Project Search Results
Results are best viewed on desktop instead of mobile. Export options are available at bottom.
Project Name | Description | State | Year | Activity | Activity Type | City | County | Federal Funds | ARRA Funds | Local Funds | Total |
---|---|---|---|---|---|---|---|---|---|---|---|
Construct 1,620 ft sidewalk on the west side of Browns Trace north of Jericho Center | Vermont | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Jericho | Chittenden | $48,000 | $0 | $12,000 | $60,000 | |
Scoping study for sidewalks on VT 9, VT 100 and South Main Street | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Wilmington | Windham | $25,000 | $0 | $25,000 | $50,000 | |
Scoping study for North Williston Rd. including shoulder widening and other bike/pedestrian considerations. | Vermont | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Williston | Chittenden | $25,000 | $0 | $25,000 | $50,000 | |
Construct concrete sidewalk with curbing. | Vermont | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Essex | Chittenden | $286,215 | $0 | $71,554 | $357,770 | |
Reconstruct sidewalks, construct new crosswal, apply bicycle sharrows. | Vermont | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | St. Albans | Franklin | $300,000 | $0 | $75,000 | $375,000 | |
Scoping Study for Shared Use Path | Scoping study for a shared Use path options on or near Lake St. and/or Maquam Shore Road. | Vermont | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Swanton | Franklin | $22,500 | $0 | $22,500 | $45,000 |
Scoping study for providing pedestrian and bicycle accomodation on two roads in West Hartford Village, Route 14 and Quechee West Hartford Road | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hartford | Windsor | $14,000 | $0 | $14,000 | $28,000 | |
Lake Shore Drive Shared Use Path | Vermont | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Colchester | Chittenden | $250,000 | $0 | $62,500 | $312,500 | |
Montpelier Bike/Ped Scoping | Vermont | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Montpelier | Washington | $13,500 | $0 | $13,500 | $27,000 | |
Construct 1300 ft of sidewalk on US 5 and Vinegar Lane to Landmark College | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Putney | Windham | $300,000 | $0 | $75,000 | $375,000 | |
Scoping Study for improvements to municipal complex | Scoping study for the area joining the Pomfret Town Office and Town Hall, in order to determine what pedestrian/ADA access and compliance, lighting, and other safety related infrastructure is needed at the municipal complex. | Vermont | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Pomfret | Windsor | $10,000 | $0 | $10,000 | $20,000 |
Scoping study on a the feasibility of installing a sidewalk. | Vermont | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Enosburg | Franklin | $16,500 | $0 | $16,500 | $33,000 | |
Construct 2605 ft of sidewalk on Elm Street, Northfield Street and Towne Hill Road | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Montpelier | Washington | $248,000 | $0 | $62,000 | $310,000 | |
Scoping study for sidewalks and crosswalks around the Elm Street Primary School | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Springfield | Windsor | $15,000 | $0 | $15,000 | $30,000 | |
Scoping study for improvements for bicycle and pedestrian safety along 0.75 miles of East Darling Hill Road | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Burke | Caledonia | $12,250 | $0 | $12,250 | $24,500 | |
Sidewalk Scoping Study - Various Routes | Vermont | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rutland | Rutland | $18,000 | $0 | $18,000 | $36,000 | |
Franklin Lane Scoping Study | Vermont | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bennington | Bennington | $20,250 | $0 | $20,250 | $40,500 | |
VT-15 & Lee River Road Pedestrian Accomodations | Design and Construct 1000-ft. of sidewalk, installation of 2 crosswalks with RRFB's & mountable splitter islands at VT 15 & Lee River Rd intersection. | Vermont | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Jericho | Chittenden | $220,587 | $0 | $55,147 | $275,734 |
Construct five new pedestrian crossings | Vermont | 2015 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Burlington | Chittenden | $220,316 | $0 | $55,079 | $275,395 | |
Scoping study for sidewalks along Mechanic Street from Second St to Fair Haven Union High School | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Fair Haven | Rutland | $15,000 | $0 | $15,000 | $30,000 | |
Stratton Valley Trail Scoping Study | Vermont | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Stratton | Windham | $21,500 | $0 | $21,500 | $43,000 | |
2,032 ft. of sidewalk on from 24 E. Main St. to 88 E. Main St. | Design and construction of a sidewalk on East Main Street, including lighting, retaining walls and crosswalks. | Vermont | 2016 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Wilmington | Windham | $75,000 | $0 | $300,000 | $375,000 |
Scoping study to determine feasibility of constructing a 3000 ft walkway to connect the existing Killington Rd walkway to the Killington Ski Resort | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Killington | Rutland | $15,000 | $0 | $15,000 | $30,000 | |
Winooski Gateway Crosswalks | Construct enhanced crosswalk treatments, including pedestrian activated rectangular rapid flashing beacons, bulb-outs, and associated features at five locations along the gateways to the City of Winooski. | Vermont | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Winooski | Chittenden | $289,000 | $0 | $73,000 | $362,000 |
Hartford Bike/Ped Scoping Study | Vermont | 2013 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Hartford | Windsor | $31,500 | $0 | $31,500 | $63,000 | |
Rutland Creek Path - Segment 4 | This project will supplement funding for the Rutland BIKE(61) project. The project consists of the design & installation of approximately 1,264 feet of a bituminous concrete shared-use path; from the driveway at Monsignor Connor/Meadow Street Park to River Street. Additionally, approximately 396 feet of a 5 foot wide concrete sidewalk will be designed & installed along the north side of River Street; from the front of the Riverside Veterinary Clinic, to meet the existing concrete sidewalk approach at the eastern end of Dorr Drive Bridge. | Vermont | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rutland City | Rutland | $91,142 | $0 | $22,786 | $113,928 |
Applegate-Willowbrook Path | Construct a 480 ft. multi-use path, connecting Applegate apartments to the sidewalk on Willowbrook Drive. | Vermont | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Bennington | Bennington | $78,800 | $0 | $19,700 | $98,500 |
Installation of 3 Rectangular Rapid Flashing Beacons and curb ramps | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Rutland | Rutland | $51,000 | $0 | $12,750 | $63,750 | |
Scoping Study for multi-use path on Elmore Road | To scope the potential to construct a 5,350 foot, multi-¬?‚Äêuse path on the old road bed of the ‚ÄúWorcester -¬?‚Äê Elmore Road (Rt. 12) | Vermont | 2017 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Worcester | Washington | $22,595 | $0 | $22,595 | $45,190 |
Construct 2682 ft of sidewalk and crosswalks on South Street to connect to Union Street to the High School and Howard Dean Education Center | Vermont | 2014 | 101 | (TAP) 101. Construction, planning, and design of on-road and off-road trail facilities | Springfield | Windsor | $300,000 | $0 | $75,000 | $375,000 | |
Create a one-mile active transportation corridor along Benmont Avenue | Vermont | 2016 | 103 | (TAP) 103. Conversion and use of abandoned railroad corridors for trails for pedestrians, bicyclists, or other nonmotorized transportation users | Bennington | Bennington | $62,736 | $0 | $250,944 | $313,680 | |
Determining the feasibility of relocating and restoring the Hectorville Covered Bridge. | Vermont | 2015 | 106 | (TAP) 106. Historic preservation and rehabilitation of historic transportation facilities | Montgomery | Franklin | $11,261 | $0 | $11,261 | $22,522 | |
Construct a Salt Shed near the Black River | Vermont | 2016 | 107 | (TAP) 107. Vegetation management practices in transportation rights-of-way to improve roadway safety, prevent against invasive species, and provide erosion control | Fairfield | Franklin | $75,000 | $0 | $300,000 | $375,000 | |
Vactor Truck | Vactor Truck | Vermont | 2018 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Milton | Chittenden | $300,000 | $0 | $75,000 | $375,000 |
Salt & Sand Shed | Design a new municipal salt & sand shed at the town highway garage | Vermont | 2017 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Enosburg | Franklin | $300,000 | $0 | $75,000 | $375,000 |
Culvert Replacement | Replacement of an elliptical 11 ft culvert with a larger galvanized steel multiplate culvert | Vermont | 2017 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Chester | Windsor | $300,000 | $0 | $75,000 | $375,000 |
Expansion of existing stormwater pond | Expansion of existing stormwater pond | Vermont | 2018 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | S. burlington | Chittenden | $300,000 | $0 | $75,000 | $375,000 |
BMP's in Moorings Stream Watershed | BMP's in Moorings Stream Watershed | Vermont | 2018 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Colchester | Chittenden | $295,200 | $0 | $73,800 | $369,000 |
Retrofit of a detention pond in a wooded area adjacent to Sydney Drive. | Vermont | 2016 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Essex | Chittenden | $60,988 | $0 | $243,953 | $304,942 | |
Relocation of existing muncipal infrastructire out of a floodplain fluvial erosion hazard area to a new location that is not in a floodplain. | Vermont | 2015 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Cabot | Washington | $50,000 | $0 | $12,500 | $62,500 | |
Concrete box culvert | Concrete box culvert | Vermont | 2018 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Newfane | Windham | $160,000 | $0 | $40,000 | $200,000 |
Stormwater improvements along Picard Circle | Design & construction of a stormwater infiltration basin & drainage infrastructure along Picard Circle | Vermont | 2017 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | South Burlington | Chittenden | $229,600 | $0 | $57,400 | $287,000 |
Sub-surface stormwater infiltration system | Sub-surface stormwater infiltration system | Vermont | 2018 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | S. Burlington | Chittenden | $242,000 | $0 | $60,500 | $302,500 |
Construct a gravel wetland for runoff from Creek Condominiums as well as portions of the Village owned road. | Vermont | 2016 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Essex | Chittenden | $35,614 | $0 | $142,456 | $178,070 | |
Replace undersized culverts near the Butler Farms and Oak Creek Village neighborhood | Vermont | 2016 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | S. Burlington | Chittenden | $75,000 | $0 | $300,000 | $375,000 | |
Construct a Gravel wetland stormwater treatment system to treat runoff from Shelburne Bay. | Vermont | 2016 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | S. Burlington | Chittenden | $21,750 | $0 | $87,000 | $108,750 | |
Scoping Study on culverts in Allen Brook Watershed | Scoping Study on culverts in Allen Brook Watershed | Vermont | 2018 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Williston | Chittenden | $15,000 | $0 | $15,000 | $30,000 |
Retrofit of 3 cul-de-sacs with infiltration systems | Retrofit of 3 cul-de-sacs with infiltration systems | Vermont | 2018 | 109 | (TAP) 109. Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to address stormwater management | Essex | Chittenden | $271,139 | $0 | $67,785 | $338,924 |
Town Green: paths, landscaping and fence | Vermont | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Middlebury | Addison | $90,000 | $0 | $22,500 | $112,500 | |
E. Arlington Road Sidewalks | Vermont | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Arlington | Bennington | $175,000 | $0 | $43,750 | $218,750 | |
Upgrade Streets & Sidewalks,Upgrade & Expand Public Park.,Improve Streetscape | Vermont | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Windsor | Windsor | $175,800 | $0 | $75,200 | $251,000 | |
Statewide | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $0 | $457,840 | $114,460 | $572,300 | |
Bennington Sidewalk | Sidewalk, curbing, light poles, landscaping | Vermont | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bennington | Bennington | $150,000 | $0 | $37,500 | $187,500 |
Sidewalk Construction | Vermont | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hartford | Windsor | $87,000 | $0 | $22,170 | $109,170 | |
Thetford | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Thetford | Orange | $210,000 | $0 | $52,500 | $262,500 | |
Hartford Sykes Avenue Sidewalk | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hartford | Windsor | $300,000 | $0 | $75,000 | $375,000 | |
Pedestrian Improvements | Vermont | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Albans | Franklin | $300,000 | $0 | $75,000 | $375,000 | |
Sidewalks | Vermont | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Poultney | Rutland | $54,000 | $0 | $13,500 | $67,500 | |
Lake Champlain Bikeways Rest Stop | Vermont | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Isle Lamotte | Grand Isle | $86,000 | $0 | $22,000 | $108,000 | |
Bike/Ped/Snowmobile Trail - New bridge | Vermont | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Montpelier | Washington | $115,000 | $0 | $28,750 | $143,750 | |
Pulp Mill Bridge Sidewalk Study | Vermont | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Middlebury | Addison | $20,000 | $0 | $5,000 | $25,000 | |
Vergennes Riverwalk | Vermont | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Vergennes | Addison | $158,000 | $0 | $39,500 | $197,500 | |
Cornwall Pedestrian Shoulders | Vermont | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cornwall | Addison | $155,000 | $0 | $38,750 | $193,750 | |
Cavendish Village Sidewalks | Vermont | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cavendish | Windsor | $83,000 | $0 | $22,000 | $105,000 | |
Ped Path/Bike Access, Village-Recrtn Field | Vermont | 1997 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wells River | Orange | $63,085 | $0 | $15,770 | $78,855 | |
Sidewalks | Vermont | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Derby | Orleans | $200,000 | $0 | $50,000 | $250,000 | |
East Poultney Pedestrian Bridge Study | Vermont | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Poultney | Rutland | $16,000 | $0 | $4,000 | $20,000 | |
South Shaftsbury Sidewalk | Vermont | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shaftsbury | Bennington | $73,000 | $0 | $18,250 | $91,250 | |
Montpelier East Pathway | Vermont | 1992 | 1 | (TE) 1. Pedestrian and bicycle facilities | Montpelier | Washington | $383,000 | $0 | $0 | $383,000 | |
Planning for Bike/Ped Improvements | Vermont | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Burlington | Chittenden | $24,000 | $0 | $6,000 | $30,000 | |
Scoping Study, Route 4/100 | Vermont | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Killington | Rutland | $30,000 | $0 | $7,500 | $37,500 | |
Montpelier North Branch Pedestrian Bridge | Vermont | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Montpelier | Washington | $300,000 | $0 | $75,000 | $375,000 | |
Burlington: Flynn Theater Streetlights | Vermont | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Burlington | Chittenden | $80,000 | $0 | $20,000 | $100,000 | |
Shared-use Path Scoping Study | Vermont | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Norwich | Windsor | $28,000 | $0 | $7,000 | $35,000 | |
Island Pond Pedestrian bridge over RR | Vermont | 1992 | 1 | (TE) 1. Pedestrian and bicycle facilities | Island Pond | Essex | $75,120 | $0 | $18,780 | $93,900 | |
Shelburne Falls Pedestrian Study | Vermont | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shelburne | Chittenden | $24,000 | $0 | $6,000 | $30,000 | |
Fairfield Sidewalk Study | Vermont | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairfield | Franklin | $24,000 | $0 | $6,000 | $30,000 | |
Village Pedestrian Scoping Study | Vermont | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Cabot | Washington | $24,000 | $0 | $6,000 | $30,000 | |
Lyndon Path Study | Vermont | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Lyndon | Caledonia | $28,000 | $0 | $7,000 | $35,000 | |
County Transportation Authority Bus Shelters | Vermont | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Burlington | Chittenden | $80,000 | $0 | $20,000 | $100,000 | |
Three Corners Pedestrian Scoping Study | Vermont | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hartland | Windsor | $24,000 | $0 | $6,000 | $30,000 | |
Ludlow Share-use Path Scoping Study | Vermont | 2012 | 1 | (TE) 1. Pedestrian and bicycle facilities | Ludlow | Windsor | $24,000 | $0 | $6,000 | $30,000 | |
Pittsford | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Pittsford | Rutland | $315,369 | $0 | $78,842 | $394,211 | |
Derby Line Sidewalk Study | Vermont | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Derby | Orleans | $25,000 | $0 | $7,000 | $32,000 | |
Pave Existing Bike/Ped Trail | Vermont | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Barre | Washington | $73,000 | $0 | $18,250 | $91,250 | |
Path, Bridge Repair and Sidewalks | Vermont | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Northfield | Washington | $92,000 | $0 | $23,000 | $115,000 | |
Trail Construction | Vermont | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Newbury | Orange | $136,000 | $0 | $34,000 | $170,000 | |
St Johnsbury US Rte 5 Sidewalk | Vermont | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Johnsbury | Caledonia | $40,000 | $0 | $10,000 | $50,000 | |
St. Albans Town Sidewalk Study | Vermont | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Albans | Franklin | $18,000 | $0 | $4,500 | $22,500 | |
Granville Pedestrian Access | Vermont | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | Granville | Addison | $41,771 | $0 | $8,354 | $50,125 | |
Planning on/off Road Bike Path | Vermont | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Burke | Caledonia | $20,000 | $0 | $5,000 | $25,000 | |
Fairfax Sidewalk Study | Vermont | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fairfax | Franklin | $20,000 | $0 | $5,000 | $25,000 | |
Wolcott LVRT Trailhead Study | Vermont | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wolcott | Lamoille | $20,000 | $0 | $5,000 | $25,000 | |
Derby Line Sidewalk Study | Vermont | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Derby Line | Orleans | $20,000 | $0 | $5,000 | $25,000 | |
Sidewalk Scoping Study | Vermont | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | East Montpelier | Washington | $20,000 | $0 | $5,000 | $25,000 | |
Tech. Assistance: Bike/Ped. Planning, Stwde. | Vermont | 1992 | 1 | (TE) 1. Pedestrian and bicycle facilities | Statewide | Statewide | $120,000 | $0 | $30,000 | $150,000 | |
Multi-Use Path & Underpass of Rt.7 | Vermont | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Charlotte | Chittenden | $150,000 | $0 | $37,500 | $187,500 | |
Mt. Independence Historic Site Trails* | Vermont | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Orwell | Addison | $70,000 | $0 | $22,715 | $92,715 | |
Bike/Ped Spot Improvements in Downtown* | Vermont | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Middlebury | Addison | $70,000 | $0 | $22,715 | $92,715 | |
North St. Revitalization, Ph. 1 | Vermont | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Burlington | Chittenden | $92,055 | $0 | $23,014 | $115,069 | |
Ped Improvements, Community Parking Lot | Vermont | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Moretown | Washington | $70,479 | $0 | $22,871 | $93,350 | |
Sidewalks | Vermont | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Bradford | Orange | $138,268 | $0 | $34,567 | $172,835 | |
Pedestrian System and Traffic Calming | Vermont | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Brattleboro | Windham | $220,000 | $0 | $57,053 | $277,053 | |
Pedestrian Walkway & Re-Used Bridge | Vermont | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | West Rutland | Rutland | $71,753 | $0 | $17,938 | $89,691 | |
Stowe Sidewalk Planning | Vermont | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Stowe | Lamoille | $40,000 | $0 | $10,000 | $50,000 | |
Shared-use Path Scoping Study | Vermont | 2011 | 1 | (TE) 1. Pedestrian and bicycle facilities | Stowe | Lamoille | $38,724 | $0 | $9,681 | $48,405 | |
Sidewalks, Landscaping & Hist. Site Marker | Vermont | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wallingford | Rutland | $49,433 | $0 | $12,358 | $61,791 | |
Bike/Ped Lane Addition to Covered Bridge | Vermont | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Middlebury | Addison | $250,000 | $0 | $62,500 | $312,500 | |
Whetstone Brook Pathway | Vermont | 1993 | 1 | (TE) 1. Pedestrian and bicycle facilities | Brattleboro | Windham | $292,000 | $0 | $73,000 | $365,000 | |
North St. Revitalization, Ph. 2 (Streetscaping) | Vermont | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Burlington | Chittenden | $311,200 | $0 | $77,800 | $389,000 | |
Barton Sidewalk Study | Vermont | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Barton | Orleans | $13,000 | $0 | $3,250 | $16,250 | |
Pedestrian Facilities | Vermont | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Stowe | Lamoille | $45,000 | $0 | $21,666 | $66,666 | |
Sidewalk & Path to Rec. Field | Vermont | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Chelsea | Orange | $41,696 | $0 | $10,424 | $52,120 | |
Bike Lane Planning and Demonstration Project | Vermont | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Rutland | Rutland | $45,000 | $0 | $11,250 | $56,250 | |
Burke-Lyndon Bike Path Study | Vermont | 2004 | 1 | (TE) 1. Pedestrian and bicycle facilities | 0 | Caledonia | $17,000 | $0 | $3,400 | $20,400 | |
Bike/Ped Path & Snowmobile Trail Br. Acq. | Vermont | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Montpelier | Washington | $14,000 | $0 | $6,740 | $20,740 | |
Franklin | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Franklin | Franklin | $0 | $84,000 | $21,000 | $105,000 | |
Alburg Streetscape Study | Vermont | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Alburg | Grand Isle | $16,000 | $0 | $4,000 | $20,000 | |
Winhall Sidewalks Study | Vermont | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Winhall | Bennington | $15,000 | $0 | $3,750 | $18,750 | |
Burlington school crosswalk | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Burlington | Chittenden | $105,000 | $0 | $26,250 | $131,250 | |
Chittenden County Transit Authority Bus Shelters | Vermont | 2000 | 1 | (TE) 1. Pedestrian and bicycle facilities | Burlington | Chittenden | $104,000 | $0 | $26,000 | $130,000 | |
Johnson Sidewalks Scoping Study | Vermont | 2007 | 1 | (TE) 1. Pedestrian and bicycle facilities | Johnson | Lamoille | $16,000 | $0 | $4,000 | $20,000 | |
Construct Sidewalk, Landscape Trees* | Vermont | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hinesburg | Chittenden | $104,000 | $0 | $26,000 | $130,000 | |
New Sidewalks in Both Towns | Vermont | 2001 | 1 | (TE) 1. Pedestrian and bicycle facilities | Jericho | Chittenden | $264,000 | $0 | $66,000 | $330,000 | |
Vergennes Sidewalk Study | Vermont | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Vergennes | Addison | $12,000 | $0 | $3,000 | $15,000 | |
Welcome Center & Ped Path* | Vermont | 1996 | 1 | (TE) 1. Pedestrian and bicycle facilities | Wells River | Orange | $112,000 | $0 | $22,400 | $134,400 | |
Essex Crosswalks | Vermont | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | Essex | Chittenden | $46,800 | $0 | $11,700 | $58,500 | |
North Hero | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | North Hero | Grand Isle | $0 | $12,000 | $3,000 | $15,000 | |
Streetscape | Vermont | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Norwich | Windsor | $320,000 | $0 | $80,000 | $400,000 | |
Montpelier | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Montpelier | Washington | $0 | $168,000 | $42,000 | $210,000 | |
Springfield Bike Racks | Vermont | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Springfield | Windsor | $10,000 | $0 | $2,500 | $12,500 | |
Park and Walk Project* | Vermont | 1995 | 1 | (TE) 1. Pedestrian and bicycle facilities | Manchester | Bennington | $41,391 | $0 | $10,348 | $51,739 | |
South Burlington | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | South Burlington | Chittenden | $0 | $158,000 | $39,500 | $197,500 | |
Fair Haven Sidewalk | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Fair Haven | Rutland | $285,000 | $0 | $71,250 | $356,250 | |
Shelburne | Vermont | 2009 | 1 | (TE) 1. Pedestrian and bicycle facilities | Shelburne | Chittenden | $0 | $156,000 | $39,000 | $195,000 | |
Stockbridge Trail Study | Vermont | 2006 | 1 | (TE) 1. Pedestrian and bicycle facilities | Stockbridge | Windsor | $17,000 | $0 | $5,000 | $22,000 | |
Trow Hill Sidewalk | Vermont | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Barre | Washington | $107,536 | $0 | $26,884 | $134,420 | |
Sidewalk Rehabilitation | Vermont | 1998 | 1 | (TE) 1. Pedestrian and bicycle facilities | Hartland | Windsor | $47,000 | $0 | $11,750 | $58,750 | |
Johnson Sidewalk | Vermont | 2010 | 1 | (TE) 1. Pedestrian and bicycle facilities | Johnson | Lamoille | $290,000 | $0 | $72,500 | $362,500 | |
South Strafford sidewalks | Vermont | 2008 | 1 | (TE) 1. Pedestrian and bicycle facilities | Strafford | Orange | $285,000 | $0 | $71,250 | $356,250 | |
St. Albans City Congress St Sidewalk | Vermont | 2002 | 1 | (TE) 1. Pedestrian and bicycle facilities | St. Albans | Franklin | $48,000 | $0 | $12,000 | $60,000 | |
Relocate the Long Trail off of the hwy. | Vermont | 1999 | 1 | (TE) 1. Pedestrian and bicycle facilities | Stowe | Washington | $40,800 | $0 | $10,200 | $51,000 | |
Middlesex Sidewalk Study | Vermont | 2005 | 1 | (TE) 1. Pedestrian and bicycle facilities | Middlesex | Washington | $16,000 | $0 | $4,000 | $20,000 | |
Vermont Safe Kids Bicycle Rodeos | Vermont | 2002 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Statewide | Statewide | $21,000 | $0 | $5,250 | $26,250 | |
Statewide Share the Road Campaign | Vermont | 2005 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Statewide | Statewide | $60,000 | $0 | $15,000 | $75,000 | |
Multi-Towns Bicycle Safety | Vermont | 2009 | 2 | (TE) 2. Pedestrian and bicycle safety and educational activities | Statewide | Statewide | $40,000 | $0 | $10,000 | $50,000 | |
Vermont River Conservancy Land Conservation near Berlin Pond | Vermont | 2000 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Berlin | Washington | $97,500 | $0 | $24,375 | $121,875 | |
Acquire Scenic Easements | Vermont | 2001 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Statewide | Statewide | $68,000 | $0 | $52,000 | $120,000 | |
Sidewalks/Scenic Easement, Rte 2 Corr.* | Vermont | 1997 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Richmond | Chittenden | $351,000 | $0 | $87,750 | $438,750 | |
Acquire Scenic Acreage & Build Ped. Access in State Natural Area | Vermont | 2001 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Granville | Addison | $20,000 | $0 | $36,000 | $56,000 | |
Strafford - Morrill Combined w/'02 | Vermont | 2004 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Strafford | Windsor | $308,960 | $0 | $61,792 | $370,752 | |
Acq. Scenic Easements | Vermont | 1999 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Statewide | Statewide | $585,000 | $0 | $147,000 | $732,000 | |
Sidewalks/Scenic Easement, Rte 2 Corr.* | Vermont | 1997 | 3 | (TE) 3. Acquisition of scenic or historic easements and sites | Richmond | Chittenden | $100,000 | $0 | $25,000 | $125,000 | |
Southern VT. Natural History Museum Scenic Overlook | Vermont | 2000 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Marlboro | Windham | $28,000 | $0 | $7,000 | $35,000 | |
Colchester Visitors Center | Vermont | 2005 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Colchester | Chittenden | $147,000 | $0 | $26,750 | $173,750 | |
15 Roadside Historic Site Markers* | Vermont | 1996 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Statewide | Statewide | $27,000 | $0 | $8,761 | $35,761 | |
Rt. 9 Scenic Road Study | Vermont | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | 0 | Bennington | $26,000 | $0 | $6,500 | $32,500 | |
Pocket Park Along US 5 | Vermont | 2001 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Newbury | Orange | $30,080 | $0 | $9,400 | $39,480 | |
Brandon Stephen Douglas Birthplace | Vermont | 2007 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Brandon | Rutland | $258,000 | $0 | $64,500 | $322,500 | |
Barnes Camp Visitors Center | Vermont | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Stowe | Lamoille | $32,000 | $0 | $8,000 | $40,000 | |
BGS Welcome Center Sculpture Pres. | Vermont | 2011 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Statewide | Statewide | $37,040 | $0 | $9,260 | $46,300 | |
Visitors Center | Vermont | 2002 | 4 | (TE) 4. Scenic or historic highway programs including tourist and welcome centers | Rockingham | Windham | $325,000 | $0 | $82,000 | $407,000 | |
Downtown Signage Demonstration, Beautification | Vermont | 1999 | 5 | (TE) 5. Landscaping and scenic beautification | Rutland | Rutland | $41,069 | $0 | $10,267 | $51,336 | |
Tree Plantings | Vermont | 1998 | 5 | (TE) 5. Landscaping and scenic beautification | Norwich | Windsor | $8,000 | $0 | $0 | $8,000 | |
North Winooski Gateway Streetscape | Vermont | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Burlington | Chittenden | $198,000 | $0 | $50,000 | $248,000 | |
Landscaping & Parking for Historic RR Depot | Vermont | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | Bennington | Bennington | $25,000 | $0 | $6,500 | $31,500 | |
Hinesburg Streetscape | Vermont | 2008 | 5 | (TE) 5. Landscaping and scenic beautification | Hinesburg | Chittenden | $240,000 | $0 | $60,000 | $300,000 | |
West Street Bridge Lighting | Vermont | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Rutland | Rutland | $36,000 | $0 | $9,000 | $45,000 | |
Pocket Park | Vermont | 2002 | 5 | (TE) 5. Landscaping and scenic beautification | Brattleboro | Windham | $215,000 | $0 | $54,000 | $269,000 | |
Construct Gateway Park, Route 2 | Vermont | 1995 | 5 | (TE) 5. Landscaping and scenic beautification | Montpelier | Washington | $75,800 | $0 | $18,950 | $94,750 | |
Historic Downtown Lighting & Landscaping | PROJECT IS FOR REPLACEMENT OF OLD LIGHT POLES, LIGHTING AND ELECTRICAL CONDUIT. REMOVAL OF OLD SIDEWALK & INSTALLATION OF A NEW CONCRETE SIDEWALK ON EAST SIDE OF RAILROAD STREET. INSTALLATION OF NEW STREETSCAPE SIGNAGE, PAVEMENT MARKINGS & TREES. | Vermont | 2001 | 5 | (TE) 5. Landscaping and scenic beautification | St. Johnsbury | Caledonia | $110,400 | $0 | $27,600 | $138,000 |
Barre City Gazebo | Vermont | 2005 | 6 | (TE) 6. Historic preservation | Barre | Washington | $100,000 | $0 | $25,000 | $125,000 | |
Reconstruct Barn for Visitors Center & Trans.Museum at State Historic Site | Vermont | 2001 | 6 | (TE) 6. Historic preservation | Plymouth | Windsor | $300,000 | $0 | $75,000 | $375,000 | |
Bennington | Vermont | 2005 | 6 | (TE) 6. Historic preservation | Bennington | Bennington | $100,000 | $0 | $25,000 | $125,000 | |
Reconstruct Historic Stone Wall | Vermont | 2002 | 6 | (TE) 6. Historic preservation | Manchester | Bennington | $40,000 | $0 | $11,000 | $51,000 | |
Randolph: Restoration of Historic School Facade | Vermont | 2000 | 6 | (TE) 6. Historic preservation | Randolph | Orange | $100,000 | $0 | $25,000 | $125,000 | |
Poultney Reconstruction of Historic Inn to be Visitors' Center | Vermont | 2000 | 6 | (TE) 6. Historic preservation | Poultney | Rutland | $185,500 | $0 | $46,375 | $231,875 | |
Renovation of Historic Bldg for Visitor's Ctr | Vermont | 1995 | 6 | (TE) 6. Historic preservation | Waitsfield | Washington | $200,000 | $0 | $50,000 | $250,000 | |
Locomotive #494 Restoration | Vermont | 1997 | 6 | (TE) 6. Historic preservation | Hartford | Windsor | $82,500 | $0 | $20,625 | $103,125 | |
Vergennes Opera House Truck Traffic Mitigation | Vermont | 2000 | 6 | (TE) 6. Historic preservation | Vergennes | Addison | $200,000 | $0 | $50,000 | $250,000 | |
Springfield Bridge Rehabilitation | Vermont | 2004 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Springfield | Windsor | $760,000 | $0 | $152,000 | $912,000 | |
Pinsly RR Depot Acq. & Rehab. for Visitor Center, & Trail to Granite Mus. | Vermont | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Barre | Washington | $374,500 | $0 | $93,625 | $468,125 | |
Feasibility Study for Union Station Rehab | Vermont | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Brattleboro | Windham | $14,520 | $0 | $3,630 | $18,150 | |
North Bennington Railroad Depot Restoration | Vermont | 1996 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | North Bennington | Bennington | $73,000 | $0 | $26,688 | $99,688 | |
Stone Bridge Rehabilitation | Vermont | 2002 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Putney | Windham | $122,000 | $0 | $41,000 | $163,000 | |
Planning to Restore Covered Bridge | Vermont | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Rutland | Rutland | $10,000 | $0 | $15,000 | $25,000 | |
Covered Bridge Rehabilitation | Vermont | 2008 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Waitsfield | Washington | $270,000 | $0 | $67,500 | $337,500 | |
Marshfield Covered Bridge | Vermont | 2006 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Marshfield | Washington | $188,000 | $0 | $70,000 | $258,000 | |
Stabilize Bridge [Bridge of Flowers & Lights] | Vermont | 1996 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Enosburg Falls | Franklin | $589,916 | $0 | $89,000 | $678,916 | |
Brattleboro Train Depot Improvements | Vermont | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Brattleboro | Windham | $192,000 | $0 | $48,000 | $240,000 | |
Green River Covered Bridge #2 | Vermont | 2012 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Guilford | Windham | $194,000 | $0 | $48,500 | $242,500 | |
Feasibility Study for Restoration of RR station | Vermont | 1998 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Waterbury | Washington | $20,000 | $0 | $5,000 | $25,000 | |
Rockingham Canal Exhibit | Vermont | 2005 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Rockingham | Windham | $21,000 | $0 | $5,250 | $26,250 | |
Develop Book on Hist. Bridges in VT | Vermont | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Statewide | Statewide | $10,000 | $0 | $2,500 | $12,500 | |
Historic Bridge Restoration | Vermont | 1992 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Highgate | Franklin | $90,000 | $0 | $0 | $90,000 | |
Historic Bridge Rehabilitation Fund - Adaptive Re-Use; Statewide | Vermont | 1996 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Statewide | Statewide | $1,445,000 | $0 | $361,250 | $1,806,250 | |
Construct Replica of Historic Schooner | Vermont | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Burlington | Chittenden | $20,000 | $0 | $980,000 | $1,000,000 | |
Hist. Downtown Sidewalks/Lighting* | Vermont | 1997 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Bennington | Bennington | $280,000 | $0 | $70,000 | $350,000 | |
Highgate Iron Truss Bridge Repairs | Vermont | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Highgate | Franklin | $1,002,500 | $0 | $0 | $1,002,500 | |
Wallingford Steel Truss Bridge Rehabilitation | Vermont | 2008 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Wallingford | Rutland | $300,000 | $0 | $75,000 | $375,000 | |
Warren Covered Bridge Restoration | Vermont | 2012 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Warren | Washington | $300,000 | $0 | $75,000 | $375,000 | |
Historic Bridge Restoration | Vermont | 1992 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Townshend | Windham | $28,900 | $0 | $0 | $28,900 | |
Waterbury Train Depot Restoration | Vermont | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Waterbury | Washington | $369,560 | $0 | $92,390 | $461,950 | |
Depot Square Improvements | Vermont | 1995 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Randolph | Orange | $200,000 | $0 | $50,000 | $250,000 | |
Burlington Community Land Trust: Bus Barns Rehabilitation | Vermont | 2000 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Burlington | Chittenden | $220,000 | $0 | $55,000 | $275,000 | |
Swanton Depot Rehab. & RR Interpretive Park Project | Vermont | 2001 | 7 | (TE) 7. Rehabilitation and operation of historic transportation buildings, structures or facilities | Swanton | Franklin | $174,000 | $0 | $43,189 | $217,189 | |
Trailhead Imps. for Missisquoi Valley Rail-Trail | Vermont | 1998 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | 0 | Lamoille | $61,271 | $0 | $0 | $61,271 | |
Feasibility Study for Wilmington Trail | Vermont | 1999 | 8 | (TE) 8. Conversion of abandoned railway corridors to trails | Wilmington | Windham | $32,000 | $0 | $8,000 | $40,000 | |
Underwater Survey for Archeo. Sites | Vermont | 1997 | 10 | (TE) 10. Archaeological planning & research | 0 | Addison | $50,000 | $0 | $19,418 | $69,418 | |
Stormwater Pond | Vermont | 1998 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | South Burlington | Chittenden | $112,600 | $0 | $28,150 | $140,750 | |
Morristown Stormwater Mitigation | Vermont | 2005 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Morristown | Lamoille | $75,000 | $0 | $18,750 | $93,750 | |
Poultney Salt Shed | Vermont | 2008 | 11 | (TE) 11. Environmental mitigation of runoff pollution and provision of wildlife connectivity | Poultney | Rutland | $40,000 | $0 | $10,000 | $50,000 | |
RR Depot, move and rehab for museum | Vermont | 1999 | 12 | (TE) 12. Establishment of transportation museums | Swanton | Franklin | $156,400 | $0 | $39,100 | $195,500 |