Exterior Restoration Phases A,B,C of the exterior restoration of the Klondike Railroad Hotel. Iowa 2001 6 (TE) 6. Historic preservation MANILLA CRAWFORD $114,200 $0 $28,300 $142,500
Phase 4: Milwaukee Railroad Shops Historic District Rehabilitation Project Phase 4 Milwaukee Railroad Shop Historic District Rehabilitration Paroject. Iowa 2007 6 (TE) 6. Historic preservation SIOUX CITY WOODBURY $606,856 $0 $310,394 $917,250
Lincoln Highway Rehabilitation & Restoration Storm sewer/Intake. - 8th St. to Bus Brown Drive in Woodbine. Also has $175,000 in TE Funding from Region 18 (MAPA). The TE funds should be used first Iowa 2006 6 (TE) 6. Historic preservation WOODBINE HARRISON $359,735 $0 $42,228 $401,963
Keystone Bridge Rehabilitation over Turkey River Keystone Bridge Rehabilitation - Bridge Street over Turkey River - Tuck pointing, pillar repair. Storm sewer repair and water line relocation for Keystone Bridge Rehabiliation project. Iowa 2005 6 (TE) 6. Historic preservation ELKADER CLAYTON $261,352 $0 $112,008 $373,360
Historic Main Street Rehabilitation AMANA Phase 1 - 47th Avenue (1st St.) from 46th Avenue to 48th Avenue Design development and construction documents for the entire project area and the restoration of 47th Avenue Iowa 2001 6 (TE) 6. Historic preservation RURAL IOWA $477,000 $0 $208,240 $685,240
Historic Main Street in Amana Phase 2 Reconstruction of Main St in Amana 220th Trail (IA 220) 43rd Ave to 47th Ave Phase 2 Iowa 2003 6 (TE) 6. Historic preservation RURAL IOWA $637,223 $0 $667,776 $1,305,000
Iowa State Fair Grandstand Rehabilitation For the rehabilitation of the historic Iowa State Fair Grandstand to its original 1927 condition Iowa 1996 6 (TE) 6. Historic preservation DES MOINES POLK $1,250,000 $0 $3,067,930 $4,317,930
Historic Preservation Building Restoration Iowa 1994 6 (TE) 6. Historic preservation DAVENPORT SCOTT $483,000 $0 $800,681 $1,283,681
Amtrak Station Platform Improvements For improvements to AMTRAK platforms to bring them up to ADA compliance. Facilities for pedestrians.Jasper Construction Services and City of West Des Moines. Project Engineer Shive-Hattery Engr&Arch Iowa 2006 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities FORT MADISON LEE $750,000 $0 $250,000 $1,000,000
Milwaukee RR Roundhouse Acquisition and Stabilization For the acquisition of the former Milwaukee Railroad Roundhouse Complex and stabilization of the current deterioration of the roundhouse AKA Siouxland Historical Railroad Bldg Iowa 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities SIOUX CITY WOODBURY $540,000 $0 $135,000 $675,000
Carroll Depot Courtyard Development To develop the courtyard around the restored historic C & NW depot along US 30 & the Lincoln Highway Iowa 2002 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities RURAL CARROLL $278,930 $0 $211,497 $490,427
Transportation Improvements to the Boone & Scenic Valley Railroad To purchase 23.6 acres of historic railroad right ofway and electrify 1.6 miles of track, other associated rehabilitation activities. SEE NOTE: SAYS FUNDS WERE ADDED FROM ANOTHER PROJECT Iowa 1996 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities BOONE BOONE $516,000 $0 $118,370 $634,370
Burlington Northern Depot Renovation #2 Renovation of historic depot located at Hwy 69 (Main St) and main rail in Osceola. Restoration to reflect the early 1900's. Iowa 2013 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities OSCEOLA CLARKE $811,924 $0 $618,076 $1,430,000
Relocation / Restoration of Illinois Central RR Depot Building restoration Iowa 1996 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities INDEPENDENCE BUCHANAN $192,000 $0 $48,001 $240,001
Dawson Depot Acquisition and Restoration Dawson Depot Acquisition and Restoration Iowa 2007 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities DAWSON DALLAS $157,500 $0 $48,750 $206,250
Heritage Zone - the Milwaukee Railroad Shops Historic District Building Renovation.The project will purchase 8+ acres of former railroad property, and will rehabilitate the wood sand tower, sand drying house, interior of car shops, and interior of roundhouse bay 1. Iowa 2005 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities SIOUX CITY WOODBURY $263,782 $0 $113,050 $376,832
Phase 2 Humeston Union Depot Interior Renovation The Union RR depot restoration. This is part of the Mormon Trail program as the depot is owned by the Mormon Trail Chamber and Development Corporation. Iowa 1999 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities HUMESTON WAYNE $48,200 $0 $12,100 $60,300
Santa Fe Depot & Freight Complex Restoration Initiate the restoration and reuse of the historic 1909 Santa Fe Depot, 1926 Railway Expressway Agency Building adjacent to the depot and the 1930 Santa Fe Freight Office building. These buildings, known as the Atcheson, Topeka and Santa Fe Passenger and Freight Complex, are listed as a complex on the National Register of Historic Places. The project will encompass Phase I of the complex restoration and reuse project, which will rehabilitate part of the depot for use as an Amtrak station and the first floor of the Freight Office for use as an interpretive center for the North Lee County Historical Society, which possesses many artifacts relevant to the area's history, especially related to rail transportation. Iowa 2008 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities FORT MADISON LEE $280,000 $0 $120,000 $400,000
Window Rennovation / Preservation To replace window frames and install new windows in a historic Creston railroad depot. Iowa 1998 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities CRESTON UNION $180,000 $0 $45,000 $225,000
Rehabilitation and Retrofit of Historic Boone County Wagon Bridge Rehabilitation and Retrofit of Historic Boone County Wagon Bridge Iowa 2006 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities RURAL BOONE $800,000 $0 $160,000 $960,000
Historic Transportation Depot Rehabilitation - Cedar Valley Nature Trail Cedar Valley Nature Trail Depot Rehabilitation Iowa 2009 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities RURAL LINN $192,500 $0 $92,500 $285,000
Marsh Arch Bridge Rehabilitation For the rehabilitation and restoration of an existing Marsh Rainbow Arch concrete bridge constructed in 1916 Iowa 1997 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities RURAL BOONE $112,000 $0 $28,000 $140,000
Cedar Covered Bridge in Madison County To restore the fire-damaged Cedar Covered Bridge and landscape the immediate vicinity. The bridge was extensively damaged by fire on September 3, 2002. This bridge was immortamized by the Robert Waller novel, "The Bridges of Madison County". Iowa 2003 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities RURAL MADISON $700,000 $0 $300,000 $1,000,000
Phase 2 Lincoln Way Restoration from 3rd St. to 7th St. Rehabilitation / restoration of Lincoln Way from 3rd Street to 7th Street - grading, drainage, paving, walls, lights, interpretive signs, etc. Brick paver restoration Iowa 2003 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities WOODBINE HARRISON $1,107,000 $0 $375,820 $1,482,820
Pine Ave pedestrian bridge over I-35 Adding sidewalks to brdiges built in conjunction with the IA 5 Beltway project. Funding was included in the structure project. Iowa 2001 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities WEST DES MOINES POLK $139,700 $0 $210,300 $350,000
Hale Bridge Restoration and Renovation For the restoration and relocation of a three-span bowstring truss bridge known as the Hale Bridge in Jones County. The 296-foot bridge is listed on the National Register of Historic Places and is scheduled for replacement by a new structure. Over the Wapsipinicon River Iowa 2002 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities RURAL JONES $205,874 $0 $196,450 $402,324
Mills Tower Complex and ICRR Depot Restoration Architectural and construction costs. Iowa 2000 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities IOWA FALLS HARDIN $185,948 $0 $25,986 $211,935
Reed/Niland Corner - Phase 3 Reed/Niland Corner - Phase 3 Iowa 2007 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities COLO STORY $131,363 $0 $56,300 $187,663
Leon Depot Renovation, Phase 2 Leon Depot Renovation, Phase 2 Iowa 2005 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities LEON DECATUR $135,000 $0 $58,800 $193,800
Lincoln Way Restoration from 2nd St. to 3rd St. Project includes design of improvements from 2nd to 11th St., but only includes construction from 2nd to 3rd St. NOTE:Expanded to 7th st. Brick paver restoration Iowa 2001 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities WOODBINE HARRISON $1,107,000 $0 $1,117,000 $2,224,000
Osceola Burlington Northern Railroad Depot Building Renovation. Amtrak Depot - Osceola Burlington Northern Depot. Iowa 2003 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities OSCEOLA CLARKE $301,186 $0 $71,590 $372,776
Leon Depot Restoration, Phase III Location at 1306 S Main Street, Leon, IA. Goal of this phase of the restoration of the historic BNSF rail depot is to replace the current single pane windows (many already damaged or deteriorated) with modern windows that also preserve the historic look and function of the existing windows. Iowa 2013 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities LEON DECATUR $130,000 $0 $53,700 $183,700
Iowa River Trail - Burlington St. to Napoleon Park Iowa Rail Trail-Burlington-Napoleon Pk. ACC/PCC Trail Iowa 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails IOWA CITY JOHNSON $715,000 $0 $597,306 $1,312,306
Raccoon River Valley Trail (Phase 3) from Herndon S. to Yale (from N. termini of RRVT in Yale to E-5 Raccoon River Valley Trail (Phase 3) from Herndon S. to Yale (from N. termini of RRVT in Yale to E-5 (RTC rail-trail database) ACC trail. Iowa 1999 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL GREENE $123,700 $0 $236,067 $359,767
Correctionville to Little Sioux Park Rail Trail (.70 miles) From IA 31 (Correctionville) along abandoned RR to Little Sioux Pk Recreational Trail south of Correctionville and Iowa 31 continuing along abandoned Chicago, Central and Pacific Right of way and terminating in Little Sioux Park Iowa 2000 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL WOODBURY $90,000 $0 $22,500 $112,500
From 5th St. to F St. on Charles City Western RR ROW On Charles City Western RR ROW. Charles City Engineer trail designer. Bike/Pedestrian trail Iowa 2001 8 (TE) 8. Conversion of abandoned railway corridors to trails CHARLES CITY FLOYD $82,400 $0 $25,135 $107,535
Raccoon River Valley Trail Overlay (extension) This is an extension of the previously funded overaly project STP-E-C025(54)--8V-25. Raccoon Valley Trail from P58 E. to 0.6 miles west of R22 in Waukee. Iowa 2005 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL DALLAS $306,410 $0 $111,682 $418,093
Postville Trail Rail Trail along I&M RR in Postville. Co-op Drive from Lybrand St to Ogden St. Iowa 2004 8 (TE) 8. Conversion of abandoned railway corridors to trails POSTVILLE ALLAMAKEE $72,600 $0 $30,298 $102,898
Raccoon Valley Trail from Beuna Vista Drive to Rocklyn Drive HMA Trail - Raccoon Valley Trail from Buena Vista Dr. & Oakbrook Dr. Jct. SE to Rocklyn Dr. in City of Urbandale. Iowa 2007 8 (TE) 8. Conversion of abandoned railway corridors to trails URBANDALE POLK $145,000 $0 $70,186 $215,186
Keosauqua Two-Mile Loop Trail Along old rr bed, Mulberry St, fairgrounds, & shared use streets. 2 miles Iowa 2004 8 (TE) 8. Conversion of abandoned railway corridors to trails KEOSAUQUA VAN BUREN $148,000 $0 $53,500 $201,500
Cedar Valley / Hoover Trail Connector (Phase 2) from Tait Cummins Park to Ely Road SW For 4.61 miles of trail along the riverfront, city streets, and railroad right of way to connect the CVNT to downtown Cedar Rapids. Prairie Creek to Ely Rd Sw. Iowa 2000 8 (TE) 8. Conversion of abandoned railway corridors to trails CEDAR RAPIDS LINN $601,125 $0 $104,033 $705,158
Old Stone Arch Trail - trail construction on abandoned RR ROW in Shelby and Pottawattamie counties trail construction on abandoned RR ROW in Shelby and Pottawattamie counties. ACC trail Iowa 1996 8 (TE) 8. Conversion of abandoned railway corridors to trails SHELBY SHELBY $334,410 $0 $83,635 $418,045
Correctionville - Little Sioux Park Trail RR ROW between Little Sioux County Park and the town of Correctionville. 1.7 miles Iowa 2004 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL WOODBURY $270,000 $0 $545,413 $815,413
Rolling Prairie Trail-Clarksville Connection 1.00 mile of Rail trail connecting east of Clarksville to rail trail west of Clarksville. Iowa 2006 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL BUTLER $160,000 $0 $40,000 $200,000
Raccoon River Valley Trail Located in Cooper from N St. to Booth St. (RTC rail-trail database) Iowa 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL GREENE $181,900 $0 $190,145 $372,045
Raccoon River Valley Trail Addition Commission again 1/8/2008 for increase; Raccoon River Valley Trail-Addition-Former RR ROW from Herndon in Guthrie Cty. to Waukee in Dallas Cty. Iowa 2008 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL DALLAS $1,979,056 $0 $2,346,584 $4,325,640
Boone & Scenic Valley Rail To rehabilitate 2.5 miles of railroad track and six interpretive sites, refurbish freight train and funds for purchase of FDDMS right of way. Mainline Rehabilitation and interpretive Sites Iowa 2003 8 (TE) 8. Conversion of abandoned railway corridors to trails BOONE BOONE $497,000 $0 $213,000 $710,000
Railbanking of IANW RR, Section 2 & 3 Purchase of Sections 2 & 3 of the IANW RR Iowa 2012 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL DICKINSON $595,511 $0 $255,219 $850,730
Rail Trail Extension - Trains unlimited corridor US 63 to Readlyn Acquire right of way for rail trail extension.SW cor sec 7-91-12 E 6 mi. to SE cor sec 11-91-11 Iowa 2000 8 (TE) 8. Conversion of abandoned railway corridors to trails WAVERLY BREMER $52,000 $0 $48,200 $100,200
Ringgold Co. Trail - Phase 2 (on abandoned RR ROW in W 1/4 Cor. Of Section 4-68-29) Mp Trail on abandoned RR ROW in W 1/4 Cor. Of section 4-68-29 Iowa 2000 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL RINGGOLD $32,897 $0 $8,224 $41,122
Clearfield Trail Walking and biking trail 0.6 miles long on abandoned rail line. The trail begins on the west edge of the City of Clearfield and continues west. It will be surfaced with gravel/mulch and will be landscaped. Iowa 2007 8 (TE) 8. Conversion of abandoned railway corridors to trails CLEARFIELD TAYLOR $21,500 $0 $11,500 $33,000
Waverly / Bremer Co. Rail-Trail To develop a trail extending from US 63 to 1st St. in Waverly along an abandoned railroad corridor. (ROW Acquistion) Iowa 1998 8 (TE) 8. Conversion of abandoned railway corridors to trails WAVERLY BREMER $70,600 $0 $17,700 $88,300
Four rail to trail corridors: Sheffield to Chapin, Belmond to Thornton, Thornton to Mason City, Eddyville to Maxon ROW- Four Rail to Trail Corridors: Sheffield to Chapin, Belmond to Thornton, Thornton to Mason City, Eddyville to Maxon. Iowa 2006 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL CERRO GORDO $600,000 $0 $300,210 $900,210
Railbanking of IANW RR, Section 1 in Dickinson County and a rail segment in Osceola. County. Acquisition of the a segment of the IANW RR in Dickinson County and a segment in Osceola County. Iowa 2013 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL DICKINSON $750,000 $0 $753,566 $1,503,566
Waukee to Dawson Trail Right of Way Waukee to Dawson Trail Right of Way, Rural railroad ROW between Waukee and Dawson PE, ROW Iowa 2006 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL DALLAS $836,000 $0 $209,000 $1,045,000
Rolling Prairie Trail Acquisition- Allison to Coulter Rolling Prairie Trail. Union Pacific Railroad corridor from East of Allison to just East of Coulter. PE, Right of way acquisition. Iowa 2005 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL BUTLER $620,377 $0 $246,497 $866,875
Raccoon River Valley Trail Extension - connecting existing Raccoon River Valley trail to Clive Green For a six-mile trail project connecting the Raccoon River Valley Trail to the Des Moines metro area along US 6 Iowa 2000 8 (TE) 8. Conversion of abandoned railway corridors to trails RURAL DALLAS $17,500 $0 $503,682 $521,182
Sand Road Heritage architectural survey Sand Road Heritage - achitectural survey. Iowa 1996 10 (TE) 10. Archaeological planning & research RURAL JOHNSON $65,800 $0 $29,052 $94,852
Archaeological Survey of the Glenwood Resource Center Archaeological Survey of the Glenwood Resource Center Iowa 2011 10 (TE) 10. Archaeological planning & research GLENWOOD POTTAWATTAMIE $292,402 $0 $125,598 $418,000
Historic Preservation Historic preservation activities done by a consultant and temporary Iowa DOT staff. Document the location and condition and preserve the Iowa Dot's historic materials. Iowa 2006 10 (TE) 10. Archaeological planning & research RURAL STORY $220,000 $0 $220,000 $440,000
Provide On-line Access to History, Architecture, Archaeology Documents To provide on-line computer access to history, architecture and archaeology documents contained in Iowa's statewide site inventory with scanned, searchable text in Portable Digital File (PDF) format. Iowa 2006 10 (TE) 10. Archaeological planning & research RURAL Statewide $220,275 $0 $94,404 $314,679
LANDMASS - GIS Landscape Model for Archaeological Site Suitability in Iowa For the creation of LANDMASS, a decision support model for archaeological survey planning and cultural resource management in Iowa. The model will include a relational database and Geographical Information System (GIS) that combines and synthesizes multiple layers of archaeological and environmental data. Iowa 2004 10 (TE) 10. Archaeological planning & research DES MOINES POLK $221,406 $0 $101,190 $322,596
Bringing the Glenwood Culture to Iowan's: Research Publication & Engagement on Archaeological Sites Excavated by IDOT This project proposes archaeological research culminating in the publication of a scientific report and activities associated with outreach programs on the 800-year-old Glenwood culture of Mills County, Iowa. The project involves Glenwood archaeological sites excavated as part of Iowa DOT?¢‚Ä¢‚Äôs 1970 construction of U.S. Route 34, now part of the Loess Hills Scenic Byway. Iowa 2011 10 (TE) 10. Archaeological planning & research RURAL Statewide $398,986 $0 $340,747 $739,733
Historic Document Archiving, Phase IV For the consultant to continue to develop a plan for cataloging and preserving, as well as digitizing and making available the Iowa DOT's hhistoric photo collections. Iowa 2009 10 (TE) 10. Archaeological planning & research RURAL Statewide $120,000 $0 $51,429 $171,429
Cultural Resources Study in the Loess Hills Cultural Resources Study in the Loess Hills Iowa 2008 10 (TE) 10. Archaeological planning & research RURAL Statewide $119,710 $0 $51,305 $171,015
Various County Roads - Roadside Vegetation EROSIAN CONTROL AT VARIOUS LOCATIONS IN THE COUNTY. DELAY WAITING FOR FINAL PAPER WORK AND AUDIT Iowa 1999 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity RURAL LINN $80,000 $0 $20,000 $100,000
Enhancement of Education about 20th & 21st Centuries Rail Transportation This project allows the museum to expand exhibits about passenger and freight transportation in the 20th and 21st century railroading. Iowa 2008 12 (TE) 12. Establishment of transportation museums COUNCIL BLUFFS POTTAWATTAMIE $265,000 $0 $238,500 $503,500
Territorial Transportation and Railroad Museum Territorial Transportation and Railroad Museum Iowa 1995 12 (TE) 12. Establishment of transportation museums MARQUETTE CLAYTON $76,300 $0 $19,100 $95,400
Four Mile Creek Greenway Trail from Ankeny to Neal Smith Trail (RTC rail-trail database). Neal Smith Saylorville DM River to NW 2nd Ave. PCC Trail Iowa 2004 12 (TE) 12. Establishment of transportation museums RURAL POLK $319,800 $0 $446,800 $766,600
National Mississippi River Museum & Aquarium Rivers Center, Phase III Project was Locally Let. Contractor J.P. Cullen & Sons, Inc Iowa 2007 12 (TE) 12. Establishment of transportation museums DUBUQUE DUBUQUE $4,530,695 $0 $1,719,305 $6,250,000
Laura Ingalls Wilder Museum in Burr Oak For the installation of a new roof on the hotel and heat/AC/insulation to lengthen the tourism season Iowa 2000 12 (TE) 12. Establishment of transportation museums RURAL WINNESHIEK $17,870 $0 $4,926 $22,796
Mid America Transportation Museum Wing Airport - Construction of the Mid American Transportation to Air Museum Building Iowa 2005 12 (TE) 12. Establishment of transportation museums SIOUX CITY WOODBURY $1,078,428 $0 $1,283,372 $2,361,800
Lewis and Clark Keelboat Exhibit - Phase 1 & 2 Lewis & Clark Keelboat Exhibit, Phase 1-construction of a facility to house the boat for educational display purposes. Iowa 2003 12 (TE) 12. Establishment of transportation museums RURAL WOODBURY $850,000 $0 $1,041,175 $1,891,175
Grinnell Transportation Museum -Spaulding Historic Site Acquisition and Stabilization Project For purchase, stabilization, and engineering work for the Spaulding Buggy Works & Automobile Factory Complex Iowa 2002 12 (TE) 12. Establishment of transportation museums GRINNELL POWESHIEK $978,000 $0 $7,022,000 $8,000,000
Iowa Transportation Museum-Phase One Buildings IA Transportation Museum-Rehabilitation of the Adinistratiion Building and Link Building (aka Phase One Buildings) Iowa 2008 12 (TE) 12. Establishment of transportation museums GRINNELL POWESHIEK $750,000 $0 $187,500 $937,500
Iowa Transportation Museum, Emergency Repairs Iowa Transportation Museum, Emergency Repairs Iowa 2007 12 (TE) 12. Establishment of transportation museums GRINNELL POWESHIEK $4,098,790 $0 $1,578,972 $5,677,763
Iowa Transportation Museum, National Transportation Heroes Center Nat'l Transportation Heroes Center&Regional Transp. Library. Iowa 2006 12 (TE) 12. Establishment of transportation museums GRINNELL POWESHIEK $4,098,790 $0 $1,024,697 $5,123,487
Iowa Transportation Museum, Phase 2 For continued development of the museum, research library, restoration lab, and conference center. Iowa 2006 12 (TE) 12. Establishment of transportation museums GRINNELL POWESHIEK $500,000 $0 $2,985,000 $3,485,000
Carnegie Library Cultural Museum Restoration (Phase 1) To transform the 1904 Carnegie Library into a transportation and cultural museum . Interactive electronic and video displays Iowa 2001 12 (TE) 12. Establishment of transportation museums COUNCIL BLUFFS POTTAWATTAMIE $200,000 $0 $650,000 $850,000
Restoration/Preservation of BN Depot WW II Museum For Phase II and III of the project - includes restoring interior infrastructure, heating/cooling; plumbing; electricity, museum installation Iowa 2000 12 (TE) 12. Establishment of transportation museums RED OAK MONTGOMERY $119,937 $0 $54,475 $174,412
Centerville Safe Routes to School - Phase I Centerville Safe Routes to School - Phase I Iowa 2010 301 (TE) 301. Safe routes to school infrastructure CENTERVILLE APPANOOSE $10,000 $0 $249,595 $259,595