Project Search Results

Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Back to Search Page
Project Name Description State Year Activity Activity Type City County Federal Funds ARRA Funds Local Funds Total
Durham Construct sidewalks, crosswalks, lighting and landscaping along Main Street on the University of New Hampshire Campus New Hampshire 2017 101 (OTHER) 101. Construction, planning, and design of on-road and off-road trail facilities Durham Strafford $394,665 $0 $98,666 $493,331
Exeter Widen shoulders to 5' on Kingston Road (NH Route 111) for approximately 1.1 miles. (14-26TAP) New Hampshire 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Exeter Rockingham $600,000 $0 $150,000 $750,000
Colebrook Reconstruction of approximately 2700’ of US 3/Main Street from South Main Street traffic island to Beaver Brook is an eligible project for funding under the Federal Aid Highway Program created under the FAST-ACT (Fixing America’s Surface Transportation Act) and to construct lighting, crosswalks and sidewalks along Main Street New Hampshire 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Colebrook Coos $2,008,967 $0 $502,242 $2,511,209
Brookline Construct a sidewalk from Route 130 to the recently created rail trail off South Main Street and construct a 60-foot pedestrian bridge over the Nissitissit River near the Town Beach, plus approximately 100 feet of sidewalk New Hampshire 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Brookline Hillsborough $588,000 $0 $147,000 $735,000
Hillsborough Construct approximately 4,600 feet of sidewalk along NH Route 149 New Hampshire 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Hillsborough Hillsborough $530,765 $0 $132,691 $663,456
Exter Construct sidewalks on Epping Road, Winter Street and Spring Street New Hampshire 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Exter Rockingham $504,500 $0 $126,125 $630,625
Hinsdale Construct sidewalks along Brattleboro Road New Hampshire 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Hinsdale Cheshire $439,835 $0 $109,959 $549,794
Nashua Construct multi-use path and pedestrian bridge over the Nashua Canal (14-08TAP) New Hampshire 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Nashua Hillsborough $400,000 $0 $100,000 $500,000
Claremont Const. Sidewalks along East Street and improve Bobby Woodman Trail for non-motorized use (14-21TAP) New Hampshire 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Claremont Sullivan $477,519 $0 $119,380 $596,899
Merrimack Construct Multi-use path in the town of Merrimack for approximatly 2,500LF. (14-15TAP) New Hampshire 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Merrimack Hillsborough $436,000 $0 $109,000 $545,000
Keene Construct 11,695' of shared lane and bike lane markings. (14-42TAP) New Hampshire 2016 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Keene Cheshire $329,292 $0 $82,323 $411,616
Dover Improve existing path from Knox Marsh Road to Bellamy Road, construct a new multi-use path from Bellamy Road to Dover Middle School and construct sidewalks along Durham Road New Hampshire 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Dover Strafford $320,000 $0 $80,000 $400,000
Littleton Construct sidewalks along Cottage Street, Mill Street, South Street, Meadow Street, Mt. Eustis Road and Bronson Street and connection to Suspension Bridge New Hampshire 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Littleton Grafton $806,203 $0 $201,551 $1,007,754
Brookline Construct Sidewalks on NH Route 130 and Construct Sidewalks on Old Milford Road (14-14TAP) New Hampshire 2015 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Brookline Hillsborough $440,000 $0 $110,000 $550,000
Berlin Construct a multi-use path along the Androscoggin river from the Service Credit Union Heritage Park to the 12th Street Bridge New Hampshire 2017 101 (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities Berlin Coos $760,086 $0 $190,021 $1,531,252
Manchester Construct a Rail Trail along the abandoned railroad bed from Mammoth Road to Lake Shore Avenue New Hampshire 2017 103 (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users Manchester Hillsborough $843,545 $0 $210,886 $1,054,431
Salem Construct approximatly 3,000' of multi-use path along the existing M&L rail corridor. (14-40TA) New Hampshire 2016 106 (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities Salem Rockingham $326,400 $0 $81,600 $408,000
Dover Const multi-use path to connect 2 portions of the Dover Community Trail, which are gaps (14-27TAP) New Hampshire 2016 106 (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities Dover Strafford $320,000 $0 $80,000 $400,000
NH 108, CONSTRUCT 2600' SIDEWALK FROM WEEKS CROSSING TO SOUTHERN LIMIT OF THE DOVER - SOMERSWORTH #12608 PROJECT [96-28TE] Project to Advertise with Dover 12608. Design Underway. New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Dover Strafford $315,806 $0 $78,947 $394,753
Picataqua Riverwalk: Construct 400 LF of pedestrian facility and pier along the Piscataqua River paralleling Bow St. Design underway. Multifunded with 993,830 of non-federal earmarked funds. City requested delay in construction funds to 2010 New Hampshire 2003 1 (TE) 1. Pedestrian and bicycle facilities Portsmouth Rockingham $500,000 $0 $942,830 $1,442,830
NH 111, SCHOOL ZONE SIDEWALK IMPROVEMENTS: CONSTRUCT 0.2 MILES OF SIDEWALK ALONG NH 111 CONNECTING ELEMENTARY SCHOOLS WITH THE TOWN AMENITIES (TE Program) [06-42TE] Design underway. Requesting more funds from TEAC. New Hampshire 2007 1 (TE) 1. Pedestrian and bicycle facilities North Hampton Rockingham $228,384 $0 $57,096 $285,480
HERITAGE TRAIL, CONSTRUCT 500' NASHUA RIVERWALK GREENWAY CORRIDOR - EXTENSION OF HERITAGE TRAIL [94-39TE] Construction complete. New Hampshire 1999 1 (TE) 1. Pedestrian and bicycle facilities Nashua Hillsborough $203,840 $0 $50,960 $254,800
Bristol CENTRAL SQUARE, PEDESTRIAN / BICYCLE IMPROVEMENT [09-05TE] New Hampshire 2010 1 (TE) 1. Pedestrian and bicycle facilities Bristol Grafton $397,600 $0 $99,400 $497,000
MAIN, HIGHLAND, LANGDON STREETS, MAIN ST, REFURBISH 600' OF EXIST'N SIDEWALK ON EAST & W.SIDE INCLUDING FRONT LAWN & VET. MEMORIAL [94-29TE], HIGHLAND ST, EXTEND EXIST'N SIDEWALK 3000' ON W.END [94-28TE], LANGDON ST, EXTEND EXIST'N SIDEWALK 900' TO LINK S Construction complete. New Hampshire 2001 1 (TE) 1. Pedestrian and bicycle facilities Plymouth Grafton $205,208 $0 $51,302 $256,510
CENTRAL SQUARE, PEDESTRIAN IMPROVEMENTS AT CENTRAL SQUARE (5 POINT INTERSECTION) [02-24TE] (Brick & mortar construction to improve appearance & function of Central Square and to also bring the pedestrian facilities into compliance with the American Disab Construction complete. Project multi-funded with State-Aid highway funds. New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Hillsborough Hillsborough $346,652 $0 $124,907 $471,560
VARIOUS ROUTES, REHABILITATION OF SIDEWALK IN CANAAN VILLAGE AREA [93-25TE] Construction Complete. Project multifunded with STP Funds. New Hampshire 1996 1 (TE) 1. Pedestrian and bicycle facilities Canaan Grafton $26,042 $0 $6,510 $32,553
US 202 / NH 31 MAIN STREET, REHABILITATION PHASE 2: CONTINUE EXISTING PROJECT TO RECONSTRUCT SIDEWALKS, SHOULDERS AND DRAINAGE TO IMPROVE THE DOWNTOWN PEDESTRIAN FACILITIES AND COMPLETE TRAFFIC CALMING AND PEDESTRIAN FLOW IMPROVEMENTS (TE Program) [06-0 Complete New Hampshire 2007 1 (TE) 1. Pedestrian and bicycle facilities Antrim Hillsborough $284,682 $0 $122,006 $406,688
US 202 / NH 9, STONE ARCH BRIDGE ENHANCEMENT PROJECT: SW & SE CORNERS OF THE INTERSECTION OF NH 9 / US 202: CONSTRUCT VISITOR'S KIOSK & SMALL PARKING AREA (6 SPACES), NEW TOP SURFACE FOR BRIDGE, PED/BIKE TRAILS LINKING SITE TO SURROUNDING BUSINESSES, CA Under Construction New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Hillsborough Hillsborough $99,450 $150,045 $34,862 $284,358
NORTH STATE STREET, 500' PEDESTRIAN CORRIDOR, UPGRADE-VEHICULAR TRAFFIC [94-17TE] Construction Complete. New Hampshire 1999 1 (TE) 1. Pedestrian and bicycle facilities Concord Merrimack $93,158 $0 $23,289 $116,448
NH 108, CONSTRUCT 4' BIKE SHOULDERS NORTH OF US 4 BYPASS BETWEEN CANNEY ROAD AND BAGDAD ROAD TO COMPLETE MISSING LINK ON BIKE NETWORK (0.4MI) ON MPO BIKE ROUTE [98-16TE] Construction Complete. New Hampshire 2005 1 (TE) 1. Pedestrian and bicycle facilities Durham Strafford $431,128 $0 $107,782 $538,910
COMPLETE PEDESTRIAN CONNECTIONS FROM CONFERENCE CENTER TO MULTI-MODAL TRANSPORTATION CENTER & DOWNTOWN [00-16TE] Complete New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Concord Merrimack $276,000 $0 $69,000 $345,000
HUTCHINS, TWELFTH & UNITY STREETS, CONSTRUCT APPROX. 5100' OF SIDEWALK ALONG SEGMENTS 2 (Hutchins/Twelfth)[94-35TE] & 3 (Unity)[96-41TE(Old12629)] Projects 12282 & 12629 combined with this project. Construction completed 10/98. New Hampshire 2002 1 (TE) 1. Pedestrian and bicycle facilities Berlin Coos $379,800 $0 $94,950 $474,750
OSSIPEE LAKE ROAD, CONSTRUCT PEDESTRIAN / BIKE PATH (5.6 MI) AROUND LAKE OSSIPEE TO COMPLETE 21.3 FACILITY; TO ENCOURAGE BIKE & WALKING AS ALTERNATIVE TO MOTORIZED TRANSPORTATION [NBPA][98-40TE] Construction Complete. Project Closed. New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Ossipee Carroll $285,875 $0 $71,468 $357,344
HEATER ROAD, CONSTRUCT PEDESTRIAN WALKWAY FROM NH 120 TO I-89 [94-70TE] Construction complete. New Hampshire 2003 1 (TE) 1. Pedestrian and bicycle facilities Lebanon Grafton $320,573 $0 $80,143 $400,716
Sanbornville/Paul School sidewalk project: construct 3,740 LF of 5' wide pedestrian/bicycle ways that link the elementary /middle school with the adjacent neighborhoods and town center. Design to begin 2008 New Hampshire 2007 1 (TE) 1. Pedestrian and bicycle facilities Wakefield Carroll $175,200 $0 $43,800 $219,000
WEIR'S BOARDWALK, RECONSTRUCT MIDDLE SECTION, INSTALL SIDEWALK AND FENCE AND LANDSCAPE [93-41TE] Construction complete. New Hampshire 1996 1 (TE) 1. Pedestrian and bicycle facilities Laconia Belknap $186,012 $0 $46,503 $232,516
NEWPORT ROAD, CONSTRUCT CURBING & SIDEWALK ON SOUTHSIDE BETWEEN MAIN STREET & COUNTY ROAD [98-54TE] Construction Complete. Project to be closed. New Hampshire 2003 1 (TE) 1. Pedestrian and bicycle facilities New London Merrimack $302,400 $0 $75,600 $378,000
US 4, CONSTRUCT SIDEWALKS IN AREA OF ELEMENTARY SCHOOL [93-03TE] Construction complete. New Hampshire 1997 1 (TE) 1. Pedestrian and bicycle facilities Enfield Grafton $186,591 $0 $46,647 $233,239
NH 25, CONSTRUCT PATHWAY TO CONNECT NH 25 WITH TOWN BEACH ALONG MOULTONBOROUGH NECK ROAD [00-66TE] Construction Complete. Project to be closed. New Hampshire 2003 1 (TE) 1. Pedestrian and bicycle facilities Moultonborough Carroll $296,690 $0 $79,063 $375,754
NH 27, CONSTRUCT BIKE SHOULDERS [98-02TE] Construction Complete. Project to be closed. New Hampshire 2005 1 (TE) 1. Pedestrian and bicycle facilities Exeter Rockingham $291,677 $0 $72,919 $364,597
NH 11, CONSTRUCT 0.6 MILE SIDEWALK WITH GRANITE CURB WHICH WILL COMPLETE SIDEWALK FROM ALTON VILLAGE TO ALTON BAY [96-56TE] Construction Complete. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Alton Belknap $311,321 $0 $77,830 $389,151
NH 132 (East Side Drive), CONSTRUCT SIDEWALKS / BIKE SHOULDERS TO FILL IN GAPS FROM I-393, EXIT 2, TO LOUDON ROAD (NH9); INCLUDES CURBING, DRAINAGE, ADA COMPLIANT RAMPS [98-37TE] Construction Complete. Project to be closed. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Concord Merrimack $259,141 $0 $148,141 $407,283
Durham NH 155A Main St. improvements - construct sidewalks, multi-use paths and bicycle shoulders along NH 155A for approximately 1.1 miles approaching the UNH campus and downtown Durham. New Hampshire 2009 1 (TE) 1. Pedestrian and bicycle facilities Durham Strafford $143,200 $758,258 $223,688 $1,125,147
NH 3A, CONSTRUCT 1.7 MILE MULTI-USE TRAIL TO REMOVE PEDESTRIAN / BICYCLE TRAFFIC FROM HIGHLY CONGESTED ROUTE [96-57TE] Construction complete New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Bristol Grafton $535,705 $0 $133,926 $669,631
WINNIPESAUKEE RIVER TRAIL PHASE 2: CONSTRUCT TRAIL FROM PARK STREET IN NORTHFIELD THROUGH TILTON AND CROSS OVER OF NH 140 IN TILTON AND THROUGH THE CORRIDOR TO THE BELMONT T/L [02-22TE] Franklin - Northfield - Tilton New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities 0 Multiple $129,242 $429,646 $32,310 $591,199
MAIN STREET & BROAD STREET, CONSTRUCT 2400' OF NEW SIDEWALK WITHIN THE HISTORICAL TOWN CENTER TO IMPROVE PEDESTRIAN SAFETY AND CIRCULATION [96-09TE] Construction complete. New Hampshire 2002 1 (TE) 1. Pedestrian and bicycle facilities Hollis Hillsborough $295,559 $0 $73,889 $369,449
NORTH MAIN ST, KING ST SIDEWALK CONNECTOR: CONSTRUCT SIDEWALKS ALONG NORTH MAIN ST FROM EXISTING SIDEWALK TO INTERSECTION OF US 3/4 & FROM US 3/4 INTERSECTION TO RIVER RD CONNECTING WITH EXISTING SIDEWALK ON KING ST. PROVIDE PED WALK SIGNAL AND CROSS W Complete New Hampshire 2007 1 (TE) 1. Pedestrian and bicycle facilities Boscawen Merrimack $71,401 $440,231 $21,098 $532,731
NH 28, CONSTRUCT 5000' SIDEWALK FROM SOUTH WOLFEBORO TO KINGSWOOD REGIONAL HIGH SCHOOL - PART OF WATER MAIN REPLACEMENT & ROAD WIDENING PROJ [94-49TE] Construction complete. New Hampshire 2001 1 (TE) 1. Pedestrian and bicycle facilities Wolfeboro Carroll $299,233 $0 $74,808 $374,042
MULTI-MODAL ROUTE, CONSTRUCT MULTI-MODAL PATH CONNECTING US 2 AND NH 16 SOUTH OF THE ST. LAWRENCE & ATLANTIC RAILROADS [94-22TE] & [98-71TE] Construction complete. Gorham 13094 funds combined with this project New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Gorham Coos $941,600 $0 $235,400 $1,177,000
VARIOUS, VILLAGE PEDESTRIAN IMPROVEMENTS: RECONSTRUCT APPROX. 2,800' OF ROADSIDE IN THE VILLAGE TO RESTORE DEFINITION OF PEDESTRIAN ACCESS BY WAY OF SIDEWALKS AND CROSSWALKS. RECONSTRUCT SIDEWALKS, DELINEATION OF ROADWAY AND PARKING WITH GRANITE CURBING Complete New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Bennington Hillsborough $117,150 $617,600 $67,105 $801,855
NH 119 (MAIN STREET), CONSTRUCT SIDEWALK (APPROX. 800') [98-65TE] Construction complete. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Hinsdale Cheshire $449,739 $0 $112,434 $562,174
NH 102, CONSTRUCT 4,000 LF OF 5' WIDE BITUMINOUS SIDEWALK ON ONE SIDE & CONSTRUCT 4,000 LF OF 4' WIDE BITUMINOUS & BICYCLE LANE ON ONE SIDE: LOCATED ON THE EAST SIDE OF NH 102 BETWEEN EVERGREEN DRIVE AND MEGAN DRIVE [02-27TE] Complete New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Hudson Hillsborough $87,489 $357,000 $37,495 $481,985
NH 155 (Knox Marsh Road), CONSTRUCT 1000' (250 Meters) OF SIDEWALK FOR ALTERNATE TRANSPORTATION TO CITY FACILITIES [94-13TE] construction complete New Hampshire 2000 1 (TE) 1. Pedestrian and bicycle facilities Dover Strafford $93,451 $0 $23,362 $116,814
US 4, CONSTRUCT CURBING, SIDEWALK, & BIKEWAY ALONG BOTH SIDES, BETWEEN NH 12A & MASCOMA RIVER BRIDGE [98-53TE] Construction complete. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Lebanon Grafton $299,563 $0 $74,890 $374,453
US 3, RECONSTRUCT 2500' OF SIDEWALK FOR SAFETY [94-51TE] Construction Complete. Project to be closed. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Meredith Belknap $175,818 $0 $43,954 $219,772
Enfield Construct a sidewalk along Maple St. from US 4 to the intersection of Laramie Farms Access Road providing connectivity from the neighborhood to Enfield Village New Hampshire 2008 1 (TE) 1. Pedestrian and bicycle facilities Enfield Grafton $86,500 $0 $86,500 $173,000
RIVER ROAD, CONSTRUCT 4' BIKE SHOULDER BETWEEN NH 16 & CATHEDRAL LEDGE ROAD (1.5 km) [98-81TE] Construction complete. New Hampshire 2005 1 (TE) 1. Pedestrian and bicycle facilities Conway Carroll $688,728 $0 $172,182 $860,910
Keene MULTI-USE PATH ALONG GILBO AVE AND COLONY MILL MARKET PLACE New Hampshire 2014 1 (TE) 1. Pedestrian and bicycle facilities Keene Cheshire $584,960 $0 $146,240 $731,200
MANCHESTER STREET, COMPLETION OF SIDEWALK EXTENSIONS & CONNECTIONS AROUND SCHOOL [94-42TE] Construction complete. New Hampshire 1999 1 (TE) 1. Pedestrian and bicycle facilities Nashua Hillsborough $289,837 $0 $74,849 $364,687
US 4, VILLAGE REDEVELOPMENT PLAN: A) US 4 - FOUR CORNERS TRAFFIC CALMING, PED. AND VEHICULAR SAFETY; B) DEPOT ST PED. AMENITIES & DESIGNATED PARKING SPACES; C) WILLIAMS FIELD PUBLIC PARKING, SCENIC IMPROVEMENT & FOOT/BIKE LINK TO DEPOT ST [02-10TE] Construction Complete. New Hampshire 2005 1 (TE) 1. Pedestrian and bicycle facilities Canaan Grafton $269,100 $0 $67,275 $336,375
ALBUQUERQUE AVENUE, ALBUQUERQUE AVENUE TRAIL COMPLETION: CONSTRUCT 0.85 MILES AND 0.95 MILES OF PEDESTRIAN BIKEWAY ADJACENT TO ALBUQUERQUE AVENUE (TE Program) [06-26TE] Complete New Hampshire 2007 1 (TE) 1. Pedestrian and bicycle facilities Litchfield Hillsborough $81,575 $394,477 $17,900 $493,952
US 3 / NH 113, INTERSECTION OF NH 113 WESTERLY TO NH 175, PEDESTRIAN / BICYCLE PATH & ROADWAY RECONSTRUCTION [94-47TE] Construction complete. New Hampshire 2002 1 (TE) 1. Pedestrian and bicycle facilities Holderness Grafton $150,000 $0 $37,500 $187,500
US 4 / MAIN STREET, CONSTRUCT BUS STOP & SHELTER TO PROMOTE PARK'N'RIDE OPTIONS FOR COMMUTERS [98-58TE] Construction complete New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Enfield Grafton $11,354 $0 $2,838 $14,193
New London ELKINS ROAD & WILMOT CENTER ROAD, PEDESTRIAN / BICYCLE IMPROVEMENTS IN ELKINS VILLAGE [09-34TE] New Hampshire 2010 1 (TE) 1. Pedestrian and bicycle facilities New London Merrimack $638,672 $0 $159,668 $798,340
OAK STREET, CONSTRUCT 1700' SIDEWALK ADJACENT TO OAK ST. TO / THROUGH DENSELY POPULATED AREA AND ENABLE RESIDENTS TO USE FACILITY AS ALTERNATIVE FORM OF TRANSPORTATION [96-31TE] Construction complete. New Hampshire 2003 1 (TE) 1. Pedestrian and bicycle facilities Dover Strafford $115,168 $0 $28,792 $143,960
NH 16 & NH 16A, RECONSTRUCT SIDEWALK ALONG NH 16 AND 16A THROUGH VILLAGE [00-42TE] Construction complete. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Jackson Carroll $134,722 $0 $33,680 $168,402
NH 103, LAKE SUNAPEE WATERFRONT PEDESTRIAN IMPROVEMENTS: NH 103 SIDEWALK AND LIGHTING IMPROVEMENTS LINKING TOWN AMENITIES (TE Program) [06-38TE] Construction Complete. New Hampshire 2007 1 (TE) 1. Pedestrian and bicycle facilities Newbury Merrimack $654,539 $0 $163,634 $818,174
NH 3A, CONSTRUCT SIDEWALKS FROM BIRCH STREET TO CENTRAL STREET [98-23TE] Complete New Hampshire 2005 1 (TE) 1. Pedestrian and bicycle facilities Hudson Hillsborough $253,891 $0 $209,236 $463,127
US 4, BIKE & PEDESTRIAN IMPROVEMENTS ALONG US 4 NEAR I-89, EXIT 19 [00-52TE] Construction complete New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Lebanon Grafton $268,741 $0 $47,200 $315,941
NH 108 (Durham Rd), CONSTRUCT IMPROVED SHOULDERS, STRIPING & SIGNAGE FROM BACK RIVER ROAD TO MADBURY T/L (APPROX 2.5 MI) - PROVIDE BETTER BICYCLE FACILITIES [96-29TE] Project to be Closed. New Hampshire 2003 1 (TE) 1. Pedestrian and bicycle facilities Dover Strafford $146,652 $0 $36,663 $183,316
WESTSIDE ROAD, CONSTRUCT 4' BIKE LANES ON BOTH SIDES OF ROAD - 3.0 MILES [93-48TE] Construction complete. New Hampshire 1998 1 (TE) 1. Pedestrian and bicycle facilities Conway Carroll $300,033 $0 $75,008 $375,041
NEWPORT RD / COUNTY RD, INSTALL 800' SIDEWALK NORTH SIDE OF NEWPORT RD, INSTALL 1000' SIDEWALK WEST SIDE OF COUNTY RD. INTERSECTION IMPROVEMENTS (Traffic Signal or Modern Roundabout) [04-46TE] Under construction. New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities New London Merrimack $670,533 $0 $203,522 $874,056
EAST DUNSTABLE, COMPLETION OF A 1600' CONTINUOUS SIDEWALK FROM KLONDIKE ST. TO PHILLIPS ST. PLUS TWO GAPS ADDING TO 125' [96-08TE] Project complete. New Hampshire 2002 1 (TE) 1. Pedestrian and bicycle facilities Nashua Hillsborough $92,260 $0 $23,065 $115,326
NH 108, SIDEWALKS SOUTH OF TOWN CENTER - CONSTRUCT NEW 2040' SIDEWALK ON EAST SIDE OF NH 108 FROM 400' SOUTH OF IRVING TO B&M RAIL LINE. CONSTRUCT NEW 4' PAVED SHOULDERS ON BOTH SIDES SAME AREA [98-19TE] Construction Complete. Project can be closed. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Newmarket Rockingham $199,238 $0 $49,809 $249,047
HILLSIDE AVENUE, REPLACEMENT OF OLD SIDEWALKS [02-05TE] Complete New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Berlin Coos $161,598 $0 $40,561 $202,159
CONSTRUCT 1500' OF SIDEWALK TO CONNECT SCHOOL TO LIBRARY, STORE, & HISTORICAL BUILDING [00-34TE] Construction complete. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Gilford Belknap $58,848 $0 $14,712 $73,560
NH 121A & ELM STREET, CONSTRUCT SIDEWALKS ALONG ELM STREET AT TOWN HALL & ALONG MAIN STREET, FROM TOWN HALL TO THE PUBLIC LIBRARY [98-05TE] Construction Complete. Project to be closed. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Plaistow Rockingham $168,577 $0 $47,202 $215,780
GEREMONTY DRIVE, CONSTRUCT 2815' OF SIDEWALK ALONG GEREMONTY DRIVE & VETERAN MEMORIAL PARKWAY to FREEDOM DRIVE [94-61TE] Construction complete. New Hampshire 1998 1 (TE) 1. Pedestrian and bicycle facilities Salem Rockingham $91,492 $0 $23,053 $114,546
NH 108, CONSTRUCT 4' BIKE SHOULDERS FROM OYSTER RIVER BRIDGE TO DAME ROAD AND SANBORN AVE IN NEWMARKET (3.4MI) STP & [98-17TE] Project Split into 2 projects. 13080A/B New Hampshire 2005 1 (TE) 1. Pedestrian and bicycle facilities 0 Multiple $4,125,172 $0 $1,031,293 $5,156,466
MAIN STREET / SHAKER HILL ROAD, (MAIN ST) CONSTRUCT APPROX. 935' OF SIDEWALK ALONG NORTHERN SIDE BETWEEN US 4 & HIGH STREET [98-52TE], (SHAKER HILL RD) CONSTRUCT APPRX. 1045' OF CURBING & SIDEWALK ALONG EASTERN SIDE BETWEEN RAILROAD UNDERPASS & PILLSBURY Project combined with bridge project 10652. New Hampshire 2005 1 (TE) 1. Pedestrian and bicycle facilities Enfield Grafton $30,276 $0 $7,569 $37,846
ROCKINGHAM BRIDGE, CONSTRUCT BIKEWAY FOR PEDESTRIAN/ BIKE SPANNING SPAULDING TPK FROM ASHLAND ROAD RAMP OVER I-95 [94-62TE] $767,524 other Federal Funds used on this Project in addition to TE. Construction complete. New Hampshire 2000 1 (TE) 1. Pedestrian and bicycle facilities Portsmouth Rockingham $659,591 $0 $164,897 $824,488
US 302, CONSTRUCT 1.2m BIKE SHOULDERS ON SOUTHERN END OF CRAWFORD NOTCH (1.6MI) INCLUDING THE REHABILITATION OF DAVIS BROOK BRIDGE - 168/084 [98-79TE] Project Multifunded With NHS Funds ($787,582). Construction complete. New Hampshire 2003 1 (TE) 1. Pedestrian and bicycle facilities Harts Location Carroll $236,559 $0 $59,140 $295,699
MAIN STREET, ASH STREET, BROAD STREET, CONSTRUCT SIDEWALK ON MAIN ST, ASH ST, & BROAD ST [00-40TE] Project delayed to 2009 at the request of the Town. Scope changed to construct sidewalks along Ash Street only. Approved at the February 13, 2008 TEAC meeting. Construction to begin in 2011 New Hampshire 2002 1 (TE) 1. Pedestrian and bicycle facilities Hollis Hillsborough $296,090 $0 $74,023 $370,113
EAST MAIN STREET, CONSTRUCT 1400 FEET OF SIDEWALK ON NORTH SIDE OF E. MAIN ST. FROM AGWAY DRIVE TO THE EXISTING SIDEWALK AT GRANT ST AND RECONSTRUCT 1400 FEET SIDEWALK ALONG US 3 / NH 11 WITH 4' SHOULDERS BOTH SIDES [96-59TE] Construction Complete. New Hampshire 2004 1 (TE) 1. Pedestrian and bicycle facilities Tilton Northfield Belknap $673,412 $0 $139,700 $813,112
SHAKER HILL RD / MAIN ST, REPLACE BRIDGES OVER MASCOMA RIVER - 083/156 & 081/154 AND (MAIN ST) CONSTRUCT APPROX. 935' OF SIDEWALK ALONG NORTHERN SIDE BETWEEN US 4 & HIGH ST [98-52TE], (SHAKER HILL RD) CONSTRUCT APPRX. 1045' OF CURBING & SIDEWALK ALONG EAS Construction Complete. Multi-Funded. New Hampshire 2006 1 (TE) 1. Pedestrian and bicycle facilities Enfield Grafton $200,000 $0 $50,000 $250,000
PUBLICATION OF A COVERED BRIDGE DOCUMENT [93-__TE] Covered Bridge Book was published August 1994. New Hampshire 1997 4 (TE) 4. Scenic or historic highway programs including tourist and welcome centers Statewide Statewide $5,447 $0 $0 $5,447
COURT STREET, ENHANCE 500' OF SCENIC HIGHWAY, LANDSCAPING / CONSTRUCT FOOT PATH - COURT STREET to BELKNAP MALL [94-48TE] Construction complete. New Hampshire 2000 5 (TE) 5. Landscaping and scenic beautification Laconia Belknap $30,401 $0 $7,600 $38,001
Amherst Town hall beautification and safety: add green space immediately in front of Town Hall and in front of an adjoining old burial ground. Improve pedestrian safety and reduce paved surfaces which will reduce stormwater runoff. New Hampshire 2008 5 (TE) 5. Landscaping and scenic beautification Amherst Hillsborough $193,687 $0 $48,421 $242,109
SHAKER ROAD, LANDSCAPING TO ENHANCE SCENIC BEAUTY, ETC. [94-20TE] Construction Complete. New Hampshire 1999 5 (TE) 5. Landscaping and scenic beautification Canterbury Merrimack $132,264 $0 $33,066 $165,330
RESTORATION OF THE \FLYING YANKEE\" TRAIN TO BE A MOVING HISTORIC EXHIBIT, EDUCATION PROGRAM AND EXCURSION TRAIN" Under Construction. Additional $600K approved by TEAC 2002. NON Participating $ = $1.086m New Hampshire 2002 6 (TE) 6. Historic preservation 0 Multiple $1,400,000 $0 $1,436,165 $2,836,165
TRAIN DEPOT, HUDSON CENTER TRAIN STOP DEPOT - RELOCATION AND RESTORATION OF FORMER HUDSON CENTER TRAIN DEPOT, WORCESTER, NASHUA, & PORTLAND RAILROAD BUILT IN 1873 [04-25TE] Town requested a delay in construction to 2009. New Hampshire 2006 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Hudson Hillsborough $269,679 $0 $89,893 $359,572
RESTORE STRATFORD RR STATION [00-101TE] Construction Complete. Project to be Closed. New Hampshire 2005 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Stratford Coos $80,000 $0 $20,000 $100,000
RESTORATION AND RENOVATION OF HISTORIC STRATFORD GRAND TRUNK RR STATION [04-60TE] PHASE II AND [06-52TE] PHASE III Under construction. Combined with Stratford 14733. New Hampshire 2006 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Stratford Coos $186,624 $0 $46,656 $233,280
REHABILITATE WINDHAM DEPOT AS VISITORS CENTER / MUSEUM / WAY STATION ON SALEM - CONCORD BIKEWAY / RAIL TRAIL: ALSO MAKE IMPROVEMENTS TO PARKING AREAS (TE Program) [06-59TE] complete New Hampshire 2007 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Windham Rockingham $104,432 $159,977 $20,663 $285,074
RESTORE UTILITY BRIDGE OVER NASHUA RIVER TO ACCOMMODATE PATHWAY CROSSING [00-67TE] Construction Complete. Project to be Closed. New Hampshire 2006 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Nashua Hillsborough $840,000 $0 $372,000 $1,212,000
US 2, RAILROAD STATION RENOVATION [93-39TE] Construction complete. New Hampshire 1995 7 (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities Gorham Coos $26,816 $0 $6,704 $33,520
PHASE III - RAILROAD, PISCATAQUOG TRAILWAY PHASE II- CONTINUE IMPROVEMENTS ON ABANDONED RAIL CORRIDOR FROM A POINT PARALLEL TO DOUGLAS ST TO ELECTRIC ST (0.9 MI) (TE Program) [04-33TE] Construction Complete. Project to be coordinated with Phase II (Manchester-Weare 13898). New Hampshire 2007 8 (TE) 8. Conversion of abandoned railway corridors to trails Manchester Hillsborough $575,573 $0 $143,893 $719,466
WAUKEWAN STREET, WAUKEWAN SIDEWALK AND MULTI-USE PATHWAY: CONSTRUCT 5' WIDE SIDEWALK WITH GRANITE CURB FOR APPROXIMATELY 3110 LF ON WAUKEWAN STREET; CONSTRUCT 6-8' WIDE MULTI USE PATH FOR APPROXIMATELY 2650 LF LOCATED ALONG THE NHDOT RAIL CORRIDOR [02- Construction Complete. New Hampshire 2006 8 (TE) 8. Conversion of abandoned railway corridors to trails Meredith Belknap $208,069 $0 $52,161 $260,230
PONDICHERRY RAILWAY CORRIDOR (MCRC), ACQUISITION OF 1.5 MILES OF THE PONDICHERRY RAILROAD CORRIDOR FROM HAZEN ROAD (Whitefield) TO WAUMBEK JUNCTION (Jefferson) - CORRIDOR PRESERVATION FOR RECREATIONAL USE [96-40TE] ROW acquired New Hampshire 2001 8 (TE) 8. Conversion of abandoned railway corridors to trails Jefferson Coos $32,835 $0 $8,208 $41,044
FARMINGTON BRANCH RR, ACQUISITION OF 6 MILES OF ABANDONED CORRIDOR FOR RECREATIONAL PURPOSES [96-70TE] ROW acquired. New Hampshire 1999 8 (TE) 8. Conversion of abandoned railway corridors to trails Farmington Strafford $161,405 $0 $40,351 $201,756
B&M ACTON TRACKS, ROW PURCHASE FOR PEDESTRIAN/BIKE TRAIL ON A PORTION OF THE B&M ACTON TRACKS BETWEEN MASS S/L & DEPOT ROAD [98-33TE] Acquisition complete. Project to be closed. New Hampshire 2001 8 (TE) 8. Conversion of abandoned railway corridors to trails Nashua Hillsborough $37,135 $0 $9,283 $46,418
Andover NORTHERN RAIL TRAIL: IMPROVEMENTS: CONSTRUCT LEDGE PACK SURFACE ON NORTHERN RAIL CORRIDOR FROM DANBURY THROUGH WILMOT AND ENDING IN ANDOVER. APPROX. 8.3 MILES IN LENGTH New Hampshire 2008 8 (TE) 8. Conversion of abandoned railway corridors to trails Andover Merrimack $268,712 $0 $67,186 $335,898
MAINE CENTRAL RAILROAD, ACQUISITION OF ROW AND INFRASTRUCTURE OF THE MTN DIVISION BRANCH OF MAINE CENTRAL RR ME/NH TO WHITEFIELD [93-09TE] Conway - Whitefield New Hampshire 1996 8 (TE) 8. Conversion of abandoned railway corridors to trails 0 Multiple $2,064,817 $0 $516,204 $2,581,021
PHASE 2: DEVELOPMENT OF THE FORMER MANCHESTER & NO. WEARE RAILROAD INTO AN ALTERNATIVE TRANS. SYSTEM & REC. TRAIL; CONSTRUCT REMAINING 1.3 MILES ABANDONED RAILROAD IN MANCHESTER WHICH EXTENDS FROM WEST SIDE OF SO. MAIN ST TO GOFFSTOWN [02-38TE] Construction Complete. Project to be coordinated with Manchester 14412. New Hampshire 2006 8 (TE) 8. Conversion of abandoned railway corridors to trails Manchester Hillsborough $447,107 $0 $111,875 $558,982
Nashua RAIL CORRIDOR, EAST OF MAIN STREET, PURCHASE RAIL CORRIDOR AT VARIOUS LOCATIONS [09-32TE] New Hampshire 2010 8 (TE) 8. Conversion of abandoned railway corridors to trails Nashua Merrimack $280,104 $0 $70,026 $350,130
Belmont Phase 2, Lake Winisquam Scenic Trail: Construct hardpack gravel surface, 8' wide from US 3 in Belmont to Jefferson Rd. in Belmont. New Hampshire 2008 8 (TE) 8. Conversion of abandoned railway corridors to trails Belmont Belknap $349,905 $0 $87,476 $437,382
GOFFSTOWN BRANCH RR, PLANNING AND ENGINEERING TO FURTHER DEVELOP THE GOFFSTOWN BRANCH RR LINE FOR ALTERNATE TRANSPORTATION CORRIDOR Project complete. New Hampshire 2001 8 (TE) 8. Conversion of abandoned railway corridors to trails Manchester Hillsborough $33,188 $0 $8,297 $41,485
FORT HILL RR CORRIDOR, PURCHASE 9 MILES OF THE FORT HILL RR CORRIDOR [93-21TE] ROW aquired. Project complete. New Hampshire 1999 8 (TE) 8. Conversion of abandoned railway corridors to trails Hinsdale Cheshire $301,345 $0 $75,336 $376,681
PEDESTRIAN / BIKE PATH, PURCHASE ABANDONED B&M RR CORRIDOR (APPROX. 5.0MI) [98-48TE] ROW aquired. Project complete. New Hampshire 2004 8 (TE) 8. Conversion of abandoned railway corridors to trails Goffstown Hillsborough $348,000 $0 $87,000 $435,000
ASHUELOT RAIL TRAIL, ASHUELOT RAIL TRAIL IMPROVEMENT - IMPROVE 13,000' OF RAIL TRAIL BY IMPROVING EXISTING RR BED TO A CRUSHED GRANITE HARD PACK SURFACE. INSTALL BIKE STORAGE FACILITY AT TOWN-OWNED Trailhead PARKING AREA NEAR CRESSON COVERED BRIDGE (TE P Construction Complete New Hampshire 2007 8 (TE) 8. Conversion of abandoned railway corridors to trails Swanzey Cheshire $181,619 $0 $45,405 $227,024
HERITAGE TRAIL, CONSTRUCT 0.97 MI BIKE & PEDESTRIAN PATH ON ABANDONED CHESHIRE RR FROM MAIN STREET TO EASTERN AVE [96-69TE] Project complete. New Hampshire 2003 8 (TE) 8. Conversion of abandoned railway corridors to trails Keene Cheshire $304,189 $0 $76,047 $380,237
PEDESTRIAN / BIKE PATH, CONSTRUCT 2.0 MILES OF 8' WIDE PATH WITHIN RAILROAD CORRIDOR ALREADY PURCHASED BY NHDOT [98-47TE] Construction complete. New Hampshire 2003 8 (TE) 8. Conversion of abandoned railway corridors to trails Manchester Hillsborough $404,833 $0 $101,208 $506,041
PED-BIKE PATH, CONSTRUCT PEDESTRIAN BIKE PATH ON ACQUIRED NASHUA BRANCH RR [93-36TE] ROW purchase in FY 95. ROW transferred to city. New Hampshire 2002 8 (TE) 8. Conversion of abandoned railway corridors to trails Nashua Hillsborough $722,096 $0 $180,524 $902,620
HAMPTON BRANCH RR, ACQUISITION OF 4.5 MILES OF ABANDONED CORRIDOR FROM MASS S/L TO HAMPTON FOR RECREATIONAL PURPOSES [96-71TE] ROW acquired. New Hampshire 2004 8 (TE) 8. Conversion of abandoned railway corridors to trails Hampton Rockingham $231,948 $0 $57,987 $289,935
RAILROAD CORRIDOR, LANDSCAPING AND LIGHTING ASSOCIATED WITH THE 11918 PROJECT See project 11918 for time of selection information. New Hampshire 2002 8 (TE) 8. Conversion of abandoned railway corridors to trails Nashua Hillsborough $114,684 $0 $28,671 $143,355
CHESHIRE BRANCH RR, CHESHIRE BRANCH RAILROAD CORRIDOR ACQUISITION FROM FITZWILLIAM THROUGH TROY MARLBOROUGH, SWANZEY, KEENE, & SURRY TO WALPOLE - 43.2 MILES [94-03TE] (Trans.Enhance.Project) Fitzwilliam - Walpole New Hampshire 1999 8 (TE) 8. Conversion of abandoned railway corridors to trails Fitzwilliam Cheshire $829,333 $0 $194,833 $1,024,166
REMOVE SECOND STREET BRIDGE @ RAILROAD [94-16TE] Construction complete. New Hampshire 1997 8 (TE) 8. Conversion of abandoned railway corridors to trails Manchester Hillsborough $73,737 $0 $18,434 $92,172
MONADNOCK BRANCH RR CORRIDOR, CONSTRUCT MULTI-USE PATH ON ABANDONED RR CORRIDOR FROM RINDGE TO PETERBOROUGH [96-66TE] Construction Complete. New Hampshire 2004 8 (TE) 8. Conversion of abandoned railway corridors to trails Jaffrey Cheshire $553,600 $0 $138,400 $692,000
NH 108, CONSTRUCT BIKE PATH ALONG RAIL LINE FROM RAIL STATION TO NH 108 / BELLAMY PARK [00-20TE] Complete New Hampshire 2006 8 (TE) 8. Conversion of abandoned railway corridors to trails Dover Strafford $799,972 $0 $199,992 $999,964
PUBLIC ACCESS TRAIL, CONSTRUCT PUBLIC ACCESS TRAIL ON ABANDONED RR [93-45TE] Purchase completed. Construction funds not available due to increased purchase costs. (Ownership transferred to the city) New Hampshire 1998 8 (TE) 8. Conversion of abandoned railway corridors to trails Claremont Sullivan $258,011 $0 $64,502 $322,514
PORTSMOUTH BRANCH RR, ACQUISITION OF ABANDONED CORRIDOR IN MANCHESTER AND PART OF MANCHESTER-LAWRENCE BRANCH FOR RECREATIONAL PURPOSES [96-02TE] Portsmouth branch acquired in 1999. Manchester/Lawrence acquisition from city in 2002. Project Multifunded With Min-Guarantee Funds ($703,000). Project to be Closed. New Hampshire 2000 8 (TE) 8. Conversion of abandoned railway corridors to trails Manchester Hillsborough $1,348,593 $0 $337,148 $1,685,741
MULTI-USE PATH, ALONG WOLFEBORO BRANCH LINE RAILROAD; THIS IS A PORTION OF A LARGER PROJECT TO CONNECT WOLFEBORO, THROUGH BROOKFIELD, TO WAKEFIELD; THIS PHASE RUNS FROM FERNALD STATION TO COTTON VALLEY [96-34TE] Construction complete. Funding increase approved by TEAC. New Hampshire 2006 8 (TE) 8. Conversion of abandoned railway corridors to trails Wolfeboro Carroll $446,315 $0 $111,578 $557,893
PED-BIKE PATH, CONSTRUCT PEDESTRIAN BIKE PATH ON ACQUIRED B&M RR LAND [93-11TE] Construction Complete. Project to be closed. New Hampshire 2005 8 (TE) 8. Conversion of abandoned railway corridors to trails Rochester Strafford $244,225 $0 $61,056 $305,281
RAIL TRAIL ACQUISITION FROM MAIN STREET TO EAST HOLLIS STREET : PURCHASE THE REMAINING ABANDONED RAILROAD CORRIDOR THAT INCORPORATES WALKING AND BIKING FACILITIES, AND POSSIBLY MASS TRANSIT IN THE FUTURE (TE Program) [06-30TE] ROW aquired. Project closed. New Hampshire 2007 8 (TE) 8. Conversion of abandoned railway corridors to trails Nashua Hillsborough $416,736 $0 $104,184 $520,920
Manchester PISCATAQUOG TRAILWAYS, PHASE III - A REHABILITATE WOOD TRESTLE BRIDGE OVER PISCATAQUOG RIVER FOR MULTI-USE ACCESS AND CONST 1/2 MILE OF MULTI-USE TRAIL (TE Program) [Part of 04-33TE] New Hampshire 2009 8 (TE) 8. Conversion of abandoned railway corridors to trails Manchester Merrimack $592,800 $0 $148,200 $741,000
VARIOUS, ACQUISITION OF RAILROAD CORRIDORS (NHDOT) [98-01TE] Littleton to Whitefield acquired through advance construction in Fy 99. New Hampshire 2001 8 (TE) 8. Conversion of abandoned railway corridors to trails Statewide Statewide $372,050 $0 $93,012 $465,063
ASHUELOT RR CORRIDOR, ASHUELOT RAILROAD CORRIDOR ACQUISITION FROM HINSDALE THROUGH WINCHESTER & SWANZEY TO KEENE [94-03TE] (Trans.Enhance.Project) ROW aquired. Project complete. New Hampshire 1999 8 (TE) 8. Conversion of abandoned railway corridors to trails Hinsdale Cheshire $470,748 $0 $110,187 $580,936
ARCHEOLOGY PLANNING & RESEARCH 1st OF MULTI-PHASE PROGRAM - NHDOT/FHWA ARTIFACT COLLECTION [94-04TE] Project complete. New Hampshire 1995 10 (TE) 10. Archaeological planning & research 0 Merrimack $28,276 $0 $7,070 $35,346
REMOTE SENSING APPLICATIONS FOR NH ARCHEOLOGY-GROUND PENETRATING RADAR & PROTON MAGNOM. [94-05TE] Project complete. New Hampshire 2004 10 (TE) 10. Archaeological planning & research Statewide Statewide $12,000 $0 $3,000 $15,000
NH ARCHEOLOGICAL SOCIETY, OBTAIN RADIOCARBON DATES FOR 29 CARBON SAMPLES FROM ARCHEOLOGICAL SITES IN NH [94-07TE] Project complete. New Hampshire 2000 10 (TE) 10. Archaeological planning & research Statewide Statewide $4,869 $0 $1,217 $6,086
NH 101, DRAINAGE MODIFICATIONS TO PROTECT WATER QUALITY ADJACENT TO DUBLIN LAKE POND [94-01TE] Construction Complete. Project Multi-Funded. New Hampshire 2001 11 (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity Dublin Cheshire $150,297 $0 $37,574 $187,872
NEWPORT ROAD, PLYMOUTH SENIOR CENTER: PHASE 2 - RENOVATE 2ND FLOOR OF THE FORMER B&M RAILROAD STATION CURRENTLY USED AS A REGIONAL SENIOR CENTER, A SCHEDULED STOP FOR THE HOBO RR AND MUSEUM FOR RAILROAD HISTORY IN THE AREA [04-52TE] Construction complete. Project to be closed. New Hampshire 2005 12 (TE) 12. Establishment of transportation museums Plymouth Grafton $287,501 $0 $151,120 $438,621
RAIL STATION, RESTORE TO 19th CENTURY APPEARANCE & RENOVATE AS MUSEUM / MEETING PLACE [94-52TE] Construction Complete. New Hampshire 1999 12 (TE) 12. Establishment of transportation museums Ashland Grafton $177,383 $0 $44,345 $221,729